JP3155407B2 - Switchable test equipment for private generators - Google Patents

Switchable test equipment for private generators

Info

Publication number
JP3155407B2
JP3155407B2 JP18612793A JP18612793A JP3155407B2 JP 3155407 B2 JP3155407 B2 JP 3155407B2 JP 18612793 A JP18612793 A JP 18612793A JP 18612793 A JP18612793 A JP 18612793A JP 3155407 B2 JP3155407 B2 JP 3155407B2
Authority
JP
Japan
Prior art keywords
voltage
capacity
load
generator
loader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18612793A
Other languages
Japanese (ja)
Other versions
JPH0743436A (en
Inventor
豊嗣 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tatsumi Corp
Original Assignee
Tatsumi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tatsumi Corp filed Critical Tatsumi Corp
Priority to JP18612793A priority Critical patent/JP3155407B2/en
Publication of JPH0743436A publication Critical patent/JPH0743436A/en
Application granted granted Critical
Publication of JP3155407B2 publication Critical patent/JP3155407B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION 【産業上の利用分野】[Industrial applications]

【0001】本発明は高層ビルなどにおいて、停電など
の緊急事態に対処するため設置されている自家用発電機
の性能をあらかじめ通電試験し、その正常動作を確認す
る自家用発電機の試験装置に関するものである。
[0001] The present invention relates to a test apparatus for a private power generator which is installed in a high-rise building or the like to test the performance of a private power generator installed in order to cope with an emergency such as a power outage in advance, and to confirm its normal operation. is there.

【0002】ここで、発電機には高電圧大容量、高電圧
小容量、低電圧大容量及び低電圧小容量型のものがあ
り、一般に電圧6、6KV,あるいは3、3KVなど7
00V以上で容量が800KW以上のものは高電圧大容
量型の発電機と指標され、電圧6、6KV,あるいは
3、3KVなど700V以上で容量が500KW以下の
ものは高電圧小容量型の発電機と指標される。
Here, there are high-voltage large-capacity, high-voltage small-capacity, low-voltage large-capacity and low-voltage small-capacity generators.
A generator with a capacity of 800 V or more and a voltage of 800 V or more is indicated as a high-voltage large-capacity generator. A generator with a capacity of 700 V or more and a capacity of 500 KW or less, such as a voltage of 6, 6 KV, or 3, 3 KV, is a high-voltage small-capacity generator. Is indexed.

【0003】また、電圧415V,あるいは200Vな
ど700V未満で容量が800KW以上のものは低電圧
大容量型の発電機と指標され、電圧415V,あるいは
200Vなど700V未満で容量が500KW以下のも
のは低電圧小容量型の発電機と指標される。
A generator having a voltage of less than 700 V such as 415 V or 200 V and having a capacity of 800 KW or more is indicated as a low-voltage large-capacity generator. A generator having a voltage of less than 700 V such as 415 V or 200 V and having a capacity of 500 KW or less is low. It is indexed as a small voltage generator.

【0004】[0004]

【従来の技術】当初、自家用発電機の通電試験装置は図
16に示すように、方形状の通電槽71内に20度C前
後の抵抗水72を流入させ、その抵抗水72中に、三方
向に突設し上下動可能に保持された一対の電極板73・
・・を浸し、この状態で前記電極板73・・・間に自家
用発電機から発電した電力を所要時間通電し、前記自家
用発電機の発電能力あるいは耐久性などの性能を試験、
確認していた。
2. Description of the Related Art Initially, as shown in FIG. 16, a resistance test apparatus for a private power generator flows resistance water 72 at about 20 ° C. A pair of electrode plates 73 projecting in the direction and held movably up and down.
, And in this state, the power generated from the private generator is passed between the electrode plates 73... For a required time, and the performance of the private generator, such as power generation capability or durability, is tested.
I was checking.

【0005】ここで、この種の試験装置による一例の試
験操作を挙げれば、出力1000KVA、力率0.8、
電圧415V、容量800KWの低電圧小容量タイプの
自家用発電機を作動させ、通電槽71内の電極板73・
・・間で通電させると、常時約642.6Aの電流が流
れる。
Here, as an example of a test operation using this type of test apparatus, an output of 1000 KVA, a power factor of 0.8,
A low-voltage small-capacity type private power generator with a voltage of 415 V and a capacity of 800 kW is operated, and the electrode plate 73 in the current tank 71.
When current is supplied between the terminals, a current of about 642.6 A always flows.

【0006】この通電動作を例えば3時間程度継続し、
前記自家用発電機の性能に異常がなければ所定の発電能
力及び耐久性を有した発電機であると認定できる。
This energizing operation is continued for, for example, about three hours,
If there is no abnormality in the performance of the private generator, it can be determined that the generator has a predetermined power generation capacity and durability.

【0007】しかしながら、通電槽71内の抵抗水72
は前記通電によってその温度が上昇し、図示するような
排水口75からのオーバーフロー排水時には約80度C
程となる。
[0007] However, the resistance water 72
The temperature rises due to the energization as described above, and at about 80 ° C. during overflow drainage from the drain port 75 as shown in the figure.
It will be about.

【0008】ところで、抵抗水72中での電極板73・
・・間の通電の程度は通電槽71内における抵抗水72
の温度の上昇、下降あるいは抵抗水72内の不純物混入
度によって著しい影響を受けるため、あらかじめ設定し
た試験の条件、例えば、出力1000KVA、力率0.
8、電圧415V、642.6Aの自家用発電機を作動
させ、通電槽71内の電極板73・・・間で通電させる
という条件に変化が生じ、通電槽71内において64
2.6A以上の電流が通電してしまうとの事態が生じ
る。
By the way, the electrode plate 73 in the resistance water 72
..The degree of energization between the resistance water 72 in the energization tank 71
Is significantly affected by the rise or fall of the temperature or the degree of impurity contamination in the resistance water 72. Therefore, test conditions set in advance, for example, an output of 1000 KVA and a power factor of 0.
8, the condition that the private power generator with the voltage of 415 V and 642.6 A is operated and the current is supplied between the electrode plates 73...
A situation occurs in which a current of 2.6 A or more flows.

【0009】このため、発電機及びエンジンに過負荷を
生じさせることがあった。そこで従来の試験装置では、
前記あらかじめ設定した642.6A以上の電流が流れ
ないように、電極板73・・・を上下動させて抵抗水7
2内での電極板73の通電面積を調節したり、供給口7
4から低温の抵抗水72を補給して通電槽71内の抵抗
水72の温度上昇を押さえていたのである(水温の上昇
によって過剰な通電流を招来させるからである)。
For this reason, the generator and the engine may be overloaded. Therefore, in the conventional test equipment,
The electrode plates 73 are moved up and down so that a current of 642.6 A or more does not flow.
2 to adjust the current-carrying area of the electrode plate 73,
4 to supply the low-temperature resistance water 72 to suppress the rise in the temperature of the resistance water 72 in the current tank 71 (because the rise in the water temperature causes an excessive current flow).

【0010】しかしながら、前記従来の試験装置では、
装置が大型化してしまい、運搬にきわめて不便であると
ともに装置の設置準備に手間がかかり過ぎる。また、電
極板73の上下動操作が困難で精密な調節が期待できな
い。
However, in the above-mentioned conventional test apparatus,
The device becomes large in size, which is extremely inconvenient to transport and takes too much time to prepare for installation of the device. Further, it is difficult to move the electrode plate 73 up and down, and precise adjustment cannot be expected.

【0011】さらに、大きな問題としては、たえず抵抗
水72を連続的に補給しなければならないと共に、使用
した抵抗水72を速やかに廃棄しなければならず、これ
により大量の水を必要とするためきわめて不経済となっ
ていたと共に、使用した抵抗水72を垂れ流し状態とし
なければならず、きわめて作業環境が悪いものとなって
いた。
Further, as a serious problem, it is necessary to continuously replenish the resistance water 72 continuously, and it is necessary to promptly discard the used resistance water 72, which requires a large amount of water. In addition to being extremely uneconomical, the used resistance water 72 had to be drained and the working environment was extremely poor.

【0012】そこで、本発明者は前記課題を解決するた
めに、装置を小形化できてどのような場所に設置された
自家用発電機であっても試験することができ、また試験
中における通電流の異常な上昇を簡単な操作で防止する
ことができ、さらには抵抗水を無駄づかいすることな
く、きわめて安全でかつ経済的な自家用発電機を試験で
きる試験装置を提案するに至った。
In order to solve the above-mentioned problems, the present inventor can reduce the size of the apparatus and can test a private generator installed at any place. It has been proposed that a test device which can prevent an abnormal rise of the electric power by a simple operation, and can test an extremely safe and economical private power generator without wasting resistance water.

【0013】ここで、発明者が先ずこの第1回目に発明
した前述の試験装置について出願した特許出願として
は、特願昭62−204866号(特開昭64−479
76号)、特願平1−202554号(特開平3−70
451号)、特願平2−82183号(特開平3−68
106号)、特願平2−89754号(特開平3−28
7085号)、特願平2−89755号(特開平3−2
87086号)、特願平2−249798号(特開平4
−127502号)、特願平3−76270号(特開平
5−264679号)、特願平3−100180号(特
開平4−329383号)等がある。
Here, as a patent application filed by the inventor for the above-described test apparatus first invented, Japanese Patent Application No. 62-204866 (Japanese Patent Application Laid-Open No. 64-479)
No. 76), Japanese Patent Application No. 1-202554 (Japanese Unexamined Patent Application Publication No.
No. 451), Japanese Patent Application No. 2-82183 (Japanese Patent Application Laid-Open No. 3-68)
No. 106), Japanese Patent Application No. 2-89754 (Japanese Patent Application Laid-Open No. 3-28)
No. 7085), Japanese Patent Application No. 2-89755 (Japanese Unexamined Patent Application Publication No.
87086), Japanese Patent Application No. 2-249798 (Japanese Unexamined Patent Application Publication No.
-127502), Japanese Patent Application No. 3-76270 (JP-A-5-264679), Japanese Patent Application No. 3-100180 (JP-A-4-329383) and the like.

【0014】これら発明の概略構成を図15に示す。す
なわち、本発明者が第1回目に発明した前記試験装置
は、内部に抵抗用液体86が充填される通電槽81と、
通電槽81の上部で基端部が固定されると共に、該基端
部から先端部側に向かって垂下状態で前記通電槽81内
部に挿入されて前記抵抗用液体86に浸され、試験対象
となる自家用発電機から電力の供給をうけて通電される
電極82と、前記通電槽81内に配置され、前記電極8
2の通電量を可変とする可動絶縁体83と、前記通電槽
81内における抵抗用液体86を冷却するラジエータ8
4の表面(スプレー管より水が噴射される)へ強制的に
空気を送るファン85と、を有して構成されているもの
である。
FIG. 15 shows a schematic configuration of these inventions. That is, the test apparatus invented by the inventor for the first time includes an energizing tank 81 in which a resistance liquid 86 is filled,
A base end portion is fixed at the upper part of the energization tank 81, and is inserted into the energization tank 81 in a hanging state from the base end portion toward the distal end side, immersed in the resistance liquid 86, and An electrode 82 that is energized by receiving power from a private generator, and an electrode 8 that is disposed in the energization tank 81 and
A movable insulator 83 for making the amount of current flowing variable, and a radiator 8 for cooling the resistance liquid 86 in the current tank 81.
And a fan 85 for forcibly sending air to the surface (water is sprayed from the spray pipe) of the surface 4.

【0015】これにより、発電機等の負荷試験を簡単な
構造で正確に行え、かつ連続的に大量の水を必要としな
い自家用発電機の試験装置を提供するに至ったのであ
る。しかし、発明者はその後、抵抗用の水を全く必要と
しない、いわゆる金属体を抵抗部材とした第2回発明に
かかる試験装置を発明した。
As a result, a test apparatus for a private generator that can accurately perform a load test on a generator or the like with a simple structure and does not require a large amount of water continuously has been provided. However, the inventor has subsequently invented a test apparatus according to the second invention in which a so-called metal body is used as a resistance member, which does not require any water for resistance.

【0016】しかも、高電圧大容量(前述のように一応
の基準として、電圧が700V以上で、容量が800K
W以上のもの)、高電圧小容量(前述のように一応の基
準として、電圧が700V以上で、容量が500KW以
下のもの)、低電圧大容量(前述のように一応の基準と
して、電圧が700V未満で、容量が800KW以上の
もの)、低電圧小容量型(前述のように一応の基準とし
て、電圧が700V未満で、容量が500KW以下のも
の)のすべての発電機に対応できる水のいらない乾式タ
イプの試験機を発明したのである(特願平4ー2123
5号:特開平5−215825号、特願平4ー1940
32号:特開平6−34725号)。
In addition, high voltage and large capacity (as described above, as a temporary reference, a voltage of 700 V or more and a capacity of 800K
W, high voltage and small capacity (as described above, a voltage of 700 V or more and a capacity of 500 KW or less), and a low voltage and large capacity (as described above, Water that can be used for all generators of less than 700 V and capacity of 800 KW or more and low-voltage small capacity type (for a tentative standard, voltage of less than 700 V and capacity of 500 KW or less) They invented a dry-type testing machine that did not need it (Japanese Patent Application No. 4-2123).
No. 5: JP-A-5-215825, Japanese Patent Application No. 4-1940
No. 32: JP-A-6-34725).

【0017】自家用の発電機は、過疎地域である山奥の
僻地に設置されることもあり、そのような地域に大量の
水を充分に供給することはきわめて困難だからである。
また、大量の雪が降雪する雪国地方に設置された自家用
発電機を試験しなければならない場合も、当該試験に際
し大量の水を供給するのはきわめて困難だからである。
This is because a generator for private use is sometimes installed in a remote area in a mountainous area, which is a depopulated area, and it is extremely difficult to sufficiently supply a large amount of water to such an area.
Also, when it is necessary to test a private generator installed in a snowy country where a large amount of snow falls, it is extremely difficult to supply a large amount of water during the test.

【0018】さらに、ここで、前記第2回発明をするに
至った経緯について述べると、従来、電圧6,6KV、
容量2000KW程の高電圧大容量の発電機を試験する
試験機、特に乾式タイプでの試験機を製作するには、抵
抗体とすべき金属体で負荷器を製作するためその構成が
きわめて大規模のものにならざるを得ないと共に、基準
負荷値設定に際しての微調整機構を設けることが難かし
いため、その製作が非常に困難だったことがある。
Further, here, the background of the invention was described. Conventionally, a voltage of 6,6 KV,
In order to manufacture a tester for testing a high-voltage large-capacity generator with a capacity of about 2000 kW, particularly a dry-type tester, the configuration is extremely large because a loader is manufactured using a metal body to be a resistor. In addition, it is difficult to provide a fine adjustment mechanism for setting the reference load value, and it has been very difficult to manufacture the reference load value.

【0019】また、電圧200V,容量2000KW程
度の低電圧大容量タイプ、電圧415V,容量2000
KW程度の低電圧大容量タイプ、電圧3,3KV、容量
2000KW程の高電圧大容量タイプあるいは、電圧2
00V,容量500W程度の低電圧小容量タイプ、電圧
415V,容量500W程度の低電圧小容量タイプ、電
圧3,3KV、容量500W程の高電圧小容量タイプの
発電機を試験する試験機については、乾式タイプでの試
験機を前記の発電機に対応するよう各々別々に製作しな
ければならず、きわめてコスト高となっていた。
A low-voltage large-capacity type having a voltage of 200 V and a capacity of about 2,000 kW, a voltage of 415 V and a capacity of 2000
Low-voltage large-capacity type of about KW, high-voltage large-capacity type of voltage of about 3,3 KV, capacity of about 2000 KW, or voltage of 2
For a tester for testing a low-voltage small-capacity type of 00 V and a capacity of about 500 W, a low-voltage small-capacity type of a voltage of 415 V and a capacity of about 500 W, and a high-voltage small-capacity type of a voltage of about 3.3 KV and a capacity of about 500 W, Test machines of the dry type had to be separately manufactured so as to correspond to the above-mentioned generators, which was extremely expensive.

【0020】かくして、この様な課題を解決するために
前記第2回目の発明をするに至ったのである。しかし、
この発明も各種の課題が生じた。
Thus, to solve such a problem, the second invention has been made. But,
This invention also has various problems.

【0021】すなわち、発明者は、トランスと、該トラ
ンスに接続され、負荷値(容量値、通電量)を段階的に
調節できる低電圧小容量型の容量可変負荷器を発明し、
前記第2回発明の重要構成部材としたのであるが、この
トランスと容量可変負荷器、特にトランスがきわめて重
量が重く、過疎地域である山奥の僻地等への運搬は困難
を極めるとの課題があった。
That is, the inventor of the present invention has invented a transformer and a low-voltage small-capacity variable capacity loader connected to the transformer and capable of adjusting a load value (capacity value, amount of current) in a stepwise manner.
Although the transformer and the variable capacity loader, particularly the transformer, are extremely heavy, it is extremely difficult to transport the transformer and the variable capacity loader to remote areas in the mountains, which are depopulated areas. there were.

【0022】さらに、負荷値は前述のように段階的(通
常4段階)にしか調整できないため、やはり、微妙な負
荷値の微調整を行うには可動絶縁体を設け、無段階に負
荷値の調整ができる水抵抗器が好ましい、との課題があ
った。
Further, since the load value can be adjusted only stepwise (normally four steps) as described above, a movable insulator is provided to finely adjust the load value, and the load value can be adjusted steplessly. There is a problem that a water resistor that can be adjusted is preferable.

【0023】[0023]

【発明が解決しようとする課題】かくして、本発明によ
る自家用発電機の切り替え型試験装置は、従来発明者が
なした試験装置の発明の課題を解決するために創案され
たものであり、装置の総重量を軽量化でき、その製作コ
ストも安価になしえ、さらに高電圧大容量、高電圧小容
量、低電圧大容量、低電圧小容量のいずれの型の発電機
をも一台の試験装置で簡単、かつ正確、迅速に試験で
き、さらには試験に際しての容量値の微調整も確実に行
え、抵抗用液体の量も従来の水負荷器のみで構成された
試験装置に比べ、約4分の1に減少することができる自
家用発電機の切り替え型試験装置を提供することを目的
とするものである。
Thus, a switching test apparatus for a private generator according to the present invention has been devised in order to solve the problem of the invention of a test apparatus made by the inventor of the present invention. The total weight can be reduced, the manufacturing cost can be reduced, and the generator of any type of high voltage large capacity, high voltage small capacity, low voltage large capacity, low voltage small capacity is one test equipment The test can be performed easily, accurately, and quickly, and the fine adjustment of the capacity value can be performed reliably. The amount of liquid for resistance is about 4 minutes compared to the conventional tester consisting only of a water loader. It is an object of the present invention to provide a private generator switchable test device that can be reduced to one.

【0024】[0024]

【課題を解決するための手段】上記目的を達成するため
に本発明に係る自家用発電機の切り替え型試験装置は以
下のように構成されている。
Means for Solving the Problems In order to achieve the above object, a switching test apparatus for a private generator according to the present invention is configured as follows.

【0025】即ち、本発明による自家用発電機の切り替
え型試験装置は、抵抗用液体10が充填される通電槽1
2と、通電槽12内に配置されて試験対象の自家用発電
機から電力の供給を受ける主電極14と、
That is, the switching test apparatus for a private power generator according to the present invention comprises a current-carrying tank 1 filled with a resistance liquid 10.
2, a main electrode 14 that is arranged in the power supply tank 12 and receives power from a private generator to be tested;

【0026】主電極14と通電槽12との間に介在さ
れ、主電極14から通電槽12への通電量を調整する可
動絶縁体16と、通電槽12内の抵抗用液体10を冷却
又はろ過して再度通電槽12内に戻す循環用の配管系1
8と、
A movable insulator 16 that is interposed between the main electrode 14 and the current supply tank 12 and adjusts the amount of current supplied from the main electrode 14 to the current supply tank 12, and cools or filters the resistance liquid 10 in the current supply tank 12. Piping system 1 for returning to the electric tank 12
8 and

【0027】通電槽12の上方で配管系18と接続さ
れ、通電槽12内に抵抗用液体10を送り込む導入管2
0と、を有し、該導入管20は前記主電極14を通電槽
12上方から吊り下げて保持する保持部材を兼用し、か
つ、自家用発電機から電力を主電極14へ送電する送電
部材をも兼用してなり、
An introduction pipe 2 connected to a piping system 18 above the energizing tank 12 and for feeding the resistance liquid 10 into the energizing tank 12.
0, and the introduction pipe 20 also serves as a holding member that holds the main electrode 14 by suspending the main electrode 14 from above the energizing tank 12, and a power transmission member that transmits power from the private generator to the main electrode 14. Is also used,

【0028】主電極14は、試験対象の自家用発電機の
規格電圧に合わせて低電圧用または高電圧用のいずれを
も選択、交換可能とされた、500KW以下の小容量型
の水負荷器36と、前記水負荷器36に設けられた接続
端子15と、
The main electrode 14 is a small-capacity water loader of 500 KW or less, which can be selected and exchanged for either low voltage or high voltage in accordance with the standard voltage of the private generator to be tested. A connection terminal 15 provided on the water loader 36;

【0029】各々接続端子17−1,17−2,17−
3,・・・17−nを有し、前記水負荷器36と共に、
並列接続された複数の固定負荷器19−1,19−2,
19−3,・・・19−nと、を備え、
The connection terminals 17-1, 17-2, 17-
3,... 17-n, together with the water loader 36,
A plurality of fixed loads 19-1, 19-2,
19-3,... 19-n,

【0030】前記固定負荷器19−1,19−2,19
−3,・・・19−nは、各相において複数の抵抗体が
組み合わされて接続構成された3相スター結線の回路4
1を含み、発電機1の出力電圧が印加される負荷器本体
23と、
The fixed loaders 19-1, 19-2, 19
-3,..., 19-n are three-phase star-connected circuits 4 formed by combining and connecting a plurality of resistors in each phase.
1, a load main body 23 to which the output voltage of the generator 1 is applied;

【0031】前記回路41の耐電圧が発電機1の出力電
圧に相当するよう、回路41内の抵抗体を操作に応じて
接続切り替えする切替器24と、を有してなり、
A switch 24 for switching the connection of the resistor in the circuit 41 in accordance with the operation so that the withstand voltage of the circuit 41 corresponds to the output voltage of the generator 1;

【0032】前記主電極14を交換すること、及び前記
回路41の切替器24により各固定負荷器19−1,1
9−2,19−3,・・・19−nの各相において前記
複数の抵抗体の接続を並列及び直列または並列若しくは
直列に切り替えて抵抗値を調節することにより、700
V未満の低電圧型あるいは700V以上の高電圧型の発
電機試験に対応可能に、水負荷器36及び前記固定負荷
器19−1,19−2,19−3,・・・19−nの接
続を切り替えて並列接続する負荷器の台数を調整するこ
とにより、500KW以下の小容量型あるいは800K
W以上の大容量型の発電機試験に対応可能に、前記水負
荷器36の可動絶縁体16の移動によりトランスを用い
ずに投入する負荷の容量を無段階に調整して発電試験を
行うことを可能として構成されている。
The fixed electrodes 19-1 and 19-1 are replaced by replacing the main electrode 14 and the switch 24 of the circuit 41.
9-2, 19-3,..., 19-n, the resistance is adjusted by switching the connection of the plurality of resistors in parallel and in series or in parallel or in series to adjust the resistance value.
The water load 36 and the fixed loads 19-1, 19-2, 19-3,..., 19-n can be used for low-voltage generators of less than V or high-voltage generators of 700 V or more. By switching the connection and adjusting the number of loaders connected in parallel, a small capacity type of 500KW or less or 800KW
Performing a power generation test by adjusting the capacity of a load applied without using a transformer by moving the movable insulator 16 of the water loader 36 in a stepless manner so as to be applicable to a large capacity type generator test of W or more. It is configured as possible.

【0033】[0033]

【作用】本発明では、小容量型の水負荷器36と、前記
水負荷器36に設けられた接続端子15と、各々接続端
子17−1,17−2,17−3,・・・17−nを有
し、前記水負荷器36と共に、並列接続された複数の固
定負荷器19−1,19−2,19−3,・・・19−
nと、
According to the present invention, a small-capacity water loader 36, connection terminals 15 provided on the water loader 36, and connection terminals 17-1, 17-2, 17-3,. -N and a plurality of fixed loaders 19-1, 19-2, 19-3, ... 19- connected in parallel with the water loader 36.
n and

【0034】を備え、前記固定負荷器19−1,19−
2,19−3,・・・19−nは、複数の抵抗体が組み
合わされて接続構成された回路41を含み、発電機1の
出力電圧が印加される負荷器本体23と、
The fixed loaders 19-1 and 19-
, 19-n include a circuit 41 connected and configured by combining a plurality of resistors, and a load main body 23 to which an output voltage of the generator 1 is applied;

【0035】前記回路41の耐電圧が発電機1の出力電
圧に相当するよう、回路41内の抵抗体を操作に応じて
接続切り替えする切替器24と、を有してなり、前記主
電極14の交換、及び固定負荷器19−1,19−2,
19−3,・・・19−nにおける切替器24での回路
41の抵抗体接続切り替えにより、低電圧型あるいは高
電圧型の発電機試験に対応可能に、
A switch 24 for switching the connection of the resistor in the circuit 41 in accordance with the operation so that the withstand voltage of the circuit 41 corresponds to the output voltage of the generator 1; Replacement, and fixed loaders 19-1, 19-2,
By switching the connection of the resistor of the circuit 41 in the switch 24 in 19-3,... 19-n, it is possible to cope with a low-voltage or high-voltage generator test.

【0036】水負荷器36及び前記固定負荷器19−
1,19−2,19−3,・・・19−nの接続切り替
えにより、小容量型あるいは大容量型の発電機試験に対
応可能とし、もって高電圧大容量、高電圧小容量、低電
圧大容量及び低電圧小容量型発電機のいずれの発電機で
の負荷試験をスムーズに行える。
The water loader 36 and the fixed loader 19-
1, 19-2, 19-3,..., 19-n can be switched to a small-capacity or large-capacity generator test, thereby providing high-voltage large-capacity, high-voltage small-capacity, low-voltage A load test can be smoothly performed on any of the large-capacity and low-voltage small-capacity generators.

【0037】また、従来に比して、トランスを用いない
ため、試験機の総重量を軽量化できる。さらに、使用す
る抵抗用液体10(水)も少量ですむ。
Further, compared with the conventional case, since no transformer is used, the total weight of the tester can be reduced. Further, a small amount of resistance liquid 10 (water) to be used is required.

【0038】[0038]

【実施例】以下、図面に基づいて本発明の好適な実施例
を説明する。図2には実施例の全体構成が示されてお
り、符号30は試験すべき自家用の発電機を示す。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below with reference to the drawings. FIG. 2 shows the overall configuration of the embodiment. Reference numeral 30 denotes a private generator to be tested.

【0039】該発電機30には本実施例による切り替え
型試験装置32が接続されている。ここで、切り替え型
試験装置32は、接続端子33を介して接続される、低
電圧型あるいは高電圧型の主電極14が交換できる小容
量型(例えば、500KW)の水負荷器36、そして接
続端子40−1,40−2,40−3を介して接続され
る複数の高電圧小容量型(例えば6、6KV,500K
W)の固定負荷器42−1,42−2,42−3と、こ
れら負荷器42−1,42−2,42−3に隣接された
ファン44−2,44−3,44−4とによって構成さ
れている。
The generator 30 is connected to the switching type test apparatus 32 according to the present embodiment. Here, the switching type test apparatus 32 is connected via a connection terminal 33 and is a small capacity (for example, 500 KW) water loader 36 with which the low voltage type or the high voltage type main electrode 14 can be replaced, and a connection. A plurality of high-voltage small-capacity types (e.g., 6, 6 KV, 500K) connected via terminals 40-1, 40-2, 40-3
W) fixed loads 42-1, 42-2, 42-3, and fans 44-2, 44-3, 44-4 adjacent to these loads 42-1, 42-2, 42-3. It is constituted by.

【0040】そして、水負荷器36及び三台の固定負荷
器42−1,42−2,42−3は接続端子33及び4
0−1,40−2,40−3を介して発電機30に並列
状態で接続されている。
The water load 36 and the three fixed loads 42-1, 42-2, 42-3 are connected to the connection terminals 33 and 4 respectively.
It is connected in parallel to the generator 30 via 0-1, 40-2, 40-3.

【0041】ここで、先ず水負荷器36の構成について
図3を参照して説明する。符号26は連通槽を示し、該
連通槽26上部には4基の通電槽ユニット28が設けら
れている。
Here, first, the configuration of the water loader 36 will be described with reference to FIG. Reference numeral 26 denotes a communication tank, and four current tank units 28 are provided above the communication tank 26.

【0042】これは一般に使用される発電機が三相交流
タイプであるので、これに合わせて通電槽ユニット28
を3基設け、1基は予備用にしてある。そして、使用し
ない通常時に、この1基内にも抵抗用液体10を送り、
もって通電槽ユニット28内の抵抗用液体10の微妙な
水温調整を行うものとしている。
This is because a commonly used generator is a three-phase alternating current type, and accordingly, a current tank unit 28
And three are reserved. Then, during normal use when not in use, the resistance liquid 10 is also sent into this one unit,
Thus, the water temperature of the resistance liquid 10 in the energization tank unit 28 is finely adjusted.

【0043】通電槽ユニット28は、連通槽26上部に
設けられた略円筒状の通電槽12と、吊り下げられた状
態で通電槽12内に配置される主電極14と、通電槽1
2と主電極14との間に介在される可動絶縁体16とで
構成されており、各通電槽12内には抵抗用液体10が
充填される。
The energizing tank unit 28 includes a substantially cylindrical energizing tank 12 provided above the communication tank 26, the main electrode 14 suspended in the energizing tank 12, and the energizing tank 1.
2 and a movable insulator 16 interposed between the main electrodes 14, and each energization tank 12 is filled with a resistance liquid 10.

【0044】ここで、各通電槽12内には外周をテフロ
ン等の絶縁材24で被覆された導入管20が上方より延
出されて配設されており、導入管20の先端部には主電
極14が着脱、交換可能に取り付けられている。
Here, an introduction pipe 20 whose outer periphery is covered with an insulating material 24 such as Teflon is provided extending from above in each of the energizing tanks 12, and a leading end portion of the introduction pipe 20 is mainly provided. The electrode 14 is detachably mounted.

【0045】そして、該導入管20は、後述する主電極
14に試験すべき発電機30から電力を送電する送電部
材を兼用し、さらには主電極14を上方から吊り下げて
保持する保持部材ともなっている。
The introduction tube 20 also serves as a power transmitting member for transmitting power from a generator 30 to be tested to a main electrode 14 to be described later, and also serves as a holding member for suspending and holding the main electrode 14 from above. ing.

【0046】ここで、通電槽12と主電極14との間に
介在される略円筒状の可動絶縁体16は昇降装置38で
支持され、かつ上下動可能とされている。また、前記連
通槽26は、その上に載置された各通電槽12・・・内
の抵抗用液体10を集水し、ラジエータ32に送流する
役目を果たしている。
Here, the substantially cylindrical movable insulator 16 interposed between the energizing tank 12 and the main electrode 14 is supported by an elevating device 38 and can be moved up and down. The communication tank 26 has a function of collecting the resistance liquid 10 in each of the energizing tanks 12... Mounted thereon and sending it to the radiator 32.

【0047】さらに該連通槽26は、運転中の通電槽1
2・・・内に発生したエアを内部に導入し、これを運転
していない予備の通電槽12に移動させそこでエア抜き
させる役目をも有している。
Further, the communication tank 26 is connected to the current-carrying tank 1 during operation.
2) has a function of introducing the air generated in the inside into the inside, moving the air to a spare power supply tank 12 that is not operating, and bleeding the air there.

【0048】すなわち、通電槽12に多くエアが混在し
ている状態での通電はアークが発生するものとなり、負
荷バランスに悪影響を与え、正確な試験が行えないから
である。
That is, when a large amount of air is mixed in the energizing tank 12, energization causes an arc, which adversely affects the load balance and makes it impossible to perform an accurate test.

【0049】通電槽12の上方にはタンク40が設けら
れており、タンク40は耐電圧、耐触のフレキシブルホ
ース42で各導入管20に接続されている。タンク40
には抵抗用液体10を供給する導入本管21が取り付け
られており、タンク40とフレキシブルホース42との
間には導入管20へ流れる抵抗用液体10の流量を調整
する流量調整バルブ22が取り付けられている。
A tank 40 is provided above the energizing tank 12, and the tank 40 is connected to each of the introduction pipes 20 by a withstand voltage and contact-resistant flexible hose 42. Tank 40
Is provided with an introduction main pipe 21 for supplying the resistance liquid 10, and between the tank 40 and the flexible hose 42, a flow adjustment valve 22 for adjusting the flow rate of the resistance liquid 10 flowing to the introduction pipe 20 is attached. Have been.

【0050】また、通電槽12下方の連通槽26には抵
抗用液体10を排出する排水管44が取り付けられてお
り、排水管44にはポンプ46が取り付けられている。
A drain pipe 44 for discharging the resistance liquid 10 is attached to the communication tank 26 below the energizing tank 12, and a pump 46 is attached to the drain pipe 44.

【0051】排水管44はラジエータ32に接続されて
おり、ラジエータ32の出口側には導入本管21が接続
されている。また、排水管44と導入本管21は、ろ過
装置48にも接続されており、抵抗用液体10はラジエ
ータ32を通らずろ過装置44でろ過される場合があ
る。
The drain pipe 44 is connected to the radiator 32, and the outlet main pipe 21 is connected to the outlet side of the radiator 32. Further, the drain pipe 44 and the introduction main pipe 21 are also connected to a filtration device 48, and the resistance liquid 10 may be filtered by the filtration device 44 without passing through the radiator 32.

【0052】また、図4に示すように導入管20の上端
部には絶縁がいし34を介して接続端子バー36が取り
付けられており、該接続端子バー36と通電槽12側の
端子(図示せず)には試験対象となる自家用発電機側の
ケーブルが接続される。図5および図6には主電極14
の構成が示されている。
As shown in FIG. 4, a connection terminal bar 36 is attached to the upper end of the introduction pipe 20 via an insulating insulator 34, and the connection terminal bar 36 and the terminals on the side of the power supply tank 12 (shown in FIG. 4). The cable on the private generator side to be tested is connected to (z). 5 and 6 show the main electrode 14.
Is shown.

【0053】図5には略円筒形状の主電極14aが示さ
れており、このタイプは200〜400Vの低電圧型発
電機の試験に使用される。図6には細長円筒状で縦断面
が小判型の主電極14bが示されており、このタイプは
3300〜6600Vの高電圧型発電機の試験に使用さ
れる。
FIG. 5 shows a substantially cylindrical main electrode 14a, which is used for testing a low voltage generator of 200 to 400V. FIG. 6 shows an elongated cylindrical main electrode 14b having an oval vertical cross section, which is used for testing a high voltage generator of 3300 to 6600V.

【0054】これらの主電極14a,14bはフランジ
等を介して導入管20に着脱可能に接続され、発電機の
規格電圧に合わせて簡単に選択、交換が可能である。次
に、固定負荷器42−1、42−2、42−3の構成に
ついて説明する。まず、図7、図8に示すように、固定
負荷器42−1、42−2、あるいは42−3は回路6
0・・・を含んだ負荷器本体62を有して構成されてい
るいる。
The main electrodes 14a and 14b are detachably connected to the introduction pipe 20 via flanges and the like, and can be easily selected and replaced according to the standard voltage of the generator. Next, the configuration of the fixed loads 42-1, 42-2, 42-3 will be described. First, as shown in FIGS. 7 and 8, the fixed loaders 42-1 and 42-2 or 42-3 are connected to the circuit 6
0... Are included.

【0055】そして、各回路60・・・はスター結線で
接続されており、例えば電圧6、6KVの固定負荷器で
は端子u−u間の相間電圧が図7に図示するように3
815Vとされている。
The circuits 60 are connected in a star connection. For example, in a fixed load having a voltage of 6, 6 KV, the inter-phase voltage between the terminals u- 0 is 3 as shown in FIG.
815V.

【0056】また、回路60は図9に示すように複数の
抵抗体64・・・を組み合わせ接続して構成されてい
る。以上において、この固定負荷器42−1、42−
2、あるいは42−3を電圧6、6KVで使用する場合
には、前記図8、図10のように回路60内の複数の抵
抗体64・・・を組み合わせ接続し、電源からの接続ケ
ーブルをu,v,wの端子へそれぞれ接続することにな
る。
The circuit 60 is constructed by connecting a plurality of resistors 64... As shown in FIG. In the above, the fixed loaders 42-1 and 42-
2, or 42-3 at a voltage of 6, 6 KV, a plurality of resistors 64... In a circuit 60 are combined and connected as shown in FIGS. The terminals are connected to u, v, and w terminals, respectively.

【0057】また、固定負荷器42−1、42−2、あ
るいは42−3を3、3KVで使用する場合には図1
1、図12に示すように回路60内の複数の抵抗体64
・・・を組み合わせ接続し、そしてuの端子をスター
結線の中性点(いわゆる0点)へ、u’の端子を電源か
らの接続端子へ接続すれば良い。
When the fixed loaders 42-1, 42-2 or 42-3 are used at 3.3 KV, FIG.
1, a plurality of resistors 64 in the circuit 60 as shown in FIG.
... to combine connection and a neutral point of the star connection terminals of u 0 to (so-called zero point) may be connected to terminal u 'to the connection terminal from the power source.

【0058】さらに、固定負荷器42を電圧415Vで
使用したい場合には、バー66あるいはケーブル等で図
13のように複数の抵抗体64・・・同士を短絡し、そ
の後各々u,v,wの端子を電源からの接続端子へ接続
すれば良い。
When it is desired to use the fixed loader 42 at a voltage of 415 V, a plurality of resistors 64 are short-circuited by a bar 66 or a cable as shown in FIG. May be connected to the connection terminal from the power supply.

【0059】また、固定負荷器42を電圧200Vで使
用したい場合には、図14に示すような状態にバー66
あるいはケーブル等で複数の抵抗体64・・・同士を短
絡し、各々u’,v’,w’の端子を電源からの接続端
子へ接続すれば良い。
When it is desired to use the fixed loader 42 at a voltage of 200 V, the bar 66 is brought into the state shown in FIG.
Alternatively, a plurality of resistors 64... May be short-circuited by a cable or the like, and terminals u ′, v ′, and w ′ may be connected to connection terminals from a power supply.

【0060】この様に、本実施例では、回路60内の複
数の抵抗体64・・・を操作に応じて組み合わせ接続が
簡単に変更出来、これにより、該固定負荷器42の電圧
を迅速、確実に変更することができる。
As described above, in the present embodiment, the connection of the plurality of resistors 64... In the circuit 60 can be easily changed in accordance with the operation, whereby the voltage of the fixed loader 42 can be quickly changed. Can be changed reliably.

【0061】よって、固定負荷器42−1、42−2、
42−3のそれぞれに重量のあるトランスを隣設しなく
とも、簡単に電圧値を変更できることとなる。以上にお
いて、本実施例による試験動作について述べると、先ず
試験すべき発電機が6,6KVの高電圧タイプのもの
で、2000KWの大容量タイプの発電機の場合、試験
装置は小容量タイプの水負荷器36(容量500KW,
主電極14aは低電圧用のものをしようしてある。)が
一台、及び三台の固定負荷器42−1、42−2、42
−3(容量500KW,電圧6,6KV)が並列に接続
されて構成される。
Therefore, the fixed loads 42-1, 42-2,
The voltage value can be easily changed without placing a heavy transformer next to each of 42-3. In the above, the test operation according to the present embodiment will be described. First, in the case where the generator to be tested is a high voltage type of 6.6 KV and a large capacity type generator of 2000 kW, the test apparatus is a small capacity type water generator. Loader 36 (capacity 500KW,
The main electrode 14a is used for a low voltage. ) Is one and three fixed loads 42-1, 42-2, 42
-3 (capacity: 500 KW, voltage: 6, 6 KV) are connected in parallel.

【0062】この際、前記固定負荷器42−1、42−
2、42−3の電圧はあらかじめ6、6KVに設定され
ているため回路60内の抵抗体64・・・の組み合わせ
接続を切り替える必要はない。
At this time, the fixed loaders 42-1 and 42-
Since the voltages of 2, 42-3 are preset to 6, 6 KV, there is no need to switch the combination connection of the resistors 64... In the circuit 60.

【0063】ここで、発電機の試験はいわゆる負荷試験
とガバナー試験とで行われるが、負荷試験とは、本実施
例で言えば先ず、6、6KVの電圧で500KWの負荷
を前記発電機に10分間かけ、ついで500KWをプラ
スして全体として1000KWの負荷を10分程度か
け、さらに500KWをプラスして全体で1500KW
の負荷を10分程度かけ、最後、さらに500KWプラ
スして2000KWの負荷を3〜4時間程度かけて負荷
試験を行うことをいう。
Here, the test of the generator is performed by a so-called load test and a governor test. In the present embodiment, first, in this embodiment, a load of 500 KW at a voltage of 6, 6 KV is applied to the generator. Take 10 minutes, then add 500 KW, apply a total load of 1000 KW for about 10 minutes, add 500 KW, and add 1500 KW
Means that a load test is performed for about 10 minutes, and finally a load of 500 KW is added to the load of 2000 KW for about 3 to 4 hours.

【0064】そして、最初の500KWの負荷試験は図
2より理解されるように二段目に接続されている固定負
荷器42−1の接続端子40−1を発電機30へ接続す
ることによって行なわれ、つぎの1000KWでの負荷
試験は前記固定負荷器42−1と三段目の固定負荷器4
2−2の接続端子40−1,40−2とを発電機30へ
接続させることにより行われる。
The first 500 KW load test is performed by connecting the connection terminal 40-1 of the fixed loader 42-1 connected to the second stage to the generator 30, as understood from FIG. Then, the load test at the next 1000 kW was performed with the fixed loader 42-1 and the fixed loader 4 in the third stage.
This is performed by connecting the 2-2 connection terminals 40-1 and 40-2 to the generator 30.

【0065】さらに1500KWの負荷試験は四段目に
接続されている固定負荷器42−3の接続端子40−3
を発電機30に接続することによって行われる。
Further, in the load test of 1500 KW, the connection terminal 40-3 of the fixed loader 42-3 connected to the fourth stage is used.
Is connected to the generator 30.

【0066】しかし、特にディーゼルエンジンを使用し
た発電機30の場合は、その保護のため最後の2000
KWの負荷の投入は一気に500KWの負荷を投入する
ことは出来ず、徐々に負荷をあげて最終的に2000K
Wの負荷としなければならない。
However, especially in the case of the generator 30 using a diesel engine, the last 2000
The load of KW cannot be applied at a stretch, and the load of 500KW cannot be applied at a stretch.
W must be the load.

【0067】よって、そのため一段目に接続されている
小容量型の水負荷器36を接続端子33を介して発電機
30に接続し、該水負荷器36に設けられた可動絶縁体
16を操作して(一般には可動絶縁体16を上昇させ、
主電極14と通電槽12との通電面積を増加させること
になる。)、徐々にその負荷値をあげ、最終的に200
0KWの負荷を3乃至4時間かける様にするのである。
Therefore, the small-capacity water loader 36 connected to the first stage is connected to the generator 30 via the connection terminal 33, and the movable insulator 16 provided on the water loader 36 is operated. (Generally, the movable insulator 16 is raised,
The energized area between the main electrode 14 and the energizing tank 12 is increased. ), Gradually increase the load value, and finally 200
A load of 0 kW is applied for 3 to 4 hours.

【0068】次にガバナー試験につき述べる。ガバナー
試験とは負荷の入、切についての試験であり、これによ
り原動機及び発電機の動作異常が発見できる。
Next, the governor test will be described. The governor test is a test for turning on and off the load, and it is possible to find out abnormal operation of the prime mover and the generator.

【0069】例えば、試験すべき発電機が6、6KVの
高電圧タイプのもので、2000KWの容量ではなく1
000KWの容量タイプの発電機30の場合には、試験
装置は、小容量タイプの水負荷器36(容量500K
W)が一台、及び一台の固定負荷器42(容量500K
W,電圧6、6KV)が並列に接続されて構成されるこ
とになる。
For example, the generator to be tested is of a high voltage type of 6,6 KV, and has a capacity of 1 kW instead of 2000 KW.
In the case of a generator 30 of a capacity type of 000 KW, the test apparatus is a water loader 36 of a small capacity type (capacity 500 KW).
W) and one fixed loader 42 (capacity 500K)
W, voltage 6, 6 KV) are connected in parallel.

【0070】この場合、ガバナー試験においては250
KWの負荷時での入、切、500KWの負荷時での入、
切、750KWの負荷時での入、切、1000KWの負
荷時での入、切が行われる。ここで、250KWの負荷
の入、切は一段目に接続されている小容量型の水負荷器
36を接続端子33により発電機30に接続し、該水負
荷器36に設けられた可動絶縁体16を操作して負荷値
を250KWに設定し、その状態で入、切が行われる。
In this case, in the governor test, 250
On / off with KW load, on / off with 500KW load,
Off, on / off at a load of 750 KW, and on / off at a load of 1000 KW are performed. Here, when a load of 250 KW is turned on and off, a small-capacity water loader 36 connected to the first stage is connected to the generator 30 through a connection terminal 33, and a movable insulator provided on the water loader 36 is provided. 16 is operated to set the load value to 250 KW, and in this state, the on / off operation is performed.

【0071】また500KWの負荷時での入、切は前記
小容量型の水負荷器36を、該水負荷器36に設けられ
た可動絶縁体16で操作して500KWの負荷がかけら
れるように設定し、その状態で入、切が行われる。75
0KWの負荷時での入、切は並列に接続された固定負荷
器42(容量500KW,電圧6、6KV)と前記可動
絶縁体16で負荷値250KWに調整された水負荷器3
6とにより行われる。
The small capacity water loader 36 is turned on and off at a load of 500 KW by operating the movable insulator 16 provided on the water loader 36 so that a load of 500 KW can be applied. Set and turn on / off in that state. 75
The on / off operation at a load of 0 KW is performed by the fixed loader 42 (capacity: 500 KW, voltage: 6, 6 KV) connected in parallel with the water loader 3 adjusted to a load value of 250 KW by the movable insulator 16.
6 is performed.

【0072】最後に、1000KWの負荷の入、切は前
記固定負荷器42−1(容量500KW,電圧6、6K
V)と前記可動絶縁体16で最大容量500KWに調整
された水負荷器36とにより行われることとなる。次
に、試験すべき発電機が3,3KVの高電圧タイプのも
ので、2000KWの大容量タイプの発電機の場合の試
験につき述べる。
Finally, the load of 1000 KW is turned on and off by the fixed loader 42-1 (capacity 500KW, voltage 6, 6K).
V) and the water loader 36 adjusted to a maximum capacity of 500 KW by the movable insulator 16. Next, a test in the case where the generator to be tested is a high voltage type of 3.3 KV and a large capacity type generator of 2000 KW will be described.

【0073】この場合においても、試験装置は小容量タ
イプの水負荷器36(容量500KW)が一台、及び三
台の固定負荷器42・・・(容量500KW,電圧6,
6KV)が並列に接続して構成される。この際、各固定
負荷器42−1、42−2、42−3の各電圧はあらか
じめ6、6KVに設定されているため回路60内の抵抗
体64・・・の組み合わせ接続を切り替える必要があ
る。
Also in this case, the test apparatus has one small-capacity type water loader 36 (capacity 500 kW) and three fixed loaders 42 (capacity 500 kW, voltage 6,
6KV) are connected in parallel. At this time, since the voltages of the fixed loaders 42-1, 42-2, and 42-3 are set to 6, 6 KV in advance, it is necessary to switch the combination connection of the resistors 64 in the circuit 60. .

【0074】すなわち、抵抗体64・・・の接続を図1
1、図12に示すように切り替えて、各固定負荷器42
−1、42−2、42−3の各電圧を3、3KVにする
のである。しかして、この切り替えは電圧6、6KVの
状態である図10から図12の状態に切り替えることに
より電圧3、3KVの状態に設定できるのである。この
状態で、負荷試験が行なわれる。
That is, the connection of the resistors 64...
1. Switching as shown in FIG.
The voltages of -1, 42-2 and 42-3 are set to 3.3 KV. Thus, this switching can be set to the state of the voltage of 3, 3 KV by switching from the state of the voltage of 6, 6 KV to the state of FIG. In this state, a load test is performed.

【0075】すなわち、3、3KVの電圧で500KW
の負荷を前記発電機に10分間かけ、ついで500KW
をプラスして全体として1000KWの負荷を10分程
度かけ、さらに500KWをプラスして全体で1500
KWの負荷を10分程度かけ、最後、さらに500KW
プラスして2000KWの負荷を3〜4時間程度かけて
負荷試験を行うのである。
That is, 500 KW at a voltage of 3.3 KV
Load on the generator for 10 minutes, then 500KW
And a load of 1000 KW is applied for about 10 minutes, and a total of 1500 KW is added by adding 500 KW.
Apply KW load for about 10 minutes, and finally 500KW
In addition, the load test is performed by applying a load of 2000 KW for about 3 to 4 hours.

【0076】ここで、最初の500KWの負荷試験は図
2より理解されるように二段目に接続されている電圧
3、3KVに設定された固定負荷器42−1の接続端子
40−1を発電機30へ接続することによって行なわ
れ、つぎの1000KWの負荷試験は前記固定負荷器4
2−1と三段目の電圧3、3KVに設定された固定負荷
器42−2の接続端子40−1,40−2とを発電機3
0へ接続させることにより行われる。
Here, in the first 500 KW load test, as can be understood from FIG. 2, the connection terminal 40-1 of the fixed loader 42-1 set to the voltage of 3, 3 KV, which is connected to the second stage, is connected. The next 1000 kW load test is carried out by connecting to the generator 30.
2-1 and the connection terminals 40-1 and 40-2 of the fixed loader 42-2 set to the third-stage voltage 3 and 3 KV, respectively.
This is done by connecting to 0.

【0077】さらに1500KWの負荷試験は四段目に
接続されている電圧3、3KVに設定された固定負荷器
42−3の接続端子40−3を発電機30に接続するこ
とによって行われる。そして、最後の2000KWの負
荷の投入は一気に500KWの負荷を投入することは出
来ず、徐々に負荷をあげて最終的に2000KWの負荷
とする。
Further, the 1500 KW load test is performed by connecting the connection terminal 40-3 of the fixed loader 42-3 set to the voltage of 3, 3KV, which is connected to the fourth stage, to the generator 30. In the final loading of 2000 KW, a load of 500 KW cannot be supplied at a stretch, but the load is gradually increased to finally a load of 2000 KW.

【0078】このため一段目に接続されている小容量型
の水負荷器36を接続端子33を介して発電機30に接
続し、該水負荷器36に設けられた可動絶縁体16を操
作して徐々にその負荷値をあげ、最終的に2000KW
の負荷を3乃至4時間かける様にするのである。
For this reason, the small capacity water loader 36 connected to the first stage is connected to the generator 30 via the connection terminal 33, and the movable insulator 16 provided on the water loader 36 is operated. And gradually increase the load value, and finally 2000KW
The load is applied for 3 to 4 hours.

【0079】この際、水負荷器36の耐電圧は主電極を
14aから14bに交換することにより、415Vから
3、3KVのものにしておくものとする。次にガバナー
試験につき述べる。試験すべき発電機を3、3KVの高
電圧タイプのもので、1000KWの容量タイプの発電
機30とする。
At this time, the withstand voltage of the water loader 36 is changed from 415 V to 3.3 KV by changing the main electrode from 14a to 14b. Next, the governor test will be described. The generator to be tested is of a high voltage type of 3.3 KV, and a generator 30 of a capacity type of 1000 KW.

【0080】この場合、試験装置は小容量タイプの水負
荷器36(容量500KW)が一台、及び内部の回路6
0の電圧を3、3KVに接続切り替えた一台の固定負荷
器42(容量500KW,電圧3、3KV)が並列に接
続されて構成される。
In this case, the test apparatus includes one small-capacity type water loader 36 (capacity: 500 kW) and the internal circuit 6.
One fixed loader 42 (capacity: 500 KW, voltage: 3, 3 KV) in which connection of the voltage of 0 is switched to 3, 3 KV is connected in parallel.

【0081】ここで、固定負荷器42の電圧を6、6K
Vから3、3KVへの切り替え操作は前述した通りであ
る。
Here, the voltage of the fixed loader 42 is set to 6, 6K
The switching operation from V to 3, 3 KV is as described above.

【0082】この場合、ガバナー試験においては250
KWの負荷時での入、切、500KWの負荷時での入、
切、750KWの負荷時での入、切、1000KWの負
荷時での入、切が行われる。
In this case, in the governor test, 250
On / off with KW load, on / off with 500KW load,
Off, on / off at a load of 750 KW, and on / off at a load of 1000 KW are performed.

【0083】ここで、250KWの負荷の入、切は一段
目に接続されている小容量型の水負荷器36を接続端子
33により発電機30に接続し、該水負荷器36に設け
られた可動絶縁体16を操作して負荷値を250KWに
設定し、その状態で入、切が行われる。
Here, when a load of 250 KW was turned on and off, a small-capacity water loader 36 connected to the first stage was connected to the generator 30 through a connection terminal 33 and provided on the water loader 36. The load value is set to 250 KW by operating the movable insulator 16 and turning on and off is performed in that state.

【0084】また500KWの負荷時での入、切は前記
小容量型の水負荷器36を、該水負荷器36に設けられ
た可動絶縁体16で操作して500KWの負荷がかけら
れるように設定し、その状態で入、切が行われる。
The small capacity water loader 36 is turned on and off at a load of 500 KW by operating the movable insulator 16 provided on the water loader 36 so that a load of 500 KW can be applied. Set and turn on / off in that state.

【0085】750KWの負荷時での入、切は並列に接
続された固定負荷器42(容量500KW,電圧3、3
KV)と前記可動絶縁体16で負荷値250KWに調整
された水負荷器36とにより行われる。
The on / off operation under the load of 750 kW is performed by connecting the fixed loader 42 (capacity 500 kW, voltage 3, 3) connected in parallel.
KV) and the water loader 36 adjusted to a load value of 250 KW by the movable insulator 16.

【0086】最後に、1000KWの負荷の入、切は前
記固定負荷器42−1(容量500KW,電圧3、3K
V)と前記可動絶縁体16で最大負荷500KWに調整
された水負荷器36とにより行われることとなる。
Finally, the load of 1000 KW is turned on and off by the fixed loader 42-1 (capacity 500KW, voltage 3, 3K).
V) and the water loader 36 adjusted to a maximum load of 500 KW by the movable insulator 16.

【0087】ここで、さらに試験すべき発電機が200
Vの低電圧タイプのもので、2000KWの大容量タイ
プの発電機の場合につき述べる。
Here, the generator to be further tested is 200
A case of a low-voltage type V generator and a large-capacity 2000 KW type generator will be described.

【0088】この場合においても、試験装置は小容量タ
イプの水負荷器36(容量500KW)が一台、及び三
台の固定負荷器42−1,42−2,42−3(容量5
00KW,切り替えにより電圧が200Vになる)が並
列に接続されて構成される。
Also in this case, the test apparatus has one small capacity type water loader 36 (capacity 500 kW) and three fixed loaders 42-1, 42-2, 42-3 (capacity 5).
00KW, the voltage becomes 200 V by switching).

【0089】この際、各固定負荷器42−1,42−
2,42−3の各電圧は6、6KVに設定されているた
め回路60内の抵抗体64・・・の組み合わせ接続を切
り替えて各々200Vにする必要がある。
At this time, each of the fixed loaders 42-1 and 42-
Since the voltages of 2, 42-3 are set to 6, 6 KV, it is necessary to switch the combination connection of the resistors 64...

【0090】すなわち、抵抗体64・・・の接続を図1
4に示すようにバー66で短絡して結線することによ
り、各固定負荷器42−1、42−2、42−3の各電
圧を200Vにすることができる。
That is, the connection of the resistors 64...
As shown in FIG. 4, by short-circuiting and connecting with the bar 66, each voltage of each of the fixed loads 42-1, 42-2, and 42-3 can be set to 200V.

【0091】この様に、各固定負荷器42−1、42−
2、42−3の各電圧を200Vにした上で、負荷試験
を行う。
As described above, each of the fixed loaders 42-1 and 42-
A load test is performed after setting each voltage of 2, 42-3 to 200V.

【0092】すなわち、200Vの電圧で500KWの
負荷を前記発電機に10分間かけ、ついで500KWを
プラスして全体として1000KWの負荷を10分程度
かけ、さらに500KWをプラスして全体で1500K
Wの負荷を10分程度かけ、最後、さらに500KWプ
ラスして2000KWの負荷を3〜4時間程度かけて負
荷試験を行うのである。
That is, a load of 500 KW is applied to the generator at a voltage of 200 V for 10 minutes, then a load of 1000 KW is added for about 10 minutes by adding 500 KW, and a total of 1500 KW is added by adding 500 KW.
A load test is performed by applying a load of W for about 10 minutes, and finally adding a load of 500 KW and a load of 2000 KW for about 3 to 4 hours.

【0093】そして、最初の500KWの負荷試験は図
2より理解されるように二段目に接続されている固定負
荷器42−1の接続端子40−1を発電機30へ接続す
ることによって行なわれ、つぎの1000KWの負荷試
験は前記固定負荷器42−1と三段目の固定負荷器42
−2の接続端子40−1,40−2とを発電機30へ接
続させることにより行われる。
The first 500 KW load test is performed by connecting the connection terminal 40-1 of the fixed loader 42-1 connected to the second stage to the generator 30, as understood from FIG. Then, the load test of the next 1000 kW was performed with the fixed loader 42-1 and the fixed loader 42 in the third stage.
-2 connection terminals 40-1 and 40-2 are connected to the generator 30.

【0094】さらに1500KWの負荷試験は四段目に
接続されている固定負荷器42−3の接続端子40−3
を発電機30に接続することによって行われる。
Further, in the 1500 KW load test, the connection terminal 40-3 of the fixed loader 42-3 connected to the fourth stage was used.
Is connected to the generator 30.

【0095】そして、最後の2000KWの負荷の投入
は一気に500KWの負荷を投入することは出来ず、徐
々に負荷をあげて最終的に2000KWの負荷とする。
In the final loading of 2000 KW, a load of 500 KW cannot be applied at a stretch, but the load is gradually increased to finally a load of 2000 KW.

【0096】このため一段目に接続されている小容量型
の水負荷器36を接続端子33を介して発電機30に接
続し、該水負荷器36に設けられた可動絶縁体16を操
作して徐々にその負荷値をあげ、最終的に2000KW
の負荷を3乃至4時間かける様にするのである。
For this purpose, the small-capacity water loader 36 connected to the first stage is connected to the generator 30 via the connection terminal 33, and the movable insulator 16 provided on the water loader 36 is operated. And gradually increase the load value, and finally 2000KW
The load is applied for 3 to 4 hours.

【0097】次にガバナー試験につき述べる。試験すべ
き発電機は200Vの低電圧タイプのもので、1000
KWの容量タイプの発電機30とする。
Next, the governor test will be described. The generator to be tested is of the low voltage type of 200V, 1000
The generator 30 has a capacity of KW.

【0098】この場合、試験装置は小容量タイプの水負
荷器36(容量500KW)が一台、及び内部の回路6
0の電圧を200Vに接続切り替えた一台の固定負荷器
42(容量500KW,電圧200V)が並列に接続さ
れて構成される。
In this case, the test apparatus includes one small-capacity type water loader 36 (capacity: 500 kW) and the internal circuit 6.
One fixed loader 42 (capacity 500 kW, voltage 200 V) in which the voltage of 0 is switched to 200 V is connected in parallel.

【0099】この場合、ガバナー試験においては250
KWの負荷時での入、切、500KWの負荷時での入、
切、750KWの負荷時での入、切、1000KWの負
荷時での入、切が行われる。
In this case, in the governor test, 250
On / off with KW load, on / off with 500KW load,
Off, on / off at a load of 750 KW, and on / off at a load of 1000 KW are performed.

【0100】ここで、250KWの負荷の入、切は一段
目に接続されている小容量型の水負荷器36を接続端子
33により発電機30に接続し、該水負荷器36に設け
られた可動絶縁体16を操作して負荷値を250KWに
設定し、その状態で入、切が行われる。
Here, when a load of 250 KW was turned on and off, a small-capacity water loader 36 connected to the first stage was connected to the generator 30 through a connection terminal 33 and provided on the water loader 36. The load value is set to 250 KW by operating the movable insulator 16 and turning on and off is performed in that state.

【0101】また500KWの負荷時での入、切は前記
小容量型の水負荷器36を、該水負荷器36に設けられ
た可動絶縁体16で操作して500KWの負荷がかけら
れるように設定し、その状態で入、切が行われる。
Further, the on / off operation at a load of 500 KW is performed by operating the small capacity type water loader 36 with the movable insulator 16 provided on the water loader 36 so that a load of 500 KW can be applied. Set and turn on / off in that state.

【0102】750KWの負荷時での入、切は並列に接
続された固定負荷器42−1(容量500KW,電圧2
00V)と前記可動絶縁体16で負荷値250KWに調
整された水負荷器36とにより行われる。
When a load of 750 KW is turned on and off, a fixed load 42-1 (capacity of 500 KW, voltage of 2) is connected in parallel.
00V) and the water loader 36 adjusted by the movable insulator 16 to a load value of 250 KW.

【0103】最後に、1000KWの負荷の入、切は前
記固定負荷器42−1(容量500KW,電圧200
V)と前記可動絶縁体16で最大負荷500KWに調整
された水負荷器36とにより行われることとなる。
Finally, the load of 1000 kW is turned on and off by the fixed loader 42-1 (capacity 500 kW, voltage 200
V) and the water loader 36 adjusted to a maximum load of 500 KW by the movable insulator 16.

【0104】上述のようにこの種の試験でも、かけるべ
き負荷の調節が必要となり、そのため可動絶縁体16を
有する水負荷器36の重要性もきわめて大となる。
As described above, even in this type of test, it is necessary to adjust the load to be applied, so that the importance of the water loader 36 having the movable insulator 16 becomes extremely large.

【0105】尚、試験時には、水負荷器36、各固定負
荷器42−1,42−2,42−3の温度が上昇するた
め、隣設されたファン41−2,41−3,41−4に
よって冷却することが肝要である。
At the time of the test, the temperatures of the water loader 36 and the fixed loaders 42-1, 42-2, 42-3 rise, so that the adjacent fans 41-2, 41-3, 41- It is important to cool by 4.

【0106】さらに、これら試験機は頻繁に運搬しなけ
ればならないため車両の荷台部に予め設置しておくもの
とする。
Furthermore, since these test machines must be frequently transported, they are to be installed in advance on the bed of a vehicle.

【0107】この様に、高電圧大容量タイプ(電圧6,
6KVあるいは3、3KVで容量1000KWあるいは
2000KW)、高電圧小容量タイプ(電圧6,6KV
あるいは3、3KVで容量500KW)、低電圧大容量
タイプ(電圧415Vあるいは200Vで容量1000
KWあるいは2000KW)あるいは小容量タイプ(電
圧415Vあるいは200Vで容量500KW)等の発
電機の試験が、本実施例での試験機中で各種負荷器を取
捨選択することにより、一台の試験機ですべて安全、迅
速、正確に、しかも試験機の総重量を軽量化し、さらに
水も少量化できてスムーズな負荷試験を行うことが出来
る。
As described above, the high-voltage large-capacity type (voltage 6,
6KV or 3,3KV, capacity 1000KW or 2000KW), high voltage small capacity type (voltage 6,6KV)
Alternatively, a capacity of 500 KW at 3, 3 KV, and a low voltage large capacity type (capacity 1000 at a voltage of 415 V or 200 V)
Testing of generators such as KW or 2000 KW) or small capacity type (voltage 415 V or 200 V and capacity 500 KW) can be performed by selecting one of various loaders in the testing machine in this embodiment. All are safe, quick and accurate, and the total weight of the tester can be reduced, and the amount of water can be reduced to perform a smooth load test.

【0108】[0108]

【発明の効果】以上説明したように本発明によれば、装
置の総重量を軽量化でき、その製作コストも安価になし
え、さらに高電圧大容量、高電圧小容量、低電圧大容
量、低電圧小容量のいずれの型の発電機をも一台の試験
装置で簡単、かつ正確、迅速に試験でき、さらには試験
に際しての容量値の微調整も確実に行えることとなる。
As described above, according to the present invention, the total weight of the apparatus can be reduced, the manufacturing cost can be reduced, and the high-voltage large capacity, high-voltage small capacity, low-voltage large capacity, Any type of low-voltage, small-capacity generator can be tested simply, accurately and quickly with a single test apparatus, and fine adjustment of the capacity value during the test can be performed reliably.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の原理説明図である。FIG. 1 is a diagram illustrating the principle of the present invention.

【図2】実施例の構成を示す説明図である。FIG. 2 is an explanatory diagram illustrating a configuration of an embodiment.

【図3】水負荷器の構成を示す概略説明図(その1)で
ある。
FIG. 3 is a schematic explanatory diagram (part 1) illustrating a configuration of a water loader.

【図4】水負荷器の構成を示す概略説明図(その2)で
ある。
FIG. 4 is a schematic explanatory diagram (part 2) illustrating a configuration of a water loader.

【図5】主電極の構成を示す説明図(その1)である。FIG. 5 is an explanatory diagram (part 1) illustrating a configuration of a main electrode.

【図6】主電極の構成を示す説明図(その2)である。FIG. 6 is an explanatory diagram (part 2) illustrating a configuration of a main electrode.

【図7】固定負荷器の構成を示す概略説明図(その1)
である。
FIG. 7 is a schematic explanatory view showing the configuration of a fixed loader (part 1).
It is.

【図8】固定負荷器の構成を示す概略説明図(その2)
である。
FIG. 8 is a schematic explanatory view showing the configuration of a fixed loader (part 2).
It is.

【図9】複数の抵抗体の構成を示す説明図である。FIG. 9 is an explanatory diagram showing a configuration of a plurality of resistors.

【図10】電圧6、6KVに設定された固定負荷器の概
略構成図である。
FIG. 10 is a schematic configuration diagram of a fixed loader set to a voltage of 6, 6 KV.

【図11】電圧3、3KVに設定された固定負荷器の概
略構成図である(その1)。
FIG. 11 is a schematic configuration diagram of a fixed loader set to voltages of 3, 3 KV (part 1).

【図12】電圧3、3KVに設定された固定負荷器の概
略構成図である(その1)。
FIG. 12 is a schematic configuration diagram of a fixed loader set to voltages of 3, 3 KV (part 1).

【図13】電圧415Vに設定された固定負荷器の概略
構成図である。
FIG. 13 is a schematic configuration diagram of a fixed loader set to a voltage of 415V.

【図14】電圧200Vに設定された固定負荷器の概略
構成図である。
FIG. 14 is a schematic configuration diagram of a fixed loader set to a voltage of 200V.

【図15】従来例の負荷器を示す概略構成図(その1)
である。
FIG. 15 is a schematic configuration diagram showing a conventional load device (part 1).
It is.

【図16】従来例の負荷器を示す概略構成図(その2)
である。
FIG. 16 is a schematic configuration diagram showing a conventional load device (part 2).
It is.

【符号の説明】[Explanation of symbols]

1 発電機 10 抵抗用液体 12 通電槽 14 主電極 15 接続端子 16 可動絶縁体 17−1、17−2、17−3、・・・17−n 接続
端子 18 配管系 19−1、19−2、19−3、・・・19−n 固定
負荷器 22 流量調整部材 23 負荷器本体 24 切替器 30 発電機 32 切り替え型試験装置 33 接続端子 36 水負荷器 40−1,40−2,40−3 接続端子 41 回路 42−1,42−2,42−3 固定負荷器 44−2,44−3,44−4 ファン 60 回路 62 負荷器本体 64 抵抗体 66 バー
DESCRIPTION OF SYMBOLS 1 Generator 10 Resistance liquid 12 Current tank 14 Main electrode 15 Connection terminal 16 Movable insulator 17-1, 17-2, 17-3, ... 17-n Connection terminal 18 Piping system 19-1, 19-2 , 19-3,... 19-n Fixed loader 22 Flow rate adjusting member 23 Loader main body 24 Switch 30 Generator 32 Switching type test apparatus 33 Connection terminal 36 Water loader 40-1, 40-2, 40- 3 Connection Terminal 41 Circuit 42-1, 42-2, 42-3 Fixed Loader 44-2, 44-3, 44-4 Fan 60 Circuit 62 Loader Main Body 64 Resistor 66 Bar

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G01R 31/34 H02K 11/00 H01C 10/02 H01C 13/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 7 , DB name) G01R 31/34 H02K 11/00 H01C 10/02 H01C 13/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 抵抗用液体(10)が充填される通電槽
(12)と、 通電槽(12)内に配置されて試験対象の自家用発電機
から電力の供給を受ける主電極(14)と、 主電極(14)と通電槽(12)との間に介在され、主
電極(14)から通電槽(12)への通電量を調整する
可動絶縁体(16)と、 通電槽(12)内の抵抗用液体(10)を冷却又はろ過
して再度通電槽(12)内に戻す循環用の配管系(1
8)と、 通電槽(12)の上方で配管系(18)と接続され、通
電槽(12)内に抵抗用液体(10)を送り込む導入管
(20)と、を有し、 該導入管(20)は前記主電極(14)を通電槽(1
2)上方から吊り下げて保持する保持部材を兼用し、か
つ、自家用発電機から電力を主電極(14)へ送電する
送電部材をも兼用してなり、 主電極(14)は、試験対象の自家用発電機の規格電圧
に合わせて低電圧用または高電圧用のいずれをも選択、
交換可能とされた、500KW以下の小容量型の水負荷
器(36)と、 前記水負荷器(36)に設けられた接続端子(15)
と、 各々接続端子(17−1,17−2,17−3,・・・
17−n)を有し、前記水負荷器(36)と共に、並列
接続された複数の固定負荷器(19−1,19−2,1
9−3,・・・19−n)と、 を備え、 前記固定負荷器(19−1,19−2,19−3,・・
・19−n)は、 各相において複数の抵抗体が組み合わされて接続構成さ
れた3相スター結線の回路(41)を含み、発電機
(1)の出力電圧が印加される負荷器本体(23)と、 前記回路(41)の耐電圧が発電機(1)の出力電圧に
相当するよう、回路(41)内の抵抗体を操作に応じて
接続切り替えする切替器(24)と、 を有してなり、 前記主電極(14)を交換すること、及び前記回路(4
1)の切替器(24)により各固定負荷器(19−1,
19−2,19−3,・・・19−n)の各相において
前記複数の抵抗体の接続を並列及び直列または並列若し
くは直列に切り替えて抵抗値を調節することにより、7
00V未満の低電圧型あるいは700V以上の高電圧型
の発電機試験に対応可能に、 水負荷器(36)及び前記固定負荷器(19−1,19
−2,19−3,・・・19−n)の接続を切り替えて
並列接続する負荷器の台数を調整することにより、50
0KW以下の小容量型あるいは800KW以上の大容量
型の発電機試験に対応可能に、 前記水負荷器(36)の可動絶縁体(16)の移動によ
りトランスを用いずに投入する負荷の容量を無段階に調
整して発電試験を行うことを可能とした自家用発電機の
切り替え型試験装置
An electricity tank (12) filled with a resistance liquid (10), a main electrode (14) arranged in the electricity tank (12) and supplied with power from a private generator to be tested. A movable insulator (16) interposed between the main electrode (14) and the power supply tank (12) for adjusting the amount of power supply from the main electrode (14) to the power supply tank (12); The circulating piping system (1) cools or filters the resistance liquid (10) inside and returns it to the current tank (12) again.
8), and an inlet pipe (20) connected to the piping system (18) above the power supply tank (12) and for feeding the resistance liquid (10) into the power supply tank (12). (20) connects the main electrode (14) to the current tank (1).
2) It also serves as a holding member that is suspended from above and holds it, and also serves as a power transmitting member that transmits power from a private generator to the main electrode (14). Select either low voltage or high voltage according to the standard voltage of the private generator,
A replaceable small-capacity water loader (36) of 500 KW or less, and a connection terminal (15) provided on the water loader (36)
And connection terminals (17-1, 17-2, 17-3,...)
17-n) and a plurality of fixed loaders (19-1, 19-2, 1) connected in parallel with the water loader (36).
9-3,... 19-n), and the fixed loaders (19-1, 19-2, 19-3,...).
19-n) includes a three-phase star connection circuit (41) in which a plurality of resistors are combined and connected in each phase, and a load main body (21) to which the output voltage of the generator (1) is applied. 23) and a switch (24) for switching the connection of the resistor in the circuit (41) according to the operation such that the withstand voltage of the circuit (41) corresponds to the output voltage of the generator (1). Replacing said main electrode (14) and said circuit (4)
Each fixed load device (19-1,
19-2, 19-3,... 19-n), the connection of the plurality of resistors is switched in parallel and in series or in parallel or in series to adjust the resistance value.
A water loader (36) and the fixed loaders (19-1, 19) can be used to test low-voltage generators of less than 00V or high-voltage generators of 700V or more.
, 19-3,..., 19-n), the number of load devices connected in parallel is adjusted so that 50
The capacity of the load to be applied without using a transformer by moving the movable insulator (16) of the water loader (36) can be adapted to the test of a small capacity type of 0 KW or less or a large capacity type of 800 KW or more. Switchable test equipment for private generators that enables power generation tests to be performed steplessly
JP18612793A 1993-07-28 1993-07-28 Switchable test equipment for private generators Expired - Fee Related JP3155407B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18612793A JP3155407B2 (en) 1993-07-28 1993-07-28 Switchable test equipment for private generators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18612793A JP3155407B2 (en) 1993-07-28 1993-07-28 Switchable test equipment for private generators

Publications (2)

Publication Number Publication Date
JPH0743436A JPH0743436A (en) 1995-02-14
JP3155407B2 true JP3155407B2 (en) 2001-04-09

Family

ID=16182844

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18612793A Expired - Fee Related JP3155407B2 (en) 1993-07-28 1993-07-28 Switchable test equipment for private generators

Country Status (1)

Country Link
JP (1) JP3155407B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2212040C2 (en) 1999-12-02 2003-09-10 Тацуми Корпорейшн Testing gear of dry load
JP3853307B2 (en) 2003-07-08 2006-12-06 株式会社興研 Dry high-voltage load system apparatus and chain disconnection / arc discharge prevention method of the apparatus
JP5889216B2 (en) * 2013-01-18 2016-03-22 赤司電機株式会社 High voltage generator load test equipment
CN108463735B (en) 2016-02-25 2019-04-19 株式会社辰巳菱机 Electricity generation system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2519165Y2 (en) * 1991-03-26 1996-12-04 デンヨー株式会社 Resistance device for load test of engine generator
JP2598843B2 (en) * 1991-05-01 1997-04-09 株式会社辰巳菱機 Output characteristic test equipment for private generators

Also Published As

Publication number Publication date
JPH0743436A (en) 1995-02-14

Similar Documents

Publication Publication Date Title
US7880341B2 (en) Switching device for transformer having uninterruptible power supply function, and methods of controlling turn ratio and voltage of the transformer using the same
JP3155407B2 (en) Switchable test equipment for private generators
JP2994144B2 (en) Switching type loader set
AU2007249039A1 (en) Method and device for maintenance of high-voltage switchgear with voltage
US5281908A (en) Loading device assembly
US5381088A (en) Change-over type of testing equipment for non-utility power generators or the like
CN103048596B (en) End-to-end direct-current voltage withstand testing device and method of MMC (modular multilevel converter) valve
JP2709227B2 (en) Load set
US5107209A (en) Power supply testing system for non-utility power generators
US5210445A (en) Change-over type loading device assembly
CN207381234U (en) A kind of distribution transformer on-load voltage regulation system
JP2598843B2 (en) Output characteristic test equipment for private generators
CN105263220A (en) Analog load cabinet of airport navigational light dimmer
CN208015411U (en) A kind of accumulator group constant-current discharge load controlling PTC resistor using PWM
JP3364090B2 (en) Main inverter and auxiliary equipment
JP2560154B2 (en) Power supply test equipment for private generators, etc.
DE102016202288A1 (en) Charging device for charging an electrical energy store which can be connected to the charging device
US5250924A (en) Power supply testing system for non-utility power generators and so on
Yokley et al. Stepless variable resistor for high currents
US3039023A (en) Monitoring circuit for 3-phase supply systems
CN111521930B (en) Fault current limiting resistor and fault current detection device
CN101399534B (en) Thyristor reactor transition loaded adapter switch without quick mechanism
JPH11295369A (en) Relay testing device
JPH04127502A (en) Power supply testing device for non-utility generator, etc.
DE400024C (en) Wind-electric system with a direct current dynamo machine and an accumulator battery lying parallel to it

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees