JP3195417B2 - Steel pipe with chuck - Google Patents
Steel pipe with chuckInfo
- Publication number
- JP3195417B2 JP3195417B2 JP15874992A JP15874992A JP3195417B2 JP 3195417 B2 JP3195417 B2 JP 3195417B2 JP 15874992 A JP15874992 A JP 15874992A JP 15874992 A JP15874992 A JP 15874992A JP 3195417 B2 JP3195417 B2 JP 3195417B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile
- driven
- hiring
- chuck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、部分地下工事などで山
留め杭を地表からロス部分をあけた下に、雇い杭を使用
して打ち込むようにした杭の打設方法と、それに使用す
るチャック付雇い鋼管に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for driving a pile in which a retaining pile is driven by using a hiring pile under a loss portion from the ground surface for partial underground construction or the like, and a chuck used therefor. About hiring steel pipes.
【0002】[0002]
【従来の技術】部分地下工事では、杭を地表からロス部
分をあけた下側に打設するが、その場合、従来では図6
に示すように、地下に打設する杭aの上からロス部分b
の長さに相当する山留め鋼材cを振動打設機dで打ち込
んでいる。そして山留め鋼材cは、ロス部分bに打ち込
んだまま引き抜くことなく残している。なおロス部分b
より長い山留め鋼材cを打ち込んだ場合は、所定長さ打
ち込んだ後、上部の余分な部分を切断していた。2. Description of the Related Art In a part of underground construction, a pile is cast below a loss portion from the surface of the ground.
As shown in the figure, the loss b
The steel material c corresponding to the length is driven by a vibration driving machine d. And the mountain retaining steel material c is left without being pulled out while being driven into the loss part b. Loss part b
When a longer retaining steel material c was driven in, a surplus portion at the top was cut off after driving for a predetermined length.
【0003】[0003]
【発明が解決しようとする課題】前記従来技術のように
山留め杭をロス部分の下に打設する場合、ロス部分の長
さに相当する山留め鋼材を使用してそれを埋めたまま残
すので、地下に不要な山留め鋼材を残すことになり、不
経済であった。またロス部分より長い山留め鋼材を打ち
込んだ場合は切断する作業があり、手間を要するもので
あった。そこで本発明は、山留め杭を地表からロス部分
をあけた下側に打設する場合に、地下に残す山留め鋼材
を使用することなく、経済的に山留め杭を地下に打設で
きるようにし、さらに長さの異なるロス部分に対応して
容易に杭を地下に打設できるようにすることを目的とす
る。When a retaining pile is driven under a loss portion as in the prior art, a steel retaining material corresponding to the length of the loss portion is used and the pile is left buried. Unnecessary pile retaining steel was left underground, which was uneconomical. In addition, when a mountain retaining steel material longer than the loss portion is driven, there is a cutting operation, which requires time and effort. Therefore, the present invention, when driving a pile pile below the ground surface with a loss portion, without using a steel pile remaining underground, so that the pile pile can be economically driven underground, furthermore It is an object of the present invention to enable piles to be easily driven underground corresponding to loss portions having different lengths.
【0004】[0004]
【課題を解決するための手段】本発明の雇い鋼管は、地
下部分に打設する杭の上方から打ち込むものであり、上
部雇い鋼管と下部雇い鋼管とを鞘管を介してスライド可
能に構成するとともに、上部および下部の雇い鋼管のう
ち鞘管に対してスライドする方を鞘管の適宜位置に固定
できる構成とし、下部雇い鋼管の下部にチャック装置を
取付けた。また本発明の杭の打設方法は、雇い鋼管を使
用して地表からロス部分をあけた下側に杭を打設する方
法である。すなわちその方法は、杭の上端が地表面近く
となるまで打ち込んだ後、下端にチャック装置を備えた
雇い鋼管を使用して、そのチャック装置を前記打ち込ん
だ杭の上端に連結し、雇い鋼管の上端を打ち込むことに
より前記杭を所定深さに打設し、次いでチャック装置と
前記杭との結合を解除して、雇い鋼管を引き抜くように
した。The hired steel pipe of the present invention is driven from above a pile to be cast in an underground part, and the upper and lower hired steel pipes are slidable via a sheath pipe. At the same time, the upper and lower hiring steel pipes were configured so that the side sliding with respect to the sheath pipe could be fixed at an appropriate position on the sheath pipe, and a chuck device was attached to the lower part of the lower hiring steel pipe. In addition, the method of driving a pile according to the present invention is a method of driving a pile below a ground surface with a loss portion by using a hired steel pipe. That is, in that method, after driving the pile until the upper end is close to the ground surface, using a hired steel pipe equipped with a chuck device at the lower end, the chuck device is connected to the upper end of the driven pile, and The pile was driven into the predetermined depth by driving the upper end, then the connection between the chuck device and the pile was released, and the employed steel pipe was pulled out.
【0005】[0005]
【作用】本発明の雇い鋼管を使用して地下に山留め杭を
打設する場合、雇い鋼管の下部に取付けたチャック装置
を、上端が地表近くにまで打設された杭の上端に連結し
て継ぎ足し、雇い鋼管で杭を所定深さに打ち込んだ後、
チャック装置を杭から解除して雇い鋼管を引き抜くの
で、従来のように鋼管を地下に残すようなことはなく経
済的である。また雇い鋼管は上部と下部との2部材をス
ライドさせて長さ調節できるので、地表から所定深さま
での異なるロス部分の長さに対応でき、山留め杭を地下
の異なる深さに打設することができる。When a pile pile is driven underground using the hired steel pipe of the present invention, a chuck device attached to the lower part of the hired steel pipe is connected to the upper end of the pile whose upper end is driven close to the ground surface. After adding and driving the pile to the specified depth with hired steel pipe,
Since the chuck device is released from the stake and the employed steel pipe is withdrawn, the steel pipe is not left underground as in the prior art, which is economical. In addition, since the length of the hired steel pipe can be adjusted by sliding the upper and lower members, it is possible to cope with the different lengths of the loss part from the ground surface to a predetermined depth, and the pile pile is cast at different depths underground Can be.
【0006】[0006]
【実施例】本発明の一実施例を図1乃至4により説明す
る。本発明の雇い鋼管は、地表からロス部分をあけてそ
の下の地下部分に杭を打設する場合に使用し、杭の上端
が地表近くとなるまで打ち込んだ後、杭の上端に連結し
て杭を地下に打ち込むものである。雇い鋼管1は、例え
ば断面四角形状の上部雇い鋼管1aと下部雇い鋼管1b
とからなり、本実施例では下部雇い鋼管1bの上部内周
に鞘管2が溶接により連結され、鞘管2の上部外周に上
部雇い鋼管1aがスライド可能に挿入されている。な
お、鞘管2を上部雇い鋼管1aに溶接で連結し、下部雇
い鋼管1bを鞘管2に対してスライドさせるようにして
もよい。An embodiment of the present invention will be described with reference to FIGS. The employed steel pipe of the present invention is used when a loss part is opened from the ground surface and a pile is driven into an underground part below the pile, after driving until the upper end of the pile is near the ground surface, it is connected to the upper end of the pile. The pile is driven into the basement. The hired steel pipe 1 is, for example, an upper hired steel pipe 1a and a lower hired steel pipe 1b having a rectangular cross section.
In the present embodiment, the sheath pipe 2 is connected to the upper inner periphery of the lower hiring steel pipe 1b by welding, and the upper hiring steel pipe 1a is slidably inserted into the upper outer periphery of the sheath pipe 2. In addition, you may make it connect the sheath pipe 2 to the upper employed steel pipe 1a by welding, and slide the lower employed steel pipe 1b with respect to the sheath pipe 2.
【0007】上部雇い鋼管1aの上部と下部との間に適
宜間隔でネジ孔3が設けられるとともに、鞘管2の上部
と下部とにもネジ孔4が設けられ、上部雇い鋼管1aの
スライド位置を所定のものにしてネジ孔3を、鞘管2の
ネジ孔4に一致させてネジ5により連結できるようにな
っている。なお、鞘管2の上端部は補強板2aにより補
強されている。また前記上部雇い鋼管1aのネジ孔3の
うち、鞘管2から外れた位置のものにはネジ6aを止め
てネジ孔3を閉じ、鞘管2のネジ孔4のうち上部雇い管
1aから外れた位置のものにもネジ6bを止めて、ネジ
孔4を閉じるようになっている。さらに上部雇い鋼管1
aの下部に補強バンド7が設けられ、上部雇い鋼管1a
の下部の破損を防止し、補強バンド7は前記ネジ孔3に
対応する位置に孔があけられている。Screw holes 3 are provided at appropriate intervals between the upper and lower portions of the upper hiring steel pipe 1a, and screw holes 4 are also provided in the upper and lower portions of the sheath tube 2, so that the sliding position of the upper hiring steel pipe 1a is slid. Is set to a predetermined value, and the screw hole 3 is aligned with the screw hole 4 of the sheath tube 2 and can be connected by the screw 5. The upper end of the sheath tube 2 is reinforced by a reinforcing plate 2a. Further, among the screw holes 3 of the upper employed steel pipe 1a, those which are located at positions deviated from the sheath tube 2 are stopped by closing the screw 6a, and the screw holes 4 of the sheath tube 2 are removed from the upper employed tube 1a. The screw 6b is also stopped at the position where it is positioned, and the screw hole 4 is closed. Further hired steel pipe 1
a reinforcing band 7 is provided at the lower part of the upper steel pipe 1a.
The reinforcement band 7 is provided with a hole at a position corresponding to the screw hole 3.
【0008】上部雇い鋼管1aの上端に、補強板付きの
蓋8が取り付けられ、蓋の上側に掴み金物9が取り付け
られて、後記する振動式打設機dで打ち込まれるように
なっている。また上部雇い鋼管1aの上部側壁に油圧ホ
ース11を貫通させ、後記するチャック装置12に連通
させて、チャック装置12を油圧で操作できるようにな
っている。下部雇い鋼管1bの下部は補強板10により
補強されるとともに、下端にチャック装置12が取り付
けられる。チャック装置12は前記油圧ホース11と連
通されて、油圧制御によりチャック装置12の掴み部1
2aが開閉されるようになっており、チャック装置12
は地中に打設される杭aの上端と結合あるいは解除でき
るようになっている。A lid 8 with a reinforcing plate is attached to the upper end of the upper hiring steel pipe 1a, and a gripping metal 9 is attached to the upper side of the lid, and is driven by a vibration type driving machine d to be described later. Further, a hydraulic hose 11 is passed through the upper side wall of the upper hiring steel pipe 1a and communicates with a chuck device 12 described later, so that the chuck device 12 can be operated by hydraulic pressure. A lower portion of the lower hiring steel pipe 1b is reinforced by a reinforcing plate 10, and a chuck device 12 is attached to a lower end. The chuck device 12 is communicated with the hydraulic hose 11, and is controlled by a hydraulic control so that the grip portion 1 of the chuck device 12 is held.
2a is opened and closed.
Can be connected to or released from the upper end of a pile a to be driven into the ground.
【0009】上記の雇い鋼管1を使用し、地表からロス
部分bをあけてその下に杭aを打設する方法を図5によ
り説明する。初めに、杭aを振動打設機dで地表面上か
ら打ち込み、杭aの上端が地表面GLの近くとなるまで
打ち込む。次に杭aに雇い鋼管1を継ぎ足すため、チャ
ック装置12を油圧操作して、雇い鋼管1の下端のチャ
ック装置12と前記打ち込まれた杭aの上端とを結合す
る。そして、雇い鋼管1の上端を振動打設機dにより打
ち込むことにより、杭aを地表からロス部分bをあけた
下側にまで打ち込む。次いでチャック装置12を油圧制
御して前記杭aとの結合を解除し、さらに雇い鋼管1を
ウインチ操作により引き抜けば作業は終了する。また雇
い鋼管1の長さを変える場合は、上部雇い鋼管1aと鞘
管2とを結合しているネジを外して、上部雇い鋼管1a
をスライドさせて所定長さでネジ止めすれば、長さの異
なるロス部分bに対応して杭aを地下に打設することが
できる。A method of using the hired steel pipe 1 to open a loss portion b from the ground surface and drive a pile a below the loss portion b will be described with reference to FIG. First, the pile a is driven from above the ground surface by the vibration driving machine d, and is driven until the upper end of the pile a is close to the ground surface GL. Next, in order to add the employed steel pipe 1 to the pile a, the chuck device 12 is hydraulically operated to connect the chuck device 12 at the lower end of the employed steel pipe 1 to the upper end of the driven pile a. Then, by driving the upper end of the employed steel pipe 1 with the vibration driving machine d, the pile a is driven from the ground surface to the lower side with the loss portion b opened. Next, the chuck device 12 is hydraulically controlled to release the connection with the pile a, and the work is completed by pulling out the employed steel pipe 1 by a winch operation. When changing the length of the employed steel pipe 1, the screw connecting the upper employed steel pipe 1a and the sheath pipe 2 is removed, and the upper employed steel pipe 1a is removed.
Is slid and screwed at a predetermined length, the pile a can be driven into the basement corresponding to the loss portions b having different lengths.
【0010】[0010]
【発明の効果】本発明のチャック付雇い鋼管は長さを調
整できるので、長さの異なるロス部分に対応して容易に
杭を地下に打設することができる。かかる本発明のチャ
ック付雇い鋼管を使用して杭を打設する方法では、チャ
ック付雇い鋼管を打ち込むことにより杭をロス部分をあ
けた下側に打設し、その打設後にチャック付雇い鋼管は
抜き出すので、地下に鋼材を残すことはなく、経済的に
山留め杭を地下に打設することができる。Since the length of the steel pipe with a chuck according to the present invention can be adjusted, the pile can be easily driven into the basement in accordance with the loss portions having different lengths. In the method of driving a pile by using the steel pipe with a chuck according to the present invention, the pile is driven into the lower side with a loss portion by driving the steel pipe with the chuck, and the steel pipe with the chuck is driven after the driving. Since the steel is extracted, the steel material is not left underground, and the pile pile can be economically driven into the basement.
【図面の簡単な説明】[Brief description of the drawings]
【図1】本発明のチャック付雇い鋼管の一部破断側面図
である。FIG. 1 is a partially broken side view of a steel pipe with a chuck according to the present invention.
【図2】図1の正面図である。FIG. 2 is a front view of FIG.
【図3】下部雇い鋼管と鞘管との連結部を示す部分断面
図である。FIG. 3 is a partial cross-sectional view showing a connecting portion between a lower hiring steel pipe and a sheath pipe.
【図4】上部雇い鋼管と鞘管との連結部を示す部分断面
図である。FIG. 4 is a partial cross-sectional view showing a connecting portion between an upper hiring steel pipe and a sheath pipe.
【図5】チャック付雇い鋼管を使用した杭の打設方法を
示す説明図である。FIG. 5 is an explanatory diagram showing a method of driving a pile using a steel pipe with a chuck.
【図6】従来の杭の打設方法を示す説明図である。FIG. 6 is an explanatory view showing a conventional pile driving method.
a 杭 b ロス部分 1 雇い鋼管 1a 上部雇い鋼管 1b 下部雇い鋼管 2 鞘管 12 チャック装置 a Pile b Loss part 1 Hired steel pipe 1a Upper hired steel pipe 1b Lower hired steel pipe 2 Sheath pipe 12 Chuck device
Claims (1)
し可能に打ち込む雇い鋼管であって、上部雇い鋼管と下
部雇い鋼管とを鞘管を介してスライド可能に構成すると
ともに、上部および下部の雇い鋼管のうち鞘管に対して
スライドする方を鞘管の適宜位置に固定部材で連結でき
る構成とし、下部雇い鋼管の下部にチャック装置を取付
けたことを特徴とするチャック付雇い鋼管。1. A hiring steel pipe which is removably driven from above a pile to be driven into an underground part, wherein the upper and lower hiring steel pipes are configured to be slidable via a sheath pipe. A hiring steel pipe with a chuck, characterized in that a side of the hiring steel pipe that slides with respect to the sheath pipe can be connected to an appropriate position of the sheath pipe by a fixing member, and a chuck device is attached to a lower part of the lower hiring steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15874992A JP3195417B2 (en) | 1992-05-26 | 1992-05-26 | Steel pipe with chuck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15874992A JP3195417B2 (en) | 1992-05-26 | 1992-05-26 | Steel pipe with chuck |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05321255A JPH05321255A (en) | 1993-12-07 |
JP3195417B2 true JP3195417B2 (en) | 2001-08-06 |
Family
ID=15678496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15874992A Expired - Fee Related JP3195417B2 (en) | 1992-05-26 | 1992-05-26 | Steel pipe with chuck |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3195417B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102034741B1 (en) * | 2019-07-09 | 2019-10-21 | 박동규 | Extendable vibratory pile hammer |
-
1992
- 1992-05-26 JP JP15874992A patent/JP3195417B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH05321255A (en) | 1993-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6176644B1 (en) | Pipe rehabilitation test mandrel | |
FI64097C (en) | RELEASE FACTORY LIGHTING UPP EN PAO HAVSBOTTEN LIGGANDE ROERLEDNING MED TILLHJAELP AV ETT ROERNEDLAEGGNINGSFARTYG | |
US5056959A (en) | Method and device for stripping from the concrete to which it adheres the header of a wall section cast in the ground | |
US4691788A (en) | Lateral hole boring method and apparatus | |
DE1934884A1 (en) | Device for connecting two pipelines at the bottom of a body of water | |
AU2002217433B2 (en) | Drilling mast with movable and fixed unscrewing vice | |
CN104563118A (en) | Full sleeve vibration soil sampling prefabricating pouring composite pile construction method | |
JP3195417B2 (en) | Steel pipe with chuck | |
US5540294A (en) | Vertical percussion ground boring tool apparatus and method | |
JP2001193060A (en) | Soil cement pile forming machine | |
JPH0925724A (en) | Concrete placing hopper | |
EP0902129A3 (en) | Method and device for laying pipes in the ground | |
JP2000356099A (en) | Method for compacting concrete of tunnel lining | |
JP2820247B2 (en) | Pile pull-out method and device | |
JPH0738295U (en) | Blade for construction of underground structures | |
JPH0517958A (en) | Execution method for steel pipe pile | |
JPS61250229A (en) | Method and apparatus for penetration of steel sheet pile | |
US3986568A (en) | Apparatus for making underground passages | |
JP2700378B2 (en) | Winch device for drawing in screw auger propulsion method | |
JPH0458526B2 (en) | ||
JP3043586U (en) | Grasping device for removing existing connecting piles | |
JPS615121A (en) | Drawing work of existing pile | |
JP2932843B2 (en) | Pile material joint alignment device | |
JPH07173825A (en) | Method of driving soil improving pile | |
JP2002030881A (en) | Casing for shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |