JP3155829B2 - Pre-actuated running water detector - Google Patents

Pre-actuated running water detector

Info

Publication number
JP3155829B2
JP3155829B2 JP23549392A JP23549392A JP3155829B2 JP 3155829 B2 JP3155829 B2 JP 3155829B2 JP 23549392 A JP23549392 A JP 23549392A JP 23549392 A JP23549392 A JP 23549392A JP 3155829 B2 JP3155829 B2 JP 3155829B2
Authority
JP
Japan
Prior art keywords
pipe
valve
water
priming
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23549392A
Other languages
Japanese (ja)
Other versions
JPH0679014A (en
Inventor
知博 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochiki Corp
Original Assignee
Hochiki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochiki Corp filed Critical Hochiki Corp
Priority to JP23549392A priority Critical patent/JP3155829B2/en
Publication of JPH0679014A publication Critical patent/JPH0679014A/en
Application granted granted Critical
Publication of JP3155829B2 publication Critical patent/JP3155829B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、スプリンクラー消火設
備に用いられる予作動式流水検知装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pre-actuated running water detecting device used in a sprinkler fire extinguishing system.

【0002】[0002]

【従来の技術】従来の予作動式流水検知装置としては、
例えば図8〜図10に示すようなものがある。図8は定
常監視状態における予作動式流水検知装置を示し、一次
配管接続部には消火用の加圧水が充満され、呼水室
2にも一次配管1aの加圧水が入り、弁体であるクラッ
パー3の前後に同圧の加圧水が加わるので、クラッパー
3の前後の面積差(一次側1:呼水室2)によりクラッ
パー3は閉鎖状態に保持される。
2. Description of the Related Art Conventional pre-actuated running water detecting devices include:
For example, there are those as shown in FIGS. Figure 8 shows a pre-activated water flow detection device in the steady monitoring state, in the primary pipe connection portion 1 b is filled with the pressurized water for fire fighting, also contains the pressurized water of the primary pipe 1a to priming chamber 2 is the valve body Since pressurized water of the same pressure is applied before and after the clapper 3, the area difference between the front and rear of the clapper 3 (primary side 1: priming chamber 2) keeps the clapper 3 in a closed state.

【0003】クラッパー3により画成される二次側室2
Aには、湾曲形成された二次配管4が接続され、二次配
管4にはクラッパー5Aを備えた逆止弁5が接続され
る。逆止弁5にはスプリンクラーヘッドを接続した分岐
管6が接続される。逆止弁5のクラッパー5Aの二次側
部分から分岐管6内には圧縮空気が充填されており、一
方、二次配管4内は大気圧にあるため、逆止弁5は閉鎖
状態に保たれる。
[0003] The secondary chamber 2 defined by the clapper 3
A is connected to a curved secondary pipe 4, and the secondary pipe 4 is connected to a check valve 5 having a clapper 5A. A branch pipe 6 to which a sprinkler head is connected is connected to the check valve 5. Compressed air is filled in the branch pipe 6 from the secondary side of the clapper 5A of the check valve 5 while the inside of the secondary pipe 4 is at atmospheric pressure, so that the check valve 5 is kept closed. Dripping.

【0004】また、呼水室2にはリリーフ弁7、圧力計
8、手動開放弁9、および電動弁10が設けられた起動
用配管11が接続され、電動弁10は定常監視状態で閉
鎖し、呼水室2は加圧水を保持している。リリーフ弁7
はリリーフ配管12により二次側室2Aに接続されてい
る。また、呼水室2にはオリフィス13、二方逆止弁1
4および呼水弁15が設けられた呼水配管16が接続さ
れ、呼水配管16は一次側制御弁17より前側の一次配
管1に接続される。復旧時には呼水室2に常時閉状態
の呼水弁15を開いて一次配管1の加圧水が供給され
る。監視時には呼水室2に一次側制御弁17より後側の
一次配管接続部に接続された一次側加圧水導入配管
18から二方逆止弁14、オリフィス13を介して加圧
水が供給される。
A starting pipe 11 provided with a relief valve 7, a pressure gauge 8, a manual release valve 9, and a motor-operated valve 10 is connected to the priming chamber 2, and the motor-operated valve 10 is closed in a steady monitoring state. , The priming chamber 2 holds pressurized water. Relief valve 7
Is connected to the secondary side chamber 2A by a relief pipe 12. The orifice 13 and the two-way check valve 1 are provided in the priming chamber 2.
The priming pipe 16 provided with the priming valve 4 and the priming valve 15 is connected. The priming pipe 16 is connected to the primary pipe 1 a in front of the primary control valve 17. Pressurized water of the primary pipe 1 a by opening the priming valve 15 in the normally closed state in priming chamber 2 at the time of recovery is provided. During monitoring, pressurized water is supplied to the priming chamber 2 through a two-way check valve 14 and an orifice 13 from a primary-side pressurized water introduction pipe 18 connected to a primary pipe connection part 1 b behind the primary-side control valve 17. .

【0005】また、二次側室2Aには、流水警報配管1
9が接続され、流水警報配管19には圧力スイッチ20
が設けられている。圧力スイッチ20は二次側室2A、
二次配管4内の圧力が所定圧力になったことを検知す
る。この圧力スイッチ20は流水検知機能を有する。す
なわち、クラッパー3が開くと二次側室2A、二次配管
4に加圧水が流れ込んで圧力が上昇し、圧力スイッチ2
0が検出出力を生ずる。
[0005] A running water alarm pipe 1 is provided in the secondary chamber 2A.
9 is connected, and a pressure switch 20
Is provided. The pressure switch 20 is connected to the secondary chamber 2A,
It detects that the pressure in the secondary pipe 4 has reached a predetermined pressure. This pressure switch 20 has a running water detection function. That is, when the clapper 3 is opened, pressurized water flows into the secondary side chamber 2A and the secondary pipe 4 to increase the pressure, and the pressure switch 2
0 produces a detection output.

【0006】また、前記一次側加圧水導入配管18に
は、一次側排水弁21と圧力計22が設けられるととも
に、流水警報配管19との接続部には圧力スイッチ20
のテストを行うアラームテスト弁23が設けられてい
る。また、流水警報配管19から、弁座漏れ程度のわず
かな流水は排水するが、クラッパー3が開いた時の加圧
水の場合に排水をストップさせるオートドリップ24が
設けられている排水配管25が分岐接続され、排水配管
25には補助排水弁26が設けられている。
The primary side pressurized water introduction pipe 18 is provided with a primary side drain valve 21 and a pressure gauge 22, and a connection part with the flowing water alarm pipe 19 is provided with a pressure switch 20.
, An alarm test valve 23 is provided. A small amount of flowing water such as valve seat leakage is drained from the flowing water alarm pipe 19, but a drain pipe 25 provided with an automatic drip 24 for stopping drainage in the case of pressurized water when the clapper 3 is opened is connected to a branch connection. The drain pipe 25 is provided with an auxiliary drain valve 26.

【0007】一方、逆止弁5には、コンプレッサからの
圧縮空気を供給する空気供給配管27が接続され、空気
供給配管27には、圧力計28、圧力スイッチ29、空
気供給弁30が設けられ、空気供給弁30のバイパス配
管31に空気バイパス弁32とオリフィスチャッキニッ
プル33が設けられている。また、逆止弁5に接続され
る排水配管34にはシステム排水弁35が設けられる。
On the other hand, an air supply pipe 27 for supplying compressed air from a compressor is connected to the check valve 5, and a pressure gauge 28, a pressure switch 29 and an air supply valve 30 are provided in the air supply pipe 27. An air bypass valve 32 and an orifice check nipple 33 are provided in a bypass pipe 31 of the air supply valve 30. A drainage pipe 34 connected to the check valve 5 is provided with a system drainage valve 35.

【0008】圧力スイッチ29は分岐管6内に充填され
た加圧空気の減圧、例えば配管の破損による圧縮空気の
漏れを検出する減圧スイッチとして作動する。図9は予
作動式流水検知装置の作動状態を示す図である。予作動
式流水検知装置の開放動作は火災感知器の作動信号に基
づき電動弁10を開動作することで行われる。
The pressure switch 29 operates as a pressure reduction switch for detecting a pressure reduction of the pressurized air filled in the branch pipe 6, for example, a leak of the compressed air due to a broken pipe. FIG. 9 is a diagram showing an operation state of the pre-operation type running water detection device. The opening operation of the pre-operation type running water detection device is performed by opening the electric valve 10 based on the operation signal of the fire detector.

【0009】電動弁10が開くと呼水室2の加圧水が、
オリフィス13を介して入ってくる加圧水の流量より、
起動用配管11へ排出される流量の方が多いため、ドレ
ン側に排出されて圧力が下がり、クラッパー3が一次配
接続部の加圧水に押され図9のように開かれ、二
次側室2A、二次配管4に加圧水を供給する。このとき
逆止弁5、分岐管6内の充填空気圧力は一次配管接続部
内の加圧水圧力より低いのでクラッパー5も開き、
スプリンクラーヘッドに対する加圧水の供給が行われ
る。
When the motor-operated valve 10 opens, the pressurized water in the priming chamber 2
From the flow rate of pressurized water that enters through the orifice 13,
Because who flow discharged into the starting pipe 11 is large, it lowers the pressure is discharged to the drain side, is opened so clapper 3 is pushed Figure 9 in pressurized water in the primary pipe connection portion 1 b, the secondary chamber 2A, pressurized water is supplied to the secondary pipe 4. In this case the check valve 5, the packing air pressure branch pipe 6 is lower than the pressurized water pressure in the primary pipe connection portion 1 b clapper 5 also opens,
Supply of pressurized water to the sprinkler head is performed.

【0010】このようなクラッパー3の開動作におい
て、圧力スイッチ20は二次側室2Aからの加圧水の供
給が所定圧力になったことを検知し、流水警報を発す
る。次に、予作動式流水検知装置を復旧させるために
は、一次側制御弁17を閉じ、この閉じた状態でシステ
ム排水弁35、補助排水弁26、および一次側排水弁2
1を開く。
In the opening operation of the clapper 3, the pressure switch 20 detects that the supply of the pressurized water from the secondary chamber 2A has reached a predetermined pressure, and issues a running water alarm. Next, in order to restore the pre-actuated running water detection device, the primary control valve 17 is closed, and in this closed state, the system drain valve 35, the auxiliary drain valve 26, and the primary drain valve 2
Open 1.

【0011】そして、図示しない予作動弁制御盤をリセ
ットし、電動弁10を閉じた状態で呼水弁15を開き、
一次側制御弁17より前側の加圧水を呼水室2に導入す
る。圧力計8の示す圧力が上昇し、補助排水弁26から
の排水がなくなって、クラッパー3が閉鎖したことを確
認してから、一次側制御弁17を部分的に開き、ゆっく
りと一次側排水弁21を閉じ、また、補助排水弁26を
閉じる。更に分岐管6内の排水完了後、システム排水弁
35を閉じる。
Then, the pre-actuation valve control panel (not shown) is reset, and the priming valve 15 is opened with the motor-operated valve 10 closed.
The pressurized water before the primary side control valve 17 is introduced into the priming chamber 2. After confirming that the pressure indicated by the pressure gauge 8 has increased and drainage from the auxiliary drain valve 26 has ceased and the clapper 3 has been closed, the primary control valve 17 is partially opened, and the primary drain valve is slowly opened. 21 and the auxiliary drain valve 26 is closed. Further, after drainage in the branch pipe 6 is completed, the system drainage valve 35 is closed.

【0012】そして、一次側制御弁17を完全に開き、
呼水弁15を閉じる。こうして、クラッパー3は前後の
面積差により一次配管接続部の開口部を閉じた状態
を保つ。次に、図10に従来の予作動式流水検知装置の
外観を示す。図10において、本体36には湾曲形成さ
れた二次配管4が接続され、二次配管4には逆止弁5が
接続される。逆止弁5と分岐管6の接続部には二次側制
御弁(仕切弁)37が設けられる。
Then, the primary side control valve 17 is completely opened,
The priming valve 15 is closed. Thus, clapper 3 keeps the closed state of the opening of the primary pipe connection portion 1 b by the area difference between the front and rear. Next, FIG. 10 shows the appearance of a conventional pre-actuated running water detection device. In FIG. 10, a curved secondary pipe 4 is connected to the main body 36, and a check valve 5 is connected to the secondary pipe 4. At the connection between the check valve 5 and the branch pipe 6, a secondary side control valve (gate valve) 37 is provided.

【0013】一次配管接続部は垂直方向に配置さ
れ、その開口部の上側はクラッパー3を介して呼水室2
が設けられる(図8,9、参照)。したがって、二次側
室2Aと逆止弁5を接続するためには、湾曲形成された
二次配管4が必要であった。
[0013] The primary pipe connecting portion 1 b is arranged in a vertical direction, priming chamber 2 upper of the opening through the clapper 3
(See FIGS. 8 and 9). Therefore, in order to connect the secondary side chamber 2A and the check valve 5, the curved secondary pipe 4 was required.

【0014】[0014]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の予作動式流水検知装置にあっては、本体と逆
止弁の間に湾曲形成した二次配管を接続しなければなら
ないために、機構が複雑で大型化するという問題点があ
った。また、呼水配管と起動用配管が別々に呼水室に接
続され、呼水配管には一次側加圧水導入配管を接続し、
さらに、流水警報配管とオートドリップへの排水配管が
別々であるなど配管も構成が複雑で、大型のものになっ
ていた。
However, in such a conventional pre-actuated running water detecting device, a curved secondary pipe must be connected between the main body and the check valve. There is a problem that the mechanism is complicated and large. Also, the priming pipe and the starting pipe are separately connected to the priming chamber, and the priming pipe is connected to the primary side pressurized water introduction pipe,
Furthermore, the piping was complicated in configuration, such as a separate flowing water alarm piping and a drainage piping to the auto drip, and was large in size.

【0015】本発明は、このような従来の問題点に鑑み
てなされたものであって、機構が簡単で小型化された予
作動式流水検知装置を提供することを目的とする。
The present invention has been made in view of such conventional problems, and an object of the present invention is to provide a pre-operation type running water detecting device having a simple mechanism and a reduced size.

【0016】[0016]

【課題を解決するための手段】前記目的を達成するため
に、本発明は、図1に示すように、水平方向に配置され
た一次配管接続部59b(一次側室)の開口部を開閉す
るとともにその内部を左右方向に呼水室93と二次側室
94を区分する弁体92と前記呼水室93内に水平方向
に設けられ前記弁体92を前記開口部に押圧する弾性体
95を有する本体91と、該本体91の垂直方向に前記
二次側室94と接続される逆止弁96とにより構成され
ることを特徴とする。
According to the present invention, as shown in FIG. 1, the opening and closing of an opening of a primary piping connection portion 59b (primary side chamber) arranged in a horizontal direction is achieved. A valve body 92 for dividing the inside into a priming chamber 93 and a secondary chamber 94 in the left-right direction, and an elastic body 95 provided horizontally in the priming chamber 93 and pressing the valve body 92 against the opening. The main body 91 includes a check valve 96 connected to the secondary chamber 94 in a vertical direction of the main body 91.

【0017】また、本発明は、所定開度のオリフィス1
07を介して呼水室93に接続される呼水配管103と
外部からの開閉信号により開閉される起動弁110が設
けられた起動用配管109を接続して設けるとともに、
前記二次側室94に接続され所定の開度のオリフィス1
17を介して排水を行うとともに途中に流水警報用の圧
力スイッチ116が設けられた流水警報用の配管112
を設けたことを特徴とする。
The present invention also provides an orifice 1 having a predetermined opening degree.
A priming pipe 103 connected to a priming chamber 93 via a tubing 07 and a starting pipe 109 provided with a starting valve 110 which is opened / closed by an opening / closing signal from the outside are connected and provided.
The orifice 1 connected to the secondary side chamber 94 and having a predetermined opening degree
A drainage pipe 112 is provided with a drain switch through which a drain switch 17 is provided and a pressure switch 116 is provided on the way.
Is provided.

【0018】[0018]

【作用】このような構成を有する本発明の予作動式流水
検知装置によれば、一次配管接 続部59bを水平方向に
配置し、その開口部を弁体92で開閉するとともに、弁
体92で内部を左右方向に呼水室93と二次側室94に
区分し、呼水室93内に水平方向に弾性体95を設けた
ため、本体91の垂直方向に二次側室94と接続される
逆止弁96を設けることができ、従来のように、本体9
1と逆止弁96の間に湾曲形成した二次配管を接続する
必要がなく、機構が簡単となり、小型化することができ
る。
SUMMARY OF According to pre-actuated water flow detection apparatus of the present invention having such a structure, placing primary distribution Kanse' connection portion 59b in the horizontal direction, as well as opening and closing the opening in the valve body 92, the valve body At 92, the inside is divided into a priming chamber 93 and a secondary chamber 94 in the left-right direction, and an elastic body 95 is provided in the priming chamber 93 in the horizontal direction, so that the elastic body 95 is connected to the secondary chamber 94 in the vertical direction of the main body 91. A check valve 96 can be provided and the body 9
There is no need to connect a curved secondary pipe between the valve 1 and the check valve 96, so that the mechanism is simplified and the size can be reduced.

【0019】また、呼水配管103と起動用配管109
を別々に呼水室93に接続する必要がなく、一つにまと
めることができ、さらに、流水警報用の圧力検出手段1
16が設けられている流水警報配管112にオリフィス
117を設けることで排水配管だけを別途設ける必要が
なく、一つにまとめることができ、その結果、配管も構
成が簡単となり、全体の小型化を図ることができる。
Also, the priming pipe 103 and the starting pipe 109
Need not be separately connected to the priming chamber 93, they can be integrated into one, and the pressure detecting means 1
By providing the orifice 117 in the running water alarm pipe 112 provided with the pipe 16, it is not necessary to separately provide a drain pipe, and the drain pipe can be integrated into one. As a result, the pipe can be simplified in configuration and the overall size can be reduced. Can be planned.

【0020】[0020]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1〜図7は本発明の一実施例を示す図である。
図5は本発明の予作動式流水検知装置が用いられるスプ
リンクラー消火設備を示す図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 7 are views showing an embodiment of the present invention.
FIG. 5 is a diagram showing a sprinkler fire extinguishing system using the pre-actuated running water detection device of the present invention.

【0021】図5において、51は消火ポンプであり、
消火ポンプ51は水源水槽52からの消火用水を加圧し
て仕切弁53を介して建物の垂直方向に立ち上げられた
給水本管54に供給する。消火ポンプ51は消火ポンプ
制御盤55により起動、停止される。給水本管54の先
端は屋上等に設置された補助高架水槽56に接続され
る。また、給水本管54は、消火ポンプ車などの加圧水
ホースを接続する連結送水口57を有する他の給水配管
58に接続されるとともに、給水本管54の途中から
は、各階毎に分岐管である一次配管59が分岐接続さ
れ、一次配管59は予作動式流水検知装置60に接続
されている。
In FIG. 5, reference numeral 51 denotes a fire pump.
The fire extinguishing pump 51 pressurizes the fire extinguishing water from the water source water tank 52 and supplies the water to a water supply main pipe 54 which is set up in the vertical direction of the building via a gate valve 53. The fire pump 51 is started and stopped by a fire pump control panel 55. The distal end of the water supply main pipe 54 is connected to an auxiliary elevated water tank 56 installed on a roof or the like. Further, the water supply main pipe 54 is connected to another water supply pipe 58 having a connection water supply port 57 for connecting a pressurized water hose such as a fire extinguishing pump car, and from the middle of the water supply main pipe 54, a branch pipe is provided for each floor. A certain primary pipe 59 a is branched and connected, and the primary pipe 59 a is connected to the pre-operation type running water detection device 60.

【0022】また、給水本管54の仕切弁53の二次側
には圧力タンク61が分岐接続され、給水本管54の管
内圧力を常時一定圧力に保つようにしている。また、消
火ポンプ51の近傍の所定の高さの位置には呼水槽63
が設置され、呼水槽63から消火ポンプ51の吐出側に
呼水供給管64が接続されている。この呼水槽63には
水位センサ65が設けられ、水位センサ65は上限電極
66、下限電極67、コモン電極68を有する。
Further, a pressure tank 61 is branched and connected to the secondary side of the gate valve 53 of the water supply main pipe 54, so that the pressure in the water supply main pipe 54 is always maintained at a constant pressure. A priming tank 63 is located at a predetermined height near the fire pump 51.
A priming water supply pipe 64 is connected from the priming tank 63 to the discharge side of the fire pump 51. A water level sensor 65 is provided in the priming tank 63, and the water level sensor 65 has an upper electrode 66, a lower electrode 67, and a common electrode 68.

【0023】水位センサ65の出力は、ポンプ制御盤5
5に与えられ、ポンプ制御盤55は満水警報(上限警
報)、減水警報(下限警報)を出すようにしている。ま
た、消火ポンプ51の吐出側にはポンプ性能試験の際に
定格流量を流すための試験配管69が分岐接続され、試
験配管69の管末は水源水槽52に挿入されている。
The output of the water level sensor 65 is
5, the pump control panel 55 issues a full-water alarm (upper-limit alarm) and a water-reduction alarm (lower-limit alarm). In addition, a test pipe 69 for flowing a rated flow rate at the time of a pump performance test is branched and connected to the discharge side of the fire pump 51, and the end of the test pipe 69 is inserted into the water source water tank 52.

【0024】また、ポンプ制御盤55の近傍には、コン
プレッサ70が設けられ、コンプレッサ70からの圧縮
空気は空気配管71により、エアフィルタ72、エアド
ライヤ73、レギュレータ74を介して予作動式流水検
知装置60に供給される。予作動式流水検知装置60に
は分岐管80が接続され、分岐管80には複数のスプリ
ンクラーヘッド81が接続されている。定常監視状態で
は、分岐管80に圧縮空気が封じ込まれている。予作動
式流水検知装置60が作動すると、消火ポンプ51から
の加圧水が分岐管80内に供給される。
A compressor 70 is provided in the vicinity of the pump control panel 55, and compressed air from the compressor 70 is supplied to the pre-operation type flowing water detecting device by an air pipe 71 through an air filter 72, an air dryer 73, and a regulator 74. 60. A branch pipe 80 is connected to the pre-operation type running water detection device 60, and a plurality of sprinkler heads 81 are connected to the branch pipe 80. In the steady monitoring state, compressed air is sealed in the branch pipe 80. When the pre-operation type running water detection device 60 is operated, pressurized water from the fire pump 51 is supplied into the branch pipe 80.

【0025】分岐管80の管末には末端試験装置82が
設けられている。末端試験装置82は圧力計83、排水
弁84およびスプリンクラーヘッド81が1個作動した
に相当する流量を流すオリフィス85を有する。スプリ
ンクラーヘッド81の近傍には複数の火災感知器86が
設けられ、その火災信号または復旧信号は予作動弁制御
盤87に出力される。予作動弁制御盤87は火災感知器
86からの火災信号により、予作動式流水検知装置60
を起動し、復旧信号により作動を停止させる。
An end testing device 82 is provided at the end of the branch tube 80. The terminal test device 82 has a pressure gauge 83, a drain valve 84, and an orifice 85 that flows at a flow rate corresponding to one actuation of the sprinkler head 81. A plurality of fire detectors 86 are provided near the sprinkler head 81, and a fire signal or a recovery signal is output to the pre-actuation valve control panel 87. The pre-actuated valve control panel 87 receives the fire signal from the fire detector 86 and operates the pre-actuated running water detector 60.
And stop operation by the recovery signal.

【0026】また、予作動弁制御盤87は火災感知器8
6からの火災信号または消火信号を自火報受信機88に
移報するとともに、予作動式流水検知装置60より流水
警報信号または、圧縮空気の圧力が低下したことを示す
圧力低下信号を受けると、これらを自火報受信機88に
移報する。自火報受信機88は火災表示、予作動弁開放
表示、ポンプ運転表示などを行う。
The pre-actuation valve control panel 87 is provided with a fire detector 8
When the fire signal or the fire extinguishing signal from 6 is transferred to the self-fire alarm receiver 88 and a running water warning signal or a pressure drop signal indicating that the pressure of the compressed air has dropped is received from the pre-operation type running water detection device 60, These are transferred to the self-fire alarm receiver 88. The self-fire alarm receiver 88 performs a fire display, a pre-operation valve open display, a pump operation display, and the like.

【0027】次に、前記予作動式流水検知装置を図1お
よび図2に基づいて説明する。図1は定常監視状態の予
作動式流水検知装置を、図2は作動状態の予作動式流水
検知装置を、それぞれ示す。図1において、91は予作
動式流水検知装置60の本体を示し、本体91には水平
方向に配置された一次配管接続部59が挿入され、そ
の端部は開口している。本体91の内部は、弁体である
クラッパー92によって呼水室93と二次側室94に区
分され、クラッパー92は一次配管接続部59の開口
部を開閉する。呼水室93には弾性体であるスプリング
95が収納され、スプリング95はクラッパー92を開
口部側に押圧する。一次配管接続部59には消火用の
加圧水が充満され、また、呼水室93にも同圧の加圧水
が充満され、クラッパー92の前後に同圧の加圧水が加
わり、クラッパー92の前後の面積差(一次側1b:
水室側2)とスプリング95の力でクラッパー92は閉
鎖状態に保持される。
Next, the pre-actuated running water detecting device will be described with reference to FIGS. FIG. 1 shows a pre-operation type running water detection device in a steady monitoring state, and FIG. 2 shows a pre-operation type running water detection device in an operation state. In Figure 1, 91 denotes the body of the pre-activated water flow detection device 60, the body 91 is inserted into the primary pipe connection portion 59 b disposed in the horizontal direction, its end is open. The main body 91 is partitioned into priming chamber 93 and secondary chamber 94 by clapper 92 is a valve body, clapper 92 to open and close the opening of the primary pipe connection section 59 b. A spring 95, which is an elastic body, is housed in the priming chamber 93, and the spring 95 presses the clapper 92 toward the opening. The primary pipe connecting portion 59 b is filled with the pressurized water for fire fighting, also it is filled with the pressurized water of the same pressure in priming chamber 93, joined by pressurized water of the same pressure before and after the clapper 92, front and rear area of the clapper 92 By the difference (primary side 1b: priming chamber side 2) and the force of the spring 95, the clapper 92 is held in a closed state.

【0028】本体91の垂直方向には逆止弁96が接続
され、逆止弁96にはクラッパー97が設けられる。逆
止弁96にはスプリンクラーヘッド81が接続される分
岐管80が接続され、逆止弁96と分岐管80との接続
部には仕切弁98が設けられる。逆止弁96のクラッパ
ー97より上部側には圧縮空気を供給する空気配管71
が接続され、クラッパー97の先の逆止弁96内および
分岐管80には圧縮空気が充満され、また、本体91の
二次側室94は大気圧であるため、クラッパー97は閉
鎖状態に保持される。
A check valve 96 is connected to the main body 91 in the vertical direction, and the check valve 96 is provided with a clapper 97. The check valve 96 is connected to a branch pipe 80 to which the sprinkler head 81 is connected, and a connection valve between the check valve 96 and the branch pipe 80 is provided with a gate valve 98. An air pipe 71 for supplying compressed air is provided above the clapper 97 of the check valve 96.
Is connected, the inside of the check valve 96 at the end of the clapper 97 and the branch pipe 80 are filled with compressed air, and since the secondary chamber 94 of the main body 91 is at atmospheric pressure, the clapper 97 is held in a closed state. You.

【0029】空気配管71には、制御弁75、オリフィ
ス機構付の流量調整弁76、逆止弁77が設けられる。
通常時、流量調整弁76は閉状態であるが、弁体にはφ
2程度の小さな径の穴が開いており、その穴から圧縮空
気が供給される。復旧時には、この流量調整弁76を開
けることにより素早く圧縮空気を配管内に供給する。9
9は逆止弁96に接続される排水配管であり、排水配管
99には、圧力計100、圧力スイッチ101およびシ
ステム排水弁102が設けられる。
The air pipe 71 is provided with a control valve 75, a flow regulating valve 76 with an orifice mechanism, and a check valve 77.
Normally, the flow control valve 76 is in a closed state.
A hole having a small diameter of about 2 is formed, and compressed air is supplied from the hole. At the time of restoration, the compressed air is quickly supplied into the pipe by opening the flow control valve 76. 9
Reference numeral 9 denotes a drain pipe connected to the check valve 96, and the drain pipe 99 is provided with a pressure gauge 100, a pressure switch 101, and a system drain valve 102.

【0030】圧力スイッチ101は逆止弁96および分
岐管80内に充填された圧縮空気の減圧、例えば配管の
破損による圧縮空気の漏れを検出し、圧力低下信号を予
作動弁制御盤87に送る。システム排水弁102として
親子弁を用いると、スプリンクラーヘッド81に加圧水
を流さずに、流水の試験を行うことができる。すなわ
ち、仕切弁98を閉じ、火災感知器86を作動させ、予
作動式流水検知装置60を作動させ、消火ポンプ51を
起動して、スプリンクラーヘッド81の1個作動分の流
量を流して、流水の試験を行う。
The pressure switch 101 detects a pressure reduction of the compressed air filled in the check valve 96 and the branch pipe 80, for example, a leak of the compressed air due to a broken pipe, and sends a pressure drop signal to the pre-actuation valve control panel 87. . When a parent-child valve is used as the system drain valve 102, a test of flowing water can be performed without flowing pressurized water to the sprinkler head 81. That is, the gate valve 98 is closed, the fire detector 86 is operated, the pre-operation type running water detection device 60 is operated, the fire extinguishing pump 51 is started, and the flow rate for one operation of the sprinkler head 81 is caused to flow. Test.

【0031】103は呼水配管であり、呼水配管103
の一端は呼水室93に接続され、他端は一次配管59a
接続されている。一次配管59aの加圧水は、常時開
状態の呼水弁104、ストレーナ105、逆止弁10
6、オリフィス107、圧力計108を介して呼水室9
3に供給される。呼水配管103のオリフィス107側
には起動用配管109が接続され、起動用配管109は
予作動制御盤87からの開閉信号により開閉する電動弁
(起動弁)110を介して排水配管に接続される。ま
た、起動用配管109には、電動弁110と並列して手
動開放弁111が設けられている。
Reference numeral 103 denotes a priming pipe.
One end is connected to the priming chamber 93, the other end primary piping 59a
It is connected to. Pressurized water of the primary piping 59a is priming valve 104 of the normally open state, a strainer 105, a check valve 10
6, priming chamber 9 via orifice 107 and pressure gauge 108
3 is supplied. A starting pipe 109 is connected to the orifice 107 side of the priming pipe 103, and the starting pipe 109 is connected to a drain pipe via a motor-operated valve (starting valve) 110 that opens and closes according to an open / close signal from a pre-operation control panel 87. You. The starting pipe 109 is provided with a manual release valve 111 in parallel with the electric valve 110.

【0032】オリフィス107の開度は、呼水配管10
3から呼水室93への流入量よりも電動弁110を開放
したときの起動用配管109の排水量を大きくなるよう
に設定される。したがって、電動弁110が開放される
と、呼水室93の圧力が低下し、一次配管接続部59
の加圧水の圧力がスプリング95の力を上回るときに、
クラッパー92がただちに開く(図2、参照)。
The opening of the orifice 107 is determined by the
The amount of water discharged from the starting pipe 109 when the motor-operated valve 110 is opened is set to be larger than the amount of water flowing into the priming chamber 93 from 3. Therefore, when the motor-operated valve 110 is opened, the pressure in the priming chamber 93 decreases, and the primary pipe connection portion 59 b
When the pressure of the pressurized water exceeds the force of the spring 95,
The clapper 92 opens immediately (see FIG. 2).

【0033】また、電動弁110が閉鎖されると、呼水
弁104、オリフィス107からの加圧水が呼水室93
に徐々に蓄圧され、一次配管接続部59の加圧水と同
圧になり、クラッパー92の前後の面積差およびスプリ
ング95の力により、クラッパー92は一次配管接続部
59bの開口部をゆっくり閉じる。逆止弁106は、呼
水室93への加圧水の流れのみを設定し、その逆流を防
止する。圧力計108は呼水配管103を流れる加圧水
の圧力を計測する。
When the electric valve 110 is closed, pressurized water from the priming valve 104 and the orifice 107 is supplied to the priming chamber 93.
To gradually accumulating, it becomes pressurized water at the same pressure in the primary pipe connection portion 59 b, by the force of the front and rear area difference and the spring 95 of the clapper 92, clapper 92 slowly closes the opening of the primary pipe connection portion 59b. The check valve 106 sets only the flow of the pressurized water to the priming chamber 93 and prevents the backflow. The pressure gauge 108 measures the pressure of pressurized water flowing through the priming pipe 103.

【0034】112は流水警報配管であり、流水警報配
管112の一端は本体91の二次側室94に接続され、
他端は排水配管に接続される。流水警報配管112には
補助排水弁113、ストレーナ114、逆止弁115、
圧力検出手段である圧力スイッチ116およびオリフィ
ス117が設けられる。圧力スイッチ116はクラッパ
ー92が開いたとき、流水警報配管112内に流入する
加圧水の圧力が所定圧力になったことを検知する。すな
わち、圧力スイッチ116は流水検知機能を有し、流水
警報信号を予作動弁制御盤87に出力する。オリフィス
117は、クラッパー92の開放時に圧力スイッチ11
6が瞬時にオンとなるのに十分な流量を供給することが
でき、かつ、クラッパー92の閉鎖時に瞬時にオフとな
るのに十分な排水量となるような開度に設定される。
Reference numeral 112 denotes a flowing water alarm pipe. One end of the flowing water alarm pipe 112 is connected to the secondary chamber 94 of the main body 91.
The other end is connected to a drain pipe. Auxiliary drain valve 113, strainer 114, check valve 115,
A pressure switch 116 and an orifice 117 are provided as pressure detecting means. When the clapper 92 is opened, the pressure switch 116 detects that the pressure of the pressurized water flowing into the flowing water alarm pipe 112 has reached a predetermined pressure. That is, the pressure switch 116 has a running water detection function, and outputs a running water alarm signal to the pre-actuation valve control panel 87. The orifice 117 is provided when the clapper 92 is opened.
The opening degree is set such that a sufficient flow rate can be supplied to turn ON the instantaneous turning on of the clapper 92 and the amount of drainage sufficient to turn off instantaneously when the clapper 92 is closed.

【0035】尚、オリフィス117は、流水警報配管1
12の適宜の場所から排水ラインを分岐させて設けても
良い。又、本体91で弁座漏れがあり、二次側室94に
水が漏れてきたとしても、その水は流水警報配管112
を通ってオリフィス117から排水される。流水警報配
管112と呼水配管103を接続するテスト配管118
にはアラームテスト弁119が設けられ、アラームテス
ト弁119を開くことにより、圧力スイッチ116のテ
ストを行うようにしている。
The orifice 117 is connected to the running water alarm piping 1
A drain line may be branched from an appropriate place of 12 and provided. Also, even if there is a valve seat leak in the main body 91 and water leaks into the secondary side chamber 94, the water is supplied to the flowing water alarm pipe 112.
Through the orifice 117. Test pipe 118 connecting the flowing water alarm pipe 112 and the priming pipe 103
Is provided with an alarm test valve 119, and the pressure switch 116 is tested by opening the alarm test valve 119.

【0036】次に、前記予作動式流水検知装置の本体を
図3に基づいてさらに詳しく説明する。図3において、
121は予作動式流水検知装置60の本体91の一部を
構成するボディであり、ボディ121の開口部はカバー
122によりボルト123で閉止されている。カバー1
22とボディ121の間にはダイヤフラム124が挟着
され、ダイヤフラム124を介してクランプリング12
5とスクリューボルト126によりクラッパー92がカ
バー122に固着されている。クラッパー92は一次配
接続部59の開口部に設けたバルブシート127に
着座するようになっている。クラッパー92は呼水室9
3を画成し、呼水室93内にはスプリング95が収納さ
れる。スプリング95は、クラッパー92を一次配管
続部59の開口部に押圧する。クラッパー92が開放
されると、一次配管接続部59と二次側室94は連通
し、一次配管接続部59の加圧水は、二次側室94に
流れる。
Next, the main body of the pre-actuated running water detecting device will be described in more detail with reference to FIG. In FIG.
Reference numeral 121 denotes a body that constitutes a part of the main body 91 of the pre-operation type running water detection device 60, and an opening of the body 121 is closed by a cover 122 with a bolt 123. Cover 1
A diaphragm 124 is sandwiched between the body 22 and the body 121, and the clamp ring 12 is
The clapper 92 is fixed to the cover 122 by the bolt 5 and the screw bolt 126. Clapper 92 is adapted to seat on the valve seat 127 provided in the opening of the primary pipe connection section 59 b. Clapper 92 is priming room 9
3 and a spring 95 is housed in the priming chamber 93. Spring 95, the primary pipe against the clapper 92
Pressed into the opening of the connection portion 59 b. When the clapper 92 is opened, the primary pipe connection portion 59 b and the secondary chamber 94 communicates pressurized water in the primary pipe connection portion 59 b flows into the secondary chamber 94.

【0037】次に、図4は予作動式流水検知装置の外観
を示す図である。図4において一次配管接続部59
水平方向に配置され、本体91に接続されている。一次
配管59には一次側制御弁128を介して一次配管5
9aと接続されている。本体91の垂直方向には二次側
室94と連結される逆止弁96が接続され、逆止弁96
と分岐管80の接続部には二次側制御弁である仕切弁9
8が設けられている。
Next, FIG. 4 is a view showing the appearance of the pre-operation type running water detecting device. The primary pipe connecting portion 59 b in FIG. 4 are arranged in a horizontal direction, and is connected to the body 91. The primary pipe 5 in the primary pipe 59 a via the primary-side control valve 128
9a . A check valve 96 connected to the secondary chamber 94 is connected to the main body 91 in the vertical direction.
A gate valve 9 which is a secondary side control valve is provided at the connection portion between the
8 are provided.

【0038】呼水弁104が設けられている呼水配管1
03は、電動弁110が設けられている起動用配管10
9に接続されている。また、本体91の二次側室94に
接続され、圧力スイッチ116が設けられた流水警報配
管112には、所定開度のオリフィス117が設けら
れ、排水配管としての機能ももつ。次に、図6は火災発
生時の動作手順を示したフロー図である。
The priming pipe 1 provided with the priming valve 104
03 is a starting pipe 10 in which the electric valve 110 is provided.
9 is connected. Further, an orifice 117 having a predetermined opening is provided in the flowing water alarm pipe 112 connected to the secondary side chamber 94 of the main body 91 and provided with the pressure switch 116, and also has a function as a drain pipe. Next, FIG. 6 is a flowchart showing an operation procedure when a fire occurs.

【0039】図6において、まず、ステップS1で火災
が発生すると、ステップS2で火災感知器86が作動
し、ステップS3で火災感知器86の作動に基づく火災
信号を受けた予作動弁制御盤87が開放信号を電動弁1
10に出力し、電動弁110が起動用配管109を開状
態にする。電動弁110が開作動すると、ステップS4
で予作動式流水検知装置60が開状態になる。すなわ
ち、呼水室93内の加圧水は起動用配管109から電動
弁110を介して排水され、呼水室93内の圧力が低下
し一次配管接続部59の加圧水による開放力がスプリ
ング95の力に打ち勝って、クラッパー92が開弁す
る。
In FIG. 6, first, when a fire occurs in step S1, the fire detector 86 is activated in step S2, and the pre-actuation valve control panel 87 which receives a fire signal based on the operation of the fire detector 86 in step S3. Sends open signal to motorized valve 1
10 and the motor-operated valve 110 opens the starting pipe 109. When the motor-operated valve 110 is opened, step S4
With this, the pre-operation type running water detection device 60 is opened. That is, the pressurized water priming chamber 93 is drained through the electric valve 110 from starting pipe 109, pressurized by opening force of drop in pressure in the priming chamber 93 primary pipe connecting portion 59 b of the spring 95 forces , The clapper 92 opens.

【0040】このとき、呼水弁104、逆止弁106、
オリフィス107を介して一次配管59aの加圧水が呼
水室93に流入しているが、オリフィス107により流
入量が制限され、電動弁110の開作動による起動用配
管109の排水量が流入量より大きいので、クラッパー
92は開放状態を保持する。クラッパー92が一次配管
接続部59の開口部から離れて、開状態になると一次
配管接続部59と本体91の二次側室94と連通し、
ステップS5で流水警報配管112内に加圧水が流入
し、ステップS6で圧力スイッチ116が作動して、流
水を検知し、流水警報信号を予作動弁制御盤87に出力
する。
At this time, the priming valve 104, the check valve 106,
Although pressurized pressure water of the primary pipe 59a via the orifice 107 flows into the priming chamber 93, the amount of inflow is restricted by the orifice 107, from the effluent of start pipe 109 by opening operation of the electric valve 110 is inflow Being large, clapper 92 remains open. Clapper 92 is primary piping
Apart from the opening of the connecting portion 59 b, communicates with the secondary chamber 94 of the in the open state and the primary pipe connecting portion 59 b body 91,
In step S5, pressurized water flows into the flowing water alarm pipe 112, and in step S6, the pressure switch 116 operates to detect flowing water and output a flowing water alarm signal to the pre-actuation valve control panel 87.

【0041】一方、予作動式流水検知装置60の一次側
の加圧水は二次側に流出するので、ステップS7で一次
配管接続部59b、一次配管59a、給水本管54の減
圧が発生し、ステップS8でこの減圧により圧力スイッ
チ62が作動し、ステップ9で消火ポンプ51が運転さ
れる。一方、クラッパー92の開放に伴い、加圧水は逆
止弁96のクラッパー97を押し上げて、分岐管80に
流れ込む。ステップS10で分岐管80内に加圧水が充
水され、ステップS11でスプリンクラーヘッド81が
作動すると、ステップS12で放水が行われる。このと
き、ステップS9で消火ポンプ51が運転されているの
で、ステップS13で連続して放水が行われる。
On the other hand, the pressurized water on the primary side of the pre-actuated running water detection device 60 flows out to the secondary side, so that the pressure in the primary pipe connection portion 59b, the primary pipe 59a, and the water supply main pipe 54 is reduced in step S7. In step S8, the pressure switch 62 is operated by the pressure reduction, and in step 9, the fire pump 51 is operated. On the other hand, with the opening of the clapper 92, the pressurized water pushes up the clapper 97 of the check valve 96 and flows into the branch pipe 80. In step S10, pressurized water is filled in the branch pipe 80, and when the sprinkler head 81 operates in step S11, water is discharged in step S12. At this time, since the fire extinguishing pump 51 is operating in step S9, water is continuously discharged in step S13.

【0042】次に、図7は消火したときの動作手順を示
したフロー図である。図7において、ステップS21で
消火になると、ステップS22で火災感知器86はオフ
となり、復旧信号が予作動弁制御盤87に出力される。
予作動弁制御盤87が復旧信号を受けて電動弁110に
閉鎖信号を出力すると、ステップS23で電動弁110
は起動用配管109を閉じる。起動用配管109が閉鎖
されて、呼水室93からの排水が行われず、呼水弁10
4、逆止弁106、オリフィス107を介して呼水配管
103から一次配管59aの加圧水が呼水室93に導入
されて、一次配管接続部59の水圧と呼水室93の水
圧が同圧になると、ステップS24でクラッパー92の
前後の面積差とスプリング95の力によりクラッパー9
2は一次配管接続部59の開口部をゆっくり閉鎖す
る。
Next, FIG. 7 is a flowchart showing an operation procedure when a fire is extinguished. In FIG. 7, when the fire is extinguished in step S21, the fire detector 86 is turned off in step S22, and a restoration signal is output to the pre-actuation valve control panel 87.
When the pre-actuation valve control panel 87 outputs a closing signal to the motor-operated valve 110 in response to the recovery signal, in step S23 the motor-operated valve 110
Closes the starting pipe 109. The starting pipe 109 is closed, and the drainage from the priming chamber 93 is not performed.
4, the check valve 106, pressurized water priming pipe 103 or al primary pipe 59a via the orifice 107 is introduced into the priming chamber 93, the water pressure of the water pressure and the priming chamber 93 of the primary pipe connection portion 59 b is the same When the pressure reaches the pressure, in step S 24, the difference in the front and rear areas of the clapper 92 and the force of the spring 95 cause the clapper 9 to move.
2 slowly closes the opening of the primary pipe connection section 59 b.

【0043】クラッパー92が閉弁すると、一次配管
続部59から二次側室94への加圧水の流入が停止す
るため、流水警報配管112内の圧力がオリフィス11
7からの排水により低下し、ステップS25で圧力スイ
ッチ116がオフとなり、ステップS26で流水警報信
号の出力が停止される。一方、クラッパー92が閉弁す
ると、一次配管接続部59b、一次配管59a、給水本
管54の減圧がなくなり、ステップS27で圧力スイッ
チ62が復旧し、ステップS28で消火ポンプ51は運
転を停止する。但し、消火ポンプの51の停止は、一般
にポンプ制御盤55に設けられている復旧ボタンの手動
操作により行う。
When the clapper 92 is closed, the primary piping connection
To inflow of pressurized water stops to the secondary chamber 94 from the connection part 59 b, the pressure of the flowing water alarm pipe 112 is an orifice 11
The pressure switch 116 is turned off in step S25, and the output of the running water warning signal is stopped in step S26. On the other hand, when the clapper 92 is closed, the pressure in the primary pipe connection portion 59b, the primary pipe 59a, and the water supply main pipe 54 is not reduced, the pressure switch 62 is restored in step S27, and the operation of the fire pump 51 is stopped in step S28. . However, stopping of the fire pump 51 is generally performed by manual operation of a recovery button provided on the pump control panel 55.

【0044】本実施例においては、従来のように、二次
側室2Aと逆止弁5をつなぐ湾曲形成した二次配管4が
必要とされないので、機構も簡単となり、小型化を図る
ことができる。すなわち、一次配管接続部59を水平
方向に配置し、一次配管接続部59の開口部をクラッ
パー92で開閉するとともにクラッパー92により内部
を左右方向に呼水室93と二次側室94を区分し、本体
91の垂直方向に逆止弁96を接続したため、横型とす
ることができ、本体91と逆止弁96との間が短くなる
ので、小型化を図ることができる。
In the present embodiment, unlike the related art, the curved secondary pipe 4 connecting the secondary side chamber 2A and the check valve 5 is not required, so that the mechanism is simplified and the size can be reduced. . In other words, to place the primary pipe connection section 59 b in a horizontal direction, divides the priming chamber 93 and secondary chamber 94 inside in the lateral direction by the clapper 92 with opening and closing the opening of the primary pipe connection section 59 b in Clapper 92 However, since the check valve 96 is connected in the vertical direction of the main body 91, the main body 91 can be of a horizontal type, and the space between the main body 91 and the check valve 96 can be shortened.

【0045】また、従来のように、呼水配管16と起動
用配管11を別々に呼水室2に接続する必要がなく、さ
らに流水警報配管19とオートドリップ24を設けた排
水配管25を別々に設ける必要がなく、この点でも配管
の構成が簡単となり、小型化を図ることができる。尚、
上記実施例では、火災感知器86から火災信号のみで電
動弁110を開制御していたが、分岐管80の圧力低下
を検出している圧力スイッチ101からの検出出力、即
ちスプリンクラーヘッド81の作動による圧力低下と火
災感知器86からの火災信号の両方が検出された時に電
動弁110を開制御しても良い。
Further, unlike the related art, it is not necessary to separately connect the priming pipe 16 and the starting pipe 11 to the priming chamber 2, and the running water alarm pipe 19 and the drain pipe 25 provided with the automatic drip 24 are separately provided. In this respect, the configuration of the piping is simplified, and the size can be reduced. still,
In the above embodiment, the electric valve 110 is controlled to be opened only by the fire signal from the fire detector 86. However, the detection output from the pressure switch 101 that detects the pressure drop of the branch pipe 80, that is, the operation of the sprinkler head 81 The opening of the motor-operated valve 110 may be controlled when both the pressure drop due to the pressure and the fire signal from the fire detector 86 are detected.

【0046】[0046]

【発明の効果】以上説明してきたように、本発明によれ
ば、本体の垂直方向に二次側室から逆止弁を直接接続す
るとともに、配管を簡略化したため、機構が簡単で、小
型化される。
As described above, according to the present invention, the check valve is directly connected from the secondary side chamber in the vertical direction of the main body and the piping is simplified, so that the mechanism is simple and the size is reduced. You.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す図FIG. 1 shows an embodiment of the present invention.

【図2】弁開放状態を示す図FIG. 2 is a diagram showing a valve open state;

【図3】本体の断面図FIG. 3 is a sectional view of a main body.

【図4】予作動式流水検知装置の外観を示す図FIG. 4 is a diagram showing an appearance of a pre-actuated running water detection device.

【図5】スプリンクラー消火設備を示す図FIG. 5 is a view showing a sprinkler fire extinguishing system.

【図6】火災時の動作手順を示すフロー図FIG. 6 is a flowchart showing an operation procedure in the event of a fire.

【図7】消火時の動作手順を示すフロー図FIG. 7 is a flowchart showing an operation procedure at the time of fire extinguishing.

【図8】従来の定常監視状態を示す図FIG. 8 is a diagram showing a conventional steady monitoring state;

【図9】従来の作動状態を示す図FIG. 9 shows a conventional operating state.

【図10】従来の外観を示す図FIG. 10 shows a conventional appearance.

【符号の説明】[Explanation of symbols]

51:消火ポンプ 52:水源水槽 53:仕切弁 54:給水本管 55:ポンプ制御盤 56:補助高架水槽 57:連結送水口 58:給水配管 59:一次配管59b: 一次配管接続部 60:予作動式流水検知装置 61:圧力タンク 62:圧力スイッチ 63:呼水槽 64:呼水供給管 65:水位センサ 66:上限電極 67:下限電極 68:コモン電極 69:試験配管 70:コンプレッサ 71:空気配管 72:エアフィルタ 73:エアドライヤ 74:レギュレータ 75:制御弁 76:流量調整弁 77:逆止弁 80:分岐管 81:スプリンクラーヘッド 82:末端試験装置 83:圧力計 84:排水弁 85:オリフィス 86:火災感知器 87:予作動弁制御盤 88:自火報受信機 91:本体 92:クラッパー(弁体) 93:呼水室 94:二次側室 95:スプリング(弾性体) 96:逆止弁 97:クラッパー 98:仕切弁 99:排水配管 100:圧力計 101:圧力スイッチ 102:システム排水弁 103:呼水配管 104:呼水弁 105:ストレーナ 106:逆止弁 107:オリフィス 108:圧力計 109:起動用配管 110:電動弁(起動弁) 111:手動開放弁 112:流水警報配管 113:補助排水弁 114:ストレーナ 115:逆止弁 116:圧力スイッチ(圧力検出手段) 117:オリフィス 118:テスト配管 119:アラームテスト弁 121:ボディ 122:カバー 123:ボルト 124:ダイヤフラム 125:クランプリング 126:スクリューボルト 127:バルブシート 128:一次側制御弁51: fire pump 52: water source water tank 53: gate valve 54: water mains 55: pump control panel 56: Auxiliary elevated tank 57: connecting water supply port 58: water supply pipe 59 a: Primary piping 59b: primary pipe connecting portion 60: pre Actuated running water detector 61: pressure tank 62: pressure switch 63: priming tank 64: priming supply pipe 65: water level sensor 66: upper electrode 67: lower electrode 68: common electrode 69: test pipe 70: compressor 71: air pipe 72: Air filter 73: Air dryer 74: Regulator 75: Control valve 76: Flow control valve 77: Check valve 80: Branch pipe 81: Sprinkler head 82: Terminal test device 83: Pressure gauge 84: Drain valve 85: Orifice 86: Fire detector 87: Pre-actuation valve control panel 88: Self-fire alarm receiver 91: Main body 92: Clapper (valve element) 93: Call Room 94: Secondary side room 95: Spring (elastic body) 96: Check valve 97: Clapper 98: Gate valve 99: Drainage pipe 100: Pressure gauge 101: Pressure switch 102: System drainage valve 103: Priming pipe 104: Call Water valve 105: strainer 106: check valve 107: orifice 108: pressure gauge 109: starting pipe 110: electric valve (starting valve) 111: manual release valve 112: running water alarm pipe 113: auxiliary drain valve 114: strainer 115: Check valve 116: Pressure switch (pressure detecting means) 117: Orifice 118: Test pipe 119: Alarm test valve 121: Body 122: Cover 123: Bolt 124: Diaphragm 125: Clamp ring 126: Screw bolt 127: Valve seat 128: Primary control valve

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) A62C 27/00 - 39/00 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int. Cl. 7 , DB name) A62C 27/00-39/00

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】水平方向に配置された一次配管接続部の開
口部を開閉するとともにその内部を左右方向に呼水室と
二次側室を区分する弁体と前記呼水室内に水平方向に設
けられ前記弁体を前記開口部に押圧する弾性体を有する
本体と、 該本体の垂直方向に前記二次側室と接続された逆止弁と
により構成されることを特徴とする予作動式流水検知装
置。
1. A valve element for opening and closing an opening of a primary pipe connecting portion arranged in a horizontal direction and separating the inside thereof into a left and right chambers in a left and right direction, and a valve body provided in the priming chamber in a horizontal direction. And a check valve connected to the secondary chamber in a vertical direction of the main body, the main body having an elastic body for pressing the valve body against the opening, and a pre-actuated running water detection. apparatus.
【請求項2】所定開度のオリフィスを介して呼水室に接
続される呼水配管と外部からの開閉信号により開閉され
る起動弁が設けられた起動用配管を接続して設けるとと
もに、前記二次側室に接続され所定の開度のオリフィス
を介して排水を行うとともに途中に流水警報用の圧力検
出手段が設けられた流水警報用の配管を設けたことを特
徴とする請求項1の予作動式流水検知装置。
2. A priming pipe connected to a priming chamber through an orifice having a predetermined opening degree and a starting pipe provided with a starting valve which is opened and closed by an open / close signal from the outside. 2. The drainage pipe according to claim 1, wherein drainage is performed through an orifice having a predetermined opening degree, the drainage pipe being connected to the secondary side chamber, and a flowing water warning pipe provided with a flowing water warning pressure detecting means is provided on the way. Actuated running water detector.
JP23549392A 1992-09-03 1992-09-03 Pre-actuated running water detector Expired - Lifetime JP3155829B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23549392A JP3155829B2 (en) 1992-09-03 1992-09-03 Pre-actuated running water detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23549392A JP3155829B2 (en) 1992-09-03 1992-09-03 Pre-actuated running water detector

Publications (2)

Publication Number Publication Date
JPH0679014A JPH0679014A (en) 1994-03-22
JP3155829B2 true JP3155829B2 (en) 2001-04-16

Family

ID=16986862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23549392A Expired - Lifetime JP3155829B2 (en) 1992-09-03 1992-09-03 Pre-actuated running water detector

Country Status (1)

Country Link
JP (1) JP3155829B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101777866B1 (en) * 2009-12-10 2017-09-12 야마모토 고가쿠 가부시키가이샤 Mask
KR101840108B1 (en) * 2016-03-07 2018-03-19 주식회사 네오메드 Mask for fine dust removal
KR102113556B1 (en) * 2018-04-03 2020-05-21 김필립 A Mask with side discharging apparatus of exhaling

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012055505A (en) * 2010-09-09 2012-03-22 Hochiki Corp Pre-operation type sprinkler equipment
JP2013000545A (en) * 2011-06-10 2013-01-07 Hiroshi Inoue Direct coupled water supply pre-operation type sprinkler fire extinguishing system apparatus
CN110485511A (en) * 2019-08-19 2019-11-22 上海威派格智慧水务股份有限公司 The fresh and alive device of water body in a kind of holding air pressure tank

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101777866B1 (en) * 2009-12-10 2017-09-12 야마모토 고가쿠 가부시키가이샤 Mask
KR101840108B1 (en) * 2016-03-07 2018-03-19 주식회사 네오메드 Mask for fine dust removal
KR102113556B1 (en) * 2018-04-03 2020-05-21 김필립 A Mask with side discharging apparatus of exhaling

Also Published As

Publication number Publication date
JPH0679014A (en) 1994-03-22

Similar Documents

Publication Publication Date Title
CA2279114C (en) Wet pipe fire protection system
US9776028B2 (en) Pre-primed preaction sprinkler system
JP3155829B2 (en) Pre-actuated running water detector
JP3777538B2 (en) Tunnel automatic valve device
JP3217867B2 (en) Test equipment for pre-actuated sprinkler fire extinguishing equipment
JP5443219B2 (en) Tunnel water spray equipment
JP3217866B2 (en) Pre-actuated running water detector
JP3238759B2 (en) Pre-actuated sprinkler fire extinguishing equipment
JP3220251B2 (en) Pre-actuated sprinkler fire extinguishing equipment
JP3256300B2 (en) Pre-actuated sprinkler fire extinguishing equipment
JP3333588B2 (en) Foam fire extinguishing equipment
JP2866874B2 (en) Decompression type backflow prevention device with abnormality detection control device
JPH1199222A (en) Sprinkler fire extinguishing equipment
JP3167807B2 (en) Sprinkler fire extinguishing system for apartment house
JP3079445B2 (en) Non-pressure water level monitoring device for sprinkler fire extinguishing equipment
JP7058555B2 (en) Fire extinguishing equipment
JP7058554B2 (en) Fire extinguishing equipment
JP7058553B2 (en) Fire extinguishing equipment
JPS6235497Y2 (en)
JPH04300565A (en) Pre-operation type sprinkler fire extinguishing device for apartment-house
JP3089362B2 (en) Wet pressure control alarm valve
JP3165568B2 (en) Sprinkler fire extinguishing equipment
JP2002291938A (en) Automatic valve
JP2979254B2 (en) Sprinkler fire extinguishing equipment
JP3013107B2 (en) Sprinkler fire extinguishing equipment

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080202

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090202

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100202

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110202

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110202

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120202

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130202

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130202

Year of fee payment: 12