JP3021002U - Sling unit - Google Patents

Sling unit

Info

Publication number
JP3021002U
JP3021002U JP1995007801U JP780195U JP3021002U JP 3021002 U JP3021002 U JP 3021002U JP 1995007801 U JP1995007801 U JP 1995007801U JP 780195 U JP780195 U JP 780195U JP 3021002 U JP3021002 U JP 3021002U
Authority
JP
Japan
Prior art keywords
hook
construction
retaining
hoisting
iron plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1995007801U
Other languages
Japanese (ja)
Inventor
政治 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP1995007801U priority Critical patent/JP3021002U/en
Application granted granted Critical
Publication of JP3021002U publication Critical patent/JP3021002U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

(57)【要約】 【課題】 建造物の施工現場において、吊り上げを行う
吊り手段と、施工用部材とを接続するための吊り具ユニ
ットであって、施工用部材の吊り上げを容易に、しかも
安全に行うことができるようにする。 【解決手段】 建造物の施工現場において、吊り上げを
行うクレーン3(吊り手段)と、敷鉄板2などの施工用
部材とを接続するための吊り具ユニット1であって、敷
鉄板2に接続され、吊り上げ状態で敷鉄板2の外れ止め
を行う外れ止め部材4aを有する外れ止めフック4と、
クレーン3に接続される玉掛ワイヤー5と、一端部をこ
の玉掛ワイヤー5に、他端部を外れ止めフック4の外れ
止め部材4aにそれぞれシャックル7(接続部材)など
を介して接続され、軸線の廻りに回転自在とする自在金
具6とから構成される。
(57) 【Abstract】 PROBLEM TO BE SOLVED: To provide a hoisting unit for connecting hoisting means for hoisting and a construction member at a construction site of a building, which makes it easy and safe to hoist the construction member. To be able to do. SOLUTION: A hanging tool unit 1 for connecting a crane 3 (lifting means) for lifting and a construction member such as an iron sheet 2 at a construction site of a building, which is connected to the iron sheet 2. A retaining hook 4 having a retaining member 4a for retaining the iron plate 2 in a suspended state,
The sling wire 5 connected to the crane 3 is connected to the sling wire 5 at one end and to the disengagement prevention member 4a of the disengagement hook 4 at the other end through a shackle 7 (connection member), respectively, and It is composed of a free metal fitting 6 that is rotatable around.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the device belongs]

本考案は、吊り具ユニットに係り、詳細には、建造物の施工現場において、施 工用部材の吊り上げを行うための吊り具ユニットに関する。 The present invention relates to a lifting tool unit, and more particularly, to a lifting tool unit for lifting working members at a construction site of a building.

【0002】[0002]

【従来の技術】[Prior art]

従来、建造物の施工現場で使用される吊り具としては、例えば、一端部に吊り 上げを行う施工用部材に適合する大きさのフックが設置され、他端部に吊り上げ 手段であるクレーンにあるケーブルの先端部分に取り付けられた大型フックに掛 けるための輪が形成された玉掛ワイヤーが用いられている。 そして、作業者が、直接、玉掛ワイヤーの一端部に設置されたフックを、例え ば、地表面上に敷き詰める敷鉄板などの施工用部材に予め形成されている孔に掛 け、他端部に形成された輪をクレーンにあるケーブルの先端部分に取り付けられ た大型フックに掛けて、ウインチでケーブルを巻込むことで、敷鉄板の吊り上げ をしていた。 Conventionally, as a hoisting tool used at a construction site of a building, for example, there is a crane, which is a hoisting means installed at one end and has a size suitable for a hoisting member. A sling wire is used that has a loop for hanging on a large hook attached to the tip of the cable. Then, the operator directly hooks the hook installed at one end of the sling wire into a hole formed in advance in a construction member such as an iron plate to be spread on the ground surface, and at the other end. The formed wheels were hung on a large hook attached to the tip of the cable on the crane, and the cable was wound with a winch to lift the iron sheet.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、上記従来の吊り具にあっては、玉掛けワイヤー等のワイヤーロ ープのねじれをなくすために、作業者自身が、前記ワイヤーロープのねじれのな いことをその度毎に確認してから施工用部材に接続しなければならず、大量の施 工用部材を扱う場合には、それらの吊り上げ作業にかなりの時間を要していた。 さらに、作業者が、ワイヤーロープのねじれを解消してから施工用部材を接続 したとしても、吊り上げ時に風が吹き込んで、その風力により施工用部材が揺ら された場合には、その揺れでワイヤーロープがねじれてしまい、揺れをさらに増 幅するというおそれがあった。 However, in order to eliminate the twist of wire ropes such as sling wires, the above-mentioned conventional hanging equipment must be constructed by the operator himself after checking that the wire rope is not twisted each time. It had to be connected to the work members, and when handling a large number of work members, it took a considerable time to lift them. Further, even if the worker removes the twist of the wire rope and then connects the construction member, if the wind blows during lifting and the construction member is shaken by the wind force, the shaking will cause the wire rope to shake. There was a risk that the rock would be twisted and the vibration would be further increased.

【0004】 そこで、本考案の目的は、施工用部材の吊り上げを容易に、しかも安全に行う ことができるようにした吊り具ユニットを提供することである。[0004] Therefore, an object of the present invention is to provide a hoisting tool unit capable of hoisting a construction member easily and safely.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

以上の課題を解決すべく、本考案は、建造物の施工現場において、吊り上げを 行う吊り手段としてのクレーンと、施工用部材(例えば、敷鉄板など)とを接続 するための吊り具ユニットであって、前記施工用部材に接続され、吊り上げ状態 で前記施工用部材の外れ止めを行う外れ止め部材を有する外れ止めフックと、前 記クレーン等の吊り手段に接続される玉掛ワイヤーと、一端部をこの玉掛ワイヤ ーに、他端部を前記外れ止めフックの前記外れ止め部材にそれぞれ接続部材、例 えば、シャックルなどを介して接続され、軸線の廻りに回転自在とする自在金具 とからなる構成を特徴としている。 In order to solve the above problems, the present invention is a hoisting unit for connecting a crane as hoisting means for hoisting and a construction member (for example, iron plate) at a construction site of a building. The retaining hook connected to the construction member and having a retaining member for retaining the construction member in a suspended state, a sling wire connected to the suspension means such as the crane, and one end The slidable wire has a structure in which the other end is connected to the slip-off preventing member of the slip-off preventing hook through a connecting member, for example, a shackle or the like, and a free metal fitting that is rotatable around an axis. It has a feature.

【0006】 このように、外れ止めフックを施工用部材(例えば、敷鉄板)に接続し、玉掛 ワイヤーをクレーン等の吊り手段に接続し、吊り具ユニットに継がれた施工用部 材の吊り上げをクレーン等の吊り手段により行うことで、外れ止めフックに対す る施工用部材の保持が外れ止め部材により確実になされ、さらに、外れ止めフッ クと玉掛ワイヤーとの間に配設された自在金具の回転により玉掛ワイヤーのねじ れが解消される。 従って、施工用部材と吊り手段とが容易に接続され、しかも、その施工用部材 の吊り上げが安全に行われる。As described above, the retaining hook is connected to the construction member (for example, the iron plate), the sling wire is connected to the hanging means such as a crane, and the construction member connected to the hanging unit is lifted. By using a hanging means such as a crane, the construction member is held securely against the slip-out prevention hook, and further, the free metal fittings placed between the slip-out prevention hook and the sling wire are secured. The rotation eliminates the twist of the sling wire. Therefore, the construction member and the hanging means are easily connected, and furthermore, the construction member is safely lifted.

【0007】[0007]

【考案の実施の形態】[Embodiment of device]

以下に、本考案に係る吊り具ユニットの実施の形態例を図1および図2に基づ いて説明する。 図1は本考案を適用した一例としての吊り具ユニットの使用状態を示すもので 、図2は図1の吊り具ユニットの各部の構成を示す拡大図で、図中、1は吊り具 ユニット、2は敷鉄板(施工用部材)、2aは孔、3はクレーン(吊り手段)、 3aはブーム、3bはケーブル、3cは旋回軸、3dはウインチ、3eはクロー ラー、3fは操作室、3gは大型フック、4は外れ止めフック、4aは外れ止め 部材、4bはフック本体、4cはピン、4dは挿入孔、4eは延長部、5は玉掛 ワイヤー、5aはループ部、5bは固定ソケット、6は自在金具、6aは円筒部 材、6bは接続口部材、7はシャックル(接続部材)、7aはU字鋼、7bはボ ルト、8は地表面である。 Hereinafter, an example of an embodiment of the hanging unit according to the present invention will be described with reference to FIGS. 1 and 2. FIG. 1 shows a usage state of a hanging unit as an example to which the present invention is applied, and FIG. 2 is an enlarged view showing a configuration of each part of the hanging unit of FIG. 1, in which 1 is a hanging unit, 2 is an iron plate (construction member), 2a is a hole, 3 is a crane (suspension means), 3a is a boom, 3b is a cable, 3c is a swivel axis, 3d is a winch, 3e is a crawler, 3f is an operation room, 3g. Is a large hook, 4 is a retaining hook, 4a is a retaining member, 4b is a hook body, 4c is a pin, 4d is an insertion hole, 4e is an extension portion, 5 is a sling wire, 5a is a loop portion, 5b is a fixed socket, 6 is a universal metal fitting, 6a is a cylindrical member, 6b is a connection port member, 7 is a shackle (connection member), 7a is a U-shaped steel, 7b is a bolt, and 8 is a ground surface.

【0008】 地盤が悪いところでは、地盤改良を行った後、砂利を敷き詰め水捌けを良くし た地表面8上に、施工用重機などを載せるための敷鉄板2が敷き詰められている 。 この建造物の施工工事の段取りが進み、敷鉄板2を移動し設置し直す時に、ク レーン3による吊り上げ手段と、敷鉄板2(施工用部材)とを接続し、吊り上げ を行うための吊り具ユニット1が使用される。When the ground is poor, after the ground is improved, a laid iron plate 2 for mounting heavy equipment for construction is laid on the ground surface 8 which is laid with gravel to improve the drainage. When the construction work of this building progresses and the iron plate 2 is moved and re-installed, a lifting tool for connecting the lifting means by the crane 3 and the iron plate 2 (construction member) to perform lifting. Unit 1 is used.

【0009】 吊り具ユニット1は、図1に示すように、外れ止めフック4、玉掛ワイヤー5 および自在金具6がシャックル7,7により接続されて構成され、外れ止めフッ ク4により敷鉄板2に、玉掛ワイヤー5によりクレーン3に継がれている。 敷鉄板2は、地盤改良や、砂利敷きなどを行った軟弱な地盤上に、クレーン、 生コン車等の施工用重機などを載せるために、長期に渡り現場(図1の点線部分 など)に敷かれ、吊り上げ運搬用の孔2aの形成された鋼鉄製の施工用部材で、 重量が一枚2t程度の施工用部材である。As shown in FIG. 1, the suspender unit 1 is configured by connecting a retaining hook 4, a sling wire 5 and a free metal fitting 6 with shackles 7, 7, and the retaining hook 4 is attached to the laid iron plate 2. , Is connected to the crane 3 by the sling wire 5. The iron sheet 2 is laid on a site (such as the dotted line in Fig. 1) over a long period of time in order to put heavy equipment for construction such as cranes and ready-mixed vehicles on the soft ground that has been improved and grounded. The construction member is made of steel and has a hole 2a for lifting and carrying, and the construction member weighs about 2 tons.

【0010】 クレーン3は、図1に示すように、上記敷鉄板2の吊り上げを行うための吊り 手段で、大型フック3gに対して、直接あるいは間接的に、施工用部材を掛けて 、操作室3f内に乗っている作業者が、ブーム3aの起伏動作や、ウインチ3d の回転動作によるケーブル3bの長さ調節や、旋回軸3cの廻りの旋回動作など の手動制御を行えるようになっている。 また、このクレーン3は、底面の両側端部にそれぞれクローラー3e,3eな どの走行装置が取り付けられており、施工現場の移動の際にも容易に対応できる ようになっている。As shown in FIG. 1, the crane 3 is a suspending means for suspending the laid iron plate 2, and a construction member is directly or indirectly hung on the large hook 3 g to operate the operation room. An operator riding inside 3f can perform manual control such as raising and lowering movement of boom 3a, adjusting the length of cable 3b by rotating movement of winch 3d, and revolving movement around revolving shaft 3c. . Further, the crane 3 is provided with traveling devices such as crawlers 3e and 3e at both end portions of the bottom surface, so that it can be easily dealt with when moving to a construction site.

【0011】 これから、図2を参照して、図1の吊り具ユニット1における各部の構成を説 明する。 外れ止めフック4は、図2に示すように、敷鉄板2にある吊り上げ運搬用の孔 2aに掛けるフック本体4bと、吊り上げ時にこのフック本体4bから敷鉄板2 が外れるのを防ぐ外れ止め部材4aにより構成されたものである。 ここで、外れ止め部材4aとフック本体4bとが重なり合った部分にピン4c が挿入され、外れ止め部材4aとフック本体4bとが係止されている。Now, with reference to FIG. 2, the configuration of each part in the hanging unit 1 of FIG. 1 will be described. As shown in FIG. 2, the disengagement prevention hook 4 includes a hook body 4b to be hung on a hole 2a for lifting and transporting in the iron sheet 2, and a retaining member 4a for preventing the iron sheet 2 from being detached from the hook body 4b at the time of hoisting. It is composed by. Here, the pin 4c is inserted into a portion where the retaining member 4a and the hook body 4b overlap each other, and the retaining member 4a and the hook body 4b are locked.

【0012】 また、外れ止め部材4aには、ピン4cを挟んで反対側に延びた延長部4eに 挿入孔4dが形成されていて、その挿入孔4d内に、シャックル7のボルト7b が挿入されている。 この状態で敷鉄板2の吊り上げを行うと、図1に示すように、敷鉄板2の重量 が外れ止めフック4に加わり、この外れ止めフック4においてフック本体4bの 対し外れ止め部材4aが閉口する方向に力が働いて、敷鉄板2の外れ止めを行う ようになっている。In addition, in the retaining member 4a, an insertion hole 4d is formed in an extension portion 4e extending on the opposite side with the pin 4c interposed therebetween, and the bolt 7b of the shackle 7 is inserted into the insertion hole 4d. ing. When the iron plate 2 is lifted in this state, the weight of the iron plate 2 is added to the retaining hook 4 as shown in FIG. 1, and the retaining member 4a of the hook body 4b is closed at the retaining hook 4. A force acts in the direction to prevent the iron plate 2 from coming off.

【0013】 玉掛ワイヤー5は、末端部に輪を作るように結束した状態で、固定ソケット5 bにより、その輪を成すループ部5aを固定したもので、全長が1m程度の鋼線 である。 そして、玉掛ワイヤー5は、図1に示すように、一端部のループ部5aに形成 された固定ソケット5bの輪内にクレーン3のケーブル3bに接続された大型フ ック3gが挿入されていて、また、図2に示すように、他端部のループ部5aに 形成された固定ソケット5bの輪内にシャックル7のU字鋼7aが挿入されてい る。The sling wire 5 is a steel wire having a total length of about 1 m, in which the loop portion 5a forming the loop is fixed by a fixed socket 5b in a state where the sled wire 5 is bound to form a loop. As shown in FIG. 1, the sling wire 5 has a large hook 3g connected to the cable 3b of the crane 3 inserted in the ring of a fixed socket 5b formed in the loop portion 5a at one end. Further, as shown in FIG. 2, the U-shaped steel 7a of the shackle 7 is inserted into the ring of the fixed socket 5b formed in the loop portion 5a at the other end.

【0014】 自在金具6は、円筒部材6aの両端部に各々がその円筒部材6aの中心軸線の 廻りに回転自在となる接続口部材6b,6bが設置され、その両端部の接続口部 材6b,6bに他の部材と接続するための接続口がそれぞれ形成されているもの で、3t程度までの重量物に対応できるようになっている。 そして、図2に示すように、自在金具6は、シャックル7,7を介して、一端 部に形成された接続口部材6bが外れ止めフック4の外れ止め部材4aに、他端 部に形成された接続口部材6bが玉掛ワイヤー5のループ部5aに形成された固 定ソケット5bの輪に接続されている。 この接続状態で、敷鉄板2の吊り上げを行うと、接続口部材6b,6bの各々 が円筒部材6aの中心軸線の廻りに回転して、予め玉掛ワイヤー5に作られてい たねじれを自ら解消することができるようになっている。The universal fitting 6 is provided with connection port members 6b, 6b, which are rotatable around the central axis of the cylindrical member 6a, at both ends of the cylindrical member 6a, and the connection port members 6b at both ends thereof are installed. , 6b are formed with connection ports for connecting to other members, respectively, so that they can handle heavy objects up to about 3t. Then, as shown in FIG. 2, the universal fitting 6 has a connection port member 6b formed at one end thereof formed on the separation prevention member 4a of the separation prevention hook 4 and at the other end thereof via shackles 7,7. The connecting port member 6b is connected to the loop of the fixed socket 5b formed in the loop portion 5a of the sling wire 5. When the laid iron plate 2 is lifted in this connection state, each of the connection port members 6b, 6b rotates around the central axis of the cylindrical member 6a, and the twist that was previously made in the sling wire 5 is eliminated by itself. Is able to.

【0015】 シャックル7は、丸鋼をU字型に曲げた形状のU字鋼7aと、そのU字鋼7a の両端部を結合するボルト7bとにより構成された接続部材である。 ここで、図2に示すように、外れ止めフック4の外れ止め部材4aにある挿入 孔4d内に、シャックル7のボルト7bを挿入し、そのU字鋼7aの両端部を結 合するボルト7bを自在金具6の接続口部材6bの接続口内に挿入することで、 外れ止めフック4と自在金具6とを接続することができるようになっている。 また、玉掛ワイヤー5のループ部5aに形成された固定ソケット5bの輪内に シャックル7のU字鋼7aを挿入し、そのU字鋼7aの両端部を結合するボルト 7bを先程とは別個の接続口部材6bの接続口内に挿入することで、玉掛ワイヤ ー5と自在金具6とを接続することができるようになっている。The shackle 7 is a connecting member composed of a U-shaped steel 7a formed by bending a round steel into a U-shape, and a bolt 7b connecting both ends of the U-shaped steel 7a. Here, as shown in FIG. 2, the bolt 7b of the shackle 7 is inserted into the insertion hole 4d in the retaining member 4a of the retaining hook 4, and the bolt 7b for connecting both ends of the U-shaped steel 7a. Is inserted into the connection opening of the connection opening member 6b of the universal fitting 6, so that the retaining hook 4 and the universal fitting 6 can be connected. In addition, the U-shaped steel 7a of the shackle 7 is inserted into the ring of the fixed socket 5b formed in the loop portion 5a of the sling wire 5, and the bolt 7b for connecting both ends of the U-shaped steel 7a is separated from the previous one. The sling wire 5 and the universal fitting 6 can be connected by inserting the connection wire 6 into the connection opening of the connection opening member 6b.

【0016】 以上の吊り具ユニット1を使用した現場での作業方法の一例とそれによる作用 を示す。 先ず、図1に示すように、操作室3fからの手動操作で、クレーン3のウイン チ3dを回転させ、ケーブル3bを送出して、大型フック3gを敷鉄板2の近傍 まで降ろし、本考案に係る吊り具ユニット1に構成されている玉掛ワイヤー5の ループ部5aに形成されている固定ソケット5bの輪を大型フック3gに掛ける 。 さらに、図2に示すように、吊り具ユニット1の外れ止めフック4を敷鉄板2 に形成される孔2aに掛け、図1に示すように、クレーン3の操作室3fからの 手動操作で、ウインチ3dを先程とは反対方向に回転させ、ケーブル3bを巻込 むことで、敷鉄板2を吊り上げる。An example of an on-site work method using the above-described hanging device unit 1 and an operation thereof will be shown. First, as shown in FIG. 1, the winch 3d of the crane 3 is rotated by a manual operation from the operation room 3f, the cable 3b is sent out, and the large hook 3g is lowered to the vicinity of the iron plate 2 to realize the present invention. The loop of the fixed socket 5b formed in the loop portion 5a of the sling wire 5 configured in the hanging device unit 1 is hooked on the large hook 3g. Further, as shown in FIG. 2, the retaining hooks 4 of the hanging unit 1 are hooked in the holes 2a formed in the laid iron plate 2, and as shown in FIG. 1, by the manual operation from the operation room 3f of the crane 3, The winch 3d is rotated in the opposite direction to the previous one, and the cable 3b is wound therein, so that the iron plate 2 is lifted.

【0017】 このようにして、施工用部材である敷鉄板2は吊り上げられて、吊り上げ状態 で、敷鉄板2の重量が外れ止めフック4に加わり、外れ止めフック4においてフ ック本体4bに対し外れ止め部材4aが閉口する方向に力が働いて、敷鉄板2の 孔2aから外れ止めフック4が外れるのを防ぐことができるとともに、玉掛ワイ ヤー5がねじれている場合には、自在金具6がその円筒部材6aの中心軸線の廻 りに回転し、そのねじれを解消することができる。In this way, the iron plate 2 which is a construction member is hoisted, and in the hoisted state, the weight of the iron plate 2 is added to the retaining hook 4, and the retaining hook 4 is attached to the hook body 4b. A force acts in the closing direction of the slip-off prevention member 4a to prevent the slip-off prevention hook 4 from coming off the hole 2a of the iron plate 2, and when the sling wire 5 is twisted, the flexible metal fitting 6 Rotates about the central axis of the cylindrical member 6a, and the twist can be eliminated.

【0018】 このような吊り具ユニット1としたので、以下に挙げるような効果が得られる 。 外れ止めフック4を敷鉄板2に、玉掛ワイヤー5をクレーン3に掛けるように したので、敷鉄板2とクレーン3とを簡単に接続でき、施工用部材である敷鉄板 2の運搬作業を迅速に行うことができる。 敷鉄板2の吊り上げ状態で、外れ止めフック4で確実に敷鉄板2を捕まえなが ら、自在金具6を玉掛ワイヤー5のねじれに合わせて回転させることで、施工用 部材である敷鉄板2を安全に運搬できる。Since the suspender unit 1 is configured as described above, the following effects can be obtained. Since the retaining hook 4 is hung on the iron plate 2 and the sling wire 5 is hung on the crane 3, the iron plate 2 and the crane 3 can be easily connected, and the work of transporting the iron plate 2, which is a construction member, can be carried out quickly. It can be carried out. While the iron plate 2 is being lifted, the iron plate 2 that is a construction member is rotated by securely catching the iron plate 2 with the retaining hooks 4 and rotating the universal metal fitting 6 in accordance with the twist of the sling wire 5. Can be safely transported.

【0019】 なお、以上の実施の形態例において、施工用部材として敷鉄板2を用いたが、 もちろんこれに限るものではなく、例えば、建造物の外壁として使用する外装板 などを吊り上げを行うようにしても良い。In the above-described embodiments, the laid iron plate 2 is used as the construction member, but the construction member is not limited to this, and for example, an exterior plate used as an outer wall of a building may be lifted. You can

【0020】[0020]

【考案の効果】[Effect of device]

以上のように、本考案に係る吊り具ユニットによれば、施工用部材と吊り手段 とを容易に接続することができるとともに、その施工用部材の吊り上げを安全に 行うことができる。 As described above, according to the hoisting tool unit of the present invention, the construction member and the suspension means can be easily connected, and the construction member can be safely lifted.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案を適用した一例としての吊り具ユニット
の使用状態を示すものである。
FIG. 1 shows a usage state of a lifting tool unit as an example to which the present invention is applied.

【図2】図1の吊り具ユニットの各部の構成を示す拡大
図である。
FIG. 2 is an enlarged view showing the configuration of each part of the hanging unit shown in FIG.

【符号の説明】[Explanation of symbols]

1 吊り具ユニット 2 敷鉄板(施工用部材) 3 クレーン(吊り手段) 4 外れ止めフック 4a 外れ止め部材 5 玉掛ワイヤー 6 自在金具 7 シャックル(接続部材) DESCRIPTION OF SYMBOLS 1 Lifting tool unit 2 Laying iron plate (construction member) 3 Crane (suspending means) 4 Detaching hook 4a Detaching member 5 Sliding wire 6 Flexible metal fitting 7 Shackle (connecting member)

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】建造物の施工現場において、吊り上げを行
う吊り手段と、施工用部材とを接続するための吊り具ユ
ニットであって、 前記施工用部材に接続され、吊り上げ状態で前記施工用
部材の外れ止めを行う外れ止め部材を有する外れ止めフ
ックと、 前記吊り手段に接続される玉掛ワイヤーと、 一端部をこの玉掛ワイヤーに、他端部を前記外れ止めフ
ックの前記外れ止め部材にそれぞれ接続部材を介して接
続され、軸線の廻りに回転自在とする自在金具と、 から構成されることを特徴とする吊り具ユニット。
1. A hoisting unit for connecting a hoisting means for hoisting and a construction member at a construction site of a building, the unit being connected to the construction member and being hoisted. An anti-slip hook having an anti-slip member, a sling wire connected to the hanging means, one end connected to this sled wire, and the other end connected to the slip-off prevention member of the slip-off hook. A suspender unit, comprising: a metal fitting that is connected via a member and is rotatable about an axis.
JP1995007801U 1995-07-27 1995-07-27 Sling unit Expired - Lifetime JP3021002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1995007801U JP3021002U (en) 1995-07-27 1995-07-27 Sling unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1995007801U JP3021002U (en) 1995-07-27 1995-07-27 Sling unit

Publications (1)

Publication Number Publication Date
JP3021002U true JP3021002U (en) 1996-02-16

Family

ID=43156356

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1995007801U Expired - Lifetime JP3021002U (en) 1995-07-27 1995-07-27 Sling unit

Country Status (1)

Country Link
JP (1) JP3021002U (en)

Similar Documents

Publication Publication Date Title
JP3021002U (en) Sling unit
JPH03192094A (en) Control of suspension attitude for curved plate and suspension tool for curved plate
CN207312948U (en) A kind of material transportation bucket for building
JPH03192093A (en) Suspension attitude control for curved plate and suspending tool for curved plate
JPH08277086A (en) Automatic hook
JP2995451B2 (en) Iron plate gripping device
JP2612431B2 (en) Ball removal hook
JP2022127911A (en) Lifting tool with release function
JPH05105386A (en) Automatic slinging device for roll
JP2021164237A (en) Guide device of wire rope for hanging insulator
JPH072549Y2 (en) Crane lifting equipment
JP2003095585A (en) Detachable type drive device for chain block and manual chain block
JP2933110B2 (en) Hanging and sling removal equipment for suspended loads
JP3092473U (en) Crane hook blocks and cranes
JPH061581Y2 (en) Crane lifting equipment
CN215974583U (en) Simple self-unhooking device for hoisting
JPH0435346Y2 (en)
CN212127241U (en) Simple pipeline hoisting device
JP3012132B2 (en) Method and apparatus for assembling ground drill
JP2516881Y2 (en) Mobile crane
JP4342255B2 (en) Hoisting and pulling device
JP3063550U (en) Hanging bracket
JPH11335065A (en) Iron plate grip device
JPH10316375A (en) High-lift fitting/removing device and method for chain block device
JPH0547820Y2 (en)