JP3224726B2 - Air conditioning equipment - Google Patents

Air conditioning equipment

Info

Publication number
JP3224726B2
JP3224726B2 JP29341595A JP29341595A JP3224726B2 JP 3224726 B2 JP3224726 B2 JP 3224726B2 JP 29341595 A JP29341595 A JP 29341595A JP 29341595 A JP29341595 A JP 29341595A JP 3224726 B2 JP3224726 B2 JP 3224726B2
Authority
JP
Japan
Prior art keywords
air conditioner
hot water
cold
heater
chiller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP29341595A
Other languages
Japanese (ja)
Other versions
JPH09113008A (en
Inventor
毅一 入江
正和 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ebara Corp
Original Assignee
Ebara Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ebara Corp filed Critical Ebara Corp
Priority to JP29341595A priority Critical patent/JP3224726B2/en
Publication of JPH09113008A publication Critical patent/JPH09113008A/en
Application granted granted Critical
Publication of JP3224726B2 publication Critical patent/JP3224726B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/27Relating to heating, ventilation or air conditioning [HVAC] technologies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/62Absorption based systems

Abstract

PROBLEM TO BE SOLVED: To enable an abnormal decreasing in temperature of cold water during a cooling operation or abnormal increasing in temperature of hot water during a heating operation to be prevented by a method wherein a control device for each of air conditioners is provided with a central monitoring device of an air conditioner for outputting an instruction to forcedly open a cold water or hot water valve. SOLUTION: A central monitoring device 9 for an air conditioner is connected to an air conditioner control device 7 for each of the air conditioners 4 through communication or the like. The air conditioners 4 are stopped in sequence and in the case that the air conditioner 4 being operated up to the last time is stopped, an instruction to make a forced opening of a cold water or hot water valve 6 is given to the predetermined air conditioner control device 7 from the central monitoring device 9 of the air conditioner, thereby the cold water or hot water valve 6 arranged for each of the air conditioners 4 is forcedly opened. With such an arrangement as above, the cold water or hot water can be circulated through a cold water or hot water pipe passage 3 at an air conditioning load including the air conditioners 4 and further it is possible to prevent an abnormal decreasing in temperature of cold water during cooling operation or to prevent an abnormal increasing in temperature of hot water during heating operation.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は空気調和設備に係り、特
に冷温水を製造する吸収式冷温水機を熱源機として使用
したセントラル式空調設備に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an air conditioner and, more particularly, to a central air conditioner using an absorption chiller / heater for producing chilled / hot water as a heat source.

【0002】[0002]

【従来の技術】従来、ガス吸収式冷温水機を熱源機とし
て、各部屋に設置した複数台の空気調和機に冷温水を送
り、冷暖房を行う空気調和設備では、特願平5−103
730号のように空気調和機への冷温水往配管と冷温水
復配管の間にバルブを設けたバイパス配管を熱源機近傍
に設置していた。この場合、空気調和機が停止し、空気
調和機ごとに設けられた冷温水弁が閉となり、冷温水循
環量が所定量以下となった場合にバイパス配管中のバル
ブを開として、冷温水機の冷温水循環量を補償し、冷温
水機の運転を継続していた。
2. Description of the Related Art Conventionally, air conditioning equipment for cooling and heating by using a gas absorption type chiller / heater as a heat source unit and sending and cooling water to a plurality of air conditioners installed in each room is disclosed in Japanese Patent Application No. Hei 5-103.
As in No. 730, a bypass pipe provided with a valve between the cold / hot water supply pipe to the air conditioner and the cold / hot water return pipe was installed near the heat source unit. In this case, the air conditioner is stopped, the cold / hot water valve provided for each air conditioner is closed, and the valve in the bypass pipe is opened when the cold / hot water circulation amount becomes equal to or less than a predetermined amount, and the cold / hot water device is opened. The circulation of the hot and cold water was compensated, and the operation of the hot and cold water heater was continued.

【0003】また、最後まで運転していた空気調和機が
停止した場合、該空気調和機に設けられた冷温水弁は閉
となり、冷温水機は、冷温水機中央監視装置から停止指
令が出力され、10分程度の残留運転(希釈運転)を行
った後に停止することになる。ここで、空気調和機が停
止したことによって、空気調和機に設けられた冷温水弁
は閉となり、冷温水機近傍に設けられたバイパス配管を
通る配管経路にて冷温水を循環させて冷温水機の残留
(希釈)運転を行うことになる。
When the air conditioner that has been operating to the end stops, the cold / hot water valve provided in the air conditioner is closed, and the cold / hot water device outputs a stop command from the cold / hot water device central monitoring device. Then, after performing the residual operation (dilution operation) for about 10 minutes, the operation is stopped. Here, when the air conditioner is stopped, the cold / hot water valve provided in the air conditioner is closed, and the cold / hot water is circulated through a piping route passing through a bypass pipe provided in the vicinity of the cold / hot water device. The residual (dilution) operation of the machine will be performed.

【0004】[0004]

【発明が解決しようとする課題】従って、この場合、循
環している冷温水はバイパス配管を通る配管経路中に保
有している冷温水だけとなり、残留(希釈)運転中に、
冷房時には冷水温度が低下し、暖房時には温水温度が上
昇することになり、冷水低温あるいは温水高温等の保護
装置が動作し、故障が発生する場合があるという不具合
があった。
Therefore, in this case, the only circulating cold and hot water is the cold and hot water retained in the pipe route passing through the bypass pipe, and during the residual (dilution) operation,
During cooling, the temperature of the cold water drops, and during the heating, the temperature of the hot water rises. As a result, there is a problem in that a protection device such as a low temperature of the cold water or a high temperature of the hot water operates to cause a failure.

【0005】本発明は上述の事情に鑑みなされたもの
で、全ての空気調和機が停止した場合にも、所定の空気
調和機の冷温水弁を強制的に開とし、空調負荷側の配管
経路中を冷温水を循環させることにより、冷房時の冷水
温度の異常低下又は暖房時の温水温度の異常上昇を防止
することができる空気調和設備を提供することを目的と
する。
The present invention has been made in view of the above circumstances, and even when all the air conditioners are stopped, the cooling / heating water valve of a predetermined air conditioner is forcibly opened, and the piping route on the air conditioning load side is opened. An object of the present invention is to provide an air conditioner capable of preventing an abnormal decrease in cold water temperature during cooling or an abnormal increase in hot water temperature during heating by circulating cold and hot water through the inside.

【0006】[0006]

【課題を解決するための手段】上述した課題を達成する
ため、本発明は、冷温水を製造する吸収式冷温水機と、
吸収式冷温水機の循環流量が所定流量以下となった場合
に開となるバルブを備えた冷温水バイパス経路と、該吸
収式冷温水機と冷温水配管で接続された複数台の空気調
和機と、各空気調和機ごとに冷温水配管途中に取付けら
れた冷温水弁と、該空気調和機の運転および運転停止を
個別に行う運転スイッチと、該運転スイッチに連動して
空気調和機の運転及び運転停止制御及び前記冷温水弁の
開閉制御を行う空気調和機制御装置と、空気調和機が1
台でも運転している場合に吸収式冷温水機を運転する冷
温水機中央監視装置とを備えた空気調和設備であって、
各空気調和機制御装置に前記冷温水弁の強制的に開指令
を出力する空気調和機中央監視装置を設け、該空気調和
機中央監視装置は、最後に停止する空気調和機の空気調
和機制御装置に冷温水弁を所定時間残留して強制的に開
とする信号を出力することを特徴とするものである。
In order to achieve the above-mentioned object, the present invention provides an absorption type chiller / heater for producing cold and hot water,
A cooling / heating water bypass path having a valve that is opened when the circulation flow rate of the absorption chiller / heater becomes equal to or less than a predetermined flow rate, and a plurality of air conditioners connected to the absorption chiller / heating machine with a chill / hot water pipe A cold / hot water valve installed in the middle of a cold / hot water pipe for each air conditioner, an operation switch for individually operating and stopping the air conditioner, and operating the air conditioner in conjunction with the operation switch And an air conditioner control device for performing operation stop control and opening / closing control of the cold / hot water valve;
An air conditioner equipped with a chiller / hot water heater central monitoring device that operates an absorption type chiller / heater when the unit is also operating,
Forcibly provided an air conditioner central monitoring device for outputting an open command for the cold and hot water valves to each air conditioner control device, the air conditioner
The central control unit of the air conditioner controls the air conditioner of the air conditioner that stops last.
The hot / cold water valve remains in the Japanese machine control unit for a predetermined time and is forcibly opened.
Is output .

【0007】本発明によれば、最後まで運転していた空
気調和機が停止した場合にも、空気調和機中央監視装置
から空気調和機制御装置に冷温水弁を強制的に開とする
指令を出力することにより、空気調和機ごとに設けられ
た冷温水弁を強制的に開とする制御を行うことができ
る。これによって、空気調和機を含む負荷側の冷温水配
管経路中を冷温水を循環させることができ、冷房時の冷
水温度の異常低下又は暖房時の温水温度の異常上昇を防
止することができる。
According to the present invention, even when the air conditioner that has been operating to the end is stopped, the air conditioner central monitoring device issues a command to the air conditioner control device to forcibly open the cold / hot water valve. By outputting, it is possible to perform control to forcibly open a cold / hot water valve provided for each air conditioner. This makes it possible to circulate the cold and hot water in the cold and hot water piping path on the load side including the air conditioner, thereby preventing an abnormal decrease in the cold water temperature during cooling or an abnormal rise in the hot water temperature during heating.

【0008】空気調和機中央監視装置は、最後に停止す
る空気調和機の冷温水弁を吸収式冷温水機の希釈時間運
転時間以上開くように制御する。
[0008] The air conditioner central monitoring device controls the cold / hot water valve of the air conditioner to be stopped last so as to be opened for the dilution time / operating time of the absorption type cold / hot water machine.

【0009】[0009]

【実施例】以下、本発明に係る空気調和設備の一実施例
を図面を参照して説明する。図1は本発明の空気調和設
備のフロー構成図を示す。図1に示すように、空気調和
設備は、冷温水を製造する吸収式冷温水機1と、吸収式
冷温水機1の循環水量が所定流量以下となった場合に開
となるバイパスバルブ2を備えた冷温水バイパス経路
と、吸収式冷温水機1と冷温水配管3で接続された複数
台の空気調和機(空調機)4と、冷温水機1と空調機4
との間で冷温水を循環させる冷温水ポンプ5と、各空調
機4ごとに冷温水配管途中に取付けられた冷温水弁6と
を備えている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the air conditioner according to the present invention will be described below with reference to the drawings. FIG. 1 shows a flow configuration diagram of the air conditioning equipment of the present invention. As shown in FIG. 1, the air-conditioning equipment includes an absorption chiller / heater 1 for producing chilled / hot water and a bypass valve 2 that opens when the circulating water amount of the absorption chiller / heater 1 becomes equal to or less than a predetermined flow rate. A plurality of air conditioners (air conditioners) 4 connected with absorption type chiller / heater 1 and chiller / heater pipe 3, chiller / heater 1 and air conditioner 4
A cold / hot water pump 5 for circulating cold / hot water between the air conditioner and a cold / hot water valve 6 attached to the middle of the cold / hot water pipe for each air conditioner 4.

【0010】また空気調和設備は、各空調機4の運転/
停止を個別に行う運転スイッチRと、運転スイッチRに
連動して空調機4の運転/停止制御および冷温水弁の開
閉制御を行う空調機制御装置7と、空調機4が1台でも
運転している場合に吸収式冷温水機1を運転する冷温水
機中央監視装置8とを備えている。さらに空気調和設備
は、各空調機制御装置7に冷温水弁6の強制的に開指令
を出力する空調機中央監視装置9を備えている。
The air-conditioning equipment is provided with an operation / operation of each air conditioner 4.
An operation switch R for individually stopping the air conditioner, an air conditioner control device 7 for operating / stopping the air conditioner 4 and controlling the opening and closing of the chilled / hot water valve in conjunction with the operation switch R, and even one air conditioner 4 operated A hot / cold water heater central monitoring device 8 for operating the absorption-type cold / hot water machine 1 when the system is in operation. Further, the air conditioner is provided with an air conditioner central monitoring device 9 for forcibly outputting a command to open the cold / hot water valve 6 to each air conditioner control device 7.

【0011】冷温水機中央監視装置8は冷温水機制御盤
10に通信等により接続されるとともに各空調機4の空
調機制御装置7に接続されている。また、空調機中央監
視装置9も各空調機4の空調機制御装置7に通信等によ
り接続されている。
The chiller / heater central monitoring device 8 is connected to the chiller / heater control panel 10 by communication or the like, and is also connected to the air conditioner controller 7 of each air conditioner 4. The air conditioner central monitoring device 9 is also connected to the air conditioner control device 7 of each air conditioner 4 by communication or the like.

【0012】上述の構成において、冷温水機1及び冷温
水ポンプ5を運転することにより、冷温水配管3を介し
て各空調機4に冷温水を導き、各空調機4にて居室の冷
暖房を行う。
In the above-described configuration, by operating the cold / hot water machine 1 and the cold / hot water pump 5, the cold / hot water is guided to each air conditioner 4 through the cold / hot water pipe 3, and each air conditioner 4 cools and heats the room. Do.

【0013】本実施例では、空調機制御装置7に冷温水
弁6の強制的に開指令を出力する空調機中央監視装置9
を設けている。この構成により、空調設備を運用する場
合の具体例を以下に説明する。
In this embodiment, an air conditioner central monitoring device 9 forcibly outputs a command to open the cold / hot water valve 6 to the air conditioner control device 7.
Is provided. A specific example in the case of operating an air conditioner with this configuration will be described below.

【0014】空調機4が順次停止してゆき、最後まで運
転していた空調機4が停止した場合、空調機中央監視装
置9から所定の空調機制御装置7に冷温水弁6を強制的
に開とする指令を出力することにより、空調機4ごとに
設けられた冷温水弁6を強制的に開とする制御を行うこ
とができる。これによって、空調機4を含む空調負荷側
の冷温水配管経路3中を冷温水を循環させることがで
き、冷房時の冷水温度の異常低下又は暖房時の温水温度
の異常上昇を防止することができる。
When the air conditioner 4 is sequentially stopped and the air conditioner 4 that has been operating to the end is stopped, the cold / hot water valve 6 is forcibly transmitted from the air conditioner central monitoring device 9 to a predetermined air conditioner control device 7. By outputting a command to open, the control for forcibly opening the cold / hot water valve 6 provided for each air conditioner 4 can be performed. Thereby, the cold and hot water can be circulated in the cold and hot water piping path 3 on the air conditioning load side including the air conditioner 4, and it is possible to prevent an abnormal decrease in the cold water temperature during cooling or an abnormal rise in the hot water temperature during heating. it can.

【0015】この場合、空調機中央監視装置9は、いず
れの空調機制御装置7に開指令信号を出力してもよい
が、最後に停止する空調機4の空調機制御装置7に運転
中に開となっていた冷温水弁6を所定時間残留して強制
的に開とする信号を出力することが好ましい。そして、
最後に停止する空調機4の空調機制御装置7に出力する
冷温水弁6の残留して強制的に開とする時間は、吸収式
冷温水機1の希釈運転時間以上に設定されている。
In this case, the air conditioner central monitoring device 9 may output an open command signal to any one of the air conditioner control devices 7, but the operation of the air conditioner control device 7 of the air conditioner 4 to be stopped last is performed during operation. It is preferable to output a signal for forcibly opening the cold / hot water valve 6 that has been left open for a predetermined time. And
The time during which the cold / hot water valve 6 that is output to the air conditioner control device 7 of the air conditioner 4 that stops last and remains open forcibly is set to be equal to or longer than the dilution operation time of the absorption cold / hot water machine 1.

【0016】[0016]

【発明の効果】以上説明したように本発明によれば、最
後まで運転していた空気調和機が停止した場合にも、空
気調和機中央監視装置から空気調和機制御装置に冷温水
弁を強制的に開とする指令を出力することにより、空気
調和機ごとに設けられた冷温水弁を強制的に開とする制
御を行うことができる。これによって、空気調和機を含
む負荷側の配管経路中を冷温水を循環させることがで
き、冷房時の冷水温度の異常低下又は暖房時の温水温度
の異常上昇を防止することができる。
As described above, according to the present invention, even when the air conditioner that has been operating to the end is stopped, the cold / hot water valve is forced from the air conditioner central monitoring device to the air conditioner control device. By outputting the command to open the air conditioner, it is possible to perform control to forcibly open the cold / hot water valve provided for each air conditioner. This makes it possible to circulate cold and hot water in the piping path on the load side including the air conditioner, and to prevent an abnormal decrease in cold water temperature during cooling or an abnormal rise in hot water temperature during heating.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る空気調和設備の一実施例を示すフ
ロー構成図である。
FIG. 1 is a flow configuration diagram showing an embodiment of an air conditioner according to the present invention.

【符号の説明】[Explanation of symbols]

1 吸収式冷温水機 2 バイパスバルブ 3 冷温水配管 4 空調機 5 冷温水ポンプ 6 冷温水弁 7 空調機制御装置 8 冷温水機中央監視装置 9 空調機中央監視装置 10 冷温水機制御盤 DESCRIPTION OF SYMBOLS 1 Absorption chiller / heater 2 Bypass valve 3 chiller / heater pipe 4 Air conditioner 5 Chiller / heater pump 6 Chiller / heater valve 7 Air conditioner controller 8 Cooler / heater central monitor 9 Air conditioner central monitor 10 Cooler / heater control panel

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F24F 11/02 102 F25B 15/00 306 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 7 , DB name) F24F 11/02 102 F25B 15/00 306

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 冷温水を製造する吸収式冷温水機と、吸
収式冷温水機の循環流量が所定流量以下となった場合に
開となるバルブを備えた冷温水バイパス経路と、該吸収
式冷温水機と冷温水配管で接続された複数台の空気調和
機と、各空気調和機ごとに冷温水配管途中に取付けられ
た冷温水弁と、該空気調和機の運転および運転停止を個
別に行う運転スイッチと、該運転スイッチに連動して空
気調和機の運転及び運転停止制御及び前記冷温水弁の開
閉制御を行う空気調和機制御装置と、空気調和機が1台
でも運転している場合に吸収式冷温水機を運転する冷温
水機中央監視装置とを備えた空気調和設備であって、 各空気調和機制御装置に前記冷温水弁の強制的に開指令
を出力する空気調和機中央監視装置を設け 該空気調和機中央監視装置は、最後に停止する空気調和
機の空気調和機制御装置に冷温水弁を所定時間残留して
強制的に開とする信号を出力する ことを特徴とする空気
調和設備。
An absorption chiller / heater for producing chilled / hot water, a chilled / heated water bypass having a valve which is opened when a circulating flow rate of the absorption chilled / heated water falls below a predetermined flow rate, A plurality of air conditioners connected by a chiller / heater and a chiller / heater pipe, a chiller / heater valve installed in the middle of a chiller / heater pipe for each air conditioner, and individually operating and stopping the air conditioner An operation switch to be operated, an air conditioner control device that operates and stops the operation of the air conditioner in conjunction with the operation switch, and controls the opening and closing of the cold / hot water valve, and when even one air conditioner is operating An air conditioner equipped with a chiller / heater central monitoring device that operates an absorption chiller / heater, wherein the air conditioner central device forcibly outputs a command to open the chiller / heater valve to each air conditioner controller. the monitoring device is provided, the air conditioner central monitoring device, An air conditioner to stop after
The cold / hot water valve remains in the air conditioner controller of the
An air conditioner, which outputs a signal for forcibly opening .
【請求項2】 前記冷温水弁の残留して強制的に開とす
る時間が、吸収式冷温水機の希釈運転時間以上であるこ
とを特徴とする請求項に記載の空気調和設備。
2. The air-conditioning equipment according to claim 1 , wherein the time during which the chilled / hot water valve remains and is forcibly opened is equal to or longer than the dilution operation time of the absorption chilled / hot water machine.
JP29341595A 1995-10-17 1995-10-17 Air conditioning equipment Expired - Fee Related JP3224726B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29341595A JP3224726B2 (en) 1995-10-17 1995-10-17 Air conditioning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29341595A JP3224726B2 (en) 1995-10-17 1995-10-17 Air conditioning equipment

Publications (2)

Publication Number Publication Date
JPH09113008A JPH09113008A (en) 1997-05-02
JP3224726B2 true JP3224726B2 (en) 2001-11-05

Family

ID=17794481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29341595A Expired - Fee Related JP3224726B2 (en) 1995-10-17 1995-10-17 Air conditioning equipment

Country Status (1)

Country Link
JP (1) JP3224726B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109827308A (en) * 2018-12-17 2019-05-31 珠海格力电器股份有限公司 A kind of multi-line system control method, device and multi-line system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5786645B2 (en) * 2011-10-27 2015-09-30 三菱電機株式会社 Refrigeration air conditioner
JP6384320B2 (en) * 2014-12-26 2018-09-05 ダイキン工業株式会社 Temperature control system
CN112484251B (en) * 2020-11-17 2021-11-23 珠海格力电器股份有限公司 Air conditioner outdoor unit water supply temperature control method and device, controller and air conditioner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109827308A (en) * 2018-12-17 2019-05-31 珠海格力电器股份有限公司 A kind of multi-line system control method, device and multi-line system
CN109827308B (en) * 2018-12-17 2020-06-26 珠海格力电器股份有限公司 Multi-split system control method and device and multi-split system

Also Published As

Publication number Publication date
JPH09113008A (en) 1997-05-02

Similar Documents

Publication Publication Date Title
US20060123815A1 (en) Multi-unit air conditioner and method for controlling the same
JP3224726B2 (en) Air conditioning equipment
JP2007046810A (en) Brine type cooling system
JP2004028476A (en) Air conditioner system having coil freeze proofing function
CN110469925B (en) HVAC system and control method thereof
JPH09113007A (en) Air conditioning facility
JPH09152157A (en) Duct type air conditioner
JPH06272938A (en) Control method of air conditioning apparatus
JP3318260B2 (en) Valve control device in air conditioning system and valve control method in air conditioning system
JPH1183126A (en) Controller for air conditioning facility
JP2676577B2 (en) Air conditioning system and its control method
JP2780930B2 (en) Outside air treatment equipment
JPH06272940A (en) Control method of air conditioning apparatus
JP3384712B2 (en) How to check the operation of the variable flow valve of the air conditioner
JPH0236198B2 (en)
JP3231983B2 (en) Ice storage refrigerator unit
JPH07151353A (en) Preventive method for stopping circulation of refrigerant in natural refrigerant-circulation air-conditioning system
JP3308141B2 (en) Ice storage air conditioning equipment
JPH0132900B2 (en)
JPH0484038A (en) Apparatus for air conditioning and method of operation
JP3299413B2 (en) Refrigerant circulation type air conditioning system
USRE25990E (en) Air conditioning system
JP3142140B2 (en) Air conditioning system
JPH03247935A (en) Air-conditioner
JPH08152144A (en) Operating method of floor heater

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080824

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080824

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090824

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090824

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100824

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees