JP3149131U - Hanger rail mounting device for partition panel - Google Patents

Hanger rail mounting device for partition panel Download PDF

Info

Publication number
JP3149131U
JP3149131U JP2008009131U JP2008009131U JP3149131U JP 3149131 U JP3149131 U JP 3149131U JP 2008009131 U JP2008009131 U JP 2008009131U JP 2008009131 U JP2008009131 U JP 2008009131U JP 3149131 U JP3149131 U JP 3149131U
Authority
JP
Japan
Prior art keywords
base material
hanger rail
vibration
welding
mounting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008009131U
Other languages
Japanese (ja)
Inventor
鈴木 孝幸
孝幸 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tachikawa Corp
Original Assignee
Tachikawa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tachikawa Corp filed Critical Tachikawa Corp
Priority to JP2008009131U priority Critical patent/JP3149131U/en
Application granted granted Critical
Publication of JP3149131U publication Critical patent/JP3149131U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

【課題】取付作業を容易にする間仕切りパネルのハンガーレール取付装置を提供する。【解決手段】防振ユニット12の連結板14は下地材11に溶接30により固定される。このため、取り付けの際、下地材11にボルト孔、及びボルトを締結する工具を挿通する操作孔を形成する等の準備をすることなく、取付現場においてその吊り筋13の配置態様に適した取り付けを簡易に行うことができる。また、下地材11は吊り筋13に固定されている防振ユニット12に取り付けるため、作業者には頭上においての作業が課せられる。このような状況においては特に、ボルト等による締付作業は大きな作業負担となる。この点、溶接30により下地材11を固定することにより、ボルト等により締結する場合に比べ取付作業が簡易となる。【選択図】図2A hanger rail mounting device for a partition panel that facilitates mounting work. A connecting plate of a vibration isolating unit is fixed to a base material by welding. For this reason, the attachment suitable for the arrangement | positioning aspect of the hanging reinforcement 13 in an installation field, without preparing preparations, such as forming the bolt hole and the operation hole which penetrates the tool which fastens a bolt, in the base material 11 in the case of attachment Can be performed easily. Further, since the base material 11 is attached to the vibration isolating unit 12 fixed to the hanging bar 13, an overhead work is imposed on the operator. Particularly in such a situation, tightening work with bolts or the like is a heavy work burden. In this respect, fixing the base material 11 by welding 30 makes the mounting operation easier than when fastening with bolts or the like. [Selection] Figure 2

Description

本考案は、間仕切りパネルを移動可能に支持するハンガーレールを下地面に取付けるための取付装置に関するものである。   The present invention relates to an attachment device for attaching a hanger rail that movably supports a partition panel to a base surface.

間仕切りパネルは、多数枚のパネルがハンガーレールに沿って移動可能に吊下支持され、各パネルをハンガーレールに沿って召し合わせることにより室内空間を適宜に区画するものである。このような間仕切りパネルのハンガーレールを建物の構造材に取付ける取付装置には、ハンガーレールと下地面との間に防振ゴムを介在させて、パネルの移動操作時に発生する走行音の上層階への伝播を防止するようにしたものがある。くわしくは、例えば図5に示すように、建物の構造材から吊下支持される吊り筋113には、防振ユニット112が固定されるとともに、同防振ユニット112には四角筒状の下地材111及びハンガーレール128が吊り下げ支持される。前記防振ユニット112の主枠121は四角形の金属の両側が上方に直角に屈曲されてなる側面121aが吊り筋113に溶接されてなる。また、主枠121の中央部には、防振材118a,118bが嵌合される嵌合孔122が形成されている。さらに、主枠121上には金属の四角板状の補助板123が載置され、その補助板123にも主枠121の嵌合孔122と同径の嵌合孔124が形成されている。前記主枠121及び補助板123の嵌合孔122,124には、上方及び下方から一対の防振材118a,118bが嵌合される。そして、前記防振材118a,118bの中心部には、パイプ120が貫通されている。   The partition panel suspends and supports a large number of panels so as to be movable along the hanger rail, and appropriately divides the indoor space by summing each panel along the hanger rail. In the mounting device that attaches the hanger rail of the partition panel to the structural material of the building, an anti-vibration rubber is interposed between the hanger rail and the base surface, to the upper floor of the running sound generated during the panel moving operation. There is something to prevent the propagation of. Specifically, as shown in FIG. 5, for example, a vibration isolator unit 112 is fixed to a suspension bar 113 suspended and supported from a building structural material, and the anti-vibration unit 112 has a rectangular tubular base material. 111 and the hanger rail 128 are suspended and supported. The main frame 121 of the vibration isolation unit 112 is formed by welding side surfaces 121a formed by bending both sides of a square metal upward at a right angle to the hanger 113. Further, a fitting hole 122 into which the vibration isolating materials 118a and 118b are fitted is formed at the center of the main frame 121. Further, a metal square plate-shaped auxiliary plate 123 is placed on the main frame 121, and a fitting hole 124 having the same diameter as the fitting hole 122 of the main frame 121 is also formed in the auxiliary plate 123. A pair of anti-vibration members 118 a and 118 b are fitted into the fitting holes 122 and 124 of the main frame 121 and the auxiliary plate 123 from above and below. And the pipe 120 is penetrated in the center part of the said vibration isolator 118a, 118b.

一方、下地材111の上面には下地材111の長手方向(図5紙面方向)に多数の取付孔114が等間隔に形成されている。また、下地材111の下面には、前記取付孔114に対応する位置に操作孔115がそれぞれ形成されている。そして、下地材111の操作孔115及び取付孔114を介してボルト116をパイプ120に挿通し、防振材118a,118bの上方に突出したボルト116の先端部に、押さえ板119を嵌挿したうえで、ナット117を螺合させることにより、防振ユニット112に対して下地材111が固定される。前記下地材111の下面にはハンガーレール128の上面が溶接129により固定される。上記のように構成されたハンガーレール取付装置では、下地材111と吊り筋113との間には防振ユニット112が設けられている。このため、パネルの移動操作にともなうハンガーレール128に対する振動が防振ユニット112(特に、防振材118a,118b)によって吸収され、上層階への伝播が抑制される(例えば、実用新案登録文献1参照。)。
特開2008−31634号公報
On the other hand, a large number of attachment holes 114 are formed at equal intervals on the upper surface of the base material 111 in the longitudinal direction of the base material 111 (the paper surface direction in FIG. 5). Further, on the lower surface of the base material 111, operation holes 115 are formed at positions corresponding to the mounting holes 114, respectively. Then, the bolt 116 is inserted into the pipe 120 through the operation hole 115 and the mounting hole 114 of the base material 111, and the holding plate 119 is inserted into the tip of the bolt 116 protruding above the vibration isolating materials 118a and 118b. In addition, the base material 111 is fixed to the vibration isolation unit 112 by screwing the nut 117. The upper surface of the hanger rail 128 is fixed to the lower surface of the base material 111 by welding 129. In the hanger rail mounting device configured as described above, the vibration isolating unit 112 is provided between the base material 111 and the hanger bar 113. For this reason, the vibration with respect to the hanger rail 128 accompanying the operation of moving the panel is absorbed by the vibration isolation unit 112 (particularly, the vibration isolation materials 118a and 118b), and the propagation to the upper floor is suppressed (for example, Utility Model Registration Document 1). reference.).
JP 2008-31634 A

ところで、上記実用新案登録文献1に記載の取付装置では、下地材111を防振ユニット112に取り付ける際、操作孔115を介してボルト116を取付孔114に挿通し、このボルト116の頭部を同じく操作孔115から挿通される工具を通じて操作することで下地材111を防振ユニット112に締結しなければならなかった。このボルト116の締め付け作業において、作業者は下地材111を頭上に支持しながら行う必要があるので、下地材111及び防振ユニット112の取付作業が煩雑になっていた。   By the way, in the mounting apparatus described in the above-mentioned utility model registration document 1, when mounting the base material 111 to the vibration isolation unit 112, the bolt 116 is inserted into the mounting hole 114 through the operation hole 115, and the head of the bolt 116 is attached. Similarly, the base material 111 has to be fastened to the vibration isolation unit 112 by operating through a tool inserted through the operation hole 115. In the tightening operation of the bolt 116, the operator needs to perform the operation while supporting the base material 111 above the head, so that the mounting work of the base material 111 and the vibration isolation unit 112 is complicated.

本考案の目的は、ハンガーレールの取付作業を容易とするハンガーレール取付装置を提供することにある。   An object of the present invention is to provide a hanger rail mounting device that facilitates a hanger rail mounting operation.

以下、上記目的を達成するための手段及びその作用効果について説明する。
請求項1に記載の考案は、間仕切りパネルを移動可能に支持するハンガーレールを下地材及び防振構造体を介して建物の構造材に吊下支持するハンガーレール取付装置において、前記防振構造体は前記下地材に溶接により固定されることをその要旨としている。
Hereinafter, means for achieving the above-described object and its operation and effects will be described.
The invention according to claim 1 is a hanger rail mounting device for supporting a hanger rail that movably supports a partition panel on a structural material of a building via a base material and a vibration isolating structure, wherein the vibration isolating structure The gist is to be fixed to the base material by welding.

同構成によれば、防振構造体は下地材に溶接により固定される。このため、取り付けの際、下地材にボルト孔、及びボルトを締結する工具を挿通する操作孔を形成する等の準備をすることなく、取付現場においてその構造材の配置態様に適した取り付けを行うことができる。また、下地材は構造材に固定されている防振構造体に取り付けるため、作業者には頭上においての作業が課せられる。このような状況においては特に、溶接により下地材を固定することから、ボルトなどに締結する場合に比べ取付作業が簡易となる。   According to this configuration, the vibration-proof structure is fixed to the base material by welding. For this reason, the attachment suitable for the arrangement | positioning aspect of the structural material is performed in an installation field, without preparing, such as forming the operation hole which penetrates the tool which fastens a bolt hole and a bolt in a base material at the time of attachment. be able to. In addition, since the base material is attached to the vibration-proof structure fixed to the structural material, an overhead work is imposed on the operator. Especially in such a situation, since the base material is fixed by welding, the mounting operation is simplified as compared with the case of fastening to a bolt or the like.

請求項2に記載の考案は、請求項1に記載のハンガーレール取付装置において、前記下地材と前記ハンガーレールとは溶接で固定されることをその要旨としている。
同構成によれば、溶接によって、下地材、防振構造体及びハンガーレールの取り付けが可能となる。これにより、さらに取付作業が簡易となる。
The gist of claim 2 is the hanger rail mounting apparatus according to claim 1, wherein the base material and the hanger rail are fixed by welding.
According to this configuration, the base material, the vibration isolation structure, and the hanger rail can be attached by welding. This further simplifies the mounting operation.

請求項3に記載の考案は、請求項1又は2に記載のハンガーレール取付装置において、前記防振構造体は単一の防振ユニットとして構成されることをその要旨としている。
防振ユニットは単一ユニットとして、例えば工場で組み立てられて取付現場に搬入される。これにより、取付現場においては溶接のみによって取り付けが完了でき、取付作業がよりいっそう簡易となる。
The gist of a third aspect of the present invention is that, in the hanger rail mounting device according to the first or second aspect, the vibration isolation structure is configured as a single vibration isolation unit.
The anti-vibration unit is assembled as a single unit, for example, at a factory, and carried to the installation site. As a result, the installation can be completed only by welding at the installation site, and the installation work is further simplified.

請求項4に記載の考案のように、前記防振ユニットは、構造材に溶接可能な主枠と、前記主枠に嵌合する防振材と、前記下地材に溶接可能な連結板とを備え、前記防振材を貫通したボルトとナットにより前記下地材を締結して構成することで、防振効果が得られる。   According to a fourth aspect of the present invention, the vibration isolating unit includes a main frame weldable to a structural material, a vibration isolating material fitted to the main frame, and a connecting plate weldable to the base material. The anti-vibration effect can be obtained by providing the base material with a bolt and a nut penetrating the anti-vibration material.

請求項5に記載の考案は、前記連結材は前記防振ユニットの下部に設けられるとともに前記連結材の前後の幅を前記下地材の前後方向の幅とほぼ同じ長さに形成したことをその要旨としている。   The invention according to claim 5 is characterized in that the connecting member is provided at a lower portion of the vibration isolator unit, and the front and rear widths of the connecting member are substantially the same as the front and rear widths of the base material. It is a summary.

同構成によれば、連結材及び下地材の前後の幅はほぼ同一長さで形成されている。このため、溶接で固定された状態において、下地材及び連結材は一体の筒状四角柱状となり、取付後の意匠性に優れる。   According to this configuration, the front and rear widths of the connecting material and the base material are formed with substantially the same length. For this reason, in the state fixed by welding, a base material and a connection material become an integral cylindrical square column shape, and are excellent in the designability after attachment.

本考案によれば、ハンガーレールの取付作業を容易とするハンガーレール取付装置を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the hanger rail attachment apparatus which makes easy the attachment operation | work of a hanger rail can be provided.

以下、本考案を具体化した一実施の形態を図1〜図4に従って説明する。図1に示すように、角型鋼管で形成される下地材11は、所定間隔毎に防振ユニット12を介して吊り筋(構造材)13に吊下支持される。図2及び図3に示すように、防振ユニット12の主枠21は金属により四角板状に形成され、その水平面に対して図2の左側部が上方に直角に屈曲されることにより、側面21aが形成されている。また、主枠21の中央部には防振材18を嵌合するための嵌合孔22が形成されている。一方、主枠21上には金属からなる四角板状の補助板23が載置され、その補助板23にも主枠21の嵌合孔22と同径の嵌合孔24が形成されている。主枠21及び補助板23の嵌合孔22,24には、上方及び下方から一対の防振材18a,18bが嵌合されている。この状態で、防振材18a,18bによって主枠21及び補助板23の嵌合孔22,24の円周端部は挟み込まれている。また、主枠21及び補助板23における両嵌合孔22,24の内周面及び円周端部すなわち、ゴム材でなる防振材18a,18bと当接する部分には補強の為の補強金具26が嵌合されている。なお、主枠21の厚さが厚ければ補助板23は省略可能である。   Hereinafter, an embodiment embodying the present invention will be described with reference to FIGS. As shown in FIG. 1, a base material 11 formed of a square steel pipe is suspended and supported by a suspension bar (structural material) 13 via a vibration isolation unit 12 at predetermined intervals. As shown in FIGS. 2 and 3, the main frame 21 of the vibration isolation unit 12 is formed in a square plate shape with metal, and the left side of FIG. 21a is formed. A fitting hole 22 for fitting the vibration isolator 18 is formed at the center of the main frame 21. On the other hand, a rectangular plate-like auxiliary plate 23 made of metal is placed on the main frame 21, and a fitting hole 24 having the same diameter as the fitting hole 22 of the main frame 21 is also formed in the auxiliary plate 23. . A pair of vibration isolating materials 18 a and 18 b are fitted into the fitting holes 22 and 24 of the main frame 21 and the auxiliary plate 23 from above and below. In this state, the circumferential ends of the fitting holes 22 and 24 of the main frame 21 and the auxiliary plate 23 are sandwiched by the vibration isolating materials 18a and 18b. Further, reinforcing metal fittings for reinforcement are provided on the inner peripheral surfaces and the circumferential end portions of the fitting holes 22 and 24 in the main frame 21 and the auxiliary plate 23, that is, the portions contacting the vibration isolating materials 18a and 18b made of rubber. 26 is fitted. If the main frame 21 is thick, the auxiliary plate 23 can be omitted.

防振材18a,18bの中心部には、パイプ20が貫通され、前記防振材18a,18bの下面には四角板状の連結板14が設けられている。当該連結板14にはパイプ20と同一孔径でなる連結孔15が形成されている。連結孔15及びパイプ20には下から上方向にボルト16が挿通されて、連結孔15の縁周部にボルト16の頭部16aが係着している。そして、防振材18a,18bの上方に突出したボルト16の先端部には、押さえ板19が嵌挿され、さらにナット17が螺合されることにより、押さえ板19と連結板14との間で防振材18a,18bが圧縮される。以上のように構成される防振ユニット12は工場等で組み立てられ取付現場に搬入される。   A pipe 20 is penetrated in the center of the vibration isolators 18a and 18b, and a square plate-like connecting plate 14 is provided on the lower surface of the vibration isolators 18a and 18b. A connecting hole 15 having the same hole diameter as the pipe 20 is formed in the connecting plate 14. Bolts 16 are inserted through the connection holes 15 and the pipes 20 from the bottom upward, and heads 16 a of the bolts 16 are engaged with the peripheral edges of the connection holes 15. Then, a presser plate 19 is fitted into the tip of the bolt 16 protruding above the vibration isolating materials 18 a and 18 b, and a nut 17 is screwed into between the presser plate 19 and the connecting plate 14. Thus, the vibration isolators 18a and 18b are compressed. The anti-vibration unit 12 configured as described above is assembled at a factory or the like and carried into the installation site.

ハンガーレール28の取付作業は、次のようにして行われる。まず、予め組み立てられた防振ユニット12を吊り筋13に取り付ける。すなわち、主枠21の側面21aを、図2に示すように、吊り筋13に溶接27により固定する。次に、この防振ユニット12の下部に下地材11を取り付ける。すなわち、下地材11の上面を連結板14の下面に溶接30により固定する。なお、連結材14及び下地材11の前後方向(図3参照)の幅はほぼ同一長さで形成されている。図3に示すように、下地材11の上面には、その長手方向に開口する開口部11aが形成されているところ、ボルト16の頭部16aは開口部11aを介して下地材11の内部に挿入される。最後に、ハンガーレール28の上面を下地材11の下面に溶接29で固定する。このようにして、ハンガーレール28は、防振ユニット12及び下地材11を介して吊り筋13に吊下支持される。以上で、ハンガーレール28の取付作業が完了となる。このように、溶接のみによりハンガーレール28の取付作業は容易に行え、その作業時間の短縮につながる。   The attachment work of the hanger rail 28 is performed as follows. First, the vibration isolation unit 12 assembled in advance is attached to the suspension bar 13. That is, the side surface 21a of the main frame 21 is fixed to the suspension bar 13 by welding 27 as shown in FIG. Next, the base material 11 is attached to the lower part of the vibration isolation unit 12. That is, the upper surface of the base material 11 is fixed to the lower surface of the connecting plate 14 by welding 30. The connecting material 14 and the base material 11 are formed with substantially the same width in the front-rear direction (see FIG. 3). As shown in FIG. 3, an opening 11a opening in the longitudinal direction is formed on the upper surface of the base material 11, and the head 16a of the bolt 16 is placed inside the base material 11 through the opening 11a. Inserted. Finally, the upper surface of the hanger rail 28 is fixed to the lower surface of the base material 11 by welding 29. In this manner, the hanger rail 28 is suspended and supported by the hanger 13 through the vibration isolation unit 12 and the base material 11. Thus, the mounting operation of the hanger rail 28 is completed. In this way, the hanger rail 28 can be easily attached only by welding, leading to a reduction in the operation time.

以上、説明した実施形態によれば、以下の作用効果を奏することができる。
(1)防振ユニット12の連結板14は下地材11に溶接30により固定される。このため、取り付けの際、下地材11にボルト孔、及びボルトを締結する工具を挿通する操作孔を形成する等の準備をすることなく、取付現場においてその吊り筋13の配置態様に適した取り付けを簡易に行うことができる。また、下地材11は吊り筋13に固定されている防振ユニット12に取り付けるため、作業者には頭上においての作業が課せられる。このような状況においては特に、ボルト等による締付作業は大きな作業負担となる。この点、溶接30により下地材11を固定することにより、ボルト等により締結する場合に比べ取付作業が簡易となる。
As described above, according to the embodiment described above, the following effects can be obtained.
(1) The connecting plate 14 of the vibration isolation unit 12 is fixed to the base material 11 by welding 30. For this reason, the attachment suitable for the arrangement | positioning aspect of the suspension bar | burr 13 in an installation site, without preparing the bolt hole and the operation hole which penetrates the tool which fastens a bolt in the base material 11 in the case of attachment Can be performed easily. In addition, since the base material 11 is attached to the vibration isolation unit 12 fixed to the suspension bar 13, an overhead work is imposed on the operator. Particularly in such a situation, tightening work with bolts or the like is a heavy work burden. In this respect, fixing the base material 11 by welding 30 makes the mounting operation easier than when fastening with bolts or the like.

(2)下地材11にハンガーレール28が溶接29によって固定される。したがって、溶接29によって、下地材11、防振ユニット12及びハンガーレール28の取り付けが可能となる。これにより、さらに取付作業が簡易となる。   (2) The hanger rail 28 is fixed to the base material 11 by welding 29. Therefore, it is possible to attach the base material 11, the vibration isolation unit 12, and the hanger rail 28 by the welding 29. This further simplifies the mounting operation.

(3)防振ユニットは単一ユニットとして、例えば工場で組み立てられて取付現場に搬入される。これにより、取付現場においては溶接29,30のみによって取り付けが完了でき、取付作業がよりいっそう簡易となる。   (3) The anti-vibration unit is assembled as a single unit, for example, at a factory, and carried to the installation site. As a result, the installation can be completed only by welding 29 and 30 at the installation site, and the installation work is further simplified.

上記実施の形態は、以下の態様で実施してもよい。
・本実施形態においては、下地材11とハンガーレール28とは溶接29によって固定される。しかし、これに限らず、図4に示すように、ボルト40及びナット41で固定してもよい。この場合であれ、連結板14と下地材11とは溶接30により固定される。このため、連結板14と下地材11とをボルトで固定した場合に比べて取付作業は簡易となる。
・ハンガーレール28は、吊下支持するパネルの重量に応じて他の構成のハンガーレールを使用してもよい。
・下地材11は、C型鋼管あるいはH型鋼材を使用してもよい。
You may implement the said embodiment in the following aspects.
In the present embodiment, the base material 11 and the hanger rail 28 are fixed by welding 29. However, the present invention is not limited to this, and may be fixed with bolts 40 and nuts 41 as shown in FIG. Even in this case, the connecting plate 14 and the base material 11 are fixed by welding 30. For this reason, compared with the case where the connection board 14 and the base material 11 are fixed with a volt | bolt, attachment work becomes easy.
-As for the hanger rail 28, you may use the hanger rail of another structure according to the weight of the panel supported by suspension.
The base material 11 may be a C-type steel pipe or an H-type steel material.

本実施形態におけるハンガーレール取付装置を示す正面図。The front view which shows the hanger rail attachment apparatus in this embodiment. 図1のA円中拡大図。The enlarged view in A circle of FIG. 図2のB−B線断面図。BB sectional drawing of FIG. 他の実施形態のハンガーレール取付装置を示す断面図。Sectional drawing which shows the hanger rail attachment apparatus of other embodiment. 従来のハンガーレール取付装置を示す断面図。Sectional drawing which shows the conventional hanger rail attachment apparatus.

符号の説明Explanation of symbols

11…下地材、12…防振ユニット(防振構造体)、13…構造材(吊り筋)、14…連結板、18a,18b…防振材、28…ハンガーレール、27,29,30…溶接。   DESCRIPTION OF SYMBOLS 11 ... Base material, 12 ... Anti-vibration unit (vibration-proof structure), 13 ... Structural material (hanging reinforcement), 14 ... Connection board, 18a, 18b ... Anti-vibration material, 28 ... Hanger rail, 27, 29, 30 ... welding.

Claims (5)

間仕切りパネルを移動可能に支持するハンガーレールを下地材及び防振構造体を介して建物の構造材に吊下支持するハンガーレール取付装置において、
前記防振構造体は前記下地材に溶接により固定されるハンガーレール取付装置。
In the hanger rail mounting device for supporting the hanger rail that movably supports the partition panel on the structural material of the building via the base material and the vibration isolation structure,
A hanger rail mounting device in which the vibration-proof structure is fixed to the base material by welding.
請求項1に記載のハンガーレール取付装置において、
前記下地材と前記ハンガーレールとは溶接で固定されるハンガーレール取付装置。
In the hanger rail attaching device according to claim 1,
A hanger rail mounting device in which the base material and the hanger rail are fixed by welding.
請求項1又は2に記載のハンガーレール取付装置において、
前記防振構造体は単一の防振ユニットとして構成されるハンガーレール取付装置。
In the hanger rail attaching device according to claim 1 or 2,
The hanger rail mounting device is configured such that the vibration isolation structure is configured as a single vibration isolation unit.
前記防振ユニットは、
構造材に溶接可能な主枠と、前記主枠に嵌合する防振材と、前記下地材に溶接可能な連結板とを備え、
前記防振材を貫通したボルトとナットにより前記下地材を締結して構成したことを特徴とする請求項3記載のハンガーレール取付装置。
The vibration isolation unit is
A main frame that can be welded to a structural material;
The hanger rail mounting device according to claim 3, wherein the base material is fastened by a bolt and a nut penetrating the vibration isolator.
前記連結材は前記防振ユニットの下部に設けられるとともに前記連結材の前後の幅を前記下地材の前後の幅とほぼ同じ長さに形成したことを特徴とする請求項4記載のハンガーレール取り付け装置。   5. The hanger rail attachment according to claim 4, wherein the connecting member is provided at a lower portion of the vibration isolator unit, and a width before and after the connecting member is formed to be substantially the same as a width before and after the base member. apparatus.
JP2008009131U 2008-12-26 2008-12-26 Hanger rail mounting device for partition panel Expired - Fee Related JP3149131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008009131U JP3149131U (en) 2008-12-26 2008-12-26 Hanger rail mounting device for partition panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008009131U JP3149131U (en) 2008-12-26 2008-12-26 Hanger rail mounting device for partition panel

Publications (1)

Publication Number Publication Date
JP3149131U true JP3149131U (en) 2009-03-12

Family

ID=54853732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008009131U Expired - Fee Related JP3149131U (en) 2008-12-26 2008-12-26 Hanger rail mounting device for partition panel

Country Status (1)

Country Link
JP (1) JP3149131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018207946A1 (en) * 2017-05-12 2018-11-15 川崎重工業株式会社 Chain-driven conveyor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018207946A1 (en) * 2017-05-12 2018-11-15 川崎重工業株式会社 Chain-driven conveyor

Similar Documents

Publication Publication Date Title
JP5078493B2 (en) Reinforcing bracket for ceiling and suspended ceiling using the same
JP5746874B2 (en) Ceiling structure and brace material and ceiling finishing plate fixing bracket
JP3149751U (en) Suspension structure
JP3149131U (en) Hanger rail mounting device for partition panel
JP2008267524A (en) Vibration absorbing base device
JP7185465B2 (en) ceiling structure
JP2014240235A (en) Fitting structure of control device and cantilever member used in fitting structure
JP4863934B2 (en) C-shape steel mounting bracket for ceiling base mounting
JP7224037B2 (en) Ceiling frame suspension structure
JP4897380B2 (en) Hanger rail mounting device for partition panel
JP7185466B2 (en) ceiling structure
JP6925114B2 (en) Connection structure
JP7273581B2 (en) Ceiling structure and fixed reinforcing member
JP2011236727A5 (en)
JP3167311U (en) Piping support bracket
JP6057371B2 (en) Seismic reinforcement
JP2010032027A (en) Vibration-resistant piping support
JP2018204200A (en) Vibration control device and building
JP5439002B2 (en) Expansion unit mounting structure, expansion unit mounting method and unit type building
JP4514678B2 (en) Roof panel or floor panel reinforcement method, reinforcement structure, and support bracket for reinforcement
JP3116907U (en) Scaffold assembly equipment
JP2023131224A (en) Fitting structure of vibration control device
JP3019179U (en) Anti-vibration bracket for hydraulic breaker
JP4514677B2 (en) Roof panel or floor panel reinforcement method, reinforcement structure, and support bracket for reinforcement
JP2020002691A (en) Brace fixing metal fixture and floor support structure using brace fixing metal fixture

Legal Events

Date Code Title Description
R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120218

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120218

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120218

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130218

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130218

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130218

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140218

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees