JP2987710B2 - Upper mirror opening and closing device - Google Patents

Upper mirror opening and closing device

Info

Publication number
JP2987710B2
JP2987710B2 JP2251413A JP25141390A JP2987710B2 JP 2987710 B2 JP2987710 B2 JP 2987710B2 JP 2251413 A JP2251413 A JP 2251413A JP 25141390 A JP25141390 A JP 25141390A JP 2987710 B2 JP2987710 B2 JP 2987710B2
Authority
JP
Japan
Prior art keywords
upper mirror
leg
mirror
closing device
lower leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2251413A
Other languages
Japanese (ja)
Other versions
JPH04130297A (en
Inventor
賢治 岡田
良一 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Babcock Hitachi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock Hitachi KK filed Critical Babcock Hitachi KK
Priority to JP2251413A priority Critical patent/JP2987710B2/en
Publication of JPH04130297A publication Critical patent/JPH04130297A/en
Application granted granted Critical
Publication of JP2987710B2 publication Critical patent/JP2987710B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、例えば沸騰水型原子炉圧力容器の上鏡の移
送に使用する専用吊り具とナットとワッシャを取り付
け、取り外すテンショナシステムに係り、特に上鏡の着
脱作業の時間短縮を図るのに好適な原子炉圧力容器の上
鏡開閉装置に関する。
The present invention relates to a tensioner system for attaching and detaching a dedicated hanging tool, a nut and a washer used for transferring an upper mirror of a boiling water reactor pressure vessel, for example. In particular, the present invention relates to an upper-mirror opening / closing device for a reactor pressure vessel suitable for shortening the time required for attaching and detaching an upper-mirror.

〔従来の技術〕[Conventional technology]

一般に沸騰水型原子炉の原子炉圧力容器は第8図に示
すように、上鏡1の上鏡フランジ1aと胴体2の胴体フラ
ンジ2aとをスタッドボルト3で締付けることにより、原
子炉圧力容器全体を密閉構造にしている。
Generally, as shown in FIG. 8, a reactor pressure vessel of a boiling water reactor is constructed by tightening an upper mirror flange 1a of an upper mirror 1 and a fuselage flange 2a of a fuselage 2 with stud bolts 3. Has a closed structure.

このスタッドボルト3による締め付け状態の詳細を第
9図に示す。即ち、第9図に示すように胴体2の胴体フ
ランジ2aには胴体フランジねじ穴2bが周方向に間隔を保
って多数(約90個所)刻設されており、この各胴体フラ
ンジねじ穴2bに対応して上鏡1の上鏡フランジ1aに同数
の上下方向に沿う上鏡フランジ貫通孔1bが突設されてい
る。
FIG. 9 shows details of the tightened state by the stud bolts 3. That is, as shown in FIG. 9, a large number (about 90 places) of body flange screw holes 2b are engraved in the body flange 2a of the body 2 with a circumferential interval therebetween. Correspondingly, the upper mirror flange 1a of the upper mirror 1 is provided with the same number of upper mirror flange through holes 1b extending in the vertical direction.

スタッドボルト3は、その一端(上端)が上鏡1の上
鏡フランジ1aの上方に突出する状態で上鏡フランジ貫通
孔1bに挿入され、他端(下端)のスタッドボルト下部ね
じ3aが胴体2の胴体フランジ2aの胴体フランジねじ穴2b
に螺合されている。そして、このスタッドボルト3の上
端突出部分のスタッドボルト上部ねじ3bにナット4がワ
ッシャ5を介して取り付けられ、そのナット4の締付力
により、上鏡1と胴体2とが密閉構造に接続される。な
お、スタッドボルト3に取り付けたナット4およびワッ
シャ5は、上鏡1の上鏡フランジ1a上で周方向に沿い、
ほとんど接触する程度に近接して配置されている。
The stud bolt 3 is inserted into the upper mirror flange through hole 1b with one end (upper end) protruding above the upper mirror flange 1a of the upper mirror 1, and the stud bolt lower screw 3a at the other end (lower end) is connected to the body 2 Fuselage flange 2a fuselage flange screw hole 2b
Is screwed into. Then, a nut 4 is attached via a washer 5 to a stud bolt upper screw 3b at an upper end protruding portion of the stud bolt 3, and the upper mirror 1 and the body 2 are connected to a closed structure by a tightening force of the nut 4. You. The nut 4 and the washer 5 attached to the stud bolt 3 are arranged on the upper mirror flange 1a of the upper mirror 1 in the circumferential direction.
They are placed close enough to almost touch.

ところで、スタッドボルト3,ナット4,ワッシャ5によ
る密閉構造の原子炉圧力容器は、燃料交換等のため例え
ば年一回の定期検査が行われ、その際、上鏡1の開,閉
が行われる。この場合、上鏡1の取り外しにはスタッド
ボルト3からナット4,ワッシャ5の取り外し作業が行な
われ、このナット4,ワッシャ5の取り外し作業には第10
図に示すテンショナシステム11が用いられる。上鏡1の
開放時における上鏡1の取り除き作業における上鏡1の
運搬には第11図に示すヘッドストロングバック21が用い
られる。
By the way, the reactor pressure vessel having a sealed structure including the stud bolts 3, the nuts 4, and the washers 5 is periodically inspected, for example, once a year for refueling or the like, and the upper mirror 1 is opened and closed. . In this case, the nut 4 and the washer 5 are removed from the stud bolt 3 to remove the upper mirror 1.
The tensioner system 11 shown in the figure is used. A head strong back 21 shown in FIG. 11 is used to transport the upper mirror 1 in the operation of removing the upper mirror 1 when the upper mirror 1 is opened.

以下、先ず上鏡1の開放時におけるナット4,ワッシャ
5を取り外すテンショナシステム11について説明する。
Hereinafter, the tensioner system 11 for removing the nut 4 and the washer 5 when the upper mirror 1 is opened will be described.

上鏡1の開放時には、第10図に示すテンショナシステ
ム11が用いられ、スタッドボルト3を締め付けているナ
ット4をスタッドテンショナ5で緩め、ナット4及びワ
ッシャ5がスタッドボルト3から全数取り外される。そ
して、上鏡1を胴体2から移動して原子炉圧力容器が開
放され、燃料交換が行われるが、上鏡1の運搬には第11
図に示すヘッドストロングバック21に吊り下げて移動さ
せることにより、胴体2から上鏡1が取り除かれる。そ
して、上鏡1が取り除かれた後に燃料交換等の交換が行
われ、上鏡1をヘッドストロングバック21で吊って胴体
2に取り付け、さらにテンショナシステム11によってワ
ッシャ5およびナット4をスタッドボルト3に取り付
け、ナット4を締め付けて原子炉圧力容器の上鏡1によ
る閉鎖が行われる。
When the upper mirror 1 is opened, the nut 4 tightening the stud bolt 3 is loosened by the stud tensioner 5 using the tensioner system 11 shown in FIG. 10, and all the nuts 4 and washers 5 are removed from the stud bolt 3. Then, the upper head 1 is moved from the body 2 to open the reactor pressure vessel and refueling is performed.
The upper mirror 1 is removed from the body 2 by suspending the upper mirror 1 from the head strong back 21 shown in FIG. After the upper mirror 1 is removed, replacement such as fuel exchange is performed. The upper mirror 1 is suspended by the head strong back 21 and attached to the body 2, and the washer 5 and the nut 4 are attached to the stud bolt 3 by the tensioner system 11. Attachment, nut 4 is tightened, and the reactor pressure vessel is closed by upper mirror 1.

上記作業のうち、ナット4の緩め或いは締め付けに
は、第10図に示すように、上鏡1の吊り金具6上に自立
した架台12の上部に固定したレール13から電動チェーン
ブロック14を介してスタッドテンショナ15を吊り下げた
テンショナシステム11を使用して行われる。
Of the above operations, the nut 4 is loosened or tightened from the rail 13 fixed on the upper part of the stand 12 on the hanging bracket 6 of the upper mirror 1 via the electric chain block 14, as shown in FIG. This is performed using the tensioner system 11 in which a stud tensioner 15 is suspended.

一方、上鏡1の開放時における上鏡1の移動には第11
図に示すようなヘッドストロングバック21が使用され
る。ヘッドストロングバック21はスティフナー22の中央
に設けた吊りボックス25を天井クレーン9で吊り下げら
れ、フォークエンド23およびターンバックル24を介して
上鏡1の吊り金具6と取り合っている。このターンバッ
クル24は上鏡1を吊り上げた時、上鏡1をほぼ水平に保
持すると共に4本のターンバックル24にかかる荷重をで
きるだけ均等になるよう調整するために設けられてい
る。
On the other hand, when the upper mirror 1 is moved when the upper mirror 1 is opened, the eleventh
A head strong back 21 as shown in the figure is used. The head strong back 21 is suspended from a suspension box 25 provided at the center of the stiffener 22 by the overhead crane 9 and engages with the suspension fitting 6 of the upper mirror 1 via a fork end 23 and a turn buckle 24. The turnbuckle 24 is provided to hold the upper mirror 1 substantially horizontally when the upper mirror 1 is lifted and to adjust the load applied to the four turnbuckles 24 as evenly as possible.

