JP3137398B2 - High pressure underline construction robot - Google Patents

High pressure underline construction robot

Info

Publication number
JP3137398B2
JP3137398B2 JP35907591A JP35907591A JP3137398B2 JP 3137398 B2 JP3137398 B2 JP 3137398B2 JP 35907591 A JP35907591 A JP 35907591A JP 35907591 A JP35907591 A JP 35907591A JP 3137398 B2 JP3137398 B2 JP 3137398B2
Authority
JP
Japan
Prior art keywords
main line
sleeve
cover
underline
peeling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35907591A
Other languages
Japanese (ja)
Other versions
JPH05184023A (en
Inventor
雅章 伊藤
紀幸 海原
好秋 阿部
智男 小幡
彰 田辺
浩一 町田
一美 若松
耕二 河西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THE FURUKAW ELECTRIC CO., LTD.
Fujikura Ltd
Tokyo Electric Power Co Inc
Sanwa Tekki Corp
Original Assignee
THE FURUKAW ELECTRIC CO., LTD.
Fujikura Ltd
Tokyo Electric Power Co Inc
Sanwa Tekki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THE FURUKAW ELECTRIC CO., LTD., Fujikura Ltd, Tokyo Electric Power Co Inc, Sanwa Tekki Corp filed Critical THE FURUKAW ELECTRIC CO., LTD.
Priority to JP35907591A priority Critical patent/JP3137398B2/en
Publication of JPH05184023A publication Critical patent/JPH05184023A/en
Application granted granted Critical
Publication of JP3137398B2 publication Critical patent/JP3137398B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • B08B1/30

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明の高圧引下線工事用ロボッ
トは架空配電されている本線に、柱上トランスに高圧を
引込むための高圧引下線を接続するのに使用されるもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The high-voltage underline construction robot of the present invention is used to connect a high-voltage underline for drawing high voltage into a pole transformer to a mains line which is overheadly distributed.

【0002】[0002]

【従来の技術】図19示すように架空配電されている本
線Aから電柱Bに設置されている変圧器Cに高圧を引込
むには、本線Aと変圧器Cの間に高圧引下線Dを接続し
て行なっていた。この場合、本線Aへの高圧引下線Dの
接続は次のような工程を経て行なわれていた。 ナイフを使用しての本線Aの被覆層の剥離(皮剥
ぎ:約5cm程度)。 皮剥ぎにより露出した本線Aの内部導体Eの外周面
に付着している被覆層の残渣、酸化アルミ皮膜、錆、汚
れ等を除去(本線がOC電線の場合はセパレータをも除
去)するためのブラッシング。 高圧引下線(PD線)Cの保持。 スリーブF(図20)を圧縮することによる本線A
と高圧引下線Dとの接続。 スリーブFの外側への保護カバー(主に感電防止
用:主としてポリエチレン製)の取付け。 防水、接続外れ等を防止するための接続部へのテー
プ巻。 高圧引下線Dの振止めのためのバインド線による高
圧引下線Dの連結。 これらの接続作業は従来は作業員がバケット車(高所作
業車)を利用したり、電柱に昇ったりして行なってい
た。
2. Description of the Related Art As shown in FIG. 19, in order to draw a high voltage from a main line A, which is aerially distributed, to a transformer C installed on a utility pole B, a high voltage down line D is connected between the main line A and the transformer C. I was doing it. In this case, the connection of the high-voltage underline D to the main line A has been performed through the following steps. Peeling of the coating layer of the main line A using a knife (peeling: about 5 cm). For removing residues of the coating layer, aluminum oxide film, rust, dirt, etc. adhering to the outer peripheral surface of the inner conductor E of the main line A exposed by peeling (the separator is also removed when the main line is an OC electric wire). Brushing. Holding of high pressure underline (PD line) C. Main line A by compressing sleeve F (FIG. 20)
And high-voltage underline D. Attach a protective cover (mainly for prevention of electric shock: mainly made of polyethylene) to the outside of the sleeve F. Tape wrap around the connection to prevent waterproofing and disconnection. Connection of the high-voltage underline D by a binding line for stopping the high-voltage underline D. Conventionally, these connecting operations are performed by a worker using a bucket truck (a high-altitude working vehicle) or climbing on a utility pole.

【0003】[0003]

【発明が解決しようとする課題】しかし、前記した従来
の接続方法では次のような問題があった。 作業員によっては被覆の皮剥ぎが不十分であった
り、スリーブFの圧縮が不足して本線Aの挟着が不十分
であったり、本線Aへの高圧引下線Dの取付けが傾いた
りして、接続の仕上り(接続品質)にバラツキがでる。 一つ一つの作業が手作業であるため手間がかかり、
保護カバーの取付けには特に手間がかかり、多くの労力
が必要になる。 高所での作業であるため作業しにくく、また、落下
の虞れもあり危険であった。 .本線Aに高圧を流したまま(活線状態)で作業する
場合は感電の虞れがあり危険であった。 .スリーブFを加圧するために携帯用の油圧式締付け
具等が必要になり、それをバケット車に載せて押し上げ
なければならないので、高所の狭い作業場所が一層せま
くなり、接続作業が益々しにくくなる。 .安全を確保するために接続作業に先立って安全ネッ
ト、低圧防護シート、高圧防護シート等を張ったり、接
続終了後にそれを取外したりする必要があるため、それ
らの作業も面倒であった。
However, the conventional connection method described above has the following problems. Depending on the worker, the peeling of the coating is insufficient, the compression of the sleeve F is insufficient, the clamping of the main line A is insufficient, and the attachment of the high-pressure underline D to the main line A is inclined. , The connection finish (connection quality) varies. Since each work is manual work, it takes time,
The installation of the protective cover is particularly time-consuming and requires a lot of effort. Since the operation is performed at a high place, it is difficult to perform the operation, and there is a danger that the operation may be dropped. . When working with a high voltage flowing through the main line A (in a live state), there is a danger of electric shock and this is dangerous. . In order to pressurize the sleeve F, a portable hydraulic fastener or the like is required, and it has to be placed on a bucket truck and pushed up. Become. . Prior to the connection work, a safety net, a low-pressure protection sheet, a high-pressure protection sheet, and the like must be provided before connection, and the connection must be removed after the connection is completed.

【0004】本発明の目的は作業員が電柱に昇ることな
く前記の接続作業が自動的にでき、本線を活線状態にし
て作業しても危険が少なく、面倒な防護シート張りや取
外し作業の一部を省略でき、作業効率がよく、省力化で
き、しかも接続品質にばらつきがなく、安定した接続が
可能な高圧引下線工事用ロボットを実現することにあ
る。
An object of the present invention is to automatically perform the above-mentioned connection work without the worker climbing on the telephone pole, and to reduce the danger even if the work is performed while the main line is in a live state. It is an object of the present invention to provide a high-voltage pull-down line construction robot that can omit part of the work, save work efficiency, save labor, and have a stable connection quality and stable connection.

【0005】[0005]

【課題を解決するための手段】本発明のうち請求項1の
高圧引下線工事用ロボットは、架空配電されている本線
1(図1)に接続される高圧引下線2(図5)が仮保持
されたスリーブ3(図5)をセットする圧縮ダイス4
(図6)と、同スリーブ3の外側に被せるカバー5(図
7)を装填するカバー装填部6(図7)と、本線1に吊
下げる吊下げ部7(図1、図2)と、本線1の被覆層8
(図2)を剥離する皮剥ぎ機構9(図10、図11)
と、皮剥ぎにより露出した内部導体10(図2)の外周
面をブラッシングするブラッシング機構12(図2、図
15)と、前記圧縮ダイス4を加圧することによりスリ
ーブ3を圧縮して同スリーブ3に内部導体10を挟着固
定し、前記カバー5を加圧してスリーブ3の外側に被せ
る加圧機構13(図2、図7)とを備えたものである。
According to a first aspect of the present invention, there is provided a high-voltage underline construction robot according to the first aspect, in which a high-voltage underline 2 (FIG. 5) connected to an overhead distribution main line 1 (FIG. 1) is temporarily provided. Compression die 4 for setting held sleeve 3 (FIG. 5)
(FIG. 6), a cover loading section 6 (FIG. 7) for loading a cover 5 (FIG. 7) put on the outside of the sleeve 3, and a hanging section 7 (FIGS. 1 and 2) for hanging the main line 1. Coating layer 8 of main line 1
Peeling mechanism 9 for peeling (FIG. 2) (FIGS. 10 and 11)
A brushing mechanism 12 (FIGS. 2 and 15) for brushing the outer peripheral surface of the inner conductor 10 (FIG. 2) exposed by peeling; and a sleeve 3 compressed by pressing the compression die 4 to compress the sleeve 3. And a pressurizing mechanism 13 (FIGS. 2 and 7) for pressing the cover 5 to cover the outside of the sleeve 3 by sandwiching and fixing the internal conductor 10 to the outside.

【0006】本発明のうち請求項2の高圧引下線工事用
ロボットは、請求項1の高圧引下線工事用ロボットにカ
ートリッジ装填部14(図1、図7)を設け、同カート
リッジ装填部14に圧縮ダイス4、カバー5をセットし
たカートリッジ15を装填取外し可能としたものであ
る。
According to a second aspect of the present invention, a high pressure underline construction robot is provided with a cartridge loading section 14 (FIGS. 1 and 7) in the high pressure underline construction robot according to the first aspect. The cartridge 15 on which the compression die 4 and the cover 5 are set can be loaded and removed.

【0007】本発明のうち請求項3の高圧引下線工事用
ロボットは、請求項1のブラッシング機構12、圧縮ダ
イス4、カバー5の夫々を前記内部導体10の位置まで
移動可能としたものである。
According to a third aspect of the present invention, there is provided a high-pressure underline construction robot according to the first aspect, wherein each of the brushing mechanism 12, the compression die 4, and the cover 5 can be moved to the position of the internal conductor 10. .

【0008】本発明のうち請求項4の高圧引下線工事用
ロボットは、請求項1又は請求項3のブラッシング機構
12が前記内部導体10の位置{図2(b)の位置}ま
で移動可能であり、圧縮ダイス4及びカバー5が同内部
導体10の位置{図2(c)の位置}まで移動可能で且
つ昇降機構16(図7)により加圧機構13の横まで昇
降可能としたものである。
According to a fourth aspect of the present invention, the brushing mechanism 12 according to the first or third aspect is capable of moving the brushing mechanism 12 to the position of the inner conductor 10 (the position in FIG. 2B). The compression die 4 and the cover 5 can be moved to the position of the internal conductor 10 (the position in FIG. 2C) and can be moved up and down to the side of the pressing mechanism 13 by the elevating mechanism 16 (FIG. 7). is there.

【0009】本発明のうち請求項5の高圧引下線工事用
ロボットは、請求項1又は請求項3又は請求項4の高圧
引下線工事用ロボットが、本線1に吊下げられる筐体1
7(図1、図2)と、同筐体17の内部に本線1に沿っ
て往復移動可能に設けた移動台18(図2)とを備え、
同移動台18に前記圧縮ダイス4、皮剥ぎ機構9、ブラ
ッシング機構12、加圧機構13、カートリッジ装填部
14、昇降機構16が設けられてなるものである。
According to a fifth aspect of the present invention, there is provided a high-voltage underline construction robot according to claim 1, wherein the high-voltage underline construction robot according to claim 1, 3, or 4 is suspended from the main line 1.
7 (FIGS. 1 and 2), and a movable table 18 (FIG. 2) provided in the same housing 17 so as to be able to reciprocate along the main line 1.
The moving table 18 is provided with the compression die 4, the peeling mechanism 9, the brushing mechanism 12, the pressing mechanism 13, the cartridge loading unit 14, and the elevating mechanism 16.

【0010】[0010]

【作用】本発明の高圧引下線工事用ロボットでは、同ロ
ボットを本線1に吊下げる前に次のような準備を行な
う。図5のように高圧引下線2を仮保持したスリーブ3
を図6のように圧縮ダイス4にセット、その圧縮ダイス
4とカバー5(図7)をカートリッジ15(図7)に装
填する。この状態で本発明のロボットを高所作業車のク
レーンで押し上げるとか、作業者が持ち上げるなどして
図1に示すように架空配電されている本線1に仮吊下げ
する。この仮吊下げは図1の筐体17の両外側に取付け
た仮吊下げ具19を本線1に係止して行なう。
In the high-voltage underline construction robot of the present invention, the following preparations are made before the robot is suspended from the main line 1. Sleeve 3 temporarily holding high-pressure underline 2 as shown in FIG.
Is set on the compression die 4 as shown in FIG. 6, and the compression die 4 and the cover 5 (FIG. 7) are loaded into the cartridge 15 (FIG. 7). In this state, the robot of the present invention is temporarily suspended from the main line 1 which is overhead-distributed as shown in FIG. This temporary suspension is performed by locking the temporary suspension tools 19 attached to both outer sides of the housing 17 of FIG.

【0011】前記状態で図示されていないスタートスイ
ッチを押すと図2の吊下げ部7が本線1を本把持し、皮
剥ぎ機構9により本線1の被覆層8が図2(a)のよう
に剥離(皮剥ぎ)されて内部導体10が外部に露出され
る。
In this state, when a start switch (not shown) is pressed, the hanging portion 7 shown in FIG. 2 grips the main line 1 and the covering layer 8 of the main line 1 is moved by the peeling mechanism 9 as shown in FIG. The inner conductor 10 is peeled (skinned) and exposed to the outside.

【0012】次に、図2(b)のようにブラッシング機
構12が内部導体10の位置まで移動してブラッシング
する。
Next, as shown in FIG. 2B, the brushing mechanism 12 moves to the position of the internal conductor 10 and performs brushing.

【0013】次に、図2(c)、図7(a)のように圧
縮ダイス4が内部導体10の位置まで移動し、更に図7
(b)のように加圧機構13の横まで上昇し、その位置
で同圧縮ダイス4が加圧機構13により加圧されてスリ
ーブ3が図17のように圧縮されて本線1がスリーブ3
に挟着固定される。このとき、スリーブ3に仮保持され
ている高圧引下線2もスリーブ3に図17のように挟着
固定されて、本線1と高圧引下線2とがスリーブ3を介
して連結される。
Next, as shown in FIGS. 2C and 7A, the compression die 4 moves to the position of the inner conductor 10, and
As shown in (b), the compression die 4 is raised to the side of the pressure mechanism 13 and the compression die 4 is pressed by the pressure mechanism 13 at that position to compress the sleeve 3 as shown in FIG.
To be fixed. At this time, the high-voltage underline 2 temporarily held by the sleeve 3 is also fixed to the sleeve 3 as shown in FIG. 17, and the main line 1 and the high-pressure underline 2 are connected via the sleeve 3.

【0014】その後、図7(c)のようにカバー5が加
圧機構13の横まで降下し、その位置で加圧機構13が
カバー5を加圧して図18のようにスリーブ3の外側に
被せ、二枚のカバー5を互いに嵌合固定させる。
Thereafter, as shown in FIG. 7 (c), the cover 5 descends to the side of the pressing mechanism 13, and at this position, the pressing mechanism 13 presses the cover 5 to move the cover 5 out of the sleeve 3 as shown in FIG. Then, the two covers 5 are fitted and fixed to each other.

【0015】以上のように、ロボットは本線1の皮剥ぎ
位置に固定したままで本線1へ高圧引下線2を接続する
ことができる。
As described above, the robot can connect the high-voltage underline 2 to the main line 1 while keeping the main line 1 fixed at the peeling position.

【0016】前記ようにしてカバー5の被覆までの作業
が終了したら、吊下げ部7による本線1の本把持を解除
してロボットを作業員が本線1から撤去する。
When the work up to the covering of the cover 5 is completed as described above, the main grip of the main line 1 is released by the hanging portion 7, and the worker removes the robot from the main line 1.

【0017】[0017]

【実施例】本発明の高圧引下線工事用ロボットの一実施
例を図1〜図16に示す。これらのうち図1〜図3に示
す1は架空配電されている本線、17はロボットの筐
体、18は筐体17内に取付けられた移動台である。
1 to 16 show an embodiment of a high-voltage underline construction robot according to the present invention. Of these, 1 shown in FIGS. 1 to 3 is a main line which is aerially distributed, 17 is a robot housing, and 18 is a moving table mounted in the housing 17.

【0018】前記筐体17は金属板により横長箱状に形
成されており、その両側板21に本線1を通すU字状の
切欠き22(図1)が形成され、両側板21の上端部間
に丸パイプ等のガイド23(図2、図3)が2本平行に
架設され、更に両側板21の下端部間にスクリューシャ
フト24(図3)が配置されている。
The housing 17 is formed in a horizontally long box shape by a metal plate, and a U-shaped notch 22 (FIG. 1) for passing the main line 1 is formed in both side plates 21 thereof. Two guides 23 (FIGS. 2 and 3), such as round pipes, are installed in parallel between them, and a screw shaft 24 (FIG. 3) is arranged between the lower ends of both side plates 21.

【0019】前記移動台18はそのガイド受具25(図
2、図3)が前記ガイド23にスライド可能に連結さ
れ、シャフト受具26(図3)がスクリューシャフト2
4に螺合されている。
The movable table 18 has a guide holder 25 (FIGS. 2 and 3) slidably connected to the guide 23 and a shaft holder 26 (FIG. 3) connected to the screw shaft 2.
4 screwed.

【0020】スクリューシャフト24は筐体17に取付
けられているモータ27(図3)の回転によりそのプー
リ28が回転すると、スクリューシャフト24に取付け
られている従動プーリ29(図3)が回転して回転する
ようにしてある。
When the pulley 28 of the screw shaft 24 is rotated by rotation of a motor 27 (FIG. 3) mounted on the housing 17, a driven pulley 29 (FIG. 3) mounted on the screw shaft 24 rotates. It is made to rotate.

【0021】スクリューシャフト24が回転するとそれ
に螺合されているシャフト受具26がスクリューシャフ
ト24に沿って移動し、これに伴って移動台18がガイ
ド23に沿って図2の矢印x方向に移動する。前記モー
タ27が逆回転するとスクリューシャフト24も逆回転
し、移動台18が逆方向(図2の矢印y方向)に移動す
るようにしてある。
When the screw shaft 24 rotates, the shaft holder 26 screwed with the screw shaft 24 moves along the screw shaft 24, and accordingly, the moving table 18 moves along the guide 23 in the direction of arrow x in FIG. I do. When the motor 27 rotates in the reverse direction, the screw shaft 24 also rotates in the reverse direction, and the moving table 18 moves in the reverse direction (the direction of the arrow y in FIG. 2).

【0022】前記移動台18にはカートリッジ15(図
2、図7)を装填、取外し可能なカートリッジ装填部1
4(図2、図7)が設けられており、このカートリッジ
15には図7のように本線と高圧引下線を連結するスリ
ーブ3をセットする圧縮ダイス4と、同スリーブ3の外
側に被せるカバー5をセットできるようにしてある。
A cartridge loading section 1 in which a cartridge 15 (FIGS. 2 and 7) can be loaded and removed from the movable table 18 is provided.
4 (FIGS. 2 and 7), the cartridge 15 has a compression die 4 for setting a sleeve 3 for connecting the main line and the high-pressure pull-down line as shown in FIG. 7, and a cover for covering the outside of the sleeve 3. 5 can be set.

【0023】スリーブ3には圧縮ダイス4にセットする
前に、図5に示すように高圧引下線(例えばPD線)2
を仮保持しておく。
Before the sleeve 3 is set on the compression die 4, as shown in FIG.
Is temporarily stored.

【0024】スリーブ3は図5に明示するように上方に
本線1を挟着するU字状の本線挟着部33が形成され、
その下に高圧引下線2を挟着する丸穴状の高圧引下線挟
着部34が形成されている。高圧引下線挟着部34は図
5(b)に明示するように入口側に高圧引下線2の被覆
部を挿入する大径の被覆部挿入穴35が形成され、その
奥に高圧引下線2の内部導体を挿入する小径の内部導体
挿入穴36が連接され、被覆部挿入穴35の周壁の対向
位置にスリット37(図5)が形成されている。
As shown in FIG. 5, the sleeve 3 has a U-shaped main line holding portion 33 for holding the main line 1 at an upper portion thereof.
Below this, a round hole-shaped high-voltage underline sandwiching portion 34 for sandwiching the high-voltage underline 2 is formed. As shown in FIG. 5B, the high-pressure underline sandwiching portion 34 has a large-diameter covering portion insertion hole 35 for inserting the covering portion of the high-pressure underline 2 at the entrance side, and the high-pressure underline 2 A small diameter internal conductor insertion hole 36 for inserting the internal conductor is connected, and a slit 37 (FIG. 5) is formed at a position facing the peripheral wall of the covering portion insertion hole 35.

【0025】そして図5(e)のように内部導体挿入穴
36に高圧引下線2の内部導体を、被覆部挿入穴35に
高圧引下線2の被覆部を挿入した後、被覆部挿入穴35
をスリット37の部分から潰して高圧引下線2を仮保持
できるようにしてある。
Then, as shown in FIG. 5 (e), the internal conductor of the high-voltage underline 2 is inserted into the internal conductor insertion hole 36, and the coating of the high-voltage underline 2 is inserted into the coating insertion hole 35.
Is crushed from the slit 37 so that the high-pressure underline 2 can be temporarily held.

【0026】前記カートリッジ15(図7)のカバー装
填部6にセットされるカバー5はプラスチック等により
成形され、また、図18のようにスリーブ3の外側に被
せたときに二つのカバー5が互いに嵌合固定するように
形成されている。
The cover 5 set in the cover loading portion 6 of the cartridge 15 (FIG. 7) is formed of plastic or the like. When the cover 5 is put on the outside of the sleeve 3 as shown in FIG. It is formed so as to be fitted and fixed.

【0027】前記カートリッジ15にセットされる圧縮
ダイス4は図6に明示するように二つ対向しており、夫
々の圧縮ダイス4にスリーブ3の本線挟着部33を収容
する収容部41が内側に湾曲して形成され、その下方に
立設した支持軸42に移動コマ43が昇降可能に支持さ
れ、同移動コマ43が支持軸42の外周に配置したスプ
リング44により上方に押し上げられている。
As shown in FIG. 6, two compression dies 4 set in the cartridge 15 are opposed to each other, and each of the compression dies 4 has a receiving portion 41 for receiving the main line holding portion 33 of the sleeve 3 inside. The movable piece 43 is supported by a support shaft 42 erected below the movable shaft 43 so as to be able to move up and down. The movable piece 43 is pushed upward by a spring 44 arranged on the outer periphery of the support shaft 42.

【0028】この圧縮ダイス4にスリーブ3をセットす
るときは図6(b)に示すように同スリーブ3の底面に
より移動コマ43を押し下げた状態で奥に押込む。押込
みが終了してスリーブ3による移動コマ43の押し下げ
が解除されると、移動コマ43がスプリング44により
押し戻されてスリーブ3を押し上げ、スリーブ3が収容
部41の上縁と移動コマ43との間に挟着保持されて安
定する。
When the sleeve 3 is set on the compression die 4, as shown in FIG. 6B, the movable piece 43 is pushed down by the bottom surface of the sleeve 3 while being pushed down. When the pushing of the moving piece 43 by the sleeve 3 is released and the moving piece 43 is released, the moving piece 43 is pushed back by the spring 44 to push up the sleeve 3, and the sleeve 3 is moved between the upper edge of the accommodating portion 41 and the moving piece 43. And is stabilized.

【0029】前記カートリッジ15は図2の移動台18
のフレーム45(図7)に回転可能に取付けられている
昇降ネジ46に固定されており、昇降ネジ46が昇降用
モータMの正・逆回転により正逆回転するとカートリッ
ジ15が昇降し、カートリッジ15にセットされている
スリーブ3、カバー5の夫々を図7のように対抗してい
る二つの加圧機構13の間に位置するようにしてある。
The cartridge 15 is mounted on the moving table 18 shown in FIG.
The frame 15 is fixed to an elevating screw 46 rotatably attached to the frame 45 (FIG. 7). When the elevating screw 46 is rotated forward and reverse by forward and reverse rotations of the elevating motor M, the cartridge 15 is moved up and down. Each of the sleeve 3 and the cover 5 which are set at the position is positioned between two opposing pressing mechanisms 13 as shown in FIG.

【0030】カートリッジ15を使用すればスリーブ3
やカバー5のサイズが変わった場合に、そのサイズに合
わせてカートリッジ15を交換することができるので便
利である。しかし、本発明ではカートリッジ15を使用
せずに、圧縮ダイス4を移動台18のフレーム45(図
7)に直接組込み、カバー装填部6を同フレーム45に
直接形成することもできる。
If the cartridge 15 is used, the sleeve 3
When the size of the cover 5 or the cover 5 changes, the cartridge 15 can be exchanged according to the size, which is convenient. However, in the present invention, without using the cartridge 15, the compression die 4 can be directly incorporated into the frame 45 (FIG. 7) of the movable base 18 and the cover loading portion 6 can be formed directly on the frame 45.

【0031】図7のよう圧縮スリーブ4及びカバー5を
セットしたロボットは図1のように仮吊下げ部19によ
り本線1に仮吊下げされる。仮吊下げ具19は図4に明
示するように先端がL字状に曲がっており、筐体17の
外側面にピン30により回動自在に取付けられ、その下
端側がスプリング31により左側に引かれている。
The robot in which the compression sleeve 4 and the cover 5 are set as shown in FIG. 7 is temporarily suspended on the main line 1 by the temporary suspension section 19 as shown in FIG. As shown in FIG. 4, the temporary suspending device 19 has an L-shaped distal end, is rotatably attached to the outer surface of the housing 17 by a pin 30, and its lower end is pulled to the left by a spring 31. ing.

【0032】そして図4(b)に示すように仮吊下げ部
19の上端部を左側に倒してから図4(c)に示すよう
に本線1に係止すると、仮吊下げ部19の下端側がスプ
リング31により左側に引かれて上端部が本線1に係止
された状態に保持されるようにしてある。
Then, as shown in FIG. 4 (b), when the upper end of the temporary suspension portion 19 is tilted to the left and locked on the main line 1 as shown in FIG. The side is pulled to the left by a spring 31 and the upper end is held in a state of being locked to the main line 1.

【0033】このように仮吊下げした状態で図示されて
いないスタートスイッチをONにすると図1、図2に示
す吊下げ部7により本発明のロボットが本線1に本把持
されて吊下げられる。この吊下げ部7は図2に明示する
ように筐体17の長手方向両端に本線1を挟んで対向す
るように設置されており、その螺子軸7aに連結されて
いる直流モータ(図示されていない)が正・逆回転する
と本線1に対して前進・後退し、前進時に対向する吊下
げ部7により本線1を把持するようにしてある。また、
吊下げ部7の把持面はV字状にして把持された本線1が
抜けにくいようにしてある。
When the start switch (not shown) is turned on in the temporarily suspended state as described above, the robot of the present invention is fully gripped by the main line 1 and suspended by the suspension section 7 shown in FIGS. As shown in FIG. 2, the hanging portions 7 are installed at both ends in the longitudinal direction of the housing 17 so as to face each other with the main line 1 interposed therebetween, and a DC motor (shown in FIG. The main line 1 is moved forward and backward with respect to the main line 1 when the main line 1 is rotated forward and backward, and the main line 1 is gripped by the hanging portion 7 facing the main line 1 when the main line 1 is moved forward. Also,
The holding surface of the hanging portion 7 is V-shaped so that the gripped main line 1 is difficult to come off.

【0034】次に、本線1に本把持されたロボットは、
図2の移動台18に搭載されている皮剥ぎ機構9により
本線1の被覆層8を剥離(皮剥ぎ)する。この場合、移
動台18は図2(a)の皮剥位置まで移動する。
Next, the robot gripped by the main line 1
The covering layer 8 of the main line 1 is peeled (peeled) by the peeling mechanism 9 mounted on the moving table 18 in FIG. In this case, the moving table 18 moves to the peeling position in FIG.

【0035】皮剥ぎ機構9は図8に示すように被覆層8
の2箇所に切り切込み8a、8bを入れて輪切りし、両
切り込み8a、8b間に水平に切込み8c、8dを入れ
て、それら切切込み8a〜8dの内側の剥離部8eを半
割り状にして剥離するものである。
The peeling mechanism 9 includes a coating layer 8 as shown in FIG.
The cuts 8a and 8b are made in two places, and the cuts 8c and 8d are made horizontally between the cuts 8a and 8b, and the peeling portion 8e inside the cuts 8a to 8d is made into a half-shape. It peels off.

【0036】同皮剥ぎ機構9は具体的には図10に示す
刃物50を図9の様に本線1を挟んで二つ対向させてあ
る。この刃物50は回転中心軸51により開閉自在に連
結されている二つの刃物取付台52、53に、円形の1
/4の形状にした輪切刃54を二つづつ組合わせて内側
に湾曲する半円状になるように取付け、この輪切刃54
の間に直線状の水平刃55を二つ上下に組合わせて側面
形状が三角形になるように取付けてある。
In the skinning mechanism 9, two blades 50 shown in FIG. 10 are opposed to each other with the main line 1 interposed therebetween as shown in FIG. The blade 50 is attached to two blade mounts 52 and 53 that are openably and closably connected by a rotation center shaft 51.
/ 4-shaped ring cutting blades 54 are combined two by two and attached so as to form an inwardly curved semicircle.
Two straight horizontal blades 55 are vertically combined between them so that the side surface shape is triangular.

【0037】前記のように輪切刃54及び水平刃55が
取付けられた刃物50は図11に示す様に円板状の回転
ギア55の取付台56に本線1を挟んで対向するように
本線1の両側に取付けられ、刃物送りモータ57を回転
させると互いに噛合っているギア58、59、60を介
して送りネジ61が回転し、その回転に伴って二つの刃
物50が本線1側に前進して、輪切刃54が被覆層8に
食い込んで輪切りすると同時に水平刃55が被覆層8に
食い込んで水平に切る。刃物送りモータ57を逆回転さ
せるとギア58、59、60、送りネジ61が前記の場
合と逆回転し、輪切刃54、水平刃55が本線1から後
退して被覆層8から抜去されるようにしてある。なお、
図11に表示されていない左半分の送りネジは図示され
ている送りネジ61と逆ネジにしてある。
As shown in FIG. 11, the cutting tool 50 to which the wheel cutting blade 54 and the horizontal blade 55 are attached has a main line so as to face the mounting table 56 of the disc-shaped rotary gear 55 with the main line 1 interposed therebetween. When the blade feed motor 57 is rotated, the feed screw 61 is rotated via gears 58, 59 and 60 meshing with each other, and the two blades 50 are moved toward the main line 1 with the rotation. Moving forward, the cutting edge 54 cuts into the coating layer 8 and cuts, and at the same time, the horizontal blade 55 cuts into the coating layer 8 and cuts horizontally. When the blade feed motor 57 is rotated in the reverse direction, the gears 58, 59, 60 and the feed screw 61 rotate in the reverse direction as described above, and the wheel cutting blade 54 and the horizontal blade 55 are retracted from the main line 1 and are removed from the coating layer 8. It is like that. In addition,
The feed screw in the left half not shown in FIG. 11 is a reverse screw to the feed screw 61 shown.

【0038】前記刃物50は輪切刃54及び水平刃55
が被覆層8に食い込んだ状態で本線1の周方向に回転し
て、被覆層8の剥離部8e(図8)を内部導体10から
浮かせるようにしてある。
The blade 50 includes a wheel cutting blade 54 and a horizontal blade 55.
Is rotated in the circumferential direction of the main line 1 while being cut into the coating layer 8 so that the peeled portion 8e (FIG. 8) of the coating layer 8 is floated from the internal conductor 10.

【0039】このため図11、図12に示す様に、円板
状の回転ギア55と駆動ギア62とを噛合わせ、駆動ギ
ア62をモータにより回転させると回転ギア55が図1
2(a)(b)(c)(a)の順に回転すると共に回転
ギア55に取付けられている刃物50が回転して、輪切
刃54及び水平刃55が回転するようにしてある。
For this reason, as shown in FIGS. 11 and 12, when the disk-shaped rotary gear 55 is engaged with the drive gear 62 and the drive gear 62 is rotated by a motor, the rotary gear 55 is rotated as shown in FIG.
2 (a), (b), (c), and (a), the blade 50 attached to the rotating gear 55 rotates, and the wheel cutting blade 54 and the horizontal blade 55 rotate.

【0040】次に、前記刃物送りモータ57(図11)
を逆回転させて刃物50を後退させて輪切刃54及び水
平刃55を本線1の被覆層8から抜去する。この後退時
に図9(c)のように前記水平刃55を上下に開いて前
記の様に内部導体10から浮かした図8の剥離部8eが
図9(c)のように上下に開かれるようにする。
Next, the blade feed motor 57 (FIG. 11)
Is rotated in the reverse direction to retract the blade 50, and the wheel cutting blade 54 and the horizontal blade 55 are removed from the coating layer 8 of the main line 1. At the time of this retreat, the horizontal blade 55 is opened up and down as shown in FIG. 9 (c), and the peeling portion 8e of FIG. 8 floating from the inner conductor 10 as described above is opened up and down as shown in FIG. 9 (c). To

【0041】そのため図13、図14に示す様に、刃物
取付台52、53の外側面に後端面63がテーパに形成
されている開閉用爪64を上下に二つ取付け、その外側
にスプリング65で刃物50側に押出されている割込み
突子66を配置してある。これにより刃物50を本線1
より後退させたときに図14(d)のように二つの開閉
用爪64の間に前記割込み突子66が割り込んで、刃物
取付台52、53が上下に開くと同時に同刃物取付台5
2、53に取付けられている水平刃55が図14(d)
のように上下に開き、先に内部導体10から浮かせてあ
る剥離部8eを図9(c)のように上下に開いて二つ割
の状態で皮剥ぎし、本線1の内部導体10を図2(a)
のように外部に露出させることができるようにしてあ
る。
Therefore, as shown in FIGS. 13 and 14, two open / close claws 64 having a tapered rear end surface 63 are attached to the outer surfaces of the blade mounts 52, 53, and a spring 65 is attached to the outside thereof. , An interrupting projection 66 which is pushed out toward the blade 50 is arranged. As a result, the blade 50 is moved to the main line 1
As shown in FIG. 14D, when the blade is further retracted, the interrupting protrusion 66 is interrupted between the two opening / closing claws 64, and the blade mounts 52, 53 are opened up and down, and at the same time, the blade mount 5 is opened.
The horizontal blade 55 attached to 2, 53 is shown in FIG.
As shown in FIG. 9 (c), the peeled portion 8e which has been opened up and down and which has been floated from the inner conductor 10 is opened up and down as shown in FIG. 2 (a)
It can be exposed to the outside as shown in FIG.

【0042】前記開閉用爪64は図13のように後端面
63はテーパに形成されているが、前端面67は垂直に
形成され、割込み突子66の先端面68が刃物50の移
動方向手前側から先方に向けて(図13の右から左に向
けて)次第に刃物50側に突出するテーパに形成され、
同割込み突子66がスプリング65により刃物50側に
押出されているため、刃物50を図14(a)〜(c)
のように本線1側に前進させたとき、割込み突子66は
開閉用爪64により図14(e)〜(g)のように外側
に押し戻されて邪魔にならない。
The opening / closing pawl 64 has a tapered rear end face 63 as shown in FIG. 13, but a vertical front end face 67, and a front end face 68 of the interrupting projection 66 is located in front of the moving direction of the blade 50. From the side toward the front (from right to left in FIG. 13), a taper is formed that gradually projects toward the blade 50 side,
Since the interrupting projection 66 is pushed out toward the blade 50 by the spring 65, the blade 50 is moved to the position shown in FIGS.
As shown in FIGS. 14 (e) to 14 (g), when the main body 1 is moved forward, the interrupting projection 66 is pushed back outward by the opening / closing claw 64 as shown in FIGS.

【0043】次に、移動台18が図2(a)の皮剥位置
から同図(b)のブラッシング位置まで移動して、前記
のように皮剥ぎされて外部に露出した内部導体10の外
周面11を、移動台18に搭載されているブラッシング
機構12によりブラッシングされて、外周面11に付着
している被覆層8の残渣、酸化アルミ皮膜、錆、汚れ等
が除去される。本線1がOC電線の場合は外周面11に
設けられているセパレータも除去される。
Next, the moving table 18 moves from the peeling position in FIG. 2A to the brushing position in FIG. 2B, and the outer peripheral surface of the inner conductor 10 which is peeled and exposed to the outside as described above. The brush 11 is brushed by a brushing mechanism 12 mounted on a moving table 18 to remove residues of the coating layer 8 adhered to the outer peripheral surface 11, aluminum oxide film, rust, dirt, and the like. When the main line 1 is an OC electric wire, the separator provided on the outer peripheral surface 11 is also removed.

【0044】前記ブラッシング機構12は図15に示す
ように駆動輪71と従動輪72とにベルトサンダ73を
掛け、駆動輪17を駆動モータ74で回転させるとベル
トサンダ73が回転するようにした二本の回転やすり7
5を対向させて配置して、両回転やすり75の間に内部
導体10が入り込む広さの挿入部76を設け、しかも対
向する回転やすり75の下端側を互いに接近させて逆ハ
の字状にして、挿入部76に内部導体10を挿入し易く
すると共に、挿入された内部導体10の外周面11がベ
ルトサンダ73に確実に接触するようにしてある。
As shown in FIG. 15, the brushing mechanism 12 has a belt sander 73 mounted on a driving wheel 71 and a driven wheel 72, and the belt sander 73 is rotated when the driving wheel 17 is rotated by a driving motor 74. Book spinning file 7
5 are arranged so as to face each other, and an insertion portion 76 is provided between the two rotating files 75 so as to allow the internal conductor 10 to enter therein. Further, the lower ends of the opposed rotating files 75 are brought closer to each other to form an inverted C-shape. Thus, the inner conductor 10 is easily inserted into the insertion portion 76, and the outer peripheral surface 11 of the inserted inner conductor 10 is surely brought into contact with the belt sander 73.

【0045】前記挿入部4に内部導体10を挿入してベ
ルトサンダ73を回転させると同内部導体10の外周面
11がこすられる。このとき二本の回転やすり75が一
定の位置に固定されていると外周面11の一定の箇所し
かブラッシングできないので、同回転やすり75を内部
導体10の周方向に回転させて外周面11の全周がこす
られるようにする。
When the inner conductor 10 is inserted into the insertion portion 4 and the belt sander 73 is rotated, the outer peripheral surface 11 of the inner conductor 10 is rubbed. At this time, if the two rotating files 75 are fixed at a fixed position, only a fixed portion of the outer peripheral surface 11 can be brushed. Therefore, the rotating file 75 is rotated in the circumferential direction of the inner conductor 10 to completely cover the outer peripheral surface 11. Make sure your lap is rubbed.

【0046】このため二本の回転やすり75を図16に
示す様に円板状の回転ギア55(図11、図12の回転
ギア55と同じ回転ギア)の裏側(図11、図12の刃
物50が取付けられている面と反対面)に取付け、同回
転ギア55と噛合っている駆動ギア62をモータにより
回転させると回転ギア55が回転し、それに伴って同回
転ギア55に取付けられている回転やすり75が外周面
11の外周を回転するようにしてある。
For this reason, as shown in FIG. 16, two rotary files 75 are attached to the back side of the disk-shaped rotary gear 55 (the same rotary gear as the rotary gear 55 in FIGS. 11 and 12) (the blade shown in FIGS. 11 and 12). When the driving gear 62 meshing with the rotating gear 55 is rotated by a motor, the rotating gear 55 rotates, and the rotating gear 55 is attached to the rotating gear 55 accordingly. The rotating file 75 rotates around the outer periphery of the outer peripheral surface 11.

【0047】次に、図2の移動台18が図2(b)のブ
ラッシング位置から図2(c)の加圧位置まで移動し
て、図7(a)のように圧縮ダイス4にセットされてカ
ートリッジ15にセットされているスリーブ3をブラッ
シング済の内部導体10の真下まで移動する。
Next, the moving table 18 of FIG. 2 moves from the brushing position of FIG. 2B to the pressing position of FIG. 2C, and is set on the compression die 4 as shown in FIG. 7A. Then, the sleeve 3 set in the cartridge 15 is moved to a position directly below the brushed inner conductor 10.

【0048】その位置で圧縮ダイス4が昇降機構16に
より図7(b)の位置、即ち加圧機構13の横まで押し
上げられて、スリーブ3の本線挟着部33の間に内部導
体10が挿入する。そして図7のように移動台18のフ
レーム45に取付けられている加圧機構13により圧縮
ダイス4を加圧し、同圧縮ダイス4にセットされている
スリーブ3を押し潰して、に図17のよう内部導体10
をスリーブ3で挟着固定する。
At this position, the compression die 4 is pushed up by the elevating mechanism 16 to the position shown in FIG. 7B, that is, to the side of the pressurizing mechanism 13, and the internal conductor 10 is inserted between the main line clamping portions 33 of the sleeve 3. I do. Then, as shown in FIG. 7, the compression die 4 is pressed by the pressure mechanism 13 attached to the frame 45 of the movable base 18, and the sleeve 3 set on the compression die 4 is crushed, as shown in FIG. Internal conductor 10
Is fixed by a sleeve 3.

【0049】加圧機構13には例えば油圧シリンダ等が
使用される。その油圧シリンダは図7に示す様に移動台
18のフレーム45に取付けられ、そのロッド76は伸
ばすとカートリッジ15の通孔77内を貫通して圧縮ダ
イス4を加圧し、同圧縮ダイス4によりスリーブ3が押
潰されるようにしてある。このとき、図17のようにス
リーブ3の高圧引下線挟着部34も圧縮されて潰れ、同
高圧引下線挟着部34に仮保持されていた高圧引下線2
が挟着される。これにより本線1の内部導体10と高圧
引下線2とがスリーブ3を介して接続される。
For the pressure mechanism 13, for example, a hydraulic cylinder or the like is used. The hydraulic cylinder is mounted on the frame 45 of the moving base 18 as shown in FIG. 7, and when the rod 76 is extended, it penetrates through the through hole 77 of the cartridge 15 to press the compression die 4, and the sleeve is moved by the compression die 4. 3 is crushed. At this time, as shown in FIG. 17, the high-pressure underline sandwiching portion 34 of the sleeve 3 is also compressed and crushed, and the high-pressure underlining 2 temporarily held by the high-pressure underline sandwiching portion 34.
Is pinched. Thus, the internal conductor 10 of the main line 1 and the high-voltage underline 2 are connected via the sleeve 3.

【0050】前記圧縮ダイス4はロッド76を収縮する
と自動的に元の位置に復帰する。
The compression die 4 automatically returns to the original position when the rod 76 is contracted.

【0051】また、加圧機構13は前記カートリッジ1
5が昇降機構16により図7(c)の位置まで降下され
て、カートリッジ15に装填されているカバー5が内部
導体10を挟着固定したスリーブ3の外側に位置する
と、ロッド76が伸びてカートリッジ15の通孔78を
貫通してカバー5を加圧し、同スリーブ3の外側に押出
して図18の様にスリーブ3の外側に被せ、対向するカ
バー5同士を嵌合固定させるようにしてある。
The pressurizing mechanism 13 is provided for the cartridge 1.
7C is lowered by the lifting mechanism 16 to the position shown in FIG. 7C, and when the cover 5 mounted on the cartridge 15 is positioned outside the sleeve 3 with the internal conductor 10 clamped and fixed, the rod 76 extends to The cover 5 is pressurized through the 15 through holes 78 and is pushed out of the sleeve 3 so as to cover the outside of the sleeve 3 as shown in FIG. 18 so that the opposing covers 5 are fitted and fixed.

【0052】図1の80は筐体17の外側に取付けられ
た制御部であり、これは前記吊下げ具7、移動台10に
搭載されている皮剥ぎ機構11、ブラッシング機構1
2、加圧機構13、カートリッジ装填部14、昇降機構
16等の動作を電気的に制御するためのものである。
In FIG. 1, reference numeral 80 denotes a control unit attached to the outside of the housing 17, which includes the hanging device 7, the peeling mechanism 11 mounted on the moving table 10, and the brushing mechanism 1.
2, for electrically controlling the operations of the pressurizing mechanism 13, the cartridge loading section 14, the elevating mechanism 16, and the like.

【0053】[0053]

【発明の効果】本発明の高圧引下線工事用ロボットは次
のような効果がある。 .本線1と高圧引下線2とが自動的に接続されるので
大幅に省力化できる。 .省力化できた余剰人員を他の作業に回すことができ
るので、作業員を有効に活用できる。 .高圧活線の近くでの作業はロボットを本線に吊り下
げる作業だけであり、作業員の行う柱上作業が殆どなく
なるので、高所作業、高圧活線の近くでの作業に伴う危
険性が少なくなる。 .作業員の行う柱上作業が殆ど無いので、柱上作業す
る作業員の安全確保のために必要であった安全ネット、
低圧防護シート、高圧防護シート等を張ったり取外した
りする必要がなく、作業が簡易化され、また、それらの
ネット、シート等が不要になるのでコストも低減する。 .皮剥ぎ作業、ブラッシング作業、圧着作業等が機械
で自動的に行なわれるので、接続品質にバラツキがな
く、安定した接続部が得られる。
The high-voltage underline construction robot of the present invention has the following effects. . Since the main line 1 and the high-voltage underline 2 are automatically connected, the labor can be saved significantly. . Since the labor-saving surplus personnel can be transferred to other tasks, the workers can be used effectively. . The work near the high-voltage live line is only the work of hanging the robot on the main line, and there is almost no work on the pillars performed by the workers, so there is little danger associated with working at heights and near the high-voltage live line. Become. . Since there is almost no work on poles performed by workers, safety nets that were necessary to ensure the safety of workers working on poles,
There is no need to stretch or remove the low-pressure protection sheet, the high-pressure protection sheet, etc., which simplifies the operation and reduces the cost because those nets, sheets, etc. become unnecessary. . Since the peeling operation, the brushing operation, the crimping operation, and the like are automatically performed by a machine, the connection quality is stable and a stable connection portion can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の高圧引下線工事用ロボットの一例を示
す概略図。
FIG. 1 is a schematic view showing an example of a high-voltage underline construction robot according to the present invention.

【図2】(a)〜(c)は同ロボットの平面概略図であ
り、(a)は皮剥位置の平面概略図、(b)ブラッシン
グ位置の平面概略図、(c)は加圧位置の平面概略図。
2A to 2C are schematic plan views of the robot, FIG. 2A is a schematic plan view of a peeling position, FIG. 2B is a schematic plan view of a brushing position, and FIG. FIG.

【図3】(a)は同ロボットの正面概略図、(b)は同
ロボットの側面概略図。
3A is a schematic front view of the robot, and FIG. 3B is a schematic side view of the robot.

【図4】(a)は同ロボットにおける仮吊下げ具の不使
用時の説明図、(b)は同仮吊下げ具の本線への係止前
の説明図、(c)は同仮吊下げ具の本線への係止時の説
明図。
4 (a) is an explanatory view of the robot when the temporary suspending device is not used, FIG. 4 (b) is an explanatory diagram before the temporary suspending device is locked to the main line, and FIG. Explanatory drawing at the time of locking of a lowering tool to a main line.

【図5】(a)は同ロボットで使用されるスリーブに高
圧引下線を仮保持した状態の斜視図、(b)は(a)の
縦断側面図、(c)は(a)の正面図、(d)は同スリ
ーブの斜視図、(e)は同スリーブに高圧引下げ線を仮
保持した状態の側面図。
5A is a perspective view of a state in which a high-pressure underline is temporarily held on a sleeve used in the robot, FIG. 5B is a longitudinal side view of FIG. 5A, and FIG. 5C is a front view of FIG. (D) is a perspective view of the sleeve, and (e) is a side view of a state where the high-pressure pull-down line is temporarily held in the sleeve.

【図6】(a)は同ロボットにおけ圧縮ダイスの正面
図、(b)は同圧縮ダイスにスリーブを装着するときの
説明図、(c)は同圧縮ダイスにスリーブを装着した後
の説明図。
6 (a) is a front view of a compression die in the robot, FIG. 6 (b) is an explanatory diagram when a sleeve is mounted on the compression die, and FIG. 6 (c) is an explanatory diagram after a sleeve is mounted on the compression die. FIG.

【図7】(a)は同ロボットにおけカートリッジに圧縮
ダイス及びカバーを装填した状態の正面図、(b)は同
カートリッジを上昇した状態の正面図、(c)は同カー
トリッジを下げた状態の正面図。
7A is a front view showing a state in which a compression die and a cover are mounted on a cartridge in the robot, FIG. 7B is a front view showing a state where the cartridge is raised, and FIG. 7C is a state where the cartridge is lowered. FIG.

【図8】本発明の同ロボットによる皮剥ぎ説明図。FIG. 8 is an explanatory view of peeling by the robot of the present invention.

【図9】(a)〜(c)は同ロボットにおける皮剥ぎ説
明図であり、(a)は本線の被覆層への刃物の食込み前
の説明図、(b)は食込み時の説明図、(c)は被覆層
を分離する時の説明図。
9 (a) to 9 (c) are explanatory views of peeling of the robot in the same robot, FIG. 9 (a) is an explanatory view before cutting a blade into a coating layer of a main line, FIG. (C) Explanatory drawing at the time of separating a coating layer.

【図10】(a)は同ロボットにおける刃物の斜視図、
(b)は同刃物の側面図。
FIG. 10A is a perspective view of a blade in the robot,
(B) is a side view of the blade.

【図11】本発明の同ロボットにおける刃物の動作説明
図。
FIG. 11 is an explanatory view of the operation of a blade in the robot of the present invention.

【図12】(a)〜(c)は同ロボットにおける皮剥ぎ
時の刃物の回転状態を示す説明図であり、(a)は回転
前の説明図、(b)は90度回転した状態の説明図、
(c)は270度回転した状態の説明図。
12 (a) to 12 (c) are explanatory diagrams showing the rotating state of the blade when peeling the skin in the robot, FIG. 12 (a) is an explanatory diagram before rotation, and FIG. Explanatory diagram,
(C) is an explanatory view of a state rotated by 270 degrees.

【図13】本発明の同ロボットにおける刃物の斜視図。FIG. 13 is a perspective view of a blade in the robot of the present invention.

【図14】(a)(b)(c)は同ロボットにおける刃
物を本線側に前進させる場合の側面説明図、(e)は
(a)の(f)は(b)の(g)は(c)の部分平面
図、(d)は同刃物を本線から後退させる場合の側面説
明図、(h)は(d)の部分平面図。
14 (a), (b) and (c) are side views of the same robot when the blade is advanced to the main line side, (e) is (a), (f) is (b) and (g) is (C) is a partial plan view, (d) is a side view in the case of retreating the blade from the main line, and (h) is a partial plan view of (d).

【図15】本発明の同ロボットにおけるブラッシング機
構の斜視図。
FIG. 15 is a perspective view of a brushing mechanism in the robot of the present invention.

【図16】(a)〜(c)は同ロボットにおけるブラッ
シング機構の回転状態を示す説明図であり、(a)は回
転前の説明図、(b)は90度回した状態の説明図、
(c)は270度回転した状態の説明図。
16 (a) to 16 (c) are explanatory diagrams showing a rotating state of a brushing mechanism in the robot, FIG. 16 (a) is an explanatory diagram before rotation, FIG. 16 (b) is an explanatory diagram showing a state rotated by 90 degrees,
(C) is an explanatory view of a state rotated by 270 degrees.

【図17】同ロボットによりスリーブを圧縮して本線と
高圧引下線とを挟着した状態の正面図。
FIG. 17 is a front view of a state in which the sleeve is compressed by the robot to hold the main line and the high-pressure underline.

【図18】同ロボットによりスリーブの外側にカバーを
被せた状態の正面図。
FIG. 18 is a front view of a state where a cover is put on the outside of the sleeve by the robot.

【図19】本線と柱上変圧器を高圧引下線で接続した状
態の説明図。
FIG. 19 is an explanatory diagram of a state where a main line and a pole transformer are connected by a high-voltage underline.

【図20】本線と高圧引下線の従来の接続状態の説明
図。
FIG. 20 is an explanatory diagram of a conventional connection state between a main line and a high-voltage underline.

【符号の説明】[Explanation of symbols]

1 本線 2 高圧引下線 3 スリーブ 4 圧縮ダイス 5 カバー 6 カバー装填部 7 吊下げ部 8 被覆層 9 皮剥ぎ機構 10 内部導体 11 外周面 12 ブラッシング機構 13 加圧機構 14 カートリッジ装填部 15 カートリッジ 16 昇降機構 17 筐体 18 移動台 DESCRIPTION OF SYMBOLS 1 Main line 2 High-pressure underline 3 Sleeve 4 Compression die 5 Cover 6 Cover loading part 7 Hanging part 8 Coating layer 9 Peeling mechanism 10 Inner conductor 11 Outer peripheral surface 12 Brushing mechanism 13 Pressure mechanism 14 Cartridge loading part 15 Cartridge 16 Lifting mechanism 17 Housing 18 Moving table

───────────────────────────────────────────────────── フロントページの続き (73)特許権者 391011386 エフシーアイジャパン株式会社 東京都品川区南大井三丁目28番10号 (73)特許権者 000005186 株式会社フジクラ 東京都江東区木場1丁目5番1号 (73)特許権者 591265633 株式会社華陽電機工業所 東京都港区浜松町2丁目1番6号 (73)特許権者 000001890 三和テッキ株式会社 東京都品川区南品川6丁目5番19号 (72)発明者 伊藤 雅章 東京都千代田区内幸町1丁目1番3号 東京電力株式会社内 (72)発明者 海原 紀幸 東京都港区芝浦4丁目8番33号 株式会 社関電工内 (72)発明者 阿部 好秋 東京都千代田区丸の内2丁目6番1号 古河電気工業株式会社内 (72)発明者 小幡 智男 栃木県小山市西黒田87 三英社総合研究 所内 (72)発明者 田辺 彰 東京都港区高輪三丁目26番33号 日本バ ーンディ株式会社内 (72)発明者 町田 浩一 東京都江東区木場一丁目5番1号 藤倉 電線株式会社内 (72)発明者 若松 一美 千葉県佐倉市大作1丁目8番1号 株式 会社華陽電機工業所 佐倉工場内 (72)発明者 河西 耕二 山梨県中巨摩郡玉穂町中楯810番地 三 和テッキ株式会社 甲府工場内 (56)参考文献 特開 平3−164011(JP,A) 特開 平3−195313(JP,A) 実開 平3−86721(JP,U) (58)調査した分野(Int.Cl.7,DB名) H02G 1/02 B25J 15/08 H01R 4/00 H01R 43/048 ──────────────────────────────────────────────────続 き Continued on the front page (73) Patent holder 391011386 FCI Japan Co., Ltd. 3-28-10 Minamioi, Shinagawa-ku, Tokyo (73) Patent holder 000005186 Fujikura Co., Ltd. 1-5 Kiba, Koto-ku, Tokyo No. 1 (73) Patent holder 591265633 Huayo Electric Industrial Co., Ltd. 2-6-1 Hamamatsucho, Minato-ku, Tokyo (73) Patent holder 000001890 Sanwa Tekki Co., Ltd. 6-5-19 Minamishinagawa, Shinagawa-ku, Tokyo (72) Inventor Masaaki Ito 1-3-3 Uchisaiwai-cho, Chiyoda-ku, Tokyo Inside Tokyo Electric Power Company (72) Inventor Noriyuki Kaihara 4-33, Shibaura 4-chome, Minato-ku Tokyo ) Inventor Yoshiaki Abe 2-6-1 Marunouchi, Chiyoda-ku, Tokyo Inside Furukawa Electric Co., Ltd. (72) Inventor Tomoo Obata 87 Nishikuroda 87 Nishikuroda, Oyama City, Tochigi Prefecture Within the Research Institute (72) Inventor Akira Tanabe 3-26-33 Takanawa, Minato-ku, Tokyo Japan Bundy Corporation (72) Inventor Koichi Machida 1-5-1 Kiba, Koto-ku, Tokyo Fujikura Electric Wire Co., Ltd. (72) Inventor Kazumi Wakamatsu 1-8-1, Daisaku, Sakura City, Chiba Prefecture Inside Sakura Plant of Huayang Electric Industrial Co., Ltd. Inside the factory (56) References JP-A-3-164011 (JP, A) JP-A-3-195313 (JP, A) JP-A-3-86721 (JP, U) (58) Fields investigated (Int. . 7, DB name) H02G 1/02 B25J 15/08 H01R 4/00 H01R 43/048

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 架空配電されている本線1に接続される
高圧引下線2が仮保持されたスリーブ3をセットする圧
縮ダイス4と、同スリーブ3の外側に被せるカバー5を
装填するカバー装填部6と、本線1に吊下げる吊下げ部
7と、本線1の被覆層8を剥離する皮剥ぎ機構9と、皮
剥ぎにより露出した本線1の内部導体10の外周面をブ
ラッシングするブラッシング機構12と、圧縮ダイス4
を加圧することによりスリーブ3を圧縮して同スリーブ
3に内部導体10を挟着固定し、前記カバー5を加圧し
てスリーブ3の外側に被せる加圧機構13とを備えたこ
とを特徴とする高圧引下線工事用ロボット。
1. A compression die 4 for setting a sleeve 3 on which a high-voltage underline 2 connected to an overhead power distribution main line 1 is temporarily held, and a cover loading section for loading a cover 5 placed on the outside of the sleeve 3. 6, a hanging portion 7 suspended from the main line 1, a peeling mechanism 9 for peeling off the coating layer 8 of the main line 1, and a brushing mechanism 12 for brushing the outer peripheral surface of the inner conductor 10 of the main line 1 exposed by peeling. , Compression dies 4
A pressurizing mechanism 13 for compressing the sleeve 3 by pressurizing the inner conductor 10 to clamp and fix the inner conductor 10 to the sleeve 3, and pressurizing the cover 5 to cover the outer side of the sleeve 3. High pressure underline construction robot.
【請求項2】 請求項1の高圧引下線工事用ロボットに
カートリッジ装填部14を設け、同カートリッジ装填部
14に前記圧縮ダイス4、カバー5をセットできるカー
トリッジ15を装填取外し可能としたことを特徴とする
高圧引下線工事用ロボット。
2. The high-pressure underline construction robot according to claim 1, further comprising a cartridge loading section, wherein a cartridge in which the compression die and the cover can be set can be loaded into and removed from the cartridge loading section. High-voltage underline construction robot.
【請求項3】 請求項1のブラッシング機構12、圧縮
ダイス4、カバー5の夫々が前記内部導体10の位置ま
で移動可能であることを特徴とする高圧引下線工事用ロ
ボット。
3. The high-voltage underline construction robot according to claim 1, wherein each of the brushing mechanism, the compression die, and the cover is movable to a position of the internal conductor.
【請求項4】 請求項1のブラッシング機構12が前記
内部導体10の位置まで移動可能であり、前記圧縮ダイ
ス4及びカバー5が同内部導体10の位置まで移動可能
で且つ昇降機構16により加圧機構13の横まで昇降可
能であることを特徴とする高圧引下線工事用ロボット。
4. The brushing mechanism 12 according to claim 1 is movable to a position of said internal conductor 10, said compression die 4 and said cover 5 are movable to a position of said internal conductor 10 and pressurized by an elevating mechanism 16. A high-pressure underline construction robot, which can be moved up and down to the side of the mechanism 13.
【請求項5】 請求項1又は請求項3又は請求項4の高
圧引下線工事用ロボットが本線1に吊下げられる筐体1
7と、同筐体17内に本線1に沿って往復移動可能に設
けた移動台18とを備え、同移動台18に前記圧縮ダイ
ス4、カバー装填部6、皮剥ぎ機構11、ブラッシング
機構12、加圧機構13、カートリッジ装填部14、昇
降機構16が取付けられてなることを特徴とする高圧引
下線工事用ロボット。
5. A housing 1 in which the high-voltage underline construction robot according to claim 1, 3 or 4 is suspended from the main line 1.
7 and a moving table 18 provided in the same housing 17 so as to be able to reciprocate along the main line 1. The moving table 18 includes the compression die 4, the cover loading section 6, the peeling mechanism 11, and the brushing mechanism 12. , A pressure mechanism 13, a cartridge loading unit 14, and an elevating mechanism 16 are mounted.
JP35907591A 1991-12-26 1991-12-26 High pressure underline construction robot Expired - Fee Related JP3137398B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35907591A JP3137398B2 (en) 1991-12-26 1991-12-26 High pressure underline construction robot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35907591A JP3137398B2 (en) 1991-12-26 1991-12-26 High pressure underline construction robot

Publications (2)

Publication Number Publication Date
JPH05184023A JPH05184023A (en) 1993-07-23
JP3137398B2 true JP3137398B2 (en) 2001-02-19

Family

ID=18462612

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35907591A Expired - Fee Related JP3137398B2 (en) 1991-12-26 1991-12-26 High pressure underline construction robot

Country Status (1)

Country Link
JP (1) JP3137398B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4859122B2 (en) * 2006-10-26 2012-01-25 岳南建設株式会社 Cutting device for the jumper wire connection of the tension clamp
CN102698970A (en) * 2012-03-31 2012-10-03 上海市电力公司 Energized cleaning robot
CN109047082B (en) * 2018-07-20 2023-07-28 河北工业大学 Automatic inspection and cleaning device for ultra-high voltage four-split power line
CN114362065B (en) * 2021-12-07 2024-02-02 贵州电网有限责任公司 Portable power distribution network live-line drainage wire connecting robot and operation method thereof

Also Published As

Publication number Publication date
JPH05184023A (en) 1993-07-23

Similar Documents

Publication Publication Date Title
CN210500499U (en) Automatic feeding glue stripping machine
JPH07123326B2 (en) Wire sheath stripping device for wire connection robot
JP3137398B2 (en) High pressure underline construction robot
JPH05184033A (en) Cable cover stripper and robot for high-voltage pulling-down work using that device
JP3137399B2 (en) Elevating equipment such as compression dies for high pressure underline construction robots
JPH05184032A (en) Linear body brushing device and robot for high-voltage pulling-down line work using this device
JPH05184024A (en) Compressing dice of robot for high-voltage pulling-down work
CN116532582A (en) Secondary cable core wire straightening tool
JPH0686419A (en) Robotic technique for wire-connection processing and device thereof
CN211063236U (en) A fixed part for photovoltaic cable
CN111711123B (en) Rapid stripping device and method for cable testing outer sheath
CN209867550U (en) A epidermis cutting device for cylindricality battery
CN108975054B (en) Winding rubberizing machine
CN111347168A (en) Laser marking machine
CN215816626U (en) Building electrical design binding post latch device
CN214824392U (en) Automatic reinforcing steel bar bundling equipment
CN220628453U (en) Auxiliary crimping device for cable butt joint
CN219233829U (en) Cable shearing device for power engineering
CN220127420U (en) Hyperbolic aluminum veneer arc-pulling machine
CN220401072U (en) Multifunctional sheath penetrating equipment
CN218423229U (en) Plant material comminution device
CN213998932U (en) Flexible abrasive band machine for hardware processing
CN217443603U (en) High-reliability optical fiber composite overhead phase line
CN113305675B (en) Glass cutting edge rounding equipment
CN217291939U (en) Transmission grinding clamp

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees