JP3171783B2 - Steel pipe column concrete press-in method - Google Patents

Steel pipe column concrete press-in method

Info

Publication number
JP3171783B2
JP3171783B2 JP11010696A JP11010696A JP3171783B2 JP 3171783 B2 JP3171783 B2 JP 3171783B2 JP 11010696 A JP11010696 A JP 11010696A JP 11010696 A JP11010696 A JP 11010696A JP 3171783 B2 JP3171783 B2 JP 3171783B2
Authority
JP
Japan
Prior art keywords
steel pipe
concrete
pipe column
partition plate
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11010696A
Other languages
Japanese (ja)
Other versions
JPH09273308A (en
Inventor
清敏 坂本
繁克 澤邊
淳 仲宗根
浩治 新田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP11010696A priority Critical patent/JP3171783B2/en
Publication of JPH09273308A publication Critical patent/JPH09273308A/en
Application granted granted Critical
Publication of JP3171783B2 publication Critical patent/JP3171783B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0472Details of connection of the hose to the formwork, e.g. inlets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鋼管柱内にコンクリ
ートを圧入充填する工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for press-fitting concrete into steel pipe columns.

【0002】[0002]

【従来の技術】従来、鋼管柱内にコンクリートポンプ車
等からコンクリートを充填する場合には、図6に示すよ
うに、鋼管柱10の柱面に設けられた注入孔12に合わ
せてこれとほぼ同径の補助口2を取り付け、該補助口2
とコンクリート圧送管4との間を仕切弁6で接続してコ
ンクリートを圧入していた。この工法では、1日にコン
クリートを圧入すべき鋼管柱分の、補助口2と仕切弁6
を準備しなければならず、これら多数の圧入治具を製作
する必要があった。また、コンクリート硬化後、注入孔
12を塞ぐための補強板(図示せず。)も別途用意しな
ければならず、相当量の鋼材が必要となる。更に、仕切
弁6はその構造上、コンクリートがこぼれ易いという問
題点を有している。
2. Description of the Related Art Conventionally, when concrete is filled in a steel pipe column from a concrete pump truck or the like, as shown in FIG. Auxiliary port 2 of the same diameter is attached.
And the concrete pressure feed pipe 4 were connected by a gate valve 6 to press-fit the concrete. In this method, the auxiliary port 2 and the gate valve 6 for the steel pipe column into which concrete is to be pressed in a day
And a large number of these press-fitting jigs had to be manufactured. Further, after the concrete is hardened, a reinforcing plate (not shown) for closing the injection hole 12 must be separately prepared, and a considerable amount of steel is required. Further, the gate valve 6 has a problem that concrete is easily spilled due to its structure.

【0003】特開平7−197657号公報には、仕切
板を具えたスライドバルブを鋼管柱の外側に取り付け、
該仕切板により鋼管柱の注入孔を開閉しながらコンクリ
ートを圧入する方法が開示されている。当該方法によれ
ば、コンクリートのこぼれを防止することができるとい
う利点が得られるものの、コンクリートが硬化するまで
はスライドバルブを撤去することができないから、依然
として相当数の圧入治具を準備する必要がある。また、
この方法では注入孔を囲繞する鋼管柱の内壁面に補強材
を溶接しているため、鋼材量を削減することができず、
また、補強材を柱内壁面に溶接するという煩雑な作業が
増加するという問題点を有している。
[0003] Japanese Patent Application Laid-Open No. 7-197657 discloses that a slide valve having a partition plate is attached to the outside of a steel pipe column.
There is disclosed a method of press-fitting concrete while opening and closing an injection hole of a steel pipe column with the partition plate. According to the method, although the advantage that the concrete can be prevented from being spilled is obtained, since the slide valve cannot be removed until the concrete is hardened, it is still necessary to prepare a considerable number of press-in jigs. is there. Also,
In this method, since the reinforcing material is welded to the inner wall surface of the steel pipe column surrounding the injection hole, the amount of steel material cannot be reduced,
In addition, there is a problem that a complicated operation of welding the reinforcing member to the inner wall surface of the pillar increases.

【0004】[0004]

【発明が解決しようとする課題】本発明は、転用可能な
圧入治具を用いることにより鋼材量を削減するととも
に、作業性に優れた鋼管柱コンクリート圧入工法を提供
するものである。
SUMMARY OF THE INVENTION An object of the present invention is to provide a steel pipe column concrete press-fitting method which is excellent in workability while reducing the amount of steel by using a press-fitting jig which can be diverted.

【0005】[0005]

【課題を解決するための手段】本発明に係る鋼管柱コン
クリート圧入工法は、以下の(1)〜(3)工程からな
ることを特徴とするものである。 (1)鋼管柱の外表面に溶接され該鋼管柱に穿設された
注入孔の周辺に設けたガイドを介して、該注入孔の内径
に相当する大きさの開口を有する仕切板を柱面に密着固
定し、該注入孔を開放状態として、コンクリート圧送管
から鋼管柱内にコンクリートを圧入する工程 (2)鋼管柱内にコンクリートを充填した後、前記ガイ
ドに沿って前記仕切板をスライドさせて前記注入孔を閉
塞する工程 (3)充填したコンクリートが硬化した後、前記仕切板
を鋼管柱の外表面に溶接する工程
SUMMARY OF THE INVENTION A concrete method of press-fitting steel pipe columns according to the present invention comprises the following steps (1) to (3). (1) A partition plate having an opening having a size corresponding to the inner diameter of the injection hole is formed on the column surface through a guide welded to the outer surface of the steel tube column and provided around the injection hole formed in the steel tube column. And pressing the concrete into the steel pipe column from the concrete pumping pipe with the injection hole open, (2) After filling the steel pipe column with concrete, slide the partition plate along the guide. (3) Step of welding the partition plate to the outer surface of the steel pipe column after the filled concrete has hardened

【0006】前記コンクリートの圧入工程において、前
記仕切板と前記圧送管の間にアダプターを介在させて両
者を接続し、前記注入孔の閉塞工程後であって前記仕切
板の溶接工程前に、該アダプターを取り外すことが好ま
しい。
In the concrete press-fitting step, an adapter is interposed between the partition plate and the pressure feed pipe to connect them, and after the step of closing the injection hole and before the step of welding the partition plate, It is preferable to remove the adapter.

【0007】[0007]

【発明の実施の形態】以下、図面を参照しながら本発明
の好適な実施形態を説明する。図1は、鋼管柱コンクリ
ート圧入工法を示す縦断側面図であり、鋼管柱10の注
入孔12とコンクリート圧送管4とは、圧入治具20を
介して接続されている。本実施形態において圧入治具2
0は、主として仕切板22とアダプター30により構成
されているので、先ず、これらの構成部材を説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a longitudinal sectional side view showing a steel pipe column concrete press-fitting method, in which an injection hole 12 of a steel pipe column 10 and a concrete pumping pipe 4 are connected via a press-fitting jig 20. In this embodiment, the press-fitting jig 2
0 is mainly composed of the partition plate 22 and the adapter 30. First, these components will be described.

【0008】図2は、注入孔12を中心とする鋼管柱1
0の正面図(同図(A))と、B−B線における横断平
面図(同図(B))である。鋼管柱10の柱面には、1
50mmφ程度のコンクリート用注入孔12が穿設さ
れ、また、鋼管柱10の外表面には注入孔12を挟んで
アングル材14、14が平行に溶接されている。アング
ル材14、14は、後述する仕切板22を案内するため
のものであり、アングル材14、14には複数の小孔を
穿け、小孔の上にナット15a、15b、15cが溶接
されている。
FIG. 2 shows the steel pipe column 1 centered on the injection hole 12.
0 (the same figure (A)) and the cross-sectional plan view in the BB line (the same figure (B)). On the column surface of the steel pipe column 10, 1
An injection hole 12 for concrete having a diameter of about 50 mm is drilled, and angle members 14 are welded to the outer surface of the steel pipe column 10 in parallel with the injection hole 12 interposed therebetween. The angle members 14, 14 are for guiding a partition plate 22, which will be described later. A plurality of small holes are formed in the angle members 14, 14, and nuts 15a, 15b, 15c are welded on the small holes. I have.

【0009】図3は、仕切板22の正面図(同図
(A))と、B−B線における縦断側面図(同図
(B))であり、仕切板22の下半部にはコンクリート
圧送管4の内径にほぼ等しい大きさの開口24が設けら
れている。なお、仕切板22の前面上端部には、仕切板
22のスライドを容易とするように、アングル26が溶
接されている。
FIG. 3 is a front view of the partition plate 22 (FIG. 3A) and a vertical sectional side view taken along the line BB (FIG. 3B). An opening 24 having a size substantially equal to the inner diameter of the pressure feed pipe 4 is provided. An angle 26 is welded to the upper end of the front surface of the partition plate 22 so that the partition plate 22 can slide easily.

【0010】図4は、圧入治具20を取り付けた状態に
おける鋼管柱10の要部斜視図であり、ガイドとしての
アングル材14、14間に仕切板22が挿入され、ボル
ト25a、25b、25cにより柱面に押し付けられて
固定されている。また、図4において、符号30は、コ
ンクリート圧送管4と注入孔12とを連結するためのア
ダプターであって、該アダプター30はコンクリート圧
送管4に接続可能な接続管32と、該接続管32の注入
孔12側の端部に溶接され、アングル材14、14間を
上下移動可能な大きさの接続板34とからなっている。
FIG. 4 is a perspective view of a main part of the steel pipe column 10 in a state where the press-fitting jig 20 is attached. A partition plate 22 is inserted between the angle members 14 as guides, and bolts 25a, 25b, 25c are provided. It is pressed against the column surface and fixed. In FIG. 4, reference numeral 30 denotes an adapter for connecting the concrete pumping pipe 4 and the injection hole 12, and the adapter 30 includes a connecting pipe 32 connectable to the concrete pumping pipe 4 and a connecting pipe 32. And a connecting plate 34 sized to be vertically movable between the angle members 14, 14.

【0011】続いて、上記圧入治具20を用いたコンク
リートの圧入工法を、注入孔12を中心とする鋼管柱1
0の正面図である図5を参照しながら説明する。圧入治
具20を取り付けるには、図4に示すように、仕切板2
2とアダプター30の接続板34とを重ね合わせてアン
グル材14、14間に挿入し、これらを一体としてボル
ト25a、25b、25cにより鋼管柱10に定着する
(図5(a))。このとき、鋼管柱10の注入孔12は
開放状態にある。なお、圧入治具20の取り付けに先立
ち、仕切板22の裏面(鋼管柱10との接触面)にグリ
ースを塗布しておくことが望ましい。
Subsequently, the concrete press-fitting method using the press-fitting jig 20 is performed by using the steel pipe column 1 centering on the injection hole 12.
0 will be described with reference to FIG. To install the press-fitting jig 20, as shown in FIG.
2 and the connecting plate 34 of the adapter 30 are overlapped and inserted between the angle members 14, and are integrally fixed to the steel pipe column 10 by bolts 25 a, 25 b, 25 c (FIG. 5A). At this time, the injection hole 12 of the steel pipe column 10 is in an open state. Prior to mounting the press-fitting jig 20, it is desirable to apply grease to the back surface (the contact surface with the steel pipe column 10) of the partition plate 22.

【0012】圧入治具20をセットしたら、図1に示す
ように、接続管32の先端にコンクリートポンプ車の圧
送管4を接続して、鋼管柱10内にコンクリートを圧入
する。このとき、鋼管柱10の上方位置、例えば、3階
床レベルの柱面に25mmφ程度の透孔を設けておけ
ば、該透孔からコンクリートがオーバーフローすること
を以て、鋼管柱10内にコンクリートが充填されたこと
を目視にて確認することができる。
After the press-fitting jig 20 is set, as shown in FIG. 1, the press-feeding pipe 4 of the concrete pump truck is connected to the end of the connecting pipe 32, and concrete is pressed into the steel pipe column 10. At this time, if a through hole having a diameter of about 25 mm is provided at a position above the steel pipe column 10, for example, a column surface on the third floor level, concrete overflows from the through hole, so that the concrete is filled into the steel pipe column 10. This can be visually confirmed.

【0013】圧入作業が終了したら、ボルト25aを緩
め、仕切板22を下方へ打ち込んで注入孔12を塞ぐ。
仕切板22の裏面にはグリースが塗布されているので、
スムーズにスライドする。また、仕切板22は鋼管柱1
0に密着し、隙間は殆どないから、コンクリートが外部
へこぼれ出るようなことはない。仕切板22が注入孔1
2を閉塞した位置で、再び、ボルト25aを締めて、仕
切板22を固定する(図5(b))。
When the press-fitting operation is completed, the bolt 25a is loosened, and the partition plate 22 is driven downward to close the injection hole 12.
Since grease is applied to the back surface of the partition plate 22,
Slide smoothly. Further, the partition plate 22 is made of the steel pipe column 1.
Since it is in close contact with zero and there is almost no gap, concrete does not spill outside. The partition plate 22 is the injection hole 1
At the position where 2 is closed, the bolt 25a is tightened again to fix the partition plate 22 (FIG. 5B).

【0014】圧送管4を接続管32から分離した後、ボ
ルト25b、25cを緩めて、アングル材14、14の
下方よりアダプター30を取り外す。再度、ボルト25
b、25cを締めて仕切板22を柱面に強固に固定する
(図5(c))。
After separating the pressure feed pipe 4 from the connection pipe 32, the bolts 25b and 25c are loosened, and the adapter 30 is removed from below the angle members 14 and 14. Again, bolt 25
The partition plate 22 is firmly fixed to the column surface by tightening b and 25c (FIG. 5C).

【0015】打設したコンクリートが硬化した後、アン
グル材14、14を切断し、仕切板22を鋼管柱10の
外表面に溶接する。当該仕切板22は注入孔12の補強
板となる。
After the cast concrete has hardened, the angle members 14 are cut and the partition plate 22 is welded to the outer surface of the steel pipe column 10. The partition plate 22 serves as a reinforcing plate for the injection hole 12.

【0016】[0016]

【発明の効果】請求項1記載の発明によれば、圧入治具
が転用可能なので、鋼材量を大幅に削減することができ
る。特に、該圧入治具の一部を構成する仕切板を、その
まま鋼管柱に補強板として溶接するので、作業工程が極
めてシンプルとなる。また、当該補強板の溶接作業は、
鋼管柱の外側から行われるので、作業性に優れると共
に、信頼性が高い。
According to the first aspect of the present invention, since the press-fitting jig can be diverted, the amount of steel material can be significantly reduced. In particular, since the partition plate forming a part of the press-fitting jig is directly welded to the steel pipe column as a reinforcing plate, the working process is extremely simple. Also, the welding work of the reinforcing plate,
Since it is performed from the outside of the steel pipe column, workability is excellent and reliability is high.

【0017】請求項2記載の発明によれば、前記効果に
加えて、圧入治具の取り付け、取り外し作業を容易に行
うことができるという効果を得ることができる。
According to the second aspect of the present invention, in addition to the above-described effects, an effect that the work of attaching and detaching the press-fitting jig can be easily performed can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の鋼管柱コンクリート圧入工法を示す縦
断側面図である。
FIG. 1 is a longitudinal sectional side view showing a steel pipe column concrete press-fitting method of the present invention.

【図2】注入孔を中心とする鋼管柱の正面図(同図
(A))と、B−B線における横断平面図(同図
(B))である。
FIG. 2 is a front view of the steel pipe column centering on the injection hole (FIG. 2A) and a cross-sectional plan view taken along line BB (FIG. 2B).

【図3】仕切板の正面図(同図(A))と、B−B線に
おける縦断側面図(同図(B))である。
FIG. 3 is a front view of the partition plate (FIG. 3A) and a vertical sectional side view taken along line BB (FIG. 3B).

【図4】圧入治具を取り付けた状態における鋼管柱の要
部斜視図である。
FIG. 4 is a perspective view of a main part of a steel pipe column in a state where a press-fitting jig is attached.

【図5】鋼管柱コンクリート圧入工法における作業手順
を示す説明図である。
FIG. 5 is an explanatory view showing a work procedure in a steel pipe column concrete press-fitting method.

【図6】従来例における鋼管柱コンクリート圧入工法を
示す縦断側面図である。
FIG. 6 is a longitudinal sectional side view showing a conventional steel pipe column concrete press-fitting method.

【符号の説明】[Explanation of symbols]

4 コンクリート圧送管 10 鋼管柱 12 注入孔 14 ガイドとしてのアングル材 20 圧入治具 22 仕切板 24 開口 30 アダプター 4 Concrete pumping pipe 10 Steel pipe column 12 Injection hole 14 Angle material as guide 20 Press-in jig 22 Partition plate 24 Opening 30 Adapter

───────────────────────────────────────────────────── フロントページの続き (72)発明者 新田 浩治 大阪府大阪市都島区片町2丁目10番5号 株式会社熊谷組 大阪支店内 (56)参考文献 特開 平3−191176(JP,A) 実開 平2−11950(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 21/02 103 E04B 1/30 ──────────────────────────────────────────────────続 き Continuation of the front page (72) Koji Nitta, Inventor 2-10-5 Katamachi, Miyakojima-ku, Osaka-shi, Osaka Inside Kumagaya Gumi Osaka Branch (56) References JP-A-3-191176 (JP, A ) Jirukakai 2-11950 (JP, U) (58) Fields surveyed (Int. Cl. 7 , DB name) E04G 21/02 103 E04B 1/30

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 次の(1)〜(3)工程からなる鋼管柱
コンクリート圧入工法。 (1)鋼管柱の外表面に溶接され該鋼管柱に穿設された
注入孔の周辺に設けたガイドを介して、該注入孔の内径
に相当する大きさの開口を有する仕切板を柱面に密着固
定し、該注入孔を開放状態として、コンクリート圧送管
から鋼管柱内にコンクリートを圧入する工程 (2)鋼管柱内にコンクリートを充填した後、前記ガイ
ドに沿って前記仕切板をスライドさせて前記注入孔を閉
塞する工程 (3)充填したコンクリートが硬化した後、前記仕切板
を鋼管柱の外表面に溶接する工程
1. A concrete press-fitting method for a steel pipe column comprising the following steps (1) to (3). (1) is welded to the outer surface of the steel pipe columns through a guide provided on the periphery of the injection hole formed in the tubular columns, cylindrical surface of the partition plate having a size openings corresponding to the inner diameter of the injection hole And pressing the concrete into the steel pipe column from the concrete pumping pipe with the injection hole open, (2) After filling the steel pipe column with concrete, slide the partition plate along the guide. (3) Step of welding the partition plate to the outer surface of the steel pipe column after the filled concrete has hardened
【請求項2】 前記コンクリートの圧入工程において、
前記仕切板と前記圧送管の間にアダプターを介在させて
両者を接続し、前記注入孔の閉塞工程後であって前記仕
切板の溶接工程前に、該アダプターを取り外すことを特
徴とする請求項1記載の鋼管柱コンクリート圧入工法。
2. In the concrete press-fitting step,
An adapter is interposed between the partition plate and the pressure feed pipe to connect the two, and the adapter is removed after the step of closing the injection hole and before the step of welding the partition plate. 2. The method of press-fitting steel pipe column concrete according to 1.
JP11010696A 1996-04-05 1996-04-05 Steel pipe column concrete press-in method Expired - Fee Related JP3171783B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11010696A JP3171783B2 (en) 1996-04-05 1996-04-05 Steel pipe column concrete press-in method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11010696A JP3171783B2 (en) 1996-04-05 1996-04-05 Steel pipe column concrete press-in method

Publications (2)

Publication Number Publication Date
JPH09273308A JPH09273308A (en) 1997-10-21
JP3171783B2 true JP3171783B2 (en) 2001-06-04

Family

ID=14527200

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11010696A Expired - Fee Related JP3171783B2 (en) 1996-04-05 1996-04-05 Steel pipe column concrete press-in method

Country Status (1)

Country Link
JP (1) JP3171783B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101533110B1 (en) * 2013-03-11 2015-07-02 주식회사 포스코건설 Device for connecting concrete injection pipe and method for constructing concrete filled steel tube with the device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105387279A (en) * 2015-12-01 2016-03-09 上海建工一建集团有限公司 Pipeline wall-attaching fixing device and method
CN109610842B (en) * 2019-01-24 2021-03-30 杭州三中新型建材科技有限公司 Jacking concrete pumping construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101533110B1 (en) * 2013-03-11 2015-07-02 주식회사 포스코건설 Device for connecting concrete injection pipe and method for constructing concrete filled steel tube with the device

Also Published As

Publication number Publication date
JPH09273308A (en) 1997-10-21

Similar Documents

Publication Publication Date Title
JP3171783B2 (en) Steel pipe column concrete press-in method
JPS61225437A (en) Apparatus for connecting pillar and beam
JPH08170327A (en) Method of unifying construction of defective section of steel sheet pile ring
JPH1018594A (en) Steel pipe coloumn concrete feeding device and feeding method for the steel pipe column concrete
JP2752905B2 (en) Column / beam joint structure using one side bolt
JP3138720B2 (en) Pillar joining equipment
JP2923616B2 (en) Bonding structure between wall panel and base
JP2981691B2 (en) Joint method and joint structure of box-shaped column in steel frame construction
JP2536345B2 (en) Joint structure of steel pipe concrete columns
JPH10280683A (en) Hardware as level fitting, separator bolt fitting and spacer fitting in common
JPS61216914A (en) Method of fitting steel tubular pile with diagonal member or beam
JP2674460B2 (en) Joint structure between rectangular steel tube concrete column and H-shaped steel beam
JPH09125520A (en) Connection structure of beam and pillar and connection method
JPH037100Y2 (en)
JP3311455B2 (en) Connection structure of steel pipe concrete column
JP3156727B2 (en) Joint method of columns and beams in steel frame
JP2002339571A (en) Adjusting jig for measurement and correction on plumbing to plumb for reinforcement
JP3253047B2 (en) How to fix the base plate for construction
JP2000110239A (en) Method of bonding pillar to foundation
JP3248090B2 (en) Temporary joining equipment for steel columns
JP3091848B2 (en) Pillar joining equipment
JP3338387B2 (en) Joint of foundation pile
JP2000356042A (en) Jig and method for joining precast concrete column
JPH1068225A (en) Concrete pressurizing jig and method of blocking concrete pressurizing opening part
JP3168837B2 (en) Concrete filled columns

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010228

LAPS Cancellation because of no payment of annual fees