また、上鏡1を吊り上げた時にスティフナー22にたわ
みが生じるため、スティフナー22とフォークエンド23の
付け根部に曲げ応力が発生しないよう両者はピンで取り
合う構造となっている。このため、ヘッドストロングバ
ック21を保管する際には、ヘッドストロングバック21自
体はそのままでは自立できないため、フォークエンド2
3,ターンバックル24の部分を折り曲げ、第12図に示すよ
うな状態で床に置かれて保管する。
In addition, since the stiffener 22 is bent when the upper mirror 1 is lifted, the stiffener 22 and the fork end 23 have a structure in which a pin is used so that bending stress is not generated at the root of the fork end 23. For this reason, when storing the headstrong back 21, the headstrong back 21 itself cannot stand alone, so the fork end 2
3. The portion of the turnbuckle 24 is bent and placed on the floor as shown in FIG. 12 for storage.

なお、テンショナシステム11,上鏡1も床において保
管されていた。
The tensioner system 11 and the upper mirror 1 were also stored on the floor.

〔発明が解決しようとする課題〕[Problems to be solved by the invention]

上記した従来技術では、上鏡1の開放手順を例にとる
と、テンショナシステム11でナット4を緩めた後、テン
ショナシステム11を上鏡1から取り外す場合は、テンシ
ョナシステム11を上鏡1の上鏡吊り金具6から切り離
し、上鏡1の吊り上げ及び移動のために上鏡1の上鏡吊
り金具6にヘッドストロングバック21を付け替える必要
があり、この取り替え作業は放射線管理下の作業として
は効率が悪く、作業者の被曝量も多くなる。
In the prior art described above, taking the opening procedure of the upper mirror 1 as an example, when the tensioner system 11 is detached from the upper mirror 1 after the nut 4 is loosened by the tensioner system 11, the tensioner system 11 is placed on the upper mirror 1 In order to lift and move the upper mirror 1, it is necessary to replace the head strong back 21 on the upper mirror hanging bracket 6 of the upper mirror 1, and this replacement work is less efficient as a work under radiation management. Worse, the exposure of workers is also increased.

また、従来技術では、原子炉建屋の操作床の限られた
スペースにテンショナシステム11とヘッドストロングバ
ック21の二種類の機器を保管する保管スペースを必要と
しており、操作床の有効利用について配慮がされていな
かった。
In the prior art, a storage space for storing two types of equipment, the tensioner system 11 and the headstrong back 21, is required in a limited space of the operation floor of the reactor building, and consideration is given to the effective use of the operation floor. I didn't.

本発明の目的は、テンショナシステムとヘッドストロ
ングバックの取り替えに相当する作業を放射線管理下で
少なくし、これらの機器の保管スペースの有効活用を図
ることができる上鏡開閉装置を提供するにある。
An object of the present invention is to provide an upper-mirror opening / closing device capable of reducing the work corresponding to the replacement of a tensioner system and a head strong back under radiation management and effectively utilizing a storage space for these devices.

〔課題を解決するための手段〕[Means for solving the problem]

上記目的は、装置を水平に支持するサポート部材とし
ての脚を上部脚と下部脚とに着脱自在に分割できるよう
にし、また、上鏡を吊り下げる吊り機構を上部脚及び下
部脚内に配置した構造にすることにより、自立時はサポ
ート部材としての脚で装置を支持し、上鏡の吊り上げ時
は脚が分割され、上鏡の重量を吊り機構で支えられるよ
うにし、テンショナシステムとヘッドストロングバック
を一体化することにより達成される。
The object is to allow a leg as a support member for horizontally supporting the device to be removably divided into an upper leg and a lower leg, and a suspending mechanism for suspending the upper mirror is arranged in the upper leg and the lower leg. By using a structure, the device is supported by legs as support members when standing up, the legs are split when the upper mirror is lifted, and the weight of the upper mirror can be supported by the lifting mechanism. This is achieved by integrating

〔作用〕[Action]

テンショナシステムあるいは保管時には、上下に分割
されていた上部脚及び下部脚が一体に接続されることに
より装置は安定して自立した状態で保管することができ
る。一方、上鏡を吊り上げる際は上部脚及び下部脚が上
下に分割され、上鏡の重量を上部脚及び下部脚の内部に
配置された吊り機構を介してスティフナーに伝達できる
ようになる。これにより、テンショナシステムとヘッド
ストロングバックを一体化させることが可能となり、さ
らに被曝環境下での作業が少なくなり、機器を取り替え
る作業, 手間が不必要になり作業の効率化が図れると共に機器を
保管するための占有空間(保管スペース)を減少させる
ことができる。
At the time of the tensioner system or during storage, the upper leg and the lower leg, which have been divided into upper and lower parts, are integrally connected, so that the device can be stored stably and independently. On the other hand, when lifting the upper mirror, the upper leg and the lower leg are divided into upper and lower parts, so that the weight of the upper mirror can be transmitted to the stiffener via a lifting mechanism arranged inside the upper leg and the lower leg. This makes it possible to integrate the tensioner system with the headstrong back, further reduces the work in the exposed environment, and eliminates the need to replace and work with the equipment, thus increasing the efficiency of work and storing the equipment. Occupied space (storage space) can be reduced.

〔実施例〕〔Example〕

本発明の一実施例の構成を第1図〜第5図により説明
する。
The configuration of an embodiment of the present invention will be described with reference to FIGS.

第1図は上鏡開閉装置の全体を示す縦断面図、第2図
はその平面図、第3図は第1図のB部詳細図、第4図は
第3図のC−C線断面図、第5図は第3図のD−D線断
面図を示す。
1 is a longitudinal sectional view showing the entire upper mirror opening / closing device, FIG. 2 is a plan view thereof, FIG. 3 is a detailed view of a portion B in FIG. 1, and FIG. 4 is a sectional view taken along line CC in FIG. FIG. 5 is a sectional view taken along line DD of FIG.

第1図において、ナット4,ワッシャ5をスタッドボル
ト3に取り付けたり、スタッドボルト3から取り外す場
合には架台12,スティフナー22は第1図に示すように上
鏡に自立していなければならない。
In FIG. 1, when the nut 4 and the washer 5 are attached to or removed from the stud bolt 3, the gantry 12 and the stiffener 22 must be free standing on the upper mirror as shown in FIG.

したがって、上部脚37と下部脚38はボルト39で接続さ
れ、上部脚37,下部脚38で自立する自立構造になる。
Therefore, the upper leg 37 and the lower leg 38 are connected by the bolt 39, and the upper leg 37 and the lower leg 38 have a self-standing structure.

また、上鏡1を吊る場合(吊り上げ、吊り下げ)は上
部脚37と下部脚38を取り除き、上部脚37と下部脚38は第
7図に示すように離れ、ストッパ36,吊り棒33,ターンバ
ックル34の吊り機構によって上鏡1を吊るようにしたの
である。
When the upper mirror 1 is suspended (lifted or suspended), the upper leg 37 and the lower leg 38 are removed, and the upper leg 37 and the lower leg 38 are separated as shown in FIG. The upper mirror 1 is suspended by the suspension mechanism of the buckle 34.

以下、さらに詳細に説明すると、第1図,第3図にお
いて、下部脚38の一端は上鏡1の吊り金具6にピン35で
取り合うラグ34に固定し、他端は上部脚37にボルト39で
連結されている。一方、上部脚37の一端は第4図に示す
ようにスティフナー22に取り付けられたボックス31に固
定され、上部脚37の他端は下部脚38とボルト39で連結さ
せることにより架台12,スティフナー22は上部脚37,株脚
38によって吊り金具6上に安定して自立するように構成
されている。
1 and 3, one end of the lower leg 38 is fixed to a lug 34 which is fixed to the hanging bracket 6 of the upper mirror 1 by a pin 35, and the other end is a bolt 39 connected to the upper leg 37. Are connected by On the other hand, as shown in FIG. 4, one end of the upper leg 37 is fixed to a box 31 attached to the stiffener 22, and the other end of the upper leg 37 is connected to the lower leg 38 by bolts 39 to form the base 12, stiffener 22. Is upper leg 37, stock leg
By 38, it is comprised so that it may stably stand on the hanging bracket 6 independently.

上部脚37,下部脚38の中には貫通するように吊り棒33,
ターンバックル24が設けられ、吊り棒33の下端はターン
バックル24を介してラグ34に接続され、上部はスティフ
ナー22に取り付けられたボックス31内で可回転的に支持
されたピン32に対し、ピン32と直交し、吊り棒33の軸方
向にスライド可能なように貫通し、上端にはストッパー
36を設けてある。(第3図〜第5図参照) したがって、ピン35,ラグ34,ターンバックル24,吊り
棒33,ストッパ36,ピン32,ボックス31が上鏡1の吊り機
構となっている。すなわち、第3図に示すように上部脚
37と下部脚38とボルト39で接続した状態で上鏡1を吊り
上げようとすると、上鏡1は重量物であるため、スティ
フナー22にたわみが生じ、上部脚37とボックス31の付け
根部に過大な曲げ応力が発生する。
In the upper leg 37 and the lower leg 38, a hanging rod 33 is
A turnbuckle 24 is provided, a lower end of the hanging bar 33 is connected to a lug 34 via the turnbuckle 24, and an upper portion is connected to a pin 32 rotatably supported in a box 31 attached to the stiffener 22. At right angles to 32, penetrate so that it can slide in the axial direction of the hanging rod 33, and a stopper at the upper end
36 are provided. (See FIGS. 3 to 5.) Therefore, the pin 35, the lug 34, the turnbuckle 24, the hanging bar 33, the stopper 36, the pin 32, and the box 31 constitute a hanging mechanism of the upper mirror 1. That is, as shown in FIG.
If the upper mirror 1 is lifted while it is connected to the lower leg 38 and the bolts 39 with the bolts 39, the upper mirror 1 is heavy, so that the stiffener 22 bends and the root of the upper leg 37 and the box 31 becomes excessively large. High bending stress occurs.

この曲げ応力をなくすため、第7図に示すように上部
脚37と下部脚38とを接続しているボルト39を取り除い
て、上部脚37と下部脚38を切り離し、ピン32の上面にス
トッパー36が当たるまでスティフナー22を少し上昇させ
ることにより、スティフナー22と上鏡1の間はピン32,
ストッパー36,吊り棒33,ターンバックル24,吊り棒33,ラ
グ34を介してピン35でスティフナー22と上鏡1を結合す
ることができ、上鏡1を吊り下げても曲げ応力が発生し
なくなる。
In order to eliminate this bending stress, as shown in FIG. 7, a bolt 39 connecting the upper leg 37 and the lower leg 38 is removed, the upper leg 37 and the lower leg 38 are separated, and a stopper 36 is attached to the upper surface of the pin 32. The stiffener 22 is slightly raised until the stiffener 22 hits the pin 32,
The stiffener 22 and the upper mirror 1 can be connected with the pin 35 via the stopper 36, the suspension rod 33, the turnbuckle 24, the suspension rod 33, and the lug 34, and no bending stress is generated even when the upper mirror 1 is suspended. .

さらに、吊り棒33と吊り棒33の間にターンバックル24
を配置させることにより、上鏡1をピン32,ストッパー3
6,吊り棒33,ターンバックル24,吊り棒33からなる吊り機
構によってほぼ水平に保持し、4本の吊り棒33にかかる
荷重ができるだけ均等になるようにターンバックル24に
よって調整することができる。
In addition, a turnbuckle 24 is provided between the hanging rods 33.
By placing the upper mirror 1 on the pin 32 and the stopper 3
6, can be held substantially horizontally by a suspension mechanism including the suspension rod 33, the turnbuckle 24, and the suspension rod 33, and can be adjusted by the turnbuckle 24 so that the loads applied to the four suspension rods 33 are as uniform as possible.

また、架台12はスティフナー22に一体に取り付けら
れ、架台12に設けられたレール13に沿ってスタッドテン
ショナ15を吊り下げた電動チェーンブロック14が移動で
きるように構成してある。また、スティフナー22の中央
には第2図,第6図に示すように天井クレーン9のフッ
ク9aと取り合う吊りボックス25が設けられている。
The gantry 12 is integrally attached to a stiffener 22 so that an electric chain block 14 with a stud tensioner 15 suspended along a rail 13 provided on the gantry 12 can be moved. At the center of the stiffener 22, there is provided a suspension box 25 for engaging with the hook 9a of the overhead crane 9, as shown in FIGS.

以上のように構成した上鏡開閉装置において、上鏡の
開放作業手順を第1図〜第7図により説明する。
The procedure for opening the upper mirror in the upper mirror opening and closing device configured as described above will be described with reference to FIGS.

まず、従来技術の第10図に相当するテンショナシステ
ム11によるナット4の緩め作業としては、天井クレーン
9のフック9aを第6図に示すように吊りボックス25に取
り付け、上鏡開閉装置全体を吊り上げて原子炉圧力容器
の上鏡1上に降ろし、第1図,第3図に示すように上鏡
1の吊り金具6とラグ34をピン35で固定し、上鏡開閉装
置を上部脚37,下部脚38,ボルト39で一体構造にされた脚
で上鏡1上に自立させる。このとき、上部脚37と下部脚
38は第3図,第4図に示すようにボルト39により接合さ
れた状態であるので、上鏡1の上に自立させることがで
きる。
First, as the work of loosening the nut 4 by the tensioner system 11 corresponding to FIG. 10 of the prior art, the hook 9a of the overhead crane 9 is attached to the hanging box 25 as shown in FIG. 6, and the entire upper mirror opening / closing device is lifted. The reactor is lowered onto the upper mirror 1 of the reactor pressure vessel, and the hanging metal 6 and the lug 34 of the upper mirror 1 are fixed with pins 35 as shown in FIGS. The upper mirror 1 is made to stand on the upper mirror 1 by the legs integrated with the lower leg 38 and the bolt 39. At this time, upper leg 37 and lower leg
Since 38 is connected by bolts 39 as shown in FIGS. 3 and 4, it can stand on the upper mirror 1 by itself.

この状態で第1図に示す電動チェーンブロック14を操
作し、スタッドテンショナ15をスタッドボルト3にそっ
て順次降下させ,スタッドテンショナ15でナット4を順
次緩める。ナット4の緩め作業が全数終了すると、ナッ
ト4及びワッシャ5をスタッドボルト3から全数取り外
す。
In this state, the electric chain block 14 shown in FIG. 1 is operated, the stud tensioner 15 is sequentially lowered along the stud bolt 3, and the nut 4 is sequentially loosened by the stud tensioner 15. When all the nuts 4 have been loosened, the nuts 4 and washers 5 are all removed from the stud bolts 3.

その後、従来技術では第10図に示すテンショナシステ
ム11を天井クレーン9で吊り上げて上鏡1から外し、ヘ
ッドストロングバック21との取り替え作業を行う。第11
図に示すヘッドストロングバック21を天井クレーン9で
吊って上鏡1にセットして、上鏡1を吊り上げて上鏡1
を開いていた。
Thereafter, in the prior art, the tensioner system 11 shown in FIG. 10 is lifted by the overhead crane 9 and detached from the upper mirror 1, and replaced with a head strong back 21. Eleventh
The head strongback 21 shown in the figure is suspended by the overhead crane 9 and set on the upper mirror 1, and the upper mirror 1 is lifted to
Was open.

本発明の上鏡開閉装置では、上部脚37と下部脚38を接
続しているボルト39を取り除くことにより、従来のよう
なテンショナシステム11とヘッドストロングバック21と
の取り替え作業が不必要となり、第6図に示すように、
天井クレーン9のフック9aを吊りボックス25に取り付
け、上鏡開閉装置と上鏡1を一緒に吊り上げる。
In the upper mirror opening / closing device of the present invention, by removing the bolt 39 connecting the upper leg 37 and the lower leg 38, it is unnecessary to replace the conventional tensioner system 11 with the head strong back 21. As shown in FIG.
The hook 9a of the overhead crane 9 is attached to the suspension box 25, and the upper mirror opening and closing device and the upper mirror 1 are lifted together.

この上鏡1を吊り上げるとき、第3図に示す上部脚37
と下部脚38を接合しているボルト39を外すことにより、
第7図に示すように、スティフナー22に取り付けたボッ
クス31と一緒に上部脚37も上昇し、上部脚37は下部脚38
から分離する。これと同時に、ピン32も吊り棒33の軸方
向上方にスライドして上昇し、ピン32の上面がストッパ
ー36に当接する。
When the upper mirror 1 is lifted, the upper leg 37 shown in FIG.
By removing the bolt 39 joining the lower leg 38 and
As shown in FIG. 7, the upper leg 37 is also raised together with the box 31 attached to the stiffener 22, and the upper leg 37 is
Separate from At the same time, the pin 32 also slides upward in the axial direction of the suspension rod 33 and rises, and the upper surface of the pin 32 contacts the stopper 36.

すなわち、上鏡1の重量が、吊り金具6,ピン35,ラグ3
4,吊り棒33,ターンバックル24,吊り棒33,ストッパー36,
ピン32,ボックス31を介してスティフナー22に伝達さ
れ、上鏡1の吊り上げをこれらの吊り機構で行う。この
とき、吊り棒33の上下はピン32及び35で結合されている
ため、スティフナー22にたわみが生じても、吊り棒33の
付け根部に曲げモーメントが発生することはない。ま
た、上部脚37と下部脚38を分離した隙間からターンバッ
クル24を回して上鏡1の水平調整あるいは全ての吊り棒
33に均等に荷重をかけるための調整を行うことができ
る。
That is, the weight of the upper mirror 1 is determined by
4, hanging rod 33, turnbuckle 24, hanging rod 33, stopper 36,
The upper mirror 1 is transmitted to the stiffener 22 via the pins 32 and the box 31, and the upper mirror 1 is lifted by these lifting mechanisms. At this time, since the upper and lower portions of the suspension bar 33 are connected by the pins 32 and 35, even if the stiffener 22 is bent, no bending moment is generated at the base of the suspension bar 33. Also, turn the turnbuckle 24 through the gap separating the upper leg 37 and the lower leg 38 to adjust the horizontal level of the upper mirror 1 or all hanging rods.
Adjustments can be made to evenly load 33.

最後に、上鏡1を保管場所へ移動し、仮置台へ降ろす
過程では、上述の吊り上げ時とは逆の手順で、上鏡1が
仮置台へ設置される。その後、天井クレーン9を降下さ
せると、スティフナー22が降下し、ピン32がストッパー
36を離れて吊り棒33の軸方向下側にスライドして降下
し、上部脚37が下部脚38上へ降下してボルト39で接続す
る。この状態で吊り棒33にかかる荷重はなくなり、上部
脚37,下部脚38へその荷重は移される。
Finally, in the process of moving the upper mirror 1 to the storage place and lowering it on the temporary storage table, the upper mirror 1 is installed on the temporary storage table in the reverse procedure to the above-described lifting. Then, when the overhead crane 9 is lowered, the stiffener 22 is lowered and the pin 32 is
The upper leg 37 descends onto the lower leg 38 by sliding downward from the hanging bar 33 in the axial direction, leaving the hanging rod 33, and is connected with the bolt 39. In this state, the load applied to the hanging bar 33 is eliminated, and the load is transferred to the upper leg 37 and the lower leg 38.

また、上部脚37と下部脚38を第3図に示すようにボル
ト39で接続することにより、上鏡開閉装置は上鏡1上に
上部脚37,株脚38によって自立できるため、上鏡開閉装
置を上鏡1上に自立させたままの状態で保管することが
できる。
By connecting the upper leg 37 and the lower leg 38 with bolts 39 as shown in FIG. 3, the upper mirror opening / closing device can stand on the upper mirror 1 by the upper leg 37 and the stock leg 38. The apparatus can be stored on the upper mirror 1 in a state of being independent.

すなわち、従来技術のヘッドストロングバック21では
上鏡1上に自立させることができずに、上鏡1を移動し
た後は、床に保管せざるを得なかったものが、本発明の
上鏡開閉では上鏡1上に自立したままで保管できるよう
になり、従来のテンショナシステム11,ヘッドストロン
グバック21及び上鏡1の別々のスペースに保管されるた
めに3個所必要であったが、テンショナシステム11とヘ
ッドストロングバック21が一体化されたので保管スペー
スは1個分少なくなる。
That is, the headstrong back 21 of the prior art cannot stand on the upper mirror 1 independently and has to be kept on the floor after the upper mirror 1 is moved. Can be stored independently on the upper mirror 1, and three locations are required to be stored in separate spaces of the conventional tensioner system 11, headstrong back 21 and upper mirror 1. Since the head 11 and the headstrong back 21 are integrated, the storage space is reduced by one.

〔発明の効果〕〔The invention's effect〕

本発明の上鏡開閉装置によれば、上鏡開閉装置を支え
る脚を上部脚と下部脚とに着脱自在に設け、上部脚と下
部脚の内部に吊り機構を設けており、脚による自立機構
と吊り機構とを備えているので、スタッドテンショナを
吊り下げて操作する架台と上鏡を吊り上げるヘッドスト
ロングバックを一体化することができるので取り替え作
業や取り替えのための手間を少なくすることができ、作
業の効率向上の効果があると共に、放射線管理下での取
り替え作業を少なくして作業者への被曝低減の効果があ
る。
According to the upper mirror opening / closing device of the present invention, the legs supporting the upper mirror opening / closing device are detachably provided on the upper leg and the lower leg, and the suspension mechanism is provided inside the upper leg and the lower leg. And a suspension mechanism, so that a stand that suspends and operates the stud tensioner and a head strong back that lifts the upper mirror can be integrated, so that replacement work and labor for replacement can be reduced, In addition to the effect of improving work efficiency, there is an effect of reducing replacement work under radiation management and reducing exposure to workers.

また、テンショナ架台とヘッドストロングバックを一
体化し、これを仮置された上鏡上に保管できるようにな
ることにより、上記2つの機器の保管スペースを有効に
利用できるようになる。
Further, by integrating the tensioner base and the head strong back and storing them on the temporarily placed upper mirror, the storage space of the above two devices can be effectively used.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明に係る上鏡開閉装置の一実施例を示す断
面図、第2図は第1図の平面図、第3図は第1図のB部
を拡大して示す拡大断面図、第4図は第3図のC−C線
断面図、第5図は第3図のD−D線断面図、第6図は本
発明の上鏡開閉装置を使用して上鏡を吊り上げる状態を
示す断面図、第7図は第6図のE部を拡大して示す拡大
断面図、第8図は原子炉圧力容器を示す断面図、第9図
は第8図のA部を拡大した断面図、第10図は従来のナッ
トの締め付け及び緩め作業に使用するテンショナシステ
ムの側面図、第11図は従来のヘッドストロングバックを
使用しての上鏡を吊り上げた時の状態を示す側面図、第
12図は従来のヘッドストロングバックを床に保管する状
態を示した側面図である。 1……上鏡、 2……胴体、 3……スタッドボルト 4……ナット 5……ワッシャ 6……吊り金具 9……天井クレーン 9a……フック、 12……架台、 13……レール、 14……電動チェーンブロック、 15……スタッドテンショナ、 22……スティフナー、 24……ターンバックル、 25……吊りボックス、 31……ボックス、 32……ピン、 33……吊り棒、 34……ラグ、 35……ピン、 36……ストッパー、 37……上部脚、 38……下部脚、 39……ボルト。
FIG. 1 is a sectional view showing an embodiment of the upper mirror opening / closing device according to the present invention, FIG. 2 is a plan view of FIG. 1, and FIG. 3 is an enlarged sectional view showing part B of FIG. 4 is a cross-sectional view taken along the line CC of FIG. 3, FIG. 5 is a cross-sectional view taken along the line DD of FIG. 3, and FIG. 6 lifts the upper mirror using the upper mirror opening / closing device of the present invention. FIG. 7 is an enlarged sectional view showing a portion E in FIG. 6, FIG. 7 is an enlarged sectional view showing a reactor pressure vessel, and FIG. 9 is an enlarged portion A in FIG. FIG. 10 is a side view of a tensioner system used for tightening and loosening a conventional nut, and FIG. 11 is a side view showing a state where an upper mirror is lifted using a conventional head strong back. Figure, No.
FIG. 12 is a side view showing a state in which a conventional headstrong back is stored on the floor. 1 top mirror, 2 body, 3 stud bolts 4 nuts 5 washers 6 hanging brackets 9 overhead crane 9a hooks 12 hooks 13 rails 14 … Electric chain block, 15… Stud tensioner, 22… Stiffener, 24… Turnbuckle, 25… Hanging box, 31… Box, 32… Pin, 33… Hanging rod, 34… Lug, 35 ... Pin, 36 ... Stopper, 37 ... Upper leg, 38 ... Lower leg, 39 ... Bolt.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) G21C 13/00 - 13/02 G21C 19/02 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 6 , DB name) G21C 13/00-13/02 G21C 19/02

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】沸騰水片原子炉の圧力容器の上鏡を着脱す
る上鏡開閉装置において、前記上鏡開閉装置の脚を上部
脚と下部脚とに着脱自在に分割すると共に、これらの上
部脚及び下部脚内に前記上鏡を吊るための吊り機構を配
置したことを特徴とする上鏡開閉装置。
An upper mirror opening / closing device for attaching and detaching an upper mirror of a pressure vessel of a boiling water reactor, wherein legs of the upper mirror opening / closing device are detachably divided into an upper leg and a lower leg. An upper mirror opening / closing device, wherein a suspension mechanism for suspending the upper mirror is disposed in a leg and a lower leg.
JP2251413A 1990-09-20 1990-09-20 Upper mirror opening and closing device Expired - Fee Related JP2987710B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2251413A JP2987710B2 (en) 1990-09-20 1990-09-20 Upper mirror opening and closing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2251413A JP2987710B2 (en) 1990-09-20 1990-09-20 Upper mirror opening and closing device

Publications (2)

Publication Number Publication Date
JPH04130297A JPH04130297A (en) 1992-05-01
JP2987710B2 true JP2987710B2 (en) 1999-12-06

Family

ID=17222476

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2251413A Expired - Fee Related JP2987710B2 (en) 1990-09-20 1990-09-20 Upper mirror opening and closing device

Country Status (1)

Country Link
JP (1) JP2987710B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6472705B2 (en) * 2015-04-27 2019-02-20 日立Geニュークリア・エナジー株式会社 Radiation shield, radiation shielding method and method for carrying out reactor pressure vessel head
JP2019078766A (en) * 2019-01-23 2019-05-23 日立Geニュークリア・エナジー株式会社 Device storage

Also Published As

Publication number Publication date
JPH04130297A (en) 1992-05-01

Similar Documents

Publication Publication Date Title
JP2987710B2 (en) Upper mirror opening and closing device
JP3630536B2 (en) Device for temporarily increasing the load capacity of a crane girder
JPH0516554Y2 (en)
JP2505577B2 (en) Support structure for lower core structure
US5061432A (en) Apparatus for facilitating the servicing of inverted canned pump motors having limited access space and restricted access time especially in nuclear power plants
US5064606A (en) Channel box removing apparatus
CN209584862U (en) Steel Bridge construction multifunctional operating platform
JPH092774A (en) Heavy object suspending device
CN208749114U (en) A kind of splicing apparatus of discharging platform
JPS6239355Y2 (en)
JP2503473B2 (en) How to attach / detach the upper lid of the reactor pressure vessel
JPS6019101Y2 (en) eye plate
JP4253888B2 (en) Reactor pressure vessel unloading device
JPH0225195Y2 (en)
JPH09208177A (en) Lifting device for flanged cylindrical body
JPS5911433B2 (en) Nut attachment and detachment work equipment
JP2771764B2 (en) Crane counterweight attachment / detachment adjustment device
CN220056007U (en) Large-scale electromechanical device installation suspension device
CN220849555U (en) Auxiliary ladder for maintaining hopper of ship unloader
CN217323008U (en) Novel regulation formula hanging flower basket
US2724512A (en) Partial take-down stack scaffold
JPH025438Y2 (en)
JPH06220922A (en) Delivery method of unit room
US5084233A (en) Reactor head shielding apparatus
RU2116422C1 (en) Installation for mounting and dismounting of hoist support and design of hoist

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees