JP3133043U - Protective net - Google Patents

Protective net Download PDF

Info

Publication number
JP3133043U
JP3133043U JP2007002679U JP2007002679U JP3133043U JP 3133043 U JP3133043 U JP 3133043U JP 2007002679 U JP2007002679 U JP 2007002679U JP 2007002679 U JP2007002679 U JP 2007002679U JP 3133043 U JP3133043 U JP 3133043U
Authority
JP
Japan
Prior art keywords
protective net
net
support frame
frame
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007002679U
Other languages
Japanese (ja)
Inventor
一俊 奥津
Original Assignee
株式会社Tsc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Tsc filed Critical 株式会社Tsc
Priority to JP2007002679U priority Critical patent/JP3133043U/en
Application granted granted Critical
Publication of JP3133043U publication Critical patent/JP3133043U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

【課題】 従来よりも軽量で持ち運びしやすい防護ネットの提供の提供。
【解決手段】折曲部2,3において折曲された「へ」の字形の左右1対の支柱4,5の間に、横架杆6〜9を横架したはしご形をなす支持枠13に対して、ネット14を張架してなる防護ネット。上記支柱4,5の上記起立脚部4’,5’の下端、および、上記伸縮杆11,12の先端は先鋭に形成されている。
【選択図】 図1
PROBLEM TO BE SOLVED: To provide a protective net that is lighter and easier to carry than before.
A support frame 13 having a ladder shape in which horizontal frames 6 to 9 are horizontally mounted between a pair of right and left support columns 4 and 5 bent in the bent portions 2 and 3. On the other hand, a protective net formed by stretching a net 14. The lower ends of the standing leg portions 4 ′ and 5 ′ of the columns 4 and 5 and the tips of the telescopic rods 11 and 12 are formed sharply.
[Selection] Figure 1

Description

本考案は、トンネル工事等において使用される防護ネットに関し、特に、作業員が切羽に接近して行う作業での切羽崩落事故等から作業員を保護するための防護ネット関する。   The present invention relates to a protective net used in tunnel construction or the like, and more particularly, to a protective net for protecting a worker from an accident of falling a face in an operation performed by a worker approaching the face.

トンネル掘削工事において、作業員が切羽に接近して行う必要のある作業としては、爆薬の装薬、支保工設置、補助工法における薬液注入作業等がある。
このような作業は、全体の作業時間のうち30〜50%程度の時間を占めるだけであるにもかかわらず、トンネル工事での全事故に占める切羽崩落事故の割合は非常に高くなっている。
In the tunnel excavation work, the work that the worker needs to perform near the face includes explosive charging, support construction, chemical injection work in the auxiliary method, and the like.
Although such work only occupies about 30 to 50% of the total work time, the ratio of the face collapse accident to the total accidents in tunnel construction is very high.

切羽崩落事故は、主として、切羽面(ほぼ鉛直からきつい傾斜面)の崩落と掘削支払面(天井面)からの崩落とに分けられるが、不安定な切羽面には、吹付コンクリートや補強ボルトなどの対策が施工されている場合が多いことや、重力作用の要因からすると、掘削支払面の崩落による事故が、切羽面の崩落による事故よりも多発していると思われる。   Face collapse accidents can be divided into two major types: the fall of the face (almost vertical and tightly inclined surface) and the fall of the excavation payment face (ceiling surface). Considering that there are many cases where the above countermeasures are implemented and due to the factors of gravity action, it seems that accidents caused by collapse of the excavation payment surface occur more frequently than accidents caused by collapse of the face of the face.

特に、支保工設置に関わる作業は、作業員が足下を注視して行うものであり、掘削支払面からの落下物に注意を払いにくい。
したがって、掘削支払面からの崩落(岩石の抜け落ちや土砂剥落)から、作業員を効果的に防護するための対策が重要である。
現況では、切羽監視員を配置することや、作業員にプロテクターを着用させること等により対策を講じているが、事故は突発的に発生するものであるし、プロテクターを着用しながらも負傷した事例もあるので、そのような対策では不十分である。
In particular, the work related to the support installation is performed by an operator paying attention to the feet, and it is difficult to pay attention to the falling objects from the excavation payment surface.
Therefore, it is important to take measures to effectively protect workers against collapse from the excavation payment surface (rock fallout and sediment removal).
At present, measures are taken by arranging face guards and having workers wear protectors, but accidents occur suddenly, and injuries occurred while wearing protectors. Therefore, such measures are not sufficient.

落下物からの作業員を保護するための作業員保護板としては、特許文献1に記載されたものが既に公知である。
この作業員保護板は、断面波形のFRP製板体を隆起湾曲させてなるもので、作業員は、トンネル壁面にこの作業員保護板を立て掛け、その下方に形成される作業空間にて安全に作業を行うことができる。
As a worker protection plate for protecting a worker from falling objects, the one described in Patent Document 1 is already known.
This worker protection plate is formed by raising and bending an FRP plate body having a corrugated cross section, and the worker stands up against the tunnel wall surface and safely in the work space formed below the worker protection plate. Work can be done.

特公昭52−5922Shoko 52-5922

しかし、上記作業員保護板は、その持ち運びをし易くするためにできる限り軽量化を図ることが好ましい。   However, it is preferable to reduce the weight of the worker protection plate as much as possible in order to facilitate carrying.

そこで、本考案は、崩落物から作業員を防護できる十分な強度をもちつつ、従来よりも軽量で持ち運びしやすい防護ネットの提供を課題とする。   Accordingly, an object of the present invention is to provide a protective net that is lighter and easier to carry than conventional ones, while having sufficient strength to protect workers from falling objects.

請求項1記載の本考案は、はしご形をなす支持枠13にネット14を張架してなる防護ネットである。   The present invention according to claim 1 is a protective net in which a net 14 is stretched around a support frame 13 having a ladder shape.

請求項2記載の本考案は、上記支持枠13が、左右1対の支柱4,5の間に、横架杆6〜9を横架してなる請求項1記載の防護ネットである。   The present invention according to claim 2 is the protective net according to claim 1, wherein the support frame 13 is formed by horizontally placing horizontal supports 6 to 9 between a pair of left and right columns 4 and 5.

請求項3記載の本考案は、上記支柱4,5を、起立脚部4’,5’と、これと折曲部2,3を介して連続する頭部4”,5”とにより「へ」の字形をなすものとし、支持枠13の側面形状を「へ」の字形とした請求項2記載の防護ネットである。   According to the third aspect of the present invention, the struts 4 and 5 are connected to the upright legs 4 'and 5' and the heads 4 "and 5" connected to the upright legs 4 'and 5' through the bent parts 2 and 3, respectively. The protection net according to claim 2, wherein the side surface of the support frame 13 is a “he” shape.

請求項4記載の本考案は、上記各支柱4,5の上記頭部4”,5”に伸縮杆11,12を、その突出長さを個別に設定し固定できるよう嵌挿してなる請求項3記載の防護ネットである。   The present invention according to claim 4 is formed by inserting telescopic rods 11 and 12 into the heads 4 "and 5" of the respective columns 4 and 5 so that the protruding lengths can be individually set and fixed. 3 is a protective net.

請求項5記載の本考案は、上記支柱4,5の上記起立脚部4’,5’の下端、および、上記伸縮杆11,12の先端が先鋭に形成されている請求項4記載の防護ネットである。   The invention according to claim 5 is the protection according to claim 4, wherein the lower ends of the standing legs 4 'and 5' of the support columns 4 and 5 and the tips of the telescopic rods 11 and 12 are formed sharply. The net.

請求項6記載の本考案は、上記ネット14が上記支持枠13に対し、その支持枠の側縁部において止着されている請求項1,2,3,4または5記載の防護ネットである。   The present invention according to claim 6 is the protective net according to claim 1, 2, 3, 4 or 5, wherein the net 14 is fixed to the support frame 13 at a side edge portion of the support frame. .

請求項7記載の本考案は、上記ネット14の止着が縫合により行われている請求項6記載の防護ネットである。   The present invention according to claim 7 is the protective net according to claim 6, wherein the net 14 is fixed by sewing.

請求項8記載の本考案は、上記ネット14の止着が支持枠13に固定された受け枠16とこれに嵌合するネット押さえ枠17との間に上記ネット14を挟んで行われている請求項6記載の防護ネットである。   In the present invention according to claim 8, the net 14 is fixed by sandwiching the net 14 between a receiving frame 16 fixed to the support frame 13 and a net pressing frame 17 fitted thereto. A protection net according to claim 6.

請求項9記載の本考案は、両端を上記支柱4,5の頭部4”,5”と起立脚部4’,5’とに固定することにより、上記折曲部2,3を跨架して配設された折曲部補強杆19,20を備えた請求項3,4,5,6,7または8記載の防護ネットである。   In the present invention according to claim 9, the bent portions 2 and 3 are straddled by fixing both ends to the heads 4 "and 5" of the support columns 4 and 5 and the standing leg portions 4 'and 5'. The protective net according to claim 3, 4, 5, 6, 7 or 8, further comprising bent portion reinforcing rods 19 and 20 arranged in the above-described manner.

請求項10記載の本考案は、両端を上記横架杆9と起立脚部4’,5’とに固定した脚部補強杆21,22を備えた請求項2,3,4,5,6,7,8または9記載の防護ネットである。   The present invention according to claim 10 is provided with leg reinforcement rods 21 and 22 fixed at both ends to the horizontal rod 9 and the standing leg portions 4 'and 5', respectively. , 7, 8 or 9.

請求項11記載の本考案は、上記ネット14が高密度ポリエチレン製である請求項1,2,3,4,5,6,7,8,9または10記載の防護ネットである。   The present invention according to claim 11 is the protective net according to claim 1, 2, 3, 4, 5, 6, 7, 8, 9 or 10, wherein the net 14 is made of high-density polyethylene.

本考案防護ネットは、崩落物から作業員を防護できる十分な強度をもちつつ、従来よりも軽量で持ち運びしやすいもので、これにより事故の根絶を図ることができる。   The protective net of the present invention has sufficient strength to protect workers from collapsed objects, and is lighter and easier to carry than conventional ones, thereby eradicating accidents.

以下、本考案を実施例により説明するが、本考案はこれに限られない。   Hereinafter, although an example explains the present invention, the present invention is not restricted to this.

本考案防護ネット1は、長さ2.7m、径20mmの鋼製パイプをその途中の折曲部2,3において折曲した「へ」の字形をなす左右1対の支柱4,5の間に、径20mmの鋼製パイプ製の4本の横架杆6〜9を間隔をおいて横架し溶接固定した枠本体10の、上記支柱4,5の先端の開口に伸縮杆11,12を挿嵌した、側面形状を「へ」の字形としたはしご形をなす支持枠13と、この支持枠13の外面に張架された10mm目の高密度ポリエチレン製ネット14とから構成されるものである。
この防護ネット1の全幅aは約0.8m、全高bは約2mで、上記横架杆6〜9の間隔cは約0.6mである。
上記枠本体10の支柱4,5は、上記折曲部2,3において約30°〜45°程度折曲されており、折曲部2,3から下端側の部分(起立脚部)4’,5’(約2.1m)と、これに折曲部2,3を介して連続する先端側の部分(頭部)4”,5”(約60cm)とにより「へ」の字形をなしているものである。
なお、支柱4,5および横架杆6〜9の径を変更することや、上記横架杆6〜9の本数を適宜増減することができる。
The protection net 1 according to the present invention is a steel pipe having a length of 2.7 m and a diameter of 20 mm. Further, telescopic rods 11 and 12 are opened at the ends of the support columns 4 and 5 of the frame body 10 in which four horizontal rods 6 to 9 made of steel pipe having a diameter of 20 mm are horizontally mounted and fixed at intervals. And a support frame 13 having a ladder shape with a side shape of “he” and a 10 mm high-density polyethylene net 14 stretched on the outer surface of the support frame 13. It is.
The total width a of the protective net 1 is about 0.8 m, the total height b is about 2 m, and the distance c between the horizontal rods 6 to 9 is about 0.6 m.
The support columns 4 and 5 of the frame body 10 are bent at about 30 ° to 45 ° at the bent portions 2 and 3, and a lower end side portion (standing leg portion) 4 ′ from the bent portions 2 and 3. , 5 '(approx. 2.1m) and the tip side part (head) 4 ", 5" (approx. 60cm) continuous through the bent parts 2 and 3 form a "he" shape. It is what.
In addition, the diameter of the support | pillars 4 and 5 and the horizontal racks 6-9 can be changed, and the number of the said horizontal racks 6-9 can be increased / decreased suitably.

上記伸縮杆11,12は、支柱4,5の頭部4”,5”の側面に50mm間隔で列設開口した複数のピン孔15のうち任意のものにピン15’を挿通することによって、該支柱4,5の頭部4”,5”の先端からの突出長さを30cm程度までの範囲で個別に設定して固定することができるようになっている(図3)。
したがって、両伸縮杆11,12の突出長さは、同一に設定することも、また、違えて設定すること(図1,2)も可能になっている。
上記伸縮杆11,12の先端および支柱4,5の下端は先鋭に形成されている。
The telescopic rods 11 and 12 are inserted by inserting pins 15 'into any one of a plurality of pin holes 15 arranged and opened at intervals of 50 mm on the side surfaces of the heads 4 "and 5" of the columns 4 and 5, The protruding lengths from the tips of the heads 4 ″ and 5 ″ of the columns 4 and 5 can be individually set and fixed within a range up to about 30 cm (FIG. 3).
Therefore, the protruding lengths of the two telescopic rods 11 and 12 can be set to be the same or different (FIGS. 1 and 2).
The tips of the telescopic rods 11 and 12 and the lower ends of the columns 4 and 5 are formed sharply.

上記ネット14は、支持枠13の最も上側の横架杆6から最も下側の横架杆9までの範囲をカバーするよう、該支持枠13の外面から被覆され、その左右両縁を支持枠13の側縁部において支柱4,5に巻回して縫合するとともに、上下両縁を上記横架杆6および9巻回して縫合することにより止着されている(図4)。なお、ネット14の縁部は溶着や結束により止着してもよい(図示していない)。
また、図5に示すように支持枠13側にネット14を止着するための受け枠16を固定しておき、これに嵌合するネット押さえ枠17の係合片18を、上記ネット14を挟んで上記受け枠16に嵌合させることにより止着することも可能である。
The net 14 is covered from the outer surface of the support frame 13 so as to cover a range from the uppermost horizontal frame 6 to the lowermost horizontal frame 9 of the support frame 13, and both left and right edges thereof are supported by the support frame. The side edges of 13 are wound around the support posts 4 and 5 and are sewn, and the upper and lower edges are secured by winding and suturing the above horizontal saddles 6 and 9 (FIG. 4). The edge of the net 14 may be fixed by welding or binding (not shown).
Further, as shown in FIG. 5, a receiving frame 16 for fixing the net 14 is fixed to the support frame 13 side, and the engaging piece 18 of the net presser frame 17 fitted to this is attached to the net 14. It is also possible to fix it by inserting it into the receiving frame 16 with the pinch in between.

このネット14は高密度ポリエチレン製であるので、衝撃荷重に強く、比較的安価で、また、張り替えが簡単である。   Since the net 14 is made of high-density polyethylene, it is strong against impact load, is relatively inexpensive, and can be easily replaced.

19は、その両端を上記支柱4の頭部4”,5”と起立脚部4’,5’とに溶接固定することにより上記折曲部2を跨架して配設され、その折曲部2を補強し、該支柱4が撓まないよう補強する折曲部補強杆、20は、その両端を上記支柱5の頭部4”,5”と起立脚部4’,5’とに溶接固定することにより上記折曲部3を跨架して配設され、その折曲部3を補強し、該支柱4が撓まないよう補強する折曲部補強杆である。
21,22は、その両端を、最も下側の上記横架杆9の中央と支柱4,5の起立脚部4’,5’とに溶接固定した脚部補強杆である。
19 is disposed across the bent portion 2 by welding and fixing the both ends thereof to the heads 4 ″, 5 ″ of the column 4 and the standing leg portions 4 ′, 5 ′. A bent portion reinforcing rod 20 that reinforces the portion 2 and reinforces the support column 4 so as not to bend, and has both ends thereof connected to the head portions 4 ″, 5 ″ of the support column 5 and the standing leg portions 4 ′, 5 ′. It is a bending portion reinforcing rod which is arranged so as to straddle the bending portion 3 by welding and fixing, reinforces the bending portion 3 and reinforces the support column 4 so as not to bend.
21 and 22 are leg reinforcement rods whose ends are welded and fixed to the center of the lowermost horizontal rod 9 and the standing leg portions 4 'and 5' of the columns 4 and 5, respectively.

上記のようにしてなる防護ネット1は、その支柱4,5の起立脚部4’,5’の下端を、所要の場所に接地させ、支柱4,5の頭部4”,5”の先端の伸縮杆11,12を壁面等に接するよう立て掛けて設置することで、その内側に、土砂や岩石等の崩落物より作業員を防護し、かつ、その中で所要の作業を行うことができる作業スペース23を形成することができる。   The protective net 1 constructed as described above is such that the lower ends of the standing legs 4 ′ and 5 ′ of the columns 4 and 5 are grounded to a required place, and the tips of the heads 4 ″ and 5 ″ of the columns 4 and 5 are connected. By installing the expansion rods 11 and 12 so as to be in contact with the wall surface, it is possible to protect workers from collapsed objects such as earth and sand, and to perform necessary work in the inside. A work space 23 can be formed.

その設置は、先鋭になっている上記脚部の先端、および、上記伸縮杆11,12の先端を、地面および壁面に突き刺して安定性を確保し、崩落物の荷重により設置位置がずれたり、倒れたりしないように行う。
また、壁面に凹凸がある場合、あるいは、設置箇所の壁面の一側のみが吹付けコンクリート面で壁面に段差が生じているような場合、両伸縮杆11,12をそれぞれ長さ調整したうえで設置する。
The installation of the leg portion, which is sharp, and the tips of the telescopic rods 11 and 12 are inserted into the ground and the wall surface to ensure stability, and the installation position shifts due to the load of collapsed objects, Do not fall down.
Also, if the wall surface is uneven, or if only one side of the wall of the installation location is a shotcrete surface and there is a step on the wall surface, adjust the length of both telescopic rods 11 and 12 respectively. Install.

上記の作業スペース23は、作業員が立ち作業可能な高さ(2m程度)と、スコップを水平に構えるのに支障をきたさない奥行き(1.5m程度)が確保され、また、1人の作業員を防護できる幅(0.8m)を有するので、この中で、スコップによる床均し作業、皿板の敷設、鋼製支保工の設置と固定等の作業を安全に行えるようになっている。   The work space 23 has a height (about 2 m) at which an operator can stand and work, and a depth (about 1.5 m) that does not hinder the horizontal positioning of the scoop. Since it has a width (0.8m) that can protect the staff, it is possible to safely perform work such as leveling with a scoop, laying a plate, and installing and fixing a steel support. .

また、上記従来の作業員保護板は、その作業空間内で作業する作業員にとって上方の切羽の状態を視認しづらいという問題があったが、本考案防護ネットによれば、その作業スペース23で作業する者は、ネット14を通じて上方の壁面や切羽の状態を目視確認することもできるので作業を安全に行える。   In addition, the conventional worker protection plate has a problem that it is difficult for a worker working in the work space to visually recognize the state of the upper face. Since the worker can also visually confirm the state of the upper wall surface and the face through the net 14, the worker can work safely.

想定される崩落物は、土砂トンネルでは土塊や土砂、岩山トンネルでは岩塊であるが、支保工設置作業前に不安定な状況を取り去るコソク作業を行うことや、過去の事故例、また、支保工設置箇所の位置等から判断すると、その重量は、土砂であれば10〜200kg程度、岩塊であれば100〜200kg程度であると考えられる。
したがって、この防護ネット1の強度は、200kgの土砂や岩石が1m(トンネル内の作業において想定される、防護ネット1とその直上の掘削支払面との距離)自由落下した場合に、仮に防護ネット1が損傷しても作業員を負傷させない程度に設定している。その強度は、支柱4,5の径、あるいは、横架杆の径や本数を変更することで調整できる。
また、この防護ネット1は、はしご形の支持枠13とネット14とからなり、鋼板等を使用していないので、重量は30kgに満たず、作業員1人で簡単に移動や設置ができるものである。
The assumed collapsed objects are mud and mud in the earth and sand tunnel, and rock in the rocky mountain tunnel. Judging from the position of the construction site, the weight is considered to be about 10 to 200 kg for earth and sand and about 100 to 200 kg for rocks.
Therefore, the strength of the protective net 1 is such that when 200 kg of earth and sand or rock falls free of 1 m (distance between the protective net 1 and the excavation payment surface directly above it, assumed in the work in the tunnel), the protective net It is set to such an extent that even if 1 is damaged, workers are not injured. The strength can be adjusted by changing the diameter of the columns 4 and 5 or the diameter and number of the horizontal rods.
The protective net 1 is composed of a ladder-shaped support frame 13 and a net 14 and does not use steel plates, so the weight is less than 30 kg and can be easily moved and installed by one worker. It is.

以下、本考案防護ネット1を使用したトンネル工事における作業の手順の1例を示す。   Hereinafter, an example of a work procedure in tunnel construction using the protective net 1 of the present invention will be shown.

(1)トンネル31の掘削、ズリ出し、コソク作業完了後、切羽点検員が、切羽32の状況を点検し職長に報告する。
(2)切羽32の安定を確認後、切羽点検員と切羽監視員のダブルチェックによる監視の下、支保工設置箇所の床均しを行う箇所に、上記安全防護ネット1を設置する(図6左半部および図7)。
(3)作業員は、設置した防護ネット1内で、位置や高さの確認、床均し等の作業を行う。
(4)作業終了後、防護ネットを撤収する(同図右半部)。
(5)ジャンボで鋼製支保工を所定位置に設置する。その際、支保工設置箇所に再度、防護ネット1を設置し、その中で作業員による必要な作業を行う。
(1) After excavation, slipping, and sawing of the tunnel 31, the face inspector checks the situation of the face 32 and reports it to the foreman.
(2) After confirming the stability of the face 32, the safety protection net 1 is installed at a place where the floor leveling of the support installation place is performed under the double check of the face inspector and face monitor (see FIG. 6). Left half and FIG. 7).
(3) The worker performs operations such as checking the position and height, leveling the floor, etc. in the installed protective net 1.
(4) After the work is completed, remove the protective net (right half of the figure).
(5) Install a steel support in place with jumbo. At that time, the protective net 1 is again installed at the support installation location, and necessary work is performed by the workers therein.

本考案の実施例に係る防護ネットの斜視図である。1 is a perspective view of a protective net according to an embodiment of the present invention. 上記防護ネットの正面図である。It is a front view of the said protection net. 上記防護ネットの支持枠の伸縮杆を示す部分拡大図である。It is the elements on larger scale which show the expansion-and-contraction hook of the support frame of the said protection net. 上記支持枠の側縁部におけるネットの止着状態を示す部分拡大図である。It is the elements on larger scale which show the fixation state of the net | network in the side edge part of the said support frame. ネットの他の止着方法を示す部分拡大図である。It is the elements on larger scale which show the other fastening method of a net | network. 上記防護ネットを使用して作業を行っている状況を示すトンネルの横断面図である。It is a cross-sectional view of a tunnel showing a situation where work is performed using the protective net. 同上の縦断面図である。It is a longitudinal cross-sectional view same as the above.

符号の説明Explanation of symbols

1 防護ネット
2,3 折曲部
4,5 支柱
4’,5’ 起立脚部
4”,5” 頭部
6〜9 横架杆
10 枠本体
11,12 伸縮杆
13 支持枠
14 ネット
15 ピン孔
15’ ピン
16 受け枠
17 ネット押さえ枠
18 係合片
19,20 折曲部補強杆
21,22 脚部補強杆
23 作業スペース
DESCRIPTION OF SYMBOLS 1 Protective net | network 2, 3 Bending part 4, 5 Support | pillar 4 ', 5' Standing leg part 4 ", 5" Head 6-9 Horizontal gutter 10 Frame main body 11, 12 Telescopic gutter 13 Support frame 14 Net 15 Pin hole 15 'pin 16 receiving frame 17 net holding frame 18 engaging pieces 19, 20 bent portion reinforcing rods 21, 22 leg portion reinforcing rods 23 working space

Claims (11)

はしご形をなす支持枠(13)にネット(14)を張架してなることを特徴とする防護ネット。   A protective net comprising a net (14) stretched over a ladder-shaped support frame (13). 上記支持枠(13)が、左右1対の支柱(4,5)の間に、横架杆(6〜9)を横架してなることを特徴とする請求項1記載の防護ネット。   The protective net according to claim 1, wherein the support frame (13) is formed by horizontally placing a horizontal rack (6-9) between a pair of left and right support columns (4, 5). 上記支柱(4,5)を、起立脚部(4’,5’)と、これと折曲部(2,3)を介して連続する頭部(4”,5”)とにより「へ」の字形をなすものとし、支持枠(13)の側面形状を「へ」の字形としたことを特徴とする請求項2記載の防護ネット。   The above strut (4, 5) is “fed” by the standing leg (4 ′, 5 ′) and the head (4 ″, 5 ″) continuous through the bent portion (2, 3). The protective net according to claim 2, characterized in that the shape of the protection frame (13) is a lateral shape of the support frame (13). 上記各支柱(4,5)の上記頭部(4”,5”)に、伸縮杆(11,12)を、その突出長さを個別に設定し固定できるよう嵌挿してなることを特徴とする請求項3記載の防護ネット。   The telescopic hooks (11, 12) are inserted into the heads (4 ″, 5 ″) of the support columns (4, 5) so that the protruding lengths can be individually set and fixed. The protective net according to claim 3. 上記支柱(4,5)の上記起立脚部(4’,5’)の下端、および、上記伸縮杆(11,12)の先端が先鋭に形成されていることを特徴とする請求項4記載の防護ネット。   The lower end of the standing leg (4 ', 5') of the column (4, 5) and the tip of the telescopic rod (11, 12) are formed sharply. Protective net. 上記ネット(14)が上記支持枠(13)に対し、その支持枠の側縁部において止着されていることを特徴とする請求項1,2,3,4または5記載の防護ネット。   6. The protective net according to claim 1, 2, 3, 4 or 5, wherein the net (14) is fixed to the support frame (13) at a side edge of the support frame. 上記ネット(14)の止着が縫合により行われていることを特徴とする請求項6記載の防護ネット。   7. The protective net according to claim 6, wherein the net (14) is secured by sewing. 上記ネット(14)の止着が支持枠(13)に固定された受け枠(16)とこれに嵌合するネット押さえ枠(17)との間に上記ネット(14)を挟んで行われていることを特徴とする請求項6記載の防護ネット。   The net (14) is fixed by sandwiching the net (14) between a receiving frame (16) fixed to the support frame (13) and a net pressing frame (17) fitted to the receiving frame (16). The protective net according to claim 6, wherein: 両端を上記支柱(4,5)の上記頭部(4”,5”)と上記起立脚部(4’,5’)とに固定することにより、上記折曲部(2,3)を跨架して配設された折曲部補強杆(19,20)を備えたことを特徴とする請求項3,4,5,6,7または8記載の防護ネット。   By fixing both ends to the head (4 ″, 5 ″) and the standing leg (4 ′, 5 ′) of the column (4, 5), the bent portion (2, 3) is straddled. The protective net according to claim 3, 4, 5, 6, 7 or 8, further comprising a bent portion reinforcing rod (19, 20) arranged in a bridge. 両端を上記横架杆(9)と上記起立脚部(4’,5’)とに固定した脚部補強杆(21,22)を備えたことを特徴とする請求項2,3,4,5,6,7,8または9記載の防護ネット。   A leg reinforcing rod (21, 22) having both ends fixed to the horizontal rod (9) and the standing leg (4 ', 5') is provided. The protective net according to 5, 6, 7, 8 or 9. 上記ネット(14)が高密度ポリエチレン製であることを特徴とする請求項1,2,3,4,5,6,7,8,9または10記載の防護ネット。   11. A protective net according to claim 1, 2, 3, 4, 5, 6, 7, 8, 9 or 10, wherein the net (14) is made of high-density polyethylene.
JP2007002679U 2007-04-16 2007-04-16 Protective net Expired - Fee Related JP3133043U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007002679U JP3133043U (en) 2007-04-16 2007-04-16 Protective net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007002679U JP3133043U (en) 2007-04-16 2007-04-16 Protective net

Publications (1)

Publication Number Publication Date
JP3133043U true JP3133043U (en) 2007-06-28

Family

ID=43283745

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007002679U Expired - Fee Related JP3133043U (en) 2007-04-16 2007-04-16 Protective net

Country Status (1)

Country Link
JP (1) JP3133043U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018104942A (en) * 2016-12-26 2018-07-05 株式会社ノセ技研 Enclosure device for tunnel wall surface construction and temporary enclosure method for construction site of tunnel wall surface
CN111911208A (en) * 2020-07-16 2020-11-10 西安科技大学 Gantry type multi-drilling machine parallel drilling and anchoring robot
JP7366834B2 (en) 2020-04-21 2023-10-23 鹿島建設株式会社 Safety equipment for tunnel construction and tunnel construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018104942A (en) * 2016-12-26 2018-07-05 株式会社ノセ技研 Enclosure device for tunnel wall surface construction and temporary enclosure method for construction site of tunnel wall surface
JP7366834B2 (en) 2020-04-21 2023-10-23 鹿島建設株式会社 Safety equipment for tunnel construction and tunnel construction method
CN111911208A (en) * 2020-07-16 2020-11-10 西安科技大学 Gantry type multi-drilling machine parallel drilling and anchoring robot
CN111911208B (en) * 2020-07-16 2022-03-11 西安科技大学 Gantry type multi-drilling machine parallel drilling and anchoring robot

Similar Documents

Publication Publication Date Title
US20150209954A1 (en) Auger rack with vertical securement means for suspended storage, use and/or transport of augers or drill bits
CN101341306B (en) Safety system for buildings
JP3133043U (en) Protective net
CN103758543A (en) Temporary advanced support device
CN107190997A (en) A kind of steel construction high-rise working safety belt safety rope branch hang device
JP6125158B2 (en) Falling object protection device and method for reinforcing the same
JP6114537B2 (en) Rockfall protection device and rockfall protection method
CN206233531U (en) Door-type scaffold and the attachment means for the door-type scaffold
JP3143816U (en) Rock fall protection net structure
JP5490670B2 (en) Rock fall protection net structure
CN215252938U (en) Mine resumes to administer with rockfall protector
JP6268698B2 (en) Protective body and its construction method
JP4613245B1 (en) Protective fence
KR100808291B1 (en) A safety device for pierces
JP5306530B1 (en) Protective fence reinforcement structure
CN211036969U (en) Guide device for reinforcement cage of bored pile
KR20130054056A (en) The construction method of wind power generation the upper part construction composing four leg
JP7366834B2 (en) Safety equipment for tunnel construction and tunnel construction method
CN214005462U (en) Rib arch type overbridge dismantling system
JP6444725B2 (en) Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope
JP2015140575A (en) Reinforcement method for rockfall prevention fence and rockfall prevention fence
CN105350980B (en) A kind of mine crushes region laneway support method
JP2009084864A (en) Rock fall-cum-avalanche prevention facility
JP4117238B2 (en) Work scaffold
CN209457954U (en) Headwork temporary protection device

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R323113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R323113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100606

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees