JP3002609B2 - Natural crushed stone crusher - Google Patents

Natural crushed stone crusher

Info

Publication number
JP3002609B2
JP3002609B2 JP4201877A JP20187792A JP3002609B2 JP 3002609 B2 JP3002609 B2 JP 3002609B2 JP 4201877 A JP4201877 A JP 4201877A JP 20187792 A JP20187792 A JP 20187792A JP 3002609 B2 JP3002609 B2 JP 3002609B2
Authority
JP
Japan
Prior art keywords
crushed stone
natural crushed
main body
fixed jaw
natural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4201877A
Other languages
Japanese (ja)
Other versions
JPH0626214A (en
Inventor
誠一 坂戸
幸夫 山下
誓 藤高
邦彦 松居
勇 永吉
忠比古 長瀬
博雄 小柳
勇治 永沢
Original Assignee
株式会社坂戸工作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社坂戸工作所 filed Critical 株式会社坂戸工作所
Priority to JP4201877A priority Critical patent/JP3002609B2/en
Publication of JPH0626214A publication Critical patent/JPH0626214A/en
Application granted granted Critical
Publication of JP3002609B2 publication Critical patent/JP3002609B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/96Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
    • E02F3/965Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements of metal-cutting or concrete-crushing implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、極めて効率的に天然砕
石塊を破砕することができる天然砕石塊破砕装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crushed natural crushed stone crusher which can crush natural crushed rock very efficiently.

【0002】[0002]

【従来の技術】従来より、採石現場で、岩山の岩面にダ
イナマイト等の爆破物埋設用のために複数の孔を穿孔
し、該孔にダイナマイト等の爆破物を埋め込み、岩山を
爆破して多数の天然砕石塊W,W,…とし、さらにその
天然砕石塊Wを細かく砕くため、一般に油圧砕石ブレー
カーCを使用している。
2. Description of the Related Art Conventionally, at a quarry site, a plurality of holes are drilled on a rock surface of a rocky mountain to bury blasting material such as dynamite, and a blasting material such as dynamite is embedded in the hole to blast the rocky mountain. A large number of natural crushed stone blocks W, W,..., And a hydraulic crushed stone breaker C is generally used to finely crush the natural crushed stone blocks W.

【0003】その油圧砕石ブレーカーCは、建設用車両
Mの作業用ブームbの先端に装着し、作業用ブームを操
作して油圧砕石ブレーカーCを天然砕石塊Wに当てて破
砕作業を行うものであり、山積状になった多数の天然砕
石塊Wから、これを一つずつかきだして、平坦状地面等
に移動し、さらにその天然砕石塊Wを破砕に適した安定
した状態にし、油圧砕石ブレーカーCを使用し易いよう
にして、油圧砕石ブレーカーCにて天然砕石塊Wを細か
く多数の小塊w,w,…に破砕している。
The hydraulic crushed stone breaker C is mounted on the tip of the work boom b of the construction vehicle M, and the work boom is operated to perform the crushing operation by applying the hydraulic crushed stone breaker C to the natural crushed stone mass W. Yes, from a large number of piled natural crushed stone blocks W, they are scraped out one by one and moved to flat ground, etc., and furthermore, the natural crushed stone blocks W are brought into a stable state suitable for crushing. The natural crushed stone block W is finely crushed into a large number of small blocks w, w,.

【0004】ここで、山積みされた天然砕石塊Wから、
これをひとつずつかきだすときには、別の建設用車両M
のブームに天然砕石塊Wのかきだしに適したアタッチメ
ントを装着して、天然砕石塊Wを取り出すので、油圧砕
石ブレーカーCを装着した建設用車両Mとともに複数の
建設用車両Mを必要としており、このように天然砕石塊
Wの破砕作業に多数の専用の建設用車両Mが必要とな
り、コストがかさむことになる。
Here, from the pile of natural crushed stones W,
When scraping them one by one, another construction vehicle M
Attachment suitable for scraping out the natural crushed stone mass W is attached to the boom, and the natural crushed stone mass W is taken out. Therefore, a plurality of construction vehicles M are required together with the construction vehicle M equipped with the hydraulic crushed stone breaker C. As described above, a large number of dedicated construction vehicles M are required for the crushing operation of the natural crushed stone block W, and the cost is increased.

【0005】また、天然砕石塊Wの破砕作業中には、チ
ゼルの貫入に従い、チゼルcの方向が必然的にずれてし
まったり、油圧砕石ブレーカーCの振動,衝撃等により
天然砕石塊Wの位置が変化し、油圧砕石ブレーカーCの
チゼルcの打撃方向がずれることがあるので、破砕中に
おいても、作業員は常に油圧砕石ブレーカーCのチゼル
cの方向の修正をする必要がある等、この作業には熟練
した作業員が必要である。
Further, during the crushing operation of the natural crushed stone mass W, the direction of the chisel c is inevitably shifted as the chisel penetrates, and the position of the natural crushed stone mass W is caused by the vibration or impact of the hydraulic crushed stone breaker C. May change, and the hitting direction of the chisel c of the hydraulic crushed stone breaker C may be shifted. Therefore, even during the crushing, the worker must always correct the direction of the chisel c of the hydraulic crushed stone breaker C. Requires skilled workers.

【0006】[0006]

【発明が解決しようとする課題】従来、岩山をダイナマ
イト等の爆破物にて爆破し、山積みとなった多数の天然
砕石塊Wを油圧砕石ブレーカーCにて破砕する作業で
は、以下に示すような欠点があり、その油圧砕石ブレー
カーCに代えて、本発明の破砕機Aを使用するものであ
る。
Conventionally, the work of blasting a rocky mountain with a blasting material such as dynamite and crushing a large number of crushed natural crushed stone blocks W with a hydraulic crushed rock breaker C is as follows. There is a drawback, and the crusher A of the present invention is used instead of the hydraulic crusher breaker C.

【0007】その油圧砕石ブレーカーCの有する欠点と
しては、まず天然砕石塊を安定性のある状態にしてか
ら、油圧砕石ブレーカーCのチゼルcをその天然砕石塊
Wにセットすることが前提であり、これに対して岩山の
爆破後の山積みされた多数の天然砕石塊W,W,…は、
極めて不規則且つ不安定な状態であるため、その中から
安定した状態の天然砕石塊Wを見つけることは中々面倒
であるし、これが見つけられずに、不安定な状態のまま
油圧砕石ブレーカーCにて天然砕石塊Wの破砕作業を始
めると、その油圧砕石ブレーカーCの内部でチゼルcの
空打ち状態が生じることがあり、その油圧砕石ブレーカ
ーCが極めて早期に破損する重大な欠点があった。
The disadvantage of the hydraulic crushed stone breaker C is that it is necessary to first set the natural crushed stone mass to a stable state and then set the chisel c of the hydraulic crushed stone mass breaker C to the natural crushed stone mass W. On the other hand, a large number of crushed natural crushed stone blocks W, W, ...
Since it is in an extremely irregular and unstable state, it is quite troublesome to find a natural crushed stone mass W in the crushed rock mass. When the crushing operation of the natural crushed stone mass W is started, there may be a case where the chisel c is hit in the inside of the hydraulic crushed stone breaker C, and there is a serious disadvantage that the hydraulic crushed stone breaker C is broken very early.

【0008】上述した油圧砕石ブレーカーCの早期にお
ける損傷を防止するためには、まず山積み状の天然砕石
塊Wより、これを一つずつ取り出して安定した平坦状等
の地面にかきだし、さらにその平坦状の地面上に天然砕
石塊Wを最も安定した状態に整えてから、油圧砕石ブレ
ーカーCにて天然砕石塊Wの破砕作業を行わねばならな
い。
In order to prevent the above-mentioned damage to the hydraulic crushed stone breaker C at an early stage, first, each of the piled natural crushed stone blocks W is taken out one by one, scraped out onto a stable flat ground or the like, and further flattened. After the natural crushed stone mass W is adjusted to the most stable state on the ground, the crushed work of the natural crushed stone mass W must be performed by the hydraulic crushed stone breaker C.

【0009】その天然砕石塊Wを山積箇所から一つずつ
取り出すには、油圧砕石ブレーカーCを装着した建設用
車両Mとは別に、天然砕石塊Wのかきだしに適したアタ
ッチメントをブーム先端に装着した建設用車両Mが必要
で、複数の建設用車両Mを準備し、且つこれらを現場に
搬入しなければならないし、且つ油圧砕石ブレーカーC
及び天然砕石塊Wかきだしのために作業員も複数必要と
する等、コスト,作業時間等がかさむこととなる等の問
題点がある。
In order to take out the natural crushed stone blocks W one by one from the piled point, an attachment suitable for scraping out the natural crushed stone blocks W is attached to the end of the boom separately from the construction vehicle M equipped with the hydraulic crushed stone breaker C. A construction vehicle M is required, a plurality of construction vehicles M must be prepared, and they must be carried to the site, and a hydraulic crusher breaker C
In addition, there are problems such as the need for a plurality of workers for extracting the natural crushed stone block W, which leads to an increase in cost, work time, and the like.

【0010】また、天然砕石塊Wの油圧砕石ブレーカー
Cによる破砕においては、図15に示すように、天然砕
石塊Wに対して、油圧砕石ブレーカーCのチゼルcの当
接が天然砕石塊Wの表面に略垂直状に当接させる等、作
業条件が厳しく制限され、この作業条件が備わっていな
いときには、天然砕石塊Wを効率良く破砕することがで
きず、極めて非効率的な破砕となり、一つの天然砕石塊
Wを何度も破砕しなくてはならず、作業時間が多くな
り、作業員の負担も増えることとなる。
[0010] In the crushing of the natural crushed stone mass W by the hydraulic crushed stone breaker C, the chisel c of the hydraulic crushed stone crusher C contacts the natural crushed stone mass W as shown in FIG. Working conditions are severely restricted, such as contacting the surface almost vertically, and when these working conditions are not provided, the natural crushed stone mass W cannot be efficiently crushed, resulting in extremely inefficient crushing. One natural crushed stone mass W must be crushed many times, which increases the working time and increases the burden on the worker.

【0011】さらに、破砕作業開始時には油圧砕石ブレ
ーカーCのチゼルcが天然砕石塊Wに対して適正位置に
なっていても破砕作業中、チゼルの貫入に従い、チゼル
cの方向が必然的にずれてしまったり、天然砕石塊Wが
油圧砕石ブレーカーCの振動,衝撃によって移動し、チ
ゼルcが天然砕石塊Wに対して不適正な状態となること
もあるので、破砕作業中においても常時、その状況を確
認しておかなければならず、油圧砕石ブレーカーC操作
が極めて困難且つ面倒であり、そのためには熟練した作
業員が必要であった。
Further, even when the chisel c of the hydraulic crusher breaker C is at an appropriate position with respect to the natural crushed stone mass W at the start of the crushing operation, the direction of the chisel c is necessarily shifted according to the chisel penetration during the crushing operation. The natural crushed stone mass W may move due to the vibration and impact of the hydraulic crushed stone breaker C, and the chisel c may be in an inappropriate state with respect to the natural crushed stone mass W. The operation of the hydraulic crusher breaker C was extremely difficult and troublesome, and a skilled worker was required for that.

【0012】さらに、天然砕石塊Wの破砕作業時には、
作業の衝撃力によるためブレーカーC及び建設車両の寿
命が極端に短くなる。さらに、図16に示すように、破
砕作業時には、多数の小塊w,w,…が広範囲に飛び散
って、作業者にとって危険である場合が多かったし、こ
のような油圧砕石ブレーカーCで破砕すると、破砕効率
が悪いのみならず、騒音公害を発生していた。
Further, at the time of crushing the natural crushed stone mass W,
The life of the breaker C and the construction vehicle becomes extremely short due to the impact force of the work. Further, as shown in FIG. 16, during the crushing operation, a large number of small lumps w, w,... Scattered over a wide area and were often dangerous for the operator. , Not only the crushing efficiency was poor, but also noise pollution occurred.

【0013】[0013]

【課題を解決するための手段】そこで、発明者は上記課
題を解決すべく鋭意,研究を重ねた結果、本発明を、破
砕機外筐に固定顎本体と可動顎本体とを設け、該固定顎
本体と可動顎本体との開閉作業にて破砕可能にし、且つ
固定顎本体の幅を適宜拡げたものとし、前記固定顎本体
の先端を可動顎本体の先端位置より長く形成し、固定顎
本体の破砕側には前記可動顎本体と対向する平板状の作
業部を有する補助体を着脱自在に設けてなる天然砕石塊
破砕装置としたことにより、天然砕石塊の破砕作業にお
ける効率を格段に向上させるとともに、その天然砕石塊
を極めて安全に破砕することができ、さらに耐久性及び
保守,管理性においても極めて優れたものにでき、上記
課題を解決したものである。
The inventor of the present invention has conducted intensive studies to solve the above-mentioned problems. As a result, the present invention provides a crusher outer casing having a fixed jaw main body and a movable jaw main body, and The movable jaw body and the movable jaw body can be crushed by opening and closing work, and the width of the fixed jaw body is appropriately enlarged, and the tip of the fixed jaw body is formed longer than the tip position of the movable jaw body. The crushing side of the natural crushed stone crushing device is provided with a detachable auxiliary body having a flat work section opposed to the movable jaw body. At the same time, the crushed natural crushed stone can be crushed very safely, and the durability, the maintenance and the manageability can be made extremely excellent.

【0014】[0014]

【実施例】以下、本発明の実施例を図面に基づいて説明
すると、本発明の天然砕石塊Wの破砕機Aは、図1,図
2に示すように、破砕機外筐1,固定顎本体3及び可動
顎本体4と、前記固定顎本体3に着脱自在な補助体Bと
から構成されており、まずその破砕機外筐1は、具体的
には、筐体状に形成され、内部が中空状に形成され、そ
の前側位置(図1において右側手前)に、開口部2が設
けられており、固定顎本体3は、破砕機外筐1の開口部
2側下端に外方に突出するように一体的に設けられてい
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. A crusher A for a natural crushed stone block W according to the present invention comprises, as shown in FIGS. The crusher outer casing 1 is composed of a main body 3 and a movable jaw main body 4 and an auxiliary body B detachable from the fixed jaw main body 3. Is formed in a hollow shape, and an opening 2 is provided at a front position thereof (on the right side in FIG. 1), and the fixed jaw main body 3 projects outward at a lower end of the crusher outer casing 1 on the opening 2 side. Are provided integrally.

【0015】その固定顎本体3は、図2に示すように、
前方に長く形成され、具体的には可動顎本体4が固定顎
本体3上に閉じた状態で固定顎本体3が可動顎本体4よ
りさらに前方に突出する程度の長さであって、山積され
た多数の天然砕石塊W,W,…を一度に多数かき出した
り、または一つずつかきだすときに効率的にできる構成
としている。
The fixed jaw main body 3 is, as shown in FIG.
The movable jaw body 4 is formed to be long forward, specifically, the length of the fixed jaw body 3 protruding further forward than the movable jaw body 4 when the movable jaw body 4 is closed on the fixed jaw body 3. .. Can be efficiently extruded when a large number of natural crushed stone blocks W, W,.

【0016】さらに、固定顎本体3の幅方向において、
幅広く形成され、該実施例を具体的に示すと、まず前記
固定顎本体3は破砕機外筐1の幅方向と同一幅に形成さ
れるものであるが、特に固定顎本体3を幅方向に広く形
成するものでは破砕機外筐1の幅寸法より多少広く形成
されたものである。
Further, in the width direction of the fixed jaw main body 3,
The fixed jaw main body 3 is formed to have the same width as the width direction of the crusher outer casing 1. Specifically, the fixed jaw main body 3 is formed in the width direction. When the crusher is formed wider, it is formed to be slightly wider than the width of the outer casing 1 of the crusher.

【0017】上述したように固定顎本体3の前方に長く
なるように形成し、且つ幅方向に広く形成し、これによ
って固定顎本体3の面積を広くすることにより、図10
に示すように、山積みされた多数の天然砕石塊W,W,
…より適宜の一つの天然砕石塊Wをかき出す際におい
て、同時に多くの天然砕石塊Wをかき出したり、または
これが大型の天然砕石塊Wであっても確実にかきだすこ
とができ、作業効率を向上させることができる。
As described above, the fixed jaw body 3 is formed to be long in front of the fixed jaw body 3 and wide in the width direction, thereby increasing the area of the fixed jaw body 3.
As shown in the figure, a large number of natural crushed stone masses W, W,
... When a more appropriate one natural crushed stone mass W is scraped out, a large amount of natural crushed stone mass W can be simultaneously scraped out, or even if it is a large natural crushed stone mass W, the work efficiency can be improved. be able to.

【0018】可動顎本体4は基部4aが、図1,図2に
示すように前記開口部2より破砕機外筐1の内部に挿入
されて軸支され、前記固定顎本体3に対応して開閉する
構成となっている。
The movable jaw body 4 has a base 4a inserted into the inside of the crusher outer casing 1 through the opening 2 as shown in FIGS. It is configured to open and close.

【0019】具体的には、その可動顎本体4の基部4a
が破砕機外筐1の開口部2下端に設けられた軸杆5に軸
支され、その固定顎本体3の垂直面上を揺動するように
構成され、可動顎本体4は、断面が略方形状をなし内部
は中空状となっており、可動顎本体4の先端(基部4a
と反対側)は上方に僅かに膨らみ、可動顎先端軸杆6が
設けられ、図1に示すように該可動顎先端軸杆6に開閉
用油圧シリンダ7のピストンロッド7aの先端が軸支さ
れ、そのシリンダ本体7bの長手方向中間箇所が破砕機
外筐1に軸支されている。
Specifically, the base 4a of the movable jaw main body 4
Is supported by a shaft 5 provided at the lower end of the opening 2 of the crusher outer casing 1 and swings on a vertical surface of the fixed jaw main body 3. The movable jaw main body 4 has a substantially cross section. The inside of the movable jaw body 4 is formed in a hollow shape and has a hollow end.
On the other hand, the movable jaw tip shaft 6 is slightly bulged upward, and the movable jaw tip shaft 6 is provided with the tip of the piston rod 7a of the opening / closing hydraulic cylinder 7 as shown in FIG. The middle portion of the cylinder body 7b in the longitudinal direction is supported by the outer casing 1 of the crusher.

【0020】その可動顎本体4の下面側(固定顎本体3
に対向する面)には、図1及び図2に示すように、その
幅方向の両側に、複数の横割り刃4b,4b,…が後方
に所定間隔をおいて設けられている。
The lower side of the movable jaw body 4 (the fixed jaw body 3)
1 and 2, a plurality of horizontal split blades 4b, 4b,... Are provided on the both sides in the width direction at predetermined intervals behind.

【0021】その固定顎本体3上には、着脱自在なる補
助体Bが装着されており、実際には天然砕石塊Wを本発
明の破砕機Aにて破砕するときには、補助体B上と可動
顎本体4との間に天然砕石塊Wを挟み可動顎本体4が補
助体B上に閉じで天然砕石塊Wが破砕される仕組みとな
っているものである。
A detachable auxiliary body B is mounted on the fixed jaw main body 3. When the natural crushed stone mass W is actually crushed by the crusher A of the present invention, the auxiliary body B is movable with respect to the auxiliary body B. The movable chin body 4 is closed on the auxiliary body B with the natural crushed stone block W interposed between the jaw body 4 and the natural crushed stone block W to be crushed.

【0022】その補助体Bは、図3乃至図5等に示すよ
うに、作業部8と取付部9とから構成され、この作業部
8と取付部9には種々の実施例が存在し、その第1実施
例としては、図3に示すように、平板状の作業部8の裏
面側に取付部9が一体形成されおり、該取付部9は蟻ほ
ぞ9aをなしている。
The auxiliary body B is composed of a working part 8 and a mounting part 9 as shown in FIGS. 3 to 5, and the working part 8 and the mounting part 9 have various embodiments. In the first embodiment, as shown in FIG. 3, a mounting portion 9 is integrally formed on the back side of a flat work portion 8, and the mounting portion 9 forms a dovetail tenon 9a.

【0023】また、固定顎本体3には被取付部10が形
成されており、該被取付部10は蟻溝10aとして形成
され、図3,図4(a)に示すように、前記取付部9の
蟻ほぞ9aが蟻溝10aに係止する構成となっており、
補助体Bの蟻ほぞ9aを被取付部10の蟻溝10aに係
止してその補助体Bを固定顎本体3上に固定し、図4
(b)に示すように、補助体Bの端部が固着具12にて
固着されたり、或いは補助体Bの端部箇所が固定板1
1,11により固定され、該固定板11,11は固定顎
本体3に溶接手段等にて固着される構造となっている
(図5参照)。
The fixed jaw main body 3 has a mounting portion 10 formed therein. The mounting portion 10 is formed as a dovetail groove 10a, and as shown in FIGS. The dovetail mortise 9a is locked in the dovetail groove 10a.
The dovetail tenon 9a of the auxiliary body B is locked in the dovetail groove 10a of the attached portion 10, and the auxiliary body B is fixed on the fixed jaw main body 3, and FIG.
As shown in (b), the end of the auxiliary body B is fixed by the fixing tool 12 or the end of the auxiliary body B is fixed to the fixing plate 1.
The fixing plates 11, 11 are fixed to the fixed jaw main body 3 by welding means or the like (see FIG. 5).

【0024】その補助体Bの第2実施例としては、図6
(a),(b)及び図7,図8に示すように、取付部9
は、固定顎本体3との取付面側に扁平状の窪み面となる
凹状テーパー合せ部9bが形成され、該凹状テーパー合
せ部9bは、図6(a)に示すように、左右対称のテー
パー状に形成された対向する内壁面9b1 ,9b1 が形
成され、その両内壁面9b1 ,9b1 の中心箇所に前記
蟻ほぞ9aが形成されたものでいる。
FIG. 6 shows a second embodiment of the auxiliary body B.
As shown in FIGS. 7A and 7B and FIGS.
Is formed with a concave tapered mating portion 9b which becomes a flat concave surface on the mounting surface side with the fixed jaw main body 3, and the concave tapered mating portion 9b has a symmetrical taper as shown in FIG. Opposite inner wall surfaces 9b1, 9b1 are formed, and the dovetail tenon 9a is formed at the center of the inner wall surfaces 9b1, 9b1.

【0025】また、被取付部10においては、扁平な盛
上り状となる凸状テーパー合せ部10bが形成され、該
凸状テーパー合せ部10bは、図6(b)に示すよう
に、対向する外壁面10b1 ,10b1 が形成され、該
外壁面10b1 ,10b1 も、前記凹状テーパー合せ部
9bの内壁面9b1 ,9b1 と同様に左右対称のテーパ
ー状に形成され、且つ内壁面9b1 ,9b1 と外壁面1
0b1 ,10b1 とのテーパーの勾配は一致し、両者を
接触させたときには、正確且つ確実なる当接状態とな
る。
Further, in the mounting portion 10, a convex tapered mating portion 10b having a flat raised shape is formed, and the convex tapered mating portion 10b is opposed as shown in FIG. 6 (b). Outer wall surfaces 10b1 and 10b1 are formed, and the outer wall surfaces 10b1 and 10b1 are also formed into a bilaterally symmetric tapered shape like the inner wall surfaces 9b1 and 9b1 of the concave taper mating portion 9b, and the inner wall surfaces 9b1 and 9b1 and the outer wall surface are formed. 1
The taper gradients of 0b1 and 10b1 coincide with each other, and when they are brought into contact, an accurate and reliable abutment state is obtained.

【0026】その両外壁面10b1 ,10b1 の中心箇
所に蟻溝10aが形成されたものであり、前記凹状テー
パー合せ部9bと凸状テーパー合せ部10bとは同一勾
配のテーパーを有し両者を接触させたときに、両テーパ
ー面が一致するようになっている(図7参照)。
A dovetail groove 10a is formed at the center of the outer wall surfaces 10b1 and 10b1. The concave taper mating portion 9b and the convex taper mating portion 10b have the same gradient taper and are in contact with each other. When this is done, the two tapered surfaces match (see FIG. 7).

【0027】さらに、被取付部10の蟻溝10aの前後
方向に沿って凹状部10cが蟻溝10aに連続して形成
され、該凹状部10cには前記取付部9の蟻ほぞ9aが
遊挿自在且つその凹状部10cよりスライドさせること
により蟻ほぞ9aが蟻溝10a内に移動できる構成とな
っている。
Further, a concave portion 10c is formed continuously with the dovetail groove 10a along the front and rear direction of the dovetail groove 10a of the mounted portion 10, and the dovetail tena 9a of the mounting portion 9 is loosely inserted into the concave portion 10c. The dove mortise 9a can be freely moved into the dovetail groove 10a by sliding freely from the concave portion 10c.

【0028】上記構造により、補助体Bを被取付部10
を介して固定顎本体3に装着するには、取付部9の蟻ほ
ぞ9aを、まず一旦、被取付部10の凹状部10c内に
遊挿し、次いで補助体Bを固定顎本体3に沿ってスライ
ドさせつつ蟻ほぞ9aを蟻溝10a内に挿入し、凹状テ
ーパー合せ部9bの内壁面9b1 ,9b1 が凸状テーパ
ー合せ部10bの外壁面10b1 ,10b1 に当接する
までスライドさせ、装着後、前記固定板11,11にて
固着される(図10参照)。
With the above structure, the auxiliary body B is connected to the mounting portion 10.
In order to attach to the fixed jaw body 3 through the fin, the dovetail tena 9a of the mounting portion 9 is first loosely inserted into the concave portion 10c of the mounted portion 10, and then the auxiliary body B is moved along the fixed jaw body 3 Insert the dovetail tenon 9a into the dovetail groove 10a while sliding, and slide until the inner wall surfaces 9b1 and 9b1 of the concave taper mating portion 9b contact the outer wall surfaces 10b1 and 10b1 of the convex taper mating portion 10b. It is fixed by fixing plates 11 and 11 (see FIG. 10).

【0029】その補助体Bの第3実施例では、図9
(a)に示すように、補助体Bの取付部9はボルト等の
螺子体9cが使用され、補助体Bをその螺子体9cによ
って固定顎本体3の内螺子部10dとした被取付部10
に螺合し、固着する。
In the third embodiment of the auxiliary body B, FIG.
As shown in (a), a screw member 9c such as a bolt is used as the mounting portion 9 of the auxiliary body B, and the mounting portion 10 is formed by using the auxiliary body B as the inner screw portion 10d of the fixed jaw main body 3 by the screw body 9c.
And screwed in.

【0030】その補助体Bの第4実施例では、図9
(b)に示すように、被取付部10は固定顎本体3表面
より内部に逆T字状溝10eとして形成されたものでを
あって、該被取付部10に対応する取付部9は、作業部
8とは別材として形成されたものであって、前記逆T字
状溝10eに係合可能な内螺子を有する係止ブロック9
dとし、該係止ブロック9dを逆T字状溝10e内に装
着するとともに、係止ブロック9dの内螺子と螺合する
ボルトを介して、取付部9と前記作業部8とが被取付部
10に固定される構成となっている。
In the fourth embodiment of the auxiliary body B, FIG.
As shown in (b), the attached portion 10 is formed as an inverted T-shaped groove 10e inside the surface of the fixed jaw main body 3, and the attaching portion 9 corresponding to the attached portion 10 is A locking block 9 formed as a separate material from the working portion 8 and having an internal thread engageable with the inverted T-shaped groove 10e.
d, the locking block 9d is mounted in the inverted T-shaped groove 10e, and the mounting portion 9 and the working portion 8 are connected to each other through bolts that are screwed into the internal screws of the locking block 9d. 10.

【0031】その補助体Bは、一つだけでなく、複数個
が用意され、固定顎本体3上に固着される実施例も存在
し、また補助体Bは、固定顎本体3の破砕作業側、即ち
可動顎本体4と噛み合う側に装着されるものであるが、
必要に応じて、固定顎本体3の裏面側、即ち破砕作業側
と反対側に装着されることもある。
There is an embodiment in which not only one auxiliary body B but a plurality of auxiliary bodies B are prepared and fixed on the fixed jaw main body 3. That is, it is mounted on the side that meshes with the movable jaw main body 4,
If necessary, it may be mounted on the back side of the fixed jaw body 3, that is, on the side opposite to the crushing work side.

【0032】次に、固定顎本体3の先端には先端ツメN
が着脱自在に装着される実施例が存在するが、先端ツメ
Nはツメ部13と被連結部14とからなり、また固定顎
本体3には連結部15が形成され、連結具16にて連結
固着されるものである。
Next, the tip of the fixed jaw body 3 is
There is an embodiment in which the front jaw N is detachably mounted. The front jaw N includes a jaw portion 13 and a connected portion 14, and the fixed jaw main body 3 is provided with a connecting portion 15 which is connected by a connecting tool 16. It is fixed.

【0033】その連結部15は、図17に示すように、
連結部15が突起状をなし、また被連結部14が凹状を
なし、連結部15が被連結部14に挿入する構成とな
り、且つコッタ等の連結具16が連結部15と被連結部
14とを貫通状に係止して連結固定することができる
(図18参照)。
The connecting portion 15 is, as shown in FIG.
The connecting portion 15 has a protruding shape, the connected portion 14 has a concave shape, the connecting portion 15 is inserted into the connected portion 14, and a connecting tool 16 such as a cotter is connected to the connecting portion 15 and the connected portion 14. Can be locked in a penetrating manner and connected and fixed (see FIG. 18).

【0034】本発明の破砕機Aは建設用車両Mの作業用
ブームbの先端に装着され、運転室rから作業員が操作
するもので、その破砕機Aにて天然砕石塊Wを破砕する
作業では、まず、砕石可能な岩山をダイナマイト等の爆
破物にて爆破し、山積み状にした多数の天然砕石塊W,
W,…とし、破砕機Aにて、山積み状の天然砕石塊Wか
らひとずつの天然砕石塊Wをかきだし、或いは山積み状
の多数の天然砕石塊W,W,…より適宜に一つずつ取り
出し、その場にて破砕し、該天然砕石塊Wをさらに小塊
w,w,…に破砕して行くものである。
The crusher A of the present invention is mounted on the tip of the work boom b of the construction vehicle M, and is operated by an operator from the cab r. The crusher A crushes the natural crushed stone mass W. In the work, first, a large number of natural crushed stone blocks W, which were blasted with a blasting material such as dynamite,
W,..., And the crusher A scrapes out the individual natural crushed stone blocks W from the piled natural crushed stone blocks W, or takes out one by one from the piled natural crushed stone blocks W, W, W,. The natural crushed stone mass W is further crushed into small lumps w, w,.

【0035】[0035]

【発明の効果】請求項1においては、破砕機外筐1に固
定顎本体3と可動顎本体4とを設け、該固定顎本体3と
可動顎本体4との開閉作業にて破砕可能にし、且つ固定
顎本体3の幅を適宜拡げたものとし、前記固定顎本体3
の先端を可動顎本体4の先端位置より長く形成し、固定
顎本体3の破砕側には前記可動顎本体4と対向する平板
状の作業部8を有する補助体Bを着脱自在に設けた天然
砕石塊破砕装置としたことにより、先ず第1に極めて耐
久性に優れたものにすることができるし、第2に極めて
効率的な天然砕石塊の破砕ができるし、第3に極めて容
易で熟練を必要としない作業ができるし、第4に作業員
に極めて安全且つ良好な作業環境を提供することができ
る等の種々の効果を奏する。
According to the first aspect of the present invention, a fixed jaw main body 3 and a movable jaw main body 4 are provided in the crusher outer casing 1, and crushing can be performed by opening and closing the fixed jaw main body 3 and the movable jaw main body 4. In addition, the width of the fixed jaw body 3 is appropriately enlarged,
Of the movable jaw body 4 is formed longer than the distal end position of the movable jaw body 4, and an auxiliary body B having a flat work portion 8 opposed to the movable jaw body 4 is detachably provided on the crushing side of the fixed jaw body 3. By using a crushed stone crushing apparatus, firstly, it can be made extremely durable, secondly, it can crush natural crushed stone very efficiently, and thirdly, it is very easy and skilled And 4thly, there are various effects such as providing an extremely safe and favorable working environment for workers.

【0036】上記効果を詳述すると、図11乃至図14
に示すように、固定顎本体3の破砕側に補助体Bを着脱
自在に装着していることにより、固定顎本体3が直接、
天然砕石塊Wを破砕するものではなく、固定顎本体3上
に設けた補助体B上に天然砕石塊Wを載置し、可動顎本
体4を閉じて、その天然砕石塊Wを破砕するものであ
り、前記固定顎本体3は補助体Bにより衝撃を和らげら
れることとなる。そのために、固定顎本体3等は天然砕
石塊Wの破砕時に該天然砕石塊Wから反力を受けても大
きな損傷を受けずに済む。
The above effects will be described in detail with reference to FIGS.
As shown in (2), the auxiliary body B is detachably mounted on the crushing side of the fixed jaw main body 3, so that the fixed jaw main body 3 is directly
Instead of crushing the natural crushed stone mass W, placing the natural crushed stone mass W on the auxiliary body B provided on the fixed jaw main body 3, closing the movable jaw main body 4, and crushing the natural crushed stone mass W The impact of the fixed jaw main body 3 can be reduced by the auxiliary body B. Therefore, even if the fixed jaw main body 3 receives a reaction force from the natural crushed stone mass W when the natural crushed stone mass W is crushed, the fixed jaw main body 3 does not suffer large damage.

【0037】また、補助体Bを固定顎本体3に対して着
脱自在なる構造としているので、天然砕石塊Wの破砕に
より、補助体Bの表面が傷んで、破砕作業を成しえなく
なっても、その補助体Bを新たなものに付け替えること
で、すぐに破砕作業にとりかかることができ、作業効率
を向上させることができる。さらに、天然砕石塊Wの破
砕作業において固定顎本体3は、ほとんど損傷を受けず
にすむため、破砕機Aの寿命も極めて長期となり、経済
的である。
Further, since the auxiliary body B is configured to be detachable from the fixed jaw main body 3, even if the surface of the auxiliary body B is damaged by the crushing of the natural crushed stone mass W, the crushing operation cannot be performed. By replacing the auxiliary body B with a new one, it is possible to immediately start the crushing operation and improve the working efficiency. Further, the fixed jaw main body 3 hardly receives any damage in the crushing operation of the natural crushed stone mass W, so that the life of the crusher A is extremely long, which is economical.

【0038】次に、従来の油圧砕石ブレーカーCを使用
した破砕作業では、岩山をダイナマイト等の爆破物にて
爆破し、山積みとなった多数の天然砕石塊W,W,…の
破砕作業を行う前に、山積みとなった多数の天然砕石塊
W,W,…から適宜に一つの天然砕石塊Wを適宜かきだ
して、平坦状の地面等の天然砕石塊Wを極めて安定した
状態で載置可能な場所に移動させなければならず、その
ための専用の建設用車両が必要であるが、本発明の破砕
機Aでは、破砕機外筐1に設けた固定顎本体3、及び該
固定顎本体3上に開閉自在な可動顎本体4からなるもの
であり、且つその固定顎本体3は幅方向に広く形成して
いるので、山積み状の多数の天然砕石塊W,W,…よ
り、適宜の天然砕石塊Wを確実にかきだすことができ、
該作業には極めて好適であり、このことによって、山積
み状の多数の天然砕石塊W,W,…から一つの天然砕石
塊Wを取り出す作業のためにわざわざ別の専用建設用車
両を用意する必要をなくすることができる。
Next, in the crushing operation using the conventional hydraulic crushed stone breaker C, the rocky mountain is blasted with a blasting material such as dynamite to crush many piled natural crushed stone blocks W, W,. Previously, one natural crushed stone block W can be appropriately scraped out from a large number of piled natural crushed stone blocks W, W,..., And the natural crushed stone block W such as a flat ground can be placed in an extremely stable state. The crusher A of the present invention requires the fixed jaw body 3 provided on the crusher outer casing 1 and the fixed jaw body 3. The movable jaw body 4 is configured to be openable and closable at the top, and the fixed jaw body 3 is formed wide in the width direction. Therefore, natural piles W, W,. The crushed stone mass W can be reliably scraped out,
It is very suitable for this operation, and therefore, it is necessary to separately prepare a dedicated construction vehicle for extracting one natural crushed stone block W from a large number of piled natural crushed stone blocks W, W,. Can be eliminated.

【0039】また、山積みされた多数の天然砕石塊W,
W,…から適宜の天然砕石塊Wを固定顎本体3と可動顎
本体4とによってくわえるようにして取り出すと同時に
可動顎本体4を固定顎本体3上に閉じて天然砕石塊Wを
圧壊することにより極めて迅速に破砕作業を行うことが
でき、従来の油圧砕石ブレーカーCによる破砕作業に見
られるように破砕する天然砕石塊Wをわざわざ安定した
状態に載置できる場所に移動させて、安定した状態にし
てから油圧砕石ブレーカーCのチゼルcを当接して破砕
する面倒な作業の必要がなく、従ってそのような平坦状
地面を確保する必要もなくなり、破砕作業の段取り等に
多くの時間を割かれることがなくなり、作業効率を格段
と向上させることができるものである。
Further, a large number of crushed natural crushed stone blocks W,
The appropriate natural crushed stone mass W is taken out of the fixed jaw main body 3 and the movable jaw main body 4 so as to be taken out from W,... And the movable jaw main body 4 is closed on the fixed jaw main body 3 to crush the natural crushed stone mass W. The crushing operation can be performed very quickly, and the natural crushed stone mass W to be crushed is moved to a place where the crushed natural crushed stone mass W can be placed in a stable state, as seen in the crushing operation by the conventional hydraulic crusher breaker C, and a stable state is obtained. After that, there is no need for a troublesome work of crushing by contacting the chisel c of the hydraulic crusher breaker C, and thus there is no need to secure such a flat ground, and much time is required for setting up the crushing work. Therefore, the working efficiency can be remarkably improved.

【0040】次に、従来システムに見られるように油圧
砕石ブレーカーCにての天然砕石塊Wの破砕作業では、
チゼルcの激しい衝撃,振動を利用したものであるた
め、ブレーカーC及び建設用車両の寿命が極端に短かっ
たり、天然砕石塊Wが破砕されるときに小塊w,w,…
が広範囲に飛散し、作業員に極めて危険であり、また建
設用車両Mにとっても飛散する小塊w,w,…が当たっ
て破損箇所を生じる原因となるが、本発明のシステムに
おいて、固定顎本体3と可動顎本体4とで天然砕石塊W
をかみ砕くため、衝撃力は、極端に小さく、破砕装置及
び建設用車両の寿命は非常に長く、また小塊w,w,…
の飛散の範囲を極めて狭い範囲にすることができ、安全
な作業環境を提供することができる。
Next, as seen in the conventional system, in the crushing operation of the natural crushed stone mass W in the hydraulic crushed stone breaker C,
Since the violent impact and vibration of the chisel c are used, the life of the breaker C and the construction vehicle is extremely short, and when the natural crushed stone W is crushed, small lumps w, w,.
Scatters over a wide area, which is extremely dangerous to the worker, and also causes the broken small w, w,. Natural crushed stone mass W with body 3 and movable jaw body 4
, The impact force is extremely small, the life of the crushing device and the construction vehicle is very long, and small pieces w, w,.
Can be made extremely small, and a safe working environment can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の斜視図FIG. 1 is a perspective view of the present invention.

【図2】本発明の断面図FIG. 2 is a sectional view of the present invention.

【図3】本発明の要部斜視図FIG. 3 is a perspective view of a main part of the present invention.

【図4】(a)は本発明の要部断面図 (b)は本発明の要部側面図4A is a sectional view of a main part of the present invention, and FIG. 4B is a side view of a main part of the present invention.

【図5】本発明の要部断面図FIG. 5 is a sectional view of a main part of the present invention.

【図6】(a)は取付部の斜視図 (b)は被取付部の斜視図FIG. 6A is a perspective view of a mounting portion. FIG. 6B is a perspective view of a mounting portion.

【図7】補助体の平面図FIG. 7 is a plan view of an auxiliary body.

【図8】補助体の縦断側面図FIG. 8 is a longitudinal sectional side view of an auxiliary body.

【図9】(a)は補助体の実施例の断面図 (b)は補助体の別の実施例の断面図9A is a cross-sectional view of an embodiment of an auxiliary body. FIG. 9B is a cross-sectional view of another embodiment of an auxiliary body.

【図10】本発明の作用を示す略示図FIG. 10 is a schematic view showing the operation of the present invention.

【図11】山積み状の天然砕石塊より適宜の天然砕石塊
を取り出そうとする略示図
FIG. 11 is a schematic view of trying to take out an appropriate natural crushed stone from a pile of natural crushed stone.

【図12】山積み状の天然砕石塊より適宜の天然砕石塊
を取り出した略示図
FIG. 12 is a schematic view of a natural crushed stone mass taken out of a pile of natural crushed stone masses.

【図13】天然砕石塊を破砕しようとする略示図FIG. 13 is a schematic view of trying to break a natural crushed stone mass.

【図14】天然砕石塊を破砕して小塊とした略示図FIG. 14 is a schematic diagram of crushing a natural crushed stone mass into small lumps.

【図15】従来技術を示す略示図FIG. 15 is a schematic view showing a conventional technique.

【図16】従来技術を示す略示図FIG. 16 is a schematic view showing a conventional technique.

【図17】先端ツメ箇所の要部斜視図FIG. 17 is a perspective view of a main part of a tip claw portion.

【図18】先端ツメの着脱作用を示す断面図FIG. 18 is a cross-sectional view showing the attachment / detachment operation of the tip claw.

【符号の説明】[Explanation of symbols]

1…破砕機外筐 3…固定顎本体 4…可動顎本体 B…補助体 8…作業部 DESCRIPTION OF SYMBOLS 1 ... Crusher outer case 3 ... Fixed jaw main body 4 ... Movable jaw main body B ... Auxiliary body 8 ... Working part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 松居 邦彦 千葉市千種町314番地 株式会社坂戸工 作所内 (72)発明者 永吉 勇 千葉市千種町314番地 株式会社坂戸工 作所内 (72)発明者 長瀬 忠比古 千葉市千種町314番地 株式会社坂戸工 作所内 (72)発明者 小柳 博雄 千葉市千種町314番地 株式会社坂戸工 作所内 (72)発明者 永沢 勇治 千葉市千種町314番地 株式会社坂戸工 作所内 (56)参考文献 実公 平3−15612(JP,Y2) (58)調査した分野(Int.Cl.7,DB名) E04G 23/08 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Kunihiko Matsui 314 Chikusa-cho, Chiba City Inside Sakado Works (72) Inventor Isamu Nagayoshi 314 Chika-cho, Chiba City Inside Sakado Works (72) Inventor Nagase Tadahiko 314 Chikacho, Chiba City Inside Sakado Works (72) Inventor Hiroo Koyanagi 314 Chigusamachi Chiba City Inside Sakado Works Co., Ltd. Inside Sakado Works (56) References JP 3-15612 (JP, Y2) (58) Field surveyed (Int. Cl. 7 , DB name) E04G 23/08

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 破砕機外筐に固定顎本体と可動顎本体と
を設け、該固定顎本体と可動顎本体との開閉作業にて破
砕可能にし、且つ固定顎本体の幅を適宜拡げたものと
し、前記固定顎本体の先端を可動顎本体の先端位置より
長く形成し、固定顎本体の破砕側には前記可動顎本体と
対向する平板状の作業部を有する補助体を着脱自在に設
けてなることを特徴とした天然砕石塊破砕装置。
A fixed jaw body and a movable jaw body are provided in an outer casing of a crusher, and the fixed jaw body and the movable jaw body can be crushed by opening and closing operations, and the width of the fixed jaw body is appropriately enlarged. The tip of the fixed jaw main body is formed longer than the tip end position of the movable jaw main body, and the movable jaw main body is formed on the crush side of the fixed jaw main body.
A detachable auxiliary body with opposing flat working parts
Only to become possible natural crushed stone mass crushing apparatus characterized.
JP4201877A 1992-07-07 1992-07-07 Natural crushed stone crusher Expired - Fee Related JP3002609B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4201877A JP3002609B2 (en) 1992-07-07 1992-07-07 Natural crushed stone crusher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4201877A JP3002609B2 (en) 1992-07-07 1992-07-07 Natural crushed stone crusher

Publications (2)

Publication Number Publication Date
JPH0626214A JPH0626214A (en) 1994-02-01
JP3002609B2 true JP3002609B2 (en) 2000-01-24

Family

ID=16448351

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4201877A Expired - Fee Related JP3002609B2 (en) 1992-07-07 1992-07-07 Natural crushed stone crusher

Country Status (1)

Country Link
JP (1) JP3002609B2 (en)

Also Published As

Publication number Publication date
JPH0626214A (en) 1994-02-01

Similar Documents

Publication Publication Date Title
US5435084A (en) Apparatus and method for attaching a digging tooth tip
US6764139B1 (en) System for and method of demolition
CA2107005C (en) Retaining device
JP3063940B2 (en) Natural crushed stone crushing system
US7243646B2 (en) Apparatus and method for shearing reinforced concrete piles and metal piles and crushing reinforced concrete piles
JPH02504236A (en) concrete crusher
US3530601A (en) Tooth point assembly for earth digging structures
JP3002609B2 (en) Natural crushed stone crusher
EP0249654B1 (en) Shore strut assembly for supporting sheathing wall
US2499620A (en) Pneumatic hammer for dozer blades
US4984639A (en) Demolition hammer
BR112021008022A2 (en) cover retention system for a work tool
JPH0274792A (en) Tunnel construction method with no blasting
JP3080513B2 (en) Natural crushed stone crusher
AU2021394455B2 (en) Coupling assembly
JP2978670B2 (en) Natural crushed stone crusher
JP3042944B2 (en) Natural crushed stone crusher
JP3115446U (en) Leaderless civil engineering foundation machine
JP2588105Y2 (en) Jaw tip device of crusher
JPH0619634Y2 (en) Jig for processing underground pine piles protruding in the excavation area
JPH11166210A (en) L-type guard
JPH10252055A (en) Easy-to-drive sheet pile structure and driving edge jig therefor
JPH09209384A (en) Attachment of drilling machine constituted of multispindle chisel with breaker
JPS6218380Y2 (en)
JPS591854B2 (en) Excavator for shield machine

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees