JP3000074B2 - Slope greening method and mortar spraying formwork - Google Patents

Slope greening method and mortar spraying formwork

Info

Publication number
JP3000074B2
JP3000074B2 JP25356893A JP25356893A JP3000074B2 JP 3000074 B2 JP3000074 B2 JP 3000074B2 JP 25356893 A JP25356893 A JP 25356893A JP 25356893 A JP25356893 A JP 25356893A JP 3000074 B2 JP3000074 B2 JP 3000074B2
Authority
JP
Japan
Prior art keywords
slope
mortar
rising
greening
rising surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP25356893A
Other languages
Japanese (ja)
Other versions
JPH0782750A (en
Inventor
裕司 中野
光希 桜井
Original Assignee
ライト工業株式会社
小岩金網株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ライト工業株式会社, 小岩金網株式会社 filed Critical ライト工業株式会社
Priority to JP25356893A priority Critical patent/JP3000074B2/en
Publication of JPH0782750A publication Critical patent/JPH0782750A/en
Application granted granted Critical
Publication of JP3000074B2 publication Critical patent/JP3000074B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、斜面に法枠を構築し、
かつ緑化生育基盤材を充填して行う斜面緑化工法と、法
枠施工に用いるモルタル吹付け用型枠に関するものであ
る。
BACKGROUND OF THE INVENTION The present invention relates to the construction of a legal framework on a slope,
Also, the present invention relates to a slope revegetation method performed by filling a revegetation growth base material and a mortar spraying formwork used for construction of a method frame.

【0002】[0002]

【従来の技術】斜面緑化工法の一つとして、従来から図
7に示すような工法が存在する。この工法は、斜面に金
網aを敷設し、その上に鉄筋bを配置して、アンカ−ピ
ンcにより斜面に固定する。次に、鉄筋bの周囲にモル
タルdを吹き付け、斜面上に格子状等の法枠を構築す
る。そして、法枠の升目に緑化生育基盤材eを吹き付け
て法面緑化を完成させる。
2. Description of the Related Art As one of the slope greening methods, there is a conventional method as shown in FIG. In this method, a wire mesh a is laid on a slope, and a reinforcing bar b is placed on the wire mesh a, and is fixed to the slope by an anchor pin c. Next, mortar d is sprayed around the reinforcing bar b to construct a grid-like or other legal frame on the slope. And the greening growth base material e is sprayed on the square of the law frame to complete the slope greening.

【0003】[0003]

【発明が解決しようとする課題】上記の従来技術は、鉄
筋bのみがモルタルdの吹き付けの手掛かりとなる。そ
のため、法枠の形状はなだらかな山形となり、急勾配斜
面の場合は、法枠の山側に充填された基盤材eが風化す
ると、法枠の山側面に沿って谷側に崩れ落ちるおそれが
ある。また、モルタルdを所定の山形形状に吹き付ける
には熟練を要し、人件費等の問題が発生する。
In the above prior art, only the reinforcing bar b is a key for spraying the mortar d. For this reason, the shape of the legal frame becomes a gentle mountain shape, and in the case of a steep slope, when the base material e filled on the mountain side of the legal frame is weathered, there is a possibility that it collapses to the valley side along the mountain side surface of the legal frame. In addition, skill is required to spray the mortar d into a predetermined chevron shape, which causes problems such as labor costs.

【0004】[0004]

【本発明の目的】本発明は、上記のような問題点を解決
するためになされたもので、急勾配斜面での基盤材の崩
落を防止でき、かつ容易に施工を行える斜面緑化工法を
提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and provides a slope revegetation method capable of preventing collapse of a base material on a steep slope and easily performing construction. The purpose is to do.

【0005】[0005]

【課題を解決するための手段】即ち、本発明は、斜面に
法枠を構築し、かつ緑化生育基盤材を充填して行う斜面
緑化工法において、有孔型枠を、その一面を斜面の山側
に立ち上げた状態でアンカ−ピンにより斜面に固定し、
次に前記有孔型枠にモルタルを吹き付けて法枠を構築
し、この法枠の山側に前記緑化生育基盤材の崩落防止面
を立ち上げて形成したことを特徴とする、斜面緑化工法
である。また、斜面にモルタルを吹付けて法枠を構築す
る際に用いるモルタル吹付け用型枠において、斜面の山
側に立ち上げる有孔の立上り面を有する断面L字形ある
いは半ド−ム形のモルタル吹付け用型枠である。
That is, the present invention relates to a slope revegetation method in which a slope is constructed on a slope and filled with a greening and growing base material. In the state where it was raised in the above, fixed to the slope with anchor pin,
Next, a mortar is sprayed on the perforated formwork to construct a legal form, and a slope prevention greening method is characterized in that a fall prevention surface of the greening growth base material is formed on the mountain side of the legal form. . Further, in a mortar spraying formwork used when a mortar is sprayed on a slope to construct a legal form, an L-shaped or semi-domed mortar spraying section having a perforated rising surface rising on the mountain side of the slope. This is a mounting formwork.

【0006】[0006]

【実施例1】 <イ>型枠の形状(図2) 型枠1は、金網材、エキスパンドメタル、有孔板体等で
作製した有孔型枠であり、例えば、図2に示すように、
斜面の山側に立ち上げる立上り面11と、この立上り面
11の下端に連続する設置面12とにより断面L字形に
形成する。
Embodiment 1 <a> Shape of Form (FIG. 2) The form 1 is a perforated form made of a wire mesh material, expanded metal, a perforated plate, or the like. For example, as shown in FIG. ,
A rising surface 11 rising on the mountain side of the slope and an installation surface 12 continuing to the lower end of the rising surface 11 form an L-shaped cross section.

【0007】立上り面11に開設する孔の寸法は、設置
面12に開設する孔よりも小さく形成し、立上り面11
にせき板としての機能を持たる。そのため、立上り面1
1の谷側から山側にモルタルを吹付ける際に、モルタル
が山側に飛散するのを防止することができる。
The size of the hole formed in the rising surface 11 is smaller than the size of the hole formed in the mounting surface 12.
Has the function of a squat board. Therefore, the rising surface 1
When the mortar is sprayed from the valley side to the mountain side, the mortar can be prevented from scattering to the mountain side.

【0008】<ロ>金網の張付け(図1) 先ず、図1に示すように、斜面の全体に金網2を張り付
ける。この金網2は、斜面上に吹き付ける緑化生育基盤
材6の崩落を抑えるためのものである。なお、繊維を混
入した客土を吹き付ける場合は、金網2を必要としな
い。
<B> Attachment of Wire Mesh (FIG. 1) First, as shown in FIG. 1, a wire mesh 2 is attached over the entire slope. This wire mesh 2 is for suppressing the collapse of the greening growth base material 6 sprayed on the slope. Note that the wire mesh 2 is not required when spraying the soil containing fibers.

【0009】<ハ>型枠の設置(図1、2) 上述の型枠1を、その立上り面11を斜面の山側に位置
させた状態で、アンカ−ピン3を設置面12に貫通させ
て斜面に打ち込む。アンカ−ピン3の打ち込みの際に
は、設置面12の網目に短管や筒状スペ−サなどを差し
込み、それらを貫通させて行うとよい。型枠1は、法枠
形状に合わせて水平方向等に斜面上に設置する。次に、
アンカ−ピン3の山側の上下部などに所要数の鉄筋4を
固定する。
<C> Installation of Formwork (FIGS. 1 and 2) With the above-described formwork 1 in a state where the rising surface 11 is located on the mountain side of the slope, the anchor pin 3 is passed through the installation surface 12. Drive into the slope. When the anchor pin 3 is driven, a short pipe or a tubular spacer may be inserted into the mesh of the installation surface 12 and penetrated therethrough. The mold 1 is installed on a slope in the horizontal direction or the like in accordance with the shape of the legal frame. next,
A required number of reinforcing bars 4 are fixed to the upper and lower portions of the anchor pin 3 on the mountain side.

【0010】<ニ>モルタル、基盤材の吹き付け(図
1) 斜面上に設置した型枠1にモルタル5を吹き付けて法枠
を構築する。このとき、モルタル5は立上り面11の谷
側から山側に向けて斜めに吹付けるが、立上り面11の
せき板機能によって、モルタル5の山側への飛散を防止
できる。そのため、立上り面11に吹き付けられたモル
タル5は、立上り面11の山側面に薄い層を形成するに
止まる。
<D> Spraying mortar and base material (FIG. 1) A mortar 5 is sprayed on a mold 1 installed on a slope to construct a legal frame. At this time, the mortar 5 is sprayed obliquely from the valley side of the rising surface 11 toward the mountain side, but the mortar 5 can be prevented from scattering to the mountain side by the damping plate function of the rising surface 11. Therefore, the mortar 5 sprayed on the rising surface 11 stops forming a thin layer on the mountain side of the rising surface 11.

【0011】従って、モルタル5が硬化して形成された
法枠は、その山側に斜面とほぼ垂直な部分を有する崩落
防止面51が形成される。なお、型枠1の立上り面11
の高さは予め設定されているため、この立上り面11を
定規代わりに用いてその上端まで吹き付けを行えば、モ
ルタルの吹き付け高さを正確に施工することができる。
Therefore, the legal frame formed by hardening the mortar 5 has a fall prevention surface 51 having a portion substantially perpendicular to the slope on the mountain side. The rising surface 11 of the mold 1
Since the height of the mortar is set in advance, if the rising surface 11 is used as a ruler and spraying is performed to the upper end, the spraying height of the mortar can be accurately set.

【0012】法枠が完成した後、法枠の格子状の升目部
分等に、緑化生育基盤材6を吹き付けなどにより充填す
る。充填された基盤材6は、法枠の崩落防止面51に係
止されるため、急勾配斜面でも谷側への崩落を防止でき
る。
After the legal frame is completed, the lattice-shaped squares and the like of the legal frame are filled with a greening growth base material 6 by spraying or the like. Since the filled base material 6 is locked on the fall prevention surface 51 of the legal frame, it is possible to prevent the collapse to the valley side even on a steep slope.

【0013】[0013]

【実施例2】上記実施例1では、鉄筋4をアンカ−ピン
3の上部に固定して配置したが、図3に示すように、型
枠1の立上り面11に沿って編み込み鉄筋41を配置す
ることも可能である。この場合、アンカ−ピン3は、立
上り面11の谷側面に接触させて打設する。
Second Embodiment In the first embodiment, the reinforcing bar 4 is fixed on the upper part of the anchor pin 3. However, as shown in FIG. 3, the braided reinforcing bar 41 is disposed along the rising surface 11 of the form 1. It is also possible. In this case, the anchor pin 3 is driven in contact with the valley side surface of the rising surface 11.

【0014】[0014]

【実施例3】図4に示すように、型枠1にモルタル5を
吹付けて法枠を構築した後、この法枠の上から金網2を
被せて敷設し、さらにこの金網2を埋め込んで緑化生育
基盤材6を吹き付け等により充填する場合もある。
Third Embodiment As shown in FIG. 4, a mortar 5 is sprayed on a mold 1 to construct a legal frame, and then a wire mesh 2 is laid over the legal frame, and the wire mesh 2 is further embedded. The greening growth base material 6 may be filled by spraying or the like.

【0015】[0015]

【実施例4】上記実施例ではL字形の型枠について述べ
たが、図5に示すような半ド−ム形の型枠7を用いるこ
ともできる。この型枠7は、斜面の山側に立ち上げる立
上り面71と、この立上り面71の上端に連続し、立上
り面71の谷側に包囲空間72を形成するル−フ面73
とにより形成したものである。
Embodiment 4 In the above embodiment, an L-shaped formwork has been described, but a half-dome formwork 7 as shown in FIG. 5 can also be used. The formwork 7 includes a rising surface 71 that rises on the mountain side of the slope, and a roof surface 73 that is continuous with the upper end of the rising surface 71 and forms an enclosing space 72 on the valley side of the rising surface 71.
It is formed by the above.

【0016】ル−フ面73は曲面状でも平面状でもよ
く、また立上り面71には編み込み鉄筋41を装着する
こともできる。また、立上り面71に開設する孔の寸法
は、ル−フ面73に開設する孔よりも小さく形成し、実
施例1と同様に、立上り面71にせき板としての機能を
持たせる。
The roof surface 73 may be curved or flat, and the braided reinforcing bar 41 may be mounted on the rising surface 71. Further, the size of the hole formed in the rising surface 71 is formed smaller than the hole formed in the roof surface 73, and the rising surface 71 has a function as a weir plate, as in the first embodiment.

【0017】この型枠7の設置は、図6に示すように、
斜面にアンカ−ピン3を打ち込んだ後、その上から型枠
7を被せて、アンカ−ピン3と編み込み鉄筋41などを
連結することによって行う。次に、網目の大きなル−フ
面73の谷側から包囲空間72内にモルタル5を吹き付
ける。
The installation of the formwork 7 is performed as shown in FIG.
After the anchor pin 3 is driven into the slope, the mold frame 7 is put on the anchor pin 3 and the anchor pin 3 and the braided reinforcing bar 41 are connected. Next, the mortar 5 is sprayed into the surrounding space 72 from the valley side of the large roof surface 73 of the mesh.

【0018】吹き付けられたモルタル5は、立上り面7
1とル−フ面73に包囲されて拘束された状態となり、
それらの外側に沿って薄い層を形成する。従って、法枠
の施工精度をよりいっそう高めることができる。モルタ
ル5が硬化し、ほぼ垂直面の崩落防止面51を有する法
枠が構築された後、基盤材6を吹き付けて施工を終了す
る。
The blown mortar 5 has a rising surface 7.
1 and become confined by being surrounded by the roof surface 73,
Form a thin layer along their outside. Therefore, the construction accuracy of the legal frame can be further improved. After the mortar 5 is hardened and a legal frame having a substantially vertical fall prevention surface 51 is constructed, the base material 6 is sprayed to finish the construction.

【0019】[0019]

【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>吹き付けたモルタルは、型枠の山側の立上り面に
よって、山側への飛散が抑えられる。そのため、モルタ
ルが硬化して形成された法枠は、その山側に斜面とほぼ
垂直な部分を有する生育基盤の崩落防止面が形成され
る。従って、法枠の山側に充填された基盤材はこの崩落
防止面に係止されるため、斜面の谷側への崩落を防止で
きる。
Since the present invention has been described above, the following effects can be obtained. <B> Spraying of the sprayed mortar to the mountain side is suppressed by the rising surface on the mountain side of the formwork. For this reason, the legal frame formed by hardening the mortar has a fall prevention surface of the growth base having a portion substantially perpendicular to the slope on the mountain side. Therefore, since the base material filled on the mountain side of the legal frame is locked on this fall prevention surface, it is possible to prevent the slope from falling to the valley side.

【0020】<ロ>上記のように谷側からモルタルを吹
き付けるため、吹き付けたモルタルは有孔型枠の山側の
立上り面に遮られ、山側へ飛散することがない。従っ
て、山側に無駄なモルタルを吹き付けることなく、最小
限のモルタル量で、基盤材の崩落防止面を有する法枠を
形成でき、コストの低減が図れる。 <ハ>山側に無駄なモルタルが飛散しないため、法面の
景観を汚すことがなく、また吹き付け後の掃除が不要な
ため、作業性の向上を図ることができる。 <ニ>モルタルの吹き付け作業は谷側の一方側から行え
ばよいため、斜面上において作業員の移動が少なくて済
み、安定した状態で作業を行うことができる。そのた
め、作業の容易、迅速、高精度化を図ることができ、熟
練工などの手を必要としなくても済む。特に、急斜面で
の施工ではそれらの効果が大となる。
<B> Since the mortar is sprayed from the valley side as described above, the sprayed mortar is blocked by the rising surface on the mountain side of the perforated formwork and does not scatter to the mountain side. Therefore, it is possible to form a legal frame having a surface for preventing the base material from collapsing with a minimum amount of mortar without spraying useless mortar on the mountain side, thereby reducing costs. <C> Since unnecessary mortar does not scatter on the mountain side, the landscape of the slope is not polluted, and cleaning after spraying is unnecessary, so that workability can be improved. <D> Since the mortar spraying operation may be performed from one side of the valley side, the movement of the worker on the slope is small, and the operation can be performed in a stable state. Therefore, the work can be performed easily, quickly, and with high accuracy, and the need for a skilled worker or the like is eliminated. In particular, those effects are great in construction on steep slopes.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 実施例1の施工方法の説明図FIG. 1 is an explanatory view of a construction method according to a first embodiment.

【図2】 実施例1の型枠の説明図FIG. 2 is an explanatory view of a mold according to the first embodiment.

【図3】 実施例2の施工方法の説明図FIG. 3 is an explanatory view of a construction method according to a second embodiment.

【図4】 実施例3の施工方法の説明図FIG. 4 is an explanatory view of a construction method according to a third embodiment.

【図5】 実施例4の型枠の説明図FIG. 5 is an explanatory view of a mold according to a fourth embodiment.

【図6】 実施例4の施工方法の説明図FIG. 6 is an explanatory view of a construction method according to a fourth embodiment.

【図7】 従来技術の説明図FIG. 7 is an explanatory diagram of a conventional technique.

フロントページの続き (56)参考文献 特開 平3−212513(JP,A) 特開 昭54−110606(JP,A) 特公 平3−68176(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E02D 17/20 104 E02D 17/20 102 Continuation of the front page (56) References JP-A-3-212513 (JP, A) JP-A-54-110606 (JP, A) JP-B 3-68176 (JP, B2) (58) Fields investigated (Int) .Cl. 7 , DB name) E02D 17/20 104 E02D 17/20 102

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 斜面に法枠を構築し、かつ緑化生育基盤
材を充填して行う斜面緑化工法において、斜面の山側に立ち上げる立上り面と、この立上り面の下
端に連続する設置面とにより断面L字形に形成した 有孔
型枠を、前記立上り面を前記設置面に対して 斜面の山側に立ち上
げた状態でアンカ−ピンにより斜面に固定し、 次に前記有孔型枠にモルタルを吹き付けて法枠を構築
し、 この法枠の山側には、前記立上り面に沿って前記緑化生
育基盤材の崩落防止面を立ち上げて形成したことを特徴
とする、 斜面緑化工法。
1. A slope greening method in which a slope is constructed on a slope and filled with a greenery growth base material, and a rising face rising on a mountain side of the slope and a lower face of the rising face.
A perforated form having an L-shaped cross section formed by an installation surface that is continuous with the end is fixed to the slope with an anchor pin in a state where the rising surface is raised on the mountain side of the slope with respect to the installation surface , A mortar is sprayed on the perforated formwork to construct a legal form, and on the mountain side of the legal form, a fall prevention surface of the greening and growing base material is raised along the rising surface and formed. , Slope greening method.
【請求項2】 斜面に法枠を構築し、かつ緑化生育基盤
材を充填して行う斜面緑化工法において、 斜面の山側に立ち上げる平面状の立上り面と、この立上
り面の上端から谷側に徐々に降下し、立上り面の谷側に
包囲された空間を形成するル−フ面とにより形成した有
孔型枠を、 前記立上り面を前記ル−フ面に対して斜面の山側に立ち
上げた状態でアンカ−ピンにより斜面に固定し、 次に前記有孔型枠にモルタルを吹き付けて法枠を構築
し、 この法枠の山側には、前記立上り面に沿って前記緑化生
育基盤材の崩落防止面を立ち上げて形成したことを特徴
とする、 斜面緑化工法。
2. Construction of a legal framework on a slope, and a greening growth base
In the slope revegetation method that is performed by filling materials, a flat rising surface that rises to the mountain side of the slope and this rising surface
Gradually descends from the upper end of the slope to the valley side,
And a roof surface forming an enclosed space.
With the hole form, the rising surface stands on the mountain side of the slope with respect to the roof surface.
In the raised state, it is fixed to the slope with anchor pins, and then mortar is sprayed on the perforated formwork to construct a legal form
On the mountain side of this frame, the greenery grows along the rising surface.
The feature is that it is formed by setting up the fall prevention surface of the growth base material
The slope greening method.
【請求項3】 請求項1又は請求項2に記載の斜面緑化
工法において、 モルタルの吹き付けは、有孔型枠の立上り面の谷側から
行い、緑化生育基盤材の崩落防止面は、吹き付け時に立
上り面を透過したモルタルによって形成したことを特徴
とした、 斜面緑化工法。
3. The slope greening according to claim 1 or 2.
In the construction method, the mortar is sprayed from the valley side of the rising surface of the perforated formwork.
The fall prevention surface of the greening growth base material is
Characterized by mortar that has passed through the up surface
The slope greening method.
【請求項4】 斜面にモルタルを吹付けて法枠を構築す
る際に用いるモルタル吹付け用型枠において、 斜面の山側に立ち上げる平面状で有孔の立上り面と、 この立上り面の上端から谷側に徐々に降下し、立上り面
の谷側に包囲された空間を形成するル−フ面とにより形
成したことを特徴とする、 モルタル吹付け用型枠。
4. A mortar spraying a mold used in constructing the law frame by blowing the mortar on the slopes, and the rising surface of the perforated in planar launch the mountain slope, from the upper end of the rising surface A mortar spraying formwork formed by a roof surface that gradually descends to a valley side and forms a space surrounded by a valley side of a rising surface.
JP25356893A 1993-09-17 1993-09-17 Slope greening method and mortar spraying formwork Expired - Lifetime JP3000074B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25356893A JP3000074B2 (en) 1993-09-17 1993-09-17 Slope greening method and mortar spraying formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25356893A JP3000074B2 (en) 1993-09-17 1993-09-17 Slope greening method and mortar spraying formwork

Publications (2)

Publication Number Publication Date
JPH0782750A JPH0782750A (en) 1995-03-28
JP3000074B2 true JP3000074B2 (en) 2000-01-17

Family

ID=17253186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25356893A Expired - Lifetime JP3000074B2 (en) 1993-09-17 1993-09-17 Slope greening method and mortar spraying formwork

Country Status (1)

Country Link
JP (1) JP3000074B2 (en)

Also Published As

Publication number Publication date
JPH0782750A (en) 1995-03-28

Similar Documents

Publication Publication Date Title
JP3000074B2 (en) Slope greening method and mortar spraying formwork
JP2004197472A (en) Frame body for forming slope frame and slope frame construction method using it
JP3905858B2 (en) Cross inspection member and slope reinforcement method
JPH10317381A (en) Structure for protecting face of slope by retaining wall and method for constructing the same
JPS6054459B2 (en) Slope protection method
JP6793424B1 (en) Slope protection method
JPH0197720A (en) Reinforcing work of banking
JP2573157B2 (en) Leg frame method and gauge formwork used in the method
JP2813506B2 (en) Ground reinforcement method
JP3271761B2 (en) Spacer for spray framing on slopes
JP3803272B2 (en) Reinforced earth method for cut slope
JPH0716746Y2 (en) Anchor head for fixing slope protection structure
JP3382592B2 (en) Slope stabilizer construction method and equipment
JPH03260222A (en) Construction of slope frame and block structure
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JPS5841118A (en) Sheathing and protecting method for long-sized slope
JP2001279679A (en) Slope face protective work
JP2759255B2 (en) Construction method of lattice frame body using coil for legal frame
JPS6160207B2 (en)
JPH09279610A (en) Method for constructing retaining wall and equipment therefor
JP2759254B2 (en) Construction method of lattice frame body using coil for legal frame
JP2000064301A (en) Mat foundation and execution therefor
JPH11181784A (en) Unit for foundation structure
JPH0453212B2 (en)
JPH04146327A (en) Protection method of face of slope

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20101112

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20111112

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111112

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20121112

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 14