Precast concrete plate unit for outer wall, sabo dam and its construction method

Info

Publication number
JP3384986B2
JP3384986B2 JP26094099A JP26094099A JP3384986B2 JP 3384986 B2 JP3384986 B2 JP 3384986B2 JP 26094099 A JP26094099 A JP 26094099A JP 26094099 A JP26094099 A JP 26094099A JP 3384986 B2 JP3384986 B2 JP 3384986B2
Authority
JP
Japan
Prior art keywords
precast concrete
joining
wall
concrete
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP26094099A
Other languages
Japanese (ja)
Other versions
JP2001081762A (en
Inventor
亮平 黒沢
恵三 田辺
正昭 本多
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurosawa Construction Co Ltd
Original Assignee
Kurosawa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kurosawa Construction Co Ltd filed Critical Kurosawa Construction Co Ltd
Priority to JP26094099A priority Critical patent/JP3384986B2/en
Publication of JP2001081762A publication Critical patent/JP2001081762A/en
Application granted granted Critical
Publication of JP3384986B2 publication Critical patent/JP3384986B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は外壁用プレキャスト
コンクリート板ユニット、砂防ダムおよびその構築工法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast concrete plate unit for an outer wall, a erosion control dam and a construction method thereof.

【0002】[0002]

【従来の技術】従来の砂防ダムは、図10に示すような
コンクリート重力式ダム24が主流となっている。この
施工においては、主要な資材、各種の機材および仮設資
材などを、一般自動車道のない林野を索道によって建設
現場まで運搬していた。
2. Description of the Related Art As a conventional erosion control dam, a concrete gravity dam 24 as shown in FIG. 10 is mainly used. In this construction, major materials, various equipment, and temporary materials were transported to the construction site by a cableway in a forest without an ordinary motorway.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記の砂防ダ
ムの建設においては、主要な資材、各種の機材および仮
設資材などの運搬が困難を極め、かつ施工性が悪いた
め、工事費が通常のコンクリート構造物よりも割り高に
なっていた。また施工におけるコンクリートの打設が索
道を利用するために時間がかかると同時に、冬期におけ
る凍結の問題もあり、品質管理が非常に難しかった。さ
らに掘削土を砂防ダムの周辺で処理していたため周辺環
境を破壊するという問題もあった。
However, in the construction of the above-mentioned erosion control dam, it is extremely difficult to transport main materials, various equipment and temporary materials, and the workability is poor, so that the construction cost is usually low. It was more expensive than the concrete structure. In addition, it takes time to put concrete in the construction because the cableway is used, and there is also a problem of freezing in winter, which makes quality control very difficult. Furthermore, since the excavated soil was processed around the Sabo dam, there was a problem of destroying the surrounding environment.

【0004】本発明は上記のような問題に鑑みてなされ
たものであり、その目的は、短期間で、かつ経済的に構
築することができるとともに、周辺環境を破壊せずに構
築できる外壁用プレキャストコンクリート板ユニット、
砂防ダムおよびその構築工法を提供することである。
The present invention has been made in view of the above problems, and an object thereof is to construct an outer wall which can be constructed in a short period of time and economically and which does not destroy the surrounding environment. Precast concrete board unit,
It is to provide a sabo dam and its construction method.

【0005】[0005]

【課題を解決するための手段】以上の課題を解決するた
めの手段である外壁用プレキャストコンクリート板ユニ
ットの要旨は、二枚のプレキャストコンクリート板と少
なくとも一つのプレキャストコンクリート梁とからな
り、前記二枚のプレキャストコンクリート板を対向さ
せ、その対向面中央部に設けた梁材連結用突出部に前記
のプレキャストコンクリート梁を連結し、前記プレキャ
ストコンクリート板の対向面両側端部には接合用突出部
が設けられ、該接合用突出部は隣接する他の接合用突出
部が接合されて梁材連結用突出部と同じような梁材設置
用突出部を形成するものであることを特徴とする構成で
ある。 また砂防ダムの要旨は、請求項1の外壁用プレキ
ャストコンクリート板ユニットを接合用突出部で接合し
て対向するプレキャストコンクリート板が上流側と下流
側とに位置するようにし、かつ左右方向に1/2ずつず
らした状態で積み重ねて、上側の外壁用プレキャストコ
ンクリート板ユニットのプレキャストコンクリート梁
が、下側の外壁用プレキャストコンクリート板ユニット
の接合用突出部が接合して形成された梁材設置用突出部
上に位置させ、対向するプレキャストコンクリート板で
形成される空間内に中詰め材が充填されて堤体が形成さ
れたことを特徴とする構成である。また砂防ダムの構築
工法の要旨は、渓床から渓岸にかけて基礎を形成し、該
基礎上に請求項1の外壁用プレキャストコンクリート板
ユニットを隣接状態で且つプレキャストコンクリート板
が上流側と下流側に位置するように配設して一段目を構
築し、上流側と下流側とに位置するコンクリートユニッ
ト板間の空間に中詰め材を充填し、その一段目の上部に
同様の外壁用プレキャストコンクリート板ユニットを隣
接状態で且つ左右方向に1/2ずつずらした状態で積み
重ねて二段目を構築し、上側の外壁用プレキャストコン
クリート板ユニットのプレキャストコンクリート梁を、
下側の外壁用プレキャストコンクリート板ユニット同士
の接合用突出部が接合して形成された梁材設置用突出部
上に位置させ、上流側と下流側とに位置するコンクリー
トユニット板間の空間に中詰め材を充填し、以下同様に
して外壁用プレキャストコンクリート板ユニットを積み
重ねて所定高さの堤体を 形成することを特徴とする構成
である。
[Means for Solving the Problems] The gist of the precast concrete plate unit for outer wall, which is a means for solving the above problems, is that two precast concrete plates and two
At least one precast concrete beam
The two precast concrete plates facing each other.
The beam member connecting protrusion provided at the center of the facing surface,
Connect the precast concrete beams of the
Protrusions for joining at both ends of the facing surface of the reinforced concrete plate
Is provided, and the joint protrusion is adjacent to another joint protrusion.
Installation of beams similar to the projections for connecting beams by joining parts
With a configuration characterized in that it forms a protrusion for use in
is there. Further, the gist of the sabo dam is the outer wall precast of claim 1.
Connect the cast concrete plate unit with the joint projection.
Precast concrete plates facing each other upstream and downstream
Be positioned on the right and left sides, and in the left-right direction
The outer pre-cast coke for the outer wall
Precast concrete beam for concrete plate unit
Is a precast concrete board unit for the lower outer wall
Beam installation protrusion formed by joining the above-mentioned joining protrusions
Positioned on top and facing the opposite precast concrete board
The filling material is filled in the space that is formed to form a dam body.
It is a feature that is characterized. Construction of Sabo dam
The outline of the construction method is that the foundation is formed from the stream floor to the shore.
Precast concrete board for outer wall according to claim 1 on a foundation
Precast concrete board with units adjacent to each other
Are arranged so that they are located on the upstream side and the downstream side to form the first stage.
The concrete unit that was built and located on the upstream and downstream sides.
Fill the space between the plates with the filling material and place it on the top of the first stage.
Next to a similar precast concrete board unit for exterior walls
Stacked in contact with each other and shifted by 1/2 in the left-right direction
The second stage is built up by stacking, and the upper wall precast concrete
Precast concrete beam of cleat board unit,
Precast concrete board units for outer walls on the lower side
Beam installation protrusion formed by joining the above-mentioned joining protrusions
Located on the upper side, the concrete located on the upstream side and the downstream side
Fill the space between the unit plates with filling material, and so on.
The precast concrete board unit for the outer wall
A structure characterized by forming a bank with a predetermined height by stacking
Is.

【0006】砂防ダムの上流側および下流側の外壁を簡
単に構築できる外壁用プレキャストコンクリート板ユニ
ットを提供することができる。またプレキャストコンク
リート板の横方向の連結が簡単かつ確実に行えて、砂防
ダムの上流側および下流側の外壁を簡単に構築できる。
またプレキャストコンクリート梁とプレキャストコンク
リート板とが簡単に接合できる。またプレキャストコン
クリート板と梁材とが簡単かつ強固に接合できる。また
梁材連結用突出部及び接合用突出部に緊張材が簡単に挿
通できる。また砂防ダムがプレキャストコンクリート部
材によって構築できる。また上流側および下流側の外壁
用プレキャストコンクリート板同士がプレストレスを付
与されて接合される。また砂防ダムがプレキャストコン
クリート部材によって構築されるので施工性が良く、作
業環境の悪い場所であっても短期間で、かつ経済的に、
しかも周辺環境を破壊せずに構築することができる。ま
た上流側および下流側の外壁用プレキャストコンクリー
ト板同士がプレストレスを付与されて接合される。
The outer walls on the upstream and downstream sides of the Sabo dam are simplified.
Precast concrete plate uni for exterior wall that can be simply constructed
Can be provided. Also precast conc
Lateral connection of the reed plates can be easily and reliably performed, and the sand control
The outer wall on the upstream side and the downstream side of the dam can be easily constructed.
Also precast concrete beams and precast concrete
Can be easily joined to a reed board. See also precast
The cleat plate and the beam can be joined easily and firmly. Also
Tension material can be easily inserted in the beam connecting projection and the joining projection.
I can pass. In addition, the sabo dam is the precast concrete section.
It can be constructed from wood. The outer wall on the upstream and downstream sides
Precast concrete boards for use with each other are prestressed
It is given and joined. In addition, the Sabo dam is a precast
Constructed with cleat members, it has good workability and
Even in a poor working environment, in a short period of time and economically,
Moreover, it can be built without destroying the surrounding environment. Well
Precast concrete for upstream and downstream outer walls
The plates are prestressed and joined together.

【0007】[0007]

【0008】[0008]

【0009】[0009]

【0010】[0010]

【0011】[0011]

【0012】[0012]

【0013】[0013]

【0014】[0014]

【0015】[0015]

【0016】[0016]

【0017】[0017]

【0018】[0018]

【0019】[0019]

【0020】[0020]

【0021】[0021]

【0022】[0022]

【0023】[0023]

【発明の実施の形態】以下、本発明の外壁用プレキャス
トコンクリート板ユニット、砂防ダムおよびその構築工
法の実施の形態を図面に基づいて詳細に説明する。はじ
めに外壁用プレキャストコンクリート板ユニットについ
て説明し、次に砂防ダムおよびその構築工法について説
明する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of an outer wall precast concrete plate unit, a sabo dam and a construction method therefor according to the present invention will be described below in detail with reference to the drawings. First, the precast concrete board unit for outer walls will be explained, and then the sabo dam and its construction method will be explained.

【0024】図1は外壁用プレキャストコンクリート板
の斜視図、図2の(1)は外壁用プレキャストコンクリ
ート板の平面図、(2)は同側面図、図3の(1)はプ
レキャストコンクリート板の斜視図、(2)は同平面
図、(3)は(2)のA−A線断面図である。
FIG. 1 is a perspective view of an outer wall precast concrete plate, FIG. 2 (1) is a plan view of the outer wall precast concrete plate, (2) is a side view of the same, and FIG. 3 (1) is a precast concrete plate. A perspective view, (2) is a plan view of the same, and (3) is a sectional view taken along the line AA of (2).

【0025】外壁用プレキャストコンクリート板ユニッ
ト(以下PC板ユニットという)1は、図1に示すよう
に、対向した二枚のプレキャストコンクリート板(以下
PC板という)2と一つのプレキャストコンクリート梁
(以下PC梁という)3とから平面Hに形成されてい
る。
As shown in FIG. 1, an outer wall precast concrete plate unit (hereinafter referred to as a PC plate unit) 1 includes two facing precast concrete plates (hereinafter referred to as a PC plate) 2 and one precast concrete beam (hereinafter referred to as a PC plate). (Referred to as a beam) 3 to form a plane H.

【0026】前記PC梁3は、PC板2の高さに対応す
る板状を呈するとともに、その上下端縁に膨出部4が形
成され、この膨出部4に貫通した複数の線状または棒状
の連結部材5でPC板2裏面の梁材連結用突出部6に接
合されている。
The PC beam 3 has a plate shape corresponding to the height of the PC plate 2, and bulges 4 are formed at the upper and lower edges of the PC beam 3, and a plurality of linear or linear shapes penetrating the bulges 4 are formed. The rod-shaped connecting member 5 is joined to the beam member connecting protrusion 6 on the rear surface of the PC board 2.

【0027】またPC板2の裏面両側端部には上下に伸
びる接合用突出部7が設けられ、これらのうちの一方の
接合用突出部7の側面には嵌合用凹部7aが設けられ、
他方の接合用突出部7の側面には嵌合用凸部7bがそれ
ぞれ設けられている。また梁材連結用突出部6と接合用
突出部7にはPC鋼線やPC鋼棒などの緊張材8が貫通
する孔9が設けられている。さらにPC板2の上面には
接合突起10が、また下面には接合凹部11がそれぞれ
設けられている。
Further, vertically extending joining protrusions 7 are provided at both ends of the back surface of the PC board 2, and one of these joining protrusions 7 is provided with a fitting recess 7a on its side surface.
Fitting protrusions 7b are respectively provided on the side surfaces of the other joining protrusion 7. Further, the beam member connecting projecting portion 6 and the joining projecting portion 7 are provided with a hole 9 through which a tension material 8 such as a PC steel wire or a PC steel rod penetrates. Further, a joining projection 10 is provided on the upper surface of the PC board 2, and a joining recess 11 is provided on the lower surface thereof.

【0028】なお、前記実施の形態においてPC梁3は
一つであるが、PC板2間に二つ以上設置することもで
き、PC板2の大きさに応じた数のPC梁3を設置する
ものとする。
Although the number of the PC beams 3 is one in the above-mentioned embodiment, two or more PC beams 3 can be installed between the PC plates 2, and the number of the PC beams 3 corresponding to the size of the PC plates 2 can be installed. It shall be.

【0029】図4は、上記のPC板ユニット1を使用し
て構築した砂防ダムの正面図であり、図5の(1)は図
4のB−B線断面図、同図の(2)は(1)のC−C線
断面図、図6は要部の拡大断面図、図7は図5の(2)
のD−D線断面図である。
FIG. 4 is a front view of a sabo dam constructed by using the PC board unit 1 described above. (1) of FIG. 5 is a sectional view taken along line BB of FIG. 4 and (2) of FIG. Is a sectional view taken along the line CC of FIG. 1, (1) is an enlarged sectional view of an essential part, and FIG. 7 is (2) of FIG.
6 is a cross-sectional view taken along line DD of FIG.

【0030】砂防ダム12は渓間における渓床から渓岸
にかけて設けた基礎13と、この上に構築された堤体1
4とから構成されている。この堤体14は、PC板ユニ
ット1をPC板2が上流側と下流側とに位置するように
横方向に敷き並べ、かつ左右方向に1/2ずつずらした
状態で積み重ね、対抗したPC板2で形成された空間部
15に中詰め材16が充填されて構築されている。
The erosion control dam 12 is a foundation 13 extending from the bed in the valley to the shore, and the dam body 1 constructed on the foundation 13.
4 and. The bank body 14 is constructed by laying out the PC board units 1 in a lateral direction so that the PC boards 2 are located on the upstream side and the downstream side, and stacking them in a state of being shifted by 1/2 in the left-right direction, and facing each other. The space 15 formed by 2 is filled with the filling material 16 to be constructed.

【0031】前記各PC板2の横方向は、接合用突出部
7の嵌合用凹部7aと嵌合用凸部7bとが嵌合して接合
され、上下方向はPC板上面の接合突起10と他のPC
板下面の接合凹部11とが嵌合し、かつ梁材連結用突出
部6と接合用突出部7との孔9に貫通されたPC鋼線や
PC鋼棒などの緊張材8でプレストレストが付与されて
接合されている。このように各PC板2が左右上下方向
で一体的に接合されて上流側および下流側の外壁17
a、17bを構築し、これらの外壁17a、17bで囲
まれた空間部15に中詰め材16、すなわち現地発生土
にセメントを混合して製造したソイルコンクリートが充
填されている。
In the lateral direction of each PC board 2, the fitting concave portion 7a and the fitting convex portion 7b of the joining projection 7 are fitted and joined, and the joining projection 10 on the upper surface of the PC board and the like are joined in the vertical direction. PC
Prestressing is provided by a tension member 8 such as a PC steel wire or a PC steel rod that fits into the joint recess 11 on the lower surface of the plate and penetrates through the hole 9 between the beam member connecting protrusion 6 and the connecting protrusion 7. Have been joined. In this way, the respective PC boards 2 are integrally joined in the left-right and up-down directions to form the outer wall 17 on the upstream side and the downstream side.
a, 17b are constructed, and the space portion 15 surrounded by these outer walls 17a, 17b is filled with a filling material 16, that is, soil concrete produced by mixing cement with locally generated soil.

【0032】またPC板ユニット1はPC板2が1/2
ずつ左右方向にづらして積み重ねられているため、PC
梁3も互いにずれた位置、すなわちPC板2の接合用突
出部7を接合して形成した梁材設置用突出部18上に設
置され、ここに設けた支持板19にアンカー筋20で固
定されている。このようにPC板2とPC梁3とが互い
にずれた状態で堤体14が構築されているため、強度が
大きく、かつ安全性の高い砂防ダム12となっている。
In the PC board unit 1, the PC board 2 is 1/2
PCs are stacked one by one in the left-right direction.
The beams 3 are also installed at positions displaced from each other, that is, on the beam material installation projections 18 formed by joining the bonding projections 7 of the PC board 2, and fixed to the support plate 19 provided here by anchor bars 20. ing. Since the dam body 14 is constructed in such a state that the PC plate 2 and the PC beam 3 are displaced from each other, the sabo dam 12 has high strength and high safety.

【0033】次に、上記の砂防ダム12の構築工法につ
いて説明する。はじめに、図1に示すようなPC板ユニ
ット1を工場で製作して、必要な数を現場に搬入する。
このPC板ユニット1はPC板2とPC梁3とを分離し
て別々に現場に運び込み、そこで組み立てることもでき
る。特に、必要な資材などの搬入が困難な現場において
は、このようにすると搬入しやすくなり施工性も向上す
る。
Next, the construction method of the above-mentioned erosion control dam 12 will be explained. First, a PC board unit 1 as shown in FIG. 1 is manufactured in a factory, and the required number is carried into the site.
In this PC board unit 1, the PC board 2 and the PC beam 3 can be separated and carried separately to the site and assembled there. In particular, at a site where it is difficult to carry in necessary materials, this makes it easier to carry in and improves workability.

【0034】次に、砂防ダム12を構築する渓間の渓床
から渓岸にかけて基礎13を構築し、この上に、図8に
示すように、PC板ユニット1を隣接状態でかつPC板
2が上流側と下流側に位置するように配設して一段目2
2を構築する。前記PC板2の接合用突出部の嵌合用凹
部7aと嵌合用凸部7bとを嵌合すると、上流側と下流
側とに位置する一段目のコンクリートユニット板21が
形成される。そして、これらのコンクリートユニット板
21で形成された空間部15に中詰め材16として、現
場発生土とセメントとを混合して製造したソイルコンク
リートを充填する。またPC板2の接合用突出部7同士
を接合すると、梁材連結用突出部6と同じような梁材設
置用突出部18が形成され、ここに支持板19を設置す
る。
Next, a foundation 13 is constructed from the valley floor to the shore where the erosion control dam 12 is constructed, and on top of this, as shown in FIG. The first stage 2 by arranging so that they are located on the upstream side and the downstream side.
Build 2. When the fitting concave portion 7a and the fitting convex portion 7b of the joining protruding portion of the PC board 2 are fitted to each other, the first-stage concrete unit boards 21 located on the upstream side and the downstream side are formed. Then, the space portion 15 formed by these concrete unit plates 21 is filled with the soil concrete manufactured by mixing the site-generated soil and cement as the filling material 16. Further, when the joining protrusions 7 of the PC board 2 are joined together, a beam member installing protrusion 18 similar to the beam member connecting protrusion 6 is formed, and the support plate 19 is installed there.

【0035】次に、上記一段目22の上面に同様のPC
板ユニット1を隣接状態で且つ左右方向に1/2ずつ
らして積み重ねると、PC梁3が梁材設置用突出部6上
に設置されて支持板19のアンカー筋20で固定される
とともに、PC板2の接合用突出部7同士が接合されて
なる梁材設置用突出部18が一段目22のPC梁3の上
面に設置される。
Next, a similar PC is formed on the upper surface of the first stage 22.
When the plate units 1 are stacked adjacent to each other by ½ in the left-right direction, the PC beams 3 are installed on the beam member installation protrusions 6 and fixed by the anchor bars 20 of the support plate 19. At the same time, the beam member installation projection 18 formed by joining the joining projections 7 of the PC board 2 is installed on the upper surface of the PC beam 3 of the first stage 22.

【0036】そして、これらのPC板2によって上流側
と下流側とに位置する二段目のコンクリートユニット板
21が形成され、この間に形成された空間部15に中詰
め材16として、前記と同様のソイルコンクリートを充
填して二段目23を構築する。このPC板ユニット1を
順次重ねていく際に、梁材連結用突出部6と接合用突出
部7とに設けた孔9に緊張材8を貫通させる。
The PC boards 2 form second-stage concrete unit boards 21 located on the upstream side and the downstream side, and the space portion 15 formed between them is used as the filling material 16 as described above. The second stage 23 is constructed by filling it with soil concrete. When the PC board units 1 are successively stacked, the tension member 8 is passed through the holes 9 provided in the beam member connecting protrusion 6 and the joining protrusion 7.

【0037】そして、以下同様の方法でPC板ユニット
1を積み重ねて最終段の高さまで達したら、最上段のコ
ンクリートユニット板21において緊張材8を所定の緊
張力を付与して定着する。これによりプレストレストが
付与された上流側および下流側の外壁17a、17bと
PC梁3と中詰め材16とからなる堤体14が構築され
る。
Then, when the PC board units 1 are stacked in the same manner and reach the final height, the tension members 8 are fixed to the uppermost concrete unit boards 21 by applying a predetermined tension force. As a result, the bank 14 is constructed by the prestressed outer walls 17a and 17b on the upstream and downstream sides, the PC beam 3, and the filling material 16.

【0038】[0038]

【発明の効果】砂防ダムの上流側および下流側の外壁を
簡単に構築できるPC板ユニットを提供することができ
る。
EFFECTS OF THE INVENTION It is possible to provide a PC board unit that can easily construct the outer walls on the upstream side and the downstream side of a sabo dam.

【0039】作業環境の悪い場所であってもPC板ユニ
ットの運搬が簡単に行える。特に、PC板とPC梁とを
分離できるので、現場への運搬が簡単に行える。
The PC board unit can be easily transported even in a poor working environment. In particular, since the PC board and the PC beam can be separated, they can be easily transported to the site.

【0040】PC板同士の横方向の接合が簡単かつ確実
に行える。
It is possible to easily and reliably join the PC boards to each other in the lateral direction.

【0041】PC梁とPC板との接合および分離が簡単
にできる。
It is possible to easily join and separate the PC beam and the PC board.

【0042】梁材連結用突出部および接合用突出部に緊
張材が簡単に挿通できる。
The tension member can be easily inserted into the beam connecting projection and the joining projection.

【0043】プレキャストコンクリート部材により砂防
ダムが構築できる。
A sabo dam can be constructed from precast concrete members.

【0044】上流側および下流側の外壁を、プレストレ
スを付与して構築できる。
The upstream and downstream outer walls can be constructed by prestressing.

【0045】作業環境の悪い場所であっても施工性が良
く、短期間で、かつ経済的に、しかも周辺環境を破壊せ
ずに砂防ダムを構築することができる。
It is possible to construct a sabo dam in a place where the working environment is poor, with good workability, in a short period of time, economically, and without destroying the surrounding environment.

【図面の簡単な説明】[Brief description of drawings]

【図1】PC板ユニットの斜視図である。FIG. 1 is a perspective view of a PC board unit.

【図2】(1)はPC板ユニットの平面図、(2)は同
側面図である。
2A is a plan view of a PC board unit, and FIG. 2B is a side view thereof.

【図3】(1)はPC板の斜視図、(2)は同平面図、
(3)は同側面図、(4)は(2)のA−A線断面図で
ある。
FIG. 3 is a perspective view of a PC board, FIG.
(3) is the same side view, (4) is the sectional view on the AA line of (2).

【図4】砂防ダムの正面図である。FIG. 4 is a front view of a sabo dam.

【図5】(1)は図4のB−B線断面図、(2)は
(1)のC−C線断面図である。
5A is a sectional view taken along line BB of FIG. 4, and FIG. 5B is a sectional view taken along line CC of FIG.

【図6】要部の拡大断面図である。FIG. 6 is an enlarged cross-sectional view of a main part.

【図7】図5の(1)のD−D線断面図である。FIG. 7 is a sectional view taken along line DD of FIG. 5 (1).

【図8】一段目のPC板ユニットを設置した状態の斜視
図である。
FIG. 8 is a perspective view showing a state in which a first-stage PC board unit is installed.

【図9】二段目のPC板ユニットを設置した状態の斜視
図である。
FIG. 9 is a perspective view showing a state in which a second-stage PC board unit is installed.

【図10】従来の砂防ダムの断面図である。FIG. 10 is a cross-sectional view of a conventional sabo dam.

【符号の説明】[Explanation of symbols]

1 PC板ユニット 2 PC板 3 PC梁 4 膨出部 5 連結部材 6 梁材連結用突出部 7 接合用突出部 8 緊張材 9 孔 10 接合突起 11 接合凹部 12 砂防ダム 13 基礎 15 空間部 16 中詰め材 17 外壁 18 梁材設置用突出部 19 支持板 20 アンカー筋 21 コンクリートユニット板 22 一段目 23 二段目 24 コンクリート重力式ダム 1 PC board unit 2 PC board 3 PC beams 4 bulge 5 connecting members 6 Projections for beam connection 7 Joining protrusion 8 tension materials 9 holes 10 Joint protrusion 11 Joint recess 12 Sabo Dam 13 basics 15 Space section 16 filling materials 17 outer wall 18 Projection for beam installation 19 Support plate 20 Anchor muscle 21 Concrete unit board 22 First stage 23 Second stage 24 concrete gravity dam

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平11−21860(JP,A) 特開 平6−185036(JP,A) 特開 平11−21859(JP,A) 特開 平11−117265(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02B 7/02 E02B 7/00 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) Reference JP-A-11-21860 (JP, A) JP-A-6-185036 (JP, A) JP-A-11-21859 (JP, A) JP-A-11- 117265 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) E02B 7/02 E02B 7/00

Claims (8)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 二枚のプレキャストコンクリート板と少
なくとも一つのプレキャストコンクリート梁とからな
り、前記二枚のプレキャストコンクリート板を対向さ
せ、その対向面中央部に設けた梁材連結用突出部に前記
のプレキャストコンクリート梁を連結し、前記プレキャ
ストコンクリート板の対向面両側端部には接合用突出部
が設けられ、該接合用突出部は隣接する他の接合用突出
部が接合されて梁材連結用突出部と同じような梁材設置
用突出部を形成するものであることを特徴とする外壁用
プレキャストコンクリート板ユニット。
1. A precast concrete plate comprising two precast concrete plates and at least one precast concrete beam, said two precast concrete plates are opposed to each other, and said beam member connecting projection is provided at a central portion of said opposing faces.
Connect the precast concrete beams of the
Protrusions for joining at both ends of the facing surface of the reinforced concrete plate
Is provided, and the joint protrusion is adjacent to another joint protrusion.
Installation of beams similar to the projections for connecting beams by joining parts
A precast concrete plate unit for an outer wall, which is characterized in that it forms a projecting portion .
【請求項2】 プレキャストコンクリート梁は、プレキ
ャストコンクリート板の高さに対応する板状を呈すると
ともに、その上下端縁に膨出部を形成したことを特徴と
する請求項1に記載の外壁用プレキャストコンクリート
板ユニット。
2. A precast concrete beam is a precast concrete beam.
When the plate shape corresponding to the height of the cast concrete plate is presented
The precast concrete board unit for outer wall according to claim 1 , wherein bulging portions are formed at upper and lower edges thereof .
【請求項3】 プレキャストコンクリート板とプレキャ
ストコンクリート梁との連結には、複数の線状または棒
状の連結部材が使用されたことを特徴とする請求項1に
記載の外壁用プレキャストコンクリート板ユニット。
3. Precast concrete board and precast
For connection with reinforced concrete beams, use multiple lines or bars.
The precast concrete plate unit for an outer wall according to claim 1, wherein a strip- shaped connecting member is used .
【請求項4】 梁材連結用突出部及び接合用突出部に、
高さ方向にプレストレスを付与するための緊張材が挿通
する孔を設けたことを特徴とする請求項1に記載の外壁
用プレキャストコンクリート板ユニット。
4. A beam member connecting projection and a joining projection,
Tension material for prestressing in the height direction is inserted
The precast concrete board unit for an outer wall according to claim 1, wherein the hole is provided .
【請求項5】 請求項1の外壁用プレキャストコンクリ
ート板ユニットを接合用突出部で連続的に接合して対向
するプレキャストコンクリート板が上流側と下流側とに
位置するようにし、かつ左右方向に1/2ずつずらした
状態で積み重ねて、上側の外壁用プレキャストコンクリ
ート板ユニットのプレキャストコンクリート梁が、下側
の外壁用プレキャストコンクリート板ユニットの接合用
突出部が接合して形成された梁材設置用突出部上に位置
させ、対向するプレキャストコンクリート板で形成され
る空間内に中詰め材が充填されて堤体が形成されたこと
を特徴とする砂防ダム。
5. The precast concrete for outer wall according to claim 1.
The board units are continuously joined at the joining protrusions to face each other.
Precast concrete boards are used on the upstream side and the downstream side.
So that it is positioned and shifted by 1/2 in the left-right direction
Stacked in the state, and then the upper outer wall precast concrete
The precast concrete beam of the board unit is
For joining precast concrete board units for exterior walls of
Located on the beam installation protrusion formed by joining the protrusions
Made of opposing precast concrete plates
A sabo dam characterized by a filling material being filled in the space to form a dam body .
【請求項6】 左右方向に1/2ずつずらした状態で積
み重ねた外壁用プレキャストコンクリート板ユニット
は、積み重ね方向に配設した緊張材でプレストレスが付
与されたことを特徴とする請求項5に記載の砂防ダム。
6. The product is shifted by 1/2 in the left-right direction.
Precast concrete board unit for outer walls
Is pre-stressed with tension material arranged in the stacking direction
Check dams according to claim 5, characterized in that it is given.
【請求項7】 渓床から渓岸にかけて基礎を形成し、該
基礎上に請求項1の外 壁用プレキャストコンクリート板
ユニットを接合用突出部で連続的に接合して且つプレキ
ャストコンクリート板が上流側と下流側に位置するよう
に配設して一段目を構築し、上流側と下流側とに位置す
るコンクリートユニット板間の空間に中詰め材を充填
し、その一段目の上部に同様の外壁用プレキャストコン
クリート板ユニットを接合用突出部で連続的に接合して
且つ左右方向に1/2ずつずらした状態で積み重ねて二
段目を構築し、上側の外壁用プレキャストコンクリート
板ユニットのプレキャストコンクリート梁を、下側の外
壁用プレキャストコンクリート板ユニット同士の接合用
突出部が接合して形成された梁材設置用突出部上に位置
させ、上流側と下流側とに位置するコンクリートユニッ
ト板間の空間に中詰め材を充填し、以下同様にして外壁
用プレキャストコンクリート板ユニットを積み重ねて所
定高さの堤体を形成することを特徴とする砂防ダムの構
築工法。
7. A foundation is formed from a stream bed to a shore,
Outer wall precast concrete plate as claimed in claim 1 on a foundation
The unit is continuously joined with the joining protrusion and
Cast concrete plates should be located upstream and downstream
To form the first stage, and are located on the upstream side and the downstream side.
Filling the space between the concrete unit boards
Then, at the top of the first stage, a similar precast concrete for outer wall
Connect the cleat plate unit continuously with the protrusion for joining.
And stack them in a state that they are shifted by 1/2 in the left-right direction.
Precast concrete for the outer wall of the upper tier
Attach the precast concrete beam of the plate unit to the outer
For joining precast concrete plate units for walls
Located on the beam installation protrusion formed by joining the protrusions
The concrete units located on the upstream side and the downstream side.
Fill the space between the panels with the filling material and do the same in the following.
For stacking precast concrete board units for
A construction method for a sabo dam, which is characterized by forming a bank with a constant height .
【請求項8】 基礎上に複数段積み重ねた外壁用プレキ
ャストコンクリート板ユニットは、基礎との間で緊張材
によってプレストレスが付与されるようにしたことを特
徴とする請求項7に記載の砂防ダムの構築工法。
8. A plaster for an outer wall stacked in a plurality of stages on a foundation
The cast concrete plate unit is a tension member with the foundation.
The construction method of a sabo dam according to claim 7, wherein prestress is applied by the method.
JP26094099A 1999-09-14 1999-09-14 Precast concrete plate unit for outer wall, sabo dam and its construction method Expired - Fee Related JP3384986B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26094099A JP3384986B2 (en) 1999-09-14 1999-09-14 Precast concrete plate unit for outer wall, sabo dam and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26094099A JP3384986B2 (en) 1999-09-14 1999-09-14 Precast concrete plate unit for outer wall, sabo dam and its construction method

Publications (2)

Publication Number Publication Date
JP2001081762A JP2001081762A (en) 2001-03-27
JP3384986B2 true JP3384986B2 (en) 2003-03-10

Family

ID=17354901

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26094099A Expired - Fee Related JP3384986B2 (en) 1999-09-14 1999-09-14 Precast concrete plate unit for outer wall, sabo dam and its construction method

Country Status (1)

Country Link
JP (1) JP3384986B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008291543A (en) * 2007-05-25 2008-12-04 Takamura Sogyo Kk Method of constructing concrete structure by using soil concrete inside
KR101014268B1 (en) * 2008-05-14 2011-02-16 (주)신성엔지니어링 gravel protection panel for gravel ballast
KR101156873B1 (en) * 2009-09-11 2012-06-21 이황의 Upper structure to increase the height of dam/bank levee crown
CN109459327B (en) * 2018-12-24 2024-08-06 石家庄铁道大学 Dynamic deformation characteristic simulation test system for red layer roadbed

Also Published As

Publication number Publication date
JP2001081762A (en) 2001-03-27

Similar Documents

Publication Publication Date Title
US6098357A (en) Modular precast construction block system
KR100609304B1 (en) Precast Composition I-Beam with Concrete Panel and Corrugated Steel Web Girder
JP2000319816A (en) Rigid connection structure of upper and lower composite members
JP6499853B2 (en) Seismic wall structure
KR101833373B1 (en) Precast modular bridge and its construction method
JP2007254974A (en) Prestressed concrete floor slab bridge of composite structure of steel/concrete using shape steel, and construction method of the prestressed concrete floor slab bridge
KR101499337B1 (en) Wide PC beam for slim floor
JP3384986B2 (en) Precast concrete plate unit for outer wall, sabo dam and its construction method
US4452019A (en) Antiseismic reinforcement method for an existing building with a concrete block system
JP2002038420A (en) Corrugated steel plate for bridge
JP2001254319A (en) Upper structure of bridge and its construction method
WO1983000522A1 (en) Building structure, especially air raid shelter
KR20060088308A (en) Multi-h section steel girder compounded part
JP2886364B2 (en) PC composite truss beam and its construction method
JPH08209653A (en) Form block for civil engineering and construction building, building structure using it, and construction thereof
KR102479370B1 (en) Hybrid Composite Girder and Bridge Construction Method Using Thereof
CN212836059U (en) PC prefabricated anti-buckling steel plate shear wall
JP2624479B2 (en) How to build a ramen structure
JPH0270850A (en) Pc coupled beam and execution of construction using same
CN217420236U (en) Semi-rigid assembly type steel coupling beam
JPS627339B2 (en)
CN211665927U (en) Prestress assembling frame structure
JP7284617B2 (en) foundation structure
JP4744027B2 (en) Foundation reinforcement structure
JP2822364B2 (en) Concrete member joining structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081227

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081227

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091227

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101227

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101227

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111227

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121227

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131227

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees