JP3164207B2 - Network operation information management method - Google Patents

Network operation information management method

Info

Publication number
JP3164207B2
JP3164207B2 JP22442497A JP22442497A JP3164207B2 JP 3164207 B2 JP3164207 B2 JP 3164207B2 JP 22442497 A JP22442497 A JP 22442497A JP 22442497 A JP22442497 A JP 22442497A JP 3164207 B2 JP3164207 B2 JP 3164207B2
Authority
JP
Japan
Prior art keywords
operation information
network
information
network design
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22442497A
Other languages
Japanese (ja)
Other versions
JPH1155265A (en
Inventor
寛 滝田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP22442497A priority Critical patent/JP3164207B2/en
Publication of JPH1155265A publication Critical patent/JPH1155265A/en
Application granted granted Critical
Publication of JP3164207B2 publication Critical patent/JP3164207B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Small-Scale Networks (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、網運用情報管理方
式に関し、特に、誤りのある網設計情報の検証及び網設
計情報を基に生成した論理的矛盾のある運用情報を迅速
に復旧する網運用情報管理方式に関する。
The present invention relates to a network operation information management system, and more particularly to a network for verifying erroneous network design information and quickly recovering logically inconsistent operation information generated based on the network design information. It relates to an operation information management system.

【0002】[0002]

【従来の技術】図11は、網管理システムの構成を示す
ブロック図である。この網管理システムは、管理対象の
網5と、網5を管理する網管理装置2と、設計された網
5の網設計情報を生成して網管理装置2へ送信する網設
計管理装置1から構成され、更に網5は複数の局6a、
6b、…からなり、局6a、6b、…は複数の伝送装置
4及び伝送装置4の監視制御を行う1台の伝送監視制御
装置3a、3b、…より構成される。
2. Description of the Related Art FIG. 11 is a block diagram showing a configuration of a network management system. The network management system includes a network 5 to be managed, a network management device 2 that manages the network 5, and a network design management device 1 that generates network design information of the designed network 5 and transmits it to the network management device 2. The network 5 further comprises a plurality of stations 6a,
., And each of the stations 6a, 6b,... Comprises a plurality of transmission devices 4 and one transmission monitoring and control device 3a, 3b,.

【0003】各局の伝送監視制御装置3a、3b、…
は、それぞれの局内で1台のみ設置され各伝送監視制御
装置3a、3b、…が保持する運用情報に基づいて伝送
装置4の監視制御を行うものである。そして、このため
の前記運用情報は、網設計管理装置1から送られる網設
計情報を基に網管理装置2が生成し、更に網設計管理装
置1の要求により網管理装置2からそれぞれ伝送監視制
御装置3a、3b、…へダウンロードされる。
The transmission monitoring control devices 3a, 3b,.
Is for monitoring and controlling the transmission device 4 based on operation information held by only one transmission monitoring and control device 3a, 3b,... Installed in each station. The operation information for this purpose is generated by the network management device 2 based on the network design information sent from the network design management device 1, and further transmitted and controlled by the network management device 2 at the request of the network design management device 1. Are downloaded to the devices 3a, 3b,...

【0004】図12は、網設計管理装置1で生成され、
網管理装置2へ送られる網設計情報と運用情報の推移を
そのフォーマット例を示す図である。網設計情報は、図
12に示す管理番号D1、D2、…とその情報の属性
(伝送装置の追加/削除の情報)及び伝送装置41a〜
43a、41b、42bの情報である。伝送装置41a
〜43a、41b、42bの情報は、各伝送装置ごとに
装置番号、局名、装置内の実装情報(図12ではパッケ
ージ番号を示す)及び論理パスを含む装置間の接続情報
からなる。図12において、管理番号D7〜D9は伝送
装置43aの設定と伝送装置42aの削除を行い伝送装
置43aと42bを接続する網設計情報と運用情報の推
移を表し、また、管理番号D7’及びD8’は誤りの網
設計情報と運用情報の推移を表している。
FIG. 12 is generated by the network design management device 1,
FIG. 4 is a diagram showing an example of the format of transition of network design information and operation information sent to the network management device 2. The network design information includes the management numbers D1, D2,... Shown in FIG. 12, the attributes of the information (information on addition / deletion of the transmission device), and the transmission devices 41a to 41a.
43a, 41b, and 42b. Transmission device 41a
The information of .about.43a, 41b, and 42b includes, for each transmission device, a device number, a station name, mounting information in the device (indicated by a package number in FIG. 12), and connection information between devices including a logical path. In FIG. 12, management numbers D7 to D9 indicate transition of network design information and operation information for setting the transmission device 43a and deleting the transmission device 42a and connecting the transmission devices 43a and 42b, and management numbers D7 'and D8. 'Represents the transition of erroneous network design information and operation information.

【0005】又、公知の技術として、特開昭63−23
6435号公報記載の「ネットワークの構成情報管理方
式」は、各局側に自局の運用情報を認めることを前提と
して各局相互間で運用情報に相違が生じて通信が断状態
になり、更に一致させるのに長時間を要するという問題
を解決することを目的とするものである。網管理装置で
運用情報を一元管理して常時各局の運用情報の変化の有
無を確認し、変更があった場合には網管理装置で管理し
ている運用情報の方に各局の運用情報を合わせることに
より運用情報の保障を行っている。
Further, as a known technique, Japanese Patent Application Laid-Open No. 63-23 / 1988
The “network configuration information management method” described in Japanese Patent No. 6435 is based on the premise that each station recognizes its own operation information, the operation information differs between the stations, the communication is cut off, and the communication is further matched. It is intended to solve the problem that it takes a long time to perform the operation. The operation information is centrally managed by the network management device and constantly checks whether or not the operation information of each station has changed. If there is a change, the operation information of each station is adjusted to the operation information managed by the network management device. This guarantees operational information.

【0006】更に、特開平2−305139号公報記載
の「ネットワークの構成変更方式」は、運用情報の変更
を行うときに変更部分のみの情報を子局に送ることによ
り、構成変更を行う処理時間の短縮及び構成変更に伴う
他の通信ルートへの影響の排除並びに効率的な網運用を
図るものである。
[0006] Further, the "network configuration change method" described in Japanese Patent Application Laid-Open No. 2-305139 discloses a processing time for performing a configuration change by sending information of only a changed portion to a slave station when operating information is changed. The purpose of the present invention is to eliminate the influence on other communication routes due to the shortening and the configuration change, and to efficiently operate the network.

【0007】[0007]

【発明が解決しようとする課題】前述の従来の網管理装
置では、生成された運用情報に対し伝送監視制御装置で
網設計管理装置の網設計情報に起因する誤りが発見され
た時に、どの網設計情報に誤りがあったかを特定するこ
とが困難であり、正常な運用情報を生成し直すまでに時
間がかかるという問題があった。
In the above-mentioned conventional network management device, when an error caused by the network design information of the network design management device is found by the transmission monitoring control device with respect to the generated operation information, which network It is difficult to specify whether there is an error in the design information, and there is a problem that it takes time to regenerate normal operation information.

【0008】例えば、追加する伝送装置の局情報や削除
する伝送装置を誤った場合等では従来の網設計情報のチ
ェックでは発見されずに伝送監視制御装置の運用が開始
されてから最終的に論理矛盾が生じ網設計情報の設計ミ
スの発見が遅れるという問題があった。
For example, when the station information of the transmission device to be added or the transmission device to be deleted is incorrect, the conventional network design information is not found by the check, and the logic is finally determined after the operation of the transmission monitoring and control device is started. There is a problem that inconsistency arises and the discovery of a design error in the network design information is delayed.

【0009】又、前記公知技術においては、何れも運用
情報に変更があった場合の技術であり、運用情報ひいて
は網設計情報そのものに設計ミスがあった場合は上述と
同様の問題が起こるものであった。
[0009] Further, the above-mentioned prior arts are all techniques in the case where there is a change in the operation information, and the same problem as described above occurs when there is a design error in the operation information and hence the network design information itself. there were.

【0010】(発明の目的)本発明の目的は、誤りの網
設計情報の早期発見を可能とし効率的な網運用を行うた
めの検証を可能とする網運用情報管理方式を提供するこ
とにある。
(Object of the Invention) An object of the present invention is to provide a network operation information management system which enables early detection of erroneous network design information and enables verification for efficient network operation. .

【0011】本発明の他の目的は、誤りの網設計情報を
基に生成した論理矛盾のある運用情報の復旧を可能とす
る網運用情報管理方式を提供することにある。
Another object of the present invention is to provide a network operation information management system which enables recovery of logically inconsistent operation information generated based on erroneous network design information.

【0012】[0012]

【課題を解決するための手段】本発明の網運用情報管理
方式は、複数の伝送装置と伝送装置の監視制御を行う伝
送監視制御装置とを含む複数の局が相互接続して構成さ
れる網と、網を設計する網設計情報を生成する網設計管
理装置と、網設計情報を基に伝送監視制御装置の運用情
報を生成し網の運用を管理する網管理装置とからなる網
管理システムの網運用情報管理方式において、網管理装
置は、生成した運用情報を網設計情報の履歴を付加して
管理することにより、伝送監視制御装置から誤りの運用
情報を通知されたときに誤りを含む網設計情報の履歴を
網設計管理装置ヘ提供することを特徴とする。また、前
記網管理装置は、網設計情報の受信毎に生成した運用情
報の履歴を管理することにより、前記網設計管理装置か
ら誤りの運用情報の復旧を要求されたとき、運用情報を
誤りの網設計情報が反映された運用情報の直前の運用情
報に戻すことにより正しい運用情報を伝送監視制御装置
へ提供することを特徴とする。さらに、前記網管理装置
は、網設計情報の受信毎に生成した運用情報の履歴及び
運用情報と網設計情報との対応関係を記録した運用情報
テーブル及び網設計情報毎の管理番号と網設計情報の受
信毎に生成した運用情報の履歴との対応関係を記録した
運用情報履歴テーブルを有する。
According to the present invention, there is provided a network operation information management system which comprises a plurality of stations including a plurality of transmission apparatuses and a transmission monitoring control apparatus for monitoring and controlling the transmission apparatuses. A network management system that generates network design information for designing a network, and a network management device that generates operation information of the transmission monitoring and control device based on the network design information and manages the operation of the network. In the network operation information management method, the network management device manages the generated operation information by adding the history of the network design information to the network including the error when notified of the error operation information from the transmission monitoring control device. A history of the design information is provided to the network design management device. Further, the network management device manages the history of the operation information generated every time the network design information is received, so that when the network design management device requests recovery of the erroneous operation information, the operation information is deleted. By returning the operation information immediately before the operation information on which the network design information is reflected, correct operation information is provided to the transmission monitoring control device. Further, the network management device includes an operation information table that records a history of operation information generated each time the network design information is received and a correspondence relationship between the operation information and the network design information, a management number for each network design information, and network design information. And an operation information history table that records the correspondence between the information and the history of operation information generated each time the information is received.

【0013】また、本発明の網管理装置は、受信した網
設計情報に基づいて複数の局が相互接続される網を設計
運用する網管理装置において、受信した網設計情報に基
づいて局内の伝送装置の設定、削除及び接続の制御を行
うための運用情報を生成する運用情報生成部と、網設計
情報の受信毎に生成した運用情報の履歴及び運用情報と
網設計情報との対応関係を記録した運用情報テーブルと
を有し、各局への運用情報の提供及び網設計管理装置へ
の誤りの網設計情報の提供を行う。
A network management apparatus according to the present invention is a network management apparatus for designing and operating a network in which a plurality of stations are interconnected based on received network design information. An operation information generation unit that generates operation information for controlling the setting, deletion, and connection of devices, and records the history of operation information generated each time network design information is received and the correspondence between the operation information and network design information It provides operation information to each station and provides erroneous network design information to the network design management device.

【0014】具体的には、網管理装置は網設計管理装置
から送られた網設計情報を基に生成した運用情報と網設
計情報の管理番号を運用情報記憶部に登録する。さらに
その網設計情報の管理番号と生成した運用情報を運用情
報履歴記憶部に登録する。伝送監視制御装置から運用情
報に対する誤りの通知を受信すると、網管理装置は誤り
を指摘された運用情報に対する網設計情報履歴を網設計
管理装置ヘ送信する。網設計管理装置から網設計情報履
歴の中から誤りと判断された網設計情報の管理番号を受
信したら、運用情報履歴記憶部を検索してその網設計情
報を反映する直前の運用情報を読み出して運用情報記憶
部に登録し、該当の伝送監視制御装置へダウンロードす
る。
[0014] Specifically, the network management device registers the operation information generated based on the network design information sent from the network design management device and the management number of the network design information in the operation information storage unit. Further, the management number of the network design information and the generated operation information are registered in the operation information history storage unit. Upon receiving the error notification for the operation information from the transmission monitoring control device, the network management device transmits a network design information history for the operation information for which the error has been pointed out to the network design management device. Upon receiving the management number of the network design information determined to be incorrect from the network design information history from the network design management device, search the operation information history storage unit and read the operation information immediately before reflecting the network design information. It is registered in the operation information storage unit and downloaded to the corresponding transmission monitoring and control device.

【0015】(作用)網管理装置に網設計管理装置から
の網設計情報の受信毎に生成した運用情報の履歴を記録
した運用情報テーブルに各運用情報との対応する網設計
情報の履歴を新たに記録することにより、前記運用情報
テーブルを参照することにより網設計情報の設計ミスや
情報欠落の早期発見を可能とし、誤りのある網設計情報
が反映された直前の運用情報に迅速に復旧することを可
能とする。また、網設計情報の管理番号と前記運用情報
の履歴との対応関係を運用情報履歴テーブルに記録する
ことにより、誤りの網設計情報の特定、通知及び復旧等
の網運用を効率的に行う。
(Operation) The history of the network design information corresponding to each operation information is newly added to the operation information table which records the history of the operation information generated each time the network design information is received from the network design management device. By referring to the operation information table, it is possible to detect a design error or missing information of the network design information at an early stage, and quickly recover to the operation information immediately before the erroneous network design information is reflected. To make things possible. In addition, by recording the correspondence between the management number of the network design information and the history of the operation information in the operation information history table, network operation such as identification, notification, and recovery of erroneous network design information is efficiently performed.

【0016】[0016]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

[1]構成の説明 次に、本発明の実施の形態について図面を参照して詳細
に説明する。
[1] Description of Configuration Next, an embodiment of the present invention will be described in detail with reference to the drawings.

【0017】図1は、本実施の形態を示す網管理装置2
の機能ブロック図であり、図2〜図6は、網管理装置2
の動作を示す流れ図である。
FIG. 1 shows a network management apparatus 2 according to this embodiment.
FIG. 2 to FIG. 6 show the network management device 2.
5 is a flowchart showing the operation of FIG.

【0018】図1において、本実施の形態は、網設計管
理装置1と、網管理装置2と、各局の伝送監視制御装置
3a、3bとから構成されており、また、網管理装置2
は、網管理装置2の各機能を管理する中央管理部21
と、網設計管理装置1との通信を行う設計装置通信部2
2と、各局6の伝送監視制御装置3a、3bの運用情報
を生成する運用情報生成部23と、運用情報生成部23
で生成した運用情報を登録する運用情報記憶部25と、
その運用情報の履歴を登録する運用情報履歴記憶部24
と、伝送監視制御装置3a、3bとの通信を行う伝送装
置通信部26とからなる。
In FIG. 1, the present embodiment comprises a network design management device 1, a network management device 2, and transmission monitoring and control devices 3a and 3b of each station.
Is a central management unit 21 that manages each function of the network management device 2.
Device communication unit 2 that communicates with the network design management device 1
2, an operation information generation unit 23 that generates operation information of the transmission monitoring control devices 3a and 3b of each station 6, and an operation information generation unit 23
An operation information storage unit 25 for registering the operation information generated in
Operation information history storage unit 24 for registering the history of the operation information
And a transmission device communication unit 26 that communicates with the transmission monitoring control devices 3a and 3b.

【0019】運用情報履歴記憶部24は、網設計情報に
対する運用情報の履歴を格納する運用情報履歴テーブル
27を、運用情報記憶部25は、各伝送監視制御装置3
a、3bに対する運用情報を格納する運用情報テーブル
28を有する。そして、運用情報履歴テーブル27は網
設計情報の管理番号D1、D2、…と運用情報T1、T
2、…との対応情報からなり、運用情報テーブル28
は、伝送監視制御装置、局、伝送装置、その対向伝送装
置及び網設計情報履歴からなる。
The operation information history storage unit 24 stores an operation information history table 27 for storing the history of operation information with respect to the network design information.
It has an operation information table 28 for storing operation information for a and 3b. The operation information history table 27 includes management numbers D1, D2,... Of the network design information and operation information T1, T2.
2, the operation information table 28
Is composed of a transmission monitoring control device, a station, a transmission device, its opposite transmission device, and a network design information history.

【0020】[2]動作の説明 次に、図面を参照して本発明の実施の形態の動作につい
て説明する。
[2] Description of Operation Next, the operation of the embodiment of the present invention will be described with reference to the drawings.

【0021】図2は、本実施の形態の全体の動作の概要
を示す流れ図である。特に、網設計監視装置1からの指
示により、網管理装置2が伝送監視制御装置3a、3b
に対して行う各処理の一連の流れの概要を示すものであ
る。
FIG. 2 is a flowchart showing an outline of the overall operation of the present embodiment. In particular, in response to an instruction from the network design monitoring device 1, the network management device 2 transmits the transmission monitoring control devices 3a and 3b.
1 shows an outline of a series of flows of each processing performed on the processing.

【0022】網管理装置2は、網設計管理装置1から送
られる網設計情報を基に伝送監視制御装置3a、3bに
出力する運用情報の生成処理を行う(ステップA1)。
次に、網管理装置2は、伝送監視制御装置3a、3bに
生成した前記運用情報をダウンロードする(ステップA
2)。ダウンロード処理終了後、網管理装置2は網設計
管理装置1からの要求により伝送監視制御装置3a、3
bヘダウンロードした運用情報の検証を行うよう運用情
報検証要求を行う(ステップA3)。伝送監視制御装置
3a、3bは、入力した前記運用情報に基づいて配下の
伝送装置の設定、削除及び接続関係について論理的な誤
りがないかを検証して網管理装置2にその結果を送信す
る。網管理装置2は、受信した検証応答結果が異常の場
合(ステッA4)は網設計管理装置1に通知し、網設計
管理装置1からの要求により運用情報を復旧する運用情
報復旧処理を行う(ステップA5)。
The network management device 2 generates operation information to be output to the transmission monitoring control devices 3a and 3b based on the network design information sent from the network design management device 1 (step A1).
Next, the network management device 2 downloads the generated operation information to the transmission monitoring control devices 3a and 3b (step A).
2). After the end of the download process, the network management device 2 requests the transmission monitoring and control devices 3a, 3a
b, an operation information verification request is made to verify the downloaded operation information (step A3). The transmission monitoring control devices 3a and 3b verify whether there is a logical error in the setting, deletion, and connection relation of the subordinate transmission devices based on the input operation information, and transmit the result to the network management device 2. . If the received verification response result is abnormal (step A4), the network management device 2 notifies the network design management device 1 and performs operation information restoration processing for restoring operation information in response to a request from the network design management device 1 (step A4). Step A5).

【0023】図3は、網設計情報受信時の網管理装置2
の処理を示す流れ図である。図1と図3を参照すると、
網設計管理装置1からの網設計情報とその管理番号を設
計装置通信部22が受信すると(ステップB1)、設計
装置通信部22はその網設計情報の内容をチェックし、
チェック結果を中央管理部21ヘ送る。中央管理部21
は、チェック結果が正常ならば(ステップB2)、運用
情報生成部23に運用情報の生成を指示する。
FIG. 3 shows the network management device 2 when receiving network design information.
6 is a flowchart showing the processing of FIG. Referring to FIGS. 1 and 3,
When the design device communication unit 22 receives the network design information and its management number from the network design management device 1 (step B1), the design device communication unit 22 checks the contents of the network design information,
The check result is sent to the central management unit 21. Central management unit 21
If the check result is normal (step B2), the operation information generation unit 23 is instructed to generate operation information.

【0024】運用情報生成部23は、網設計情報から各
伝送監視制御装置3a、3bごとに必要な情報を抜き出
して伝送監視制御装置が制御する局間の伝送装置の追
加、削除、伝送装置間の接続、切断等に必要なの装置の
設定等の運用情報を生成し、生成結果を中央管理部21
ヘ送る(ステップB3)。
The operation information generation unit 23 extracts necessary information for each of the transmission monitoring control devices 3a and 3b from the network design information, and adds or deletes transmission devices between stations controlled by the transmission monitoring control devices, and deletes information between transmission devices. Generates operation information such as device settings necessary for connection and disconnection of the device, and transmits the generated result to the central management unit 21.
Send (step B3).

【0025】中央処理装置21は、前記生成結果をチエ
ックし正常ならば(ステップB4)、生成された運用情
報について運用情報記憶部25ヘの登録を運用情報生成
部23ヘ指示する。また、中央処理装置21は、生成元
となった網設計情報の管理番号と生成した運用情報につ
いて運用情報履歴記憶部24ヘの登録も指示する。
The central processing unit 21 checks the generation result and, if normal (step B4), instructs the operation information generation unit 23 to register the generated operation information in the operation information storage unit 25. The central processing unit 21 also instructs the management information of the network design information as the generation source and the generated operation information to be registered in the operation information history storage unit 24.

【0026】運用情報生成部23は、運用情報記憶部2
5と運用情報履歴記憶部24への登録を完了する(ステ
ップB5,B6)。また、中央処理装置21におけるチ
ェックにより網設計情報の内容が異常(ステップB2)
か運用情報生成処理異常(ステップB4)の場合は、中
央管理部21はその旨の処理結果を設計装置通信部22
経由で網設計管理装置1ヘ送る(ステップB7)。
The operation information generation unit 23 includes the operation information storage unit 2
5 and registration in the operation information history storage unit 24 is completed (steps B5 and B6). Further, the content of the network design information is abnormal due to the check in the central processing unit 21 (step B2).
If the operation information generation process is abnormal (step B4), the central management unit 21 sends the processing result to that effect to the design device communication unit 22.
It is sent to the network design management device 1 via the network (step B7).

【0027】図4は、各伝送監視制御装置3a、3bに
運用情報をダウンロードするように指示する運用情報ダ
ウンロード要求を、網設計管理装置1から中央処理装置
21が受信時の網管理装置2の動作を示す流れ図であ
る。
FIG. 4 shows an operation information download request instructing each of the transmission monitoring and control devices 3a and 3b to download operation information from the network design management device 1 to the network management device 2 when the central processing unit 21 receives the operation information download request. It is a flowchart which shows operation | movement.

【0028】図1と図4を参照すると、設計装置通信部
22は、網設計管理装置1から送信された、網管理装置
2から伝送監視制御装置3ヘの運用情報のダウンロード
要求を受信すると(ステップC1)、設計装置通信部2
2と接続されている中央管理部21は、伝送装置通信部
26ヘ運用情報を伝送監視制御装置3a、3bにヘダウ
ンロードを行うよう指示する。伝送装置通信部26は、
運用情報テーブル28より運用情報を読み出して各伝送
監視制御装置3a、3bヘその運用情報を送信し(ステ
ップC2)、その送信の処理結果を中央管理部21ヘ送
る。中央管理部21は、受け取った処理結果を設計装置
通信部22経由で網設計管理装置1ヘ送信する(ステッ
プC3)。
Referring to FIGS. 1 and 4, when the design device communication unit 22 receives a request for downloading operation information from the network management device 2 to the transmission monitoring control device 3 transmitted from the network design management device 1 ( Step C1), design device communication unit 2
The central management unit 21 connected to the communication device 2 instructs the transmission device communication unit 26 to download the operation information to the transmission monitoring control devices 3a and 3b. The transmission device communication unit 26 includes:
The operation information is read from the operation information table 28, and the operation information is transmitted to each of the transmission monitoring control devices 3a and 3b (step C2), and the transmission processing result is transmitted to the central management unit 21. The central management unit 21 transmits the received processing result to the network design management device 1 via the design device communication unit 22 (Step C3).

【0029】図5は、各伝送監視制御装置3a、3bが
運用情報を検証することを要求する運用情報検証要求
を、網設計管理装置1から中央処理装置21が受信時の
網管理装置2の動作を示す流れ図である。
FIG. 5 shows an operation information verification request from the network design management device 1 to the network management device 2 when the central processing unit 21 receives an operation information verification request requesting that each of the transmission monitoring control devices 3a and 3b verify the operation information. It is a flowchart which shows operation | movement.

【0030】図1と図5を参照すると、網設計管理装置
1から運用情報検証要求を設計装置通信部22が受信す
ると(ステップD1)、中央管理部21は伝送装置通信
部26に対して伝送監視制御装置3a、3bへの運用情
報検証要求を指示する。伝送装置通信部26は、各伝送
監視制御装置3a、3bヘ運用情報検証要求を送信する
(ステップD2)。
Referring to FIGS. 1 and 5, when the design device communication unit 22 receives an operation information verification request from the network design management device 1 (step D1), the central management unit 21 transmits the request to the transmission device communication unit 26. It issues an operation information verification request to the monitoring control devices 3a and 3b. The transmission device communication unit 26 transmits an operation information verification request to each of the transmission monitoring control devices 3a and 3b (step D2).

【0031】伝送監視制御装置3a、3bが前記運用情
報に基づく運用の検証を行い、伝送装置通信部26が伝
送監視制御装置3a、3bから運用情報の検証結果の運
用情報検証応答を受信する(ステップD3)。中央管理
部21は、その応答結果が運用情報の誤りの場合(ステ
ップD4)は、当該運用情報の網設計情報履歴を読み出
して処理結果と共に設計装置通信部22経由で網設計管
理装置1ヘ送信する(ステップD5)。また、応答結果
が正常の場合(ステップD4)は、処理結果のみを設計
装置通信部22経由で網設計管理装置1ヘ送信する(ス
テップD6)。
The transmission monitoring control devices 3a and 3b verify the operation based on the operation information, and the transmission device communication unit 26 receives the operation information verification response of the operation information verification result from the transmission monitoring control devices 3a and 3b ( Step D3). When the response result is an error in the operation information (step D4), the central management unit 21 reads out the network design information history of the operation information and transmits it to the network design management device 1 via the design device communication unit 22 together with the processing result. (Step D5). If the response result is normal (step D4), only the processing result is transmitted to the network design management device 1 via the design device communication unit 22 (step D6).

【0032】図6は、網設計管理装置1からの誤りの運
用情報を復旧するように要求する運用情報復旧要求を網
管理装置2が受信時の動作を示す流れ図である。運用情
報の誤りに基づいて網設計管理装置1から出力された運
用情報復旧要求を設計装置通信部22が受信すると(ス
テップE1)、中央管理部21は復旧要求内の誤りの網
設計情報の管理番号を基に、運用情報履歴記憶部24か
ら誤りの網設計情報の直前の運用情報を読み出して運用
情報記憶部25に登録されている誤りの網設計情報受信
前のものを取り出し(ステップE2)、その運用情報を
伝送装置通信部26経由で当該伝送監視制御装置3ヘダ
ウンロードする(ステップE3)。但し、網設計管理装
置1が誤りと判断して網管理装置2へ通知する網設計情
報は1つとし、複数誤りが発見された場合、最古の網設
計情報を送るものとする。
FIG. 6 is a flowchart showing the operation when the network management device 2 receives an operation information recovery request from the network design management device 1 requesting that the erroneous operation information be recovered. When the design device communication unit 22 receives the operation information restoration request output from the network design management device 1 based on the error in the operation information (step E1), the central management unit 21 manages the erroneous network design information in the restoration request. Based on the number, the operation information immediately before the erroneous network design information is read from the operation information history storage unit 24, and the one before reception of the erroneous network design information registered in the operation information storage unit 25 is extracted (step E2). Then, the operation information is downloaded to the transmission monitoring control device 3 via the transmission device communication unit 26 (step E3). However, the network design management device 1 determines that there is an error and notifies the network management device 2 of one piece of network design information. When a plurality of errors are found, the oldest network design information is sent.

【0033】その後、網設計管理装置1は、必要により
誤りを修正した網設計情報を網管理装置2に送信して網
運用情報管理を行う。
After that, the network design management device 1 transmits the network design information with the error corrected as necessary to the network management device 2 to manage the network operation information.

【0034】[3]運用管理の具体的動作 次に、本実施の形態の網運用情報管理の具体例として伝
送装置の追加実装、削除及び伝送路接続に関する動作を
詳細に説明する。
[3] Specific Operation Management Operation Next, as a specific example of the network operation information management according to the present embodiment, the operation relating to the addition and deletion of the transmission device and the connection of the transmission line will be described in detail.

【0035】図1、図7及び図8を参照すると、例え
ば、設計装置通信部22が網設計管理装置1から網設計
情報として、伝送装置41a、41bの実装情報、伝送
装置41a、41bの接続情報を追加情報として受信
し、その網設計情報を基に運用情報生成部23が運用情
報を生成し、その運用情報と生成元の網設計情報の管理
番号D1、D2、…を運用情報テーブル28に登録する
と共に、網設計情報の管理番号と生成した運用情報T
1、T2…を運用情報履歴テーブル27に登録する。次
に網設計管理装置1よりダウンロード要求を受信する
と、伝送装置通信部26はこの運用情報から該当の伝送
監視制御装置3a、3bの運用情報を読み出してそれぞ
れの伝送監視制御装置3a、3bにダウンロードする。
さらに網設計管理装置1より運用情報検証要求を受信す
ると、網管理装置2は伝送監視制御装置3a、3bヘ運
用情報の検証要求を送信する。伝送監視制御装置3a、
3bから検証結果が正常との応答を受信したら、その旨
網設計管理装置1ヘ検証応答を返す。
Referring to FIG. 1, FIG. 7 and FIG. 8, for example, the design device communication unit 22 receives, as network design information from the network design management device 1, the mounting information of the transmission devices 41a and 41b and the connection of the transmission devices 41a and 41b. The information is received as additional information, the operation information generating unit 23 generates operation information based on the network design information, and the operation information and the management numbers D1, D2,... And the management number of the network design information and the generated operation information T
Are registered in the operation information history table 27. Next, upon receiving a download request from the network design management device 1, the transmission device communication unit 26 reads the operation information of the corresponding transmission monitoring control device 3a, 3b from this operation information and downloads the operation information to the transmission monitoring control device 3a, 3b. I do.
Further, when receiving the operation information verification request from the network design management device 1, the network management device 2 transmits the operation information verification request to the transmission monitoring control devices 3a and 3b. Transmission monitoring and control device 3a,
When a response indicating that the verification result is normal is received from 3b, a verification response is returned to the network design management device 1 to that effect.

【0036】一方、図7及び図8は、例えば伝送装置4
2aを不要又は何らかの不具合を判断してこれを伝送装
置43aに変更する網設計情報に対して生成された運用
情報の推移を示す図であり、管理番号D7の網設計情報
は伝送装置43aの追加情報、管理番号D8は伝送装置
42aの削除情報、管理番号D9は伝送装置43aと伝
送装置42bの接続の追加情報である。運用情報T6か
らT9は各網設計情報D7からD9により更新された運
用情報を示す。
On the other hand, FIG. 7 and FIG.
FIG. 9 is a diagram showing a transition of operation information generated for network design information for determining whether or not 2a is unnecessary or for some kind of failure and changing it to the transmission device 43a, and the network design information of management number D7 is added to the transmission device 43a. The information and management number D8 are deletion information of the transmission device 42a, and the management number D9 is additional information of the connection between the transmission device 43a and the transmission device 42b. The operation information T6 to T9 indicate the operation information updated by the respective network design information D7 to D9.

【0037】運用情報記憶部25に運用情報T6が登録
されている状態において、設計装置通信部22が局に関
する誤った網設計情報D7'を受信すると運用情報生成
部23は誤りの運用情報T7'を生成し、運用情報記憶
部25に登録する。斜線部分は運用情報の誤り部分を示
す。伝送装置通信部26は、その後の網設計管理情報D
8、D9を基に生成した運用情報T9'(但し網設計情
報履歴の項目は除く)を伝送監視制御装置3a、3bヘ
ダウンロードし、その後運用情報検証要求を行うと、伝
送監視制御装置3bから斜線部分を誤りとする応答結果
が受信される。
In the state where the operation information T6 is registered in the operation information storage unit 25, when the design equipment communication unit 22 receives the erroneous network design information D7 'regarding the station, the operation information generation unit 23 causes the erroneous operation information T7'. Is generated and registered in the operation information storage unit 25. The hatched portion indicates an error portion of the operation information. The transmission device communication unit 26 transmits the subsequent network design management information D
8, the operation information T9 '(excluding the items of the network design information history) generated based on D9 is downloaded to the transmission monitoring and control devices 3a and 3b, and when an operation information verification request is made thereafter, the transmission monitoring and control device 3b A response result in which the hatched portion is erroneous is received.

【0038】中央管理部21は当該運用情報に対する網
設計情報履歴を運用情報記憶部25より読み出して網設
計管理装置1ヘD7'、D8、D9が誤りであるとの応
答通知を設計装置通信部22を介して送信する。
The central management unit 21 reads the network design information history for the operation information from the operation information storage unit 25, and sends a response notification to the network design management device 1 that D7 ', D8, and D9 are erroneous to the design device communication unit. 22.

【0039】網設計管理装置1は、応答通知を解析して
D7'が誤りであると判断してその情報を含んだ運用情
報復旧要求を設計装置通信部22へ送信すると、中央管
理部21は、運用情報履歴記憶部24からD7'を反映
する前の運用情報T6を読み出して運用情報記憶部25
の運用情報をT9'からT6ヘ戻し、T6から伝送監視
制御装置3a、3bの運用情報を読み出してそれぞれに
ダウンロードする。
The network design management device 1 analyzes the response notification, determines that D7 'is erroneous, and transmits an operation information restoration request including the information to the design device communication unit 22. The operation information T6 before the reflection of D7 ′ is read from the operation information history storage unit 24, and the operation information storage unit 25 is read.
Is returned from T9 'to T6, and from T6, the operation information of the transmission monitoring control devices 3a and 3b is read and downloaded to each.

【0040】更に、本実施の形態の網運用情報管理にお
ける他の誤った伝送装置の追加実装、削除及び伝送路接
続に関する動作を詳細に説明する。
Further, the operation related to the addition and deletion of another erroneous transmission device and the connection of the transmission line in the network operation information management of this embodiment will be described in detail.

【0041】図9及び図10において、運用情報記憶部
25に運用情報T7が登録されている状態において、網
設計管理装置1から網設計情報D8'として伝送装置4
2aでなく伝送装置41aを削除する旨の削除情報を受
信したとする。運用情報生成部23は誤りの運用情報T
8"を生成して運用情報記憶部25に登録する。その
後、網設計情報D9(接続)を基に生成した運用情報T
9"を伝送監視制御装置3a、3bの運用情報としてそ
れぞれにダウンロードし、網設計管理装置1からの要求
により各伝送監視制御装置3a、3bへ運用情報検証要
求を送信した結果、伝送監視制御装置3bから斜線部分
が誤りであるとの応答結果が送られる。
9 and 10, in a state where the operation information T7 is registered in the operation information storage unit 25, the network design management device 1 transmits the transmission device 4 as the network design information D8 '.
It is assumed that deletion information indicating that the transmission device 41a is to be deleted instead of 2a has been received. The operation information generation unit 23 outputs the erroneous operation information T
8 "is generated and registered in the operation information storage unit 25. Thereafter, the operation information T generated based on the network design information D9 (connection) is generated.
9 "is individually downloaded as operation information of the transmission monitoring control devices 3a and 3b, and an operation information verification request is transmitted to each of the transmission monitoring control devices 3a and 3b in response to a request from the network design management device 1. A response result indicating that the shaded portion is incorrect is sent from 3b.

【0042】中央管理部21は、網設計管理装置1ヘ網
設計情報D8'が誤りであるとの応答通知を設計装置通
信部22を介して送信する。網設計管理装置1は、前記
応答通知を受信して内容を解析し網設計情報D8'が誤
りの情報を含む運用情報の復旧要求を網管理装置2に送
信する。網管理装置2の中央管理部21は、前記復旧要
求を受信すると運用情報履歴記憶部24からD8'を反
映する運用情報の直前の運用情報T7を読み出して運用
情報記憶部25の運用情報をT9"からT7ヘ戻し、伝
送装置通信部26から伝送監視制御装置3a、3bにそ
の運用情報をダウンロードする。このようにして誤った
運用情報の復旧を可能とし、合理的な網運用情報管理を
実現する。
The central management unit 21 transmits a response notification that the network design information D8 'is erroneous to the network design management device 1 via the design device communication unit 22. The network design management device 1 receives the response notification, analyzes the contents, and transmits a recovery request for operation information including information on an error in the network design information D8 'to the network management device 2. Upon receiving the restoration request, the central management unit 21 of the network management device 2 reads the operation information T7 immediately before the operation information reflecting D8 ′ from the operation information history storage unit 24, and stores the operation information in the operation information storage unit 25 as T9. "And return to T7 to download the operation information from the transmission device communication unit 26 to the transmission monitoring and control devices 3a and 3b. In this way, it is possible to recover erroneous operation information and realize rational network operation information management. I do.

【0043】以上の実施の形態においては、網設計情報
に対する運用情報の履歴として網設計情報の受信毎に生
成した運用情報の履歴及び運用情報と網設計情報との対
応関係を記録した運用情報テーブルと、網設計情報毎の
管理番号を使用し該管理番号と当該網設計情報まで反映
された運用情報の履歴とを対応させて運用情報履歴テー
ブルとを使用して、伝送監視制御装置から誤りの運用情
報を通知されたときに、網設計管理装置へ誤りの網設計
情報を提供するとともに、網設計管理装置からの復旧要
求に対して、運用情報を誤りの前記網設計情報が反映さ
れた直前の運用情報に戻すことにより正しい運用情報を
伝送監視制御装置へ提供するようにしているが、運用情
報を誤りの前記網設計情報が反映された直前の運用情報
に戻すために前記直前の運用情報を取得する方法は、運
用情報テーブルを参照するだけでも可能である、つま
り、運用情報テーブルのうち誤りのある網設計情報が反
映された直前の運用情報の履歴を特定することで正しい
運用情報を伝送監視制御装置へ提供することが可能であ
る。
In the above embodiment, the history of operation information generated each time the network design information is received and the operation information table which records the correspondence between the operation information and the network design information are recorded as the history of the operation information for the network design information. Using the management number for each network design information, associating the management number with the history of the operation information reflected up to the network design information, and using the operation information history table, When the operation information is notified, the erroneous network design information is provided to the network design management device, and in response to a recovery request from the network design management device, the operation information is changed immediately before the erroneous network design information is reflected. Although the correct operation information is provided to the transmission monitoring control device by returning to the operation information of the above, in order to return the operation information to the operation information immediately before the erroneous network design information is reflected, The method of acquiring the previous operation information is also possible simply by referring to the operation information table, that is, by specifying the history of the operation information immediately before the erroneous network design information is reflected in the operation information table. It is possible to provide correct operation information to the transmission monitoring control device.

【0044】[0044]

【発明の効果】以上説明したように、本発明は網管理装
置は網設計情報に基づいて生成した運用情報テーブルの
項目に網設計情報の履歴を設けているので、伝送監視制
御装置から送られる誤りの運用情報から誤りの網設計情
報を特定して網設計管理装置へ通知することができるの
で、網設計情報の設計ミスや情報欠落の早期発見が可能
となり、また、正しい運用情報までの復旧が迅速に行う
ことが可能である。
As described above, according to the present invention, since the network management device provides the history of the network design information in the items of the operation information table generated based on the network design information, the network management device is sent from the transmission monitoring control device. Since the erroneous network design information can be specified from the erroneous operation information and notified to the network design management device, it is possible to detect design errors and missing information of the network design information at an early stage, and to restore the correct operation information. Can be done quickly.

【0045】さらに、本発明は網設計情報の管理番号を
利用し該管理番号に対する運用情報の履歴テーブルを運
用情報履歴記憶部に設けているので、誤りの網設計情報
の特定、網設計管理装置への通知及び正しい運用情報の
発見、復旧等の網運用の効率化が図れる。
Further, according to the present invention, the management table of the operation information corresponding to the management number is provided in the operation information history storage unit using the management number of the network design information. Notification and correct operation information discovery, recovery, etc., and more efficient network operation.

【0046】[0046]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態の構成を示す機能ブロッ
ク図である。
FIG. 1 is a functional block diagram showing a configuration of an embodiment of the present invention.

【図2】網管理装置の動作の概要を示す流れ図である。FIG. 2 is a flowchart showing an outline of an operation of the network management device.

【図3】網設計情報を受信時の処理を示す流れ図であ
る。
FIG. 3 is a flowchart showing a process when network design information is received.

【図4】運用情報のダウンロード要求を受信時の処理を
示す流れ図である。
FIG. 4 is a flowchart showing a process when receiving a download request for operation information.

【図5】運用情報の検証要求を受信時の処理を示す流れ
図である。
FIG. 5 is a flowchart showing a process when receiving a verification request for operation information.

【図6】運用情報の復旧要求を受信時の処理を示す流れ
図である。
FIG. 6 is a flowchart showing a process when receiving a recovery request for operation information.

【図7】運用管理の具体的動作例を示す図である。FIG. 7 is a diagram showing a specific operation example of operation management.

【図8】網設計情報のフォーマット例を示す図である。FIG. 8 is a diagram illustrating a format example of network design information.

【図9】運用管理の他の具体的動作例を示す図である。FIG. 9 is a diagram showing another specific operation example of operation management.

【図10】他の網設計情報のフォーマット例を示す図で
ある。
FIG. 10 is a diagram showing a format example of other network design information.

【図11】網管理システムの構成を示すブロック図であ
る。
FIG. 11 is a block diagram illustrating a configuration of a network management system.

【図12】網設計情報に対する運用情報の推移を示す図
である。
FIG. 12 is a diagram showing transition of operation information with respect to network design information.

【符号の説明】[Explanation of symbols]

1 網設計管理装置 2 網管理装置 3、3a、3b 伝送監視制御装置 4、41a、41b、42a、42b、43a 伝送装
置 5 網 6、6a、6b 局 21 中央管理部 22 設計装置通信部 23 運用情報生成部 24 運用情報履歴記憶部 25 運用情報記憶部 26 伝送装置通信部 27 運用情報履歴テーブル 28 運用情報テーブル
DESCRIPTION OF SYMBOLS 1 Network design management device 2 Network management device 3, 3a, 3b Transmission monitoring control device 4, 41a, 41b, 42a, 42b, 43a Transmission device 5 Network 6, 6a, 6b Station 21 Central management unit 22 Design device communication unit 23 Operation Information generation unit 24 Operation information history storage unit 25 Operation information storage unit 26 Transmission device communication unit 27 Operation information history table 28 Operation information table

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H04L 12/24 - 12/28 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) H04L 12/24-12/28

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数の伝送装置と伝送装置の監視制御を
行う伝送監視制御装置とを含む複数の局が相互接続して
構成される網と、網を設計する網設計情報を生成する網
設計管理装置と、網設計情報を基に伝送監視制御装置の
運用情報を生成し網の運用を管理する網管理装置とから
なる網運用情報管理方式において、 網管理装置は、生成した運用情報を網設計情報の履歴を
付加して管理することにより、伝送監視制御装置から誤
りの運用情報を通知されたときに誤りを含む網設計情報
の履歴を網設計管理装置ヘ提供することを特徴とする網
運用情報管理方式。
1. A network configured by interconnecting a plurality of stations including a plurality of transmission devices and a transmission monitoring and control device for monitoring and controlling the transmission devices, and a network design for generating network design information for designing the network. In a network operation information management system including a management device and a network management device that generates operation information of the transmission monitoring control device based on the network design information and manages network operation, the network management device transmits the generated operation information to the network. A network characterized by providing a history of network design information containing an error to a network design management device when an error operation information is notified from the transmission monitoring control device by adding and managing the history of the design information. Operation information management method.
【請求項2】 網管理装置は、網設計情報の受信毎に生
成した運用情報の履歴を管理することにより、前記網設
計管理装置から誤りの運用情報の復旧を要求されたと
き、運用情報を誤りの網設計情報が反映された運用情報
の直前の運用情報に戻すことにより正しい運用情報を伝
送監視制御装置へ提供することを特徴とする請求項1記
載の網運用情報管理方式。
2. The network management device manages a history of operation information generated each time the network design information is received, so that when the network design management device requests a recovery of erroneous operation information, the network management device transmits the operation information. 2. The network operation information management system according to claim 1, wherein correct operation information is provided to the transmission monitoring and control apparatus by returning the operation information immediately before the operation information on which the erroneous network design information is reflected.
【請求項3】 網管理装置は、網設計情報の受信毎に生
成した運用情報の履歴及び運用情報と網設計情報との対
応関係を記録した運用情報テーブルを有することを特徴
とする請求項1又は2記載の網運用情報管理方式。
3. The network management apparatus according to claim 1, wherein the network management device has an operation information table that records a history of operation information generated each time the network design information is received and a correspondence relationship between the operation information and the network design information. Or the network operation information management system described in 2.
【請求項4】 網設計情報毎の管理番号と網設計情報の
受信毎に生成した運用情報の履歴との対応関係を記録し
た運用情報履歴テーブルを有することを特徴とする請求
項1、2又は3記載の網運用情報管理方式。
4. An operation information history table which records a correspondence between a management number for each network design information and a history of operation information generated each time the network design information is received. 3. The network operation information management system described in 3.
【請求項5】 受信した網設計情報に基づいて複数の局
が相互接続される網を設計運用する網管理装置におい
て、 受信した網設計情報に基づいて局内の伝送装置の設定、
削除及び接続の制御を行うための運用情報を生成する運
用情報生成部と、網設計情報の受信毎に生成した運用情
報の履歴及び運用情報と網設計情報との対応関係を記録
した運用情報テーブルとを有し、各局への運用情報の提
供及び網設計管理装置への誤りの網設計情報の提供を行
うことを特徴とする網管理装置。
5. A network management device for designing and operating a network in which a plurality of stations are interconnected based on received network design information, comprising: setting a transmission device in the station based on the received network design information;
An operation information generation unit that generates operation information for controlling deletion and connection, and an operation information table that records the history of operation information generated each time network design information is received and the correspondence between the operation information and network design information A network management device comprising: providing operation information to each station; and providing error network design information to the network design management device.
【請求項6】 網設計管理装置からの誤りの運用情報の
修復要求に対して運用情報テーブルを参照して、誤りの
網設計情報が反映された運用情報の直前の運用情報を局
に提供することを特徴とする請求項5記載の網管理装
置。
6. The operation information immediately before the operation information on which the erroneous network design information is reflected is provided to the station by referring to the operation information table in response to the error operation information repair request from the network design management device. The network management device according to claim 5, wherein:
【請求項7】 網設計情報毎の管理番号と網設計情報の
受信毎に生成した運用情報の履歴との対応関係を記録し
た運用情報履歴テーブルを有し、網設計管理からの誤り
の運用情報の復旧要求に対して運用情報履歴テーブル及
び運用情報テーブルを参照して、誤りの網設計情報が反
映された運用情報の直前の運用情報を局に提供すること
を特徴とする請求項5記載の網管理装置。
7. An operation information history table which records a correspondence relationship between a management number for each network design information and a history of operation information generated each time the network design information is received, wherein error operation information from the network design management is recorded. The operation information immediately before the operation information in which the erroneous network design information is reflected is provided to the station by referring to the operation information history table and the operation information table in response to the recovery request. Network management device.
JP22442497A 1997-08-07 1997-08-07 Network operation information management method Expired - Fee Related JP3164207B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22442497A JP3164207B2 (en) 1997-08-07 1997-08-07 Network operation information management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22442497A JP3164207B2 (en) 1997-08-07 1997-08-07 Network operation information management method

Publications (2)

Publication Number Publication Date
JPH1155265A JPH1155265A (en) 1999-02-26
JP3164207B2 true JP3164207B2 (en) 2001-05-08

Family

ID=16813570

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22442497A Expired - Fee Related JP3164207B2 (en) 1997-08-07 1997-08-07 Network operation information management method

Country Status (1)

Country Link
JP (1) JP3164207B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001020850A1 (en) * 1999-09-16 2001-03-22 Fujitsu Limited Network system matching confirming method and device therefor

Also Published As

Publication number Publication date
JPH1155265A (en) 1999-02-26

Similar Documents

Publication Publication Date Title
US7398530B1 (en) Methods and apparatus for event handling
JP3830389B2 (en) Internet-based remote data and file recovery system and method
US7716137B2 (en) System and method for automatically tracking and enabling the operation of a product
US20050108704A1 (en) Software distribution application supporting verification of external installation programs
CN114612101A (en) Reliable inter-link route cross-link method and system for connection
JP3164207B2 (en) Network operation information management method
JP3164147B2 (en) Network management device configuration information management method and managed device
CN112910697B (en) Fault processing method and device
JPH11265309A (en) Partial extraction type remote maintenance system
JPH08249279A (en) Online system
JP2998686B2 (en) Network management method and network management system
JPH06119182A (en) Information communication network system with down-load control function
US20050132082A1 (en) System and method for resuming downloading from interruption points
JP2988402B2 (en) Method and apparatus for verifying network configuration information
CN114171165B (en) Forwarding method and system based on independent task management service
JP4864755B2 (en) Data processing system and diagnostic method
JP3869287B2 (en) Network device setting processing method and apparatus
JPH06332872A (en) Job starting system for file transfer
JPH06168193A (en) Transaction data re-transmission system
JPH1097447A (en) Telegraphic message control system and storage medium storing telegraphic message control program
CN118827056A (en) Real-name authentication method and device for Internet of vehicles, electronic equipment and storage medium
JP2000112675A (en) Video server device, method for recovering its data fault and medium in which data fault recovery program is recorded
TW400475B (en) CMOS data loading method
JPH11305606A (en) Equipment management system, method thereof, and storage medium
JP2004326621A (en) Database matching system, method and program

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees