JP3065560B2 - Pin connection device for construction machinery - Google Patents

Pin connection device for construction machinery

Info

Publication number
JP3065560B2
JP3065560B2 JP12697397A JP12697397A JP3065560B2 JP 3065560 B2 JP3065560 B2 JP 3065560B2 JP 12697397 A JP12697397 A JP 12697397A JP 12697397 A JP12697397 A JP 12697397A JP 3065560 B2 JP3065560 B2 JP 3065560B2
Authority
JP
Japan
Prior art keywords
pin
boom
hole
diameter
inner boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12697397A
Other languages
Japanese (ja)
Other versions
JPH10316367A (en
Inventor
章弘 名倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SHI Construction Machinery Co Ltd
Original Assignee
Sumitomo SHI Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SHI Construction Machinery Co Ltd filed Critical Sumitomo SHI Construction Machinery Co Ltd
Priority to JP12697397A priority Critical patent/JP3065560B2/en
Publication of JPH10316367A publication Critical patent/JPH10316367A/en
Application granted granted Critical
Publication of JP3065560B2 publication Critical patent/JP3065560B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は建設機械のピン結合
装置に関するものであり、特に、アウターブームとイン
ナーブームとを固定するピン結合装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pin connecting device for a construction machine, and more particularly to a pin connecting device for fixing an outer boom and an inner boom.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】図6は
建設機械の一例として一般的な走行クレーン1を示し、
台車2にクレーン部3が載置されている。クレーン部3
に装着されているブーム4は、アウターブーム5とイン
ナーブーム6a,6b,6c…とからなり、アウターブ
ーム5からインナーブーム6a,6b,6c…を繰り出
し若しくは繰り入れて、ブーム4の全長を伸縮するよう
に形成されている。ここで、ブーム4を伸長した状態で
は、吊り荷重による伸縮シリンダの破損を防止するため
に、アウターブーム5とインナーブーム6aとをピン結
合する場合がある。
2. Description of the Related Art FIG. 6 shows a general traveling crane 1 as an example of a construction machine.
A crane unit 3 is mounted on the carriage 2. Crane part 3
The outer boom 5 and the inner booms 6a, 6b, 6c... Are extended or retracted from the outer boom 5 to extend and retract the entire length of the boom 4. It is formed as follows. Here, in a state where the boom 4 is extended, the outer boom 5 and the inner boom 6a may be pin-connected in order to prevent breakage of the telescopic cylinder due to a hanging load.

【0003】図7に示すように、アウターブーム5の側
面部からインナーブーム6aに向けてピン7を出没自在
に設け、アウターブーム5からインナーブーム6aを繰
り出してブーム4が伸長状態のときに、インナーブーム
6aの側面部には、突出されたピン7の先端が結合すべ
き位置にピン孔8が開穿されている。一般的に、ピン7
の貫通を容易にするため、ピン孔8の直径はピン7の外
径より大きく開穿してガタが設けられている。
As shown in FIG. 7, a pin 7 is provided so as to be able to protrude and retract from the side surface of the outer boom 5 toward the inner boom 6a, and when the boom 4 is extended by extending the inner boom 6a from the outer boom 5, A pin hole 8 is formed in the side surface of the inner boom 6a at a position where the tip of the protruding pin 7 is to be connected. Generally, pin 7
In order to facilitate the penetration of the pin, the diameter of the pin hole 8 is larger than the outer diameter of the pin 7 so that play is provided.

【0004】図8に示すように、前記ピン7及びピン孔
8が円形の場合は、ピン7の外径よりピン孔8をあまり
大きくすると、ピン7とピン孔8が局部的に接触するこ
とになり、α点で応力集中が発生してピン7が破損する
虞がある。この応力集中を避けるために、ピン孔8の直
径をできる限り小さくしてピン7とのガタをなくすと、
ピン7を貫通する際にピン孔8との位置合わせを行うた
めに、アウターブーム5とインナーブーム6aを上下に
微動させる調整機構が必要となる。
As shown in FIG. 8, when the pin 7 and the pin hole 8 are circular, if the pin hole 8 is much larger than the outer diameter of the pin 7, the pin 7 and the pin hole 8 may come into local contact. Then, stress concentration may occur at the point α and the pin 7 may be damaged. In order to avoid this stress concentration, if the diameter of the pin hole 8 is made as small as possible to eliminate backlash with the pin 7,
In order to align with the pin hole 8 when penetrating the pin 7, an adjustment mechanism for vertically moving the outer boom 5 and the inner boom 6a is required.

【0005】一方、図9に示すように、ピン9及びピン
孔10が矩形の場合についても同様に、ピン9とピン孔
10とのガタが大きいと、ピン孔10の隅部10aに局
部集中が起きる。また、図10に示すように、ブーム4
の撓みによってアウターブーム5に対してインナーブー
ム6aが傾斜したときは、ピン孔10に対してピン9が
片当たりとなり、β点で応力集中が発生する。
On the other hand, as shown in FIG. 9, similarly, when the pins 9 and the pin holes 10 are rectangular, if the backlash between the pins 9 and the pin holes 10 is large, local concentration occurs at the corners 10a of the pin holes 10. Happens. Also, as shown in FIG.
When the inner boom 6a inclines with respect to the outer boom 5 due to the bending of the pin 9, the pin 9 comes into contact with the pin hole 10 on one side, and stress concentration occurs at the β point.

【0006】そこで、ピンとピン孔との局部的接触によ
る応力集中をなくしてピン及びブームの破損を防止する
とともに、ピンを貫通する際にピン孔との位置合わせを
行うための上下調整機構を廃止するために解決すべき技
術的課題が生じてくるのであり、本発明はこの課題を解
決することを目的とする。
Therefore, the pin and the boom are prevented from being broken by eliminating the stress concentration due to the local contact between the pin and the pin hole, and the vertical adjustment mechanism for aligning the pin hole when the pin is penetrated is eliminated. Therefore, a technical problem to be solved arises, and an object of the present invention is to solve this problem.

【0007】[0007]

【課題を解決するための手段】本発明は上記目的を達成
するために提案されたものであり、アウターブームとイ
ンナーブームとからなる伸縮式のブームを備え、前記ア
ウターブームからインナーブームへピンを出没可能に貫
通させて、前記アウターブームとインナーブームとをピ
ン結合するように構成した建設機械に於いて、インナー
ブームに開穿されたピン孔は、大径の円孔と小径の円孔
を重ね合わせた長孔に形成され、該小径の円孔の直径を
前記ピンの外径に一致させた建設機械のピン結合装置を
提供するものである。
DISCLOSURE OF THE INVENTION The present invention has been proposed to achieve the above object, and comprises a telescopic boom comprising an outer boom and an inner boom, wherein a pin is provided from the outer boom to the inner boom. In a construction machine configured to penetrate the outer boom and the inner boom so as to be able to protrude and retract, the pin hole opened in the inner boom has a large-diameter circular hole and a small-diameter circular hole. An object of the present invention is to provide a pin connecting device for a construction machine in which the small holes are formed in overlapping slots and the diameter of the small holes is made to match the outer diameter of the pins.

【0008】[0008]

【発明の実施の形態】以下、本発明の実施の形態を図面
に従って詳述する。建設機械の一例として一般的な走行
クレーンについて説明する。図6に示した走行クレーン
1の構成及び図7に示したピン結合装置の構成は、従来
技術の項で既に説明してあるので重複説明を省略する
が、本発明のピン結合装置は、図7に於けるピン孔8の
形状を、後述するピン孔13の形状にしてある。
Embodiments of the present invention will be described below in detail with reference to the drawings. A general traveling crane will be described as an example of a construction machine. The configuration of the traveling crane 1 shown in FIG. 6 and the configuration of the pin coupling device shown in FIG. 7 have already been described in the section of the prior art, and thus redundant description will be omitted. The shape of the pin hole 8 in 7 is the shape of a pin hole 13 described later.

【0009】図1に示すように、アウターブーム5から
インナーブーム6aを繰り出してブーム4が伸長状態の
ときに、アウターブーム5の側面部からインナーブーム
6aに向けて突出されたピン7の先端が、インナーブー
ム6aの側面部に結合すべき位置にピン孔13を開穿
し、該ピン7をこのピン孔13に貫通して、アウターブ
ーム5とインナーブーム6aとをピン結合する。
As shown in FIG. 1, when the inner boom 6a is extended from the outer boom 5 and the boom 4 is in the extended state, the tip of the pin 7 protruding from the side surface of the outer boom 5 toward the inner boom 6a. A pin hole 13 is formed at a position to be connected to the side surface of the inner boom 6a, and the pin 7 is inserted through the pin hole 13 to connect the outer boom 5 and the inner boom 6a.

【0010】図2に示すように、該ピン孔13は大径の
円孔(直径D1 )14と小径の円孔(直径D2 )15を
重ね合わせた長孔に形成され、大径の円孔14の中心1
4aと小径の円孔15の中心15aは距離Cだけ離間し
ている。更に、前記二つの円孔14,15を接線16で
結んだ状態にし、大略卵形にピン孔13が開穿されてい
る。また、図3に示すように、ピン7の直径D2 は前記
小径の円孔15の直径D2 に等しく、且つ大径の円孔1
4の直径D1 より小さく形成されているため、大径の円
孔14に対してはガタが設けられている。
As shown in FIG. 2, the pin hole 13 is formed as a long hole in which a large-diameter circular hole (diameter D 1 ) 14 and a small-diameter circular hole (diameter D 2 ) 15 are overlapped. Center 1 of circular hole 14
4a and the center 15a of the small diameter circular hole 15 are separated by a distance C. Further, the two circular holes 14 and 15 are connected by a tangent line 16, and a pin hole 13 is formed in a substantially oval shape. As shown in FIG. 3, the diameter D 2 of the pin 7 is equal to the diameter D 2 of the small-diameter hole 15 and the large-diameter hole 1 is large.
4 for being smaller than the diameter D 1, backlash is provided for the circular hole 14 of larger diameter.

【0011】而して、ブーム4を伸長した状態で、アウ
ターブーム5とインナーブーム6aとをピン結合する場
合は、先ず、図1及び図3に示したように、インナーブ
ーム6aを伸ばした状態で、大径の円孔14の中心14
aとピン7の中心7aが一致する位置付近で、ピン孔1
3に向けてピン7を突出させる。このとき、大径の円孔
14の直径D1 はピン7の直径D2 よりも十分大きいた
め、従来のように、アウターブーム5とインナーブーム
6aを上下に調整することなく、容易にピン7をピン孔
13へ貫通できる。
When the outer boom 5 and the inner boom 6a are pin-connected to each other with the boom 4 extended, first, as shown in FIGS. 1 and 3, the inner boom 6a is extended. The center 14 of the large-diameter circular hole 14
a near the position where the center 7a of the pin 7 coincides with the center 7a of the pin 7,
The pin 7 is protruded toward 3. In this case, the diameter D 1 of the circular hole 14 of larger diameter is sufficiently larger than the diameter D 2 of the pin 7, as in the prior art, without adjusting the outer boom 5 and the inner boom 6a vertically, easily pin 7 Through the pin hole 13.

【0012】ピン孔13の大径の円孔14部位へピン7
を貫通した後に、インナーブーム6aを僅かに収縮すれ
ば、ピン7に対してピン孔13が移動し、図4及び図5
に示すように、小径の円孔15の中心15aとピン7の
中心7aが一致する。前述したように、小径の円孔15
の直径D2 とピン7の直径D2 が等しいので、ピン7の
外側面が略半周に亘って小径の円孔15へ均一に当接
し、従来のように、ピン7の片当たりがなく、応力集中
の発生を防止できる。
The pin 7 is inserted into the large-diameter circular hole 14 of the pin hole 13.
If the inner boom 6a is slightly shrunk after passing through, the pin hole 13 moves with respect to the pin 7, and FIG.
As shown in the figure, the center 15a of the small-diameter circular hole 15 coincides with the center 7a of the pin 7. As described above, the small-diameter circular hole 15
Since the diameter D 2 of the pin 7 is equal to the diameter D 2 of the pin 7, the outer surface of the pin 7 uniformly contacts the small-diameter hole 15 over substantially half a circumference, and there is no contact of the pin 7 as in the related art. The occurrence of stress concentration can be prevented.

【0013】尚、本発明は、本発明の精神を逸脱しない
限り種々の改変を為すことができ、そして、本発明が該
改変されたものに及ぶことは当然である。
The present invention can be variously modified without departing from the spirit of the present invention, and it goes without saying that the present invention extends to the modified ones.

【0014】[0014]

【発明の効果】以上説明したように、本発明では大径の
円孔と小径の円孔を重ね合わせた長孔をピン孔としてい
るので、アウターブームとインナーブームとをピン結合
する場合は、ピン孔の大径の円孔部位へピンを突出する
ことにより、極めて容易にピンを貫通することができ、
アウターブームとインナーブームの上下調整機構を廃止
できる。
As described above, according to the present invention, a long hole obtained by overlapping a large-diameter circular hole and a small-diameter circular hole is used as a pin hole. Therefore, when the outer boom and the inner boom are pin-connected, By protruding the pin to the large-diameter circular hole portion of the pin hole, the pin can be penetrated very easily,
The vertical adjustment mechanism for the outer boom and the inner boom can be eliminated.

【0015】そして、インナーブームを僅かに収縮する
ことにより、ピン孔の小径の円孔部位とピンが一致し、
ピンとピン孔との局部的接触による応力集中がなくなっ
てピン及びブームの破損を防止できる。
By slightly shrinking the inner boom, the pin matches the small-diameter circular hole of the pin hole,
Stress concentration due to local contact between the pin and the pin hole is eliminated, and damage to the pin and the boom can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態を示し、ブームが伸長状態
に於けるピンとピン孔の部分断面図。
FIG. 1 shows an embodiment of the present invention and is a partial cross-sectional view of a pin and a pin hole when a boom is in an extended state.

【図2】本発明の実施の形態を示し、ピン孔の拡大図。FIG. 2 shows an embodiment of the present invention and is an enlarged view of a pin hole.

【図3】本発明の実施の形態を示し、図1に於けるピン
とピン孔の拡大図。
FIG. 3 is an enlarged view of a pin and a pin hole in FIG. 1, showing the embodiment of the present invention.

【図4】本発明の実施の形態を示し、図1の状態からイ
ンナーブームを僅かに収縮した状態に於けるピンとピン
孔の部分断面図。
FIG. 4 is a partial cross-sectional view of the pin and the pin hole in a state where the inner boom is slightly contracted from the state of FIG. 1 according to the embodiment of the present invention.

【図5】本発明の実施の形態を示し、図4に於けるピン
とピン孔の拡大図。
5 shows the embodiment of the present invention and is an enlarged view of a pin and a pin hole in FIG. 4;

【図6】建設機械の一例としての一般的な走行クレーン
を示す図。
FIG. 6 is a diagram showing a general traveling crane as an example of a construction machine.

【図7】図6のX−X線断面図。FIG. 7 is a sectional view taken along line XX of FIG. 6;

【図8】従来例を示し、ピン及びピン孔が円形の場合の
部分断面図。
FIG. 8 shows a conventional example, and is a partial cross-sectional view when a pin and a pin hole are circular.

【図9】従来例を示し、ピン及びピン孔が矩形の場合の
部分断面図。
FIG. 9 shows a conventional example, and is a partial cross-sectional view when a pin and a pin hole are rectangular.

【図10】従来例を示し、図9の状態からブームが撓ん
だ状態に於けるピン及びピン孔の部分断面図。
FIG. 10 is a partial cross-sectional view of a pin and a pin hole in a state where the boom is bent from the state of FIG.

【符号の説明】[Explanation of symbols]

4 ブーム 5 アウターブーム 6a,6b,6c インナーブーム 7 ピン 13 ピン孔 14 大径の円孔 15 小径の円孔 4 Boom 5 Outer Boom 6a, 6b, 6c Inner Boom 7 Pin 13 Pin Hole 14 Large Diameter Hole 15 Small Diameter Hole

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 23/42 B66C 23/68 B66C 23/70 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 23/42 B66C 23/68 B66C 23/70

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 アウターブームとインナーブームとから
なる伸縮式のブームを備え、前記アウターブームからイ
ンナーブームへピンを出没可能に貫通させて、前記アウ
ターブームとインナーブームとをピン結合するように構
成した建設機械に於いて、インナーブームに開穿された
ピン孔は、大径の円孔と小径の円孔を重ね合わせた長孔
に形成され、該小径の円孔の直径を前記ピンの外径に一
致させたことを特徴とする建設機械のピン結合装置。
A telescopic boom including an outer boom and an inner boom is provided, and a pin is penetrably penetrated from the outer boom to the inner boom so that the outer boom and the inner boom are pin-connected. In the construction machine described above, the pin hole opened in the inner boom is formed as a long hole in which a large-diameter hole and a small-diameter hole are overlapped, and the diameter of the small-diameter hole is set outside the pin. A pin coupling device for construction machinery, the diameter of which is matched to the diameter.
JP12697397A 1997-05-16 1997-05-16 Pin connection device for construction machinery Expired - Fee Related JP3065560B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12697397A JP3065560B2 (en) 1997-05-16 1997-05-16 Pin connection device for construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12697397A JP3065560B2 (en) 1997-05-16 1997-05-16 Pin connection device for construction machinery

Publications (2)

Publication Number Publication Date
JPH10316367A JPH10316367A (en) 1998-12-02
JP3065560B2 true JP3065560B2 (en) 2000-07-17

Family

ID=14948488

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12697397A Expired - Fee Related JP3065560B2 (en) 1997-05-16 1997-05-16 Pin connection device for construction machinery

Country Status (1)

Country Link
JP (1) JP3065560B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4613897B2 (en) * 2006-08-21 2011-01-19 コベルコクレーン株式会社 Crane jib assembly method and crane jib
JP4978704B2 (en) * 2010-02-25 2012-07-18 コベルコ建機株式会社 Work machine
JP6294716B2 (en) * 2014-03-18 2018-03-14 日本車輌製造株式会社 Drilling machine
PL3515851T3 (en) * 2016-09-19 2023-08-07 Gustomsc B.V. Extendable boom with a locking system and method for operating an extendable boom of a crane

Also Published As

Publication number Publication date
JPH10316367A (en) 1998-12-02

Similar Documents

Publication Publication Date Title
JP3065560B2 (en) Pin connection device for construction machinery
US20030019123A1 (en) Tape rule with improved structure of tape end
JPS60252590A (en) Connecting structure of crane proper and boom
JP6837885B2 (en) Pin coupling device
JP6805036B2 (en) Pin coupling device
JP2898590B2 (en) Structure to prevent rotation of connecting pin in crane etc.
JP2533988Y2 (en) Shield jack for shield machine
JPH072588B2 (en) Tower crane
JPH0215733Y2 (en)
JP2796517B2 (en) Post-tilting mechanism of roughing jib in jib crane
JP2018162862A (en) Pin connection device and pin connection method
JPS6116306Y2 (en)
JPS6316894Y2 (en)
US2198281A (en) Derrick pedestal
JP2586269B2 (en) Roll clamp
JP2574687Y2 (en) Crane boom telescopic device
JPH0329406Y2 (en)
JPH033669Y2 (en)
JPH0414286U (en)
JP3582879B2 (en) Segment for tunnel
JPS6354630B2 (en)
JP2003336476A (en) Kelly bar
JPH0340863Y2 (en)
JPS6216468Y2 (en)
JP3328116B2 (en) Lift cylinder support structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees