Prior art keywords
power failure
power
operation data
screen
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP01529396A
Other languages
Japanese (ja)
Other versions
JPH09212230A (en
Inventor
一夫 大島
則夫 江口
忠司 今村
弘 中村
愼 椿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Priority to JP01529396A priority Critical patent/JP3393633B2/en
Publication of JPH09212230A publication Critical patent/JPH09212230A/en
Application granted granted Critical
Publication of JP3393633B2 publication Critical patent/JP3393633B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、電力の供給を受
けて稼働する施設内の機器を監視制御する監視制御装置
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supervisory control device for supervising and controlling equipment in a facility which receives power and operates.

【0002】[0002]

【従来の技術】従来の監視制御システムの構成を図4に
示す。同図において、1’は中央監視室に設けられたセ
ンタ装置(MCU)、2はビル内に分散配置されたサブ
センタ装置(DCU)、3はデータ伝送線路4によりサ
ブセンタ装置2と接続されたリモートユニット、5はビ
ル内に配置された各種の機器、6は分電盤、7はセンタ
装置1’とサブセンタ装置2との間をつなぐ通信線、8
はCRT、9はキーボード等の入力装置、10はプリン
タである。
2. Description of the Related Art FIG. 4 shows the configuration of a conventional supervisory control system. In the figure, 1'is a center unit (MCU) provided in the central monitoring room, 2 is a sub-center unit (DCU) distributed in the building, and 3 is a remote connected to the sub-center unit 2 by a data transmission line 4. A unit, 5 are various devices arranged in the building, 6 is a distribution board, 7 is a communication line connecting the center device 1 ′ and the sub-center device 2, and 8
Is a CRT, 9 is an input device such as a keyboard, and 10 is a printer.

【0003】センタ装置1’,サブセンタ装置2,リモ
ートユニット3は階層構造に設けられている。リモート
ユニット3(リモートユニット3−1は除く)は機器5
に接続されており、機器5に運転指令を与え、機器5の
状態情報を収集する。分電盤6は電源(商用電源,自家
発電)から電力の供給を受けて各機器5に配電する。ま
た、分電盤6には、リモートユニット3−1が接続され
ている。リモートユニット3−1は電源供給状態情報
(給電/停電)を収集する。
The center device 1 ', the sub-center device 2 and the remote unit 3 are provided in a hierarchical structure. The remote unit 3 (excluding the remote unit 3-1) is the device 5
Is connected to the device 5 and gives an operation command to the device 5 to collect status information of the device 5. The distribution board 6 receives power from a power source (commercial power source, private power generation) and distributes the power to each device 5. A remote unit 3-1 is connected to the distribution board 6. The remote unit 3-1 collects power supply status information (power supply / power failure).

【0004】機器3の状態情報や分電盤6の電源供給状
態情報はリモートユニット3からサブセンタ装置2を介
してセンタ装置1’へ送信される。センタ装置1’は、
リモートユニット3から送信されてくる機器3の状態情
報や分電盤6の電源供給状態情報を、CRT8の画面上
に表示する。
The state information of the equipment 3 and the power supply state information of the distribution board 6 are transmitted from the remote unit 3 to the center unit 1'through the sub center unit 2. The center device 1'is
The status information of the device 3 and the power supply status information of the distribution board 6 transmitted from the remote unit 3 are displayed on the screen of the CRT 8.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の監視制御システムでは、停電が発生した場合
に各機器5がどのような挙動を示すのか、オペレータが
前もって体験することができない。すなわち、稼働中の
ビルで停電を試してみる訳には行かず、実際に停電が生
じた場合にしか体験することができない。このため、実
際の停電に際し、対応が遅れるという問題があった。
However, in such a conventional supervisory control system, the operator cannot experience in advance how each device 5 behaves when a power failure occurs. In other words, you cannot try a power outage in a building that is in operation, and you can experience it only when a power outage actually occurs. Therefore, there is a problem that the response is delayed in case of an actual power failure.

【0006】また、機器5は多種多様であり、復電した
ときに自動的に停電前の状態に復帰するものもあれば、
オペレータが入力装置9から起動の指令を与えなければ
停止したままのものもある。このため、実際に停電が生
じた場合、復電に際してオペレータが対処しにくい。
There are various kinds of devices 5, and some of them automatically return to the state before the power failure when the power is restored.
If the operator does not give a start command from the input device 9, some may remain stopped. Therefore, when a power failure actually occurs, it is difficult for the operator to deal with the power recovery.

【0007】また、機器5の保守点検などの際に、特定
の電源ラインのみの切断により部分停電が生じることが
ある。例えば、図4において、分電盤6から機器5−1
への電源ラインが切断されることがある。このような場
合、分電盤6自体には給電が行われているので、センタ
装置1’は部分停電を認識することができない。しか
し、実際には停電しているので、センタ装置1’側から
見ると機器5−1の挙動がおかしくなる。このような場
合、原因を究明することが困難で、時間がかかる。
Further, during maintenance and inspection of the equipment 5, a partial power failure may occur due to disconnection of only a specific power supply line. For example, in FIG. 4, the distribution board 6 to the device 5-1
The power line to is sometimes disconnected. In such a case, since the distribution board 6 itself is supplied with power, the center device 1 ′ cannot recognize the partial power failure. However, since the power is actually cut off, the behavior of the device 5-1 becomes strange when viewed from the side of the center device 1 '. In such a case, it is difficult and difficult to investigate the cause.

【0008】本発明はこのような課題を解決するために
なされたもので、その目的とするところは、実際の停電
時の状況(全館停電や部分停電など)を疑似的に体験す
ることができ、停電に際しての対応を早めるための一助
として、また機器の挙動がおかしい場合の原因究明の一
助として、その機能を利用することができ、かつ復電に
際してのオペレータの対処を容易とする監視制御装置を
提供することにある。
[0008] The present invention has been made in order to solve such problems, it is an purpose of that, the actual power failure situations (such as the entire power failure or partial power failure) be artificially experience The function can be used to assist in speeding up the response to a power failure, and to investigate the cause when the behavior of the device is abnormal , and to restore power.
An object of the present invention is to provide a supervisory control device that facilitates the operator's handling of the situation.

【0009】[0009]

【課題を解決するための手段】このような目的を達成す
るために、本発明は、各機器の停電時の動作状況を示す
停電時動作データおよび各機器の復電時の動作状況を示
す復電時動作データを記憶した停電シミュレーションデ
ータベース手段と、各機器の設置状況を表す図面情報を
記憶した画面表示用データベース手段と、疑似情報とし
入力される全館停電か部分停電かなどの停電条件に基
づいて停電シミュレーションデータベース手段から所要
の機器の停電時動作データおよび復電時動作データを読
み出すと共に画面表示用データベース手段から所要の図
面情報を読み出し、両者を関係づけた表示情報を出力す
る処理手段と、この処理手段からの表示情報を、復電し
たときに停電前の動作状態に自動復帰する機器と自動復
帰しない機器とに区別して、画面上に表示する表示手段
とを設けたものである。
In order to achieve such an object, the present invention shows the operating status of each device during a power failure.
Shows operation data at power failure and operation status at power recovery of each device
Power failure simulation database means that stores operation data during power recovery , screen display database means that stores drawing information that shows the installation status of each device, and power failure conditions such as a total power failure or a partial power failure that is input as pseudo information Based on
And a processing means for reading out the operation data at the time of a power outage and the operation data at the time of power recovery of the required equipment from the power outage simulation database means, reading out the required drawing information from the screen display database means, and outputting the display information in which the both are related. , the display information from the processing means, the power recovery Mr.
In the event of a power failure, a device that automatically returns to the operating state before the power failure
The display means for displaying on the screen is provided separately from the non-returnable devices .

【0010】[0010]

【0011】[0011]

【0012】この発明によれば、疑似情報として全館停
電か部分停電かなどの停電条件を入力すると、その停電
条件に応じて所要の機器の停電時の動作状況を示す停電
時動作データおよび復電時の動作状況を示す復電時動作
データが読み出されると共に所要の図面情報が読み出さ
れ、両者を関係づけた表示情報が、復電したときに停電
前の動作状態に自動復帰する機器と自動復帰しない機器
とに区別して、画面上に表示される。すなわち、画面表
示用データベース手段から読み出される図面情報より作
成される図面上に、停電シミュレーションデータベース
手段から読み出された機器の停電時動作データと復電時
動作データとが、復電したときに停電前の動作状態に自
動復帰する機器と自動復帰しない機器とが分かるように
表示される。
According to the present invention, the entire building is stopped as pseudo information.
If you enter a power failure condition such as power or partial power failure, the power failure
A power outage that indicates the operating status of the required equipment during a power outage according to the conditions
Power recovery operation showing the time operation data and the operation status at power recovery
When the data is read and the required drawing information is read, the display information that correlates the two is displayed on the screen separately for devices that automatically return to the operating state before the power failure when the power is restored and those that do not. Is displayed in. That is, on the drawing created from the drawing information read from the screen display database means, the power failure operation data and the power recovery operation data of the device read from the power failure simulation database means are blacked out when power is restored. It is displayed so that the device that automatically returns to the previous operating state and the device that does not automatically return can be seen.

【0013】[0013]

【発明の実施の形態】以下、本発明を実施の形態に基づ
き詳細に説明する。図1はこの発明の一実施の形態を示
す監視制御装置の要部を示す図である。同図において、
図4と同一符号は同一、或いは同等構成要素を示す。こ
の実施の形態では、センタ装置1とCRT8と入力装置
9とで監視制御装置が構成されている。センタ装置1
は、図4に示したセンタ装置1’に代わるもので、処理
部1−1,表示制御部1−2,停電シミュレーションデ
ータベース1−3および画面表示用データベース1−4
を備えている。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, the present invention will be described in detail based on embodiments. FIG. 1 is a diagram showing a main part of a supervisory control device showing an embodiment of the present invention. In the figure,
The same reference numerals as those in FIG. 4 indicate the same or equivalent components. In this embodiment, the center device 1, the CRT 8 and the input device 9 constitute a monitor control device. Center device 1
Is a substitute for the center device 1 ′ shown in FIG. 4, and includes a processing unit 1-1, a display control unit 1-2, a power failure simulation database 1-3, and a screen display database 1-4.
Is equipped with.

【0014】停電シミュレーションデータベース1−3
には、図2に示すように、ビル内の各種機器の「機器ア
ドレス」,「機器種類」,「設置場所」,「停電時の動
作データ(停電時動作データ)」,「復電時の動作デー
タ(復電時動作データ)」などの停電に関するデータ
(停電シミュレーションデータ)が記憶されている。な
お、この場合の停電時動作データとは、その機器の停電
時の動作状況を示すデータであり、「OFF」は停電時
にオフ状態になることを示し、「バックアップ有」は停
電時にバックアップ電源により動作を継続することを示
す。また、復電時動作データとは、その機器の復電時の
動作状況を示すデータであり、「自動」は復電したとき
に自動的に停電前の動作状態に自動復帰することを示
し、「手動」は復電したときに自動的に停電前の動作状
態に戻らない、すなわち手動でしか停電前の動作状態に
戻すことができないことを示す。
Power failure simulation database 1-3
As shown in Fig. 2, "device address", "device type", "installation location", "operation data at power failure (operation data at power failure)", "power recovery Data about power failure (power failure simulation data) such as "operation data (operation data at power recovery)" is stored. In this case, the operation data at power failure is the data indicating the operation status at the time of power failure of the device, "OFF" indicates that it will be in the off state at the time of power failure, "Presence of backup" means by the backup power supply at the time of power failure Indicates that the operation is continued. In addition, the power recovery operation data is data indicating the operation status of the device at power recovery, and "automatic" indicates that when power is restored, it automatically returns to the operating state before the power failure. “Manual” means that when the power is restored, the operating state before the power failure is not automatically returned to, that is, the operating state before the power failure can be returned only by manual operation.

【0015】画面表示用データベース1−4にはビル内
における各種機器の設置状況(設置場所や接続関係)を
表す図面情報や指示入力画面を表示するためのデータが
記憶されている。次に、センタ装置1での特徴的な処理
動作について、処理部1−1の機能を交えながら説明す
る。
The screen display database 1-4 stores drawing information indicating the installation status (installation location and connection relationship) of various devices in a building and data for displaying an instruction input screen. Next, a characteristic processing operation in the center device 1 will be described together with the function of the processing section 1-1.

【0016】処理部1−1は、入力装置9を介して停電
シミュレーション画面の表示要求(オペレータからの要
求)があれば、図3(a)に示すような停電条件入力画
面G1をCRT8の画面上に表示する。この停電条件入
力画面G1において、オペレータは、全館停電(全停
電)なのか部分停電なのかを選択する。この場合、停電
条件入力画面G1において、部分停電を選択したとす
る。
If there is a request for displaying a power failure simulation screen (request from the operator) via the input device 9, the processing section 1-1 displays the power failure condition input screen G1 as shown in FIG. Display on top. On this power failure condition input screen G1, the operator selects whether the power failure is the whole building (total power failure) or the partial power failure. In this case, it is assumed that the partial power failure is selected on the power failure condition input screen G1.

【0017】すると、CRT8の画面上には、停電条件
入力画面G1に代えて、図3(b)に示すような部分停
電範囲入力画面G2が表示される。ここで、例えば、
「1階の東側」として部分停電の範囲を入力する。する
と、CRT8の画面上には、部分停電範囲入力画面G2
に代えて、図3(c)に示すような停電シミュレーショ
ン画面G3が表示される。
Then, instead of the power failure condition input screen G1, a partial power failure range input screen G2 as shown in FIG. 3B is displayed on the screen of the CRT 8. Where, for example,
Enter the range of partial power failure as "East side of 1st floor". Then, the partial power failure range input screen G2 is displayed on the screen of the CRT 8.
Instead of this, a power failure simulation screen G3 as shown in FIG. 3 (c) is displayed.

【0018】この停電シミュレーション画面G3には、
「1階の東側」の各機器の停電時の動作状態が、復電し
たときに停電前の動作状態に自動復帰する機器と自動復
帰しない機器とが分かるように表示される。この例で
は、停電時にオフとされる機器のシンボルが黒色(図で
は斜線)で表示され、復電したときに停電前の動作状態
に自動復帰する機器についてはそのシンボルが黒色のま
ま、復電したときに停電前の動作状態に自動復帰しない
機器(手動で復帰させる必要のある機器)についてはそ
のシンボルが黒色でかつ点滅する。なお、図3(c)で
は、便宜上、「1階の東側」の一部の機器しか示してい
ない。
On this power failure simulation screen G3,
The operating status of each device on the "East side of the first floor" at the time of power failure is displayed so that it is possible to see which devices automatically return to the operating status before the power failure when the power is restored and which do not. In this example, the symbol of the device that is turned off at the time of power failure is displayed in black (the diagonal line in the figure), and when the power is restored, the device that automatically returns to the operating state before the power failure remains that symbol and remains For devices that do not automatically return to the operating state before the power failure (devices that need to be manually restored), the symbol is black and blinks. In addition, in FIG.3 (c), for convenience, only a part of device of "the east side of the first floor" is shown.

【0019】停電シミュレーション画面G3のCRT8
の画面上への表示は次のようにして行われる。すなわ
ち、「1階の東側」として部分停電の範囲が入力される
と、すなわち疑似情報として停電条件が入力されると、
処理部1−1は、その停電状況に応じて、停電シミュレ
ーションデータベース1−3から所要の機器の停電時動
作データおよび復電時動作データを読み出すと共に画面
表示用データベース1−4から所要の図面情報を読み出
し、両者を関係づけた表示情報を表示制御部1−2へ送
る。表示制御部1−2は、この処理部1−1からの表示
情報を、復電したときに停電前の動作状態に自動復帰す
る機器と自動復帰しない機器とに区別して、すなわちそ
のシンボルを黒色のままとする機器と黒色でかつ点滅す
る機器とに区別して、CRT8の画面上に表示する。
CRT8 of power failure simulation screen G3
Is displayed on the screen as follows. That is, when the range of partial power outage is input as "the first floor east side", that is, when the power outage condition is input as pseudo information,
The processing unit 1-1 reads out the operation data at the time of the power failure and the operation data at the time of the power recovery of the required equipment from the power outage simulation database 1-3 and the required drawing information from the screen display database 1-4 according to the power outage situation. Is read out and the display information relating them is sent to the display controller 1-2. The display control unit 1-2 distinguishes the display information from the processing unit 1-1 into a device that automatically returns to the operating state before the power failure when the power is restored and a device that does not automatically return, that is, the symbol is black. It is displayed on the screen of the CRT 8 by distinguishing between the device which is left as it is and the device which is black and blinks.

【0020】なお、上述においては、停電条件入力画面
G1において部分停電を選択した場合について説明した
が、全館停電を選択した場合にも同様にして、その停電
シミュレーション画面をCRT8の画面上に表示させる
ことができることは言うまでもない
In the above description, the case where the partial power failure is selected on the power failure condition input screen G1 has been described, but the power failure simulation screen is similarly displayed on the screen of the CRT 8 when the entire building power failure is selected. It goes without saying that you can do it .

【0021】[0021]

【発明の効果】以上説明したことから明らかなように本
発明によれば、疑似情報として全館停電か部分停電かな
どの停電条件を入力すると、その停電条件に応じて所要
の機器の停電時の動作状況を示す停電時動作データおよ
び復電時の動作状況を示す復電時動作データが読み出さ
れると共に所要の図面情報が読み出され、両者を関係づ
けた表示情報が、復電したときに停電前の動作状態に自
動復帰する機器と自動復帰しない機器とに区別して、画
面上に表示されるものとなり、実際の停電時の状況を疑
似的に体験することができ、停電に際しての対応を早め
るための一助として、また機器の挙動がおかしい場合の
原因究明の一助として、その機能を利用することができ
るようになる。また、復電したときに自動復帰する機器
と自動復帰しない機器とが一目で判り、自動復帰しない
機器については復帰指令を与える等の処理を確実に行う
ことが可能となり、復電に際してオペレータの対処が容
易となる。
As is apparent from the above description, according to the present invention, whether the power failure is the whole building or the partial power failure is used as the pseudo information.
If you enter any power outage condition, it will be required according to the power outage condition.
Power failure operation data indicating the operation status of
Power recovery operation data that indicates the operation status at power recovery
At the same time, the required drawing information is read and the two are related.
When the power is restored, the information displayed on the
A device that recovers automatically and a device that does not recover automatically
It will be displayed on the screen and the situation at the time of actual power failure
You can experience a similar experience and quickly respond to power outages
As a way to help, and when the device behaves abnormally
You can use the function as an aid in investigating the cause.
Become so. Also, a device that automatically returns when the power is restored.
And the device that does not automatically recover will not be automatically recovered.
Make sure to perform processing such as giving a return command for equipment
This makes it possible for the operator to handle the power restoration.
It will be easy.

【0022】[0022]

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施の形態を示す監視制御装置の
要部を示す図である。
FIG. 1 is a diagram showing a main part of a supervisory control device showing an embodiment of the present invention.

【図2】 停電シミュレーションデータベースに記憶さ
れた停電シミュレーションデータを例示する図である。
FIG. 2 is a diagram exemplifying power failure simulation data stored in a power failure simulation database.

【図3】 停電条件入力画面、部分停電範囲入力画面お
よび停電シミュレーション画面を例示する図である。
FIG. 3 is a diagram exemplifying a power failure condition input screen, a partial power failure range input screen, and a power failure simulation screen.

【図4】 従来の監視制御システムの構成図である。FIG. 4 is a configuration diagram of a conventional monitoring control system.

【符号の説明】 1…センタ装置、1−1…処理部、1−2…表示制御
部、1−3…停電シミュレーションデータベース、1−
4…画面表示用データベース、8…CRT、9…入力装
置。
[Explanation of Codes] 1 ... Center device, 1-1 ... Processing unit, 1-2 ... Display control unit, 1-3 ... Blackout simulation database, 1-
4 ... Screen display database, 8 ... CRT, 9 ... Input device.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 江口 則夫 東京都港区六本木一丁目4番33号 株式 会社エヌ・ティ・ティ ファシリティー ズ内 (72)発明者 今村 忠司 東京都港区六本木一丁目4番33号 株式 会社エヌ・ティ・ティ ファシリティー ズ内 (72)発明者 中村 弘 東京都渋谷区渋谷2丁目12番19号 山武 ハネウエル株式会社内 (72)発明者 椿 愼 東京都渋谷区渋谷2丁目12番19号 山武 ハネウエル株式会社内 (56)参考文献 特開 平4−208796(JP,A) 特開 平3−11944(JP,A) 特開 昭64−62998(JP,A) (58)調査した分野(Int.Cl.7,DB名) G05B 23/00 - 23/02 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Norio Eguchi 1-43 Roppongi, Minato-ku, Tokyo Inside NTT FACILITIES INC. (72) Inventor Tadashi Imamura 1-chome, Roppongi, Minato-ku, Tokyo No. 4-33 Incorporated NTT FACILITIES (72) Inventor Hiroshi Nakamura 2-12-19 Shibuya, Shibuya-ku, Tokyo Sanmu Honeywell Co., Ltd. (72) Inventor Tsubaki Shibuya Shibuya-ku, Tokyo 2-12 No. 19 Yamatake Honeywell Co., Ltd. (56) Reference JP-A-4-208796 (JP, A) JP-A-3-11944 (JP, A) JP-A-64-62998 (JP, A) ( 58) Fields investigated (Int.Cl. 7 , DB name) G05B 23/00-23/02

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 電力の供給を受けて稼働する施設内の機
器を監視制御する監視制御装置において、各機器の停電時の動作状況を示す停電時動作データおよ
び各機器の復電時の動作状況を示す復電時動作データ
記憶した停電シミュレーションデータベース手段と、 各機器の設置状況を表す図面情報を記憶した画面表示用
データベース手段と、 疑似情報として入力される停電条件に基づいて前記停電
シミュレーションデータベース手段から所要の機器の
電時動作データおよび復電時動作データを読み出すと共
に前記画面表示用データベース手段から所要の図面情報
を読み出し、両者を関係づけた表示情報を出力する処理
手段と、 この処理手段からの表示情報を、復電したときに停電前
の動作状態に自動復帰する機器と自動復帰しない機器と
に区別して、画面上に表示する表示手段とを備えたこと
を特徴とする監視制御装置。
1. In a supervisory control device for supervising and controlling the equipment in a facility that receives power and operates, a power failure operation data indicating the operation status of each equipment during a power failure and
A power failure simulation database means for storing power recovery operation data indicating an operation status of the power recovery of each device beauty, and the screen display database means for storing drawing information indicating the installation status of each device, is input as pseudo data stop of the required equipment from the power failure simulation database means based on that power failure condition
A processing unit that reads out the power-on operation data and the power-on-recovery operation data , reads out the required drawing information from the screen display database unit, and outputs the display information in which the two are related, and the display information from the processing unit , Before power failure when power is restored
Devices that automatically return to the operating state of
And a display means for displaying on the screen.
【請求項2】 電力の供給を受けて稼働する施設内の機
器を監視制御する監視制御装置において、各機器の停電時の動作状況を示す停電時動作データおよ
び各機器の復電時の動作状況を示す復電時動作データ
記憶した停電シミュレーションデータベース手段と、 各機器の設置状況を表す図面情報を記憶した画面表示用
データベース手段と、 疑似情報として入力される全館停電か部分停電かの停電
条件に基づいて前記停電シミュレーションデータベース
手段から所要の機器の停電時動作データおよび復電時動
作データを読み出すと共に前記画面表示用データベース
手段から所要の図面情報を読み出し、両者を関係づけた
表示情報を出力する処理手段と、 この処理手段からの表示情報を、復電したときに停電前
の動作状態に自動復帰する機器と自動復帰しない機器と
に区別して、画面上に表示する表示手段とを備えたこと
を特徴とする監視制御装置。
2. In a supervisory control device for supervising and controlling equipment in a facility that receives power and operates, a power failure operation data indicating an operation status of each equipment at the time of power failure and
A power failure simulation database means for storing power recovery operation data indicating an operation status of the power recovery of each device beauty, and the screen display database means for storing drawing information indicating the installation status of each device, is input as pseudo data Blackout
Based on the conditions, the operation data at the time of a power failure and the power recovery time of the required equipment from the power failure simulation database means
The processing data is read out and the required drawing information is read out from the screen display database means, and the display information relating the two is output, and the display information from this processing means is displayed before the power failure when the power is restored. A monitoring and control apparatus comprising: a display unit for displaying on a screen by distinguishing between a device that automatically returns to an operating state and a device that does not automatically return.
JP01529396A 1996-01-31 1996-01-31 Monitoring and control equipment Expired - Lifetime JP3393633B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP01529396A JP3393633B2 (en) 1996-01-31 1996-01-31 Monitoring and control equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP01529396A JP3393633B2 (en) 1996-01-31 1996-01-31 Monitoring and control equipment

Publications (2)

Publication Number Publication Date
JPH09212230A JPH09212230A (en) 1997-08-15
JP3393633B2 true JP3393633B2 (en) 2003-04-07

Family

ID=11884799

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01529396A Expired - Lifetime JP3393633B2 (en) 1996-01-31 1996-01-31 Monitoring and control equipment

Country Status (1)

Country Link
JP (1) JP3393633B2 (en)

Also Published As

Publication number Publication date
JPH09212230A (en) 1997-08-15

Similar Documents

Publication Publication Date Title
RU2101224C1 (en) System of remote control of lifts in separate buildings
JPH1185853A (en) Coping system for recovery from disaster
JP3393633B2 (en) Monitoring and control equipment
WO2018199012A1 (en) Monitoring control system
WO2018199013A1 (en) Monitoring control system
JP3400227B2 (en) Monitoring and control equipment
JP3264774B2 (en) Building remote management device
JPS596735A (en) Defect notifying system
JPH10108271A (en) Building remote monitoring device
KR101631084B1 (en) Facilities control system
JPH05276178A (en) Home bus system
JP2719578B2 (en) Ticketing system
JP3016934B2 (en) Test equipment for remote monitoring system
JP3290017B2 (en) Centralized monitoring and control device
JP2991263B2 (en) Reproduction equipment for microcomputer board for elevator control
JPH0726796Y2 (en) Failure confirmation device
JP2002109235A (en) Information display system
JPH0993248A (en) Network management system and fault occurrence information transmission method
JPH0879377A (en) On-line transaction processing system
JP2954849B2 (en) Disaster prevention monitoring device
JPH11249865A (en) Display method for plural image display devices in distributed monitoring system
JP3371673B2 (en) Monitoring and control system
JPH05122339A (en) Fault display automatic mask system
JPH0830980B2 (en) Plant monitoring operation device
KR19980036221A (en) Command reservation structure and operation method for operation management of signaling relay switch

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090131

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090131

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100131

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110131

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120131

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130131

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140131

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term