Installation method of lining plate in open shield method

Info

Publication number
JP2976106B1
JP2976106B1 JP23571698A JP23571698A JP2976106B1 JP 2976106 B1 JP2976106 B1 JP 2976106B1 JP 23571698 A JP23571698 A JP 23571698A JP 23571698 A JP23571698 A JP 23571698A JP 2976106 B1 JP2976106 B1 JP 2976106B1
Authority
JP
Japan
Prior art keywords
shield machine
lining plate
open shield
road surface
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23571698A
Other languages
Japanese (ja)
Other versions
JP2000064777A (en
Inventor
誠 植村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP23571698A priority Critical patent/JP2976106B1/en
Application granted granted Critical
Publication of JP2976106B1 publication Critical patent/JP2976106B1/en
Publication of JP2000064777A publication Critical patent/JP2000064777A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

【要約】 【課題】 オープンシールド機によるオープンシールド
工法で掘進する工程において、道路の開削した部分に覆
工板を敷設する場合、道路の水勾配やオープンシールド
機の自重によって覆工板と道路との境界部に段差が生じ
ても、これを迅速に解消でき平坦な路面を短時間で形成
でき、また、掘進を再開するに際しても、オープンシー
ルド機の上面を短時間で開放できる。 【解決手段】 左右側壁板1aの内側に推進ジャッキ2
を配設し、前面、後面及び上面を開口したオープンシー
ルド1機において、路面との高さ調整用の側板12を取付
位置自在に設けた覆工板11を前記オープンシールド機1
の上面開口に配設し、前記覆工板11の上面にアスファル
トなどの高さ調整用の路面材14を敷設する。
Abstract: [PROBLEMS] In a process of digging by an open shield method using an open shield machine, when a lining plate is laid on an excavated portion of a road, the lining plate and the road are separated by a water gradient of the road or the own weight of the open shield machine. Even if a step occurs at the boundary of the open shield machine, it can be quickly eliminated and a flat road surface can be formed in a short time, and the top surface of the open shield machine can be opened in a short time even when resuming digging. SOLUTION: A propulsion jack 2 is provided inside left and right side wall plates 1a.
And a lining plate 11 provided with a side plate 12 for height adjustment with respect to a road surface to be freely attached to the open shield machine 1.
And a road surface material 14 for height adjustment such as asphalt is laid on the upper surface of the lining plate 11.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、市街地に上下水
道、地下道等の地下構造物を施工するオープンシールド
工法における覆工板据え付け方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a lining plate in an open shield method for constructing an underground structure such as water supply and sewerage and an underpass in an urban area.

【0002】[0002]

【従来の技術】オープンシールド工法は開削工法(オー
プンカット工法)とシールド工法の長所を生かした合理
性に富む工法であり、このオープンシールド工法で使用
するオープンシールド機1の概略は図1、図8に示すよ
うに左右の側壁板1aとこれら側壁板1aに連結する底
板1bとからなる前面、後面及び上面を開口したもの
で、フロント部1dの前記側壁板1aと底板1bの先端
を刃口1cとして形成し、またジャッキ部1eである側
壁板1aの中央又は後端近くに推進ジャッキ2を後方に
向け上下に並べて配設する。図中3は隔壁、1fはテー
ル部を示す。
2. Description of the Related Art The open shield method is an efficient method utilizing the advantages of the open cutting method (open cut method) and the shield method, and the open shield machine 1 used in the open shield method is schematically shown in FIGS. As shown in FIG. 8, the front, rear and upper surfaces of left and right side walls 1a and a bottom plate 1b connected to these side walls 1a are opened, and the front end of the side wall 1a of the front part 1d and the tip of the bottom plate 1b are cut off. 1c, and the propulsion jacks 2 are arranged vertically rearward near the center or near the rear end of the side wall plate 1a which is the jack portion 1e. In the figure, 3 indicates a partition, and 1f indicates a tail.

【0003】かかるオープンシールド機1を使用して施
工するオープンシールド工法は、図示は省略するが、発
進坑内にこのオープンシールド機1を設置して、シール
ド機1の推進ジャッキ2を伸長して発進坑内の反力壁に
反力をとってシールド機1を前進させ、地下構造物を形
成する第1番目のコンクリート函体4を上方から吊り降
し、シールド機1のテール部1f内で縮めた推進ジャッ
キ2の後方にセットする。推進ジャッキ2と反力壁の間
にはストラットを配設して適宜間隔調整をする。
[0003] An open shield method using the open shield machine 1 is not shown in the drawings, but the open shield machine 1 is installed in a starting pit, and the propulsion jack 2 of the shield machine 1 is extended to start. The shield machine 1 was advanced by applying a reaction force to the reaction wall in the mine, and the first concrete box 4 forming the underground structure was suspended from above and shrunk in the tail portion 1f of the shield machine 1. Set behind the propulsion jack 2. A strut is provided between the propulsion jack 2 and the reaction force wall to adjust the distance as appropriate.

【0004】また、発進坑はシートパイル等の土留壁で
構成し、オープンシールド機1を発進させるにはこの土
留壁を一部鏡切りするが、必要に応じて薬液注入等で発
進坑の前方部分に地盤改良を施しておくこともある。
[0004] The starting pit is constituted by a retaining wall such as a sheet pile, and the retaining wall is partially mirror-cut to start the open shield machine 1. The ground improvement may be given to the part.

【0005】ショベル等の掘削機9でオープンシールド
機1の前面又は上面から土砂を掘削しかつ排土する。こ
の排土工程と同時またはその後に推進ジャッキ2を伸長
してオープンシールド機1を前進させる。この前進工程
の場合、コンクリート函体4の前にはボックス鋼材又は
型鋼を用いた枠体よりなる押角8を配設する。
An excavator 9 such as a shovel excavates earth and sand from the front or upper surface of the open shield machine 1 and discharges the earth. Simultaneously with or after this earth removal step, the propulsion jack 2 is extended to move the open shield machine 1 forward. In the case of this advancing process, a pressing angle 8 composed of a frame using a box steel material or a mold steel is disposed in front of the concrete box 4.

【0006】そして前記第1番目のコンクリート函体4
の前に第2番目のコンクリート函体4をシールド機1の
テール部1f内に吊り降す。以下、同様の排土工程、前
進工程、コンクリート函体4のセット工程を適宜繰返し
て、順次コンクリート函体4をオープンシールド機1の
前進に伴い縦列に地中に残置し、さらにこのコンクリー
ト函体4の上面に埋戻土5を入れる。
[0006] The first concrete box 4
The second concrete box 4 is hung in the tail part 1f of the shield machine 1 before (1). Hereinafter, the same earth removal process, advance process, and setting process of the concrete box 4 are appropriately repeated, and the concrete box 4 is sequentially left in the ground as the open shield machine 1 advances, and the concrete box 4 is further removed. Put backfill soil 5 on the upper surface of 4.

【0007】なお、コンクリート函体4をシールド機1
のテール部1f内に吊り降す際には、コンクリートブロ
ック等による高さ調整材7をコンクリート函体4下に配
設し、このテール部1c内でコンクリート函体4の左右
および下部の空隙にグラウト材6を充填する。
The concrete box 4 is connected to the shielding machine 1
When suspended in the tail portion 1f, a height adjusting member 7 made of a concrete block or the like is disposed below the concrete box 4, and inside the tail portion 1c, a gap is formed in the left, right, and lower spaces of the concrete box 4. The grout material 6 is filled.

【0008】このようにして、オープンシールド機1が
到達坑まで達したならばこれを撤去して工事を完了す
る。
In this way, when the open shield machine 1 reaches the destination pit, it is removed and the construction is completed.

【0009】このようなオープンシールド工法では、前
記のごとくコンクリート函体4をオープンシールド機1
の前進に伴い縦列に地中に残置し、コンクリート函体4
は、シールド機1のテール部1f内に吊り降され、オー
プンシールド機1の前進とともに該テール部1fから出
て地中に残されていくものである。
In such an open shield method, the concrete box 4 is connected to the open shield machine 1 as described above.
Left in the ground in tandem with the advance of
Is suspended in the tail part 1f of the shield machine 1 and leaves the tail part 1f and remains in the ground as the open shield machine 1 advances.

【0010】コンクリート函体4は鉄筋コンクリート製
のもので、図9に示すように左側板4a,右側板4bと
上床板4cと下床板4dとからなるもので、前後面が開
口10として開放されている。
The concrete box 4 is made of reinforced concrete and comprises a left side plate 4a, a right side plate 4b, an upper floor plate 4c and a lower floor plate 4d as shown in FIG. I have.

【0011】ところで、このようなオープンシールド工
法によるコンクリート函体4の埋設は市街地の道路下で
施工されることが多く、施工中は通行止めとなるが、一
日のうちの一定の時間は道路を開放して通行可能状態と
することが義務付けられている。このため、オープンシ
ールド機1が発進坑から到達坑にまで到達する迄の間
に、掘進を適宜中止し、オープンシールド機1の上部開
口すなわち道路の開削した部分に覆工板を敷設して開口
を一時的に閉塞し、この覆工板の上を自動車が走行し、
また人が歩行できるようにしている。
By the way, the burying of the concrete box 4 by such an open shield method is often carried out under a road in an urban area, and the road is closed during the construction, but the road is closed for a certain period of day. It is obligatory to open the door to make it passable. For this reason, excavation is appropriately stopped before the open shield machine 1 reaches from the starting pit to the arrival pit, and a lining plate is laid on the upper opening of the open shield machine 1, that is, the cut-out portion of the road to open the pit. Is temporarily closed, and the car runs on this lining plate,
It also allows people to walk.

【0012】[0012]

【発明が解決しようとする課題】オープンシールド機1
の上部に覆工板を設置したとき、道路には水勾配があ
り、また、オープンシールド機1も自重で沈むために、
覆工板と道路との境界部分に段差が生じ、この段差がス
ムーズな自動車走行や歩行の妨げとなっている。また、
この段差は大きい場合は例えば20cm程度に達するため、
これを無くすために覆工板の設置角度を調整するなどし
てるが、かかる調整作業は時間と手間を要し、所定の時
間までに道路を開放することが困難で交通に支障を来す
こともある。
Problems to be Solved by the Invention Open Shield Machine 1
When a lining board is installed on the upper part of the road, there is a water gradient on the road, and the open shield machine 1 sinks by its own weight,
A step occurs at the boundary between the lining plate and the road, and this step hinders smooth running and walking of the car. Also,
If this step is large, for example, it will reach about 20 cm,
In order to eliminate this, the installation angle of the lining plate is adjusted, but such adjustment work requires time and effort, and it is difficult to open the road by the predetermined time, which will hinder traffic. There is also.

【0013】本発明の目的は前記従来例の不都合を解消
し、オープンシールド機によるオープンシールド工法で
掘進する工程において、道路の開削した部分に覆工板を
敷設する場合、道路の水勾配やオープンシールド機の自
重によって覆工板と道路との境界部に段差が生じても、
これを迅速に解消でき平坦な路面を短時間で形成でき、
また、掘進を再開するに際しても、オープンシールド機
の上面を短時間で開放できるオープンシールド工法にお
ける覆工板据え付け方法を提供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned disadvantages of the prior art. Even if there is a step at the boundary between the lining plate and the road due to the weight of the shield machine,
This can be solved quickly and a flat road surface can be formed in a short time,
Another object of the present invention is to provide a method for installing a lining plate in an open shield method that allows the upper surface of an open shield machine to be opened in a short time even when resuming excavation.

【0014】[0014]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、左右側壁板の内側に推進ジャッキを
配設し、前面、後面及び上面を開口したオープンシール
ド機の前面又は上面開口より前方の土砂を掘削排土する
工程と、推進ジャッキを伸長してコンクリート函体を反
力にしてシールド機を前進させる工程と、シールド機の
テール部内で縮めた推進ジャッキの後方に新たなコンク
リート函体を上方から吊り降ろしてセットする工程とを
適宜繰り返して順次コンクリート函体を縦列に埋設する
オープンシールド工法において、所定長掘進後、前進を
停止し、高さ調整用の側板を取付位置自在に設けた覆工
板をオープンシールド機の上面開口に敷設し、高さ調整
用の側板を取付位置を選定してその上端を路面に合致さ
せ、該覆工板上にアスファルトなどの高さ調整用の路面
材を敷設して該路面材の上面を路面と合致させ、所定時
間経過後、前記路面材と覆工板とを撤去してオープンシ
ールド機の掘進を再開することを要旨とするものであ
る。
In order to achieve the above object, the present invention firstly arranges a propulsion jack inside the left and right side wall plates and opens the front, rear and upper surfaces of an open shield machine. Excavating and discharging earth and sand in front of the upper surface opening, extending the propulsion jack and moving the shield machine forward with a concrete box as a reaction force, and a new process behind the propelled jack shrunk in the tail part of the shield machine In the open shield method, where the concrete box is suspended from above and set by hanging down from above, the concrete box is sequentially buried in tandem.In the open shield method, after a predetermined length of excavation, advance is stopped, and side plates for height adjustment are attached. Lay the lining plate provided freely at the top opening of the open shield machine, select the mounting position for the side plate for height adjustment, match the upper end with the road surface, and place it on the lining plate Laying a road surface material for height adjustment such as asphalt and matching the upper surface of the road surface material with the road surface, after a lapse of a predetermined time, removing the road surface material and the lining plate and restarting the excavation of the open shield machine The gist is that.

【0015】第2に、左右側壁板の内側に推進ジャッキ
を配設し、前面、後面及び上面を開口したオープンシー
ルド機の前面又は上面開口より前方の土砂を掘削排土す
る工程と、推進ジャッキを伸長してコンクリート函体を
反力にしてシールド機を前進させる工程と、シールド機
のテール部内で縮めた推進ジャッキの後方に新たなコン
クリート函体を上方から吊り降ろしてセットする工程と
を適宜繰り返して順次コンクリート函体を縦列に埋設す
るオープンシールド工法において、高さ調整用の側板を
上下にスライド自在に設けた覆工板をオープンシールド
機のジャッキ配設部の上面開口に固定しておき、所定長
掘進後、前進を停止し、高さ調整用の側板を取付位置自
在に設けた覆工板をオープンシールド機のフロント部と
テール部の上面開口に敷設し、高さ調整用の側板を取付
位置を選定してその上端を路面に合致させ、該覆工板上
にアスファルトなどの高さ調整用の路面材を敷設して該
路面材の上面を路面と合致させ、所定時間経過後、前記
路面材とオープンシールド機のフロント部とテール部の
上面開口に敷設した覆工板とを撤去してオープンシール
ド機の掘進を再開することを要旨とするものである。
Second, a propulsion jack is disposed inside the left and right side wall plates, and a step of excavating and discharging earth and sand in front of the front or top opening of the open shield machine having the front, rear and top surfaces opened; The process of extending the shield machine by making the concrete box a reaction force by extending the concrete box, and the step of hanging and setting a new concrete box from the top behind the propelled jack shrunk in the tail part of the shield machine as appropriate In the open shield method, in which concrete boxes are repeatedly buried one after another in a row, a lining plate with side plates for height adjustment slidable up and down is fixed to the top opening of the jack arrangement part of the open shield machine. After a predetermined length of excavation, stop moving forward and open the lining plate with the side plates for height adjustment at the mounting position freely. On the road surface material for height adjustment, such as asphalt, on the lining board. The point is to remove the road surface material and the lining plate laid on the upper opening of the front part and the tail part of the open shield machine and resume the excavation of the open shield machine after a lapse of a predetermined time. Is what you do.

【0016】請求項1記載の本発明によれば、オープン
シールド機の上面開口に敷設する覆工板に高さ調整用の
側板が取り付けてあるから、この覆工板を敷設し、側板
の高さ位置を路面と同一となるように調整して、この側
板を型枠として覆工板の上にアスファルトなどの高さ調
整用の路面材を敷設するだけの短時間の簡単な作業で、
覆工板敷設箇所を路面と同一高さにできる。また、オー
プンシールド機の上面開口を再度開放するには、路面材
と覆工板を撤去すればよいから容易である。
According to the first aspect of the present invention, since the side plate for adjusting the height is attached to the lining plate laid on the upper surface opening of the open shield machine, the lining plate is laid and the height of the side plate is adjusted. The height is adjusted to be the same as the road surface, and this side plate is used as a formwork to lay a road surface material for height adjustment such as asphalt on the lining plate,
The laying plate can be laid at the same height as the road surface. Further, it is easy to open the upper surface opening of the open shield machine again because the road surface material and the lining plate may be removed.

【0017】そして、高さ調整用の路面材はアスファル
トや砂などの流体や粒体を用いることで、高さ調整が容
易となるだけでなく、精度よく行える。
The use of a fluid or granular material such as asphalt or sand as a road surface material for height adjustment facilitates not only height adjustment but also accuracy.

【0018】請求項2記載の本発明によれば、前記請求
項2記載の本発明の作用に加えて、オープンシールド機
の上面開口のうち、掘進中も閉塞状態としておいても施
工に支障のないジャッキ部分については、覆工板を常時
固定しておくことで、この部分は道路開放時に覆工板を
敷設し、また撤去する手間が省略でき、作業性が向上す
る。
According to the second aspect of the present invention, in addition to the operation of the second aspect of the present invention, there is no problem in the construction even if the upper opening of the open shield machine is closed or excavated. By always fixing the lining plate for the jack portion which is not used, it is possible to lay the lining plate at the time of opening the road and to eliminate the trouble of removing the lining plate, thereby improving workability.

【0019】[0019]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明のオープンシー
ルド工法の第1実施形態を示す縦断側面図、図2は同上
要部の縦断正面図で、オープンシールド機1の全体構成
は図8についても既に説明したとおり左右の側壁板1a
の内側に推進ジャッキ2を配設し、前面、後面及び上面
を開口したものであるからここでの詳細な説明は省略す
る。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a vertical sectional side view showing a first embodiment of the open shield method according to the present invention, and FIG. 2 is a vertical sectional front view of a main part of the open shield method. As shown in FIG. Side wall plate 1a
Since the propulsion jack 2 is disposed inside and the front, rear and top surfaces are opened, detailed description thereof will be omitted.

【0020】図中11は本発明のオープンシールド工法に
おける覆工板据え付け方法で使用する覆工板を示し、該
覆工板11の側部には路面との高さ調整用の側板12を取付
位置自在に設けた。この側板12は図3にも示すように高
さ調整用のボルト孔12aを上下方向に適宜数穿設してあ
り、ボルト13で覆工板11の側部に固定される。なお、覆
工板11の設置状態で、フロント部1dの先端とテール部
1fの後端に配設されるものについては、前部と後部に
も側板12を取り付けておく。
In the drawing, reference numeral 11 denotes a lining plate used in the method of installing a lining plate in the open shield method according to the present invention, and a side plate 12 for height adjustment with a road surface is attached to a side portion of the lining plate 11. It was provided freely. As shown in FIG. 3, the side plate 12 is provided with a number of bolt holes 12a for height adjustment as appropriate in the vertical direction, and is fixed to the side of the lining plate 11 with bolts 13. When the lining plate 11 is installed, the side plate 12 is also attached to the front and rear portions of the front portion 1d and the rear portion of the tail portion 1f.

【0021】また、図中14は該覆工板11の上面に敷設す
る高さ調整用の路面材であり、材質としてはアスファル
トなどの流体、砂、砕石などの粒体を用いる。アスファ
ルトの場合は、アスファルト、石粉、細骨材、粗骨材を
加熱混合したもので、180 〜240℃で打設する。
In FIG. 1, reference numeral 14 denotes a road surface material for adjusting the height laid on the upper surface of the lining plate 11. The material is a fluid such as asphalt, or a granular material such as sand or crushed stone. In the case of asphalt, asphalt, stone powder, fine aggregate and coarse aggregate are mixed by heating, and are poured at 180 to 240 ° C.

【0022】かかる覆工板11と路面材14を使用して、オ
ープンシールド機1の上面開口を一時的に閉塞し道路を
開放する方法を説明する。道路15の下をオープンシール
ド機1で掘進し、所定時間になったならば、オープンシ
ールド機1のフロント部1d、ジャッキ部1e、テール
部1fの全ての上面開口に覆工板11を設置する。該覆工
板11は側壁板1aと、該側壁板1aの内側に取り付けて
あるアングル材である支持金物16によりオープンシール
ド機1の上部に保持される。
A method of using the lining plate 11 and the road surface material 14 to temporarily close the upper opening of the open shield machine 1 and open the road will be described. Excavate under the road 15 with the open shield machine 1 and, when a predetermined time has passed, install the lining plate 11 at all the upper surface openings of the front portion 1d, the jack portion 1e, and the tail portion 1f of the open shield machine 1. . The lining plate 11 is held on the upper part of the open shield machine 1 by the side wall plate 1a and the support metal 16 which is an angle material attached to the inside of the side wall plate 1a.

【0023】次に覆工板11に取り付けてある側板12の取
り付け位置をボルト孔12aを選択することで、または側
板12の天地方向を逆して覆工板11に取り付けることで、
該側板12の覆工板11から上方の突出長を調整し、側板12
の上端を道路15の面と同一面に位置させる。これによ
り、道路15が水勾配などにより傾斜していたり、オープ
ンシールド機1が自重で沈んで覆工板11と道路15との境
界部に段差が生じていても、側板12は道路15と同一面と
なる。
Next, the mounting position of the side plate 12 mounted on the lining plate 11 is selected by selecting the bolt hole 12a, or the side plate 12 is mounted on the lining plate 11 in the upside down direction.
By adjusting the length of the side plate 12 projecting upward from the lining plate 11, the side plate 12
Is located on the same plane as the surface of the road 15. Accordingly, even if the road 15 is inclined due to a water gradient or the like, or the open shield machine 1 sinks by its own weight and a step occurs at the boundary between the lining plate 11 and the road 15, the side plate 12 is the same as the road 15. Surface.

【0024】この状態で覆工板11の上面にアスファルト
などの流体、砂、砕石などの粒体を用いる路面材14を打
設して撒く。この路面材14の敷設は側板12が型枠として
機能し、側板12に囲まれた範囲になされるから作業しや
すく、また、敷設の高さは側板12の上端までとするが、
路面材14には前記のような流体や粒体を使用するからセ
ルフレベリングの作用で高さ調整は簡単に行える。
In this state, a road surface material 14 using a fluid such as asphalt, or a granular material such as sand or crushed stone is cast and scattered on the upper surface of the lining plate 11. The laying of this road surface material 14 is easy to work because the side plate 12 functions as a formwork and is made in a range surrounded by the side plate 12, and the height of the laying is up to the upper end of the side plate 12,
Since the fluid or the granules as described above are used for the road surface material 14, the height can be easily adjusted by the action of self-leveling.

【0025】これにより、覆工板11と道路15との境界部
に段差がある場合は、覆工板11との関係では路面材14が
傾斜して敷設されるから、結果的には路面材14により道
路15との段差が解消し、道路15と覆工板11上が平坦面に
形成される。
Accordingly, if there is a step at the boundary between the lining plate 11 and the road 15, the road surface material 14 is laid slopingly in relation to the lining plate 11. By 14, the step with the road 15 is eliminated, and the road 15 and the lining plate 11 are formed on a flat surface.

【0026】以上のようにしてオープンシールド機1の
上面開口を閉鎖して道路15を開放する。一定時間経過
後、道路15を閉鎖してオープンシールド機1による掘進
を開始するには、路面材14と覆工板11を撤去する。この
場合、覆工板11はもちろんのこと、路面材14として砕石
や砂などを使用したときは、再利用が可能である。
The road 15 is opened by closing the upper opening of the open shield machine 1 as described above. After a certain period of time, to close the road 15 and start digging by the open shield machine 1, the road surface material 14 and the lining plate 11 are removed. In this case, when crushed stone, sand, or the like is used as the road surface material 14, as well as the lining plate 11, it can be reused.

【0027】前記した第1実施形態は、オープンシール
ド機1のフロント部1d、ジャッキ部1e、テール部1
fの全ての上面開口を施工時には開口しておき、道路開
放時にはこの開口に覆工板11を設置するものであるが、
図5〜図7に示す第2実施形態では、地上からの掘削を
行うフロント部1dと地上からのコンクリート函体4の
据え付けを行うテール部1fについては施工中、開放状
態とするが、ジャッキが配設されている部分は開放状態
としておかなくとも支障はないため、この部分について
は覆工板11を予め固定しておくものとした。
In the first embodiment, the front portion 1d, the jack portion 1e, and the tail portion 1 of the open shield machine 1 are used.
All top openings of f are opened at the time of construction, and the lining plate 11 is installed in this opening at the time of opening the road,
In the second embodiment shown in FIGS. 5 to 7, the front part 1 d for excavating from the ground and the tail part 1 f for installing the concrete box 4 from the ground are in an open state during construction, but the jack is not open. Since there is no problem even if the disposed portion is not left open, the lining plate 11 is fixed to this portion in advance.

【0028】図5において11aはオープンシールド機1
のジャッキが配設されている部分の上部に常時固定され
ている覆工板であり、11bは道路開放時にのみ設置され
る覆工板を示す。そして、いずれの覆工板11a、11bも
第1実施形態と同様に側部に高さ調整用の側板12を取り
付けておく。
In FIG. 5, 11a is an open shield machine 1.
Is a lining plate which is always fixed above the portion where the jack is provided, and 11b denotes a lining plate which is installed only when the road is opened. Each of the lining plates 11a and 11b has a height-adjusting side plate 12 attached to a side portion in the same manner as in the first embodiment.

【0029】そして、オープンシールド機1のジャッキ
が配設されている部分の上部には覆工板11aが常時固定
されているから、道路開放時には、フロント部1dとテ
ール部1fの上面開口だけに覆工板11bを別途設置すれ
ばよい。また、撤去の際もこの部分だけを撤去すればよ
い。よって、第1実施形態に比較して覆工板11bの開閉
作業に要する時間と手間を削減できる。なお、路面材14
の敷設は両方の覆工板11a,11bの上に行う。
Since the lining plate 11a is always fixed above the portion of the open shield machine 1 where the jack is provided, only the upper surface openings of the front portion 1d and the tail portion 1f are opened when the road is opened. What is necessary is just to install the lining board 11b separately. Also, only this part needs to be removed at the time of removal. Therefore, the time and labor required for opening and closing the lining plate 11b can be reduced as compared with the first embodiment. Road surface material 14
Is laid on both lining plates 11a and 11b.

【0030】[0030]

【発明の効果】以上述べたように本発明のオープンシー
ルド工法における覆工板据え付け方法は、覆工板を敷設
し、側板の高さ位置を路面と同一となるように調整し
て、この側板を型枠として覆工板の上にアスファルトな
どの高さ調整用の路面材を敷設するだけの短時間の簡単
な作業で、手間を要せずに精度よく覆工板敷設箇所を路
面と同一高さにできる。また、オープンシールド機の上
面開口を再度開放するには、路面材と覆工板を撤去すれ
ばよいから容易である。
As described above, in the method for installing a lining plate in the open shield method according to the present invention, the lining plate is laid, and the height of the side plate is adjusted to be the same as the road surface. A simple work of laying asphalt or other road surface material such as asphalt on a lining board using the formwork as a formwork. Height can be. Further, it is easy to open the upper surface opening of the open shield machine again because the road surface material and the lining plate may be removed.

【0031】そして、高さ調整用の路面材はアスファル
トや砂などの流体や粒体を用いることで、高さ調整が容
易となるだけでなく、精度よく行える。
The use of a fluid or granular material such as asphalt or sand as a road surface material for height adjustment facilitates not only height adjustment but also accuracy.

【0032】さらに、オープンシールド機の上面開口の
うち、掘進中も閉塞状態としておいても施工に支障のな
いジャッキ部分については、覆工板を常時固定しておく
ことで、この部分は道路開放時に覆工板を敷設し、また
撤去する手間が省略でき、覆工板の開閉時間と手間をさ
らに削減でき作業性がより向上するものである。
Further, the jacking portion of the upper surface opening of the open shield machine, which does not hinder the construction even during the excavation or in the closed state, is always fixed by the lining plate, and this portion is opened to the road. In some cases, the labor of laying and removing the lining plate can be omitted, and the opening and closing time and labor of the lining plate can be further reduced, so that the workability is further improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のオープンシールドにおける覆工板据え
付け方法の第1実施形態を示す縦断側面図である。
FIG. 1 is a vertical sectional side view showing a first embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図2】本発明のオープンシールドにおける覆工板据え
付け方法の第1実施形態を示す要部の縦断正面図であ
る。
FIG. 2 is a longitudinal sectional front view of a main part showing a first embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図3】本発明方法における覆工板据え付け構造の要部
としての側板の一部を示す正面図である。
FIG. 3 is a front view showing a part of a side plate as a main part of a lining plate installation structure in the method of the present invention.

【図4】本発明のオープンシールドにおける覆工板据え
付け方法の第1実施形態を示す縦断正面図である。
FIG. 4 is a longitudinal sectional front view showing a first embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図5】本発明のオープンシールドにおける覆工板据え
付け方法の第2実施形態を示す縦断側面図である。
FIG. 5 is a longitudinal sectional side view showing a second embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図6】本発明のオープンシールドにおける覆工板据え
付け方法の第2実施形態を示す要部の縦断正面図であ
る。
FIG. 6 is a longitudinal sectional front view of a main part showing a second embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図7】本発明のオープンシールドにおける覆工板据え
付け方法の第2実施形態を示す縦断正面図である。
FIG. 7 is a vertical sectional front view showing a second embodiment of a method for installing a lining plate in an open shield according to the present invention.

【図8】オープンシールド工法の概要を示す縦断側面図
である。
FIG. 8 is a vertical sectional side view showing an outline of the open shield method.

【図9】コンクリート函体の斜視図である。FIG. 9 is a perspective view of a concrete box.

【符号の説明】[Explanation of symbols]

1…オープンシールド機 1a…側壁板 1b…底板 1c…刃口 1d…フロント部 1e…ジャッキ部 1f…テール部 2…推進ジャッキ 3…隔壁 4…コンクリート函体 4a…左側壁板 4b…右側壁板 4c…上床板 4d…下床板 5…埋戻土 6…グラウト材 7…高さ調整材 8…押角 9…掘削機 10…開口 11,11a,11b…
覆工板 12…側板 12a…ボルト孔 13…シール材 14…路面材 15…道路 16…支持金物
DESCRIPTION OF SYMBOLS 1 ... Open shield machine 1a ... Side wall plate 1b ... Bottom plate 1c ... Blade part 1d ... Front part 1e ... Jack part 1f ... Tail part 2 ... Propulsion jack 3 ... Partition wall 4 ... Concrete box 4a ... Left wall plate 4b ... Right wall plate 4c: Upper floor plate 4d: Lower floor plate 5: Backfill soil 6: Grout material 7: Height adjusting material 8: Push angle 9: Excavator 10: Opening 11, 11a, 11b ...
Lining plate 12 ... Side plate 12a ... Bolt hole 13 ... Seal material 14 ... Road surface material 15 ... Road 16 ... Support hardware

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
の前面又は上面開口より前方の土砂を掘削排土する工程
と、推進ジャッキを伸長してコンクリート函体を反力に
してシールド機を前進させる工程と、シールド機のテー
ル部内で縮めた推進ジャッキの後方に新たなコンクリー
ト函体を上方から吊り降ろしてセットする工程とを適宜
繰り返して順次コンクリート函体を縦列に埋設するオー
プンシールド工法において、所定長掘進後、前進を停止
し、高さ調整用の側板を取付位置自在に設けた覆工板を
オープンシールド機の上面開口に敷設し、高さ調整用の
側板の取付位置を選定してその上端を路面に合致させ、
該覆工板上にアスファルトなどの高さ調整用の路面材を
敷設して該路面材の上面を路面と合致させ、所定時間経
過後、前記路面材と覆工板とを撤去してオープンシール
ド機の掘進を再開することを特徴とするオープンシール
ド工法における覆工板据え付け方法。
1. A step of disposing a propulsion jack inside a left and right side wall plate, excavating and discharging earth and sand in front of a front or top opening of an open shield machine having front, rear and top openings, and extending the propulsion jack. The concrete box as a reaction force to advance the shield machine, and the step of hanging a new concrete box from above and setting it behind the propelled jack shrunk in the tail part of the shield machine as appropriate In the open shield method, in which concrete boxes are sequentially buried in a column, after a predetermined length of excavation, the advancing is stopped, and a lining plate provided with a side plate for height adjustment at the mounting position is laid at the top opening of the open shield machine. , Select the mounting position of the side plate for height adjustment and match the upper end to the road surface,
A road surface material such as asphalt is laid on the lining plate to make the upper surface of the road surface material coincide with the road surface, and after a lapse of a predetermined time, the road surface material and the lining plate are removed to open the shield. A method for installing a lining plate in an open shield method, wherein the excavation of the machine is resumed.
【請求項2】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
の前面又は上面開口より前方の土砂を掘削排土する工程
と、推進ジャッキを伸長してコンクリート函体を反力に
してシールド機を前進させる工程と、シールド機のテー
ル部内で縮めた推進ジャッキの後方に新たなコンクリー
ト函体を上方から吊り降ろしてセットする工程とを適宜
繰り返して順次コンクリート函体を縦列に埋設するオー
プンシールド工法において、高さ調整用の側板を取付位
置自在に設けた覆工板をオープンシールド機のジャッキ
配設部の上面開口に固定しておき、所定長掘進後、前進
を停止し、高さ調整用の側板を上下にスライド自在に設
けた覆工板をオープンシールド機のフロント部とテール
部の上面開口に敷設し、高さ調整用の側板の取付位置を
選定してその上端を路面に合致させ、該覆工板上にアス
ファルトなどの高さ調整用の路面材を敷設して該路面材
の上面を路面と合致させ、所定時間経過後、前記路面材
とオープンシールド機のフロント部とテール部の上面開
口に敷設した覆工板とを撤去してオープンシールド機の
掘進を再開することを特徴とするオープンシールド工法
における覆工板据え付け方法。
2. A step of disposing a propulsion jack inside the left and right side wall plates, excavating and discharging earth and sand in front of the front or top opening of the open shield machine having front, rear and top openings, and extending the propulsion jack. The concrete box as a reaction force to advance the shield machine, and the step of hanging a new concrete box from above and setting it behind the propelled jack shrunk in the tail part of the shield machine as appropriate In the open shield method, in which concrete boxes are sequentially buried in columns, a lining plate provided with side plates for height adjustment at the mounting position is fixed to the top opening of the jack arrangement part of the open shield machine, and a predetermined length After excavation, stop moving forward and lay a lining plate with side plates for height adjustment slidable up and down at the upper opening of the front and tail of the open shield machine Then, the mounting position of the side plate for height adjustment is selected, the upper end thereof is matched with the road surface, the road surface material for height adjustment such as asphalt is laid on the lining plate, and the upper surface of the road surface material is And after a lapse of a predetermined time, removing the road surface material and the lining plate laid on the upper surface opening of the front part and the tail part of the open shield machine and restarting the excavation of the open shield machine. Installation method of lining plate in shield method.
JP23571698A 1998-08-21 1998-08-21 Installation method of lining plate in open shield method Expired - Lifetime JP2976106B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23571698A JP2976106B1 (en) 1998-08-21 1998-08-21 Installation method of lining plate in open shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23571698A JP2976106B1 (en) 1998-08-21 1998-08-21 Installation method of lining plate in open shield method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP11179189A Division JP3103978B2 (en) 1999-06-25 1999-06-25 Installation structure of lining plate in open shield method

Publications (2)

Publication Number Publication Date
JP2976106B1 true JP2976106B1 (en) 1999-11-10
JP2000064777A JP2000064777A (en) 2000-02-29

Family

ID=16990179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23571698A Expired - Lifetime JP2976106B1 (en) 1998-08-21 1998-08-21 Installation method of lining plate in open shield method

Country Status (1)

Country Link
JP (1) JP2976106B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293798A (en) * 2021-06-30 2021-08-24 中铁二院重庆勘察设计研究院有限责任公司 Construction method of shallow-buried open-cut tunnel penetrating urban road obliquely

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103742162B (en) * 2014-01-20 2016-06-29 中铁工程装备集团有限公司 Shield tail top is provided with shield machine and the synchronous grouting device of synchronous grouting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293798A (en) * 2021-06-30 2021-08-24 中铁二院重庆勘察设计研究院有限责任公司 Construction method of shallow-buried open-cut tunnel penetrating urban road obliquely

Also Published As

Publication number Publication date
JP2000064777A (en) 2000-02-29

Similar Documents

Publication Publication Date Title
JP3586864B2 (en) Underground structure construction method and elevated traffic path
KR20190079588A (en) Construction Method of Duplex Tunnel
JP6543176B2 (en) Building method
JP6629825B2 (en) Road lining method in open shield method
JP6944882B2 (en) How to build an invert in an existing tunnel
JP3893056B2 (en) Construction method of underground structure
JP3103978B2 (en) Installation structure of lining plate in open shield method
JP2976106B1 (en) Installation method of lining plate in open shield method
JP3366580B2 (en) How to install an invert in the bottom of an existing mountain tunnel
JP2963972B2 (en) Construction method for underground structures
JP5155236B2 (en) Installation method of lining board in open shield method
JP3581332B2 (en) Earth retaining equipment and open-cutting method using it
JP3403345B2 (en) Invert formation method and block in existing mountain tunnel
JP2668648B2 (en) Construction method of underground structure and starting pit used for it
CN109914478A (en) A kind of Blasting Excavation continued access diaphram wall construction subway station method
JP6543177B2 (en) Building method
JP2005307544A (en) Laying method and removal method for covering plate for open shield method
JP6276300B2 (en) Open shield method
JP3348052B2 (en) Open shield machine
KR20200088659A (en) Top-down type underground structure construction method using earth support plate
JP2002188392A (en) Method of starting open shield machine
JP3868959B2 (en) Waterway construction method
JP6871344B1 (en) Tunnel repair method and repair equipment for existing tunnels
JP3926818B2 (en) Installation method of concrete box
JP3302661B2 (en) Open shield machine and construction method of underground structure using it

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090910

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100910

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100910

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110910

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140910

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term