JP3295913B2 - Building unit - Google Patents

Building unit

Info

Publication number
JP3295913B2
JP3295913B2 JP32230093A JP32230093A JP3295913B2 JP 3295913 B2 JP3295913 B2 JP 3295913B2 JP 32230093 A JP32230093 A JP 32230093A JP 32230093 A JP32230093 A JP 32230093A JP 3295913 B2 JP3295913 B2 JP 3295913B2
Authority
JP
Japan
Prior art keywords
ceiling
floor
building unit
refractory material
ceiling beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP32230093A
Other languages
Japanese (ja)
Other versions
JPH07178634A (en
Inventor
徳次 斉藤
廣久 徳成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP32230093A priority Critical patent/JP3295913B2/en
Publication of JPH07178634A publication Critical patent/JPH07178634A/en
Application granted granted Critical
Publication of JP3295913B2 publication Critical patent/JP3295913B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、柱、床梁及び天井梁を
含んで骨組みが構成される建物ユニットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building unit having a framework including columns, floor beams and ceiling beams.

【0002】[0002]

【背景技術】柱、天井梁及び床梁から骨組みが構成され
る建物ユニットを工場にて複数製造し、これらの建物ユ
ニットを現場で組み合わせてユニット建物が建てられ
る。従来には、建物ユニットを製造する方法の一例とし
て、柱、短い床梁及び短い天井梁から妻パネルを製造
し、長い床梁に複数の根太を取り付けて床パネルを製造
し、長い天井梁に天井小梁や面材等からなる天井構成体
を取り付けて天井パネルを製造し、これらのパネルを製
造ラインで接合する方法がある。
2. Description of the Related Art A plurality of building units each having a framework composed of columns, ceiling beams and floor beams are manufactured in a factory, and these building units are combined on site to build a unit building. Conventionally, as an example of a method of manufacturing a building unit, a wife panel is manufactured from a column, a short floor beam, and a short ceiling beam, a plurality of joists are attached to a long floor beam, and a floor panel is manufactured. There is a method of manufacturing a ceiling panel by attaching a ceiling structure composed of ceiling beams, face materials, and the like, and joining these panels on a manufacturing line.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、前述の
建物ユニットの製造方法では、天井構成体の取付作業は
天井梁の下部から行っているので、この取付作業におい
て、作業者は上を向いて釘打ち等の作業を行わなければ
ならず、作業しにくいという問題点がある。さらに、建
物ユニットの天井梁に軟質耐火材が設けられることが考
えられるが、この軟質耐火材を天井梁に効率的に取り付
る構造は従来提供されていない。
However, in the above-described method for manufacturing a building unit, since the work of mounting the ceiling structure is performed from the lower part of the ceiling beam, the worker faces the nail upward in this mounting work. There is a problem that work such as hammering must be performed, which makes it difficult to work. Moreover, although the soft refractory material on the ceiling beams of a building unit is considered be provided efficiently to <br/> only that structure Installing the soft refractory material on the ceiling beams are not provided conventionally.

【0004】本発明の目的は、天井梁に天井構成体と軟
質耐火材を取り付ける作業において、作業者が作業をし
やすい建物ユニットを提供することにある。
[0004] It is an object of the present invention to provide a building unit in which a worker can easily work in attaching a ceiling structure and a soft refractory material to a ceiling beam.

【0005】[0005]

【課題を解決するための手段】そのため、本発明の建物
ユニットは、柱、床梁とともに建物ユニットの骨組みを
構成する天井梁に天井構成体及び軟質耐火材を取り付け
た建物ユニットであって、前記天井梁に前記軟質耐火材
を被覆し、前記軟質耐火材は鉛直被覆部とこの鉛直被覆
部に連接されるとともに前記天井梁の下面に接する下部
被覆部とを備え、前記天井梁にブラケットを取り付け、
このブラケットは、前記天井梁に取り付けられた鉛直部
と、この鉛直部の上端部に形成される上部水平部と、
記鉛直部の下端部に形成される下部水平部と、これらの
水平部に設けられ前記天井構成体を取り付ける前記鉛直
部に向き合う延出部と、を備え、これらの鉛直部と延出
部との間には前記軟質耐火材の鉛直被覆部を収納するス
ペースが形成され、前記下部水平部は、その下面が前記
天井梁より下方であって前記軟質耐火材の下部被覆部の
下面と略同一面となるように形成されることを特徴とす
る。
Therefore, a building unit according to the present invention is a building unit in which a ceiling structure and a soft refractory material are attached to a ceiling beam constituting a framework of the building unit together with columns and floor beams. A ceiling beam is covered with the soft refractory material, the soft refractory material includes a vertical covering portion and a lower covering portion connected to the vertical covering portion and in contact with a lower surface of the ceiling beam, and a bracket is attached to the ceiling beam. ,
The bracket includes a vertical portion attached to the ceiling beam, an upper horizontal portion formed at an upper end portion of the vertical portion, a lower horizontal portion formed at a lower end portion of the vertical portion ,
The vertical, which is provided in a horizontal portion and mounts the ceiling structure
With a extending portion which faces the part, and these are between the vertical portion and the extending portion is formed a space for accommodating the vertical covering portion of the soft refractory material, the lower horizontal portion, a lower surface wherein Below the ceiling beam and the lower covering of the soft refractory material
Characterized in that it is by Uni form a lower surface substantially the same plane.

【0006】[0006]

【作用】本発明では、まず、妻パネルを製造し、床梁に
複数の根太等の部材を取り付けて床パネルを製造し、天
井梁に天井小梁及び面材等からなる天井構成体を釘打ち
等して天井パネルを製造し、その後、これらのパネルの
接合作業を行うが、天井構成体の天井梁への取付作業に
おいて、天井梁に軟質耐火材を被覆した後、天井梁に天
井構成体を取り付けるので、天井梁に軟質耐火材が確実
に被覆されることでこれらの部材の取付作業が容易とな
る。
According to the present invention, first, a wife panel is manufactured, a plurality of members such as joists are attached to the floor beam to manufacture a floor panel, and a ceiling structure composed of a ceiling beam and face materials is nailed to the ceiling beam. The ceiling panels are manufactured by striking, etc., and then these panels are joined.When attaching the ceiling structure to the ceiling beams, the ceiling beams are covered with a soft refractory material and then
The installation of the well structure ensures that the ceiling beam is made of soft refractory material
The work of attaching these members becomes easy
You.

【0007】[0007]

【実施例】以下、本発明の一実施例を図面に基づいて詳
細に説明する。図1は建物ユニットの骨組みを示す概略
構成図である。図1に示される通り、建物ユニット1
は、2本の長い床梁2と、これらの長い床梁2の両端に
立設されるとともに短い床梁2、柱3及び短い天井梁4
から矩形状に形成された2個の妻パネル5と、これらの
妻パネル5の上端に架設される2本の長い天井梁4とか
ら箱型の鉄骨骨組み6が構成されている。前記2本の長
い床梁2の間には複数本の根太7が架設され、2本の長
い天井梁4の間には複数本の天井小梁8が架設されてい
る。この建物ユニット1は、上階建物ユニット1Aや下
階建物ユニット1B等、複数種類用意され、これらの建
物ユニット1A,1Bが基礎の上で組み合わされること
によりユニット式建物が施工される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a schematic configuration diagram showing a framework of a building unit. As shown in FIG. 1, the building unit 1
Are two long floor beams 2, short floor beams 2, columns 3 and short ceiling beams 4 which are erected at both ends of the long floor beams 2.
A box-shaped steel frame 6 is formed from two end panels 5 formed in a rectangular shape from the above, and two long ceiling beams 4 erected at the upper ends of the end panels 5. A plurality of joists 7 are installed between the two long floor beams 2, and a plurality of ceiling beams 8 are installed between the two long ceiling beams 4. A plurality of types of the building units 1 such as an upper-floor building unit 1A and a lower-floor building unit 1B are prepared, and a unit-type building is constructed by combining these building units 1A and 1B on a foundation.

【0008】図2には水平方向に隣合う上階建物ユニッ
ト1Aの床梁2と水平方向に隣合う下階建物ユニット1
Bの天井梁4との耐火構造が示されている。図2におい
て、各上階建物ユニット1Aの床梁2は、それぞれ断面
コ字型に形成されている。これらの床梁2の開口部側に
は梁長手方向に複数の当て部材9がそれぞれ接合され、
これらの当て部材9にはL型の取付具10を介して耐火
性床材であるALC板11が設けられている。このAL
C板11の上には前記根太7が配置され、この根太7の
上には床面材であるパーティクルボード12が配置され
ている。各上階建物ユニット1Aの当て部材9には珪酸
カルシウム板等からなる耐火性板13がそれぞれ隣接し
て設けられ、これらの耐火性板13の上部間には、ジョ
イント材14に上面が固定された耐火性板15が接続さ
れている。この耐火性板15は、現場にて隣合う上階建
物ユニット1Aの2本の床梁2の上に配置され、かつ、
ALC板11及び耐火性板13とともに床梁2の側面及
び上面を覆う構造である。ここで、前記長い床梁2、根
太7、当て部材9、取付具10、ALC板11、パーテ
ィクルボード12及び耐火性板13から床パネル16が
構成される。なお、下階建物ユニット1Bの床部分も上
階建物ユニット1Aと同様の構造である。
FIG. 2 shows a lower-floor building unit 1 horizontally adjacent to a floor beam 2 of an upper-floor building unit 1A horizontally adjacent.
The fireproof structure with the ceiling beam 4 of B is shown. In FIG. 2, the floor beam 2 of each upper-floor building unit 1A is formed in a U-shaped cross section. A plurality of contact members 9 are joined to the opening side of these floor beams 2 in the beam longitudinal direction, respectively.
These contact members 9 are provided with an ALC plate 11 as a fire-resistant floor material via an L-shaped fixture 10. This AL
The joist 7 is arranged on the C plate 11, and a particle board 12 as a floor material is arranged on the joist 7. A fire-resistant plate 13 made of a calcium silicate plate or the like is provided adjacent to the contact member 9 of each upper-floor building unit 1A, and an upper surface is fixed to a joint member 14 between upper portions of the fire-resistant plates 13. The refractory plate 15 is connected. This refractory plate 15 is arranged on two floor beams 2 of the adjacent upper-floor building unit 1A at the site, and
This structure covers the side and top surfaces of the floor beam 2 together with the ALC plate 11 and the refractory plate 13. Here, the floor panel 16 is composed of the long floor beam 2, the joist 7, the abutment member 9, the fixture 10, the ALC plate 11, the particle board 12, and the fireproof plate 13. The floor of the lower-floor building unit 1B has the same structure as the upper-floor building unit 1A.

【0009】各下階建物ユニット1Bの天井梁4は、そ
れぞれ断面コ字型に形成されている。これらの天井梁4
の開口部側には梁長手方向に複数の当て部材17がそれ
ぞれ接合され、これらの当て部材17及び天井梁4は軟
質耐火材18(商品名;フレックスガード〔ニチアス社
製〕)で連続被覆されている。図2中、左側に配置され
た下階建物ユニット1Bでは、前記軟質耐火材18は、
前記ALC板11の下面に接続する水平部18Aと、こ
の水平部18Aと連設されるとともに当て部材17に接
する鉛直被覆部18Bと、この鉛直被覆部18Bに連設
されるとともに天井梁4の下面に接する下部被覆部18
Cとから構成されている。図2中、右側に配置された下
階建物ユニット1Bでは、前記軟質耐火材18は、前記
水平部18A、前記鉛直被覆部18B、前記下部被覆部
18C及びこの下部被覆部18Cに連設されるとともに
隣合う天井梁4に挟持される延長部18Dから構成され
ている。
The ceiling beam 4 of each lower-floor building unit 1B is formed in a U-shaped cross section. These ceiling beams 4
A plurality of contact members 17 are respectively joined to the opening side of the beam in the longitudinal direction of the beam, and these contact members 17 and the ceiling beam 4 are continuously covered with a soft refractory material 18 (trade name: Flexguard [Nichias Corporation]). ing. In the lower-floor building unit 1B arranged on the left side in FIG. 2, the soft refractory 18 is
A horizontal portion 18A connected to the lower surface of the ALC plate 11, a vertical covering portion 18B connected to the horizontal portion 18A and in contact with the abutment member 17, and a vertical covering portion 18B connected to the vertical covering portion 18B and Lower covering portion 18 in contact with the lower surface
C. In the lower-floor building unit 1B arranged on the right side in FIG. 2, the soft refractory material 18 is connected to the horizontal portion 18A, the vertical covering portion 18B, the lower covering portion 18C, and the lower covering portion 18C. And an extension 18D sandwiched between adjacent ceiling beams 4.

【0010】前記軟質耐火材18の水平部18Aは、そ
の下部がブラケット19で支持されている。このブラケ
ット19は1本の天井梁4に対して梁長手方向に複数設
けられており、それぞれ当て部材17に固定されてい
る。ブラケット19は当て部材17に固定された鉛直部
19Aと、この鉛直部19Aの上端部に形成されるとと
もに前記水平部18Aを支持する上部水平部としての
平支持部19Bと、この水平支持部19Bの中間部から
下方に突出するように形成される上部延出部19Cと、
鉛直部19Aの下端部に形成されるとともに前記水平部
18Aと平行な下部水平部19Dと、この下部水平部1
9Dの端部から上方に突出するように形成される下部延
出部19Eとから略コ字型に形成され、上部及び下部延
出部19C,19Dと鉛直部19Aとの間に軟質耐火材
18の鉛直被覆部18Bを収納するスペース19Fが形
成された構造である。
The lower portion of the horizontal portion 18 A of the soft refractory material 18 is supported by a bracket 19. A plurality of the brackets 19 are provided for one ceiling beam 4 in the beam longitudinal direction, and are respectively fixed to the contact members 17. The bracket 19 includes a vertical portion 19A fixed to the contact member 17, a horizontal support portion 19B formed at an upper end portion of the vertical portion 19A and serving as an upper horizontal portion for supporting the horizontal portion 18A. An upper extension 19C formed to protrude downward from an intermediate portion of the horizontal support 19B;
A lower horizontal portion 19D formed at the lower end of the vertical portion 19A and parallel to the horizontal portion 18A;
And a lower extension 19E formed so as to protrude upward from the end of 9D. A soft refractory material 18 is formed between the upper and lower extensions 19C and 19D and the vertical portion 19A. Is formed in a space 19F for accommodating the vertical covering portion 18B.

【0011】前記上部及び下部延出部19C,19Eに
は、前記天井小梁8を取り付けた通し材20が釘21A
により取り付けられている。前記天井小梁8の下部には
面材22が釘21Bにより取り付けられている。この面
材22と連設して板材23が釘21C,21Dによりブ
ラケット19の下部水平部19D及び通し材20に取り
付けられている。ここにおいて、天井小梁8、通し材2
0、面材22及び板材23から天井構成体24が構成さ
れ、このうち、板材23は天井梁4に被覆された軟質耐
火材18をこの天井梁4に押さえつける突出部である。
さらに、前記天井構成体24、天井梁4、当て部材1
7、軟質耐火材18及びブラケット19から天井パネル
25が構成されている。また、隣合う下階建物ユニット
1Bの天井パネル25を接続するようにジョイント板2
6が設けられている。なお、上階建物ユニット1Aの天
井部も下階建物ユニット1Bと同様の構造である。
At the upper and lower extensions 19C and 19E, a thread member 20 to which the ceiling beam 8 is attached is nailed 21A.
It is attached by. A face member 22 is attached to a lower portion of the ceiling beam 8 with a nail 21B. A plate member 23 is attached to the lower horizontal portion 19D of the bracket 19 and the through member 20 by nails 21C and 21D so as to be connected to the face member 22. Here, the ceiling beam 8 and the passing member 2
The ceiling member 24 is composed of the surface member 22 and the plate member 23, and the plate member 23 is a protrusion that presses the soft refractory material 18 coated on the ceiling beam 4 against the ceiling beam 4.
Further, the ceiling structure 24, the ceiling beam 4, the contact member 1
7. The ceiling panel 25 is composed of the soft refractory material 18 and the bracket 19. Also, the joint plate 2 is connected to connect the ceiling panels 25 of the adjacent lower-floor building unit 1B.
6 are provided. The ceiling of the upper floor building unit 1A has the same structure as the lower floor building unit 1B.

【0012】次に、本実施例のユニット式建物の施工方
法について図3から図6に基づいて説明する。まず、建
物ユニット1の製造方法について説明する。図6で示し
た妻パネル5、床パネル16及び天井パネル25を別の
製造ラインで製造する。妻パネル製造ラインでは、2本
の柱3及び2本の短い天井梁4の端部同士を溶接等して
矩形状の妻パネル5を製造する。床パネル製造ラインで
は、2本の長い床梁2にそれぞれ当て部材9を溶接し、
この当て部材9に取付具10を介してALC板11を設
け、このALC板11の上において複数本の根太7を長
い床梁2間に架設し、当て部材9の側面を耐火性板13
で覆い、根太7の上にパーティクルボード12を配置し
て床パネル16を製造する。
Next, a method of constructing a unit building according to the present embodiment will be described with reference to FIGS. First, a method for manufacturing the building unit 1 will be described. The wife panel 5, floor panel 16 and ceiling panel 25 shown in FIG. 6 are manufactured by another manufacturing line. In the wife panel production line, the end portions of the two columns 3 and the two short ceiling beams 4 are welded or the like to produce the rectangular wife panel 5. In the floor panel manufacturing line, the contact members 9 are welded to the two long floor beams 2, respectively.
An ALC plate 11 is provided on the contact member 9 via a fixture 10, a plurality of joists 7 are installed between the long floor beams 2 on the ALC plate 11, and the side surface of the contact member 9 is connected to a fire-resistant plate 13.
Then, the particle board 12 is arranged on the joist 7 to manufacture the floor panel 16.

【0013】天井パネル製造ラインでは、2本の長い天
井梁4にそれぞれ複数の当て部材17を溶接し、各当て
部材17にブラケット19を溶接する。ブラケット19
が設けられた天井梁4に軟質耐火材18を被覆するが、
そのため、図3に示される通り、軟質耐火材18に予め
T字型の切り込み18Eを形成し、この切り込み18E
の端部を開いてブラケット19を挿入するとともにブラ
ケット19のスペース19Fに軟質耐火材18の鉛直被
覆部18Bを収納する。その後、2本の通し材20の間
に複数本の天井小梁8を架設し、これらの天井小梁8に
面材22を釘21Bで取り付け、さらに、通し材20に
板材23を釘21Dで取り付けて天井構成体24を製造
する。
In the ceiling panel production line, a plurality of contact members 17 are welded to two long ceiling beams 4, respectively, and a bracket 19 is welded to each of the contact members 17. Bracket 19
Is coated with a soft refractory material 18 on the ceiling beam 4 provided with
Therefore, as shown in FIG. 3, a T-shaped cut 18E is previously formed in the soft refractory material 18, and this cut 18E is formed.
Is opened, and the bracket 19 is inserted, and the vertical covering portion 18B of the soft refractory material 18 is stored in the space 19F of the bracket 19. Thereafter, a plurality of ceiling beams 8 are erected between the two through members 20, the face members 22 are attached to these ceiling beams 8 with nails 21B, and the plate members 23 are attached to the through members 20 with nails 21D. The ceiling structure 24 is manufactured by mounting.

【0014】図4に示される通り、この天井構成体24
を軟質耐火材18が被覆された天井梁4に釘21Cによ
り取り付けて天井パネル25を製造する。天井構成体2
4の天井梁4への取付作業は、天井梁4と天井構成体2
4の両方の上下を逆にした状態で行う。天井構成体24
が取り付けられた状態が図5に示されている。なお、軟
質耐火材18をブラケット19に取り付けるために形成
した切り込み18Eは、その端部間を密接させ、確実に
断熱できるようにする。
As shown in FIG. 4, this ceiling structure 24
Is attached to the ceiling beam 4 covered with the soft refractory material 18 with the nail 21C to manufacture the ceiling panel 25. Ceiling structure 2
The mounting work of the ceiling beam 4 to the ceiling beam 4 is performed by the ceiling beam 4 and the ceiling structure 2.
4 is performed in a state where both sides are turned upside down. Ceiling structure 24
5 is shown in FIG. The notch 18E formed for attaching the soft refractory material 18 to the bracket 19 makes the ends of the notch 18E close to each other so that the heat can be reliably insulated.

【0015】妻パネル5、床パネル16及び天井パネル
25を製造した後、図6に示される通り、妻パネル5、
床パネル16及び天井パネル25を接合して建物ユニッ
ト1を組み立てる。この組み立て作業は、天井パネル2
5の上下を元に戻して行う。建物ユニット1を上階建物
ユニット1Aや下階建物ユニット1B等の複数種類製造
する。次に、これらのユニット1A,1Bを建設現場ま
で搬送し、基礎の上に複数の上階建物ユニット1Aを並
べ、これらの上階建物ユニット1Aの上に下階建物ユニ
ット1Bを載置してユニット式建物が施工される。ここ
で、下階建物ユニット1Bの上に上階建物ユニット1A
を載置する際、下階建物ユニット1Bに設けられた軟質
耐火材18の水平部18Aの全面にわたり上階建物ユニ
ット1AのALC板11が当接し、これらの軟質耐火材
18とALC板11とで床梁2と天井梁4との間が確実
かつ迅速に覆われる。その後、上階建物ユニット1A同
士の継ぎ目にジョイント材14が固定された耐火性板1
5を配置し、さらに、下階建物ユニット1B同士の継ぎ
目にジョイント板26を設ける。
After manufacturing the wife panel 5, floor panel 16 and ceiling panel 25, as shown in FIG.
The building unit 1 is assembled by joining the floor panel 16 and the ceiling panel 25. This assembly work is performed on the ceiling panel 2
5 is performed upside down. A plurality of types of building units 1 such as an upper floor building unit 1A and a lower floor building unit 1B are manufactured. Next, these units 1A and 1B are transported to a construction site, a plurality of upper-floor building units 1A are arranged on a foundation, and a lower-floor building unit 1B is placed on these upper-floor building units 1A. A unit building will be constructed. Here, the upper-floor building unit 1A is placed on the lower-floor building unit 1B.
When the ALC board 11 of the upper-floor building unit 1A abuts on the entire horizontal portion 18A of the soft refractory material 18 provided in the lower-floor building unit 1B, the soft refractory material 18 and the ALC board 11 Thus, the space between the floor beam 2 and the ceiling beam 4 is reliably and quickly covered. After that, the refractory plate 1 with the joint material 14 fixed to the joint between the upper-floor building units 1A
5, and a joint plate 26 is provided at a joint between the lower-floor building units 1B.

【0016】従って、本実施例によれば、天井梁4に天
井構成体24を取り付ける作業において、天井梁4と天
井構成体24の両方の上下を逆にしたから、作業員が下
向きで釘打ち等の取付作業を容易に行える。さらに、妻
パネル5、床パネル16及び天井パネル25を別の製造
ラインで製造した後、これらのパネル5,16,25を
接合する製造ラインで建物ユニット1を製造し、前記天
井梁4の天井構成体24への取付作業を天井パネル25
の製造ラインで行ったから、前記取付作業を既存の製造
ラインの中で行え、製造設備を有効利用できる。また、
天井構成体24は突出部である板材23を備え、この板
材23で天井梁4に被覆された軟質耐火材18をこの天
井梁4に押さえつけるようにしたから、天井構成体24
を取り付けることにより軟質耐火材18を固定できる。
従って、建物ユニット1を現場まで搬送する時に天井梁
4に被覆された軟質耐火材18がずれることはない。
Therefore, according to the present embodiment, since the ceiling beam 24 and the ceiling beam 24 are turned upside down in the work of attaching the ceiling beam 24 to the ceiling beam 4, the worker nails downward. Etc. can be easily performed. Further, after the wife panel 5, floor panel 16 and ceiling panel 25 are manufactured on separate manufacturing lines, the building unit 1 is manufactured on a manufacturing line joining these panels 5, 16 and 25, and the ceiling of the ceiling beam 4 is manufactured. Installation work to the structural body 24 is performed by the ceiling panel 25.
The mounting work can be performed in the existing manufacturing line, and the manufacturing equipment can be used effectively. Also,
The ceiling member 24 includes a plate member 23 as a projecting portion, and the soft refractory material 18 covered by the ceiling member 4 with the plate member 23 is pressed against the ceiling beam 4.
By attaching the refractory material, the soft refractory material 18 can be fixed.
Therefore, when the building unit 1 is transported to the site, the soft refractory 18 covered by the ceiling beam 4 does not shift.

【0017】また、本実施例では、下階建物ユニット1
Bの天井梁4を被覆した軟質耐火材18に水平部18A
を形成し、この水平部18Aの下部を支持するブラケッ
ト19をこの天井梁4に取り付けたから、下階建物ユニ
ット1Bの上に上階建物ユニット1Aを載置することに
より、上下ユニット1A,1B間の耐火構造の施工が現
場にて迅速かつ確実に行える。さらに、ブラケット19
は、天井小梁8を天井梁4に取り付けるためのものであ
るから、部品点数の減少を図ることができる。さらにま
た、ブラケット19は、当て部材17に固定された鉛直
部19Aと、この鉛直部19Aの上端部に形成されると
ともに前記水平部18Aを支持する水平支持部19B
と、この水平支持部19Bの中間部から下方に突出する
ように形成される上部延出部19Cと、鉛直部19Aの
下端部に形成されるとともに前記水平部18Aと平行な
下部水平部19Dと、この下部水平部19Dの端部から
上方に突出するように形成される下部延出部19Eとか
ら略コ字型に形成され、上部及び下部延出部19C,1
9Dと鉛直部19Aとの間に軟質耐火材18の鉛直被覆
部18Bを収納するスペース19Fが形成された構造と
したから、天井小梁8の天井梁4への取り付けと軟質耐
火材18の支持とをコンパクトに行うことができる。
In this embodiment, the lower-floor building unit 1
A horizontal portion 18A is attached to the soft refractory material 18 covering the ceiling beam 4 of B.
And the bracket 19 for supporting the lower portion of the horizontal portion 18A is attached to the ceiling beam 4, so that the upper floor building unit 1A is placed on the lower floor building unit 1B, so that the upper and lower units 1A and 1B The construction of the refractory structure can be performed quickly and reliably on site. Further, the bracket 19
Is for attaching the ceiling beam 8 to the ceiling beam 4, so that the number of parts can be reduced. Furthermore, the bracket 19 has a vertical portion 19A fixed to the contact member 17, and a horizontal support portion 19B formed at the upper end of the vertical portion 19A and supporting the horizontal portion 18A.
An upper extension 19C formed so as to protrude downward from an intermediate portion of the horizontal support portion 19B; and a lower horizontal portion 19D formed at the lower end of the vertical portion 19A and parallel to the horizontal portion 18A. The lower horizontal portion 19D is formed in a substantially U-shape from a lower extension portion 19E formed to protrude upward from an end of the lower horizontal portion 19D, and the upper and lower extension portions 19C, 1C are formed.
Since the space 19F for accommodating the vertical covering portion 18B of the soft refractory material 18 is formed between the 9D and the vertical portion 19A, the ceiling beam 8 is attached to the ceiling beam 4 and the soft refractory material 18 is supported. And can be performed compactly.

【0018】なお、前記実施例では、天井構成体24の
天井梁4への取り付けを釘21Cで行ったが、釘21C
に代えてボルトやビス等の適宜な固定具を使用できる。
さらに、前記天井構成体24の天井梁4への取付作業
は、必ずしも前述の製造ラインで行うことを要しない。
また、天井小梁8、通し材20、面材22及び板材23
から天井構成体24を構成したが、この天井構成体24
の構成は、ユニットの用途により異なるものであり、よ
って、板材23を必ずしも設けることを要しない。さら
に、前記実施例では、上階建物ユニット1A及び下階建
物ユニット1Bを同じ構造としたが、本発明では、上階
建物ユニット1Aの床梁2にALC板11を取り付け、
下階建物ユニット1Bの天井梁4を軟質耐火材18で被
覆した構造であれば、各ユニット1A,1Bの用途に応
じてその構造が相違してもよい。
[0018] In the above embodiment, the attachment to the ceiling beams 4 of the ceiling structure 24 was carried out with nails 21C, nail 21C
Instead, an appropriate fixing tool such as a bolt or a screw can be used.
Further, the work of attaching the ceiling structure 24 to the ceiling beam 4 does not necessarily need to be performed on the above-described production line.
In addition, the ceiling beam 8, the through member 20, the face member 22, and the plate member 23
From the ceiling structure 24,
Is different depending on the use of the unit. Therefore, it is not always necessary to provide the plate member 23. Further, in the above embodiment, the upper-floor building unit 1A and the lower-floor building unit 1B have the same structure. However, in the present invention, the ALC plate 11 is attached to the floor beam 2 of the upper-floor building unit 1A.
As long as the ceiling beam 4 of the lower-floor building unit 1B is covered with the soft refractory material 18, the structure may be different depending on the use of each unit 1A, 1B.

【0019】[0019]

【発明の効果】以上の通り、本発明によれば、天井梁に
天井構成体と軟質耐火材を取り付ける作業において、天
井梁に軟質耐火材を被覆し、天井梁に天井構成体を取り
付けたから、軟質耐火材を天井梁に確実に被覆するこ
でき、これらの部材の取付作業が容易となる。
As described above, according to the present invention, in the work of attaching the ceiling structure and the soft refractory material to the ceiling beam, the ceiling beam is covered with the soft refractory material and the ceiling beam is attached to the ceiling beam. and certainty covered child soft refractory material to the ceiling beams
And the work of attaching these members becomes easy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】建物ユニットの骨組みを示す概略構成図であ
る。
FIG. 1 is a schematic configuration diagram showing a framework of a building unit.

【図2】隣合う上階建物ユニットの床梁と隣合う下階建
物ユニットの天井梁との耐火構造の断面図である。
FIG. 2 is a cross-sectional view of a fireproof structure of a floor beam of an adjacent upper floor building unit and a ceiling beam of an adjacent lower floor building unit.

【図3】床梁に軟質耐火材を取り付ける状態を示す斜視
図である。
FIG. 3 is a perspective view showing a state in which a soft refractory material is attached to a floor beam.

【図4】天井構成体を天井梁に取り付ける状態を示す斜
視図である。
FIG. 4 is a perspective view showing a state in which the ceiling structure is attached to a ceiling beam.

【図5】天井構成体を天井梁に取り付けた後の状態を示
す斜視図である。
FIG. 5 is a perspective view showing a state after the ceiling structure is attached to a ceiling beam.

【図6】建物ユニットを製造する方法を説明する概略図
である。
FIG. 6 is a schematic diagram illustrating a method for manufacturing a building unit.

【符号の説明】[Explanation of symbols]

1 建物ユニット 1A 上階建物ユニット 1B 下階建物ユニット 2 床梁 3 柱 4 天井梁 5 妻パネル 6 骨組み 16 床パネル 23 突出部である板材 24 天井構成体 25 天井パネル DESCRIPTION OF SYMBOLS 1 Building unit 1A Upper-floor building unit 1B Lower-floor building unit 2 Floor beam 3 Column 4 Ceiling beam 5 Wife panel 6 Frame 16 Floor panel 23 Projection plate material 24 Ceiling structure 25 Ceiling panel

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−171712(JP,A) 特開 平5−195583(JP,A) 特開 昭63−194051(JP,A) 特開 平4−55542(JP,A) (58)調査した分野(Int.Cl.7,DB名) B23P 21/00 302 B27M 1/08 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-5-171712 (JP, A) JP-A-5-195583 (JP, A) JP-A-63-194051 (JP, A) JP-A-4-1992 55542 (JP, A) (58) Field surveyed (Int. Cl. 7 , DB name) B23P 21/00 302 B27M 1/08

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】柱、床梁とともに建物ユニットの骨組みを
構成する天井梁に天井構成体及び軟質耐火材を取り付け
た建物ユニットであって、前記天井梁に前記軟質耐火材
を被覆し、前記軟質耐火材は鉛直被覆部とこの鉛直被覆
部に連接されるとともに前記天井梁の下面に接する下部
被覆部とを備え、前記天井梁にブラケットを取り付け、
このブラケットは、前記天井梁に取り付けられた鉛直部
と、この鉛直部の上端部に形成される上部水平部と、
記鉛直部の下端部に形成される下部水平部と、これらの
水平部に設けられ前記天井構成体を取り付ける前記鉛直
部に向き合う延出部と、を備え、これらの鉛直部と延出
部との間には前記軟質耐火材の鉛直被覆部を収納するス
ペースが形成され、前記下部水平部は、その下面が前記
天井梁より下方であって前記軟質耐火材の下部被覆部の
下面と略同一面となるように形成されることを特徴とす
る建物ユニット。
1. A building unit comprising a ceiling beam and a soft refractory material attached to a ceiling beam that forms a framework of a building unit together with columns and floor beams, wherein the ceiling beam is covered with the soft refractory material, The refractory material includes a vertical covering portion and a lower covering portion connected to the vertical covering portion and in contact with a lower surface of the ceiling beam, and a bracket is attached to the ceiling beam,
The bracket includes a vertical portion attached to the ceiling beam, an upper horizontal portion formed at an upper end portion of the vertical portion, a lower horizontal portion formed at a lower end portion of the vertical portion ,
The vertical, which is provided in a horizontal portion and mounts the ceiling structure
With a extending portion which faces the part, and these are between the vertical portion and the extending portion is formed a space for accommodating the vertical covering portion of the soft refractory material, the lower horizontal portion, a lower surface wherein Below the ceiling beam and the lower covering of the soft refractory material
Building units, characterized in that the by Uni form a lower surface substantially the same plane.
JP32230093A 1993-12-21 1993-12-21 Building unit Expired - Fee Related JP3295913B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32230093A JP3295913B2 (en) 1993-12-21 1993-12-21 Building unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32230093A JP3295913B2 (en) 1993-12-21 1993-12-21 Building unit

Publications (2)

Publication Number Publication Date
JPH07178634A JPH07178634A (en) 1995-07-18
JP3295913B2 true JP3295913B2 (en) 2002-06-24

Family

ID=18142097

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32230093A Expired - Fee Related JP3295913B2 (en) 1993-12-21 1993-12-21 Building unit

Country Status (1)

Country Link
JP (1) JP3295913B2 (en)

Also Published As

Publication number Publication date
JPH07178634A (en) 1995-07-18

Similar Documents

Publication Publication Date Title
JP3295913B2 (en) Building unit
JP3276217B2 (en) Fireproof structure of building
JP3205152B2 (en) Fireproof structure of unit building
JP3164327B2 (en) Boundary wall of unit type building and construction method of the boundary wall
JP7164080B2 (en) Skylight structure and skylight construction method
JP2002081159A (en) Steel framed house
JP2539997B2 (en) Beam mounting
JP3241124B2 (en) Room unit with ceiling
JP4120820B2 (en) Structure and construction method of fire protection wall
JPH06294174A (en) Attic space separation wall construction
JP3126572B2 (en) Boundary wall structure and building wall construction method of building unit
JP3701707B2 (en) Ceiling structure of building unit
JP2837072B2 (en) Building unit
JP2837073B2 (en) Building unit joint structure
JP3359417B2 (en) Building unit, unit building and construction method of unit building
JP3224178B2 (en) Fireproof construction method of building unit and fireproof structure
JP3127972B2 (en) Building unit boundary wall construction method
JP3575623B2 (en) Building wall panels and method of mounting
JP3178938B2 (en) Temporary reinforcement structure of building unit
JP2020105811A (en) Corner frame, corner cover, and mounting structure of projected corner column and corner cover
JP3169290B2 (en) Building wall
JP3224179B2 (en) Underfloor piping structure
JP2709155B2 (en) ALC floor panel mounting method
JPH083212B2 (en) Fireproof structure of unit building
JPH0414560A (en) Installing structure for floor board for placing concrete for vertical pipe unit of building

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20000321

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080412

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090412

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090412

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100412

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110412

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110412

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120412

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120412

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130412

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees