JP2965014B2 - Vernier bracket - Google Patents

Vernier bracket

Info

Publication number
JP2965014B2
JP2965014B2 JP29101297A JP29101297A JP2965014B2 JP 2965014 B2 JP2965014 B2 JP 2965014B2 JP 29101297 A JP29101297 A JP 29101297A JP 29101297 A JP29101297 A JP 29101297A JP 2965014 B2 JP2965014 B2 JP 2965014B2
Authority
JP
Japan
Prior art keywords
long
adjusting
tool
sag
vernier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP29101297A
Other languages
Japanese (ja)
Other versions
JPH11127512A (en
Inventor
悠二 中川
栄 小峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daido Denki Kogyo KK
Original Assignee
Daido Denki Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daido Denki Kogyo KK filed Critical Daido Denki Kogyo KK
Priority to JP29101297A priority Critical patent/JP2965014B2/en
Publication of JPH11127512A publication Critical patent/JPH11127512A/en
Application granted granted Critical
Publication of JP2965014B2 publication Critical patent/JP2965014B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は架空送電線を鉄塔
或いは鉄塔に取付けられる碍子側と電線クランプ側とを
連結する架線金具となるバーニヤ金具に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a vernier fitting which serves as an overhead wire fitting for connecting an overhead transmission line to a tower or an insulator attached to the tower and a wire clamp side.

【0002】[0002]

【従来の技術】一般に、送電線の架線に際し弛度を調整
するためには図4に示すような油圧式弛度調整圧工具を
使用する架線工法が採用されている。この場合、弛度を
直接調整する架線金具としては図10に示すような長尺
のバーニヤ金具が知られている。この従来のバーニヤ金
具1の構成は、単に平行な一対の長尺型外板2とその間
隙部に長尺型中板3を挿入介在とし、且つ該外板2と中
板3の夫々に穿った複数個の調整孔2a,3a中、その
適宜合致した調整孔位置に調整ボルト4を挿通の連結と
し、両端に張力が懸かったときに所定長さを得る連結金
具としている。
2. Description of the Related Art In general, in order to adjust the sag of a transmission line, an overhead wire method using a hydraulic sag adjusting pressure tool as shown in FIG. 4 is employed. In this case, a long vernier fitting as shown in FIG. 10 is known as a wire fitting for directly adjusting the sag. The configuration of the conventional vernier fitting 1 is such that a pair of parallel long elongate outer plates 2 and a long elongate intermediate plate 3 are inserted into a gap therebetween, and the outer plate 2 and the intermediate plate 3 are pierced respectively. Of the plurality of adjustment holes 2a and 3a, the adjustment bolt 4 is inserted and connected at an appropriately adjusted adjustment hole position, and is a connection fitting for obtaining a predetermined length when tension is applied to both ends.

【0003】このバーニヤ金具1の実際の弛度調整使用
としては、油圧式弛度調整圧工具5を図11に示すよう
な横位置装着か、図12に示すような縦位置装着を取
る。但し、このとき、バーニヤ金具1の両端に接続する
電線側,鉄塔側となる直角クレビスリンク状の架線金具
6,6には、上下,左右となる四方位置に取付孔6a,
6aを配設して横装着,縦装着を可能としている。この
架線金具6,6に油圧式弛度調整圧工具5をセットす
る。また、油圧式弛度調整圧工具5の構成としては、両
端部に対峙する平行リンクとなる金具連結用アタッチメ
ント金具7,7と該アタッチメント金具7,7の中間位
置に差し渡す支持杆8、及び該支持杆8に平行となるア
タッチメント金具7,7の上端取付ける油圧ラム9とよ
りなる。
In actual use of the sagging adjustment of the vernier fitting 1, the hydraulic sag adjusting pressure tool 5 is mounted in a horizontal position as shown in FIG. 11 or in a vertical position as shown in FIG. However, at this time, the right-angle clevis link-shaped overhead wire fittings 6 and 6 on the electric wire side and the steel tower side connected to both ends of the vernier fitting 1 have mounting holes 6a,
6a is provided to enable horizontal mounting and vertical mounting. The hydraulic looseness adjusting pressure tool 5 is set in the overhead wire fittings 6 and 6. Further, the configuration of the hydraulic sag adjusting pressure tool 5 includes attachment metal fittings 7, 7 serving as parallel links facing the both ends, a supporting rod 8, which is inserted into an intermediate position between the metal attachments 7, 7, and A hydraulic ram 9 is provided at the upper end of the attachment metal fittings 7, 7 which is parallel to the support rod 8.

【0004】この一種のリンク機構を呈する油圧式弛度
調整圧工具5の油圧ラム9を作動させ、このラム部9a
を図13に示す矢印のように繰出すと、中間位置の支持
杆8の両端を支点として両側アタッチメント金具7,7
が回動し、該アタッチメント金具7,7の下端に連結し
た架線金具6,6の連結点6′,6′が引き寄せられそ
の間隔が縮まれば、バーニヤ金具1の長尺型外板2と長
尺型中板3の緊張張力が緩められ荷重が除去されるの
で、長尺型外板2と長尺型中板3はその中間の調整ボル
ト4を中心として折れ曲る垂下となる(図13参照)。
The hydraulic ram 9 of the hydraulic-type sag adjusting pressure tool 5 exhibiting this kind of link mechanism is operated, and the ram portion 9a
13 is extended as shown by an arrow in FIG. 13, the both ends of the support rod 8 at the intermediate position are used as fulcrums, and the attachment brackets 7, 7 on both sides are provided.
Is pivoted, the connection points 6 ', 6' of the overhead wire fittings 6, 6 connected to the lower ends of the attachment fittings 7, 7 are drawn and the distance between them is reduced. Since the tension of the long middle plate 3 is relaxed and the load is removed, the long outer plate 2 and the long middle plate 3 are drooping around the intermediate adjustment bolt 4 (FIG. 13).

【0005】この後、前記折れ曲り下がった長尺型外板
2と長尺型中板3を、中間連結の調整ボルト4を外して
から上方へ抱え上げ、長尺型外板2と長尺型中板3の夫
々の調整孔2a,3aを適宜選定し、この合致した調整
孔2a,3aに調整ボルト4を再度挿通して連結する所
謂調整組み替えを行い、バーニヤ金具1の伸長又は短縮
して電線の弛度を調節している。
[0005] Thereafter, the bent long outer plate 2 and the long intermediate plate 3 are lifted upward after removing the intermediate connecting adjustment bolt 4, and the long outer plate 2 and the long intermediate plate 3 are lifted up. The adjustment holes 2a and 3a of the middle plate 3 are appropriately selected, and the adjustment bolts 4 are reinserted into the matching adjustment holes 2a and 3a to perform a so-called adjustment rearrangement to connect the adjustment holes 2a and 3a. To adjust the wire slack.

【0006】この従来のバーニヤ金具1の使用として
は、例えば図14に示す耐張2導体装置Aでは長尺型中
板3を鉄塔側に連結し、長尺型外板2を電線側に連結さ
せる構成とする。図15は同図の平面図を示す構成であ
る。
As the use of this conventional vernier fitting 1, for example, in a tension-resistant two-conductor device A shown in FIG. 14, a long middle plate 3 is connected to a steel tower side, and a long outer plate 2 is connected to an electric wire side. Configuration. FIG. 15 is a configuration showing a plan view of FIG.

【0007】[0007]

【発明が解決しようとする課題】即ち、油圧式弛度調整
工具5により取込み作業を行なうと、バーニヤ金具1は
張力が除去されその両端が図13に示すように、架線金
具6,6端の接続点2′,3′で折曲されると同時に、
長尺型中板3と長尺型外板2を接続の調整ボルト4位置
でも折曲し、接続点2′,3′,4′を結ぶ三角形が形
成される(長尺型中板3と長尺型外板2の垂下量が大き
くなる)。このため、長尺型の中板3と外板2の調整孔
3a,2aの孔位置組み替えをしバーニヤ金具1を伸長
又は短縮して電線の弛度調整をするには、一旦深く垂下
した長尺型中板3と長尺型外板2を持ち上げてから調整
ボルト4を外さなければならない。この場合、バーニヤ
金具自体は重く、このため中板3側を一方に乗る作業者
が前屈し手で抱え上げ、外板2側を他方に乗る別の作業
者が前屈して抱えながらスライドさせ、バーニヤ金具の
調整孔3a,2bに対する調整ボルト4の組み替えを行
なうので、その作業は危険であり、且つ少なくとも2人
の作業員を要し面倒な作業となる。
That is, when the take-in operation is performed by the hydraulic looseness adjusting tool 5, the tension of the vernier fitting 1 is removed, and both ends of the vernier fitting 1, as shown in FIG. At the same time as being bent at the connection points 2 'and 3',
The long intermediate plate 3 and the long external plate 2 are bent at the position of the connection adjustment bolt 4 to form a triangle connecting the connection points 2 ', 3', and 4 '. The amount of droop of the long outer plate 2 increases). For this reason, in order to adjust the sag of the electric wire by rearranging the hole positions of the adjustment holes 3a and 2a of the long-sized middle plate 3 and the outer plate 2 and extending or shortening the vernier fitting 1, it is necessary to temporarily suspend the wire. The adjusting bolt 4 must be removed after lifting the middle plate 3 and the long outer plate 2. In this case, the vernier metal fitting itself is heavy, so the worker who rides on the middle plate 3 side leans forward and holds it with his hand, and another worker who rides on the outer plate 2 side leans forward while sliding, Since the adjustment bolts 4 are rearranged for the adjustment holes 3a and 2b of the vernier fitting, the operation is dangerous and requires at least two workers, which is a troublesome operation.

【0008】しかも、近年の送電線は電線が太線化、高
強度化、多導体化しており、それに伴いバーニヤ金具自
体も大型化し重量も嵩むものとなるため、作業者は電線
側金具連上の高所で狭隘且つ不安定な足場での環境で、
上体を前屈させての2人作業を余儀なくされ危険度の高
い作業となる。
Moreover, in recent transmission lines, the wires have become thicker, stronger, and multi-conductor, and the vernier fittings themselves have become larger and heavier. In an environment with narrow and unstable scaffolds at high altitudes,
This requires a two-person operation with the upper body bent forward, resulting in a highly dangerous operation.

【0009】本発明は上記実情に鑑み、油圧式弛度調整
工具を取付ける取付点を少なくともバーニヤ金具の一端
部分に直接配設するようにし、上記課題を解決するバー
ニヤ金具を提供することを目的としたものである。
SUMMARY OF THE INVENTION In view of the above circumstances, it is an object of the present invention to provide a vernier fitting which solves the above-mentioned problem by providing a mounting point for mounting a hydraulic sag adjusting tool directly at least at one end of the vernier fitting. It was done.

【0010】[0010]

【課題を解決するための手段】本発明は、架空送電線の
弛度をバーニヤ金具位置で油圧式弛度調整工具をもって
調整する架線工法のバーニヤ金具において、複数個の調
整孔を長手方向に設けた平行となる一対の長尺型外板
と、この平行間隙内に挿入する複数個の調整孔を長手方
向に設けた調整部を配設すると共に、その後端側に工具
用支持部を一体形成した長尺型中板とを形成し、且つ長
尺型外板の適宜調整孔と長尺型中板の適宜調整孔の合致
位置に挿入する調整ボルトと、長尺型外板と長尺型中板
の両末端位置に電線側連結孔と鉄塔側連結孔を設け、さ
らに、長尺型中板の工具用支持部を十字ヨーク構造と
し、その左右、上下の端面に、油圧式弛度調整圧工具の
一端部を直接係止する工具用支持孔を設けてなるもので
ある。
According to the present invention, there is provided a vernier metal fitting of an overhead wire construction method for adjusting the sag of an overhead transmission line at a vernier metal fitting position with a hydraulic sag adjusting tool. A pair of long outer skins which are parallel to each other, and an adjusting portion provided with a plurality of adjusting holes inserted in the parallel gap in the longitudinal direction are arranged, and a tool is provided at a rear end side.
Forming an elongated middle plate integrally formed with a support portion for use , and adjusting bolts to be inserted into the appropriate adjustment holes of the elongated outer plate and the appropriate adjustment holes of the elongated middle plate, and the elongated type. Wire-side connection holes and tower-side connection holes are provided at both end positions of the outer plate and the long middle plate ,
In addition, the tool support of the long intermediate plate has a cross yoke structure.
And the left and right and upper and lower end faces
A tool support hole for directly locking one end is provided .

【0011】この様に、弛度調整金具となるバーニヤ金
具を、平行となる2枚一対の長尺型外板とこの中に挿入
介在する1枚の長尺型中板にあって、該長尺型中板の形
状を、その後端に前記油圧式弛度調整工具の一端部を直
接接続するため、弛度の調整に際しては、張力が懸かっ
た状態下で、バーニヤ金具の前記長尺型中板の後端の工
具用支持部の支持孔に油圧式弛度調整工具の一端に配設
のアタッチメント金具端を連結し、該油圧式弛度調整工
具の他端に配設のアタッチメント金具端を、前記長尺型
外板の先端に連結した直角クレビスリンク状架線金具の
中間位置に接続するセット構成とする。
As described above, the vernier fittings serving as the sag adjusting fittings are provided on two parallel long pair of outer plates and one long middle plate interposed therebetween. In order to directly connect one end of the hydraulic sag adjusting tool to the rear end of the middle plate of the shank, the sag is adjusted under tension while the elongate mold of the vernier metal fitting is being used. Attach the attachment fitting end provided at one end of the hydraulic sag adjustment tool to the support hole of the tool support portion at the rear end of the plate, and attach the attachment fitting end provided at the other end of the hydraulic sag adjustment tool. A set configuration is provided for connecting to an intermediate position of a right-angle clevis link-like overhead wire fitting connected to the end of the long type outer plate.

【0012】即ち、バーニヤ金具の長尺型中板の後端に
油圧式弛度調整工具の一部を直接接続する構成としてい
るため、長尺型外板と長尺型中板間にセットした油圧式
弛度調整工具の油圧ラムを作動させ、ラム部を繰出し油
圧式弛度調整工具のセット間隔を広げても、油圧式弛度
調整工具の一部が取り付く箇所が長尺型中板位置のた
め、該長尺型中板は電線張力に起因して直線状を維持す
るものとなる。このため、電線側となる2枚の長尺型外
板側のみが、該長尺型外板と長尺型中板の調整連結点と
なる調整ボルト位置を支点とし、長尺型外板側は架線金
具に更に連結した平行クレビスリンク型の連結金具の連
結点をしてとして回動するため、この長尺型外板の折り
曲がり(垂下量)は最小となり、長尺型中板を従来の如
く抱え上げることがなく、長尺型外板側のみを抱え上げ
所定の調整を行えばよく、1人作業が可能となる。
That is, since a part of the hydraulic sag adjusting tool is directly connected to the rear end of the long intermediate plate of the vernier fitting, it is set between the long external plate and the long intermediate plate. Even when the hydraulic ram of the hydraulic sag adjustment tool is operated and the ram is extended to extend the set interval of the hydraulic sag adjustment tool, the part where the hydraulic sag adjustment tool is partially attached is the long middle plate position. Therefore, the long intermediate plate maintains a straight shape due to the wire tension. For this reason, only the two elongate outer panels on the electric wire side use the adjustment bolt position as an adjustment connection point between the elongate outer panel and the elongate intermediate panel as a fulcrum, and the elongate outer panel side Is turned as the connecting point of the parallel clevis link type connecting bracket further connected to the overhead wire fitting, so that the bending (amount of droop) of this long type outer plate becomes minimum and the long type middle plate is It is only necessary to hold the elongate outer panel side and carry out a predetermined adjustment without having to hold it as in the case of the above, and one-person work becomes possible.

【0013】[0013]

【発明の実施の形態】以下、本発明のバーニヤ金具を実
施例の図に基づいて説明すれば、次の通りである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a vernier fitting of the present invention will be described with reference to the drawings of an embodiment.

【0014】図1乃至図3は長尺型中板の工具用支持部
を十字ヨーク構造とした実施例のバーニヤ金具を示す。
10は平行となる一対の長手方向に複数個の調整孔2a
を所定間隔に穿ってなる長尺型外板2と、該長尺型外板
2の平行間隙aに挿入する長手方向に複数個の調整孔3
aを前記孔間隔と異なる間隔で穿った調整部11及び後
端部に工具用支持部12を一体形成した長尺型中板13
と、前記調整孔2aと調整孔3aの合致位置に挿通する
調整ボルト4より構成のバーニヤ金具である。この場
合、長尺型中板13は、前記後端部に形成する工具用支
持部12が全体として十字ヨーク部12aの形状を呈
し、該十字ヨーク部12aの左右,上下の端面に工具用
支持孔14を穿ち、油圧式弛度調整工具のセットを縦装
着,横装着自在としている。また、長尺型外板2の先端
には電線側連結孔2bを穿ち、工具用支持部12の末端
に鉄塔側連結孔3bを穿っている。
FIGS. 1 to 3 show a vernier fitting of an embodiment in which a tool support portion of a long intermediate plate has a cross yoke structure.
10 is a plurality of adjusting holes 2a in a pair of parallel longitudinal directions.
And a plurality of adjusting holes 3 in the longitudinal direction to be inserted into the parallel gap a of the long outer plate 2.
a long intermediate plate 13 integrally formed with an adjusting portion 11 having a hole a different from the hole interval and a tool supporting portion 12 at a rear end portion.
And a vernier fitting comprising an adjusting bolt 4 inserted into a matching position between the adjusting hole 2a and the adjusting hole 3a. In this case, in the long intermediate plate 13, the tool supporting portion 12 formed at the rear end portion has the shape of a cross yoke portion 12a as a whole, and the left and right and upper and lower end surfaces of the cross yoke portion 12a support the tool. A hole 14 is formed so that a set of hydraulic-type sag adjusting tools can be freely mounted vertically and horizontally. In addition, a wire-side connection hole 2b is drilled at the tip of the long outer panel 2, and a tower-side connection hole 3b is drilled at the end of the tool support portion 12.

【0015】いまこの作用を説明すると、このバーニヤ
金具10の長さ調整をし弛度調整を行うに際し、先ずこ
のバーニヤ金具10を、例えば図8,図9に示す耐張2
導体装置Aに組み込む場合、長尺型中板13の末端の鉄
塔側連結孔3bを鉄塔側となる2連ヨーク15に取付く
直角クレビス16に連結し、長尺型外板2の先端の電線
側連結孔2bには電線17を引止める耐張クランプ18
を先方に配設する電線側連結金具19の基端を、平行ク
レビスリンク20を介して連結する構成とし、所定の架
線工法をもって電線を張り上げる。
Now, the operation will be described. When adjusting the length of the vernier fitting 10 and adjusting the sag, first, the vernier fitting 10 is, for example, tensioned as shown in FIGS. 8 and 9.
When incorporated in the conductor device A, the tower-side connection hole 3b at the end of the long intermediate plate 13 is connected to a right-angle clevis 16 that is attached to the double yoke 15 on the tower side, and the electric wire at the tip of the long outer plate 2 A tension clamp 18 for retaining the electric wire 17 is provided in the side connection hole 2b.
Is connected via a parallel clevis link 20, and the electric wire is pulled up by a predetermined overhead wire construction method.

【0016】ここにおいて、電線弛度の調整を行う場合
は、例えば図4に示す公知の油圧式弛度調整圧工具5を
用いてバーニヤ金具10に懸かる荷重を一旦緩め、その
調整孔2a,調整孔3aの選定替えをもって行う。この
とき、油圧式弛度調整圧工具5の前後端に位置する一対
のアタッチメント金具7,7の下端を(図6,図7に示
す縦装着では)、電線側連結金具19の架線金具部19
aに設けた上下,左右の4個の取付孔6a中、所定(左
右)の取付孔6aに連結すると共に、長尺型中板13の
工具用支持部12の十字ヨーク部12aにあっても上
下,左右の4個の支持孔14中、所定(左右)の支持孔
14に連結する。
Here, when adjusting the sag of the electric wire, the load on the vernier fitting 10 is temporarily relaxed by using a known hydraulic sag adjusting pressure tool 5 shown in FIG. 4, and the adjusting hole 2a is adjusted. This is performed by changing the selection of the hole 3a. At this time, the lower ends of the pair of attachment fittings 7, 7 located at the front and rear ends of the hydraulic-type sag adjusting pressure tool 5 (in the vertical mounting shown in FIGS. 6 and 7) are connected to the wire fitting 19 of the electric wire side connection fitting 19.
a of the four upper and lower mounting holes 6a provided on the long middle plate 13 and the cross yoke portion 12a of the tool supporting portion 12 of the long intermediate plate 13. It is connected to a predetermined (left / right) support hole 14 among the four support holes 14 of upper, lower, left and right.

【0017】勿論、油圧式弛度調整圧工具5の装着状態
は導体配列に起因し支障のない様にする。例えば、図5
に示すようにバーニヤ金具10に対し横装着とするか、
図6に示すようにバーニヤ金具10に対し縦装着とす
る。また、バーニヤ金具10自体の配置は、図8,図9
に示す耐張2導体装置Aでは鉄塔側と電線側の中間に介
在する連結金具の一員として組み込む。
Of course, the mounting state of the hydraulic-type sag adjusting pressure tool 5 is not affected by the conductor arrangement. For example, FIG.
As shown in FIG.
As shown in FIG. 6, it is mounted vertically on the vernier fitting 10. The arrangement of the vernier fitting 10 itself is shown in FIGS.
In the tensile strength two conductor device A shown in (1), it is incorporated as a member of a connection fitting interposed between the tower side and the electric wire side.

【0018】即ち、長尺型中板13の末端の鉄塔側連結
孔3bを鉄塔側となる2連ヨーク15に取付く直角クレ
ビス16に連結し、長尺型外板2の先端の電線側連結孔
2bには電線17を引止める耐張クランプ18を先方に
配設する電線側連結金具19の基端を、平行クレビスリ
ンク20を介して連結する構成とし、公知の架線工法で
耐張張り上げをする。
That is, the tower-side connection hole 3b at the end of the long intermediate plate 13 is connected to a right-angle clevis 16 which is attached to the double yoke 15 on the steel tower side, and the distal end of the long outer plate 2 is connected to the electric wire side. In the hole 2b, a base end of an electric wire side connection metal fitting 19 in which a tension clamp 18 for holding the electric wire 17 is provided at the front is connected via a parallel clevis link 20, and the tension is pulled up by a known overhead wire method. I do.

【0019】ここで、更に電線の弛度調整作業を詳述す
ると、先ず油圧式弛度調整圧工具5をバーニヤ金具10
に装着し、該バーニヤ金具10の両端間隔を縮めここに
懸かる張力荷重を一旦緩めて、その長尺型外板2の調整
孔2aと長尺型中板13の調整孔3aの連結位置を組み
替えする。この場合、図6にあって油圧式弛度調整圧工
具5を作動しこのラム部9aを適宜繰出せば、前後配設
の起立したアタッチメント金具7,7は中間位置が1本
の支持杆8の介在で間隔を一定としているため、図7に
示すようにアタッチメント金具7,7は支持杆8の連結
点8′,8′を支点として上方間(弛度調整圧工具5
側)が広がる回動となり、下方間(架線金具部19a
側)が縮まる回動となる。このため、架線金具部19a
の連結点6′と,長尺型中板13側の工具用支持部12
の支持孔14の連結点6′が寄せられるため、長尺型中
板13と長尺型外板2の緊張は解ける。但し、このと
き、前記片方のアタッチメント金具7の下端は直線的に
荷重が加わる長尺型中板13の後端部に直接連結してい
るので、この連結点6′は実質的に不動となっている。
Here, the work for adjusting the sag of the electric wire will be described in more detail. First, the hydraulic sag adjusting pressure tool 5 is connected to the vernier fitting 10.
To reduce the distance between both ends of the vernier metal fitting 10 to temporarily loosen the tension load applied thereto, and rearrange the connection position of the adjustment hole 2a of the long outer plate 2 and the adjustment hole 3a of the long intermediate plate 13. I do. In this case, in FIG. 6, if the hydraulic-type sagging adjusting pressure tool 5 is operated and the ram portion 9a is appropriately extended, the up-and-down attachment metal fittings 7, 7 arranged in the front and rear directions have a single support rod 8 at an intermediate position. As shown in FIG. 7, the attachment metal fittings 7, 7 are supported at the connection points 8 ', 8' of the support rod 8 as a fulcrum (the sag adjustment pressure tool 5) as shown in FIG.
Side) is widened, and the space between the lower portion (the wire fitting 19a) is extended.
Side) is contracted. For this reason, the overhead wire fitting 19a
Connecting point 6 'and the tool support portion 12 on the side of the long intermediate plate 13
The connecting point 6 'of the supporting hole 14 is moved closer, so that the tension between the long intermediate plate 13 and the long outer plate 2 is released. However, at this time, since the lower end of the one attachment fitting 7 is directly connected to the rear end of the long intermediate plate 13 to which a load is linearly applied, the connection point 6 'is substantially immobile. ing.

【0020】従って、長尺型中板13と長尺型外板2と
よりなるバーニヤ金具10は、長尺型中板13と長尺型
外板2を連結する調整ボルト4の連結点4′と、平行ク
レビスリンク20の連結点20′と、該平行クレビスリ
ンク20と長尺型外板2の連結点2′の3点を屈曲点と
して折り曲がる。即ち、直線状を維持する長尺型中板1
3自体は折り曲がらず、この調整孔3aの連結点4′か
ら先方位置の長尺型外板2が折り曲がる垂下となり荷重
が除去される状態となるため、従来の長尺型中板3と長
尺型外板2の双方がV状に垂下し荷重を除去するものに
比して垂下量が小さく設定される。このため、電線側に
乗った1人の作業員のみで、上体を深く前屈させること
なく長尺型外板2を抱え上げる事ができ、長尺型中板1
3と長尺型外板2を挿通した調整ボルト4の抜き差し作
業が可能となり、双方の調整孔2a,3aの組み替えが
簡単にできる。
Accordingly, the vernier fitting 10 composed of the long intermediate plate 13 and the long outer plate 2 is connected to the connecting point 4 'of the adjusting bolt 4 for connecting the long intermediate plate 13 and the long outer plate 2. Then, the connection point 20 ′ of the parallel clevis link 20 and the connection point 2 ′ of the parallel clevis link 20 and the long outer plate 2 are bent at three bending points. That is, a long intermediate plate 1 that maintains a straight shape
3 itself does not bend, and the long outer plate 2 at the forward position from the connection point 4 'of the adjusting hole 3a is bent down to be bent and the load is removed. The amount of droop is set to be smaller than that of both of the long type outer plates 2 which droop in a V shape and remove the load. Therefore, only one worker riding on the wire side can hold the long outer plate 2 without bending the upper body deeply forward, and the long middle plate 1
It is possible to insert and remove the adjustment bolt 4 through which the long outer plate 2 and the long outer plate 3 are inserted, and the adjustment holes 2a and 3a can be easily rearranged.

【0021】この後、油圧式弛度調整圧工具5の伸長又
は伸縮動作を止めることでバーニヤ金具10に耐張の所
定荷重が懸かり、前記孔位置の調整分の変化だけ弛度調
整が完了するものとなる。
Thereafter, the extension or expansion / contraction operation of the hydraulic sag adjusting pressure tool 5 is stopped, so that a predetermined load of tension is applied to the vernier fitting 10, and the sag adjustment is completed by the change of the hole position. It will be.

【0022】[0022]

【発明の効果】上述の様に、本発明は長尺型外板と長尺
型中板よりなるバーニヤ金具にあって、少なくとも片方
の金具部材となる長尺型中板の形状を調整孔を配す調整
部と油圧式弛度調整圧工具の一端部を直接係止する工具
用支持部を一体とした構成としてなるため、油圧式弛度
調整圧工具を作動しても前記長尺型中板には直線的に荷
重が加わる状態に維持され、荷重が除去されても長尺型
外板側のみが折れ曲がるので、従来の油圧工具の装着で
中板と外板の双方が折れ曲がる垂下(V状折曲)より小
さな垂下にとどまる。このため、弛度調整に際し折れ曲
がる外板の抱え上げ作業が容易となり、且つ調整ボルト
の抜き、調整孔の選定作業がも外板側に乗る1人の作業
員だけで可能となり、安全で能率的な省力化弛度調整と
なる。しかも、長尺型中板の工具用支持部が十字ヨーク
構造となっており、その左右、上下の端面に工具用支持
孔が設けられているため、油圧式弛度調整圧工具を取り
付けるときに周囲の状況に応じて縦装着または横装着を
適宜選択できることから、油圧式弛度調整圧工具の装着
に支障を来すようなことはない。
As described above, the present invention relates to a vernier fitting comprising a long outer plate and a long middle plate, wherein at least one of the long middle plates serving as a fitting member has an adjusting hole. Since the adjusting part to be arranged and the tool support part for directly locking one end of the hydraulic type sagging adjustment pressure tool are integrated, even if the hydraulic type sag adjusting pressure tool is actuated, the elongate mold is not used. The plate is maintained in a state in which a load is applied linearly, and even when the load is removed, only the long type outer plate side bends. Therefore, when the conventional hydraulic tool is attached, both the middle plate and the outer plate are bent (V). (Bending) smaller stays. For this reason, it is easy to lift the outer plate that is bent when adjusting the sag, and it is also possible to remove the adjustment bolt and select the adjustment hole with only one worker on the outer plate side, and it is safe and efficient. It is a labor-saving sag adjustment. Moreover, the tool support of the long middle plate is a cross yoke
It has a structure and supports the tool on the left, right, top and bottom end faces
Since the holes are provided, remove the hydraulic
Attach vertically or horizontally according to the surrounding conditions when attaching
Since it can be selected as appropriate, mounting of hydraulic type sag adjustment pressure tool
There is no problem with

【0023】このことは、近時、益々大型化する送電線
金具の使用では必然的にバ−ニヤ金具自体も大型,重量
化されるため、弛度調整時の折曲垂下量が問題となる
が、本発明のバ−ニヤ金具構成では長尺型外板のみが小
さく垂下するので、危険な前屈姿勢を取ることなく抱え
上げができ、該外板を中板に沿ってスライドするだけで
調整ができ作業員の手作業の負担も少なく安全性の向上
につながる。
In recent years, the use of increasingly large transmission line fittings inevitably increases the size and weight of the vernier fittings, so that the amount of sagging when adjusting the sag becomes a problem. However, in the vernier bracket structure of the present invention, only the long-type outer plate hangs small, so it can be held without taking a dangerous forward bending posture, and only by sliding the outer plate along the middle plate. Adjustment is possible, and the burden of manual work on the worker is small, leading to improvement in safety.

【0024】しかも、本発明のバ−ニヤ金具は長尺型中
板の形状のみを改良するだけの簡略構成となるため、製
作も容易で且つ基本的な取り扱い作業も従来同様でよ
く、この点からも作業性が良い等の効果を奏する。
In addition, the vernier fitting of the present invention has a simple structure in which only the shape of the long intermediate plate is improved, so that it is easy to manufacture and the basic handling operation can be the same as in the prior art. Therefore, the effects such as good workability can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のバーニヤ金具の一実施例の要部を示す
斜視図である。
FIG. 1 is a perspective view showing a main part of an embodiment of a vernier fitting of the present invention.

【図2】同側面図である。FIG. 2 is a side view of the same.

【図3】同平面図である。FIG. 3 is a plan view of the same.

【図4】電線の弛度調整作業に使用する油圧式弛度調整
工具の一例の説明図である。
FIG. 4 is an explanatory view of an example of a hydraulic sag adjusting tool used for a sag adjusting operation of an electric wire.

【図5】本発明のバーニヤ金具に油圧式弛度調整工具を
横装着する説明図である。
FIG. 5 is an explanatory view of horizontally mounting a hydraulic sag adjusting tool on the vernier fitting of the present invention.

【図6】同バーニヤ金具に油圧式弛度調整工具を縦装着
する説明図である。
FIG. 6 is an explanatory view for vertically mounting a hydraulic sag adjusting tool to the vernier fitting.

【図7】バーニヤ金具を油圧式弛度調整工具で荷重を除
去した状態の説明図である。
FIG. 7 is an explanatory diagram of a state in which a load is removed from the vernier fitting with a hydraulic sag adjusting tool.

【図8】本発明のバーニヤ金具を連結させた2導体装置
の電線側架線金具の構成とした平面図である。
FIG. 8 is a plan view showing a configuration of a wire-side overhead metal fitting of a two-conductor device to which a vernier metal fitting of the present invention is connected.

【図9】同側面図である。FIG. 9 is a side view of the same.

【図10】従来のバーニヤ金具の斜視図である。FIG. 10 is a perspective view of a conventional vernier fitting.

【図11】同バーニヤ金具に油圧式弛度調整工具を横装
着する説明図である。
FIG. 11 is an explanatory view of horizontally mounting a hydraulic sag adjusting tool on the vernier fitting.

【図12】同バーニヤ金具に油圧式弛度調整工具を縦装
着する説明図である。
FIG. 12 is an explanatory view for vertically mounting a hydraulic sag adjusting tool to the vernier fitting.

【図13】同バーニヤ金具に油圧式弛度調整工具を配し
荷重を除去した説明図である。
FIG. 13 is an explanatory view in which a hydraulic sag adjusting tool is arranged on the vernier fitting and the load is removed.

【図14】同バーニヤ金具を2導体装置の電線側架線金
具構成とした平面図である。
FIG. 14 is a plan view in which the vernier fitting is configured as a wire-side overhead fitting of a two-conductor device.

【図15】同側面図である。FIG. 15 is a side view of the same.

【符号の説明】[Explanation of symbols]

2 長尺型外板 2a 調整孔 3a 調整孔 4 調整ボルト 10 バーニヤ金具 11 調整部 12 工具用支持部 13 長尺型中板 14 工具用支持孔 2 Long type outer plate 2a Adjustment hole 3a Adjustment hole 4 Adjustment bolt 10 Vernier bracket 11 Adjustment part 12 Tool support part 13 Long medium plate 14 Tool support hole

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 架空送電線の弛度をバーニヤ金具位置で
油圧式弛度調整工具をもって調整する架線工法のバーニ
ヤ金具において、複数個の調整孔を長手方向に設けた平
行となる一対の長尺型外板と、この平行間隙内に挿入す
る複数個の調整孔を長手方向に設けた調整部を配設する
と共に、その後端側に工具用支持部を一体形成した長尺
型中板とを形成し、且つ長尺型外板の適宜調整孔と長尺
型中板の適宜調整孔の合致位置に挿入する調整ボルト
と、長尺型外板と長尺型中板の両末端位置に電線側連結
孔と鉄塔側連結孔を設け、さらに、長尺型中板の工具用
支持部を十字ヨーク構造とし、その左右、上下の端面
に、油圧式弛度調整圧工具の一端部を直接係止する工具
用支持孔を設けてなることを特徴とするバーニヤ金具。
1. A vernier metal fitting of an overhead wire method for adjusting the sag of an overhead transmission line at a vernier metal fitting position with a hydraulic sag adjusting tool, wherein a pair of elongated parallel holes having a plurality of adjusting holes provided in a longitudinal direction. A mold outer plate and an adjusting portion provided with a plurality of adjusting holes to be inserted into the parallel gap in the longitudinal direction, and a long intermediate plate integrally formed with a tool supporting portion on the rear end side. Adjusting bolts to be formed and inserted into the appropriate adjustment holes of the long outer plate and the appropriate adjustment holes of the long intermediate plate, and electric wires at both end positions of the long outer plate and the long intermediate plate A side connection hole and a tower side connection hole are provided .
The support part has a cross yoke structure and its left, right, top and bottom end faces
Tool that directly locks one end of a hydraulic type sag adjustment pressure tool
Vernier metal fittings provided with a support hole for use .
JP29101297A 1997-10-23 1997-10-23 Vernier bracket Expired - Lifetime JP2965014B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29101297A JP2965014B2 (en) 1997-10-23 1997-10-23 Vernier bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29101297A JP2965014B2 (en) 1997-10-23 1997-10-23 Vernier bracket

Publications (2)

Publication Number Publication Date
JPH11127512A JPH11127512A (en) 1999-05-11
JP2965014B2 true JP2965014B2 (en) 1999-10-18

Family

ID=17763323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29101297A Expired - Lifetime JP2965014B2 (en) 1997-10-23 1997-10-23 Vernier bracket

Country Status (1)

Country Link
JP (1) JP2965014B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5167511B2 (en) * 2007-03-30 2013-03-21 日本カタン株式会社 Tensile device with vernier fittings
CN102738745A (en) * 2012-07-23 2012-10-17 辽宁省电力有限公司辽阳供电公司 Adjustable parallel hanging plate
CN104846826A (en) * 2015-06-01 2015-08-19 刘银明 Regulation plate group for piling in building site

Also Published As

Publication number Publication date
JPH11127512A (en) 1999-05-11

Similar Documents

Publication Publication Date Title
KR20080015849A (en) Temporary safety barrier system
JP2965014B2 (en) Vernier bracket
JP6544575B2 (en) Tensile clamp
JP4146942B2 (en) Adjustment tool used to adjust the sag of overhead power transmission lines
JP2018200836A (en) Connection tool for sag adjustment
JP2016103870A (en) Wiring fitting exchange and extension tool for overhead ground wire
JP5167511B2 (en) Tensile device with vernier fittings
JP2007221998A (en) Vernier fittings
JP3210502U (en) Reinforcing bar hanger
JP6604673B1 (en) hacker
JP6960015B1 (en) Wire rope socketing jig device and socketing method
JP2010172161A (en) Device for supporting compression connector
JP3914068B2 (en) Jumper device
CN210909859U (en) Multipurpose diagonal pliers
JPH038024Y2 (en)
JP4968911B2 (en) Train line support device in the tunnel
CN206928646U (en) Beam forming panel fixture
JP2700383B2 (en) Prop for safety berthing
CN213265386U (en) Plate conveying device
JPH0881155A (en) Main rope length adjusting device of hydraulic elevator
JP3108762U (en) Jig for jig
JPH04133607A (en) Strain-device replacement technique and device used for the technique
KR20230079714A (en) Mobile workbench for ships
JP3852928B2 (en) Bird net
JP3064868B2 (en) Hydraulic elevator assembly equipment

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080813

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090813

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090813

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100813

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100813

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110813

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110813

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120813

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130813

Year of fee payment: 14

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130813

Year of fee payment: 14

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130813

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140813

Year of fee payment: 15

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term