JP3235897U - Double lock tube casing for pre-boring construction - Google Patents

Double lock tube casing for pre-boring construction Download PDF

Info

Publication number
JP3235897U
JP3235897U JP2021004329U JP2021004329U JP3235897U JP 3235897 U JP3235897 U JP 3235897U JP 2021004329 U JP2021004329 U JP 2021004329U JP 2021004329 U JP2021004329 U JP 2021004329U JP 3235897 U JP3235897 U JP 3235897U
Authority
JP
Japan
Prior art keywords
casing
rod
block
lock tube
double lock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021004329U
Other languages
Japanese (ja)
Inventor
高建利
鞏立青
孫鳳東
敖岩
白錦涛
盧▲ル▼
丁慶吉
趙仲波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No3 Engwenineering Group Co Ltd Tianjin Construction Engineering Co Ltd
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No3 Engwenineering Group Co Ltd Tianjin Construction Engineering Co Ltd
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No3 Engwenineering Group Co Ltd Tianjin Construction Engineering Co Ltd, China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No3 Engwenineering Group Co Ltd Tianjin Construction Engineering Co Ltd
Application granted granted Critical
Publication of JP3235897U publication Critical patent/JP3235897U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Figure 0003235897000001

【課題】ドリルパイプを引き抜く際に、孔が潰れやすいという問題を改善する、プレボーリング施工用ダブルロックチューブケーシングを提供する。
【解決手段】互いに平行に設置される第1のケーシング1と第2のケーシング2とを含み、前記第1のケーシングの頂部外壁には1対の第1の接続板11が固定的に接続され、第1の接続板の各々の第1のケーシングから離れる片側にはいずれも第2の接続板12が固定的に接続され、前記第2のケーシングの頂部外壁には係着ブロック3が接続され、前記係着ブロックは第1のケーシングと第1の接続板と第2の接続板とで囲まれる空間内に配置され、前記係着ブロックの第1のケーシングから離れる片側は第2の接続板に当接し、前記係着ブロックの第1のケーシングに近接する片側は第1のケーシングの外壁に当接する。
【選択図】図1

Figure 0003235897000001

PROBLEM TO BE SOLVED: To provide a double lock tube casing for preboring construction, which improves a problem that a hole is easily crushed when a drill pipe is pulled out.
SOLUTION: The first casing 1 and the second casing 2 are installed in parallel with each other, and a pair of first connecting plates 11 are fixedly connected to the outer wall of the top of the first casing. , A second connecting plate 12 is fixedly connected to each side of the first connecting plate away from the first casing, and a fastening block 3 is connected to the outer wall of the top of the second casing. , The engagement block is arranged in a space surrounded by a first casing, a first connection plate and a second connection plate, and one side of the engagement block away from the first casing is a second connection plate. One side of the anchoring block close to the first casing abuts on the outer wall of the first casing.
[Selection diagram] Fig. 1

Description

本願は、建築施工の分野に関し、特にプレボーリング施工用ダブルロックチューブケーシングに関する。 The present application relates to the field of building construction, especially to a double lock tube casing for preboring construction.

建築施工の過程で、異なる場面での施工要求に応じて、水中の河床でのプレボーリングによる杭打ち作業が必要となる場合がある。 In the process of construction, pile driving work by pre-boring on the underwater riverbed may be required depending on the construction requirements in different situations.

現在、水中でのプレボーリング過程には、通常、ハンマードリルを用いて水中の河床に削孔を行い、河床の上側は玉石層であることが多く、玉石層の下側は汚泥層である。ハンマードリルのドリルパイプは、玉石層を通り抜けて汚泥層に達し、続いてドリルパイプは下向きに移動し続け、汚泥層に対して削孔作業を行い続け、削孔が完了した後、ドリルパイプを引き抜き、プレボーリング作業を完了させる。 Currently, in the underwater pre-boring process, a hammer drill is usually used to drill a hole in the underwater riverbed, and the upper part of the riverbed is often a boulder layer, and the lower part of the cobblestone layer is a sludge layer. The drill pipe of the hammer drill passes through the ball stone layer and reaches the sludge layer, and then the drill pipe continues to move downward, continues to drill holes in the sludge layer, and after the drilling is completed, the drill pipe is drilled. Complete the pulling out and pre-boring work.

上記の関連技術では、2つの孔の距離が近すぎる場合に加えて、玉石層に対する水流の衝撃作用で、ドリルパイプを引き抜く過程で孔が潰れる現象が発生し、さらに施工の進捗に影響を与える可能性がある。 In the above-mentioned related technology, in addition to the case where the distance between the two holes is too close, the impact of the water flow on the boulder layer causes the hole to collapse in the process of pulling out the drill pipe, which further affects the progress of construction. there is a possibility.

本願は、ドリルパイプを引き抜く際に、孔が潰れやすいという問題を改善するために、プレボーリング施工用ダブルロックチューブケーシングを提供する。 The present application provides a double lock tube casing for preboring construction in order to improve the problem that the hole is easily crushed when the drill pipe is pulled out.

本願にて提供されるプレボーリング施工用ダブルロックチューブケーシングは、以下の技術的解決手段を採用する。 The double lock tube casing for pre-boring construction provided in the present application employs the following technical solutions.

プレボーリング施工用ダブルロックチューブケーシングは、互いに平行に設置される第1のケーシングと第2のケーシングとを含み、前記第1のケーシングの頂部外壁には1対の第1の接続板が固定的に接続され、第1の接続板の各々の第1のケーシングから離れる片側にはいずれも第2の接続板が固定的に接続され、前記第2のケーシングの頂部外壁には係着ブロックが接続され、前記係着ブロックは第1のケーシングと第1の接続板と第2の接続板とで囲まれる空間内に配置され、前記係着ブロックの第1のケーシングから離れる片側は第2の接続板に当接し、前記係着ブロックの第1のケーシングに近接する片側は第1のケーシングの外壁に当接する。 The double lock tube casing for preboring construction includes a first casing and a second casing installed in parallel with each other, and a pair of first connecting plates is fixed to the outer wall of the top of the first casing. A second connecting plate is fixedly connected to each side of the first connecting plate away from the first casing of each of the first connecting plates, and an anchoring block is connected to the outer wall of the top of the second casing. The anchoring block is arranged in a space surrounded by a first casing, a first connection plate and a second connection plate, and one side of the engagement block away from the first casing is a second connection. One side of the anchoring block that abuts on the plate and is close to the first casing abuts on the outer wall of the first casing.

上記技術的解決手段を採用することにより、第1のケーシングと第1の接続板と第2の接続板とで囲まれる空間内に係着ブロックを配置し、第1のケーシングと第2のケーシングとを互いに平行に設置し、プレボーリングが必要となる場合、第1のケーシング及び第2のケーシングを玉石層に配置し、一方のドリルパイプを第1のケーシング内に鉛直に入れ、他方のドリルパイプを第2のケーシング内に鉛直に入れ、2つのドリルパイプは同時に下向きにプレボーリングし、ドリルパイプの移動に伴い、第1のケーシング及び第2のケーシングはドリルパイプにより掘削された孔に鉛直方向に沿って下向きに挿入され、第1のケーシング及び第2のケーシングはドリルパイプに伴って下向きに移動してプレボーリング作業を行い、第1のケーシング及び第2のケーシングはドリルパイプにより掘削された孔を支持し、ドリルパイプを引き抜く過程で、孔が潰れる可能性を減少させる効果を有する。 By adopting the above technical solution, the anchoring block is arranged in the space surrounded by the first casing, the first connecting plate and the second connecting plate, and the first casing and the second casing are arranged. And are installed parallel to each other, and if pre-boring is required, the first casing and the second casing are placed in the ball stone layer, one drill pipe is placed vertically in the first casing and the other drill. The pipe is placed vertically in the second casing, the two drill pipes are pre-bored downward at the same time, and as the drill pipe moves, the first casing and the second casing are vertically inserted into the holes drilled by the drill pipe. It is inserted downward along the direction, the first casing and the second casing move downward along with the drill pipe to perform preboring work, and the first casing and the second casing are drilled by the drill pipe. It has the effect of reducing the possibility of the hole being crushed in the process of supporting the hole and pulling out the drill pipe.

第1のケーシングと第2のケーシングとが平行に設置されることで、第1のケーシングと第2のケーシングとは互いに制限可能であり、第1のケーシング又は第2のケーシングが下向きに移動する際に傾く可能性を減少させ、プレボーリング過程でドリルパイプにより掘削された2つの孔の鉛直性を可能な限り確保する。 By installing the first casing and the second casing in parallel, the first casing and the second casing can be restricted from each other, and the first casing or the second casing moves downward. It reduces the possibility of tilting and ensures the verticality of the two holes drilled by the drill pipe during the pre-boring process as much as possible.

選択可能に、前記第2のケーシングと係着ブロックとの間には、係着ブロックと第2のケーシングを接続するための伸縮機構が設けられる。 Selectably, an expansion / contraction mechanism for connecting the engagement block and the second casing is provided between the second casing and the engagement block.

上記技術的解決手段を採用することにより、施工現場の状況に応じて第1のケーシングと第2のケーシングとの間の距離を調整する必要がある場合、伸縮アセンブリによって係着ブロックと第2のケーシングとの間の距離を調整することにより、第1のケーシングと第2のケーシングとの間の距離を変更する。 If it is necessary to adjust the distance between the first casing and the second casing according to the situation of the construction site by adopting the above technical solution, the telescopic assembly can be used for the anchoring block and the second casing. By adjusting the distance between the casings, the distance between the first casing and the second casing is changed.

選択可能に、前記伸縮機構は、係着ブロックの第2のケーシングに近接する片側に固定的に接続される第1の接続棒を含み、前記第2のケーシングの外壁に第2の接続棒が固定的に接続され、前記第1の接続棒の第2のケーシングに近接する片側には、第2の接続棒を摺動可能に挿着させる接続溝が内向きに設けられ、前記第1の接続棒には、複数の第1の接続孔が第1の接続棒の長手方向に沿って設けられ、前記第2の接続棒には、複数の第2の接続孔が第2の接続棒の長手方向に沿って設けられ、同じ軸線となる第1の接続孔と第2の接続孔の中には、挿着棒が挿着され、前記挿着棒の一端には、ストップブロックが固定的に接続され、前記ストップブロックは、第1の接続棒の外壁に当接する。 Optionally, the telescopic mechanism includes a first connecting rod that is fixedly connected to one side of the engagement block close to the second casing, with the second connecting rod on the outer wall of the second casing. On one side of the first connecting rod, which is fixedly connected and close to the second casing of the first connecting rod, a connecting groove for slidably inserting the second connecting rod is provided inwardly. The connection rod is provided with a plurality of first connection holes along the longitudinal direction of the first connection rod, and the second connection rod has a plurality of second connection holes of the second connection rod. An insertion rod is inserted into the first connection hole and the second connection hole which are provided along the longitudinal direction and have the same axis, and a stop block is fixed to one end of the insertion rod. The stop block abuts on the outer wall of the first connecting rod.

上記技術的解決手段を採用することにより、実際の要求に応じて第1の接続棒と第2の接続棒との全体の長さを調整することで、係着ブロックと第2のケーシングとの間の距離を調整し、続いて挿着棒を第1の接続孔と第2の接続棒に貫通させて第1の接続棒と第2の接続棒を固定し、調整作業を完了させ、調整過程が便利である。 By adopting the above technical solution, the anchoring block and the second casing can be provided by adjusting the total length of the first connecting rod and the second connecting rod according to the actual requirement. Adjust the distance between them, and then pass the insertion rod through the first connection hole and the second connection rod to fix the first connection rod and the second connection rod, complete the adjustment work, and make the adjustment. The process is convenient.

選択可能に、前記挿着棒には挿着棒を固定するためのロックアセンブリが接続される。 A lock assembly for fixing the insertion rod is connected to the insertion rod so as to be selectable.

上記技術的解決手段を採用することにより、ロックアセンブリは、挿着棒を固定し、挿着棒が第1の接続孔に挿着された際の安定性を増加させる。 By adopting the above technical solutions, the lock assembly secures the attachment rod and increases the stability when the insertion rod is inserted into the first connection hole.

選択可能に、前記ロックアセンブリは、第1の接続棒のストップブロックから離れる片側に当接する係着ボールを含み、前記係着ボールには、弾性変形が発生可能な1対の係着片が固定的に接続され、前記挿着棒には、係着片を係着させる挿着孔が設けられる。 Optionally, the lock assembly includes an anchoring ball that abuts on one side away from the stop block of the first connecting rod, to which a pair of anchoring pieces capable of elastic deformation are fixed. The attachment rod is provided with an insertion hole for engaging the engagement piece.

上記技術的解決手段を採用することにより、挿着棒を第1の接続孔に挿着した後、係着片を挿着孔に挿入し、係着片を挿着孔に通り抜けさせると、係着片は変形が回復し、係着片が挿着棒に係着され、係着ボールが第1の接続棒の鉛直外壁に当接して挿着棒を固定し、固定過程が便利である。 By adopting the above technical solution, when the attachment rod is inserted into the first connection hole, the engagement piece is inserted into the insertion hole, and the engagement piece is passed through the insertion hole, the engagement piece is engaged. The deformation of the attachment piece is recovered, the engagement piece is attached to the insertion rod, and the engagement ball abuts on the vertical outer wall of the first connecting rod to fix the insertion rod, and the fixing process is convenient.

選択可能に、前記ロックアセンブリは、鉛直に設置される固定棒を含み、前記挿着棒の頂部には、固定棒を挿着させる挿着溝が内向きに設けられ、前記固定棒は、第1の接続棒のストップブロックから離れる片側に当接する。 Optionally, the lock assembly includes a fixing rod that is installed vertically, the top of the mounting rod is provided with an inward insertion groove into which the fixing rod is inserted, and the fixing rod is a second. It abuts on one side away from the stop block of the connecting rod of 1.

上記技術的解決手段を採用することにより、挿着棒を第1の接続孔に挿着した後、固定棒を挿着溝に挿着すると、固定棒が第1の接続棒の鉛直外壁に当接して、挿着棒が固定され、固定過程が便利である。 By adopting the above technical solution, when the insertion rod is inserted into the first connection hole and then the fixing rod is inserted into the insertion groove, the fixing rod hits the vertical outer wall of the first connection rod. The insertion rod is fixed in contact, and the fixing process is convenient.

選択可能に、前記固定棒は鉄棒であり、前記挿着溝の溝底には、固定棒に当接する磁石が固定的に取り付けられる。 Selectably, the fixing rod is an iron rod, and a magnet abutting on the fixing rod is fixedly attached to the bottom of the insertion groove.

上記技術的解決手段を採用することにより、磁石が固定棒に吸引当接し、磁石は固定棒が第1の接続孔に挿着された際の安定性を増加させる。 By adopting the above technical solution, the magnet is attracted to the fixing rod, and the magnet increases the stability when the fixing rod is inserted into the first connecting hole.

選択可能に、第2の接続板の各々にいずれも締付ボルトが螺着され、前記締付ボルトは係着ブロックの第1のケーシングから離れる片側に当接する。 Tightening bolts are optionally screwed onto each of the second connecting plates, the tightening bolts abutting one side away from the first casing of the engagement block.

上記技術的解決手段を採用することにより、係着ブロックが第2の接続板の第1のケーシングに近接する片側に当接する時に締付ボルトを締め付けると、締付ボルトが係着ブロックに密着して当接し、締付ボルトは係着ブロックを固定し、係着ブロックが第2の接続板に当接した際の安定性を増加させる。 By adopting the above technical solution, when the tightening bolt is tightened when the fastening block comes into contact with one side of the second connecting plate close to the first casing, the tightening bolt is brought into close contact with the fastening block. The tightening bolt secures the fastening block and increases the stability when the fastening block abuts on the second connecting plate.

選択可能に、前記第1の接続板と第1のケーシングとの間に支持板が固定的に接続される。 A support plate is fixedly connected between the first connecting plate and the first casing so as to be selectable.

上記技術的解決手段を採用することにより、支持板は、第1の接続板が第1のケーシングに接続された際の安定性を増加させる。 By adopting the above technical solutions, the support plate increases the stability when the first connecting plate is connected to the first casing.

要約すると、本願は、以下の少なくとも1つの有益な効果を含む。
1.第1のケーシング及び第2のケーシングはドリルパイプにより掘削された孔に鉛直方向に沿って下向きに挿入され、第1のケーシング及び第2のケーシングはドリルパイプに伴って下向きに移動してプレボーリング作業を行い、第1のケーシング及び第2のケーシングはドリルパイプにより掘削された孔を支持し、ドリルパイプを引き抜く過程で、孔が潰れる可能性を減少させる効果を有する。
2.挿着棒を第1の接続孔に挿着した後、係着片を挿着孔に挿入し、係着片を挿着孔に通り抜けさせると、係着片は変形が回復し、係着片が挿着棒に係着され、係着ボールが第1の接続棒の鉛直外壁に当接して挿着棒を固定し、固定過程が便利である。
In summary, the present application includes at least one beneficial effect:
1. 1. The first casing and the second casing are inserted downward along the vertical direction into the holes drilled by the drill pipe, and the first casing and the second casing move downward along with the drill pipe for preboring. By performing the work, the first casing and the second casing support the hole drilled by the drill pipe, and have the effect of reducing the possibility that the hole is crushed in the process of pulling out the drill pipe.
2. 2. After inserting the attachment rod into the first connection hole, the anchoring piece is inserted into the insertion hole, and the engagement piece is passed through the insertion hole. Is attached to the attachment rod, and the attachment ball abuts on the vertical outer wall of the first connecting rod to fix the attachment rod, and the fixing process is convenient.

本願の実施例1の構造概略図である。It is a structural schematic diagram of Example 1 of this application. 実施例1における第1の接続孔を具現する概略図である。It is a schematic diagram which embodies the first connection hole in Example 1. FIG. 実施例1におけるストップブロックを具現する構造概略図である。It is a structural schematic diagram which embodies the stop block in Example 1. FIG. 実施例1における支持板を具現する構造概略図である。It is a structural schematic diagram which embodies the support plate in Example 1. FIG. 本願の実施例2の構造概略図である。It is a structural schematic diagram of Example 2 of this application. 実施例2における磁石を具現する構造概略図である。It is a structural schematic diagram which embodies the magnet in Example 2. FIG.

以下、図1-図6を参照して、本願をさらに詳細に説明する。 Hereinafter, the present application will be described in more detail with reference to FIGS. 1 to 6.

本願の実施例は、プレボーリング施工用ダブルロックチューブケーシングを開示する。 The embodiments of the present application disclose a double lock tube casing for pre-boring construction.

(実施例1)
図1に示すように、ダブルロックチューブケーシングは、第1のケーシング1と第2のケーシング2と、を含み、第1のケーシング1と第2のケーシング2とが平行に設置される。第1のケーシング1の外壁の頂部には2対の第1の接続板11が固定的に接続され、2対の第1の接続板11が第1のケーシング1の両側にそれぞれ位置する。第1の接続板11の各々の第1のケーシング1から離れる側面には、いずれも第2の接続板12が固定的に接続され、同じ側に位置する2つの第2の接続板12は、互いに近接する片側に向かって設置される。同じ側に位置する第1の接続板11と第2の接続板12と第1のケーシング1との間の空間は、空洞を囲み、2つの第2の接続板12の間には、欠口が残される。
(Example 1)
As shown in FIG. 1, the double lock tube casing includes a first casing 1 and a second casing 2, and the first casing 1 and the second casing 2 are installed in parallel. Two pairs of first connecting plates 11 are fixedly connected to the top of the outer wall of the first casing 1, and two pairs of first connecting plates 11 are located on both sides of the first casing 1, respectively. A second connecting plate 12 is fixedly connected to each side surface of the first connecting plate 11 away from the first casing 1, and the two second connecting plates 12 located on the same side are connected to each other. It is installed toward one side that is close to each other. The space between the first connecting plate 11, the second connecting plate 12, and the first casing 1 located on the same side surrounds the cavity, and there is a gap between the two second connecting plates 12. Is left.

第2のケーシング2の頂部外壁に1対の係着ブロック3が設けられ、2つの係着ブロック3は第2のケーシング2の両側にそれぞれ位置する。係着ブロック3の各々と第2のケーシング2との間にはいずれも伸縮機構4が設けられ、伸縮機構4は係着ブロック3と第2のケーシング2を接続する。 A pair of engagement blocks 3 are provided on the outer wall of the top of the second casing 2, and the two engagement blocks 3 are located on both sides of the second casing 2, respectively. An expansion / contraction mechanism 4 is provided between each of the engagement blocks 3 and the second casing 2, and the expansion / contraction mechanism 4 connects the engagement block 3 and the second casing 2.

プレボーリングを行う必要がある場合、係着ブロック3を第1の接続板11の上方から第1の接続板11と第2の接続板12とで囲まれた空間内に下向きに挿入し、係着ブロック3は第2の接続板12の第1のケーシング1に近接する片側に当接し、係着ブロック3の第1のケーシング1に近接する片側は第1のケーシング1の鉛直外壁に当接する。 When it is necessary to perform pre-boring, the casing block 3 is inserted downward from above the first connecting plate 11 into the space surrounded by the first connecting plate 11 and the second connecting plate 12, and engaged. The landing block 3 abuts on one side of the second connecting plate 12 close to the first casing 1, and one side of the engagement block 3 close to the first casing 1 abuts on the vertical outer wall of the first casing 1. ..

図1に示すように、第1のケーシング1及び第2のケーシング2の下面を玉石層の上面に当接させ、ドリルパイプを第1のケーシング1内に鉛直にいれ、他方のドリルパイプを第2のケーシング2内に鉛直に入れる。2つのドリルパイプは同時に下向きにプレボーリングし、ドリルパイプの下向きの移動に伴って、第1のケーシング1及び第2のケーシング2も下向きに移動する。 As shown in FIG. 1, the lower surfaces of the first casing 1 and the second casing 2 are brought into contact with the upper surface of the ball stone layer, the drill pipe is vertically inserted into the first casing 1, and the other drill pipe is placed in the first casing. Put it vertically in the casing 2 of 2. The two drill pipes are pre-boring downward at the same time, and as the drill pipe moves downward, the first casing 1 and the second casing 2 also move downward.

第1のケーシング1及び第2のケーシング2は玉石層に挿入され、第1のケーシング1及び第2のケーシング2はドリルパイプに伴って下向きに移動する過程でプレボーリング作業を行う。第1のケーシング1及び第2のケーシング2はドリルパイプにより掘削された孔を支持し、ドリルパイプを引き抜く際に孔が潰れる可能性を減少させる。 The first casing 1 and the second casing 2 are inserted into the boulder layer, and the first casing 1 and the second casing 2 perform preboring work in the process of moving downward along with the drill pipe. The first casing 1 and the second casing 2 support the holes drilled by the drill pipe and reduce the possibility of the holes being crushed when the drill pipe is pulled out.

第1のケーシング1及び第2のケーシング2の中に粘土を流し込み、第1のケーシング1及び第2のケーシング2を引き抜き、ドリルパイプにより掘削された孔内に粘土を残し、続いて第1のケーシング1及び第2のケーシング2により後続するプレボーリング作業を行い続ける。 Clay is poured into the first casing 1 and the second casing 2, the first casing 1 and the second casing 2 are pulled out, and the clay is left in the hole excavated by the drill pipe, followed by the first casing. Subsequent pre-boring work is continued by the casing 1 and the second casing 2.

第1のケーシング1と第2のケーシング2とは平行に設置され、第1のケーシング1と第2のケーシング2とは同時に鉛直下向きに移動してプレボーリング作業を行い、第1のケーシング1と第2のケーシング2とは互いに制限可能であり、第1のケーシング1又は第2のケーシング2が下向きに移動する際に傾く可能性を減少させ、プレボーリング過程でドリルパイプにより掘削された2つの孔の鉛直性を可能な限り確保するという効果をさらに有する。 The first casing 1 and the second casing 2 are installed in parallel, and the first casing 1 and the second casing 2 move vertically downward at the same time to perform preboring work, and the first casing 1 and the second casing 2 are installed. The second casing 2 is mutually restrictive, reducing the possibility of the first casing 1 or the second casing 2 tilting as it moves downwards, and two drilled by a drill pipe during the pre-boring process. It also has the effect of ensuring the verticality of the holes as much as possible.

実際の加工の要求に応じて、複数の第1のケーシング1と第2プロテクタ2とを交互に設置し、第1のケーシング1と第2のケーシング2とを順次接続し、プレボーリングを行う過程で、複数の第1のケーシング1と第2のケーシング2とは同時に下向きに移動することができ、プレボーリング施工過程における作業効率を向上させる。 A process in which a plurality of first casings 1 and second protectors 2 are alternately installed according to actual processing requirements, and the first casing 1 and the second casing 2 are sequentially connected to perform preboring. Therefore, the plurality of first casings 1 and the second casing 2 can be moved downward at the same time, improving the work efficiency in the pre-boring construction process.

図1及び図2に示すように、具体的な施工の要求に応じて、第1のケーシング1と第2プロテクタ2との間の距離を増加させる必要がある場合、伸縮機構4によって係着ブロック3と第2のケーシング2との間の距離を調整し、さらに第1のケーシング1と第2のケーシング2との間の距離を調整する。 As shown in FIGS. 1 and 2, when it is necessary to increase the distance between the first casing 1 and the second protector 2 according to a specific construction requirement, the engagement block is provided by the expansion / contraction mechanism 4. The distance between the 3 and the second casing 2 is adjusted, and the distance between the first casing 1 and the second casing 2 is further adjusted.

伸縮機構4は、係着ブロック3の第2のケーシング2に近接する片側に固定的に接続される第1の接続棒41を含み、第2のケーシング2の係着ブロック3に近接する片側に第2の接続棒42が固定的に接続される。第1の接続棒41の第2の接続棒42に近接する片側には、接続溝411が内向きに設けられ、第2の接続棒42は、接続溝411に摺動可能に挿着される。 The expansion / contraction mechanism 4 includes a first connecting rod 41 fixedly connected to one side of the engagement block 3 close to the second casing 2, and is attached to one side of the second casing 2 close to the engagement block 3. The second connecting rod 42 is fixedly connected. A connection groove 411 is provided inward on one side of the first connection rod 41 close to the second connection rod 42, and the second connection rod 42 is slidably inserted into the connection groove 411. ..

図2及び図3に示すように、第1の接続棒41に等間隔に分布した複数の第1の接続孔412が設けられ、複数の第1の接続孔412は第1の接続棒41の長手方向に沿って分布し、第1の接続孔412は、第1の接続棒41を貫通するように設置される。第2の接続棒42に等間隔に分布した複数の第2の接続孔421が設けられ、複数の第2の接続孔421は第2の接続棒42の長手方向に沿って分布し、第2の接続孔421は、第2の接続棒42を貫通するように設置される。 As shown in FIGS. 2 and 3, a plurality of first connection holes 412 distributed at equal intervals are provided in the first connection rod 41, and the plurality of first connection holes 412 are the first connection rod 41. Distributed along the longitudinal direction, the first connecting hole 412 is installed so as to penetrate the first connecting rod 41. A plurality of second connection holes 421 distributed at equal intervals are provided in the second connection rod 42, and the plurality of second connection holes 421 are distributed along the longitudinal direction of the second connection rod 42, and the second connection rod 42 is provided. The connection hole 421 of the above is installed so as to penetrate the second connection rod 42.

一方の第1の接続孔412内に挿着棒43が挿着され、挿着棒43の端部にストップブロック431が固定的に接続され、ストップブロック431は第1の接続棒41の外壁に当接する。挿着棒43は第2の接続孔421をも通り抜け、挿着棒43は第1の接続棒41と第2の接続棒42を接続して固定し、固定過程が便利である。 The insertion rod 43 is inserted into one of the first connection holes 412, the stop block 431 is fixedly connected to the end of the insertion rod 43, and the stop block 431 is attached to the outer wall of the first connection rod 41. Contact. The insertion rod 43 also passes through the second connection hole 421, and the insertion rod 43 connects and fixes the first connection rod 41 and the second connection rod 42, so that the fixing process is convenient.

挿着棒43のストップブロック431から離れる片側にロックアセンブリ44が接続され、ロックアセンブリ44は挿着棒43を固定し、挿着棒43が第1の接続孔412に挿着された際の安定性を増加させる。 The lock assembly 44 is connected to one side of the attachment rod 43 away from the stop block 431, the lock assembly 44 secures the attachment rod 43, and is stable when the attachment rod 43 is inserted into the first connection hole 412. Increase sex.

図2及び図3に示すように、挿着棒43には挿着孔432が設けられ、挿着孔432はストップブロック431から離れる片側に配置されるとともに、挿着孔432は挿着棒43を貫通するように設置される。ロックアセンブリ44は係着ボール441を含み、係着ボール441に1対の係着片442が固定的に接続され、1対の係着片442の係着ボール441から離れる片側は口拡状態となり、係着片442は力を受けて弾性変形し、外力がなくなると変形が回復可能であり、係着片442は弾性変形可能な鉄片又はステンレスバネとすることが好ましい。 As shown in FIGS. 2 and 3, the insertion rod 43 is provided with an insertion hole 432, the insertion hole 432 is arranged on one side away from the stop block 431, and the insertion hole 432 is the insertion rod 43. It is installed so as to penetrate. The lock assembly 44 includes the engagement ball 441, and a pair of engagement pieces 442 are fixedly connected to the engagement ball 441, and one side of the pair of engagement pieces 442 away from the engagement ball 441 is in an expanded state. The engagement piece 442 is elastically deformed by receiving a force, and the deformation can be recovered when the external force is lost. The engagement piece 442 is preferably an elastically deformable iron piece or a stainless spring.

1対の係着片442を挿着孔432に挿入し、続いて係着片442を挿着孔432に通り抜けさせると、係着片442は変形が回復し、係着片442が挿着棒43に係着され、係着ボール441が第1の接続棒41に当接して挿着棒43を固定し、挿着棒43が第1の挿着孔432に挿着された際の安定性を増加させる。 When a pair of engagement pieces 442 are inserted into the insertion hole 432 and then the engagement piece 442 is passed through the insertion hole 432, the engagement piece 442 recovers from the deformation and the engagement piece 442 recovers the deformation. Stability when the engagement ball 441 abuts on the first connecting rod 41 to fix the insertion rod 43 and the insertion rod 43 is inserted into the first insertion hole 432. To increase.

係着ブロック3と第2のケーシング2(図1参照)との間の距離を調整する必要がある場合、係着片442を挿着棒43から分離させ、続いて挿着棒43を第1の接続孔412から分離させ、必要に応じて第1の接続棒41と第2の接続棒42との全体の長さを調整し、さらに係着ブロック3と第2のケーシング2との間の距離を調整し、続いて挿着棒43を第1の接続孔412及び第2の接続孔421に挿入し、さらに係着片442を挿着棒43に係着させ、係着ブロック3と第2のケーシング2との間の距離を調整する作業を完了させ、調整過程が便利である。 If the distance between the engagement block 3 and the second casing 2 (see FIG. 1) needs to be adjusted, the engagement piece 442 is separated from the attachment rod 43, followed by the attachment rod 43 in the first position. The total length of the first connecting rod 41 and the second connecting rod 42 is adjusted as necessary, and further, between the engagement block 3 and the second casing 2. After adjusting the distance, the attachment rod 43 is subsequently inserted into the first connection hole 412 and the second connection hole 421, and the casing piece 442 is further attached to the attachment rod 43, so that the engagement block 3 and the second connection block 3 and the second are attached. The work of adjusting the distance between the casing 2 and the casing 2 of 2 is completed, and the adjustment process is convenient.

図4に示すように、第1の接続板11の各々と第1のケーシング1との間にいずれも支持板5が固定的に接続され、支持板5の片側は第1の接続板11に固定的に接続され、支持板5の第1の接続板11から離れる片側は第1のケーシング1の外壁に固定的に接続され、支持板5は、第1の接続板11が第1のケーシング1に接続された際の安定性を増加させる。 As shown in FIG. 4, the support plate 5 is fixedly connected between each of the first connection plates 11 and the first casing 1, and one side of the support plate 5 is connected to the first connection plate 11. One side of the support plate 5 that is fixedly connected and separated from the first connection plate 11 is fixedly connected to the outer wall of the first casing 1, and the support plate 5 has the first connection plate 11 as the first casing. Increases stability when connected to 1.

実施例1の実施原理は以下のとおりである。第1のケーシング1及び第2のケーシング2の下面を玉石層の上面に当接させ、ドリルパイプを第1のケーシング1内に鉛直に入れ、他方のドリルパイプを第2のケーシング2内に鉛直に入れ、2つのドリルパイプは同時に下向きにプレボーリングし、ドリルパイプの下向きの移動に伴って、第1のケーシング1及び第2のケーシング2も下向きに移動する。第1のケーシング1及び第2のケーシング2は玉石層に挿入され、第1のケーシング1及び第2のケーシング2は、ドリルパイプに伴って下向きに移動する過程でプレボーリング作業を行う。 The implementation principle of the first embodiment is as follows. The lower surfaces of the first casing 1 and the second casing 2 are brought into contact with the upper surface of the ball stone layer, the drill pipe is vertically inserted into the first casing 1, and the other drill pipe is vertically inserted into the second casing 2. The two drill pipes are pre-bored downward at the same time, and as the drill pipe moves downward, the first casing 1 and the second casing 2 also move downward. The first casing 1 and the second casing 2 are inserted into the boulder layer, and the first casing 1 and the second casing 2 perform preboring work in the process of moving downward along with the drill pipe.

ドリルパイプを引き抜く場合、第1のケーシング1及び第2のケーシング2の中に粘土を流し込み、第1のケーシング1及び第2のケーシング2を引き抜き、ドリルパイプにより掘削された孔内に粘土を残し、続いて第1のケーシング1及び第2のケーシング2により後続するプレボーリング作業を行い続ける。 When pulling out the drill pipe, clay is poured into the first casing 1 and the second casing 2, the first casing 1 and the second casing 2 are pulled out, and the clay is left in the hole drilled by the drill pipe. Subsequently, the subsequent pre-boring work is continued by the first casing 1 and the second casing 2.

(実施例2)
図5及び図6に示すように、実施例1とは異なって、本実施例は、挿着棒43の上面に挿着溝433が設けられ、挿着溝433はストップブロック431から離れる片側に配置される。ロックアセンブリ44は、挿入溝433内に挿着された、鉛直に設置される固定棒443を含み、固定棒443は、第1の接続棒41の鉛直外壁に当接し、固定棒443は、挿着棒43を固定し、固定過程が便利である。
(Example 2)
As shown in FIGS. 5 and 6, unlike the first embodiment, in this embodiment, the insertion groove 433 is provided on the upper surface of the insertion rod 43, and the insertion groove 433 is located on one side away from the stop block 431. Be placed. The lock assembly 44 includes a vertically installed fixing rod 443 inserted in the insertion groove 433, the fixing rod 443 abuts on the vertical outer wall of the first connecting rod 41, and the fixing rod 443 is inserted. The landing rod 43 is fixed, and the fixing process is convenient.

固定棒443は鉄棒であり、挿着溝433の溝底には磁石444が固定的に取り付けられ、磁石444が固定棒443に吸引当接し、磁石444は固定棒443が挿着溝433に挿着された際の安定性を増加させる。 The fixed rod 443 is an iron rod, and a magnet 444 is fixedly attached to the bottom of the insertion groove 433, the magnet 444 is attracted to the fixing rod 443, and the magnet 444 is inserted into the insertion groove 433 by the fixing rod 443. Increases stability when worn.

係着ブロック3と第2のケーシング2(図1参照)との間の距離を調整する必要がある場合、固定棒443を挿着溝433から分離させ、続いて挿着棒43を第1の接続孔412から分離させ、必要に応じて第1の接続棒41と第2の接続棒42との全体の長さを調整し、さらに係着ブロック3と第2のケーシング2との間の距離を調整し、続いて挿着棒43を第1の接続孔412及び第2の接続孔421に挿入し、さらに固定棒443を挿着溝433に係着させ、係着ブロック3と第2のケーシング2との間の距離を調整する作業を完了させ、調整過程が便利である。 If the distance between the engagement block 3 and the second casing 2 (see FIG. 1) needs to be adjusted, the fixing rod 443 is separated from the attachment groove 433, followed by the attachment rod 43 in the first. Separated from the connection hole 412, the overall length of the first connection rod 41 and the second connection rod 42 is adjusted as necessary, and the distance between the engagement block 3 and the second casing 2 is further adjusted. Then, the attachment rod 43 is inserted into the first connection hole 412 and the second connection hole 421, and the fixing rod 443 is further attached to the attachment groove 433, so that the attachment block 3 and the second connection block 3 and the second are attached. The work of adjusting the distance to the casing 2 is completed, and the adjustment process is convenient.

第2の接続板12の各々にいずれも締付ボルト6が螺着され、係着ブロック3が第2の接続板12の第1のケーシング1に近接する片側に当接する時に締付ボルト6を締め付けると、締付ボルト6が係着ブロック3に密着して当接し、締付ボルト6は係着ブロック3を固定し、係着ブロック3が第2の接続板12に当接した際の安定性を増加させる。 A tightening bolt 6 is screwed to each of the second connecting plates 12, and when the engaging block 3 comes into contact with one side of the second connecting plate 12 close to the first casing 1, the tightening bolt 6 is attached. When tightened, the tightening bolt 6 comes into close contact with the engagement block 3, and the tightening bolt 6 fixes the engagement block 3 and stabilizes when the engagement block 3 abuts on the second connecting plate 12. Increase sex.

以上は、いずれも本願の好適な実施例であり、これにより本願の保護範囲を制限するものではないため、本願の構造、形状、原理により行われた同等の変化は、いずれも本願の保護範囲に含まれるべきである。 The above are all preferred embodiments of the present application and do not limit the scope of protection of the present application. Therefore, any equivalent changes made by the structure, shape and principle of the present application are within the scope of protection of the present application. Should be included in.

1、第1のケーシング、11、第1の接続板、12、第2の接続板、2、第2のケーシング、3、係着ブロック、4、伸縮機構、41、第1の接続棒、411、接続溝、412、第1の接続孔、42、第2の接続棒、421、第2の接続孔、43、挿着棒、431、ストップブロック、432、挿着孔、433、挿着溝、44、ロックアセンブリ、441、係着ボール、442、係着片、443、固定棒、444、磁石、5、支持板、6締付ボルト。 1, 1st casing, 11, 1st connection plate, 12, 2nd connection plate 2, 2nd casing 3, 3 engagement block 4, expansion / contraction mechanism, 41, 1st connection rod 411 , Connection groove, 412, first connection hole, 42, second connection rod, 421, second connection hole, 43, insertion rod, 431, stop block, 432, insertion hole, 433, insertion groove. , 44, lock assembly, 441, casing ball, 442, casing piece, 443, fixing rod, 444, magnet, 5, support plate, 6 tightening bolts.

Claims (9)

互いに平行に設置される第1のケーシング(1)と第2のケーシング(2)とを含み、前記第1のケーシング(1)の頂部外壁には1対の第1の接続板(11)が固定的に接続され、第1の接続板(11)の各々の第1のケーシング(1)から離れる片側にはいずれも第2の接続板(12)が固定的に接続され、前記第2のケーシング(2)の頂部外壁には係着ブロック(3)が接続され、前記係着ブロック(3)は第1のケーシング(1)と第1の接続板(11)と第2の接続板(12)とで囲まれる空間内に配置され、前記係着ブロック(3)の第1のケーシング(1)から離れる片側は第2の接続板(12)に当接し、前記係着ブロック(3)の第1のケーシング(1)に近接する片側は第1のケーシング(1)の外壁に当接する、
ことを特徴とするプレボーリング施工用ダブルロックチューブケーシング。
A pair of first connecting plates (11) are provided on the outer wall of the top of the first casing (1), which includes a first casing (1) and a second casing (2) installed in parallel with each other. A second connecting plate (12) is fixedly connected to each side of the first connecting plate (11) away from the first casing (1), and the second connecting plate (12) is fixedly connected. An anchoring block (3) is connected to the outer wall of the top of the casing (2), and the anchoring block (3) is the first casing (1), the first connecting plate (11), and the second connecting plate (2). One side of the anchoring block (3) separated from the first casing (1), which is arranged in the space surrounded by 12), abuts on the second connecting plate (12), and the engagement block (3) One side close to the first casing (1) of the first casing (1) abuts on the outer wall of the first casing (1).
Double lock tube casing for pre-boring construction.
前記第2のケーシング(2)と係着ブロック(3)との間には、係着ブロック(3)と第2のケーシング(2)を接続するための伸縮機構(4)が設けられる、
ことを特徴とする請求項1に記載のプレボーリング施工用ダブルロックチューブケーシング。
An expansion / contraction mechanism (4) for connecting the engagement block (3) and the second casing (2) is provided between the second casing (2) and the engagement block (3).
The double lock tube casing for preboring construction according to claim 1.
前記伸縮機構(4)は、係着ブロック(3)の第2のケーシング(2)に近接する片側に固定的に接続される第1の接続棒(41)を含み、前記第2のケーシング(2)の外壁に第2の接続棒(42)が固定的に接続され、前記第1の接続棒(41)の第2のケーシング(2)に近接する片側には、第2の接続棒(42)を摺動可能に挿着させる接続溝(411)が内向きに設けられ、前記第1の接続棒(41)には、複数の第1の接続孔(412)が第1の接続棒(41)の長手方向に沿って設けられ、前記第2の接続棒(42)には、複数の第2の接続孔(421)が第2の接続棒(42)の長手方向に沿って設けられ、同じ軸線となる第1の接続孔(412)と第2の接続孔(421)の中には、挿着棒(43)が挿着され、前記挿着棒(43)の一端には、ストップブロック(431)が固定的に接続され、前記ストップブロック(431)は、第1の接続棒(41)の外壁に当接する、
ことを特徴とする請求項2に記載のプレボーリング施工用ダブルロックチューブケーシング。
The telescopic mechanism (4) includes a first connecting rod (41) fixedly connected to one side close to the second casing (2) of the engagement block (3), and the second casing (2). A second connecting rod (42) is fixedly connected to the outer wall of 2), and a second connecting rod (2) is connected to one side of the first connecting rod (41) close to the second casing (2). A connection groove (411) into which the 42) is slidably inserted is provided inward, and a plurality of first connection holes (412) are provided in the first connection rod (41). (41) is provided along the longitudinal direction, and the second connecting rod (42) is provided with a plurality of second connecting holes (421) along the longitudinal direction of the second connecting rod (42). An insertion rod (43) is inserted into the first connection hole (412) and the second connection hole (421) having the same axis, and an insertion rod (43) is inserted into one end of the insertion rod (43). , The stop block (431) is fixedly connected, and the stop block (431) abuts on the outer wall of the first connecting rod (41).
The double lock tube casing for preboring construction according to claim 2.
前記挿着棒(43)には挿着棒(43)を固定するためのロックアセンブリ(44)が接続される、
ことを特徴とする請求項3に記載のプレボーリング施工用ダブルロックチューブケーシング。
A lock assembly (44) for fixing the insertion rod (43) is connected to the insertion rod (43).
The double lock tube casing for preboring construction according to claim 3.
前記ロックアセンブリ(44)は、第1の接続棒(41)のブロック(431)から離れる片側に当接する係着ボール(441)を含み、前記係着ボール(441)には、弾性変形が発生可能な1対の係着片(442)が固定的に接続され、前記挿着棒(43)には、係着片(442)を係着させる挿着孔(432)が設けられる、
ことを特徴とする請求項4に記載のプレボーリング施工用ダブルロックチューブケーシング。
The lock assembly (44) includes an anchoring ball (441) that abuts on one side away from the block (431) of the first connecting rod (41), and the anchoring ball (441) undergoes elastic deformation. A possible pair of engagement pieces (442) are fixedly connected, and the attachment rod (43) is provided with an insertion hole (432) for engaging the engagement piece (442).
The double lock tube casing for preboring construction according to claim 4.
前記ロックアセンブリ(44)は、鉛直に設置される固定棒(443)を含み、前記挿着棒(43)の頂部には、固定棒(443)を挿着させる挿着溝(433)が内向きに設けられ、前記固定棒(443)は、第1の接続棒(41)のストップブロック(431)から離れる片側に当接する、
ことを特徴とする請求項4に記載のプレボーリング施工用ダブルロックチューブケーシング。
The lock assembly (44) includes a fixing rod (443) installed vertically, and an insertion groove (433) for inserting the fixing rod (443) is inside the top of the insertion rod (43). Provided in the orientation, the fixing rod (443) abuts on one side away from the stop block (431) of the first connecting rod (41).
The double lock tube casing for preboring construction according to claim 4.
前記固定棒(443)は鉄棒であり、前記挿着溝(433)の溝底には、固定棒(443)に当接する磁石(444)が固定的に取り付けられる、
ことを特徴とする請求項6に記載のプレボーリング施工用ダブルロックチューブケーシング。
The fixing rod (443) is an iron rod, and a magnet (444) abutting on the fixing rod (443) is fixedly attached to the groove bottom of the insertion groove (433).
The double lock tube casing for preboring construction according to claim 6.
第2の接続板(12)の各々にいずれも締付ボルト(6)が螺着され、前記締付ボルト(6)は係着ブロック(3)の第1のケーシング(1)から離れる片側に当接する、
ことを特徴とする請求項6に記載のプレボーリング施工用ダブルロックチューブケーシング。
A tightening bolt (6) is screwed to each of the second connecting plates (12), and the tightening bolt (6) is placed on one side of the engagement block (3) away from the first casing (1). Contact,
The double lock tube casing for preboring construction according to claim 6.
前記第1の接続板(11)と第1のケーシング(1)との間に支持板(5)が固定的に接続される、
ことを特徴とする請求項5に記載のプレボーリング施工用ダブルロックチューブケーシング。
The support plate (5) is fixedly connected between the first connecting plate (11) and the first casing (1).
The double lock tube casing for preboring construction according to claim 5.
JP2021004329U 2020-11-17 2021-11-09 Double lock tube casing for pre-boring construction Active JP3235897U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202022652612.2U CN214089864U (en) 2020-11-17 2020-11-17 Double-lock pipe protecting cylinder for pebble bed leading hole
CN202022652612.2 2020-11-17

Publications (1)

Publication Number Publication Date
JP3235897U true JP3235897U (en) 2022-01-14

Family

ID=77450605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021004329U Active JP3235897U (en) 2020-11-17 2021-11-09 Double lock tube casing for pre-boring construction

Country Status (2)

Country Link
JP (1) JP3235897U (en)
CN (1) CN214089864U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541747A (en) * 2022-04-06 2022-05-27 安徽开盛津城建设有限公司 Novel constructional column anti-slurry-overflowing construction process
CN115387359A (en) * 2022-09-22 2022-11-25 中国建筑第七工程局有限公司 Rain sewage slot support
CN115679957A (en) * 2022-11-14 2023-02-03 天津建设发展集团有限公司 Full-casing pipe and rotary drilling rig drilling secant pile construction equipment and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541747A (en) * 2022-04-06 2022-05-27 安徽开盛津城建设有限公司 Novel constructional column anti-slurry-overflowing construction process
CN114541747B (en) * 2022-04-06 2023-11-10 安徽开盛津城建设有限公司 Novel construction technology for preventing slurry overflow of constructional column
CN115387359A (en) * 2022-09-22 2022-11-25 中国建筑第七工程局有限公司 Rain sewage slot support
CN115679957A (en) * 2022-11-14 2023-02-03 天津建设发展集团有限公司 Full-casing pipe and rotary drilling rig drilling secant pile construction equipment and construction method thereof

Also Published As

Publication number Publication date
CN214089864U (en) 2021-08-31

Similar Documents

Publication Publication Date Title
JP3235897U (en) Double lock tube casing for pre-boring construction
CN111021373A (en) Slope reinforcing apparatus for building municipal works
KR102261191B1 (en) Earth retaining wall
CN112081098B (en) Rock breaking steel pipe pile for temporary support
CN110617094B (en) Damping positioning composite grouting anchor rod capable of strengthening anchoring effect
KR102047695B1 (en) Socket anchor assembly and construction method of thereof
CN213952240U (en) Deep foundation pit slope supporting structure
KR200389267Y1 (en) Box type trench shoring apparatus
CN215252950U (en) Slope body supporting device for hydraulic engineering
KR102146577B1 (en) Fixed structure of high strength support material with easy to install at the construction site and construction method thereof
JP3782180B2 (en) Support structure using sheet piles for earth retaining bells
CN111794408A (en) Flexible connection structure between prefabricated infilled wall and prefabricated frame post
CN114135139B (en) Existing building in-situ protection device for underground space development of historical block
CN215977297U (en) Deep basal pit collapse prevention supporting structure
CN217870519U (en) Foundation pit supporting device for construction engineering construction
CN112012769A (en) Semi-rigid and semi-flexible anti-impact tunnel surrounding rock supporting structure under seismic belt and construction method thereof
KR100502150B1 (en) Panel Assembly for Ground Protection of Earths Wall and Destruction Method of it
CN218622251U (en) Side slope supporting structure for foundation pit protection
CN217896515U (en) Be used for geotechnical engineering foundation ditch supporting construction that collapses
KR20060098779A (en) Structure and assembly for protecting landslide
CN218373808U (en) High-strength concrete pipe pile
CN217759040U (en) Mute type quartering hammer
CN213926358U (en) Novel immersed tube type submarine tunnel
CN215562673U (en) Deep foundation pit slope supporting structure
CN220284835U (en) Deep foundation pit supporting structure

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Ref document number: 3235897

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150