JP3248893B2 - Cable multi-drawing method - Google Patents

Cable multi-drawing method

Info

Publication number
JP3248893B2
JP3248893B2 JP30354999A JP30354999A JP3248893B2 JP 3248893 B2 JP3248893 B2 JP 3248893B2 JP 30354999 A JP30354999 A JP 30354999A JP 30354999 A JP30354999 A JP 30354999A JP 3248893 B2 JP3248893 B2 JP 3248893B2
Authority
JP
Japan
Prior art keywords
cable
drawing machine
cables
roller
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP30354999A
Other languages
Japanese (ja)
Other versions
JP2000102126A (en
Inventor
徹 加福
正道 矢田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP30354999A priority Critical patent/JP3248893B2/en
Publication of JP2000102126A publication Critical patent/JP2000102126A/en
Application granted granted Critical
Publication of JP3248893B2 publication Critical patent/JP3248893B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、例えばプラント
建設のケーブル布設工事における電力ケーブルや制御ケ
ーブルのケーブル多条引き延線工法に関するものであ
る。
BACKGROUND OF THE INVENTION The present invention is, for example, relates to a power cable and control cable multi-strip pulling extension line construction method of the cable in the cable laying construction of the plant construction.

【0002】[0002]

【従来の技術】一般に、機器には電力ケーブルや制御ケ
ーブル等のケーブルが配線されており、例えばプラント
建設においては、電力ケーブルや制御ケーブル等のケー
ブル配線長さが数km、本数が数百本にも及ぶことがあ
る。
2. Description of the Related Art Generally, cables such as power cables and control cables are wired to equipment. For example, in plant construction, the cable wiring length of power cables and control cables is several kilometers and hundreds of cables. It can extend to

【0003】図10は従来のケーブル延線工法の一例を
示す模式図である。図において、1はケーブル、2はケ
ーブル1が巻回されたケーブルドラムである。3はケー
ブルドラム2が搭載されたドラムローラであり、このド
ラムローラ3はローラ3a,3bが軸芯が互いに平行と
なるように所定間隙をもって枠状のベース3cに回転自
在に装着されて構成されている。なお、ローラ3aは図
示しない駆動装置により回転駆動できるようになってい
る。4は鈞車、5はケーブル1の延線経路の随所に設置
されたボール延線機であり、このボール延線機5は一対
の回転軸が軸心を平行として配置され、球状のボール5
aが一対の回転軸のそれぞれに固着されて構成され、一
対の回転軸を逆向きに回転駆動することにより、一対の
ボール5a間に挟み込まれたケーブル1を所定方向に送
り出すように構成されている。6は外周面が円弧状の凹
面をなす円柱状に成形されて軸心回りに回転自在に構成
されたコーナーコロであり、このコーナーコロ6はケー
ブル1の延線経路のコーナー部に設置されてケーブル1
を案内する。7はボール延線機5間に設置されてケーブ
ル1の垂れ下がりを防止するとともに回転してケーブル
1の走行をスムーズにするコロ、8はケーブル1を牽引
するウインチである。
FIG. 10 is a schematic view showing an example of a conventional cable drawing method. In the figure, 1 is a cable, and 2 is a cable drum around which the cable 1 is wound. Reference numeral 3 denotes a drum roller on which the cable drum 2 is mounted. The drum roller 3 is configured such that the rollers 3a and 3b are rotatably mounted on a frame-shaped base 3c with a predetermined gap so that their axes are parallel to each other. ing. The roller 3a can be driven to rotate by a driving device (not shown). Reference numeral 4 denotes a bunker, and reference numeral 5 denotes a ball-drawing machine installed at various points along the wire-drawing route of the cable 1. The ball-drawing machine 5 has a pair of rotating shafts arranged parallel to each other and a spherical ball 5 is provided.
a is fixed to each of the pair of rotating shafts, and the pair of rotating shafts are driven to rotate in opposite directions so that the cable 1 sandwiched between the pair of balls 5a is sent out in a predetermined direction. I have. Reference numeral 6 denotes a corner roller which is formed in a cylindrical shape having an arc-shaped concave surface so as to be rotatable around an axis. The corner roller 6 is provided at a corner of the extension path of the cable 1. Cable 1
I will guide you. Reference numeral 7 denotes a roller which is installed between the ball drawing machines 5 to prevent the cable 1 from hanging down and rotates to smoothly run the cable 1, and 8 denotes a winch for pulling the cable 1.

【0004】つぎに、上記従来のケーブル延線作業につ
いて説明する。まず、ケーブル1の延線に先立って、ケ
ーブル1の布設経路の全長にわたってケーブルトレイ
(図示せず)を布設する。ついで、ケーブル1の布設経
路、すなわちケーブルトレイに沿って、ボール延線機5
を随所に設置する。そして、ケーブル1の延線経路のコ
ーナ部にコーナーコロ6を設置し、ボール延線機5間に
コロ7を設置する。さらには、ケーブルドラム2が載せ
られたドラムローラ3をケーブル1の延線経路の始端側
に設置し、ウインチ8をケーブル1の延線経路の終端側
に設置する。そこで、作業者がトエルロープ等のロープ
を持って延線経路に沿って移動しつつ、始端側からまず
鈞車4に掛け、その後ボール延線機5、コーナーコロ
6、コロ7に順次掛けていく。そして、終端側まで移動
した後、ロープの先端側をウインチ8のドラムに巻き付
ける。また、ロープの後端をケーブルドラム2に巻回さ
れているケーブル1の先端に連結する。
[0004] Next, the above-mentioned conventional cable extension work will be described. First, before the cable 1 is extended, a cable tray (not shown) is laid over the entire length of the cable 1 laying path. Then, along the cable laying route, that is, along the cable tray, the ball drawing machine 5
Will be installed everywhere. Then, the corner rollers 6 are installed at the corners of the wire drawing route of the cable 1, and the rollers 7 are installed between the ball drawing machines 5. Further, the drum roller 3 on which the cable drum 2 is placed is installed at the start end of the extension path of the cable 1, and the winch 8 is installed at the end side of the extension path of the cable 1. Then, while moving along the extension route with a rope such as a towel rope, the operator first hangs the car 4 from the start end side, and then sequentially hangs the ball wire drawing machine 5, the corner roller 6, and the roller 7 in sequence. . Then, after moving to the end side, the leading end side of the rope is wound around the drum of the winch 8. Further, the rear end of the rope is connected to the front end of the cable 1 wound around the cable drum 2.

【0005】ついで、ウインチ8を駆動してロープの牽
引を開始する。同時に、ローラ3aを回転駆動させてケ
ーブルドラム2を回転させ、ケーブル1の送り出しを開
始する。さらに、各ボール延線機5を駆動させる。ケー
ブルドラム2から送り出されたケーブル1は、当初はロ
ープを介してのウインチ8の牽引力およびボール延線機
5の送り力により始端側から延線経路に沿って牽引移動
する。ケーブル1の先端がボール延線機5に至ると、さ
らにボール延線機5の送り力がケーブル1に直接作用し
て移動する。そして、ケーブル1の先端が延線経路の終
端側まで到達すると、ウインチ8、ボール延線機5およ
びローラ3aの駆動を停止する。ついで、ケーブルドラ
ム2側のケーブル1を切断し、所定の長さのケーブル1
とする。そこで、ケーブル1をケーブルトレイ内に移し
替え、1本のケーブル1の延線作業が終了する。上述の
作業を送り返し行い、所定本のケーブル1を延線するこ
とになる。そして、延線経路に沿って設置されたボール
延線機5、コーナーコロ6、コロ7等の機器を撤去し、
ケーブルの延線作業が完了する。延線されたケーブルは
ケーブルトレイ内に整線された状態で一括して収容され
る。
Then, the winch 8 is driven to start pulling the rope. At the same time, the roller 3a is rotationally driven to rotate the cable drum 2, and the feeding of the cable 1 is started. Further, each ball drawing machine 5 is driven. At first, the cable 1 sent out from the cable drum 2 is towed along the wire drawing path from the starting end side by the pulling force of the winch 8 and the feeding force of the ball drawing machine 5 via the rope. When the leading end of the cable 1 reaches the ball drawing machine 5, the feed force of the ball drawing machine 5 directly acts on the cable 1 and moves. When the end of the cable 1 reaches the end of the wire drawing path, the driving of the winch 8, the ball wire drawing machine 5, and the roller 3a is stopped. Next, the cable 1 on the cable drum 2 side is cut, and a cable 1 of a predetermined length is cut.
And Then, the cable 1 is moved into the cable tray, and the work of extending one cable 1 is completed. The above-mentioned operation is repeated, and a predetermined number of cables 1 are extended. Then, the equipment such as the ball drawing machine 5, the corner roller 6, the roller 7, etc. installed along the line drawing path is removed,
Cable extension work is completed. The extended cables are collectively accommodated in the cable tray in a state where the cables are arranged.

【0006】上述の従来のケーブル延線工法では、ケー
ブル1を1本づつ延線しているので、ケーブル1の本数
が数百本にも及ぶプラント建設においては、ケーブル1
の延線作業時間が長時間となり、工期の短縮や低コスト
化が図れないという課題があった。
In the above-described conventional cable drawing method, the cables 1 are drawn one by one. Therefore, in a plant construction where the number of cables 1 is several hundred, the cables 1 are not used.
However, there has been a problem that it is not possible to shorten the construction period and reduce the cost.

【0007】そこで、複数本のケーブル1の先端をまと
めてロープに連結して同時に延線する多条引き延線が試
みられたが、ボール延線機5の送り力が複数本のケーブ
ル1に均等に加わらず、複数本のケーブル1内でケーブ
ルの遅れ進みが発生してしまった。その結果、ケーブル
1のたわみが発生し、あるいはケーブル1のボール延線
機5からの脱線が発生してしまい、ケーブル1の多条引
き延線が実現できなかった。また、延線中のケーブル1
にたわみが発生した場合には、人手により、ボール延線
機5を個別に駆動してケーブル1のたわみ分を前方に送
って、ケーブル1のたわみを除去する必要があり、延線
作業性が低下するとともに、その分延線作業時間が長く
なるという課題があった。
[0007] In order to solve the above problem, a multi-strand drawing in which the ends of a plurality of cables 1 are collectively connected to a rope and simultaneously drawn is attempted, but the feeding force of the ball drawing machine 5 is applied to the plurality of cables 1. The cables were delayed and advanced within the plurality of cables 1 without being added evenly. As a result, the cable 1 is bent or the cable 1 is derailed from the ball wire drawing machine 5, so that the multiple wire drawing of the cable 1 cannot be realized. In addition, cable 1
When the bending occurs, it is necessary to manually drive the ball drawing machine 5 individually to send the bending amount of the cable 1 forward to remove the bending of the cable 1, and the wire drawing workability is increased. There is a problem that the wire drawing work time is prolonged as much as it is reduced.

【0008】この改善策として、複数本のケーブル1を
結束して1本のケーブルとして同時に延線する多条引き
ケーブル延線工法が提案されている。
As a remedy, there has been proposed a multi-cable cable drawing method in which a plurality of cables 1 are bundled and simultaneously drawn as one cable.

【0009】図11は従来の多条引きケーブル延線工法
を示す模式図である。図において、9はケーブルドラム
2から送り出されたケーブル1を後段に送出するキャタ
ピラ延線機、10はキャタピラ延線機9の後段に配置さ
れた鈞車、13は鈞車10の後段にシリーズに配置され
た2台の結束機11とケーブル送出機としてのボール駆
動装置12とから構成された結束装置である。
FIG. 11 is a schematic view showing a conventional multi-cable cable drawing method. In the figure, reference numeral 9 denotes a caterpillar wire drawing machine for sending out the cable 1 sent out from the cable drum 2 to a subsequent stage, 10 denotes a junk car arranged after the caterpillar drawing machine 9, and 13 denotes a series after a junk car 10. This is a binding device including two arranged binding devices 11 and a ball driving device 12 as a cable sending device.

【0010】つぎに、上記従来のケーブル延線について
説明する。まず、ケーブル1の延線に先立って、ケーブ
ル1の布設経路の全長にわたってケーブルトレイ(図示
せず)を延設する。ついで、ケーブル1の延線経路、す
なわちケーブルトレイに沿って、ボール延線機5を随所
に設置する。そして、延線経路のコーナ部にコーナーコ
ロ6を設置し、ボール延線機5間にコロ7を設置する。
そして、延線経路の始端側にて、3台のケーブルローラ
3を設置し、その後段に3台のキャタピラ延線機9を設
置する。ついで、キャタピラ延線機9の後段に、鈞車1
0、2台の結束機11、ボール駆動装置12、鈞車4を
シリーズに設置する。一方、延線経路の終端側には、ウ
インチ8が設置される。
Next, the above-mentioned conventional cable extension will be described. First, before the cable 1 is extended, a cable tray (not shown) is extended over the entire length of the cable 1 laying path. Next, the ball wire drawing machine 5 is installed everywhere along the wire drawing route of the cable 1, that is, along the cable tray. Then, the corner rollers 6 are installed at the corners of the wire drawing path, and the rollers 7 are installed between the ball wire drawing machines 5.
Then, three cable rollers 3 are installed at the starting end of the wire drawing path, and three caterpillar wire drawing machines 9 are installed at the subsequent stage. Then, after the caterpillar wire drawing machine 9, Jun Car 1
0, two binding machines 11, a ball driving device 12, and a bun 4 are installed in a series. On the other hand, a winch 8 is installed on the end side of the extension route.

【0011】そこで、作業者がトエルロープ等のロープ
を持って延線経路に沿って移動しつつ、始端側からまず
鈞車4に掛け、その後ボール延線機5、コーナーコロ
6、コロ7に順次掛けていく。そして、終端側まで移動
した後、ロープの先端側をウインチ8のドラムに巻き付
ける。また、各ケーブルローラ3のローラaを回転駆動
させてケーブルドラム2を回転させ、ケーブル1を送り
出す。送り出されたケーブル1は、それぞれキャタピラ
延線機9に導かれる。そして、キャタピラ延線機9にて
送り出されたケーブル1は、鈞車10に掛けられた後、
結束機11に3本同時に供給される。3本のケーブル1
は2台の結束機11で結束ひもで所定間隔毎に結束され
た後、ボール駆動装置12で後段に送り出される。その
後、ローラ3a、キャタピラ延線機9、結束機11およ
びボール駆動装置12の駆動を停止する。そこで、ロー
プの後端を3本のケーブル1が結束されてなる結束ケー
ブル100の先端に連結する。
Therefore, while moving along the extension route with a rope such as a towel rope, the operator first hangs on the Jun 4 from the starting end side, and then successively places the ball on the wire-drawing machine 5, the corner roller 6, and the roller 7. I will hang it. Then, after moving to the end side, the leading end side of the rope is wound around the drum of the winch 8. Further, the roller a of each cable roller 3 is rotationally driven to rotate the cable drum 2, and the cable 1 is sent out. The sent cables 1 are respectively guided to the caterpillar drawing machine 9. Then, the cable 1 sent out by the caterpillar wire drawing machine 9 is hanged on the Jun 10
Three pieces are simultaneously supplied to the binding machine 11. 3 cables 1
Are bound at predetermined intervals by a binding string by two binding machines 11, and then sent out to a subsequent stage by a ball driving device 12. After that, the driving of the roller 3a, the caterpillar drawing machine 9, the binding machine 11, and the ball driving device 12 is stopped. Therefore, the rear end of the rope is connected to the front end of a bundled cable 100 formed by binding three cables 1.

【0012】ここで、ウインチ8を駆動してロープの牽
引を開始する。同時に、ローラ3a、キャタピラ延線機
9、結束機11およびボール駆動装置12の駆動を開始
する。さらに、ボール延線機5を駆動する。3台のケー
ブルドラム2から送り出された3本のケーブル1は、2
台の結束機11で結束ひもにて所定間隔毎に結束され、
ボール駆動装置12を介して結束ケーブル100となっ
て送り出される。そして、この結束ケーブル100は、
当初ロープを介してのウインチ8の牽引力およびボール
延線機5の送り力により延線経路に沿って牽引移動す
る。結束ケーブル100は鈞車4に掛けられて一旦吊り
上げられた後、ボール延線機5に導かれる。そして、結
束ケーブル100の先端がボール延線機5に至ると、さ
らにボール延線機5の送り力が直接作用して移動する。
そして、結束ケーブル100の先端が延線経路の終端側
まで到達すると、ローラ3a、キャタピラ延線機9、結
束機11、ボール延線機5、ボール駆動装置12および
ウインチ8の駆動を停止する。ついで、ボール延線機1
2の後段側で結束ケーブル100を切断し、所定の長さ
の結束ケーブル100とする。そこで、結束ケーブル1
00をケーブルトレイ内に移し替え、3本のケーブル1
の延線作業が一度に終了する。
At this point, the winch 8 is driven to start pulling the rope. At the same time, the driving of the roller 3a, the caterpillar drawing machine 9, the binding machine 11, and the ball driving device 12 is started. Further, the ball drawing machine 5 is driven. The three cables 1 sent out from the three cable drums 2 are 2
Are bound at predetermined intervals by a binding string by one binding machine 11,
The binding cable 100 is sent out via the ball driving device 12. And this binding cable 100 is
Initially, it is towed along the wire drawing path by the pulling force of the winch 8 and the feed force of the ball drawing machine 5 via the rope. The binding cable 100 is hung on the vehicle 4 and once hung, and then guided to the ball drawing machine 5. When the leading end of the binding cable 100 reaches the ball drawing machine 5, the feed force of the ball drawing machine 5 directly acts to move.
When the end of the binding cable 100 reaches the end of the wire drawing path, the driving of the roller 3a, the caterpillar wire drawing machine 9, the binding machine 11, the ball wire drawing machine 5, the ball driving device 12, and the winch 8 is stopped. Then, ball drawing machine 1
The bundled cable 100 is cut at the subsequent stage of 2 to obtain a bundled cable 100 having a predetermined length. Therefore, the binding cable 1
00 in the cable tray and three cables 1
The extension work is completed at once.

【0013】上述の作業を繰り返し行い、所定本のケー
ブル1を延線することになる。そして、延線経路に沿っ
て設置されたボール延線機5、コーナーコロ6、コロ7
等の機器を撤去し、ケーブルの延線作業が完了する。延
線されたケーブルはケーブルトレイ内に一括して収容さ
れる。そこで、ケーブル1の延線作業時間が大幅に短縮
され、工期の短縮や低コスト化を達成することができ
る。
The above operation is repeated to extend a predetermined number of cables 1. Then, the ball wire drawing machine 5, the corner rollers 6, the rollers 7 installed along the wire drawing path.
And other equipment are removed, and cable extension work is completed. The extended cables are collectively accommodated in a cable tray. Thus, the time required for extending the cable 1 can be greatly reduced, and the construction period can be shortened and the cost can be reduced.

【0014】[0014]

【発明が解決しようとする課題】従来の多条引きケーブ
ル延線工法は以上のように、複数本のケーブル1を結束
して1本の結束ケーブル100として延線し、ケーブル
1が結束された状態でケーブルトレイ内に収容されてい
るので、占積率が低下してしまうという課題があった。
また、延線中に結束ケーブル100にねじれが生じてい
る。そして、結束ケーブル100をケーブルトレイ内に
移し替える際に、ケーブルの結束を解くと、ケーブル1
中に残留するねじれ応力によりケーブル1が跳ね、ケー
ブル1同士の絡み合いを生じてしまう。そこで、ケーブ
ルの結束を解いても、整線されにくく、多大な整線作業
時間を要するとともに、整然とした状態(整線された状
態)のケーブル布設が得られにくいという課題があっ
た。
As described above, in the conventional multi-cable cable drawing method, a plurality of cables 1 are bundled to form a single bundled cable 100, and the cables 1 are bundled. Since the cable tray is housed in the cable tray in a state, there is a problem that the space factor is reduced.
Further, the binding cable 100 is twisted during the extension. Then, when the binding cable 100 is transferred into the cable tray, the binding of the cable is released.
The cable 1 rebounds due to the torsional stress remaining therein, causing the cables 1 to be entangled with each other. Therefore, there is a problem that even if the cables are untied, it is difficult to arrange the cables, a great amount of time is required for the arrangement of the cables, and it is difficult to lay the cables in a regular state (in a state where the cables are arranged).

【0015】この発明は、上記のような課題を解決する
ためになされたもので、複数本のケーブルを結束するこ
となく、ケーブル相互のねじれを抑えて同時に延線でき
るようにし、工期の短縮や低コスト化を達成することが
できるとともに、ケーブルトレイに収容されるケーブル
の占積率を高め、整線されたケーブル布設を可能とする
ケーブル多条引き延線工法を得ることを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is possible to reduce the twisting between cables and to simultaneously extend the wires without bundling a plurality of cables. it is possible to achieve cost reduction, increasing the space factor of the cable to be accommodated in the cable tray, and an object thereof is to obtain a cable multi strip pull extension line construction method that allows cabling that is organizing organ .

【0016】[0016]

【課題を解決するための手段】この発明に係るケーブル
多条引き延線工法は、それぞれ円筒状の外形形状に成形
され、かつ、複数の溝が軸方向に沿ってそれぞれの外周
面に複数並設された一対のボールおよび該一対のボール
を回転駆動するモータを備えたケーブル延線機をケーブ
ルの延線経路に沿って所定距離毎に配置し、ケーブルを
案内するケーブル案内部がそれぞれ区画されて複数並設
された整線コーナーコロを該ケーブル案内部の並設方向
をほぼ上下方向に向けて該延線経路のコーナー部に設置
し、ケーブルを案内するケーブル案内部がそれぞれ区画
されて複数並設された整線コロを該ケーブル案内部の並
設方向を延線経路を遮る方向に向けて隣り合うケーブル
延線機間に少なくとも1台設置し、さらに該延線経路の
始端側に複数台のケーブルドラムを配置する工程と、上
記複数台のケーブルドラムのそれぞれから繰り出された
複数本のケーブルをそれぞれより戻しを介して牽引ロー
プに連結する工程と、上記牽引ロープを牽引しながら上
記ケーブル延線機を駆動させて、ケーブル案内のための
作業者が、上記より戻しが上記ケーブル延線機、上記整
線コーナーコロおよび上記整線コロを通過する際に、上
記複数本のケーブルのそれぞれを、上記ケーブル延線機
の一対のボールの上記各溝に案内し、上記整線コーナー
コロの各ケーブル案内部に案内し、上記整線コロの各ケ
ーブル案内部に案内する工程とを有するものである。
According to the present invention, there is provided a cable multi-drawing / drawing method according to the present invention, wherein each of the plurality of grooves is formed into a cylindrical outer shape, and a plurality of grooves are arranged on an outer peripheral surface along an axial direction. A cable drawing machine provided with a pair of balls provided and a motor for rotating and driving the pair of balls is arranged at predetermined intervals along a cable drawing path, and a cable guide portion for guiding the cable is defined. A plurality of straightening corner rollers arranged side by side are installed at the corners of the extending route with the direction of juxtaposition of the cable guides substantially vertically oriented, and the cable guides for guiding the cables are divided into a plurality of sections. At least one straightening roller arranged in parallel is installed between adjacent cable drawing machines so that the direction of the cable guide is parallel to the direction in which the wire drawing path is blocked, and a plurality of the plurality of straightening rollers are provided at the starting end side of the wire drawing path. Of Arranging the cable drums, connecting the plurality of cables fed from each of the plurality of cable drums to the tow ropes through the respective return loops, and pulling the tow ropes while pulling the cable. When the operator guides the cable, when the return passes through the cable drawing machine, the straightening corner roller and the straightening roller, each of the plurality of cables is Guiding in each of the grooves of the pair of balls of the cable drawing machine, guiding each of the cable guides of the straightening corner roller, and guiding to each of the cable guides of the straightening roller.

【0017】また、ウインチが上記ケーブルの延線経路
の後端側に配設され、上記牽引ロープが該ウインチのド
ラムに巻き付けられて、該ウインチの駆動により、該牽
引ロープを牽引するようにしたものである。
A winch is disposed at the rear end of the cable extending path, and the tow rope is wound around a drum of the winch, and the winch is driven to drive the tow rope. Things.

【0018】また、上記牽引ロープがループ状の牽引ロ
ープである。
Further, the tow rope is a loop-like tow rope.

【0019】また、上記牽引ロープが隣り合う上記ケー
ブル延線機間の距離とほぼ等しい長さに形成され、ロー
プ牽引のための作業者が、該牽引ロープを該ケーブル延
線機の一対のボール間に噛ませながら牽引しつつ延線経
路に沿って歩行移動し、かつ、該ケーブル延線機の駆動
を制御して該延線経路に沿った歩行移動速度に合わせて
ケーブルの移動速度を調整するようにしたものである。
Further, the tow rope is formed to have a length substantially equal to the distance between the adjacent cable drawing machines, and a worker for rope tow pulls the tow rope to a pair of balls of the cable drawing machine. Walking along the extension line while pulling while biting in between, and controlling the drive of the cable drawing machine to adjust the movement speed of the cable according to the walking movement speed along the extension line It is something to do.

【0020】[0020]

【0021】[0021]

【0022】[0022]

【発明の実施の形態】以下、この発明の実施の形態を図
について説明する。 実施の形態1.図1はこの発明の実施の形態1に係るケ
ーブル多条引き延線工法を示す模式図、図2はこの発明
の実施の形態1に係るケーブル多条引き延線工法の要部
を示す模式図である。図1および図2において、1はケ
ーブル、2はケーブル1が巻回されたケーブルドラムで
ある。3はケーブルドラム2が搭載されたドラムローラ
であり、このドラムローラ3はローラ3a、3bが軸芯
が互いに平行となるように所定間隙をもって枠状のベー
ス3cに回転自在に装着されて構成されている。なお、
ローラ3aは図示しない駆動装置により回転駆動できる
ようになっている。8はケーブル1を牽引するウイン
チ、9はケーブルドラム2から送り出されたケーブル1
を後段に送出するキャタピラ延線機、10はキャタピラ
延線機9の後段に配置された鈞車、19は牽引ロープと
してのトエルロープであり、このトエルロープ19はそ
の後端が3本に分岐されている。20はケーブル1の延
線経路の随所に設置されたケーブル延線機、21はケー
ブル1の延線経路のコーナー部に設置されてケーブル1
を案内する整線コーナーコロ、22はケーブル延線機2
0間に設置されてケーブル1を案内する整線コロ、23
はトエルロープ19とケーブル1とを連結し、ケーブル
1のねじれによる応力を緩和するより戻しである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings. Embodiment 1 FIG. FIG. 1 is a schematic view showing a cable multi-drawing method according to Embodiment 1 of the present invention, and FIG. 2 is a schematic view showing a main part of a cable multi-drawing method according to Embodiment 1 of the present invention. It is. 1 and 2, reference numeral 1 denotes a cable, and 2 denotes a cable drum around which the cable 1 is wound. Reference numeral 3 denotes a drum roller on which the cable drum 2 is mounted. The drum roller 3 is configured such that the rollers 3a and 3b are rotatably mounted on a frame-shaped base 3c with a predetermined gap so that their axes are parallel to each other. ing. In addition,
The roller 3a can be driven to rotate by a driving device (not shown). 8 is a winch for pulling the cable 1, 9 is a cable 1 sent out from the cable drum 2
Is a caterpillar wire drawing machine, which is disposed downstream of the caterpillar wire drawing machine 9, 19 is a toll rope as a tow rope, and the toer rope 19 is branched into three at the rear end. . Reference numeral 20 denotes a cable drawing machine installed at various points along the wire drawing route of the cable 1, and reference numeral 21 denotes a cable drawing machine installed at a corner of the wire drawing route of the cable 1.
Corner roller that guides the cable, 22 is the cable drawing machine 2
Alignment roller installed between 0 and guiding cable 1, 23
Is connected to the towel rope 19 and the cable 1 to reduce the stress caused by the torsion of the cable 1.

【0023】ケーブル延線機20は、図3に示されるよ
うに、一対のボール30が架台31の主面上に所定間隙
をもって立設された一対の回転軸のそれぞれに取り付け
られ、さらに該回転軸を駆動するモータ32が架台31
に取り付けられて構成されている。このボール30はゴ
ム材からなり、中空の略円柱状に成形され、空気が内部
に封入されている。このボール30の外周面には、周方
向の溝30aが軸心に沿って3つ設けられている。そし
て、一つのボール30は周方向の溝30aが相対するよ
うに回転軸に取り付けられている。このケーブル延線機
20では、モータ32を回転駆動させると、一対のボー
ル30が互いに逆向きに回転され、一対のボール30間
に挟まれたケーブル1を所定の方向に送り出せるように
なっている。
As shown in FIG. 3, the cable drawing machine 20 has a pair of balls 30 mounted on a pair of rotating shafts erected on a main surface of a gantry 31 with a predetermined gap therebetween. The motor 32 for driving the shaft is
It is configured to be attached to. The ball 30 is made of a rubber material, is formed into a hollow substantially cylindrical shape, and has air sealed therein. On the outer peripheral surface of the ball 30, three circumferential grooves 30a are provided along the axis. One ball 30 is attached to the rotating shaft so that the circumferential grooves 30a face each other. In the cable drawing machine 20, when the motor 32 is rotationally driven, the pair of balls 30 are rotated in opposite directions, and the cable 1 sandwiched between the pair of balls 30 can be sent out in a predetermined direction. I have.

【0024】整線コロ22は、図4に示されるように、
1本のローラ35が回転軸を架台37の主面と平行とな
るように架台37に回転自在に取り付けられ、さらに5
本のローラ36が回転軸を架台37の主面と直交するよ
うにしてローラ35の回転軸と平行に架台37に回転自
在に取り付けられて構成されている。そして、架台37
の主面には、長穴37aがローラ35の回転軸と平行に
穿設され、ローラ36はこの長穴37aを介して架台3
7にスライド自在に取り付けられ、ケーブル1の径に合
わせてローラ36間の隙間を調節できるようになってい
る。同様に、ケーブル1の本数に合わせてローラ36の
本数を調節できるようになっている。なお、ローラ35
と隣り合う一対のローラ36とによりケーブル案内部が
構成されている。3本のケーブル1は、各ローラ36間
に分離されて納められる。そこで、ケーブル1はローラ
35、36を回転させつつ牽引され、たるみが抑えられ
て、スムーズに移動される。
[0024] As shown in FIG.
One roller 35 is rotatably attached to the gantry 37 so that the rotation axis is parallel to the main surface of the gantry 37, and
The roller 36 is configured to be rotatably mounted on the gantry 37 in parallel with the rotation axis of the roller 35 so that the rotation axis is orthogonal to the main surface of the gantry 37. And the gantry 37
A long hole 37a is formed in the main surface of the base 3 in parallel with the rotation axis of the roller 35, and the roller 36 is connected to the base 3 through the long hole 37a.
7 so that the clearance between the rollers 36 can be adjusted according to the diameter of the cable 1. Similarly, the number of rollers 36 can be adjusted according to the number of cables 1. The roller 35
And a pair of adjacent rollers 36 constitute a cable guide. The three cables 1 are separated and stored between the rollers 36. Then, the cable 1 is pulled while rotating the rollers 35 and 36, and the slack is suppressed and the cable 1 is smoothly moved.

【0025】整線コーナーコロ21は、図5に示される
ように、コロ40がコ字状の枠体41に回転自在に取り
付けられて構成されている。このコロ40は、円柱状に
成形され、ケーブル案内部としての周方向の溝40aが
軸心に沿って3つ設けられている。3本のケーブル1
は、各溝40a内に分離されて納められる。そこで、ケ
ーブル1はコロ40を回転させつつ牽引され、ケーブル
それぞれを特定できる状態で、スムーズに移動される。
より戻し23は、図6に示されるように、連結部42
と、この連結部42の一側にピン45回りに回転可能に
連結された第1の把持部43と、連結部42の他側に軸
46回りに回転可能に連結された第2の把持部44とか
ら構成されている。そして、ピン45の軸心と軸46の
軸心とは、互いに直交している。また、第1および第2
の把持部43、44には、ケーブル1およびトエルロー
プ19が連結されるピン43a、44aが設けられてい
る。
As shown in FIG. 5, the straightening corner roller 21 is configured such that a roller 40 is rotatably attached to a U-shaped frame 41. The roller 40 is formed in a columnar shape, and is provided with three circumferential grooves 40a as cable guide portions along the axis. 3 cables 1
Are separated and stored in each groove 40a. Therefore, the cable 1 is pulled while rotating the roller 40, and is smoothly moved in a state where each cable can be specified.
The return 23 is, as shown in FIG.
A first grip 43 connected to one side of the connecting portion 42 so as to be rotatable around a pin 45, and a second grip portion connected to the other side of the connecting portion 42 so as to be rotatable around a shaft 46. 44. The axis of the pin 45 and the axis of the shaft 46 are orthogonal to each other. In addition, the first and second
Are provided with pins 43a, 44a to which the cable 1 and the towel rope 19 are connected.

【0026】つぎに、このケーブル多条引き延線工法に
ついて説明する。まず、ケーブル1の延線に先立って、
ケーブル1の布設経路の全長にわたってケーブルトレイ
(図示せず)を延設する。ついで、ケーブル1の延線経
路、すなわちケーブルトレイに沿って、ケーブル延線機
20を所定間隔毎に設置する。そして、延線経路のコー
ナ部に整線コーナーコロ21を設置し、ケーブル延線機
20間に整線コロ22を設置する。この時、整線コーナ
ーコロ21は、コロ40の回転軸が上下方向を向くよう
に配設され、整線コロ22は、ローラ35の回転軸が延
線経路を遮る方向に水平となるように配設されている。
そして、延線経路の始端側にて、3台のケーブルローラ
3を設置し、その後段に3台のキャタピラ延線機9を設
置し、その後段に鈞車10を設置する。一方、延線経路
の終端側には、ウインチ8が設置される。
Next, the cable multi-drawing method will be described. First, before extending the cable 1,
A cable tray (not shown) extends over the entire length of the cable laying path. Next, the cable drawing machines 20 are installed at predetermined intervals along the wire drawing route of the cable 1, that is, along the cable tray. Then, a straightening corner roller 21 is installed at a corner of the wire drawing route, and a straightening roller 22 is installed between the cable drawing machines 20. At this time, the straightening corner rollers 21 are disposed so that the rotation axis of the rollers 40 is oriented in the vertical direction, and the straightening rollers 22 are horizontal so that the rotation axis of the roller 35 blocks the extension path. It is arranged.
Then, three cable rollers 3 are installed at the start end side of the wire drawing route, three caterpillar wire drawing machines 9 are installed at the subsequent stage, and a trolley 10 is installed at the subsequent stage. On the other hand, a winch 8 is installed on the end side of the extension route.

【0027】そこで、作業者がトエルロープ19を持っ
て延線経路に沿って移動しつつ、始端側から、ケーブル
延線機20、整線コロ22および整線コーナーコロ21
に順次掛けていく。そして、終端側まで移動した後、ト
エルロープ19の先端側をウインチ8のドラムに巻き付
ける。また、各ケーブルローラ3のローラ3aを回転駆
動させてケーブルドラム2を回転させ、ケーブル1を送
り出す。送り出されたケーブル1は、それぞれキャタピ
ラ延線機9に導かれる。そして、キャタピラ延線機9に
て送り出されたケーブル1は、鈞車10に掛けられる。
そこで、ケーブル1の先端を第1の把持部43のピン4
3aに連結して、3本のケーブル1にそれぞれより戻し
23を連結する。ついで、トエルロープ19の分岐され
た各後端を各より戻し23の第2の把持部44のピン4
4aに連結して、より戻し23を介して3本のケーブル
1とトエルロープ19とを連結する。
Then, while the operator moves along the wire drawing path with the towel rope 19, the cable drawing machine 20, the aligning roller 22, and the aligning corner roller 21 are arranged from the starting end side.
It is multiplied sequentially. Then, after moving to the end side, the tip side of the towel rope 19 is wound around the drum of the winch 8. In addition, the cable 3 is sent out by rotating the roller 3a of each cable roller 3 to rotate the cable drum 2. The sent cables 1 are respectively guided to the caterpillar drawing machine 9. Then, the cable 1 sent out by the caterpillar wire drawing machine 9 is hung on a bunker 10.
Then, the tip of the cable 1 is connected to the pin 4 of the first gripper 43.
3a, and return 23 is connected to each of the three cables 1. Then, each of the branched rear ends of the towel rope 19 is returned from each, and the pin 4 of the second gripper 44 of the
4a, and the three cables 1 and the towel rope 19 are connected via a return 23.

【0028】ここで、ウインチ8を駆動してトエルロー
プ19の牽引を開始する。同時に、ローラ3a、キャタ
ピラ延線機9およびケーブル延線機20を駆動する。3
台のケーブルドラム2から送り出された3本のケーブル
1は、当初トエルロープ19を介してのウインチ8の牽
引力およびケーブル延線機20の送り力により延線経路
に沿って牽引移動する。そして、ケーブル1の先端がケ
ーブル延線機20に至ると、さらにケーブル延線機20
の送り力が直接作用して移動する。この時、作業者がよ
り戻し23とともに延線経路に沿って移動する。そし
て、作業者は、移動しながら、各ケーブル延線機20の
位置において、一対のボール30の最上部の溝30a
間、中央の溝30a間および最下部の溝30a間にそれ
ぞれに同じケーブル1が通過するように、3本のケーブ
ル1をそれぞれ一対のボール30間に案内する。同様
に、各整線コロ22の位置において、ローラ35の回転
軸方向に3つに区画されたローラ36間のそれぞれには
常に同一のケーブル1が通過するように、3本のケーブ
ル1を各ローラ36間にそれぞれ案内する。同様に、各
整線コーナーコロ21の位置においては、コロ40の最
上部の溝40a、中央の溝40aおよび最下部の溝40
aには常に同一のケーブル1が通過するように、3本の
ケーブル1をそれぞれローラ40の溝40aに案内す
る。
Here, the winch 8 is driven to start pulling the towel rope 19. At the same time, the roller 3a, the caterpillar drawing machine 9 and the cable drawing machine 20 are driven. 3
The three cables 1 sent out from the cable drums 2 are towed along the wire drawing path by the pulling force of the winch 8 via the towel rope 19 and the feeding force of the cable drawing machine 20 at first. When the end of the cable 1 reaches the cable drawing machine 20, the cable drawing machine 20
Is moved directly by the feed force. At this time, the worker moves along the extension path together with the return 23. Then, while moving, at the position of each cable drawing machine 20, the uppermost groove 30 a of the pair of balls 30 is moved.
The three cables 1 are guided between the pair of balls 30 so that the same cable 1 passes through the gaps, between the central grooves 30a, and between the lowermost grooves 30a. Similarly, at the position of each alignment roller 22, three cables 1 are connected to each other so that the same cable 1 always passes between the three rollers 36 divided in the rotation axis direction of the roller 35. Each is guided between the rollers 36. Similarly, at the position of each alignment corner roller 21, the uppermost groove 40 a, the central groove 40 a, and the lowermost groove 40
Each of the three cables 1 is guided to the groove 40a of the roller 40 so that the same cable 1 always passes through a.

【0029】この作業者による案内作業が終了すれば、
3本のケーブル1は、各ケーブル延線機20において軸
方向の配列順序を維持しつつ一対のボール30間を通過
し、各整線コロ22において同じ位置のローラ35間を
通過し、各整線コーナーコロ21において同じ位置の溝
40aを通過することになる。このケーブル1の延線中
に、ケーブル1にねじれが発生すると、ねじれの応力に
より第1の連結部43がピン45回りに回転し、あるい
は連結部42が軸46回りに回転し、ねじれによる応力
が緩和され、ケーブル1に蓄積されない。そして、ケー
ブル1の先端が延線経路の終端側まで到達すると、ロー
ラ3a、キャタピラ延線機9、ケーブル延線機20およ
びウインチ8の駆動を停止する。ついで、ケーブル1と
より戻し23との連結を解き、鈞車10の後段側でケー
ブル1を切断して、所定の長さの3本のケーブル1とす
る。そこで、複数の作業者が延線経路の随所に配属さ
れ、ケーブル1を1本づつケーブルトレイ内に整線しな
がら移し替え、3本のケーブル1の延線作業が一度に終
了する。
When the guide operation by the operator is completed,
The three cables 1 pass between the pair of balls 30 while maintaining the arrangement order in the axial direction in each cable drawing machine 20, pass between the rollers 35 at the same position in each straightening roller 22, and The line corner rollers 21 pass through the groove 40a at the same position. If the cable 1 is twisted during the extension of the cable 1, the torsion stress causes the first connecting portion 43 to rotate around the pin 45 or the connecting portion 42 to rotate around the shaft 46, thereby causing the stress due to the torsion. Are alleviated and are not accumulated in the cable 1. When the end of the cable 1 reaches the end of the wire drawing path, the driving of the roller 3a, the caterpillar wire drawing machine 9, the cable drawing machine 20, and the winch 8 is stopped. Next, the connection between the cable 1 and the return cable 23 is released, and the cable 1 is cut at the rear side of the vehicle 10 to obtain three cables 1 having a predetermined length. Therefore, a plurality of workers are assigned to various places in the wire drawing route, and the cables 1 are transferred one by one while being arranged in the cable tray, and the wire drawing work of the three cables 1 is completed at once.

【0030】上述の作業を繰り返し行い、所定本のケー
ブル1を延線することになる。そして、延線経路に沿っ
て設置されたケーブル延線機20、整線コーナーコロ2
1、整線コロ22等の機器を撤去し、ケーブルの延線作
業が完了する。延線されたケーブルは整線された状態で
ケーブルトレイ内に一括して収容される。
The above operation is repeated to extend a predetermined number of cables 1. And the cable drawing machine 20 installed along the wire drawing route,
1. The equipment such as the straightening roller 22 is removed, and the cable extension work is completed. The extended cables are collectively accommodated in the cable tray in a state where the cables are arranged.

【0031】このように、この実施の形態1では、3本
のケーブル1を一度に延線できるので、ケーブル1の本
数が数百本にも及ぶプラント建設においても、ケーブル
1の延線作業時間を短縮でき、工期の短縮や低コスト化
を図ることができる。また、3本のケーブル1をより戻
し23を介してトエルロープ19に連結しているので、
延線中にケーブル1にねじれが発生しても、ねじれによ
る応力がより戻し23により緩和され、ケーブル1には
蓄積されない。そこで、鈞車10の後段側でケーブル1
を切断した際に、ねじれ応力の残留に起因してケーブル
1が跳ねて3本のケーブル1が絡み合うようなことも防
止でき、ケーブル1のケーブルトレイへの移し替え作業
および整線作業が簡易になる。また、ケーブル延線機2
0が、略円柱形状に成形され、かつ、周方向の溝30a
が軸心に沿って並設されたボール30を備え、整線コー
ナーコロ21が、略円柱形状に成形され、その外周面に
周方向の溝40aを軸心方向に複数設けたコロ40を備
え、さらに整線コロ22がケーブル延線機20間に配設
されているので、3本のケーブル1はその配列状態が確
実に維持され、3本のケーブル1のそれぞれを特定でき
る状態で、絡み合うことなく、かつ、たるみを抑えて延
線することができる。そこで、ケーブル延線時に、ケー
ブル延線機20、整線コロ22および整線コーナーコロ
21における作業者によるケーブル1のガイド作業が不
要となり、延線作業の省力化が図られる。さらに、ケー
ブル1のケーブルトレイへの移し替え作業時に、延線経
路に配置された複数の作業者が移し替えるケーブル1を
簡易に、かつ、確実に識別でき、移し替え作業および整
線作業が簡易になる。
As described above, in the first embodiment, since three cables 1 can be extended at a time, even in a plant construction where the number of cables 1 is as large as several hundred, the extension time of the cables 1 can be extended. Can be shortened, and the construction period can be shortened and the cost can be reduced. Also, since the three cables 1 are connected to the towel rope 19 via the return cable 23,
Even if the cable 1 is twisted during extension, the stress due to the twist is alleviated by the return 23 and is not accumulated in the cable 1. Therefore, cable 1
When the cable is cut, it is possible to prevent the cable 1 from jumping due to the residual torsional stress and to entangle the three cables 1, so that the work of transferring the cable 1 to the cable tray and the work of straightening can be simplified. Become. In addition, cable drawing machine 2
0 is formed into a substantially columnar shape and has a circumferential groove 30a.
Is provided with balls 30 arranged side by side along the axis, and a straightening corner roller 21 is formed into a substantially cylindrical shape, and provided with rollers 40 provided with a plurality of circumferential grooves 40a in the axial direction on the outer peripheral surface thereof. In addition, since the straightening rollers 22 are disposed between the cable drawing machines 20, the three cables 1 are surely maintained in the arrangement state, and are intertwined in a state where each of the three cables 1 can be specified. The wire can be extended without sag and without sag. Therefore, at the time of cable drawing, there is no need for an operator to guide the cable 1 on the cable drawing machine 20, the aligning roller 22, and the aligning corner roller 21, thereby saving labor of the wire drawing operation. Furthermore, at the time of transferring the cable 1 to the cable tray, a plurality of workers arranged on the extension route can easily and surely identify the cable 1 to be transferred, and the transfer and straightening work can be simplified. become.

【0032】従って、この実施の形態1によれば、工期
の短縮や低コスト化が図られ、ケーブルトレイに収容さ
れるケーブルの占積率を高め、整線されたケーブル布設
を可能とするケーブル多条引き延線工法が得られる。な
お、この実施の形態1では、3本のケーブル1を同時に
延線するものとして説明しているが、延線されるケーブ
ル1の本数は3本に限定されるものではなく、2本ある
いは4本以上のケーブル1を同時に延線する場合にも適
用できることは言うまでもないことである。
Therefore, according to the first embodiment, shortening of the construction period and reduction in cost are achieved, the space factor of the cables accommodated in the cable tray is increased, and the cables capable of laying out the arranged cables can be provided. A multi-strand drawing method can be obtained. In the first embodiment, three cables 1 are described as being extended at the same time. However, the number of cables 1 to be extended is not limited to three, but may be two or four. It goes without saying that the present invention can be applied to a case where more than one cable 1 is simultaneously extended.

【0033】つぎに、このケーブル延線機20と従来の
ボール延線機5と対比して、延線機20の特徴について
図7および図8を参照しつつ説明する。ここでは、ケー
ブル1を5本まとめて延線する場合について説明する。
まず、5本のケーブル1の延線に従来のボール延線機5
を適用した場合について説明する。5本のケーブル1
は、図7の(a)に示されるように、まとまってボール
延線機5の一対のボール5a間に導かれる。そこで、ボ
ール5aとケーブル1との接触面積が各ケーブル1にお
いて異なり、各ケーブル1に作用する送り力に差異が生
じてしまう。その結果、各ケーブル1の張力に差異が生
じ、ケーブル1の弛みや捩れが発生してしまう。特に、
ボール5aに接触しないケーブル1があると、該ケーブ
ル1にはボール5aとケーブル1との間の摩擦力に比べ
て極めて小さいケーブル1間の摩擦力に起因する送り力
のみが作用して、延線されない事態が発生してしまう。
また、5本のケーブル1がまとまってボール延線機5の
一対のボール5a間に導かれると、各ケーブル1は、ボ
ール5aの回転軸に沿って配列しようとする。しかしな
がら、ボール延線機5では、ケーブル1のボール5aの
回転軸の沿った配列状態を規定する機構がなく、各ケー
ブル1の配列動作は、図7の(b)、(c)に示される
ように、各ボール延線機5で異なる。そこで、5本のケ
ーブル1が絡み合いってしまい、ケーブル1の特定がで
きない事態が発生してしまう。また、5本のケーブル1
がまとまってボール延線機5の一対のボール5a間に導
かれた際に、図7の(d)に示されるように、ボール5
aの球状の外形形状に起因してボール5aの回転軸に沿
ってボール5aから外れる方向の力がケーブル1に作用
する。そこで、一部のケーブル1が延線中に一対のボー
ル5a間から外れてしまい、延線されない事態が発生し
てしまう。
Next, the characteristics of the wire drawing machine 20 will be described with reference to FIGS. 7 and 8 in comparison with the cable drawing machine 20 and the conventional ball drawing machine 5. FIG. Here, a case where five cables 1 are collectively extended will be described.
First, a conventional ball wire drawing machine 5
The case where is applied will be described. 5 cables 1
Are collectively guided between a pair of balls 5a of the ball drawing machine 5, as shown in FIG. Therefore, the contact area between the ball 5a and the cable 1 is different in each cable 1, and a difference occurs in the feed force acting on each cable 1. As a result, a difference occurs in the tension of each cable 1 and the cable 1 is loosened or twisted. In particular,
If there is a cable 1 that does not contact the ball 5a, only a feed force caused by a frictional force between the cables 1 that is extremely small as compared with a frictional force between the ball 5a and the cable 1 acts on the cable 1, and the cable 1 is extended. A situation where lines are not drawn occurs.
Further, when the five cables 1 are led together between the pair of balls 5a of the ball wire drawing machine 5, each cable 1 tends to be arranged along the rotation axis of the balls 5a. However, in the ball wire drawing machine 5, there is no mechanism for regulating the arrangement state of the balls 5a of the cable 1 along the rotation axis, and the arrangement operation of each cable 1 is shown in FIGS. 7B and 7C. As described above, the ball wire drawing machine 5 differs. Therefore, a situation occurs in which the five cables 1 are entangled and the cable 1 cannot be specified. Also, five cables 1
As shown in FIG. 7 (d), when the pieces are guided together between the pair of balls 5a of the ball wire drawing machine 5,
Due to the spherical outer shape of a, a force in a direction away from the ball 5a along the rotation axis of the ball 5a acts on the cable 1. Therefore, a part of the cable 1 comes off from between the pair of balls 5a during the wire drawing, and a situation where the wire is not drawn occurs.

【0034】ついで、5本のケーブル1の延線にケーブ
ル延線機20を適用した場合について説明する。このケ
ーブル延線機20は、ボール30は円筒形の外形形状に
成形され、かつ、周方向の溝30aが軸心に沿って並設
されている。5本のケーブル1は、図8に示されるよう
に、それぞれ相対する溝30a内に納められて軸方向に
1列に配列された状態で一対のボール30間を通過す
る。そこで、ボール30とケーブル1との接触面積が各
ケーブル1においてほぼ等しくなり、均一な送り力が各
ケーブル1に作用する。その結果、各ケーブル1は等し
い張力で延線され、ケーブル1の弛みや捩れの発生が抑
えられる。また、ボール30に接触しないケーブル1が
ないので、一部のケーブル1が延線されないような事態
は発生しない。また、5本のケーブル1が一旦相対する
ボール30間に導かれると、5本のケーブル1のボール
30の回転軸に沿った配列状態が維持され、5本のケー
ブル1の絡み合いが防止される。さらに、各ケーブル延
線機20において、ボール30の回転軸に沿った配列順
序を同一にすれば、ケーブル1の配列位置からケーブル
1を特定することができる。また、ボール30の回転軸
に沿ってボール30から外れる方向の力がケーブル1に
作用することもなく、一部のケーブル1が延線中に一対
のボール30間から外れるような事態も防止できる。
Next, a case where the cable drawing machine 20 is applied to the drawing of five cables 1 will be described. In this cable drawing machine 20, the balls 30 are formed into a cylindrical outer shape, and circumferential grooves 30a are arranged side by side along the axis. As shown in FIG. 8, the five cables 1 are accommodated in the grooves 30a facing each other, and pass between the pair of balls 30 while being arranged in a line in the axial direction. Therefore, the contact area between the ball 30 and the cable 1 becomes substantially equal in each cable 1, and a uniform feeding force acts on each cable 1. As a result, each cable 1 is extended with the same tension, and the occurrence of loosening and twisting of the cable 1 is suppressed. In addition, since there is no cable 1 that does not contact the ball 30, a situation where some of the cables 1 are not extended does not occur. Further, once the five cables 1 are guided between the opposing balls 30, the arrangement state of the five cables 1 along the rotation axis of the balls 30 is maintained, and the entanglement of the five cables 1 is prevented. . Furthermore, in each cable drawing machine 20, if the arrangement order along the rotation axis of the ball 30 is made the same, the cable 1 can be specified from the arrangement position of the cable 1. Further, a force in a direction of detaching from the ball 30 along the rotation axis of the ball 30 does not act on the cable 1, and it is possible to prevent a situation in which a part of the cable 1 is detached from between the pair of balls 30 during extension. .

【0035】なお、延線経路の直線部に設置されたケー
ブル延線機20間が長い場合には、整線コロ22をケー
ブル延線機20間に複数台設置してもよい。そして、ロ
ーラ35の回転軸がケーブル延線機20に近付くにした
がって起立するように各整線コロ22を設置すれば、多
数本のケーブル1は、前段のケーブル延線機20から送
り出された上下方向の配列状態が整線コロ22により徐
々に傾斜して水平な配列状態となり、その後徐々に起立
して上下方向の配列状態となって後段のケーブル延線機
20に導かれる。その結果、ケーブル1のスムーズな走
行移動が行われ、牽引負荷の増大が抑制されるととも
に、ケーブル1の弛みや捩れの発生も抑制される。ま
た、長いケーブル延線機20間にコーナー部がある場合
には、ローラ35の回転軸がケーブル延線機20および
整線コーナーコロ21に近付くにしたがって起立するよ
うに整線コロ22を複数台設置するようにしてもよい。
この場合、ケーブル1のスムーズな走行移動が行われ
る。また、延線経路のコーナー部においては、整線コー
ナーコロ21が多数本のケーブル1を分離して案内する
機能を十分果たしていれば、必ずしもケーブル延線機2
0間に整線コロ22を設置する必要はない。
In the case where the distance between the cable drawing machines 20 installed on the straight portion of the wire drawing path is long, a plurality of straightening rollers 22 may be provided between the cable drawing machines 20. If each straightening roller 22 is installed so that the rotation axis of the roller 35 rises as it approaches the cable drawing machine 20, a large number of cables 1 can be moved up and down from the cable drawing machine 20 at the preceding stage. The arrangement state in the direction is gradually inclined by the straightening rollers 22 to become a horizontal arrangement state, and then gradually rises and becomes an arrangement state in the up and down direction, and is guided to the cable drawing machine 20 at the subsequent stage. As a result, the cable 1 travels smoothly, suppressing an increase in the traction load and suppressing the cable 1 from becoming loose or twisting. When there is a corner between the long cable drawing machines 20, a plurality of the straightening rollers 22 are arranged so that the rotation axis of the roller 35 rises as the cable 35 approaches the cable drawing machine 20 and the cornering roller 21. It may be installed.
In this case, a smooth traveling movement of the cable 1 is performed. Also, in the corner portion of the wire drawing route, if the straightening corner roller 21 sufficiently fulfills the function of separating and guiding a large number of cables 1, the cable drawing machine 2 is not necessarily required.
There is no need to install the straightening rollers 22 between zero.

【0036】実施の形態2.上記実施の形態1では、ケ
ーブル延線機20は、一対のボール30が溝30a
(谷)同士および凸部(山)同士を互いに相対するよう
に配置されるものとしているが、この実施の形態2で
は、図9に示されるように、一対のボール51が溝51
a(谷)と凸部(山)とを互いに相対するように配置さ
れるものとしている。そこで、この実施の形態2におい
ても、各ケーブル1は、図9に示されるように、相対す
る溝51aと凸部との間に納められてボール51の回転
軸に沿って配列されるので、上記実施の形態1と同様の
効果が得られる。
Embodiment 2 In the first embodiment, the cable drawing machine 20 is configured such that the pair of balls 30 is
Although the (valleys) and the convex portions (peaks) are arranged to face each other, in the second embodiment, as shown in FIG.
a (valley) and the convex portion (mountain) are arranged so as to face each other. Therefore, also in the second embodiment, as shown in FIG. 9, each cable 1 is accommodated between the corresponding groove 51a and the protruding portion and arranged along the rotation axis of the ball 51. The same effects as in the first embodiment can be obtained.

【0037】実施の形態3.上記実施の形態1では、長
い1本のトエルロープ19を用い、該トエルロープ19
の先端をウインチ8のドラムに巻き付けてケーブル1を
牽引するものとしているが、この実施の形態3では、ル
ープ状(エンドレス)のトエルロープを用い、該トエル
ロープをウインチ8のドラムに巻き付けてケーブル1を
牽引するものとしている。この実施の形態3では、ルー
プ状のトエルロープを延線経路に沿って配置し、ウイン
チ8による牽引操作時に、トエルロープを延線経路の始
端側と終端側との間を循環するようにしている。そこ
で、作業者がトエルロープをもって延線経路を移動しな
がらトエルロープをケーブル延線機20、整線コロ22
および整線コーナーコロ21にかけて行く作業は最初の
1回で済み、省力化が図られる。
Embodiment 3 In the first embodiment, one long towel rope 19 is used.
Is wound around the drum of the winch 8 to pull the cable 1. In the third embodiment, a loop-shaped (endless) towel rope is used. It is towed. In the third embodiment, the loop-shaped towel rope is arranged along the extension path, and the towel rope is circulated between the starting end and the end side of the extension path during the towing operation by the winch 8. Therefore, the operator moves the towel rope with the cable extending machine 20 and the straightening roller 22 while moving the towel rope with the towel rope.
In addition, the work to be performed on the straightening corner rollers 21 is only required to be performed once at the first time, thereby saving labor.

【0038】実施の形態4.上記実施の形態1では、ト
エルロープ19の先端をウインチ8のドラムに巻き付け
てウインチ8の牽引力によりトエルロープ19およびケ
ーブル1を牽引するものとしているが、この実施の形態
4では、人力によりトエルロープ19およびケーブル1
を牽引するものとしている。つまり、この実施の形態4
では、トエルロープ19の長さを隣り合うケーブル延線
機20間の距離とほぼ等しく、ウインチ8を用いず人力
によりトエルロープ19を牽引するもので、他の構成は
上記実施の形態1と同様に構成されている。
Embodiment 4 FIG. In the above-described first embodiment, the tip of the towel rope 19 is wound around the drum of the winch 8 to pull the towel rope 19 and the cable 1 by the pulling force of the winch 8. 1
Is to be driven. That is, the fourth embodiment
In this embodiment, the length of the towel rope 19 is substantially equal to the distance between the adjacent cable drawing machines 20, and the towel rope 19 is pulled by human power without using the winch 8. The other structure is the same as that of the first embodiment. Have been.

【0039】つぎに、この実施の形態4によるケーブル
多条引き延線工法について説明する。まず、ケーブル1
の延線に先立って、ケーブル1の布設経路の全長にわた
ってケーブルトレイ(図示せず)を延設する。ついで、
ケーブルトレイに沿って、ケーブル延線機20を随所に
設置する。そして、延線経路のコーナ部に整線コーナー
コロ21を設置し、ケーブル延線機20間に整線コロ2
2を設置する。そして、延線経路の始端側にて、3台の
ケーブルローラ3を設置し、その後段に3台のキャタピ
ラ延線機9を設置し、その後段に鈞車10を設置する。
Next, a description will be given of a cable multi-drawing method according to the fourth embodiment. First, cable 1
Prior to the extension, a cable tray (not shown) is extended over the entire length of the cable laying path. Then
Along the cable tray, the cable drawing machine 20 is installed everywhere. Then, a straightening corner roller 21 is installed at the corner of the wire drawing route, and the straightening roller 2 is placed between the cable drawing machines 20.
2 is installed. Then, three cable rollers 3 are installed at the start end side of the wire drawing route, three caterpillar wire drawing machines 9 are installed at the subsequent stage, and a trolley 10 is installed at the subsequent stage.

【0040】そこで、各ケーブルローラ3のローラ3a
を回転駆動させてケーブルドラム2を回転させ、ケーブ
ル1を送り出す。送り出されたケーブル1は、それぞれ
キャタピラ延線機9に導かれる。そして、キャタピラ延
線機9にて送り出されたケーブル1は、鈞車10に掛け
られる。そこで、ケーブル1の先端を第1の把持部43
のピン43aに連結して、3本のケーブル1にそれぞれ
より戻し23を連結する。ついで、トエルロープ19の
分岐された各後端を各より戻し23の第2の把持部44
のピン44aに連結して、より戻し23を介して3本の
ケーブル1とトエルロープ19とを連結する。
Therefore, the roller 3a of each cable roller 3
Is rotated to rotate the cable drum 2, and the cable 1 is sent out. The sent cables 1 are respectively guided to the caterpillar drawing machine 9. Then, the cable 1 sent out by the caterpillar wire drawing machine 9 is hung on a bunker 10. Therefore, the tip of the cable 1 is
And the return 23 is connected to each of the three cables 1. Then, the branched rear ends of the towel rope 19 are returned from the respective ends, and the second gripping portions 44 of the
, And the three cables 1 and the towel rope 19 are connected via the return 23.

【0041】ここで、1人の作業者が、トエルロープ1
9を持ち、延線経路に沿って移動しながらローラ3a、
キャタピラ延線機9およびケーブル延線機20を駆動す
る。そして、この作業者は、各ケーブル延線機20にお
いて、トエルロープ19を一対のボール30間に通しな
がら、延線経路に沿って移動する。また、もう1人の作
業者が、先行の作業者の後を移動しながら、各ケーブル
延線機20の位置において、一対のボール30の最上部
の溝30a間、中央の溝30a間および最下部の溝30
a間にそれぞれに同じケーブル1が通過するように、3
本のケーブル1をそれぞれ一対のボール30間に案内す
る。同様に、各整線コロ22の位置において、ローラ3
5の回転軸方向に3つに区画されたローラ36間のそれ
ぞれには常に同一のケーブル1が通過するように、3本
のケーブル1を各ローラ36間にそれぞれ案内する。同
様に、各整線コーナーコロ21の位置においては、コロ
40の最上部の溝40a、中央の溝40aおよび最下部
の溝40aには常に同一のケーブル1が通過するよう
に、3本のケーブル1をそれぞれローラ40の溝40a
に案内する。先行の作業者は、延線経路の足場の悪さや
階段の上り下りにより移動速度が変動する。そこで、先
行の作業者は、自分の移動速度に合わせて、ローラ3
a、キャタピラ延線機9およびケーブル延線機20の速
度を変え、ケーブル1の送り速度をコントロールする。
この時、先行の作業者は、もう1人の作業者がケーブル
1の案内作業をしやすいように、ケーブル1の送り速度
をコントロールしてもよい。
Here, one worker operates the towel rope 1
9, while moving along the extension path, the rollers 3a,
The caterpillar drawing machine 9 and the cable drawing machine 20 are driven. Then, in each cable drawing machine 20, the worker moves along the wire drawing path while passing the towel rope 19 between the pair of balls 30. In addition, while another worker moves behind the preceding worker, at the position of each cable drawing machine 20, between the uppermost groove 30a of the pair of balls 30, between the central groove 30a and the uppermost one. Lower groove 30
a so that the same cable 1 passes between
Each of the cables 1 is guided between a pair of balls 30. Similarly, at the position of each straightening roller 22, the roller 3
The three cables 1 are guided between the rollers 36 so that the same cable 1 always passes between the three rollers 36 partitioned in the direction of the rotation axis 5. Similarly, at the position of each straightening corner roller 21, three cables are arranged so that the same cable 1 always passes through the uppermost groove 40 a, the central groove 40 a, and the lowermost groove 40 a of the roller 40. 1 is a groove 40a of each roller 40
To guide. The moving speed of the preceding worker fluctuates due to poor scaffolding on the extended route or up and down stairs. Therefore, the preceding worker adjusts the roller 3 according to his own moving speed.
a, The feed speed of the cable 1 is controlled by changing the speeds of the caterpillar drawing machine 9 and the cable drawing machine 20.
At this time, the leading worker may control the feed speed of the cable 1 so that another worker can easily guide the cable 1.

【0042】この作業者による案内作業が一度終了すれ
ば、その後、3本のケーブル1は、自動的に、各ケーブ
ル延線機20において軸方向の配列順序を維持して一対
のボール30間を通過し、各整線コロ22において同じ
位置のローラ35間を通過し、各整線コーナーコロ21
において同じ位置の溝40aを通過することになる。こ
のケーブル1の延線中に、ケーブル1にねじれが発生す
ると、ねじれの応力により第1の連結部43がピン45
回りに回転し、あるいは連結部42が軸46回りに回転
し、ねじれによる応力が緩和され、ケーブル1に蓄積さ
れない。そして、1組の作業者が延線経路の終端側まで
到達すると、ローラ3a、キャタピラ延線機9およびケ
ーブル延線機20の駆動を停止する。ついで、ケーブル
1とより戻し23との連結を解き、鈞車10の後段側で
ケーブル1を切断して、所定の長さの3本のケーブル1
とする。そこで、複数の作業者が延線経路の随所に配属
され、ケーブル1を1本づつケーブルトレイ内に整線し
ながら移し替え、3本のケーブル1の延線作業が一度に
終了する。
Once the guide operation by the operator is completed, the three cables 1 are automatically moved between the pair of balls 30 while maintaining the axial arrangement order in each cable drawing machine 20. Each roller 22 passes between the rollers 35 at the same position in each of the aligning rollers 22, and each of the aligning corner rollers 21
Pass through the groove 40a at the same position. When the cable 1 is twisted during the extension of the cable 1, the first connecting portion 43 causes the pin 45
The connection portion 42 rotates around the shaft 46, or the connection portion 42 rotates around the shaft 46, so that the stress due to the torsion is relieved and is not accumulated in the cable 1. When one set of workers reaches the end of the wire drawing path, the driving of the roller 3a, the caterpillar wire drawing machine 9 and the cable drawing machine 20 is stopped. Next, the connection between the cable 1 and the return cable 23 is released, and the cable 1 is cut off at the rear side of the vehicle 10 so that three cables 1 of a predetermined length are formed.
And Therefore, a plurality of workers are assigned to various places in the wire drawing route, and the cables 1 are transferred one by one while being arranged in the cable tray, and the wire drawing work of the three cables 1 is completed at once.

【0043】上述の作業を繰り返し行い、所定本のケー
ブル1を延線することになる。そして、延線経路に沿っ
て設置されたケーブル延線機20、整線コーナーコロ2
1、整線コロ22等の機器を撤去し、ケーブルの延線作
業が完了する。延線されたケーブルは整線された状態で
ケーブルトレイ内に一括して収容される。
The above operation is repeated to extend a predetermined number of cables 1. And the cable drawing machine 20 installed along the wire drawing route,
1. The equipment such as the straightening roller 22 is removed, and the cable extension work is completed. The extended cables are collectively accommodated in the cable tray in a state where the cables are arranged.

【0044】ここで、3台のケーブルドラム2から送り
出された3本のケーブル1は、ローラ3a、キャタピラ
延線機9およびケーブル延線機20の送り力により延線
経路に沿って移動する。そこで、先行の作業者は、トエ
ルロープ19のみを牽引することになる。即ち、作業者
はケーブル1の重さを負担しない。
Here, the three cables 1 sent from the three cable drums 2 move along the wire drawing path by the feed force of the roller 3a, the caterpillar drawing machine 9 and the cable drawing machine 20. Therefore, the preceding worker pulls only the towel rope 19. That is, the operator does not bear the weight of the cable 1.

【0045】このように、この実施の形態4において
も、上記実施の形態1と同様の効果が得られる。さら
に、この実施の形態4によれば、トエルロープ19の長
さを隣り合うケーブル延線機20間の距離とほぼ等しく
し、かつ、延線経路の足場の状態あるいは階段の上り下
り等、延線ルートの環境に起因する作業者の移動速度の
変動に合わせてケーブル1の送り速度をコントロールし
ているので、ケーブル1の案内作業がしやすいウインチ
レスのケーブル多条引き延線工法が得られる。
As described above, also in the fourth embodiment, the same effects as in the first embodiment can be obtained. Further, according to the fourth embodiment, the length of the towel rope 19 is made substantially equal to the distance between the adjacent cable extending machines 20, and the extension of the extension line such as the state of the scaffolding of the extension route or the ascending or descending of the stairs. Since the feed speed of the cable 1 is controlled in accordance with the movement speed of the worker caused by the environment of the route, a winchless cable multi-strand drawing method that can easily guide the cable 1 can be obtained.

【0046】なお、整線コロは区画された複数のケーブ
ル案内部を有していればよく、図4に示される整線コロ
22の構造に限定されるものではない。また、整線コー
ナーコロも区画された複数のケーブル案内部を有してい
ればよく、図5に示される整線コーナーコロ21の構造
に限定されるものではない。また、より戻しは、ケーブ
ル1とトエルロープ19とに対して回転自在に構成され
ていればよく、図6に示されるより戻し23の構造に限
定されるものではない。また、上記各実施の形態では、
ケーブルドラム2をドラムローラ3に搭載し、ローラ3
aの回転駆動によりケーブルドラム2を回転させてケー
ブル1を送り出すものとしているが、ドラムローラ3は
ローラ3aの回転駆動源を必ずしも備えている必要はな
く、ケーブル延線機20の送り力によりケーブルドラム
2を回転させてケーブル1をケーブルドラム2から繰り
出させるようにしてもよい。同様に、ケーブル延線経路
の始端側に設置されたキャタピラ延線機9も省略するこ
とができる。また、キャタピラ延線機9はケーブル延線
機20であっても同様の機能をもつことができる。
It is sufficient that the straightening roller has a plurality of partitioned cable guides, and the structure is not limited to the structure of the straightening roller 22 shown in FIG. Further, the alignment roller may have a plurality of partitioned cable guides, and is not limited to the structure of the alignment corner roller 21 shown in FIG. Further, the return may be configured so as to be rotatable with respect to the cable 1 and the towel rope 19, and is not limited to the structure of the return 23 shown in FIG. In each of the above embodiments,
The cable drum 2 is mounted on the drum roller 3, and the roller 3
The cable drum 2 is rotated to drive the cable 1 and the cable 1 is sent out. However, the drum roller 3 does not necessarily need to have a rotation drive source for the roller 3a. The cable 1 may be extended from the cable drum 2 by rotating the drum 2. Similarly, the caterpillar drawing machine 9 installed at the start end side of the cable drawing route can be omitted. Further, even if the caterpillar wire drawing machine 9 is a cable drawing machine 20, it can have the same function.

【0047】[0047]

【発明の効果】この発明は、以上のように構成されてい
るので、以下に記載されるような効果を奏する。
Since the present invention is configured as described above, it has the following effects.

【0048】この発明によれば、それぞれ円筒状の外形
形状に成形され、かつ、複数の溝が軸方向に沿ってそれ
ぞれの外周面に複数並設された一対のボールおよび該一
対のボールを回転駆動するモータを備えたケーブル延線
機をケーブルの延線経路に沿って所定距離毎に配置し、
ケーブルを案内するケーブル案内部がそれぞれ区画され
て複数並設された整線コーナーコロを該ケーブル案内部
の並設方向をほぼ上下方向に向けて該延線経路のコーナ
ー部に設置し、ケーブルを案内するケーブル案内部がそ
れぞれ区画されて複数並設された整線コロを該ケーブル
案内部の並設方向を延線経路を遮る方向に向けて隣り合
うケーブル延線機間に少なくとも1台設置し、さらに該
延線経路の始端側に複数台のケーブルドラムを配置する
工程と、上記複数台のケーブルドラムのそれぞれから繰
り出された複数本のケーブルをそれぞれより戻しを介し
て牽引ロープに連結する工程と、上記牽引ロープを牽引
しながら上記ケーブル延線機を駆動させて、ケーブル案
内のための作業者が、上記より戻しが上記ケーブル延線
機、上記整線コーナーコロおよび上記整線コロを通過す
る際に、上記複数本のケーブルのそれぞれを、上記ケー
ブル延線機の一対のボールの上記各溝に案内し、上記整
線コーナーコロの各ケーブル案内部に案内し、上記整線
コロの各ケーブル案内部に案内する工程とを有するの
で、複数本のケーブルのそれぞれを特定できる状態で、
絡み合うことなく、かつ、弛みを抑えて同時に延線で
き、工期の短縮および低コスト化を図ることができると
ともに、延線されたケーブルのケーブルトレイへの移し
替え作業および整線作業が簡易となるケーブル多条引き
延線工法が得られる。
According to the present invention, a pair of balls each formed into a cylindrical outer shape and having a plurality of grooves arranged in parallel on the respective outer peripheral surfaces along the axial direction, and the pair of balls are rotated. A cable drawing machine equipped with a driving motor is arranged at predetermined intervals along a cable drawing path,
A cable guide section for guiding a cable is partitioned, and a plurality of straightening corner rollers arranged side by side are installed at the corners of the extended route with the direction of the cable guide sections substantially vertically oriented and the cable is arranged. A plurality of straightening rollers, each of which has a plurality of cable guide sections to be guided and partitioned, are installed between adjacent cable drawing machines such that the direction in which the cable guide sections are arranged is directed in a direction in which the wire path is interrupted. Arranging a plurality of cable drums on the starting end side of the wire extension path, and connecting a plurality of cables unreeled from each of the plurality of cable drums to a tow rope via a return. And driving the cable drawing machine while towing the tow rope, and an operator for guiding the cable returns the cable from the cable drawing machine to the wire drawing machine. When passing through the roller and the straightening roller, each of the plurality of cables is guided to each of the grooves of the pair of balls of the cable drawing machine, and is guided to each of the cable guides of the straightening corner roller. And guiding the cable to the respective cable guides of the straightening roller, so that each of the plurality of cables can be specified,
Wires can be drawn simultaneously without entanglement and with less slack, shortening the construction period and reducing costs, and simplifying the work of transferring the drawn cables to the cable tray and the work of straightening. The cable multi-drawing method is obtained.

【0049】また、ウインチが上記ケーブルの延線経路
の後端側に配設され、上記牽引ロープが該ウインチのド
ラムに巻き付けられて、該ウインチの駆動により、該牽
引ロープを牽引するようにしたので、重量のある複数本
のケーブルを確実に延線できる。
Further, a winch is provided at the rear end side of the extension route of the cable, and the tow rope is wound around a drum of the winch, and the tow rope is towed by driving the winch. Therefore, a plurality of heavy cables can be reliably extended.

【0050】また、上記牽引ロープがループ状の牽引ロ
ープであるので、延線経路に沿って牽引ロープを牽引し
つつ、該牽引ロープをケーブル延線機、整線コロおよび
整線コーナーコロに掛ける作業が2回目以降のケーブル
延線作業で不要となり、ケーブル延線の作業性を向上で
きる。
Further, since the tow rope is a loop-shaped tow rope, the tow rope is hung on a cable drawing machine, a straightening roller and a straightening corner roller while towing the tow rope along the extending route. The work becomes unnecessary in the second and subsequent cable extension work, and the workability of cable extension can be improved.

【0051】[0051]

【0052】[0052]

【0053】また、上記牽引ロープが隣り合う上記ケー
ブル延線機間の距離とほぼ等しい長さに形成され、ロー
プ牽引のための作業者が、該牽引ロープを該ケーブル延
線機の一対のボール間に噛ませながら牽引しつつ延線経
路に沿って歩行移動し、かつ、該ケーブル延線機の駆動
を制御して該延線経路に沿った歩行移動速度に合わせて
ケーブルの移動速度を調整するようにしたので、重量の
ある複数本のケーブルの牽引がケーブル延線機で負担さ
れ、ケーブルの案内作業がしやすいウインチレスのケー
ブル多条引き延線ができる。
In addition, the cable in which the tow rope is adjacent
Is formed to a length approximately equal to the distance between
An operator for towing the rope extends the towing rope through the cable.
Wire drawing while pulling while biting between a pair of balls of wire drawing machine
Walking along the road and driving the cable drawing machine
In accordance with the walking speed along the extension route
The speed of moving the cable is adjusted so that the weight
Tow several cables is burdened by cable drawing machine
Winchless cable for easy cable guidance
Bull multi-line drawing

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1に係るケーブル多条
引き延線工法を示す模式図である。
FIG. 1 is a schematic diagram showing a cable multi-strand drawing method according to Embodiment 1 of the present invention.

【図2】 この発明の実施の形態1に係るケーブル多条
引き延線工法の要部を示す模式図である。
FIG. 2 is a schematic view showing a main part of a cable multi-drawing method according to Embodiment 1 of the present invention.

【図3】 この発明の実施の形態1に係るケーブル多条
引き延線工法に用いられるケーブル延線機を示す斜視図
である。
FIG. 3 is a perspective view showing a cable drawing machine used in the multiple cable drawing method according to Embodiment 1 of the present invention;

【図4】 この発明の実施の形態1に係るケーブル多条
引き延線工法に用いられる整線コロを示す斜視図であ
る。
FIG. 4 is a perspective view showing a straightening roller used in the cable multi-strand drawing method according to Embodiment 1 of the present invention;

【図5】 この発明の実施の形態1に係るケーブル多条
引き延線工法に用いられる整線コーナーコロを示す斜視
図である。
FIG. 5 is a perspective view showing a straightening corner roller used in the cable multi-drawing and extending method according to Embodiment 1 of the present invention;

【図6】 この発明の実施の形態1に係るケーブル多条
引き延線工法に用いられるより戻しを示す一部破断側面
図である。
FIG. 6 is a partially broken side view showing a twist used in the cable multi-drawing method according to the first embodiment of the present invention.

【図7】 従来のボール延線機におけるケーブル延線状
態を説明する模式図である。
FIG. 7 is a schematic diagram illustrating a cable drawing state in a conventional ball drawing machine.

【図8】 この発明の実施の形態1によるケーブル延線
機におけるケーブル延線状態を説明する模式図である。
FIG. 8 is a schematic diagram illustrating a cable extending state in the cable extending machine according to the first embodiment of the present invention.

【図9】 この発明の実施の形態2に係るケーブル多条
引き延線工法に用いられるケーブル延線機を示す模式図
である。
FIG. 9 is a schematic diagram showing a cable drawing machine used in a cable multi-drawing method according to Embodiment 2 of the present invention.

【図10】 従来のケーブル延線工法を示す模式図であ
る。
FIG. 10 is a schematic view showing a conventional cable drawing method.

【図11】 従来のケーブル多条引き延線工法を示す模
式図である。
FIG. 11 is a schematic view illustrating a conventional cable multi-drawing method.

【符号の説明】[Explanation of symbols]

1 ケーブル、2 ケーブルドラム、8 ウインチ、1
9 トエルロープ(牽引ロープ)、20、50 ケーブ
ル延線機、21 整線コーナーコロ、22 整線コロ、
23 より戻し、30、51 ボール、30a、51a
溝、31 架台、32 モータ、35、36 ローラ
(ケーブル案内部)、40 コロ、40a 溝(ケーブ
ル案内部)。
1 cable, 2 cable drums, 8 winches, 1
9 towel rope (tow rope), 20, 50 cable drawing machine, 21 straightening corner roller, 22 straightening roller,
23, 30 and 51 balls, 30a and 51a
Groove, 31 mount, 32 motor, 35, 36 rollers (cable guide), 40 rollers, 40a groove (cable guide).

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H02G 1/06 H02G 1/02 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) H02G 1/06 H02G 1/02

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 それぞれ円筒状の外形形状に成形され、
かつ、複数の溝が軸方向に沿ってそれぞれの外周面に複
数並設された一対のボールおよび該一対のボールを回転
駆動するモータを備えたケーブル延線機をケーブルの延
線経路に沿って所定距離毎に配置し、ケーブルを案内す
るケーブル案内部がそれぞれ区画されて複数並設された
整線コーナーコロを該ケーブル案内部の並設方向をほぼ
上下方向に向けて該延線経路のコーナー部に設置し、ケ
ーブルを案内するケーブル案内部がそれぞれ区画されて
複数並設された整線コロを該ケーブル案内部の並設方向
を延線経路を遮る方向に向けて隣り合うケーブル延線機
間に少なくとも1台設置し、さらに該延線経路の始端側
に複数台のケーブルドラムを配置する工程と、 上記複数台のケーブルドラムのそれぞれから繰り出され
た複数本のケーブルをそれぞれより戻しを介して牽引ロ
ープに連結する工程と、 上記牽引ロープを牽引しながら上記ケーブル延線機を駆
動させて、ケーブル案内のための作業者が、上記より戻
しが上記ケーブル延線機、上記整線コーナーコロおよび
上記整線コロを通過する際に、上記複数本のケーブルの
それぞれを、上記ケーブル延線機の一対のボールの上記
各溝に案内し、上記整線コーナーコロの各ケーブル案内
部に案内し、上記整線コロの各ケーブル案内部に案内す
る工程とを有することを特徴とするケーブル多条引き延
線工法。
1. Each is formed into a cylindrical outer shape,
In addition, a cable drawing machine having a pair of balls in which a plurality of grooves are provided in parallel on the respective outer peripheral surfaces along the axial direction and a motor for rotating and driving the pair of balls is provided along a cable drawing path. The cable guides for guiding the cables are arranged at predetermined intervals, and a plurality of line-aligned corner rollers, each of which is divided and arranged side by side, are arranged such that the direction in which the cable guides are arranged is substantially vertically oriented at the corners of the extension route. A cable drawing machine adjacent to a plurality of straightening rollers, each of which has a cable guide section for guiding a cable, which is sectioned, and which is arranged side by side in a direction in which the cable guide sections are arranged in a direction in which the wire drawing path is blocked. Installing at least one cable drum between the plurality of cable drums, and arranging a plurality of cable drums on the starting end side of the wire drawing path; A step of connecting to the tow rope via each return, and driving the cable drawing machine while towing the tow rope, an operator for cable guiding, the return from the above is the cable drawing machine Guiding each of the plurality of cables to each of the grooves of the pair of balls of the cable drawing machine when passing through the straightening corner rollers and the straightening rollers; A step of guiding the cable to the cable guide and guiding the cable to each cable guide of the straightening roller.
【請求項2】 ウインチが上記ケーブルの延線経路の後
端側に配設され、上記牽引ロープが該ウインチのドラム
に巻き付けられて、該ウインチの駆動により、該牽引ロ
ープを牽引するようにしたことを特徴とする請求項1記
載のケーブル多条引き延線工法。
2. A winch is disposed at a rear end side of the wire drawing path of the cable, and the tow rope is wound around a drum of the winch, and driven by the winch, the tow rope is towed. 2. The method according to claim 1, wherein the cable is a multi-stretched cable.
【請求項3】 上記牽引ロープがループ状の牽引ロープ
であることを特徴とする請求項2記載のケーブル多条引
き延線工法。
3. The method of claim 2, wherein the pulling rope is a loop-shaped pulling rope.
【請求項4】 上記牽引ロープが隣り合う上記ケーブル
延線機間の距離とほぼ等しい長さに形成され、ロープ牽
引のための作業者が、該牽引ロープを該ケーブル延線機
の一対のボール間に噛ませながら牽引しつつ延線経路に
沿って歩行移動し、かつ、該ケーブル延線機の駆動を制
御して該延線経路に沿った歩行移動速度に合わせてケー
ブルの移動速度を調整するようにしたことを特徴とする
請求項1記載のケーブル多条引き延線工法。
4. The tow rope is formed to have a length substantially equal to the distance between adjacent cable drawing machines, and an operator for rope tow pulls the tow rope to a pair of balls of the cable drawing machine. Walking along the extension line while pulling while biting in between, and controlling the drive of the cable drawing machine to adjust the movement speed of the cable according to the walking movement speed along the extension line 2. The method according to claim 1, wherein the cable is extended.
JP30354999A 1999-10-26 1999-10-26 Cable multi-drawing method Expired - Fee Related JP3248893B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30354999A JP3248893B2 (en) 1999-10-26 1999-10-26 Cable multi-drawing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30354999A JP3248893B2 (en) 1999-10-26 1999-10-26 Cable multi-drawing method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP26581397A Division JP3228325B2 (en) 1997-09-30 1997-09-30 Cable multi-drawing method and cable drawing machine

Publications (2)

Publication Number Publication Date
JP2000102126A JP2000102126A (en) 2000-04-07
JP3248893B2 true JP3248893B2 (en) 2002-01-21

Family

ID=17922353

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30354999A Expired - Fee Related JP3248893B2 (en) 1999-10-26 1999-10-26 Cable multi-drawing method

Country Status (1)

Country Link
JP (1) JP3248893B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703279A (en) * 2014-11-28 2016-06-22 国家电网公司 Cable duct bank corner well line tackle

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2411296B (en) * 2004-02-20 2007-12-12 Sean Hennelly Cable laying apparatus
KR200447222Y1 (en) 2008-05-01 2010-01-06 대우조선해양 주식회사 Cable distributor
CN102955107A (en) * 2012-10-23 2013-03-06 浙江晨光电缆股份有限公司 Quick transmission device for partial discharge test of high-voltage cable
CN110380360B (en) * 2019-07-09 2024-03-08 西南交通大学 Subway tunnel construction railcar convenient to realize regular cable laying
JP7058252B2 (en) * 2019-10-08 2022-04-21 株式会社フジクラ Cable wiring method
CN112952650B (en) * 2021-03-24 2022-10-14 海南电网有限责任公司文昌供电局 Distribution network overhead line real-time supervision equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703279A (en) * 2014-11-28 2016-06-22 国家电网公司 Cable duct bank corner well line tackle
CN105703279B (en) * 2014-11-28 2018-06-22 国家电网公司 A kind of cable duct bank rotation angle well releasing pulley

Also Published As

Publication number Publication date
JP2000102126A (en) 2000-04-07

Similar Documents

Publication Publication Date Title
CN113756201B (en) T-structure continuous beam prestressed steel strand pulling method and pulling device thereof
JP3248893B2 (en) Cable multi-drawing method
JP3228325B2 (en) Cable multi-drawing method and cable drawing machine
CN1246983A (en) Method and device for mounting winding
KR101443255B1 (en) A Wiring Apparatus of an Electric Wire
JP2879667B2 (en) Cable guide device
JPH09271125A (en) Method of multiple cable stringing and switchboard for extending cable
JP3257467B2 (en) Cable laying method and cable laying equipment
JP2003511321A (en) Method and apparatus for use in handling loads
JP2003274529A (en) Cable stringing method and braking device applied thereto
KR102025155B1 (en) Cable traction device with traction assembly
JP2868597B2 (en) Transmission line replacement method and rope recovery machine for the method
JP2879668B2 (en) Cable guide device
CN219801699U (en) Cable traction device
JPH04295216A (en) Loop traction type cable laying system
JP2000115932A (en) Cable laying technique and stringing machine
CN101683948B (en) Main rope coiling method for elevator
JPH09298818A (en) Cable laying device
JPS593380B2 (en) How to wind up, transport, and unwind the striatum
JP2023103019A (en) Tool for undoing strands
JP2000328475A (en) Wiring of cable, and device therefor
JPH039684B2 (en)
CN116553307A (en) Paying-off mechanism and paying-off vehicle comprising same
JP2002218616A (en) Method for stringing three-wire bundled cable and apparatus for transferring the same
JP2000278832A (en) Multiple cable drawing method and wire drawing wheel machine being applied thereto

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071109

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081109

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081109

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091109

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091109

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111109

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121109

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121109

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131109

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees