JP2936992B2 - Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration - Google Patents

Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration

Info

Publication number
JP2936992B2
JP2936992B2 JP6003768A JP376894A JP2936992B2 JP 2936992 B2 JP2936992 B2 JP 2936992B2 JP 6003768 A JP6003768 A JP 6003768A JP 376894 A JP376894 A JP 376894A JP 2936992 B2 JP2936992 B2 JP 2936992B2
Authority
JP
Japan
Prior art keywords
steel beam
pair
piping
pipe
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6003768A
Other languages
Japanese (ja)
Other versions
JPH07208654A (en
Inventor
修 石橋
太一 原
利治 吉田
幸子 西川
孝雄 榊原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOBAYASHIGUMI KK
Original Assignee
OOBAYASHIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOBAYASHIGUMI KK filed Critical OOBAYASHIGUMI KK
Priority to JP6003768A priority Critical patent/JP2936992B2/en
Publication of JPH07208654A publication Critical patent/JPH07208654A/en
Application granted granted Critical
Publication of JP2936992B2 publication Critical patent/JP2936992B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、鉄骨構造建築物の鉄
骨梁に対して配管を固定するために用いられる固定具の
構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a fixture used for fixing a pipe to a steel beam of a steel structure building.

【0002】[0002]

【従来の技術】鉄骨構造建築物で、スプリンクラーなど
の設備の配管を、耐火被覆を行った鉄骨梁を貫通して行
う場合には、以下の施工手順による。即ち、まず、鉄骨
構造建築物を構成する鉄骨柱や鉄骨梁を組み立て、床コ
ンクリートを打設する。次に、鉄骨柱や鉄骨梁などに耐
火被覆を施す。そして、鉄骨梁に形成されている孔に、
設備配管を貫通して設ける。貫通した設備配管は固定具
により固定される。
2. Description of the Related Art In a steel structure building, when piping of equipment such as a sprinkler is made to pass through a steel beam coated with a fireproof coating, the following construction procedure is used. That is, first, steel columns and steel beams constituting a steel structure building are assembled, and floor concrete is poured. Next, a fireproof coating is applied to the steel column, the steel beam and the like. And in the hole formed in the steel beam,
Provided through the equipment piping. The penetrating equipment pipe is fixed by a fixture.

【0003】この固定具23は、例えば図5に示すよう
に、単に配管1を上部から吊るだけのものであった。
As shown in FIG. 5, for example, the fixture 23 merely suspends the pipe 1 from above.

【0004】[0004]

【発明が解決しようとする課題】このため配管1は固定
具23によって十分には固定されず、不安定になりやす
いものであった。不安定になった配管1は、例えば鉄骨
梁に対する貫通部で耐火被覆を傷つける恐れなどがあっ
た。
For this reason, the pipe 1 is not sufficiently fixed by the fixture 23 and tends to be unstable. The pipe 1 that has become unstable has a risk of damaging the refractory coating, for example, at the penetrating portion of the steel beam.

【0005】この発明は、以上の問題点を解決するため
になされたもので、鉄骨梁を貫通する配管を安定して固
定することのできる固定具を提供する事を目的とする。
The present invention has been made to solve the above problems, and has as its object to provide a fixture capable of stably fixing a pipe penetrating a steel beam.

【0006】[0006]

【課題を解決するための手段】以上の目的を達成するた
めに、この発明は、鉄骨梁に形成されている孔に配管の
一部を貫通させて固定するための固定具であって、前記
配管を左右から保持する一対の半円型部材と、前記一対
の半円型部材の上下端部を締め付ける一対のボルトと、
前記上端部または下端の間に挟まれ前記ボルトにより貫
通される板状の端部を有する一対の棒状部材と、この棒
状部材に設けられ該棒状部材の長さを調整する調整具
と、前記棒状部材の端部に設けられ鉄骨梁の上または下
のフランジに対してクランプをするクランパーと、から
成るものである。
In order to achieve the above object, the present invention relates to a fixing tool for fixing a pipe formed by penetrating a part of a pipe into a hole formed in a steel beam. A pair of semicircular members that hold the pipe from the left and right, and a pair of bolts that tighten upper and lower ends of the pair of semicircular members,
A pair of rod-like members having a plate-like end portion that is sandwiched between the upper end or lower end and penetrated by the bolt, an adjusting tool provided on the rod-like member to adjust the length of the rod-like member, A clamper provided at an end of the member to clamp on a flange above or below the steel beam.

【0007】[0007]

【作用】配管は一対の棒状部材により鉄骨梁の上および
下のフランジに対して固定され、十分に安定した固定と
なる。
The pipe is fixed to the upper and lower flanges of the steel beam by a pair of rod-shaped members, and is sufficiently stable.

【0008】[0008]

【実施例】以下、この本発明の一実施例を図1乃至及び
図3において説明する。この実施例で行われる配管工事
は、スプリンクラーなどの設備配管のものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. The piping work performed in this embodiment is for equipment piping such as a sprinkler.

【0009】[0009]

【課題を解決するための手段】以上の目的を達成するた
めに、本発明は、鉄骨梁の予め形成されている貫通孔に
設備配管の一部を挿入し、この状態で前記設備配管を、
一対の半円型部材を合わせてなるリング状部に挿入し、
前記一対の半円型部材の上端部および下端部に、上方お
よび下方へと延出する長さ調整可能な調整具を有する上
下一対の棒状部材を取り付けた後、前記上下一対の棒状
部材の先端を鉄骨梁の上または下のフランジにクランパ
ーを介して取り付けて、前記調整具によって長さ調整を
行って前記設備配管を上方および下方から張力を加えて
固定する工程と、前記設備配管を固定した後に鉄骨梁に
耐火被覆を行う工程と、前記孔を貫通した前記設備配管
の一部に配管の他の部分を接続する工程と、を含むよう
にした。 また、本発明は、鉄骨梁貫通部に挿入される設
備配管を左右からそれぞれ保持する一対の半円型部材を
有し、この一対の半円型部材を合わせてなるリング状部
に前記設備配管が挿入され、前記半円型部材の上端部お
よび下端部とそれぞれ接続されて上方および下方へと延
出する上下一対の棒状部材を設け、これらの棒状部材に
その長さを調整する調整具を取り付けるとともに、前記
棒状部材の端部にクランパーを設け、このクランパーを
鉄骨梁の上および下のフランジにクランプしながら前記
棒状部材の長さを前記調整具によって調整して、前記設
備配管を上方および下方から固定するようにした。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides a steel beam having a through hole formed in advance.
Insert a part of the equipment piping, in this state, the equipment piping,
Insert a pair of semicircular members into a ring-shaped part that is
The upper and lower ends of the pair of semicircular members are
With adjustable adjusters that extend downward and extend downward
After attaching the lower pair of rod members, the upper and lower pair of rod members
Clamp the end of the member to the flange above or below the steel beam.
And adjust the length with the adjustment tool.
Go and apply tension from above and below the equipment piping
Fixing the steel pipe after fixing the equipment piping
Performing a refractory coating, and the facility piping penetrating the hole
Connecting another part of the plumbing to a part of the
I made it. Further, the present invention provides a device to be inserted into a steel beam penetration portion.
A pair of semi-circular members that hold the
A ring-shaped part having a pair of semicircular members
The equipment pipe is inserted into the upper end of the semicircular member.
And connected to the lower end respectively to extend upward and downward.
Providing a pair of upper and lower rod-shaped members
Attach an adjustment tool to adjust the length, and
A clamper is provided at the end of the rod-shaped member, and this clamper is
While clamping on the upper and lower flanges of the steel beam,
Adjust the length of the rod-shaped member with the adjustment tool, and
The service pipe was fixed from above and below.

【0010】この配管の一部15は、固定具23により
固定される。この固定具23の斜視図を図2に示す。固
定具23の中央には、配管の一部15を左右から保持す
る一対の半円型部材25が設けられる。この半円型部材
25には、上下端部にフランジ部27が設けられボルト
孔が形成されている。また半円型の外周に沿って凸部2
8が形成され、全体の強度を高めている。フランジ部2
7は、一対の半円型部材25のものが合わされ、ボルト
29がボルト孔に貫通しナットにより締め付けられてい
る。また、この合わされたフランジ部27の間には、棒
状部材31の板状の端部33が挟まれている。この板状
の端部33にもボルト孔が形成され、前記ボルト29が
貫通されている。この棒状部材31は、半円型部材25
の上下に一対設けられる。
[0010] A part 15 of the pipe is fixed by a fixture 23. FIG. 2 shows a perspective view of the fixing device 23. At the center of the fixture 23, a pair of semicircular members 25 for holding a part 15 of the pipe from the left and right are provided. The semicircular member 25 has flange portions 27 at upper and lower ends and a bolt hole. In addition, along the outer periphery of the semicircle,
8 are formed to increase the overall strength. Flange part 2
Reference numeral 7 denotes a pair of semicircular members 25, and bolts 29 are inserted through bolt holes and fastened by nuts. A plate-like end 33 of the rod 31 is sandwiched between the fitted flanges 27. A bolt hole is also formed in this plate-shaped end 33, and the bolt 29 is penetrated. This bar-shaped member 31 is
Are provided above and below.

【0011】各棒状部材31の途中には、棒状部材31
の長さを調整する調整具35が設けられている。この調
整具35は、例えば本実施例においては長い六角ナット
であり、内部の雌ネジは、中央で分割され、分割された
上の雌ネジと下の雌ネジは逆ネジになっている。この雌
ネジに螺合するように、棒状部材31の雄ネジ37も逆
ネジになっている。即ち、棒状部材31は、調整具35
のところで2つに分割されており、例えば図2の上側に
おいて、仮に下方の棒状部材31Aの雄ネジ37が右ネ
ジとすれば、上方の棒状部材31Bの雄ネジ37は左ネ
ジとする。もちろん、これらの雄ネジ37に対応して前
記2つの雌ネジも、それぞれ右ネジ及び左ネジである。
このようにすることで、調整具35である六角ナットを
一方向に棒状部材31に対して回転すれば、六角ナット
に螺合している上下の雄ネジ37は六角ナットの内部に
向かって引き込まれるか、外部に向かって押し出され
る。このようにして棒状部材31の長さが調整され得
る。
In the middle of each rod 31, there is a rod 31.
There is provided an adjustment tool 35 for adjusting the length. The adjusting tool 35 is, for example, a long hexagon nut in the present embodiment. The internal female screw is divided at the center, and the divided upper female screw and lower female screw are reverse screws. The male screw 37 of the bar-shaped member 31 is also a reverse screw so as to be screwed into the female screw. That is, the rod-shaped member 31 is
For example, in the upper part of FIG. 2, if the male screw 37 of the lower rod 31A is a right-hand screw, the male screw 37 of the upper rod 31B is a left-hand screw. Of course, the two female screws corresponding to these male screws 37 are also right-handed screws and left-handed screws, respectively.
In this way, when the hexagon nut as the adjusting tool 35 is rotated in one direction with respect to the rod 31, the upper and lower male screws 37 screwed into the hexagon nut are drawn toward the inside of the hexagon nut. Or pushed out. In this way, the length of the rod 31 can be adjusted.

【0012】棒状部材31の端部には、クランパー39
が設けられている。このクランパー39は図3に示すよ
うに、鉄骨梁5の上または下のフランジ41に対してク
ランプできるようにコの字の断面を有する。コの字断面
の上面(図3)または下面には、ナット43が溶接など
により固定されている。このナット43に対し、前記棒
状部材31の端部の雄ネジが螺合される。
At the end of the rod-shaped member 31, a clamper 39 is provided.
Is provided. As shown in FIG. 3, the clamper 39 has a U-shaped cross section so that it can be clamped to the flange 41 above or below the steel beam 5. A nut 43 is fixed to the upper surface (FIG. 3) or the lower surface of the U-shaped cross section by welding or the like. An external thread at the end of the rod-shaped member 31 is screwed into the nut 43.

【0013】このようにして、固定具23により、棒状
部材31の長さを調整し、配管の上下位置を正確に定め
ることができる。しかも、この固定具23は、配管を上
下方向に引っ張るようにして固定するので、しっかりと
した固定が行われる。
In this manner, the length of the rod-shaped member 31 can be adjusted by the fixture 23, and the vertical position of the pipe can be accurately determined. In addition, since the fixture 23 is fixed by pulling the pipe in the vertical direction, a firm fixation is performed.

【0014】このような固定具23(図2、図3)を使
って、配管の一部15を固定した後、耐火被覆工事を行
う。この耐火被覆工事は、多数の鉄骨梁5に対し、それ
ぞれ配管の一部15を貫通し固定した後、一斉に行うこ
とができる。この耐火被覆工事は、従来と同様に岩綿の
吹き付けを、鉄骨梁や鉄骨柱に対して行い、耐火被覆3
を形成する。この吹き付けは、本実施例においては鉄骨
梁5や鉄骨柱にのみ行い、貫通している配管の一部15
や固定具23に対しては行わない。仮に吹き付けられた
としても、最小限に止める。
After fixing a part 15 of the pipe using such a fixture 23 (FIGS. 2 and 3), a fireproof covering work is performed. This refractory covering work can be performed simultaneously on a number of steel beams 5 after penetrating and fixing a part 15 of the pipe. In this refractory coating work, rock wool is sprayed on a steel beam or a steel column in the same manner as in the prior art.
To form In this embodiment, this spraying is performed only on the steel beam 5 and the steel column, and a part 15
And is not performed on the fixture 23. Even if sprayed, keep it to a minimum.

【0015】耐火被覆工事が行われた後、貫通された配
管の一部15の両端から保護用蓋21を取り去り、配管
工事を一斉に行う。この配管工事は、前記既に貫通され
ている配管の一部15に対し、他の部分の配管を接続し
て行う。この接続は、前記配管の一部15の両端に形成
されている雄ネジ19に対し、ソケットなどの継手の雌
ネジを螺合することで行う。配管工事が終わった後、既
に岩綿の吹き付けなどにより配管が鉄骨梁5に対し十分
に支持されている場合には、固定具23を取り去ること
もできる。また、取り去らずにそのまま固定具23を残
し、配管を安定して支持するのに利用しても良い。
After the refractory coating work has been performed, the protective covers 21 are removed from both ends of the part 15 of the penetrated pipe, and the pipe work is performed simultaneously. This piping work is performed by connecting a part 15 of the already penetrated pipe to another part of the pipe. This connection is made by screwing a female screw of a joint such as a socket with a male screw 19 formed at both ends of the part 15 of the pipe. After the completion of the plumbing work, if the plumbing has already been sufficiently supported by the steel beam 5 by spraying rock wool or the like, the fixture 23 can be removed. Alternatively, the fixture 23 may be left without being removed and used to stably support the pipe.

【0016】以上説明したように、本実施例によれば、
固定具23は、配管の一部15を上下から引っ張るよう
にして固定するので、上方でのみ固定する場合に比べ安
定した固定が行われる。
As described above, according to this embodiment,
Since the fixture 23 fixes the pipe part 15 by pulling it from above and below, stable fixing is performed as compared with the case where the fixture 15 is fixed only above.

【0017】更に、耐火被覆工事の前にあらかじめ鉄骨
梁5に貫通して固定される配管の一部15は、両端が未
接続のものであるため、長さを十分に短くでき、これに
より耐火被覆工事の際に配管は邪魔にならず、工事は容
易に行われる。また、配管の長さが短いことから、耐火
被覆工事に際して工事用具が接触するなどのこともな
く、設備配管を傷める恐れも小さい。
Furthermore, the part 15 of the pipe, which is fixed beforehand through the steel beam 5 before the fire-resistant coating work, can be made sufficiently short because both ends are not connected. Piping does not become a hindrance during the covering work, and the work is easily performed. In addition, since the length of the pipe is short, there is no possibility that construction tools will come into contact with the fireproof coating work, and the possibility of damaging the equipment pipe is small.

【0018】また、貫通した配管の一部15には、両端
に保護用蓋21が被せられ、吹き付けられる岩綿などが
舞い込むという不都合も生じない。
Further, a protective lid 21 is covered on both ends of the part 15 of the penetrating pipe, so that there is no inconvenience that the sprayed rock wool or the like falls.

【0019】また、配管の一部15は耐火被覆工事の前
に鉄骨梁5に貫通されるので、この貫通により耐火被覆
3が損傷することがなく、従って損傷部分を補修する必
要もない。また損傷がないので、耐火被覆3の信頼性が
増加する。
Further, since a part 15 of the pipe is penetrated into the steel beam 5 before the construction of the refractory coating, the penetration does not damage the refractory coating 3 and therefore, it is not necessary to repair the damaged portion. Also, since there is no damage, the reliability of the refractory coating 3 increases.

【0020】更に、耐火被覆工事の後に行われる配管工
事は、耐火被覆3の補修などで手間どることがなく、従
って外壁工事などと並行して迅速に工事を行うことがで
きる。このため工事短縮を図れる。
Further, the piping work performed after the fire-resistant coating work is not troublesome for repairing the fire-resistant coating 3 and the like, so that the work can be quickly performed in parallel with the outer wall work and the like. Therefore, the construction can be shortened.

【0021】なお、以上の実施例においては、クランパ
ー39は、クランパー39に固定されたナット43に棒
状部材31の両端の雄ネジが螺合することで、棒状部材
31に設けられていたが、他の実施例においては例えば
図4に示すように2つのナット47、49により締め付
けた状態で設けられても良い。即ち、クランパーのコの
字断面に対し、コの字断面が閉じている側の方向に向か
って延長部分51が設けられ、この延長部分51に形成
されたボルト孔53を通る前記棒状部材31の雄ネジに
対し、延長部分51の上下から一対のナット47、49
が設けられる。これらのナット47、49により延長部
分51が締め付けられ、従って棒状部材31がしっかり
とクランパー39に取り付けられる。このようにするこ
とで、配管の一部15が鉄骨梁5に対し強固に固定され
る。
In the above embodiment, the clamper 39 is provided on the rod 31 by screwing the male screws at both ends of the rod 31 to the nut 43 fixed to the clamper 39. In another embodiment, for example, as shown in FIG. 4, it may be provided in a state of being tightened by two nuts 47, 49. That is, with respect to the U-shaped cross section of the clamper, an extended portion 51 is provided toward the direction in which the U-shaped cross section is closed, and the rod-shaped member 31 passing through the bolt hole 53 formed in the extended portion 51 is provided. A pair of nuts 47 and 49 are placed on the male screw from above and below the extension 51.
Is provided. The extension portion 51 is tightened by these nuts 47, 49, so that the bar 31 is securely attached to the clamper 39. By doing so, the part 15 of the pipe is firmly fixed to the steel beam 5.

【0022】また、以上の実施例においては調整具35
は棒状部材31の途中に設けられるものであったが、他
の実施例においては棒状部材31の端部に設けても良
い。即ち、例えばクランパー39に設けられるナット4
3(図1図3)を長めのものとし、調整具を兼ねさせる
ことができる。
In the above embodiment, the adjusting tool 35 is used.
Is provided in the middle of the rod 31, but may be provided at the end of the rod 31 in other embodiments. That is, for example, the nut 4 provided on the clamper 39
3 (FIGS. 1 and 3) can be made longer, and can also serve as an adjusting tool.

【0023】[0023]

【発明の効果】以上説明したように、この発明の鉄骨梁
貫通部の設備配管固定具によれば、鉄骨梁の孔を貫通す
る配管は、鉄骨梁の上下のフランジに対して上下から引
っ張られるようにして固定が行われるので、強固な固定
が行われる。また、鉄骨梁が耐火被覆を行われたもので
ある場合には、不安定な配管が貫通部において耐火被覆
を傷つける恐れをなくすことができる。
As described above, according to the equipment pipe fixture of the steel beam penetration part of the present invention, the pipe penetrating the hole of the steel beam is pulled up and down with respect to the upper and lower flanges of the steel beam. The fixing is performed as described above, so that a firm fixing is performed. In addition, when the steel beam is provided with a fire-resistant coating, it is possible to eliminate the possibility that the unstable pipe may damage the fire-resistant coating at the penetration portion.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す縦断面図である。FIG. 1 is a longitudinal sectional view showing one embodiment of the present invention.

【図2】図1のII方向から見た斜視図である。FIG. 2 is a perspective view as viewed from a direction II in FIG.

【図3】図1のIII 部拡大図である。FIG. 3 is an enlarged view of a part III in FIG. 1;

【図4】図3の変形例を示す図である。FIG. 4 is a diagram showing a modification of FIG. 3;

【図5】従来例を示す斜視図である。FIG. 5 is a perspective view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 配管 3 耐火被覆 5 鉄骨梁 7 床コンクリー
ト 9 孔 11 貫通部 15 配管の一部 17 スリーブ 19 雄ネジ 21 保護用蓋 23 固定具 25 半円型部材 27 フランジ部 29 ボルト 31 棒状部材 33 板状の端部 35 調整具 37 雄ネジ 39 クランパー 41 フランジ 43、47、49 ナット 51 延長部分 53 ボルト孔
DESCRIPTION OF SYMBOLS 1 Pipe 3 Fireproof coating 5 Steel beam 7 Floor concrete 9 Hole 11 Penetration part 15 Part of piping 17 Sleeve 19 Male screw 21 Protective lid 23 Fixture 25 Semi-circular member 27 Flange part 29 Bolt 31 Bar member 33 Plate End 35 Adjusting tool 37 Male screw 39 Clamper 41 Flange 43, 47, 49 Nut 51 Extension part 53 Bolt hole

フロントページの続き (72)発明者 西川 幸子 新潟県新潟市東大通2−3−28 株式会 社大林組北陸支店内 (72)発明者 榊原 孝雄 新潟県新潟市東大通2−3−28 株式会 社大林組北陸支店内 (56)参考文献 特開 平5−180373(JP,A) 実開 平1−108480(JP,U) 実開 平1−171988(JP,U) (58)調査した分野(Int.Cl.6,DB名) F16L 3/14 E04F 17/08 Continued on the front page (72) Inventor Sachiko Nishikawa 2-3-28 Higashi Odori, Niigata City, Niigata Pref. Obayashi Gumi Hokuriku Branch (72) Inventor Takao Sakakibara 2-3-28 Higashi Odori, Niigata City, Niigata Pref. In-branch (56) References JP-A-5-180373 (JP, A) JP-A-1-108480 (JP, U) JP-A-1-171988 (JP, U) (58) Fields surveyed (Int. . 6 , DB name) F16L 3/14 E04F 17/08

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鉄骨梁の予め形成されている貫通孔に設
備配管の一部を挿入し、この状態で前記設備配管を、一
対の半円型部材を合わせてなるリング状部に挿入し、前
記一対の半円型部材の上端部および下端部に、上方およ
び下方へと延出する長さ調整可能な調整具を有する上下
一対の棒状部材を取り付けた後、前記上下一対の棒状部
材の先端を鉄骨梁の上または下のフランジにクランパー
を介して取り付けて、前記調整具によって長さ調整を行
って前記設備配管を上方および下方から張力を加えて固
定する工程と、前記設備配管を固定した後に鉄骨梁に耐
火被覆を行う工程と、前記孔を貫通した前記設備配管の
一部に配管の他の部分を接続する工程と、を含む鉄骨梁
貫通部の設備配管の施工方法。
1. A steel beam is provided in a pre-formed through hole.
Insert a part of the equipment piping, and in this state,
Insert the pair of semicircular members into the ring
The upper and lower ends of the pair of semicircular members
Up and down with adjustable lengths extending downward and downward
After attaching a pair of rod-shaped members, the pair of upper and lower rod-shaped members
Clamp the end of the material to the flange above or below the steel beam
And adjust the length with the adjustment tool.
To secure the equipment piping by applying tension from above and below.
And fixing the equipment piping to the steel beam after fixing.
Performing a fire coating, and connecting the equipment piping through the hole.
Connecting part of the pipe to another part of the steel beam
How to install equipment piping at the penetration.
【請求項2】 鉄骨梁貫通部に挿入される設備配管を左
右からそれぞれ保持する一対の半円型部材を有し、この
一対の半円型部材を合わせてなるリング状部に前記設備
配管が挿入され、前記半円型部材の上端部および下端部
とそれぞれ接続されて上方および下方へと延出する上下
一対の棒状部材を設け、これらの棒状部材にその長さを
調整する調整具を取り付けるとともに、前記棒状部材の
端部にクランパーを設け、このクランパーを鉄骨梁の上
および下のフランジにクランプしながら前記棒状部材の
長さを前記調整具によって調整して、前記設備配管を上
方および下方から固定するようにした鉄骨梁貫通部の設
備配管固定具。
2. The equipment pipe inserted into the steel beam penetration is left
It has a pair of semicircular members that respectively hold from the right,
The above-mentioned equipment is attached to a ring-shaped portion formed by joining a pair of semicircular members.
Piping is inserted and the upper and lower ends of the semicircular member
Up and down which are connected to and extend upward and downward respectively
A pair of bar members is provided, and the length of these bar members is
Attach an adjustment tool to adjust, and
Install a clamper at the end, and place this clamper on the steel beam.
And clamp the rod-like member
Adjust the length with the adjuster and move the equipment piping up.
Of steel beam penetrations fixed from the side and below
Piping fixture.
JP6003768A 1994-01-18 1994-01-18 Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration Expired - Fee Related JP2936992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6003768A JP2936992B2 (en) 1994-01-18 1994-01-18 Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6003768A JP2936992B2 (en) 1994-01-18 1994-01-18 Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration

Publications (2)

Publication Number Publication Date
JPH07208654A JPH07208654A (en) 1995-08-11
JP2936992B2 true JP2936992B2 (en) 1999-08-23

Family

ID=11566356

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6003768A Expired - Fee Related JP2936992B2 (en) 1994-01-18 1994-01-18 Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration

Country Status (1)

Country Link
JP (1) JP2936992B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3763787B2 (en) * 2001-09-04 2006-04-05 タカヤマ金属工業株式会社 Fixing tool for running water member
KR100753188B1 (en) * 2006-10-25 2007-08-30 전추길 Device of coupling taps for the wall
SE536728C2 (en) * 2012-12-04 2014-06-24 Kari Koljonen Device for mounting threaded rod in roof iron

Also Published As

Publication number Publication date
JPH07208654A (en) 1995-08-11

Similar Documents

Publication Publication Date Title
US8726607B1 (en) Sway brace assembly and method of restraining pipe relative to a building structure
JP2936992B2 (en) Construction method of equipment piping at steel beam penetration and equipment piping fixture at steel beam penetration
GB2112439A (en) Fittings for anchoring scaffold tubes to building structures
JP4346044B2 (en) Slope stabilizer
KR20210053960A (en) Combined anchor and fastener assemblies specifically intended for concrete structures and methods of using the same
JP2995006B2 (en) Building and scaffolding connection
JPH07208657A (en) Execution of work for equipment piping which passes through steel framed beam
JP3309127B2 (en) Scaffold anti-sway hardware
JPH0584321A (en) Connecting structure of sprinkler head and piping
KR100532718B1 (en) Pipe fixture
JPH09105230A (en) Device for fitting wall joint material to scaffold
JP3186347U (en) Floor sleeve
KR102196115B1 (en) Erection fixture for Connector fo Easy to adjust the angle
JPH0411064Y2 (en)
JPH0211552Y2 (en)
NL9401687A (en) Adjustable self-tapping wall tie fixing system
JPH0533622Y2 (en)
JPH0145285Y2 (en)
JPH022024Y2 (en)
JPH0358023B2 (en)
JPS5925767Y2 (en) Rail support device
JP2831341B2 (en) Suspension devices such as ceiling-mounted air conditioners
JPH08270839A (en) Support for wiring and piping
JPS6218724Y2 (en)
JPH08189107A (en) Metal fittings of board for steel skeleton beam

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees