JP2918402B2 - Blocking treatment method for unorganized supply pipe and its device - Google Patents

Blocking treatment method for unorganized supply pipe and its device

Info

Publication number
JP2918402B2
JP2918402B2 JP4257379A JP25737992A JP2918402B2 JP 2918402 B2 JP2918402 B2 JP 2918402B2 JP 4257379 A JP4257379 A JP 4257379A JP 25737992 A JP25737992 A JP 25737992A JP 2918402 B2 JP2918402 B2 JP 2918402B2
Authority
JP
Japan
Prior art keywords
supply pipe
service tee
stopper
wire
resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4257379A
Other languages
Japanese (ja)
Other versions
JPH0681995A (en
Inventor
武 飯田
雅之 羽根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Mutsubushi Rubber Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Mutsubushi Rubber Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd, Mutsubushi Rubber Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP4257379A priority Critical patent/JP2918402B2/en
Publication of JPH0681995A publication Critical patent/JPH0681995A/en
Application granted granted Critical
Publication of JP2918402B2 publication Critical patent/JP2918402B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、ガス配管として道路下
の導管から宅地内に引き込まれた供給管で、使用中止に
より供給管の一部がそのまま埋設放置されている、所謂
未整備供給管の閉塞処理工法とその閉塞装置に関し、詳
しくは、ストッパと樹脂充填による閉塞処理に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a so-called unmaintained supply pipe, which is a supply pipe drawn into a residential area from a conduit under a road as a gas pipe, and a part of the supply pipe is left buried as it is discontinued. More specifically, the present invention relates to a closing method using a stopper and resin filling.

【0002】[0002]

【従来の技術】ガス配管は、道路下の導管から各宅地内
の所定の場所にそれぞれ供給管が引き込まれているが、
宅地内の建物が立替えられたり、他の用途に転用される
と、その供給管が使用中止されることがある。この使用
中止になった供給管は、とりあえず宅地内において邪魔
にならない長さに切断し、端末を閉塞処理してガス漏出
が防止されており、このような供給管は未整理供給管と
称されている。ところで未整理供給管は導管と接続して
活管の状態であるが、不使用のため長年にわたり土中に
埋設放置され、このため管壁や導管からの分岐部のサー
ビスチーの腐食が進行しても気付くのが遅れてガス漏れ
を生じるおそれがある。
2. Description of the Related Art As for gas piping, supply pipes are drawn from a conduit under a road to a predetermined place in each residential land.
When a building in a residential land is replaced or diverted to another use, its supply pipe may be stopped. The supply pipe that has been discontinued is cut to a length that does not interfere with the residential land, and the terminal is closed to prevent gas leakage.Such a supply pipe is called an unorganized supply pipe. ing. By the way, the unconsolidated supply pipe is connected to the pipe and is in the state of a live pipe.However, because it is not used, it has been buried and left in the soil for many years. However, there is a possibility that gas leakage may occur due to delay in noticing.

【0003】そこで、未整理供給管のガス漏れ対策とし
て、一般には道路を掘削して導管において未整理供給管
が分岐しているサービスチーを露出させる。そして未整
理供給管とサービスチーを撤去し、導管のサービスチー
の取付け穴にはプラグを螺着して閉塞し、未整理供給管
を完全に撤去する工事が行われていた。この工法による
とガス漏れのおそれは完全になくなるが、以下のような
不具合がある。即ち、道路を広範囲に掘削するので、道
路使用許可の手続きが必要になり、掘削中は交通、騒音
等の点で付近の住民に迷惑をかけることが多い。また土
木、舗装の工事に多大な時間と費用を要する。このこと
から未整理供給管を非掘削の状態で、できるだけサービ
スチー側を閉塞処理して、ガス漏れを防止する工法が望
まれている。
Therefore, as a countermeasure against gas leakage of the unorganized supply pipe, a road is generally excavated to expose a service tee where the unorganized supply pipe branches. Then, the unorganized supply pipe and the service tee were removed, a plug was screwed into the mounting hole of the service tee on the conduit, and the plug was closed to completely remove the unorganized supply pipe. Although this method completely eliminates the risk of gas leakage, it has the following disadvantages. That is, since the road is excavated in a wide area, a procedure for permitting use of the road is required, and during excavation, the nearby residents are often troublesome in terms of traffic, noise, and the like. In addition, civil and pavement work requires a great deal of time and money. For this reason, there is a demand for a construction method in which the untied supply pipe is not excavated and the service tee side is closed as much as possible to prevent gas leakage.

【0004】従来、上記非掘削未整理供給管の閉塞処理
に関する先行技術として、例えば実開平3−38493
号公報で、弾性変形可能な中実の球状閉鎖具を2つの支
持体を介してリモコンワイヤー装置に連結し、この球状
閉鎖具を配管の内部に深くリモコン操作により挿入し、
且つ閉鎖具を扁平に変形して閉鎖することが示されてい
る。
[0004] Conventionally, as a prior art relating to the blockage processing of the unexcavated unorganized supply pipe, for example, Japanese Utility Model Laid-Open No. 3-38493.
In the publication, an elastically deformable solid spherical closure is connected to a remote control wire device via two supports, and the spherical closure is inserted deep into the piping by remote control operation,
It also shows that the closure is deformed flat and closed.

【0005】[0005]

【発明が解決しようとする課題】ところで、上記先行技
術のものにあっては、球状閉鎖具により撤去する配管の
上流側を一時的に閉鎖するものであるから、未整理供給
管の根元を長年にわたり完全に閉塞して、ガス漏れ防止
することはできない。
In the above-mentioned prior art, since the upstream side of the pipe to be removed is temporarily closed by a spherical closing device, the root of the unsorted supply pipe has to be kept for many years. Cannot completely prevent gas leakage.

【0006】本発明は、この点に鑑みてなされたもの
で、その主たる目的は、非掘削の状態で未整理供給管を
サービスチーの箇所において確実に閉塞処理してガス漏
れを完全に防止し、未整理供給管の工事を大幅に簡素化
することが可能な閉塞処理工法を提供する。他の目的
は、サービスチーの導管との接続部を、遠隔操作により
確実に閉塞処理することが可能な閉塞処理装置を提供す
る。
The present invention has been made in view of this point, and a main object of the present invention is to completely prevent a gas leak by completely closing an unsorted supply pipe at a service tee in a non-drilling state. In addition, the present invention provides a clogging treatment method capable of greatly simplifying the construction of unorganized supply pipes. Another object of the present invention is to provide a blockage processing device capable of reliably blocking a connection portion of a service tee with a conduit by remote control.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するた
め、本発明の閉塞処理工法は、道路下に埋設される導管
からサービスチー等介して宅地に引込まれ、不使用状態
で埋設放置される未整理供給管に対して、この未整理供
給管の管端開口部からはね形ストッパを備えた通線具
を、未整理供給管のサービスチー側に押込み移動し、通
線具とストッパをサービスチーから導管に出し入れして
ストッパをサービスチーの入口側に緊密に嵌着して塞
ぎ、その後樹脂注入手段により樹脂を、ストッパにより
塞がれたサービスチーの内部にオーバフローした状態で
充填して閉塞処理するものである。また本発明の閉塞処
理装置は、未整理供給管の内部に押込まれて屈曲しなが
ら移動する通線具と、この通線具の先端に取付けられて
サービスチーの入口側に緊密に嵌着して塞ぐストッパ
と、通線具の所定の位置に注入口を開口して装着される
樹脂注入ホースと、樹脂を樹脂注入ホースを介してサー
ビスチーの内部に注入する樹脂注入手段とを備えるもの
である。
In order to achieve the above-mentioned object, the blockage treatment method of the present invention is drawn into a residential area from a conduit buried under a road through a service tee or the like and left buried in an unused state. With respect to the unorganized supply pipe, a wire with a spring-shaped stopper is pushed from the pipe end opening of the unorganized supply pipe to the service tee side of the unorganized supply pipe, and the wire and the stopper are moved. The service tee is taken in and out of the conduit, and the stopper is tightly fitted to the inlet side of the service tee and closed, and then the resin is filled by the resin injection means in an overflow state inside the service tee closed by the stopper. Blocking processing is performed. In addition, the clogging treatment device of the present invention is characterized in that a wire tool which is pushed into the unorganized supply pipe and moves while being bent, and which is attached to the tip of the wire tool and is tightly fitted to the entrance side of the service tee. A stopper that closes and closes, a resin injection hose that is mounted with an injection port opened at a predetermined position of the communication tool, and resin injection means that injects resin into the service tee through the resin injection hose. is there.

【0008】[0008]

【作用】上記閉塞処理工法によると、はね形ストッパを
備えた通線具を未整理供給管の内部に押込み移動し、通
線具によりストッパをサービスチーから導管に出し入れ
するように遠隔操作することで、サービスチーの入口側
にストッパがワンタッチ式に嵌着して確実に塞がれ、こ
の状態でサービスチーの内部に樹脂が充填されることに
より、未整理供給管の根元の導管に取付けられるサービ
スチーの箇所において完全に閉塞される。これにより未
整理供給管は全長にわたって完全に閉塞した状態に確保
され、このため未整理供給管が任意の長さで埋設放置さ
れても、ガス漏れのおそれが全く無くなる。また遠隔操
作で閉塞されて非掘削処理されるので、道路等を掘削す
ることが不要になる。また上記閉塞処理装置によると、
通線具にはね形ストッパ、所定の位置に注入口を開口す
る樹脂注入ホースが装着される構成であるから、これら
が未整理供給管の内部に一緒に押込み移動される。そし
てサービスチーの入口側にストッパが嵌着して塞ぐと、
通線具にかかる負荷によりそれが確認され、このとき樹
脂注入ホースの注入口がサービスチーの内部に開口し
て、樹脂注入手段により樹脂が確実にサービスチー内部
に充填されるようになる。
According to the above-mentioned closing method, a wire with a spring-shaped stopper is pushed into an unarranged supply pipe and is moved so that the stopper can be remotely operated so that the stopper can be moved into and out of the conduit from a service tee. As a result, the stopper is fitted to the entrance side of the service tee in a one-touch manner and securely closed, and in this state the resin is filled inside the service tee and attached to the conduit at the base of the unorganized supply pipe Is completely blocked at the point of the service tee. This ensures that the unorganized supply pipe is completely closed over the entire length, and therefore, even if the unorganized supply pipe is left buried at an arbitrary length, there is no risk of gas leakage. In addition, since the blockage is performed by the remote control and the non-digging process is performed, it becomes unnecessary to dig a road or the like. Also, according to the closing processing device,
A spring stopper and a resin injection hose which opens an injection port at a predetermined position are attached to the wire, so that these are pushed and moved together into the unorganized supply pipe. And when the stopper is fitted and closed at the entrance side of Service Qi,
This is confirmed by the load on the wire, and at this time, the injection port of the resin injection hose is opened inside the service tee, and the resin is reliably filled into the service tee by the resin injection means.

【0009】[0009]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1において、本発明の未整理供給管の閉塞処理
工法に適した閉塞処理装置の全体の構成について説明す
る。先ず符号1は道路aの下に所定の深度で埋設される
ガスの導管であり、この導管1の分岐部にサービスチー
10が取付けられる。そしてサービスチー10から引込
み管2、エルボ3、延長管4、地上部への立管5を連結
して需要先の宅地bにガスの供給管6が、土cに埋設し
て引込まれている。そこでこの供給管6が使用中止によ
り未整理供給管6になるのであり、この未整理供給管6
に対して閉塞処理装置20が装着される。
Embodiments of the present invention will be described below with reference to the drawings. In FIG. 1, the entire configuration of a blockage processing apparatus suitable for the blockage processing method for an unordered supply pipe of the present invention will be described. First, reference numeral 1 denotes a gas conduit buried under a road a at a predetermined depth, and a service tee 10 is attached to a branch portion of the conduit 1. The service pipe 10 is connected to the service pipe 10, the elbow 3, the extension pipe 4, and the standing pipe 5 to the ground, and the gas supply pipe 6 is buried in the residential land b of the demand destination by being buried in the soil c. . Therefore, the supply pipe 6 becomes the unsorted supply pipe 6 due to the discontinuation of use.
The closing processing device 20 is attached to the apparatus.

【0010】閉塞処理装置20は、小口径で屈曲する未
整理供給管6の内部に挿入される通線具21、通線具2
1の先端に取付けられるワンタッチ式のストッパ25、
通線具21に一体的または各別に設けられる樹脂注入ホ
ース30を具備する。また閉塞処理の作業時に未整理供
給管6の端部に取付けられて、ガスが空中に飛散するの
を防止する密閉作業バッグ31、ストッパ25による閉
塞後にガス漏れを検査するガス検知器32、図2のよう
に樹脂のカートリッジタンク33を備えて樹脂注入ホー
ス30に連結されるエアーガン34を備えて構成され
る。
The closing device 20 includes a wire 21 and a wire 2 which are inserted into the unarranged supply pipe 6 which is bent at a small diameter.
One-touch type stopper 25 attached to the tip of 1
A resin injection hose 30 is provided integrally or separately on the wire 21. Further, a sealed work bag 31 attached to the end of the unorganized supply pipe 6 to prevent gas from being scattered in the air during a closing operation, a gas detector 32 for checking gas leakage after closing by the stopper 25, FIG. As shown in FIG. 2, an air gun 34 is provided which is provided with a resin cartridge tank 33 and connected to the resin injection hose 30.

【0011】図2において、通線具21、ストッパ2
5、樹脂注入ホース30等について具体的に説明する。
通線具21は、線材を螺旋状に巻いて形成されるばね力
の大きい屈曲可能なフレキシブルワイヤ22を有し、こ
のワイヤ22の先にばね力の小さいコイルばね23を首
振り動作可能に連結して、小口径で屈曲する未整理供給
管6の内部を容易に挿通することが可能に構成される。
樹脂注入ホース30は、通線具21のフレキシブルワイ
ヤ22に嵌着される被覆30aと一体的に形成され、通
線具21に隣接して一緒に移動するようになっている。
そしてホース30の注入口30bが、通線具21の先端
より所定の長さだけ後方で開口するようにセットされ
る。
In FIG. 2, a wire 21 and a stopper 2
5. The resin injection hose 30 and the like will be specifically described.
The wire passing tool 21 has a flexible wire 22 having a large spring force and bendable formed by spirally winding a wire. A coil spring 23 having a small spring force is connected to the tip of the wire 22 so as to be able to swing. As a result, the inside of the unarranged supply pipe 6 which is bent with a small diameter can be easily inserted.
The resin injection hose 30 is formed integrally with the coating 30 a fitted to the flexible wire 22 of the wire 21, and moves together with the wire 21.
Then, the inlet 30b of the hose 30 is set so as to open behind by a predetermined length from the end of the wire 21.

【0012】ストッパ25は、コイルばね23の先の金
具26に比較的大きい円板状のスポンジから成るシール
材27と鋼球28がはね形に取付けられ、鋼球28の周
囲をシール材27で包んで管内部に緊密に嵌着するよう
に構成される。またシール材27を撓ませて管内部を移
動する際の抵抗を低減するため、シール材27の鋼球2
8側には滑り易いビニール等の滑り材29が装着され
る。ここでサービスチー10は、本体11に入口ポート
12と出口ポート13が直交配置して形成され、入口ポ
ート12を導管1の取付け穴1aに螺着し、出口ポート
13に引込み管2の端部を螺着して取付けられる。そし
てこの場合の引込み管2、入口ポート12の口径は同一
であることから、鋼球28の径はその口径より少し小さ
く形成されて、シール材27は鋼球28の略2倍の径で
その略半周を包むことが可能になっている。
The stopper 25 has a seal member 27 made of a relatively large disc-shaped sponge and a steel ball 28 attached to a metal fitting 26 at the tip of the coil spring 23 in a spring shape. It is configured so as to be tightly fitted inside the tube by being wrapped in a tube. Further, in order to reduce the resistance when the sealing material 27 is bent and moved inside the pipe, the steel ball 2 of the sealing material 27 is used.
A sliding material 29 such as vinyl which is easy to slip is attached to the 8 side. Here, the service tee 10 is formed such that an inlet port 12 and an outlet port 13 are formed in the main body 11 so as to be orthogonal to each other, and the inlet port 12 is screwed into the mounting hole 1a of the conduit 1, and the outlet port 13 is connected to the end of the drawing pipe 2. Can be attached by screwing. In this case, since the diameters of the inlet pipe 2 and the inlet port 12 are the same, the diameter of the steel ball 28 is formed slightly smaller than the diameter, and the sealing material 27 has a diameter approximately twice as large as that of the steel ball 28. It is possible to wrap around half a circumference.

【0013】樹脂注入ホース30により注入される樹脂
dは、例えば注入後の3時間位で整形し、略1日で固化
するエポキシ樹脂である。そしてこの樹脂dの量は、エ
アーガン34により樹脂注入ホース30を介して注入し
た際に、樹脂dがサービスチー10の内部をオーバフロ
ーして満すものである。
The resin d injected by the resin injection hose 30 is, for example, an epoxy resin which is shaped in about three hours after injection and solidified in about one day. The amount of the resin d is such that the resin d overflows and fills the inside of the service tee 10 when the resin d is injected through the resin injection hose 30 by the air gun 34.

【0014】次にこの実施例の閉塞処理工法の作業を、
図3以降の図面を用いて説明する。先ず、図3のように
密閉作業バッグ31の内部に通線具21と樹脂注入ホー
ス30を巻いた状態で入れ、埋設状態の未整理供給管6
の管端に立管5が存在する場合は、その立管5の端部を
切断して開口する。そして立管5の開口端に直ちに通線
具21の先端のストッパ25を差し込み、且つ密閉作業
バッグ31を装着して通線具21の所定の先端位置に樹
脂注入ホース30の注入口30bを合わせる。その後密
閉作業バッグ31によりガスが空中に飛散するのを防止
した状態で、そのバッグ31の手袋31aに作業者が手
を入れて操作することで、通線具21と樹脂注入ホース
30を一緒に押出す。
Next, the operation of the closing method according to this embodiment will be described.
This will be described with reference to the drawings after FIG. First, as shown in FIG. 3, the wire 21 and the resin injection hose 30 are wound in the closed work bag 31, and the unfilled supply pipe 6 is buried.
If there is a standing pipe 5 at the end of the pipe, the end of the standing pipe 5 is cut and opened. Then, the stopper 25 at the tip of the wire 21 is immediately inserted into the open end of the standing pipe 5, and the closed work bag 31 is attached so that the injection port 30 b of the resin injection hose 30 is aligned with the predetermined tip of the wire 21. . Thereafter, in a state where the gas is prevented from being scattered into the air by the sealed work bag 31, the operator puts his hand into the glove 31a of the bag 31 and operates the glove 31a, thereby connecting the wire 21 and the resin injection hose 30 together. Extrude.

【0015】すると通線具21の押込みにより、ストッ
パ25と樹脂注入ホース30が一緒に未整理供給管6の
内部を前進して移動する。このときストッパ25では管
口径より大きいシール材27が、滑り材29により前方
を覆った状態で鋼球28と逆の後方に略くさび状につぼ
み、この滑り材29により管内壁には非接触してスムー
スに前進する。またエルボ3等の屈曲部では通線具21
が、コイルばね23の首振り作動により円滑に屈曲して
進み、最終のサービスチー10に達する。そこでサービ
スチー10では図3のように、本体11の出口ポート1
3から入口ポート12に逆移動して進入し、このとき入
口ポート12でストッパ25の鋼球28の自重が下方に
かかることで、導管1の方向に案内される。
When the wire 21 is pushed in, the stopper 25 and the resin injection hose 30 move forward inside the unorganized supply pipe 6 together. At this time, in the stopper 25, the sealing material 27 having a diameter larger than the pipe diameter is substantially wedge-shaped and is backwardly opposed to the steel ball 28 in a state where the sealing material 27 is covered with the sliding material 29. And move forward smoothly. In the bent portion of the elbow 3 or the like, the wire 21
Is smoothly bent and advanced by the swinging operation of the coil spring 23, and reaches the final service team 10. Therefore, in the service Q10, as shown in FIG.
3 moves in the reverse direction and enters the inlet port 12, and at this time, the weight of the steel ball 28 of the stopper 25 at the inlet port 12 is applied downward, so that the steel ball 28 is guided in the direction of the conduit 1.

【0016】そして図4のように、ストッパ25がサー
ビスチー10の入口ポート12から導管1に突き抜ける
と、つぼんでいたシール材27等が円板状に開き、通線
具21の押込み力が急激に低下することにより、作業者
はこのことを確認することができる。そこで通線具21
を逆に引っ張ると、ストッパ25のシール材27がサー
ビスチー10の入口ポート12の縁に当たり、鋼球28
を包むように撓んで鋼球28の径を増大し、この状態で
シール材27と鋼球28が入口ポート12に嵌合する。
そして図5のように、鋼球28を備えたスポンジ状のシ
ール材27が入口ポート12に緊密に嵌着することで完
全にシールされ、このとき多大な負荷がかかって通線具
21をそれ以上引くことができなって、作業者もこのこ
とを確認できる。こうして通線具21の出し入れによる
遠隔操作で入口ポート12の導管1との接続部が、スト
ッパ25によりワンタッチで完全に塞がれ、導管1のガ
スeは未整理供給管6に進入しなくなる。
As shown in FIG. 4, when the stopper 25 penetrates into the conduit 1 from the inlet port 12 of the service tee 10, the sealing material 27 or the like that has collapsed opens in a disk shape, and the pushing force of the wire 21 is rapidly increased. Can be confirmed by the operator. Therefore, the connecting tool 21
, The sealing material 27 of the stopper 25 hits the edge of the entrance port 12 of the service tee 10, and the steel ball 28
, And the diameter of the steel ball 28 is increased, and in this state, the sealing member 27 and the steel ball 28 fit into the inlet port 12.
Then, as shown in FIG. 5, a sponge-like sealing material 27 provided with a steel ball 28 is tightly fitted to the inlet port 12 to be completely sealed. At this time, a large load is applied to remove the wire 21. Thus, the operator can confirm this. In this way, the connection between the inlet port 12 and the conduit 1 is completely closed by the stopper 25 by one-touch operation by remote control by taking the wire 21 in and out, so that the gas e of the conduit 1 does not enter the unordered supply pipe 6.

【0017】サービスチー10の入口ポート12が塞が
れた以降は、通線具21を未整理供給管6の管端に固定
し、不要になった密閉作業バッグ31を取外す。そして
ガス検知器32によりガス漏れの有無を検査して、上述
のストッパ25による閉塞が確認される。その後この閉
塞状態を永久的に確保するため、所定量のエポキシ樹脂
dをエアーガン34のカートリッジタンク33に入れ、
そのエアーガン34を樹脂注入ホース30に接続して操
作する。すると高圧空気によりエポキシ樹脂dがホース
30内を送られ、このとき注入口30bがサービスチー
10の入口ポート12直前に位置することで、この注入
口30bからエポキシ樹脂dが入口ポート12に直接注
入される。そして図6のように、エポキシ樹脂dはスト
ッパ25により塞がれたサービスチー10の入口ポート
12の略全域、及び出口ポート13の引込み管2の一部
にオーバフローして適確に充填されるのであり、こうし
て作業を一旦終了する。
After the entrance port 12 of the service tee 10 has been closed, the connecting member 21 is fixed to the end of the unarranged supply pipe 6, and the unnecessary closed work bag 31 is removed. Then, the presence or absence of gas leakage is inspected by the gas detector 32 to confirm that the stopper 25 is closed. Thereafter, in order to permanently secure this closed state, a predetermined amount of epoxy resin d is put into the cartridge tank 33 of the air gun 34,
The air gun 34 is connected to the resin injection hose 30 for operation. Then, the epoxy resin d is sent through the hose 30 by the high-pressure air. At this time, since the injection port 30b is located immediately before the inlet port 12 of the service tee 10, the epoxy resin d is directly injected into the inlet port 12 from the injection port 30b. Is done. As shown in FIG. 6, the epoxy resin d overflows over the entirety of the inlet port 12 of the service tee 10 closed by the stopper 25 and a part of the inlet pipe 2 of the outlet port 13 to be properly filled. Thus, the work is once ended.

【0018】上記注入されたエポキシ樹脂dは、3時間
位で整形し、1日経過した後には固化する。これにより
未整理供給管6は根元のサービスチー10と引込み管2
の一部が、ストッパ25と樹脂dにより永久的に完全に
閉塞した状態に確保される。この後未整理供給管6やそ
の内部に挿入されている通線具21、樹脂注入ホース3
0は、宅地内で邪魔にならない適当な長さの箇所で切断
してそのまま埋設放置される。この場合に未整理供給管
6は根元のサービスチー10で閉塞処理されているた
め、長年にわたり仮に未整理供給管6のいずれかの箇所
が腐食しても、ガス漏れのおそれは全く無くなることに
なる。
The injected epoxy resin d is shaped in about three hours, and solidifies after one day. As a result, the unconsolidated supply pipe 6 is connected to the service tee 10 at the root and the service pipe 2.
Is completely closed by the stopper 25 and the resin d. Thereafter, the unorganized supply pipe 6, the wire 21 inserted therein, and the resin injection hose 3
0 is cut off at an appropriate length in the residential land and does not get in the way, and is buried and left as it is. In this case, since the unsorted supply pipe 6 is clogged by the root service tee 10, even if any part of the unsorted supply pipe 6 is corroded for many years, there is no possibility of gas leakage. Become.

【0019】以上、本発明の実施例について説明した
が、通線具やホースは樹脂の固化後に強く引くと途中で
切断して、一部を回収可能にすることもできる。樹脂注
入ホースは、通線具の内部に形成しても良い。
Although the embodiment of the present invention has been described above, the wire and the hose may be cut in the middle if the resin is hardened after being solidified, and a part of the hose may be collected. The resin injection hose may be formed inside the communication tool.

【0020】[0020]

【発明の効果】以上説明したように、本発明によれば、
未整理供給管を非掘削でその根元のサービスチーの箇所
を閉塞処理する工法であるから、道路を掘削する必要が
なくなる。このため、土木、舗装の工事の期間や費用が
大幅に低減し、工事施行の省力化、交通、騒音等の環境
保全、施行時間の短縮化等が図られる。未整理供給管は
根元のサービスチーで閉塞処理されるので、未整理供給
管の全長に及んで完全に閉塞されることになり、土中に
任意の長さで埋設放置されてもガス漏れのおそれが全く
なくて、信頼性が高い。未整理供給管の根元のサービス
チーの箇所のみを閉塞処理するので、樹脂の使用量は必
要最小限で済み、作業も簡素化する。
As described above, according to the present invention,
This method eliminates the need for excavation of roads because it is a method of closing the untied supply pipe at the root of the service team without excavation. For this reason, the period and cost of civil engineering and pavement construction are significantly reduced, labor saving of construction execution, environmental protection of traffic, noise, etc., and shortening of execution time are achieved. Uncleaned supply pipes are clogged by the service tee at the root, so they are completely blocked over the entire length of the uncleaned supply pipes, and even if they are buried and left in the soil at any length, gas leakage may occur. There is no fear and the reliability is high. Since only the service tee at the base of the unconsolidated supply pipe is clogged, the amount of resin used is minimized and the operation is simplified.

【0021】閉塞処理装置のストッパは、通線具をサー
ビスチーから導管に出し入れ操作することでサービスチ
ーの入口側を緊密に塞ぐ構成であるから、遠隔操作によ
り確実に閉塞することができ、操作性も良い。ストッパ
がサービスチーの入口側に嵌着して確実に塞ぐと、通線
具に大きい負荷がかかるので、これを適確に確認するこ
とができる。樹脂を注入するホースは通線具と一緒に移
動され、ストッパがサービスチーを塞いだ際に、注入口
がその内部に開口するので、樹脂を遠隔操作によりサー
ビスチーに確実且つ容易に充填することができる。
Since the stopper of the closing device is configured to close the entrance side of the service tee tightly by operating the communication tool into and out of the conduit from the service tee, the stopper can be reliably closed by remote control. Good nature. If the stopper is fitted on the entrance side of the service tee and is securely closed, a large load is applied to the wire passing tool, which can be confirmed accurately. The hose to inject the resin is moved together with the wire, and when the stopper closes the service tee, the injection port opens inside, so that the resin can be securely and easily filled into the service tee by remote control. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る未整理供給管の閉塞処理装置の実
施例を示す断面図である。
FIG. 1 is a cross-sectional view illustrating an embodiment of a device for closing a raw supply pipe according to the present invention.

【図2】通線具、ストッパ、樹脂注入ホース等を詳細に
示す図である。
FIG. 2 is a view showing in detail a wire, a stopper, a resin injection hose, and the like.

【図3】本発明に係る未整理供給管の閉塞処理工法の作
業の通線具等の押込み状態を示す断面図である。
FIG. 3 is a cross-sectional view showing a pushed-in state of a wire tool or the like in the work of the unsorted supply pipe closing processing method according to the present invention.

【図4】同作業でストッパが導管に突き抜けた状態を示
す断面図である。
FIG. 4 is a cross-sectional view showing a state in which a stopper has penetrated a conduit in the same operation.

【図5】同作業でストッパにより閉塞し、且つ樹脂を注
入する状態を示す断面図である。
FIG. 5 is a cross-sectional view showing a state where the work is closed by a stopper and a resin is injected in the work.

【図6】同作業で樹脂の注入完了を示す断面図である。FIG. 6 is a sectional view showing the completion of resin injection in the same operation.

【符号の説明】[Explanation of symbols]

1 導管 6 未整理供給管 10 サービスチー 12 入口ポート 21 通線具 25 ストッパ 34 エアーガン d 樹脂 DESCRIPTION OF SYMBOLS 1 Conduit 6 Unconsolidated supply pipe 10 Service tee 12 Inlet port 21 Communication tool 25 Stopper 34 Air gun d Resin

フロントページの続き (56)参考文献 特開 平4−185994(JP,A) 特開 平3−79899(JP,A) 特開 平4−18966(JP,A) 実開 平3−38493(JP,U) 特表 平3−502961(JP,A) (58)調査した分野(Int.Cl.6,DB名) F16L 55/00 - 55/24 Continuation of the front page (56) References JP-A-4-185994 (JP, A) JP-A-3-79899 (JP, A) JP-A-4-18966 (JP, A) JP-A-3-38493 (JP) , U) Table 3-502961 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) F16L 55/00-55/24

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 道路下に埋設される導管からサービスチ
ー等介して宅地に引込まれ、不使用状態で埋設放置され
る未整理供給管に対して、この未整理供給管の管端開口
部からはね形ストッパを備えた通線具を、未整理供給管
のサービスチー側に押込み移動し、通線具とストッパを
サービスチーから導管に出し入れしてストッパをサービ
スチーの入口側に緊密に嵌着して塞ぎ、その後樹脂注入
手段により樹脂を、ストッパにより塞がれたサービスチ
ーの内部にオーバフローした状態で充填して閉塞処理す
ることを特徴とする未整理供給管の閉塞処理工法。
1. An unsorted supply pipe which is drawn into a residential area from a conduit buried under a road through a service tee or the like and is buried and left unused in an unused state from a pipe end opening of the unsorted supply pipe. Push the wire with the spring stopper into the service tee side of the unaligned supply pipe, move the wire and the stopper out of the service tee into and out of the conduit, and fit the stopper into the service tee inlet side tightly. A method for clogging an unorganized supply pipe, wherein the clogging is performed by filling and closing the resin by means of resin injection means in a state of overflowing inside the service tee closed by the stopper.
【請求項2】 未整理供給管の内部に押込まれて屈曲し
ながら移動する通線具と、この通線具の先端に取付けら
れてサービスチーの入口側に緊密に嵌着して塞ぐストッ
パと、通線具の所定の位置に注入口を開口して装着され
る樹脂注入ホースと、樹脂を樹脂注入ホースを介してサ
ービスチーの内部に注入する樹脂注入手段とを備えるこ
とを特徴とする未整理供給管の閉塞処理装置。
2. A wire passing tool which is pushed into an unarranged supply pipe and moves while bending, and a stopper which is attached to a tip of the wire feeding tool and tightly fits and closes an entrance side of a service tee. A resin injection hose that is mounted at a predetermined position of the wire with an injection opening, and resin injection means for injecting resin into the service tee via the resin injection hose. A blockage processing device for the rearranging supply pipe.
【請求項3】 ストッパは、通線具の先端に比較的大き
い円板状のスポンジから成るシール材、鋼球、滑り材を
取付け、サービスチーから導管に突き抜けた後に再びサ
ービスチーに引込まれる際に、シール材が鋼球を包んだ
状態でサービスチーの入口ポートに嵌着して塞ぐように
構成されることを特徴とする請求項2記載の未整理供給
管の閉塞処理装置。
3. The stopper is provided with a sealing member made of a relatively large disc-shaped sponge, a steel ball, and a sliding member at the end of the wire passing tool, and is drawn back into the service tee after penetrating from the service tee into the conduit. 3. The apparatus according to claim 2, wherein the sealing material is configured to be fitted and closed to the entrance port of the service tee with the steel ball wrapped around the steel ball.
JP4257379A 1992-09-01 1992-09-01 Blocking treatment method for unorganized supply pipe and its device Expired - Fee Related JP2918402B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4257379A JP2918402B2 (en) 1992-09-01 1992-09-01 Blocking treatment method for unorganized supply pipe and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4257379A JP2918402B2 (en) 1992-09-01 1992-09-01 Blocking treatment method for unorganized supply pipe and its device

Publications (2)

Publication Number Publication Date
JPH0681995A JPH0681995A (en) 1994-03-22
JP2918402B2 true JP2918402B2 (en) 1999-07-12

Family

ID=17305574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4257379A Expired - Fee Related JP2918402B2 (en) 1992-09-01 1992-09-01 Blocking treatment method for unorganized supply pipe and its device

Country Status (1)

Country Link
JP (1) JP2918402B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5761480A (en) * 1994-04-20 1998-06-02 Canon Kabushiki Kaisha Display control method
CN107327653A (en) * 2017-06-28 2017-11-07 宁波兴光燃气集团有限公司 A kind of plugging device repaired applied to pipeline on-line production

Also Published As

Publication number Publication date
JPH0681995A (en) 1994-03-22

Similar Documents

Publication Publication Date Title
JP3430396B2 (en) Bellmouth with joint, its block body and handhole
US8277147B2 (en) Method for replacing pipes, and apparatus therefor
JP2918402B2 (en) Blocking treatment method for unorganized supply pipe and its device
US5667841A (en) Methods of lining the internal surface of a pipe
JPH10169883A (en) Non open-cut leakage preventive method of feed pipe not in use, and pipe inner surface sealing device
JP4780841B2 (en) Gas pipeline cutoff jig and gas pipeline cutoff construction method
JPH0753014B2 (en) Water stopping method and structure of pipes such as cables
JP2008144482A (en) Method of preventing permeation of chemical solution into underground embedded pipe line
US3260280A (en) Expendable mold and method for sealing joints in gas mains
IE61502B1 (en) Temporary or permanent blocking of the bore of a pipe
JP3379639B2 (en) Injection equipment in steel pipe pre-receiving method
JP3215731B2 (en) Non-drilling cutoff method for unused supply pipes
JP2773000B2 (en) Leakage prevention method for unused supply pipes
JP2683050B2 (en) Inner lining method for city gas conduits and jigs used therefor
JPH0452281Y2 (en)
JPH06137079A (en) Cutting-off work of not-yet-serviced supply pipe
JPH0333954B2 (en)
JPH0510536U (en) Water stop material for pipe penetration
JP2801680B2 (en) Method and apparatus for treating unused gas supply pipe
JP2843845B2 (en) Inner lining repair method for service pipes
JP2584895Y2 (en) Cut end structure of unbonded PC steel strand
KR200219200Y1 (en) Apparatus For Cutting Water Stream off Caused By Capillary Phenomenon In Electric Wire Layed Underground
JPH05209416A (en) Method and device for connecting pipeline to manhole
JP4692706B2 (en) Hume pipe for propulsion method
JP2796576B2 (en) Repair method for inner lining of existing piping

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090423

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090423

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100423

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110423

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees