JP2918202B1 - Correction method of joint of steel beam to existing steel column and correction tool therefor - Google Patents

Correction method of joint of steel beam to existing steel column and correction tool therefor

Info

Publication number
JP2918202B1
JP2918202B1 JP20870698A JP20870698A JP2918202B1 JP 2918202 B1 JP2918202 B1 JP 2918202B1 JP 20870698 A JP20870698 A JP 20870698A JP 20870698 A JP20870698 A JP 20870698A JP 2918202 B1 JP2918202 B1 JP 2918202B1
Authority
JP
Japan
Prior art keywords
fixed
link arm
arm
steel beam
hydraulic jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP20870698A
Other languages
Japanese (ja)
Other versions
JP2000027442A (en
Inventor
忠男 辻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KITAMURAGUMI KK
Original Assignee
KITAMURAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KITAMURAGUMI KK filed Critical KITAMURAGUMI KK
Priority to JP20870698A priority Critical patent/JP2918202B1/en
Application granted granted Critical
Publication of JP2918202B1 publication Critical patent/JP2918202B1/en
Publication of JP2000027442A publication Critical patent/JP2000027442A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

【要約】 【課題】既設鉄骨柱から張り出す付属固定梁の向かい合
う相互間へ、鉄骨梁をすばやく正確に接合作業できる便
利な矯正用具を提供する。 【解決手段】固定アーム(16)の一端部へ第1回動支
点ピン(25)により第1リンクアーム(23)の一端
部を枢着すると共に、その第1リンクアームの他端部へ
第2回動支点ピン(31)により第2リンクアーム(2
9)の一端部を枢着して、その第2リンクアームの他端
部をなす取り付け用ネジ軸(32)が固定アームの他端
部をなす取り付け用ネジ軸(18)へ接近することとな
る平面視の全体的なトライアングル形状に枠組みし、且
つ固定アームと第1リンクアームとの中途部同志を油圧
ジャッキ(39)により枢支連結して、その油圧ジャッ
キを手動操作式油圧ポンプ(46)により伸縮作動させ
るように定めた。
An object of the present invention is to provide a convenient orthodontic tool capable of quickly and accurately joining steel beams between opposed attached fixed beams protruding from an existing steel column. One end of a first link arm (23) is pivotally connected to one end of a fixed arm (16) by a first rotation fulcrum pin (25), and the other end of the first link arm is connected to the other end of the first link arm. The 2nd link arm (2
9) pivoting one end of the second link arm so that the mounting screw shaft (32) forming the other end of the second link arm approaches the mounting screw shaft (18) forming the other end of the fixed arm; And the fixed arm and the middle part of the first link arm are pivotally connected by a hydraulic jack (39), and the hydraulic jack is connected to a manually operated hydraulic pump (46). ) To extend and retract.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は既設鉄骨柱に対する
鉄骨梁の接合矯正方法と、そのための便利な接合矯正用
具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for correcting a joint of a steel beam to an existing steel column, and a convenient joint correcting tool therefor.

【0002】[0002]

【従来の技術】一般に、鉄骨建築物の躯体工事では短か
いH型鋼の付属固定梁が溶接された鉄骨柱と、その固定
梁と対応する長いH型鋼の鉄骨梁を用いて、向かい合う
一対の既設鉄骨柱から張り出す固定梁の相互間へ鉄骨梁
を接合するに当り、その鉄骨梁をクレーンにより宙吊り
し乍ら、これを2人1組の作業者が横移動させて、両固
定梁の相互間へ直列状態となるように引き込んだ上、そ
の両固定梁と鉄骨梁との接合部を各々上下・左右の継手
プレートと、これらに貫通する複数づつのボルト並びに
固定ナットにより締結一体化している通例である。
2. Description of the Related Art In general, a steel column to which a short H-shaped steel fixed beam is welded and a long H-shaped steel beam corresponding to the fixed beam are used for a pair of existing steel frames in a frame construction of a steel building. In joining the steel beams between the fixed beams overhanging from the steel columns, the steel beams are suspended by a crane while a pair of workers laterally move the beams so that the fixed beams are connected to each other. After being pulled in so as to be in series, the joints between the fixed beams and the steel beams are fastened and integrated with the upper and lower, left and right joint plates, and a plurality of bolts and fixing nuts penetrating therethrough. It is customary.

【0003】ところが、上記鉄骨梁の長さとこれを受け
入れる両固定梁の相互間隔とは、極めて僅かなクリヤラ
ンスを保つ関係状態に設計されているため、万一既設鉄
骨柱が少しでも歪み変形していたり、鉄骨梁の長さ寸法
精度やその施工上の精度に少しでもバラツキがあったり
すると、その鉄骨梁と上記固定梁との接合部が互いにオ
ーバーラップしてしまい、鉄骨梁を横方向から引き込む
ことができなくなる結果、その接合部を強制的に押し開
き矯正しなければならず、このような事態は鉄骨建築物
の高層になればなる程、頻発しやすい。
However, since the length of the steel beam and the distance between the fixed beams that receive the steel beam are designed to maintain a very small clearance, the existing steel column may be deformed even by a small amount. If there is any variation in the length dimensional accuracy or construction accuracy of the steel beam, the joints between the steel beam and the fixed beam overlap each other, and the steel beam is pulled in from the side. As a result, the joints have to be forcibly pushed open and straightened, and this situation is more likely to occur as the height of the steel building increases.

【0004】上記のような既設鉄骨柱に対する鉄骨梁の
接合矯正装置としては、特開平7−62886号や特開
平8−105209号が提案されており、殊更その後者
の図1に基き説示された第1発明の実施例が、本発明に
最も近似するものと考えられる。
Japanese Unexamined Patent Publication Nos. 7-62886 and 8-105209 have proposed a straightening device for a steel beam to an existing steel column as described above, and this was particularly suggested based on FIG. 1 of the latter. The embodiment of the first invention is believed to be the closest approximation to the present invention.

【0005】[0005]

【発明が解決しようとする課題】しかし、この特開平8
−105209号発明の構成では、油圧ジャッキ(1
0)とその半筒状挿着部(8)を備えた固定部材(5)
並びに位置調整部材(13)が、各別に独立した部品を
なしており、その部品点数が多いため、使用に先立って
面倒な組立作業を加える必要があり、そのままでの即刻
に便利良く使用することができない。
However, Japanese Patent Application Laid-open No.
In the configuration of the invention of No.-105209, the hydraulic jack (1
0) and a fixing member (5) provided with the semi-cylindrical insertion portion (8)
In addition, since the position adjusting member (13) is an independent part for each and has a large number of parts, it is necessary to add a troublesome assembling work prior to use, and to use it conveniently and immediately as it is. Can not.

【0006】しかも、上記油圧ジャッキ(10)の半筒
状挿着部(8)が固定部材(5)を形作る取付部(7)
の横側偏心位置に設けられている関係上、その挿着部
(8)の位置につき右勝手用と左勝手用とを予じめ製作
準備する必要があり、その数種を使い分けなければなら
ないので、未だ大変煩らわしいばかりでなく、装置とし
ての量産効果を発揮させることもできない。
In addition, a mounting portion (7) in which the semi-cylindrical insertion portion (8) of the hydraulic jack (10) forms a fixing member (5).
Because of the position provided at the lateral eccentric position, it is necessary to prepare for the right-hand and left-hand use for the position of the insertion portion (8) in advance, and several types thereof must be used properly. Therefore, not only is it bothersome yet, but it cannot exert the mass production effect as the device.

【0007】又、上記固定部材(5)の取付部(7)は
仕口梁(2)の上部フランジ(4)に開口分布するボル
ト貫通孔へ、そのボルトの複数によって締結固定される
ようになっているが、その上部フランジ(4)に開口分
布するボルト貫通孔の個数や間隔ピッチなどは、実際上
鉄骨建築物毎の格別に相違変化し、常に一定であるとは
限らないため、上記固定部材(5)の取付部(7)を仕
口梁(2)の上部フランジ(4)へ取り付け使用できな
いことが起り、その汎用性に劣る。
Further, the mounting portion (7) of the fixing member (5) is fastened and fixed by a plurality of bolts to bolt through-holes distributed in the upper flange (4) of the connection beam (2). However, the number and spacing pitch of the bolt through-holes distributed in the upper flange (4) actually vary significantly for each steel-framed building and are not always constant. The mounting portion (7) of the fixing member (5) cannot be mounted on the upper flange (4) of the connection beam (2) and cannot be used, resulting in poor versatility.

【0008】更に、この公知発明の場合仕口梁(2)に
対する中間梁(3)の押し開きは、油圧ジャッキ(1
0)の直線的な伸張作動によって達成されるようになっ
ているが、その後中間梁(3)を仕口梁(2)に向かっ
て引き込む横移動は、上記油圧ジャッキ(10)と別個
独立する摩擦式位置調整車(13)の回転作動によって
達成されるようになっている。
Further, in the case of this known invention, the push-opening of the intermediate beam (3) against the connection beam (2) is performed by the hydraulic jack (1).
0), the lateral movement of the intermediate beam (3) to be drawn toward the connecting beam (2) after that is independent of the hydraulic jack (10). This is achieved by rotating the friction type position adjusting wheel (13).

【0009】つまり、上記油圧ジャッキ(10)をこれ
と接続配線されたハンドポンプ(11)によって、手動
操作する必要があるほかに、これとの言わば2段階とし
て、上記位置調整部材(6)の位置調整車(13)をも
人為的に回動操作しなければならないので、甚だ煩らわ
しく重労働となり、1人の作業者では到底取り扱い使用
することができない。
That is, in addition to the manual operation of the hydraulic jack (10) by the hand pump (11) connected to the hydraulic jack (10), the hydraulic jack (10) needs to be manually operated. Since the position adjusting wheel (13) must also be rotated artificially, it is extremely troublesome and heavy labor, and one worker cannot handle and use it at all.

【0010】この点につき、上記位置調整車(13)の
操作部(14)を「適当なツールで回転させる」と説明
されているが、油圧ジャッキ(10)により強制的に押
し開かなければならない程、高負荷が作用した突っ張り
状態にある中間梁(3)を、手動操作式のツールによっ
て横移動させることは困難であり、仮りに横移動させる
ことができるとしても、その横移動ストロークには図1
(C)の3C位置までと云う限界がある。
[0010] In this regard, it is described that the operating portion (14) of the position adjusting wheel (13) is "rotated by an appropriate tool". However, the operating portion (14) must be forcibly pushed and opened by the hydraulic jack (10). As a result, it is difficult to laterally move the intermediate beam (3) in a stretched state to which a high load has been applied by a manually operated tool. Even if the intermediate beam (3) can be laterally moved, its lateral movement stroke is large. FIG.
There is a limit up to the 3C position of (C).

【0011】そのため、上記公知発明では「その3Cの
位置からハンマー等による手作業によって仕上げ調整
し、仕口梁(2)の端面(22)と中間梁(3)の端面
(23)がピタッと整合接合する図示3Dの位置に調
整」する旨として説明されているが、繰り返し述べる通
り、油圧ジャッキ(10)によって押し開かなければな
らない程、高負荷が作用した突っ張り状態にある中間梁
(3)を、ハンマーなどの手作業によって横移動させる
ことは実際上不可能であり、その大きなハンマーなどを
使用すればする程、作業者の足場が悪いこととも相俟っ
て、落下の危険を伴ない、このことは鉄骨建築物の高層
化すればする程、顕著になることが明白である。
[0011] Therefore, in the above-mentioned known invention, "the finish is adjusted manually by a hammer or the like from the position 3C, and the end face (22) of the connection beam (2) and the end face (23) of the intermediate beam (3) are sharply fitted. It is described as "adjusting to the position of the 3D shown in the figure to be aligned and joined", but as it is repeatedly described, the intermediate beam (3) in a tensioned state subjected to a high load so that it must be pushed open by the hydraulic jack (10). It is practically impossible to move the traverse by hand with a hammer or the like, and the larger the hammer or the like is used, the worse the foothold of the operator is, and the lower the risk of falling. It is evident that this becomes more pronounced the higher the height of steel structures.

【0012】[0012]

【課題を解決するための手段】本発明はこのような課題
の抜本的な解決を目的としており、その目的を達成する
ための構成として、向かい合う一対の既設鉄骨柱から一
体的に張り出す付属固定梁の相互間へ、これよりも長大
化した別個な鉄骨梁を宙吊りし乍ら、正確な直列状態と
なるよう接合矯正するに当り、
SUMMARY OF THE INVENTION The present invention aims to drastically solve the above-mentioned problems, and as a structure for achieving the objects, an attached fixing member extending integrally from a pair of existing steel columns facing each other. In suspending a separate steel beam longer than this, between beams, to correct the joint so that it is in an accurate series,

【0013】その鉄骨梁の一端部を何れか一方の固定梁
へ、残る他端部が横移動し得る仮りの接合状態に枢着し
た上、
[0013] One end of the steel beam is pivotally connected to one of the fixed beams, and the other end is pivotally connected to a temporary joint state in which the beam can move laterally.

【0014】固定アームの一端部へ第1回動支点ピンに
より第1リンクアームの一端部を枢着すると共に、その
第1リンクアームの他端部へ上記第1回動支点ピンと平
行な第2回動支点ピンにより第2リンクアームの一端部
を枢着して、その第2リンクアームの他端部が上記固定
アームの他端部へ接近することとなる平面視の全体的な
ほぼトライアングル形状に枠組みし、且つ上記固定アー
ムと第1リンクアームとの中途部同志を伸縮作動可能な
油圧ジャッキにより枢支連結して成る矯正用具を使っ
て、
[0014] One end of the first link arm is pivotally connected to one end of the fixed arm by a first rotation fulcrum pin, and a second parallel to the first rotation fulcrum pin is connected to the other end of the first link arm. One end of the second link arm is pivotally connected by a pivot pin, and the other end of the second link arm approaches the other end of the fixed arm. Using a correction tool that is pivotally connected to the middle part of the fixed arm and the first link arm by a hydraulic jack that can be extended and retracted,

【0015】先ずその矯正用具を形作る固定アームの他
端部を、上記鉄骨梁の他端部と他方の固定梁との何れか
一方へ横方向から着脱自在に取り付け固定し、次いでや
はり矯正用具を形作る第2リンクアームの他端部を、残
る他方へ同じ横方向から着脱自在に枢着した状態におい
て、
First, the other end of the fixed arm forming the correction tool is detachably attached to one of the other end of the steel beam and the other fixed beam from the lateral direction, and then the correction tool is also mounted. In a state where the other end of the second link arm to be formed is removably pivotally attached to the remaining other from the same lateral direction,

【0016】上記矯正用具の油圧ジャッキをポンプ操作
により伸張作動させて、上記固定アームとの第1回動支
点ピンを中心とする第1リンクアームの円弧運動によ
り、上記鉄骨梁の他端部と他方の固定梁とを強制的に押
し開くと一挙同時に、その鉄骨梁の他端部を他方の固定
梁と正確に直列することとなる横方向へ引き込むことを
特徴とし、
The hydraulic jack of the correction tool is extended by a pump operation, and the other end of the steel beam is connected to the fixed arm by the circular motion of the first link arm about the first pivot pin. When the other fixed beam is forcibly pushed open, at the same time, the other end of the steel beam is drawn in the lateral direction that will be accurately aligned with the other fixed beam,

【0017】又、上記接合矯正方法の実施に使う矯正用
具として、固定アームの一端部へ第1回動支点ピンによ
り第1リンクアームの一端部を枢着すると共に、その第
1リンクアームの他端部へ上記第1回動支点ピンと平行
な第2回動支点ピンにより第2リンクアームの一端部を
枢着して、その第2リンクアームの他端部が上記固定ア
ームの他端部へ接近することとなる平面視の全体的なほ
ぼトライアングル形状に枠組みし、
Further, as a correction tool used for carrying out the above-mentioned joint correction method, one end of the first link arm is pivotally connected to one end of the fixed arm by a first rotation fulcrum pin. One end of the second link arm is pivotally connected to the end by a second pivot pin parallel to the first pivot pin, and the other end of the second link arm is connected to the other end of the fixed arm. Framed in an almost triangular overall shape in plan view that will approach,

【0018】その固定アームの他端部から既設鉄骨柱の
付属固定梁又はこれと別個な鉄骨梁に対する取り付け用
ネジ軸を一体的に突設する一方、上記第2リンクアーム
の他端部にはやはり既設鉄骨柱の付属固定梁又はこれと
別個な鉄骨梁に対する取り付け用ネジ軸を、上記第1、
2回動支点ピンと平行な第3回動支点ピンにより枢着す
ると共に、
From the other end of the fixed arm, an attached fixing beam of the existing steel column or a screw shaft for mounting to a separate steel beam is integrally provided, while the other end of the second link arm is connected to the other end of the second link arm. Also, the screw shaft for attachment to the attached fixed beam of the existing steel column or a steel beam separate from this is
While pivotally connected by a third pivot pin parallel to the two pivot pins,

【0019】上記固定アームと第1リンクアームとの中
途部同志を伸縮作動可能な油圧ジャッキにより枢支連結
して、その油圧ジャッキをこれに付属一体化させた手動
操作式の油圧ポンプか、又はこれに一定長さの可撓ホー
スを介して接続配線した手動操作式の油圧ポンプによ
り、作動制御し得るように定めたことを特徴とするもの
である。
A manually operated hydraulic pump in which the fixed arm and the intermediate part of the first link arm are pivotally connected by a hydraulic jack which can be extended and retracted, and the hydraulic jack is integrated with the hydraulic jack, or It is characterized in that the operation is controlled by a manually operated hydraulic pump connected and wired via a fixed length flexible hose.

【0020】[0020]

【発明の実施の形態】以下、図面に基いて本発明の詳細
を説明すると、図1〜4はその本発明の対象とする鉄骨
建築物の躯体を示しており、(P)(P)は向かい合う
一対の既設鉄骨柱であって、H型鋼や図例のようなH型
鋼とT型鋼との溶接一体品、角型鋼管(コラム)などか
ら成る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The details of the present invention will be described below with reference to the drawings. FIGS. 1 to 4 show a frame of a steel frame object to which the present invention is applied. It is a pair of existing steel columns facing each other, and is composed of an H-shaped steel, a welded product of an H-shaped steel and a T-shaped steel as shown in the figure, a square steel pipe (column), and the like.

【0021】(A1)(A2)は上記鉄骨柱(P)
(P)の各階層と対応する一定高さ位置へ溶接されるこ
とにより、その両鉄骨柱(P)(P)から一定長さ(L
1)(L2 )だけ内向き一体的に張り出す付属固定梁で
あって、比較的短かいH型鋼から成る。
(A1) and (A2) are the steel columns (P).
By welding to a certain height position corresponding to each layer of (P), a certain length (L) is obtained from both steel columns (P) and (P).
1) Attached fixed beams extending inward and integrally by (L2), and are made of a relatively short H-shaped steel.

【0022】しかも、その各固定梁(A1)(A2)を
形作る水平な上下一対のフランジ(1a)(1b)と垂
直なウエブ(1c)における張り出し先端部付近には、
何れもボルト貫通孔(2a)(2b)(2c)の複数づ
づが集中的に開口分布されている。
In addition, near the overhanging tip of the pair of horizontal upper and lower flanges (1a) (1b) and the vertical web (1c) forming the fixed beams (A1) (A2),
In each case, a plurality of bolt through holes (2a), (2b), and (2c) are intensively distributed.

【0023】他方、(B)は上記既設鉄骨柱(P)
(P)の両付属固定梁(A1)(A2)へ爾後的に接合
される別個な一定長さ(L3)の鉄骨梁であって、その
固定梁(A1)(A2)と同一断面形状の比較的長いH
型鋼から成り、その水平な上下一対のフランジ(3a)
(3b)と垂直なウエブ(3c)における両端部付近に
は、やはりボルト貫通孔(4a)(4b)(4c)の複
数づつが集中的に開口分布されている。
On the other hand, (B) shows the existing steel column (P).
(P) is a steel beam of a fixed length (L3) that is subsequently joined to both attached fixed beams (A1) and (A2), and has the same cross-sectional shape as the fixed beams (A1) and (A2). Relatively long H
A pair of upper and lower horizontal flanges (3a) made of steel
In the vicinity of both ends of the web (3c) perpendicular to (3b), a plurality of bolt through holes (4a), (4b), and (4c) are also concentratedly distributed.

【0024】そして、上記既設鉄骨柱(P)(P)にお
ける両付属固定梁(A1)(A2)の向かい合う相互間
へ、鉄骨梁(B)を接合するに当っては、その鉄骨梁
(B)を図外のクレーンにより水平に宙吊りし乍ら、こ
れを両固定梁(A1)(A2)上から2人1組の作業者
が受け取り横移動させて、両固定梁(A1)(A2)と
の直列状態となるように引き込んだ上、その固定梁(A
1)(A2)の張り出し先端部と上記鉄骨梁(B)の両
端部とを各々接合一体化する。
When the steel beam (B) is joined between the opposed fixed beams (A1) and (A2) of the existing steel column (P) (P), the steel beam (B) is joined. ) Is suspended horizontally by a crane (not shown) and received by a pair of workers from above both fixed beams (A1) and (A2), and is moved laterally to form both fixed beams (A1) and (A2). With the fixed beam (A
1) The overhanging tip of (A2) and both ends of the steel beam (B) are joined and integrated, respectively.

【0025】つまり、図3、4から明白なように、各固
定梁(A1)(A2)と鉄骨梁(B)との上部フランジ
(1a)(3a)同志を、広幅な上部継手プレート
(5)と狭幅な一対の下部補強プレート(6)(6)に
より挟んだ上、その合計3枚を垂直に貫通するボルト
(7)の複数と、その固定ナット(8)によって締結す
る一方、同じく各固定梁(A1)(A2)と鉄骨梁
(B)との下部フランジ(1b)(3b)同志を、やは
り広幅な下部継手プレート(9)と狭幅な一対の上部補
強プレート(10)(10)により挟み、その合計3枚
を垂直に貫通するボルト(11)の複数と、その固定ナ
ット(12)によって締結する。
That is, as is clear from FIGS. 3 and 4, the upper flanges (1a) and (3a) of the fixed beams (A1) and (A2) and the steel beam (B) are connected to the wide upper joint plate (5). ) And a pair of narrow lower reinforcing plates (6) and (6), and a total of three bolts (7) are vertically penetrated and fastened by fixing nuts (8). The lower flanges (1b) and (3b) of each fixed beam (A1) (A2) and the steel beam (B) are connected to each other by a wide lower joint plate (9) and a pair of narrow upper reinforcing plates (10) (10). 10), and a total of three bolts (11) that penetrate vertically are fastened with a plurality of fixing nuts (12).

【0026】更に、上記各固定梁(A1)(A2)と鉄
骨梁(B)とのウエブ(1c)(3c)同志も、一対の
サイド継手プレート(13)(13)により挟んで、そ
の合計3枚を水平に貫通するボルト(14)の複数と、
その固定ナット(15)によって締結一体化するのであ
る。
Further, the webs (1c) and (3c) of the fixed beams (A1) and (A2) and the steel beam (B) are also sandwiched between a pair of side joint plates (13) and (13), and the total thereof is obtained. A plurality of bolts (14) penetrating three pieces horizontally,
The fastening nut (15) is used for fastening and integrating.

【0027】このような既設鉄骨柱(P)(P)に対す
る鉄骨梁(B)の正規な接合状態は、図1、2に示す通
りであるが、万一鉄骨梁(B)の一定長さ(L3)が上
記両固定梁(A1)(A2)の向かい合う相互間隔
(S)に比して、施工上少しでも長大化している場合に
は、その鉄骨梁(B)を両固定梁(A1)(A2)と正
確に直列することとなる横方向へ引き込むことができな
い関係上、これを矯正する必要がある。
The normal connection state of the steel beam (B) to the existing steel columns (P) (P) is as shown in FIGS. 1 and 2, but in the unlikely event that the steel beam (B) has a fixed length. If (L3) is slightly longer in construction than the opposed spacing (S) of the fixed beams (A1) and (A2), the steel beam (B) is connected to the fixed beams (A1). ) It is necessary to correct this because it cannot be drawn in the lateral direction, which is to be in series with (A2) exactly.

【0028】図5〜10はそのために使う矯正用具
(T)の基本実施形態を示しており、(16)は鋼棒や
アルミ合金などの金属丸棒材から成る一定長さ(L4)
(例えば約300mm)の固定アームであって、その一端
部が好ましくは僅かな長さ(L5)(例えば約120m
m)分だけ滑らかな鈍角に弯曲されている。(17)は
その一端部に扁平化された差し込み舌片である。
FIGS. 5 to 10 show a basic embodiment of a straightening tool (T) used for this purpose. (16) shows a fixed length (L4) made of a metal rod such as a steel rod or an aluminum alloy.
(E.g., about 300 mm), one end of which is preferably a small length (L5) (e.g., about 120 m).
m) It is curved to a smooth obtuse angle by the minute. (17) is an insertion tongue piece flattened at one end thereof.

【0029】(18)は上記固定アーム(16)の他端
部から一体的に突設された矯正用具取り付け用ネジ軸で
あり、上記鉄骨梁(B)のウエブ(3c)と固定梁(A
1)(A2)のウエブ(1c)との何れか一方へ互換的
に、且つ着脱自在に取り付けられる。(19)はそのネ
ジ軸(18)に螺合された固定ナットである。
Numeral (18) denotes a screw shaft for attaching a correction tool integrally projecting from the other end of the fixed arm (16). The web (3c) of the steel beam (B) and the fixed beam (A) are provided.
1) It is interchangeably and detachably attached to one of the webs (1c) of (A2). (19) is a fixing nut screwed onto the screw shaft (18).

【0030】その場合、上記ネジ軸(18)の根元部か
らは径大な接地フランジ(20)も一体的に張り出され
ており、その接地フランジ(20)が上記鉄骨梁(B)
のウエブ(3c)又は固定梁(A1)(A2)のウエブ
(1c)へ面接触して、矯正用具(T)を正確に安定良
く取り付け使用できるようになっている。
In this case, a large-diameter ground flange (20) also protrudes integrally from the root of the screw shaft (18), and the ground flange (20) is connected to the steel beam (B).
The straightening tool (T) can be accurately and stably attached and used in surface contact with the web (3c) or the web (1c) of the fixed beams (A1) and (A2).

【0031】(21)は上記固定アーム(16)の長手
方向に沿って張り出し延在された補強用背板、(22)
はこれとの連続的に区画形成された携帯用ハンドルであ
り、矯正用具(T)の携帯を至便化している。
(21) is a reinforcing back plate which protrudes and extends along the longitudinal direction of the fixed arm (16), (22)
Is a portable handle formed continuously with the handle, which facilitates carrying the correction tool (T).

【0032】又、(23)は同じく金属丸棒材から成る
一定長さ(L6)(例えば約300mm)の第1リンクア
ームであり、その一端部に分岐された二叉フォーク片
(24)が、上記固定アーム(16)の一端部に位置す
る差し込み舌片(17)を受け入れた状態のもとで、第
1回動支点ピン(25)により枢着されている。その第
1回動支点ピン(25)は図例から明白なように、上記
固定アーム(16)の取り付け用ネジ軸(18)とほぼ
直交する関係状態にある。
Reference numeral (23) denotes a first link arm of a fixed length (L6) (for example, about 300 mm) also made of a metal round bar, and a forked piece (24) branched at one end thereof. In a state in which the insertion tongue piece (17) located at one end of the fixed arm (16) is received, it is pivotally connected by a first rotation fulcrum pin (25). The first pivot pin (25) is in a state of being substantially perpendicular to the mounting screw shaft (18) of the fixed arm (16), as is apparent from the example shown in the drawing.

【0033】(26)は上記第1リンクアーム(23)
の他端部に扁平化された差し込み舌片、(27)は同じ
く第1リンクアーム(23)の長手方向に沿って張り出
し延在された補強用背板であり、これには矯正用具
(T)の落下防止用索条(図示省略)を連繋させるため
の係止環(28)が設けられている。
(26) The first link arm (23)
Is a flattened tongue piece at the other end of the first link arm, and (27) is a reinforcing back plate protruding and extending along the longitudinal direction of the first link arm (23). A lock ring (28) is provided for connecting a fall prevention cable (not shown) of the present invention.

【0034】但し、その係止環(28)の設置を省略
し、上記携帯用ハンドル(22)を兼用して、これに矯
正用具(T)の落下防止用となる索条の一端部を締結
し、同じく他端部を鉄骨建築物の既設鉄骨柱(P)
(P)や既設鉄骨梁、作業足場などへ締結してもさしつ
かえない。
However, the installation of the locking ring (28) is omitted, and the portable handle (22) is also used, and one end of a rope for preventing the correction tool (T) from falling is fastened to this. And the other end is the existing steel column of steel building (P)
(P), existing steel beams, work scaffolds, etc., may be fastened.

【0035】(29)はやはり金属丸棒材から成る一定
長さ(L7)(例えば約250mm)の第2リンクアーム
であり、その一端部に分岐された二叉フォーク片(3
0)が、上記第1リンクアーム(23)の他端部に位置
する差し込み舌片(26)を受け入れた状態のもとで、
上記第1回動支点ピン(25)と平行な第2回動支点ピ
ン(31)を介して枢着されている。
Reference numeral (29) designates a second link arm of a fixed length (L7) (for example, about 250 mm) also made of a metal round bar, and a forked piece (3) branched at one end thereof.
0) receives the insertion tongue (26) located at the other end of the first link arm (23),
It is pivotally connected via a second pivot pin (31) parallel to the first pivot pin (25).

【0036】つまり、本発明の矯正用具(T)は上記固
定アーム(16)と第1、2リンクアーム(23)(2
9)とから、その第2リンクアーム(29)の他端部が
固定アーム(16)における上記取り付け用ネジ軸(1
8)の位置する他端部へ接近し得る平面視の全体的なほ
ぼトライアングル形状に枠組みされているのである。
That is, the correction tool (T) of the present invention comprises the fixed arm (16) and the first and second link arms (23) (2).
9), the other end of the second link arm (29) is connected to the mounting screw shaft (1) of the fixed arm (16).
It is framed in an overall substantially triangular shape in plan view that can approach the other end located in 8).

【0037】(32)は上記第2リンクアーム(29)
の他端部へ更に第1、2回動支点ピン(25)(31)
と平行な第3回動支点ピン(33)を介して枢着された
取り付け用ネジ軸であり、上記鉄骨梁(B)のウエブ
(3c)と固定梁(A1)(A2)のウエブ(1c)と
の何れか一方へ互換的に、且つ着脱自在に取り付けられ
る。
(32) is the second link arm (29)
To the other end of the first and second pivot pins (25) (31)
And a fixing shaft (3c) for the steel beam (B) and a web (1c) for the fixed beams (A1) and (A2). ) Can be interchangeably and detachably attached to either one of the above.

【0038】その場合、上記第2リンクアーム(29)
の取り付け用ネジ軸(32)は図例から明白なように、
殊更その根元部が上記鉄骨梁(B)のウエブ(3c)又
は固定梁(A1)(A2)のウエブ(1c)へ面接触し
得る径大な接地フランジ(34)を備えた支持脚(3
5)として造形されており、その支持脚(35)の基端
に分岐された二叉フォーク片(36)が、上記第2リン
クアーム(29)の他端部に形成された差し込み舌片
(37)を受け入れた状態のもとで、上記第3回動支点
ピン(33)によって枢着されている。
In this case, the second link arm (29)
The mounting screw shaft (32) of is clearly seen from the example of the figure,
In particular, the supporting leg (3) having a large-diameter ground flange (34) whose root portion can make surface contact with the web (3c) of the steel beam (B) or the web (1c) of the fixed beam (A1) (A2).
5), and a bifurcated fork piece (36) branched to the base end of the support leg (35) is provided at the other end of the second link arm (29). 37), is pivoted by the third pivot pin (33).

【0039】そして、同じく支持脚(35)の先端がネ
ジ軸(32)として、その第3回動支点ピン(33)と
ほぼ直交する方向へ一体的に突設されており、上記固定
アーム(16)の取り付け用ネジ軸(18)と並列し得
るようになっている。(38)はその第2リンクアーム
(29)のネジ軸(32)に螺合された固定ナットであ
る。
The distal end of the support leg (35) is integrally provided as a screw shaft (32) in a direction substantially orthogonal to the third rotation fulcrum pin (33). 16) It can be arranged in parallel with the mounting screw shaft (18). (38) is a fixing nut screwed onto the screw shaft (32) of the second link arm (29).

【0040】何れにしても、上記固定アーム(16)の
取り付け用ネジ軸(18)がその固定アーム(16)に
対する回動不能として一体的に突設されているに反し、
第2リンクアーム(29)の取り付け用ネジ軸(32)
はその第2リンクアーム(29)に対する回動自在とし
て、上記第3回動支点ピン(33)により枢着されてい
るため、上記鉄骨梁(B)のウエブ(3c)と固定梁
(A1)(A2)のウエブ(1c)との何れか一方へ、
先に固定アーム(16)の取り付け用ネジ軸(18)を
その固定ナット(19)の締結により取り付け一体化し
た上、次いで残る他方へ第2リンクアーム(29)の取
り付け用ネジ軸(32)を制約なく、且つ正確に取り付
け固定することができることとなる。
In any case, the screw shaft (18) for attaching the fixed arm (16) is integrally protruded so as not to rotate with respect to the fixed arm (16).
Screw shaft (32) for mounting the second link arm (29)
Is pivotally attached to the second link arm (29) by the third pivot pin (33), so that the web (3c) of the steel beam (B) and the fixed beam (A1). To either one of the web (1c) of (A2),
First, the screw shaft (18) for attaching the fixed arm (16) is attached and integrated by fastening the fixing nut (19), and then the screw shaft (32) for attaching the second link arm (29) to the other side. Can be attached and fixed accurately without restriction.

【0041】そして、このような効果の達成について
は、先に取り付け一体化された固定アーム(16)のネ
ジ軸(18)に比し、その固定アーム(16)の一端部
へ第1リンクアーム(23)を介して枢支連結された第
2リンクアーム(29)のネジ軸(32)が、鉄骨梁
(B)のウエブ(3c)又は固定梁(A1)(A2)の
ウエブ(1c)に向かって自由自在に進退作用し得るこ
とも有機的に寄与することとなる。
In order to achieve such an effect, the first link arm is attached to one end of the fixed arm (16) as compared with the screw shaft (18) of the fixed arm (16) attached and integrated first. The screw shaft (32) of the second link arm (29) pivotally connected via (23) is connected to the web (3c) of the steel beam (B) or the web (1c) of the fixed beam (A1) (A2). The ability to freely move back and forth toward the surface also contributes organically.

【0042】更に、(39)は上記固定アーム(16)
と第1リンクアーム(23)との向かい合う相互間に介
在する伸縮作動可能な油圧ジャッキであり、その一端部
の差し込み舌片(40)が固定アーム(16)の中途部
に分岐された二叉フォーク片(41)へ受け入れられた
状態のもとで、抜き差し不能な第1枢支ピン(42)に
より取り付けられていると共に、同じく油圧ジャッキ
(39)における他端部の差し込み舌片(43)が第1
リンクアーム(23)の中途部に分岐された二叉フォー
ク片(44)へやはり受け入れられ、且つ抜き差し自在
の第2枢支ピン(45)を介して連結されている。その
第1、2枢支ピン(42)(45)が上記第1〜3回動
支点ピン(25)(31)(33)と平行状態にあるこ
とは、言うまでもない。
Further, (39) is the fixed arm (16)
And a first link arm (23) facing each other, which is a hydraulic jack which can be extended and retracted, and a tongue (40) at one end of the hydraulic jack is bifurcated into a middle part of the fixed arm (16). Under the condition of being received by the fork piece (41), it is attached by the first pivot pin (42) which cannot be inserted and removed, and the insertion tongue piece (43) at the other end of the hydraulic jack (39) as well. Is the first
The bifurcated fork piece (44), which branches off in the middle of the link arm (23), is also received and connected via a second pivot pin (45) which can be inserted and removed. It goes without saying that the first and second pivot pins (42) and (45) are in parallel with the first to third pivot pins (25), (31) and (33).

【0043】そのため、図5〜8のように上記第2枢支
ピン(45)を抜き去って、第1リンクアーム(23)
から油圧ジャッキ(39)を取りはずせば、その第1リ
ンクアーム(23)を上記固定アーム(16)に対して
自由自在に開閉操作することができ、その開閉度を調整
し得ることになる。
Therefore, as shown in FIGS. 5 to 8, the second pivot pin (45) is pulled out and the first link arm (23) is pulled out.
When the hydraulic jack (39) is detached from the fixed arm (16), the first link arm (23) can be freely opened and closed with respect to the fixed arm (16), and the degree of opening and closing can be adjusted.

【0044】その結果、固定アーム(16)の取り付け
用ネジ軸(18)と第2リンクアーム(29)の取り付
け用ネジ軸(32)を、上記鉄骨梁(B)のウエブ(3
c)又は固定梁(A1)(A2)のウエブ(1c)へ、
油圧ジャッキ(39)の油圧力やその伸縮作動ストロー
クによる規制なく、円滑に正しく取り付け固定すること
ができるほか、不使用時には矯正用具(T)自身を小型
コンパクトに折りたたむこともできるのである。
As a result, the screw shaft (18) for attaching the fixed arm (16) and the screw shaft (32) for attaching the second link arm (29) are connected to the web (3) of the steel beam (B).
c) or to the web (1c) of the fixed beam (A1) (A2),
The device can be smoothly and correctly mounted without being restricted by the hydraulic pressure of the hydraulic jack (39) or its expansion / contraction operation stroke, and the correction tool (T) itself can be folded into a small and compact shape when not in use.

【0045】尚、逆に上記第1枢支ピン(42)を抜き
取り自在とし、第2枢支ピン(45)を抜き取り不能と
して、その油圧ジャッキ(39)を固定アーム(16)
から取りはずせるように定めても良いことは、勿論であ
る。
Conversely, the first pivot pin (42) can be pulled out freely, the second pivot pin (45) cannot be pulled out, and the hydraulic jack (39) is fixed to the fixed arm (16).
Of course, it may be set so that it can be removed from

【0046】又、上記矯正用具(T)の使用状態を示し
た図11〜20において、(46)は上記油圧ジャッキ
(39)を伸縮作動させるための油圧ポンプであり、適
当な長さの可撓ホース(47)を介して油圧ジャッキ
(39)に連通接続されている。(48)はその油圧ポ
ンプ(46)の開閉バルブ、(49)は同じく手動操作
レバーである。
In FIGS. 11 to 20 showing the use state of the correction tool (T), reference numeral (46) denotes a hydraulic pump for expanding and contracting the hydraulic jack (39). It is connected to a hydraulic jack (39) through a flexible hose (47). (48) is an opening / closing valve of the hydraulic pump (46), and (49) is a manually operated lever.

【0047】そのため、上記油圧ポンプ(46)を図1
1、12、15に示す如く、油圧ジャッキ(39)から
遠く離れた既設鉄骨柱(P)(P)の付属固定梁(A
1)(A2)や既設鉄骨梁、作業足場などの安定な個所
に据え置き、その手動操作レバー(49)を作業者が手
元操作することにより、上記油圧ジャッキ(39)を遠
隔的に作動制御することができる。
Therefore, the hydraulic pump (46) is connected to the hydraulic pump (46) in FIG.
As shown in FIGS. 1, 12, and 15, an attached fixed beam (A) of an existing steel column (P) (P) far from the hydraulic jack (39).
1) The hydraulic jack (39) is remotely operated and controlled by placing it in a stable place such as (A2), an existing steel beam, or a work scaffold, and manually operating a manual operation lever (49) thereof. be able to.

【0048】上記のように構成された矯正用具(T)を
使って、向かい合う一対の既設鉄骨柱(P)(P)から
張り出す両付属固定梁(A1)(A2)の相互間隔
(S)へ、これよりも長大化している鉄骨梁(B)を正
しく接合作業するに当っては、その鉄骨梁(B)をクレ
ーンでの宙吊り状態において、その一端部を何れか一方
の固定梁(A1)へ、残る他端部が横移動し得る仮りの
接合状態に枢着する。
Using the straightening tool (T) configured as described above, the mutual interval (S) between the two attached fixed beams (A1) and (A2) projecting from the pair of existing steel columns (P) (P) facing each other. In order to correctly join the steel beam (B), which is longer than this, the steel beam (B) is suspended in the air with a crane, and one end of the steel beam (B) is attached to one of the fixed beams (A1). ), The remaining other end is pivotally connected to a temporary joint state that can move laterally.

【0049】つまり、図12〜14に示す通り、鉄骨梁
(B)における上下一対の水平なフランジ(3a)(3
b)へ複数づつのボルト(7)(11)と固定ナット
(8)(12)によって、予じめ取り付け固定されてい
る広幅な上部継手プレート(5)と下部継手プレート
(9)との張り出し先端部を、一方の固定梁(A1)に
おける上下一対の水平なフランジ(1a)(1b)へ跨
がる被覆状態に接合させて、その同一垂直線上に対応位
置するボルト(7)(11)の1本づつによって、仮り
止め状態に枢着しておくのである。
That is, as shown in FIGS. 12 to 14, a pair of upper and lower horizontal flanges (3a) (3
b) Overhang of the wide upper joint plate (5) and the lower joint plate (9), which are fixed in advance by a plurality of bolts (7) (11) and fixing nuts (8) (12). The tips are joined in a covering state that straddles a pair of upper and lower horizontal flanges (1a) and (1b) of one fixed beam (A1), and bolts (7) and (11) corresponding to the same vertical line. By one by one, it is pivotally connected to the temporary stop state.

【0050】その場合、上下一対の継手プレート(5)
(9)における何れか一方を、これと対応する固定梁
(A1)の上部フランジ(1a)又は下部フランジ(1
b)へ、1本のボルト(7)(11)によって仮り止め
状態に枢着しても良く、その何れにしても上記ボルト
(7)(11)に対しては、固定ナット(8)(12)
を弛緩状態に螺合させて、そのボルト(7)(11)の
抜け止めを図っておく。
In this case, a pair of upper and lower joint plates (5)
Either of (9) is replaced with the upper flange (1a) or the lower flange (1) of the corresponding fixed beam (A1).
To b), the bolts (7) and (11) may be pivotally connected to the temporary fixing state. In any case, the bolts (7) and (11) are fixed to the fixing nuts (8) and (11). 12)
Is screwed into a relaxed state to prevent the bolts (7) and (11) from coming off.

【0051】そうすれば、上記鉄骨梁(B)の横移動し
得る他端部は、他方の固定梁(A2)と一定量(W)だ
けオーバーラップすることになる結果、それから図15
に示す通り、他方の固定梁(A2)を形作るウエブ(1
c)に開口するボルト貫通孔(2c)へ、先ず矯正用具
(T)における固定アーム(16)の取り付け用ネジ軸
(18)を横方向から差し込み貫通させて、これに固定
ナット(19)を螺合締結することにより、その固定梁
(A2)へ取り付け一体化する。
Then, the other end of the steel beam (B) that can move laterally overlaps the other fixed beam (A2) by a fixed amount (W).
As shown in the figure, the web (1) forming the other fixed beam (A2)
First, a screw shaft (18) for attaching the fixing arm (16) of the correction tool (T) is inserted from the lateral direction into the bolt through hole (2c) opened in c), and the fixing nut (19) is inserted into the screw shaft. By screwing and fastening, it is attached to and integrated with the fixed beam (A2).

【0052】次いで、同じく矯正用具(T)における第
2リンクアーム(29)の取り付け用ネジ軸(32)
を、上記鉄骨梁(B)におけるウエブ(3c)の他端部
に開口するボルト貫通孔(4c)へ、図16、17のよ
うに同じ横方向から差し込み貫通させて、これにやはり
固定ナット(38)を螺合締結することにより、その鉄
骨梁(B)へ取り付け一体化するのである。
Next, a screw shaft (32) for mounting the second link arm (29) in the correction tool (T).
Into the bolt through hole (4c) opened at the other end of the web (3c) in the steel beam (B) from the same lateral direction as shown in FIGS. 38) is screwed and fastened to the steel beam (B) for integration.

【0053】このような他方の固定梁(A2)と鉄骨梁
(B)へ矯正用具(T)を取り付ける際には、その矯正
用具(T)における油圧ジャッキ(39)の一端部を上
記第2枢支ピン(45)の抜き去りによって、一旦第1
リンクアーム(23)から取りはずしておくのであり、
そうすればその第1リンクアーム(23)が先に固定梁
(A2)へ取り付け一体化された固定アーム(16)に
対して、自由自在に開閉し得るため、これに枢支連結さ
れている第2リンクアーム(29)の取り付け用ネジ軸
(32)を、上記鉄骨梁(B)のウエブ(3c)へ何等
の制約もなく、円滑・正確に取り付け固定することがで
きる。
When attaching the correction tool (T) to the other fixed beam (A2) and the steel beam (B), one end of the hydraulic jack (39) in the correction tool (T) is connected to the second jack. By removing the pivot pin (45), the first
Remove it from the link arm (23)
Then, the first link arm (23) can be freely opened and closed freely with respect to the fixed arm (16) which is first attached to the fixed beam (A2), and is pivotally connected thereto. The screw shaft (32) for attaching the second link arm (29) can be smoothly and accurately attached and fixed to the web (3c) of the steel beam (B) without any restrictions.

【0054】そこで、次に上記油圧ジャッキ(39)の
一端部を第1リンクアーム(23)へ取り付けた上、そ
の油圧ジャッキ(39)を油圧ポンプ(46)の手動操
作により伸張作動させて、固定アーム(16)との第1
回動支点ピン(25)を中心とする第1リンクアーム
(23)の円弧運動により、上記鉄骨梁(B)と他方の
固定梁(A2)に図16、20の矢印(Y)で示す強制
的な押し開き力を加えるのである。
Then, one end of the hydraulic jack (39) is attached to the first link arm (23), and the hydraulic jack (39) is extended by manual operation of the hydraulic pump (46). First with fixed arm (16)
Due to the circular motion of the first link arm (23) about the pivot pin (25), the steel beam (B) and the other fixed beam (A2) are forcibly shown by arrows (Y) in FIGS. It applies a typical pushing force.

【0055】やがて図18に示す通り、他方の固定梁
(A2)と鉄骨梁(B)とのオーバーラップ状態が解除
されるや否や、上記第1リンクアーム(23)の継続中
にある円弧運動によって、鉄骨梁(B)には図18、2
0の矢印(X)で示す固定梁(A2)への横向き引き込
み力が作用することとなり、その結果鉄骨梁(B)が図
19のような固定梁(A2)と直列する正確な接合状態
として、自動連続的にすばやく矯正されるのである。
As soon as shown in FIG. 18, as soon as the overlapping state between the other fixed beam (A2) and the steel beam (B) is released, the circular motion during the continuation of the first link arm (23). 18 and 2 in the steel beam (B).
A horizontal pull-in force acts on the fixed beam (A2) indicated by the arrow (X) of 0, and as a result, the steel beam (B) is in an accurate joint state in series with the fixed beam (A2) as shown in FIG. It is automatically and quickly corrected.

【0056】その矯正作業終了後には、上記矯正用具
(T)における固定アーム(16)の取り付け用ネジ軸
(18)と第2リンクアーム(29)の取り付け用ネジ
軸(32)とを、何れも固定ナット(19)(38)の
螺退操作によって、その固定梁(A2)のウエブ(1
c)と鉄骨梁(B)のウエブ(3c)から各々抜き取
り、次回の使用に備える。
After the completion of the straightening operation, the screw shaft (18) for attaching the fixed arm (16) and the screw shaft (32) for attaching the second link arm (29) in the above-mentioned straightening tool (T) are either connected. Also, the web (1) of the fixed beam (A2) is moved by retreating the fixing nuts (19) and (38).
c) and the web (3c) of the steel beam (B), respectively, to prepare for the next use.

【0057】そして、図1〜4の正規な接合状態から明
白なように、鉄骨梁(B)の両端部を既設鉄骨柱(P)
(P)から張り出す両付属固定梁(A1)(A2)の先
端部へ、各々上記継手プレート(5)(9)(13)や
補強プレート(6)(10)を介して、複数づつのボル
ト(7)(11)(14)並びに固定ナット(8)(1
2)(15)により締結一体化すれば良い。
Then, as is apparent from the normal joining state shown in FIGS. 1 to 4, both ends of the steel beam (B) are connected to the existing steel column (P).
A plurality of the fixed beams (A1) and (A2) projecting from (P) are respectively connected to the distal ends of the attached fixed beams (A1) and (A2) via the joint plates (5), (9) and (13) and the reinforcing plates (6) and (10). Bolts (7) (11) (14) and fixing nuts (8) (1)
2) Fastening and integrating may be performed according to (15).

【0058】上記矯正用具(T)を図例との逆な横方向
から取り付ける場合には、これを裏返し反転させること
によって、上記説明と全く同様に使用することができ、
その右勝手用と左勝手用との数種を製作準備する必要が
ない。
When the above-mentioned correction tool (T) is mounted from the side opposite to the direction shown in the figure, it can be used in exactly the same manner as described above by turning it over.
There is no need to prepare several types of right-handed and left-handed ones.

【0059】又、鉄骨梁(B)のウエブ(3c)と固定
梁(A2)のウエブ(1c)に予じめ開口分布する複数
づつのボルト貫通孔(4c)(2c)を活用して、その
選択した1個づつに上記固定アーム(16)の取り付け
用ネジ軸(18)と第2リンクアーム(29)の取り付
け用ネジ軸(32)を着脱自在に、且つ互換的に差し込
み貫通させれば足るので、その取り付け使用上の汎用性
と量産効果に著しく優れる。
Further, a plurality of bolt through-holes (4c) and (2c) having openings distributed in advance on the web (3c) of the steel beam (B) and the web (1c) of the fixed beam (A2) are utilized. The screw shaft (18) for mounting the fixed arm (16) and the screw shaft (32) for mounting the second link arm (29) are detachably and interchangeably inserted into each of the selected ones and penetrated therethrough. Since it is sufficient, it is extremely excellent in versatility and mass production effect in mounting and use.

【0060】つまり、先には固定アーム(16)の取り
付け用ネジ軸(18)を固定梁(A2)へ、第2リンク
アーム(29)の取り付け用ネジ軸(32)を鉄骨梁
(B)へ各々取り付け使用する旨として説示したが、そ
の取り付け順序が変らぬ限り、逆に固定アーム(16)
の取り付け用ネジ軸(18)を鉄骨梁(B)のウエブ
(3c)へ、第2リンクアーム(29)の取り付け用ネ
ジ軸(32)を固定梁(A2)のウエブ(1c)へ各々
取り付け使用することも可能である。
That is, first, the screw shaft (18) for attaching the fixed arm (16) is attached to the fixed beam (A2), and the screw shaft (32) for attaching the second link arm (29) is attached to the steel beam (B). It is described that each of them is to be attached and used. However, as long as the order of attachment is not changed, the fixing arm (16) is reversed.
Attachment screw shaft (18) to the web (3c) of the steel beam (B) and attachment screw shaft (32) of the second link arm (29) to the web (1c) of the fixed beam (A2). It is also possible to use.

【0061】殊更、上記図15〜20と対応する図21
〜25から示唆されるように、鉄骨梁(B)の横移動し
得る他端部にも、その上下一対の水平なフランジ(3
a)(3b)へ複数づつのボルト(7)(11)と固定
ナット(8)(12)によって、広幅な上下一対の継手
プレート(5)(9)と狭幅な一対づつの補強プレート
(6)(6)(10)(10)を、予じめ他方の固定梁
(A2)に向かう張り出し状態に取り付け固定すると共
に、その一対づつ並列する補強プレート(6)(6)
(10)(10)のうち、矯正用具(T)が取り付けら
れる片側横方向に臨む上下一対のみを、1本づつのボル
ト(7)(11)による仮り止め枢支状態として、図2
2の矢印(R1)で示す方向へ回動させることにより、
他方の固定梁(A2)と干渉しない退避状態に準備して
おく。
In particular, FIG. 21 corresponding to FIGS.
25, a pair of upper and lower horizontal flanges (3) are also provided at the other end of the steel beam (B) that can move laterally.
a) (3b) A pair of wide upper and lower joint plates (5) and (9) and a pair of narrow reinforcing plates (5) and (9) by a plurality of bolts (7) (11) and fixing nuts (8) (12). 6) (6) (10) (10) are attached and fixed in advance in a projecting state toward the other fixed beam (A2), and a pair of reinforcing plates (6) (6) are arranged in parallel.
(10) Of the (10), only the upper and lower pair facing the one side laterally to which the correction tool (T) is attached is set as a temporary fixing pivot state by one bolt (7) (11), and FIG.
By rotating in the direction indicated by the arrow 2 (R1),
It is prepared in a retracted state that does not interfere with the other fixed beam (A2).

【0062】そして、図15〜20に基き上記した矯正
方法と同じく、その鉄骨梁(B)と他方の固定梁(A
2)とを矯正用具(T)により強制的に押し開けば、図
22、23から図24を経て図25のように、上記鉄骨
梁(B)が一挙同時に固定梁(A2)と正しく直列する
こととなる横方向へ引き込まれて、その正確に接合され
る結果となる。
Then, the steel beam (B) and the other fixed beam (A) are used in the same manner as described above with reference to FIGS.
2) is forcibly pushed open by the correction tool (T), and as shown in FIG. 25 through FIG. 22, FIG. 23 through FIG. 24, the steel beam (B) is correctly and simultaneously in series with the fixed beam (A2). Different lateral retraction results in its precise joining.

【0063】そのため、先に退避されていた上記補強プ
レート(6)(10)を、図25の矢印(R2)で示す
逆方向へ回動復帰させると共に、その補強プレート
(6)(10)や上記継手プレート(5)(9)を張り
出し先端部において、他方の固定梁(A2)に対応する
上下一対の水平なフランジ(1a)(1b)へ、複数づ
つのボルト(7)(11)と固定ナット(8)(12)
により締結一体化すれば良い。
For this reason, the previously evacuated reinforcing plates (6) and (10) are rotated and returned in the reverse direction indicated by the arrow (R2) in FIG. 25, and the reinforcing plates (6) and (10) and A plurality of bolts (7) (11) are attached to a pair of upper and lower horizontal flanges (1a) (1b) corresponding to the other fixed beam (A2) at the tip end of the joint plates (5) and (9). Fixing nut (8) (12)
It is only necessary to integrate by fastening.

【0064】図21〜25のような矯正方法を採用する
ならば、鉄骨梁(B)に予じめ取り付け固定されている
上下一対の継手プレート(5)(9)が、上記押し開き
過程において固定梁(A2)の水平なフランジ(1a)
(1b)を上下方向から挟むことになるため、その固定
梁(A2)への引き込み作用が言わば真横方向から円滑
に安定良く営なまれることになるほか、矯正作業終了後
における鉄骨梁(B)と固定梁(A2)との取り付け固
定作業も、比較的簡単に能率良く完了できる利点があ
る。
If the straightening method as shown in FIGS. 21 to 25 is adopted, a pair of upper and lower joint plates (5) and (9) which are previously attached and fixed to the steel beam (B) are moved in the above-mentioned push-opening process. Horizontal flange (1a) of fixed beam (A2)
(1b) is sandwiched from above and below, so that the pull-in action to the fixed beam (A2) can be performed smoothly and stably from the so-called lateral direction, and the steel beam (B) after the completion of the correction work. ) And the fixing beam (A2) can be completed relatively easily and efficiently.

【0065】次に、図26〜33は本発明に係る矯正用
具(T)の変形実施形態を示しており、これでは上記固
定アーム(16)と第1、2リンクアーム(23)(2
9)を鋼板などの金属板材から断面チャンネル型やH型
に作成している。
Next, FIGS. 26 to 33 show modified embodiments of the correction tool (T) according to the present invention, in which the fixed arm (16) and the first and second link arms (23) (2) are shown.
9) is made into a channel-shaped or H-shaped cross section from a metal plate material such as a steel plate.

【0066】又、油圧ジャッキ(39)の一端部を固定
アーム(16)から取りはずせるようにするための構成
として、その一端部の軸受ボス(50)を固定アーム
(16)の中途部へ、抜き差し不能な第1枢支ピン(4
2)によって取り付け、その軸受ボス(50)から油圧
ジャッキ(39)の一端部を取りはずすことができるよ
うになっている。油圧ジャッキ(39)の他端部も第1
リンクアーム(23)の中途部へ、抜き差し不能な第2
枢支ピン(45)を介して取り付けられている。
In order to remove one end of the hydraulic jack (39) from the fixed arm (16), a bearing boss (50) at one end of the hydraulic jack (39) is inserted into the fixed arm (16). The first pivot pin (4
2), one end of the hydraulic jack (39) can be removed from the bearing boss (50). The other end of the hydraulic jack (39) is also the first
A second, non-removable second part of the link arm (23)
Attached via a pivot pin (45).

【0067】更に、油圧ジャッキ(39)を作動制御す
る油圧ポンプ(46)は、その油圧ジャッキ(39)と
の連通状態に付属一体化されており、これに適当な長さ
の手動操作レバー(49)を抜き差し自在に差し込み使
用して、上記油圧ジャッキ(39)を伸縮作動させ得る
ようになっている。これによれば、油圧ポンプ(46)
をその油圧ジャッキ(39)と一緒に携帯できる利点が
ある。
Further, a hydraulic pump (46) for controlling the operation of the hydraulic jack (39) is integrally attached to the hydraulic jack (39) in a communicating state with the hydraulic jack (39). The hydraulic jack (39) can be extended and retracted by inserting and removing the hydraulic jack (49). According to this, the hydraulic pump (46)
Has the advantage that it can be carried with the hydraulic jack (39).

【0068】尚、上記変形実施形態におけるその他の構
成と作用は図5〜20の基本実施形態と実質的に同一で
あるため、その構成を示した図26〜31と作用を示し
た図32、33に、図5〜20との対応符号を記入する
にとどめて、その詳細な説明を省略する。
Since the other constructions and operations of the modified embodiment are substantially the same as those of the basic embodiment shown in FIGS. 5 to 20, the constructions are shown in FIGS. In FIG. 33, only the reference numerals corresponding to those in FIGS. 5 to 20 are entered, and the detailed description thereof is omitted.

【0069】[0069]

【発明の効果】以上のような本発明の構成によれば、そ
の矯正用具(T)が固定アーム(16)と第1、2リン
クアーム(23)(29)とから枠組みされた平面視の
全体的なほぼトライアングル形状として、自己完結した
製品に仕上がっており、しかもその固定アーム(16)
の取り付け用ネジ軸(18)と第2リンクアーム(2
9)の取り付け用ネジ軸(32)を、既設鉄骨柱(P)
(P)から張り出す付属固定梁(A1)(A2)と鉄骨
梁(B)へ互換的に、且つ同じ横方向からの着脱自在と
して取り付けるようになっているため、そのままでの即
刻に便利良く使用できるほか、予じめ右勝手用と左勝手
用との数種を製作準備する必要もなく、その裏返し状態
での使用も支障なく行なえるのであり、汎用性と量産効
果に著しく優れる。
According to the configuration of the present invention as described above, the correction tool (T) is a plan view in which the correction tool (T) is framed by the fixed arm (16) and the first and second link arms (23) and (29). As a whole, almost triangular, finished in a self-contained product, and its fixed arm (16)
Mounting screw shaft (18) and the second link arm (2
9) Attach the screw shaft (32) to the existing steel column (P).
It is designed to be attached to the attached fixed beams (A1) and (A2) and the steel beam (B) which are extended from (P) interchangeably and detachably from the same lateral direction. In addition to being usable, there is no need to prepare several types of right-handed and left-handed ones in advance, and they can be used upside down without any problems, and are extremely excellent in versatility and mass production effects.

【0070】特に、上記固定アーム(16)とその一端
部へ枢着された第1リンクアーム(23)との中途部同
志は、伸縮作動可能な油圧ジャッキ(39)を介して枢
支連結されており、しかも固定アーム(16)の他端部
をなす取り付け用ネジ軸(18)が、その固定アーム
(16)から一体的に突設された固定状態にあるに反し
て、上記第1リンクアーム(23)に枢支連結された第
2リンクアーム(29)の取り付け用ネジ軸(32)
は、その第2リンクアーム(29)へ回動自在に枢着さ
れているため、上記固定アーム(16)の取り付け用ネ
ジ軸(18)を先に固定梁(A1)(A2)と鉄骨梁
(B)との何れか一方へ取り付け固定した状態のもと
で、その後第2リンクアーム(29)の取り付け用ネジ
軸(32)を残る他方へ制約なく、且つ円滑・正確に取
り付け使用できる効果がある。
In particular, the fixed arm (16) and the first link arm (23) pivotally connected to one end of the fixed arm (16) are pivotally connected via a hydraulic jack (39) which can be extended and retracted. In addition, the mounting screw shaft (18), which is the other end of the fixed arm (16), is in a fixed state integrally projecting from the fixed arm (16). Screw shaft (32) for mounting the second link arm (29) pivotally connected to the arm (23)
Is pivotally attached to the second link arm (29), so that the screw shaft (18) for mounting the fixed arm (16) is fixed first to the fixed beams (A1) (A2) and the steel beam. (B), the screw shaft (32) for attaching the second link arm (29) can be attached smoothly and accurately to the remaining one without any restriction, in a state where the attachment screw shaft (32) is attached and fixed to one of them. There is.

【0071】又、上記油圧ジャッキ(39)を油圧ポン
プ(46)の手動操作によって伸張作動させれば、上記
固定アーム(16)との第1回動支点ピン(25)を中
心として円弧運動する第1リンクアーム(23)によ
り、鉄骨梁(B)と固定梁(A1)(A2)には押し開
き力が加えられると一挙同時に、その鉄骨梁(B)は固
定梁(A1)(A2)に向かって引き込み横移動される
ことになるため、その言わば1段階での自動連続的に鉄
骨梁(B)を固定梁(A1)(A2)との正確な接合状
態に矯正することができ、その作業性にも著しく優れる
のである。
When the hydraulic jack (39) is extended by the manual operation of the hydraulic pump (46), the hydraulic jack (39) moves in an arc around the first pivot pin (25) with the fixed arm (16). When the pushing force is applied to the steel beam (B) and the fixed beams (A1) (A2) by the first link arm (23), the steel beam (B) is simultaneously fixed to the fixed beams (A1) (A2). In this case, the steel beam (B) can be automatically and continuously corrected in one stage so as to correct the steel beam (B) to a precise joint state with the fixed beams (A1) and (A2). The workability is also remarkably excellent.

【0072】更に、上記油圧ジャッキ(39)の一端部
を固定アーム(16)又は第1リンクアーム(23)か
ら取りはずすこともできるように枢着するならば、その
固定アーム(16)と第1リンクアーム(23)とを自
由自在に開閉操作し得るため、上記固定アーム(16)
の取り付け用ネジ軸(18)と第2リンクアーム(2
9)の取り付け用ネジ軸(32)を、鉄骨梁(B)又は
固定梁(A1)(A2)へ一層制約なく、円滑・確実に
取り付け使用できることとなる。
Further, if one end of the hydraulic jack (39) is pivotally attached so as to be detachable from the fixed arm (16) or the first link arm (23), the fixed arm (16) and the first link arm (23) are connected to each other. The fixed arm (16) can be freely opened and closed with the link arm (23).
Mounting screw shaft (18) and the second link arm (2
9) The mounting screw shaft (32) can be smoothly and reliably mounted on the steel beam (B) or the fixed beams (A1) (A2) without any restrictions.

【0073】又、上記固定アーム(16)から一体的に
突出する取り付け用ネジ軸(18)と、第2リンクアー
ム(29)に枢着された取り付け用ネジ軸(32)との
根元部から、固定梁(A1)(A2)のウエブ(1c)
又は鉄骨梁(B)のウエブ(3c)へ面接触し得る接地
フランジ(20)(34)を一体的に張り出すならば、
その両ネジ軸(18)(32)を何れも安定・確固な取
り付け状態に保つことができる。
The mounting screw shaft (18) integrally protruding from the fixed arm (16) and the mounting screw shaft (32) pivotally mounted on the second link arm (29). , Web (1c) of fixed beams (A1) (A2)
Alternatively, if the ground flanges (20) and (34) that can make surface contact with the web (3c) of the steel beam (B) are integrally extended,
Both of the screw shafts (18) and (32) can be kept in a stable and firmly attached state.

【0074】上記矯正用具(T)を形作る固定アーム
(16)と第1リンクアーム(23)の任意個所に、携
帯用ハンドル(22)やその矯正用具落下防止用索条の
係止環(28)を設置するならば、矯正作業場所への携
帯に便利であるほか、使用上の安全性を昂めることもで
きることになる。
At any place of the fixed arm (16) and the first link arm (23) forming the straightening tool (T), the locking ring (28) of the portable handle (22) and the rope for preventing the straightening tool from dropping. ) Is convenient to carry to the correction work place and can enhance the safety in use.

【図面の簡単な説明】[Brief description of the drawings]

【図1】既設鉄骨柱に対する鉄骨梁の正規な接合状態を
示す全体概略平面図である。
FIG. 1 is an overall schematic plan view showing a normal joint state of a steel beam to an existing steel column.

【図2】図1の全体概略側面図である。FIG. 2 is an overall schematic side view of FIG.

【図3】図2の接合部を抽出拡大して示す側面図であ
る。
FIG. 3 is a side view showing a joint portion of FIG. 2 in an extracted and enlarged manner.

【図4】図3の4−4線断面図である。FIG. 4 is a sectional view taken along line 4-4 of FIG. 3;

【図5】本発明に係る矯正用具の基本実施形態を示す平
面図である。
FIG. 5 is a plan view showing a basic embodiment of a correction tool according to the present invention.

【図6】図5の正面図である。FIG. 6 is a front view of FIG. 5;

【図7】図5の7−7線断面図である。FIG. 7 is a sectional view taken along line 7-7 of FIG. 5;

【図8】図5の8−8線断面図である。FIG. 8 is a sectional view taken along line 8-8 in FIG. 5;

【図9】油圧ジャッキの両端部を取り付けた状態の図5
に対応する平面図である。
FIG. 9 shows a state in which both ends of the hydraulic jack are attached.
FIG.

【図10】図9の10−10線断面図である。FIG. 10 is a sectional view taken along line 10-10 of FIG. 9;

【図11】既設鉄骨柱における両付属固定梁の向かい合
う相互間隔と、これよりも長大な鉄骨梁との関係を示す
図1に対応する全体概略平面図である。
FIG. 11 is an overall schematic plan view corresponding to FIG. 1 and showing the relationship between the opposed mutual spacing of both attached fixed beams and the longer steel beam in the existing steel column.

【図12】両付属固定梁の一方へ鉄骨梁の一端部を仮り
止めした状態の全体概略平面図である。
FIG. 12 is an overall schematic plan view showing a state in which one end of a steel beam is temporarily fixed to one of both attached fixed beams.

【図13】図12の仮り止め部を抽出拡大して示す平面
図である。
FIG. 13 is a plan view showing the temporary fixing portion of FIG. 12 extracted and enlarged.

【図14】図13の14−14線断面図である。FIG. 14 is a sectional view taken along line 14-14 of FIG.

【図15】矯正用具の使用状態を示す斜面図である。FIG. 15 is a perspective view showing a use state of the correction tool.

【図16】両付属固定梁の他方と鉄骨梁の他端部に対す
る矯正用具の取り付け状態を示す平面図である。
FIG. 16 is a plan view showing a state in which a correction tool is attached to the other of the attached fixing beams and the other end of the steel beam.

【図17】図16の17−17線断面図である。FIG. 17 is a sectional view taken along line 17-17 of FIG. 16;

【図18】図16に続く固定梁と鉄骨梁との押し開き作
用過程を示す平面図である。
FIG. 18 is a plan view showing the process of pushing open the fixed beam and the steel beam following FIG. 16;

【図19】図18に続く固定梁と鉄骨梁との正確な接合
状態を示す平面図である。
FIG. 19 is a plan view showing an accurate joint state between the fixed beam and the steel beam beam, following FIG. 18;

【図20】図16から図19への自動連続的な全体作用
を示す平面図である。
FIG. 20 is a plan view showing the automatic continuous whole operation from FIG. 16 to FIG. 19;

【図21】鉄骨梁の他端部へ継手プレートと補強プレー
トを予じめ取り付けた状態の斜面図である。
FIG. 21 is a perspective view of a state in which a joint plate and a reinforcing plate are attached to the other end of the steel beam in advance.

【図22】本発明の別な矯正方法を示す図16に対応す
る平面図である。
FIG. 22 is a plan view corresponding to FIG. 16 showing another correction method of the present invention.

【図23】図22の23−23線断面図である。FIG. 23 is a sectional view taken along line 23-23 of FIG. 22;

【図24】図22に続く押し開き作用過程を示す平面図
である。
FIG. 24 is a plan view showing a push-opening action process following FIG. 22;

【図25】図24に続く正確な接合状態を示す平面図で
ある。
FIG. 25 is a plan view showing an accurate joining state following FIG. 24;

【図26】本発明に係る矯正用具の変形実施形態を示す
平面図である。
FIG. 26 is a plan view showing a modified embodiment of the correction tool according to the present invention.

【図27】図26の正面図である。FIG. 27 is a front view of FIG. 26;

【図28】図26の28−28線に沿う拡大断面図であ
る。
FIG. 28 is an enlarged sectional view taken along line 28-28 of FIG.

【図29】図26の29−29線に沿う拡大断面図であ
る。
FIG. 29 is an enlarged sectional view taken along line 29-29 of FIG.

【図30】油圧ジャッキの両端部を取り付けた状態の図
26に対応する平面図である。
FIG. 30 is a plan view corresponding to FIG. 26 in a state where both ends of the hydraulic jack are attached.

【図31】図30の31−31線に沿う拡大断面図であ
る。
FIG. 31 is an enlarged sectional view taken along line 31-31 of FIG. 30;

【図32】上記変形実施形態の矯正用具を鉄骨梁と固定
梁に取り付けた状態の平面図である。
FIG. 32 is a plan view showing a state where the correction tool of the modified embodiment is attached to a steel beam and a fixed beam.

【図33】図32に続く固定梁と鉄骨梁との正確な接合
状態を示す平面図である。
FIG. 33 is a plan view showing an accurate joint state between the fixed beam and the steel beam beam, following FIG. 32;

【符号の説明】[Explanation of symbols]

(1a)(3a)・上部フランジ (1b)(3b)・下部フランジ (1c)(3c)・ウエブ (2a)(2b)(2c)・ボルト貫通孔 (4a)(4b)(4c)・ボルト貫通孔 (5)・上部継手プレート (9)・下部継手プレート (13)・サイド継手プレート (16)・固定アーム (18)・取り付け用ネジ軸 (19)・固定ナット (20)・接地フランジ (22)・携帯用ハンドル (23)・第1リンクアーム (25)・第1回動支点ピン (28)・係止環 (29)・第2リンクアーム (31)・第2回動支点ピン (32)・取り付け用ネジ軸 (33)・第3回動支点ピン (34)・接地フランジ (35)・支持脚 (38)・固定ナット (39)・油圧ジャッキ (42)・第1枢支ピン (45)・第2枢支ピン (46)・油圧ポンプ (49)・手動操作レバー (50)・軸受ボス (A1)(A2)・固定梁 (B)・鉄骨梁 (L3)・鉄骨梁の長さ (P)(P)・既設鉄骨柱 (S)・両固定梁の向かい合う相互間隔 (T)・矯正用具 (1a) (3a) · Upper flange (1b) (3b) · Lower flange (1c) (3c) · Web (2a) (2b) (2c) · Bolt through hole (4a) (4b) (4c) · Bolt Through-hole (5), Upper joint plate (9), Lower joint plate (13), Side joint plate (16), Fixed arm (18), Screw shaft for mounting (19), Fixed nut (20), Ground flange ( 22) ・ Portable handle (23) ・ First link arm (25) ・ First rotation fulcrum pin (28) ・ Locking ring (29) ・ Second link arm (31) ・ Second rotation fulcrum pin ( 32) · Mounting screw shaft (33) · Third pivot pin (34) · Ground flange (35) · Support leg (38) · Fixed nut (39) · Hydraulic jack (42) · First pivot pin (45) 2nd pivot pin (4 )-Hydraulic pump (49)-Manual operation lever (50)-Bearing boss (A1) (A2)-Fixed beam (B)-Steel beam (L3)-Length of steel beam (P) (P)-Existing steel frame Pillar (S) · Spacing between both fixed beams (T) · Correction tool

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】向かい合う一対の既設鉄骨柱(P)(P)
から一体的に張り出す付属固定梁(A1)(A2)の相
互間へ、これよりも長大化した別個な鉄骨梁(B)を宙
吊りし乍ら、正確な直列状態となるよう接合矯正するに
当り、 その鉄骨梁(B)の一端部を何れか一方の固定梁(A
1)へ、残る他端部が横移動し得る仮りの接合状態に枢
着した上、 固定アーム(16)の一端部へ第1回動支点ピン(2
5)により第1リンクアーム(23)の一端部を枢着す
ると共に、その第1リンクアーム(23)の他端部へ上
記第1回動支点ピン(25)と平行な第2回動支点ピン
(31)により第2リンクアーム(29)の一端部を枢
着して、その第2リンクアーム(29)の他端部が上記
固定アーム(16)の他端部へ接近することとなる平面
視の全体的なほぼトライアングル形状に枠組みし、且つ
上記固定アーム(16)と第1リンクアーム(23)と
の中途部同志を伸縮作動可能な油圧ジャッキ(39)に
より枢支連結して成る矯正用具(T)を使って、 先ずその矯正用具(T)を形作る固定アーム(16)の
他端部を、上記鉄骨梁(B)の他端部と他方の固定梁
(A2)との何れか一方へ横方向から着脱自在に取り付
け固定し、次いでやはり矯正用具(T)を形作る第2リ
ンクアーム(29)の他端部を、残る他方へ同じ横方向
から着脱自在に枢着した状態において、 上記矯正用具(T)の油圧ジャッキ(39)をポンプ操
作により伸張作動させて、上記固定アーム(16)との
第1回動支点ピン(25)を中心とする第1リンクアー
ム(23)の円弧運動により、上記鉄骨梁(B)の他端
部と他方の固定梁(A2)とを強制的に押し開くと一挙
同時に、その鉄骨梁(B)の他端部を他方の固定梁(A
2)と正確に直列することとなる横方向へ引き込むこと
を特徴とする既設鉄骨柱に対する鉄骨梁の接合矯正方
法。
1. A pair of existing steel columns facing each other (P) (P)
While suspending a separate steel beam (B) longer than this from the attached fixed beams (A1) and (A2) integrally extending from One end of the steel beam (B) is fixed to one of the fixed beams (A
1), the other end is pivotally connected to a temporary joint state in which the other end can be moved laterally, and the first rotation fulcrum pin (2) is connected to one end of the fixed arm (16).
5) to pivotally connect one end of the first link arm (23) to the other end of the first link arm (23), and to the other end of the first link arm (23), a second rotation fulcrum parallel to the first rotation fulcrum pin (25). One end of the second link arm (29) is pivotally connected by the pin (31), and the other end of the second link arm (29) approaches the other end of the fixed arm (16). The frame is formed into a generally triangular shape in plan view, and the fixed arm (16) and the first link arm (23) are pivotally connected to each other in the middle part by a hydraulic jack (39) which can be extended and retracted. First, using the correction tool (T), the other end of the fixed arm (16) forming the correction tool (T) is connected to either the other end of the steel beam (B) or the other fixed beam (A2). Attach it to one side so that it can be detached from the side, and fix it. The hydraulic jack (39) of the correction tool (T) is pumped while the other end of the second link arm (29) forming the correction tool (T) is removably pivotally connected to the other side from the same lateral direction. The other end portion of the steel beam (B) is extended by an operation, and the first link arm (23) is circularly moved about the first rotation fulcrum pin (25) with the fixed arm (16). And the other fixed beam (A2) are forcibly pushed open, and at the same time, the other end of the steel beam (B) is connected to the other fixed beam (A2).
(2) A method for correcting the joint of a steel beam to an existing steel column, wherein the steel beam is drawn in a lateral direction so as to be accurately in series with (2).
【請求項2】既設鉄骨柱(P)(P)の付属固定梁(A
1)(A2)と別個な鉄骨梁(B)とを互いに同一のH
型鋼として、その各個の垂直なウエブ(1c)(3c)
に複数づつのボルト貫通孔(2c)(4c)を開口分布
させると共に、 矯正用具(T)を形作る固定アーム(16)の他端部
を、上記ボルト貫通孔(2c)(4c)へ互換的に且つ
抜き差し自在に貫通し得るネジ軸(18)として、その
固定アーム(16)から一体的に突設する一方、 同じく矯正用具(T)を形作る第2リンクアーム(2
9)の他端部を、上記ボルト貫通孔(2c)(4c)へ
やはり互換的に且つ抜き差し自在に貫通し得るネジ軸
(32)として、その第2リンクアーム(29)へ第
1、2回動支点ピン(25)(31)と平行な第3回動
支点ピン(33)により枢着し、 上記固定アーム(16)のネジ軸(18)と第2リンク
アーム(29)のネジ軸(32)を、何れも上記ボルト
貫通孔(2c)(4c)へ横方向から貫通させて、その
各個に締結される固定ナット(19)(38)により、
上記固定梁(A1)(A2)のウエブ(1c)又は鉄骨
梁(B)のウエブ(3c)へ取り付けるように定めたこ
とを特徴とする請求項1記載の既設鉄骨柱に対する鉄骨
梁の接合矯正方法。
2. An attached fixing beam (A) of an existing steel column (P) (P).
1) (A2) and a separate steel beam (B) are connected to the same H
Vertical steel webs (1c) (3c)
A plurality of bolt through holes (2c) and (4c) are open-distributed, and the other end of the fixing arm (16) forming the correction tool (T) is compatible with the bolt through holes (2c) and (4c). And a screw shaft (18) which can be inserted and removed freely and integrally protrudes from its fixed arm (16), while the second link arm (2) also forming a correction tool (T)
The other end of (9) is a screw shaft (32) that can also be inserted through the bolt through-holes (2c) and (4c) in an interchangeable and removable manner. A pivot shaft (18) of the fixed arm (16) and a screw shaft of the second link arm (29) are pivotally mounted by a third pivot shaft pin (33) parallel to the pivot shaft pins (25) and (31). (32) are passed through the bolt through-holes (2c) and (4c) from the lateral direction, and the fixing nuts (19) and (38) fastened to the bolts (2c) and (4c) are used.
2. The straightening of a steel beam to an existing steel column according to claim 1, characterized in that the beam is fixed to the web (1c) of the fixed beam (A1) (A2) or the web (3c) of the steel beam (B). Method.
【請求項3】矯正用具(T)を形作る油圧ジャッキ(3
9)の一端部を、固定アーム(16)の中途部と第1リ
ンクアーム(23)の中途部との何れか一方へ着脱不能
に枢着し、同じく油圧ジャッキ(39)の他端部を残る
他方へ着脱自在に枢着すると共に、 その油圧ジャッキ(39)の作動をこれに接続配線した
手動操作式の油圧ポンプ(46)により、遠隔制御する
ように定めたことを特徴とする請求項1記載の既設鉄骨
柱に対する鉄骨梁の接合矯正方法。
3. A hydraulic jack (3) for forming a correction tool (T).
One end of 9) is non-detachably pivoted to one of the middle part of the fixed arm (16) and the middle part of the first link arm (23), and the other end of the hydraulic jack (39) is also connected. 6. A hydraulic pump according to claim 5, wherein the hydraulic jack is detachably pivotally connected to the remaining one and the operation of the hydraulic jack is remotely controlled by a manually operated hydraulic pump connected to the hydraulic jack. The method for correcting the joint of a steel beam to an existing steel column according to claim 1.
【請求項4】固定アーム(16)の一端部へ第1回動支
点ピン(25)により第1リンクアーム(23)の一端
部を枢着すると共に、その第1リンクアーム(23)の
他端部へ上記第1回動支点ピン(25)と平行な第2回
動支点ピン(31)により第2リンクアーム(29)の
一端部を枢着して、その第2リンクアーム(29)の他
端部が上記固定アーム(16)の他端部へ接近すること
となる平面視の全体的なほぼトライアングル形状に枠組
みし、 その固定アーム(16)の他端部から既設鉄骨柱(P)
(P)の付属固定梁(A1)(A2)又はこれと別個な
鉄骨梁(B)に対する取り付け用ネジ軸(18)を一体
的に突設する一方、 上記第2リンクアーム(29)の他端部にはやはり既設
鉄骨柱(P)(P)の付属固定梁(A1)(A2)又は
これと別個な鉄骨梁(B)に対する取り付け用ネジ軸
(32)を、上記第1、2回動支点ピン(25)(3
1)と平行な第3回動支点ピン(33)により枢着する
と共に、 上記固定アーム(16)と第1リンクアーム(23)と
の中途部同志を伸縮作動可能な油圧ジャッキ(39)に
より枢支連結して、その油圧ジャッキ(39)をこれに
付属一体化させた手動操作式の油圧ポンプ(46)か、
又はこれに適当な長さの可撓ホース(47)を介して接
続配線した手動操作式の油圧ポンプ(46)により、作
動制御し得るように定めたことを特徴とする既設鉄骨柱
に対する鉄骨梁の接合矯正用具。
4. One end of a first link arm (23) is pivotally connected to one end of a fixed arm (16) by a first rotation fulcrum pin (25) and the other end of the first link arm (23). One end of the second link arm (29) is pivotally connected to the end by a second pivot pin (31) parallel to the first pivot pin (25), and the second link arm (29) is pivoted. The other end of the fixed arm (16) approaches the other end of the fixed arm (16), and the frame is formed into an overall substantially triangular shape in plan view. )
The screw shaft (18) for attaching to the attached fixed beam (A1) (A2) of (P) or the steel beam (B) separate therefrom is integrally protruded, while the other of the second link arm (29) is provided. At the end, the screw shaft (32) for attaching to the attached fixed beam (A1) (A2) of the existing steel column (P) (P) or the steel beam (B) separate from the same, the first and second times. Moving fulcrum pin (25) (3
A hydraulic jack (39) that is pivotally mounted by a third rotation fulcrum pin (33) parallel to 1) and is capable of extending and contracting the middle part of the fixed arm (16) and the first link arm (23). A manually operated hydraulic pump (46) with its hydraulic jack (39) attached to and integrated with a pivotal connection,
Alternatively, a steel beam for an existing steel column characterized in that its operation can be controlled by a manually operated hydraulic pump (46) connected and wired through a flexible hose (47) of an appropriate length. Tools for joint correction.
【請求項5】油圧ジャッキ(39)の一端部を固定アー
ム(16)の中途部と第1リンクアーム(23)の中途
部との何れか一方へ、抜き差し不能な第1枢支ピン(4
2)により取り付けると共に、同じく油圧ジャッキ(3
9)の他端部を残る他方へ、抜き差し自在の第2枢支ピ
ン(45)により取り付けて、 その油圧ジャッキ(39)の他端部を取り付けた第2枢
支ピン(45)の抜き取り状態のもとで、固定アーム
(16)の取り付け用ネジ軸(18)と第2リンクアー
ム(29)の取り付け用ネジ軸(32)を、既設鉄骨柱
(P)(P)の付属固定梁(A1)(A2)又はこれと
別個な鉄骨梁(B)へ、各々自由自在に取り付け固定で
きるように定めたことを特徴とする請求項4記載の既設
鉄骨柱に対する鉄骨梁の接合矯正用具。
5. An unremovable first pivot pin (4) for connecting one end of the hydraulic jack (39) to one of the middle part of the fixed arm (16) and the middle part of the first link arm (23).
Attach by 2) and hydraulic jack (3
9) The other end of the hydraulic jack (39) is attached to the other end by a second pivot pin (45) that can be freely inserted and removed, and the second pivot pin (45) to which the other end of the hydraulic jack (39) is attached is removed. Under the condition, the screw shaft (18) for attaching the fixed arm (16) and the screw shaft (32) for attaching the second link arm (29) are attached to the attached fixed beam (P) of the existing steel column (P) (P). The tool for correcting the joint of a steel beam to an existing steel column according to claim 4, characterized in that the tool is fixed to A1) (A2) or a steel beam (B) separate therefrom so that it can be freely attached and fixed.
【請求項6】固定アーム(16)の他端部から一体的に
突出する取り付け用ネジ軸(18)と、第2リンクアー
ム(29)の他端部に枢着した取り付け用ネジ軸(3
2)へ、既設鉄骨柱(P)(P)の付属固定梁(A1)
(A2)又はこれと別個な鉄骨梁(B)に対する固定ナ
ット(19)(38)を各々螺合させると共に、 その各ネジ軸(18)(32)の根元部から上記固定梁
(A1)(A2)又は鉄骨梁(B)へ面接触し得る接地
フランジ(20)(34)を一体的に張り出したことを
特徴とする請求項4記載の既設鉄骨柱に対する鉄骨梁の
接合矯正用具。
6. A mounting screw shaft (18) integrally projecting from the other end of the fixed arm (16), and a mounting screw shaft (3) pivotally attached to the other end of the second link arm (29).
To 2), attached beam (A1) of existing steel column (P) (P)
(A2) or separate fixing nuts (19) and (38) for the steel beam (B) are screwed together, and the fixing beams (A1) ( The tool for correcting the joint of a steel beam to an existing steel column according to claim 4, wherein the grounding flanges (20) and (34) capable of surface-contacting the A2) or the steel beam (B) are integrally extended.
【請求項7】固定アーム(16)と第1リンクアーム
(23)の任意個所に、携帯用のハンドル(22)又は
/及び落下防止用索条の係止環(28)を設けたことを
特徴とする請求項4記載の既設鉄骨柱に対する鉄骨梁の
接合矯正用具。
7. A portable handle (22) and / or a locking ring (28) for a fall-prevention rope are provided at arbitrary positions of the fixed arm (16) and the first link arm (23). The tool for correcting the joint of a steel beam to an existing steel column according to claim 4.
JP20870698A 1998-07-07 1998-07-07 Correction method of joint of steel beam to existing steel column and correction tool therefor Expired - Lifetime JP2918202B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20870698A JP2918202B1 (en) 1998-07-07 1998-07-07 Correction method of joint of steel beam to existing steel column and correction tool therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20870698A JP2918202B1 (en) 1998-07-07 1998-07-07 Correction method of joint of steel beam to existing steel column and correction tool therefor

Publications (2)

Publication Number Publication Date
JP2918202B1 true JP2918202B1 (en) 1999-07-12
JP2000027442A JP2000027442A (en) 2000-01-25

Family

ID=16560740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20870698A Expired - Lifetime JP2918202B1 (en) 1998-07-07 1998-07-07 Correction method of joint of steel beam to existing steel column and correction tool therefor

Country Status (1)

Country Link
JP (1) JP2918202B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6201068B1 (en) * 2017-01-25 2017-09-20 新日鉄住金エンジニアリング株式会社 Buckling restraint brace, load bearing structure, and method of attaching buckling restraint brace
CN113618308A (en) * 2021-08-04 2021-11-09 马鞍山钢铁股份有限公司 Water cooling plate correcting and anti-deformation device and using method thereof
CN115126268A (en) * 2022-07-29 2022-09-30 中国化学工程第六建设有限公司 Cup-rim type foundation steel structure stand column rapid alignment tool and construction method thereof
CN118223512A (en) * 2024-05-27 2024-06-21 山西一建昆仑阳诚建设工程有限公司 Side slope supporting structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5207005B2 (en) * 2011-04-20 2013-06-12 株式会社水野架設 Verticalness adjustment jig and verticality adjustment method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6201068B1 (en) * 2017-01-25 2017-09-20 新日鉄住金エンジニアリング株式会社 Buckling restraint brace, load bearing structure, and method of attaching buckling restraint brace
JP2018119309A (en) * 2017-01-25 2018-08-02 新日鉄住金エンジニアリング株式会社 Buckling restrained brace, load bearing structure, and connection method of buckling restrained brace
CN113618308A (en) * 2021-08-04 2021-11-09 马鞍山钢铁股份有限公司 Water cooling plate correcting and anti-deformation device and using method thereof
CN115126268A (en) * 2022-07-29 2022-09-30 中国化学工程第六建设有限公司 Cup-rim type foundation steel structure stand column rapid alignment tool and construction method thereof
CN118223512A (en) * 2024-05-27 2024-06-21 山西一建昆仑阳诚建设工程有限公司 Side slope supporting structure

Also Published As

Publication number Publication date
JP2000027442A (en) 2000-01-25

Similar Documents

Publication Publication Date Title
US4304078A (en) Adjustable support apparatus
US5918843A (en) Scaffold bracket
JP2918202B1 (en) Correction method of joint of steel beam to existing steel column and correction tool therefor
JP6120119B1 (en) Wall fittings
JP3751708B2 (en) Curing scaffold plate support assembly
JP2019120032A (en) Reinforcement jig
US6669172B1 (en) Post puller
JP3692433B2 (en) PC foundation member position adjustment jig
KR20130142929A (en) The system supporter
JP3500447B2 (en) Retaining panel support structure
KR20140002205U (en) lashing clamp device for upsetting prevention of welding plates
EP0104164A1 (en) Method of and apparatus for straightening a deformed frame element of a vehicle body
JP2023027953A (en) Brace upper part installing metal fitting
JP3964881B2 (en) Scaffolding for starting and ending work on roof joining machines
JP4011436B2 (en) Handrail mounting device and handrail support
CN215544522U (en) Tool for simply straightening reinforcing steel bars
JP6694774B2 (en) Scaffolding for scaffolding
KR102304974B1 (en) Portable multi-tensioning device
JP2003293370A (en) Temporary working platform and its construction method
JP3115524U (en) Scaffold assembly equipment
JPH076480Y2 (en) Step tools
JP4250073B2 (en) Level adjustment jig
JPH1193400A (en) Bracket for slope scaffold
JPH0311298Y2 (en)
JPS5847106Y2 (en) Attachment for assembling reinforcing bars for shovel type excavators

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080423

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090423

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090423

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100423

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100423

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110423

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110423

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120423

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120423

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130423

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130423

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140423

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term