JP2900115B2 - Wiring / pipe floor structure and floor support used for it - Google Patents

Wiring / pipe floor structure and floor support used for it

Info

Publication number
JP2900115B2
JP2900115B2 JP32234293A JP32234293A JP2900115B2 JP 2900115 B2 JP2900115 B2 JP 2900115B2 JP 32234293 A JP32234293 A JP 32234293A JP 32234293 A JP32234293 A JP 32234293A JP 2900115 B2 JP2900115 B2 JP 2900115B2
Authority
JP
Japan
Prior art keywords
floor
wiring
piping
guide path
storage space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP32234293A
Other languages
Japanese (ja)
Other versions
JPH06292318A (en
Inventor
昭八 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mirai Kogyo KK
Original Assignee
Mirai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mirai Kogyo KK filed Critical Mirai Kogyo KK
Priority to JP32234293A priority Critical patent/JP2900115B2/en
Publication of JPH06292318A publication Critical patent/JPH06292318A/en
Application granted granted Critical
Publication of JP2900115B2 publication Critical patent/JP2900115B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • Electric Cable Installation (AREA)
  • Details Of Indoor Wiring (AREA)
  • Installation Of Indoor Wiring (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、コンピュータルーム等
の床下に通信ケーブルや電力ケーブルを配線する場合
や、オフィスビル、マンション、一般家庭等の床下に給
排水湯管やガス管を配管する場合等において、床下にこ
れら配線・配管材の収納空間を形成する配線・配管床構
造物及びこれに使用される床支持材に関する。
The present invention relates to a case where a communication cable or a power cable is laid under a floor of a computer room or the like, or a case where a water supply / drainage hot water pipe or a gas pipe is laid under a floor of an office building, a condominium, a general home, etc. The present invention relates to a wiring / pipe floor structure which forms a storage space for these wiring / pipe materials under the floor, and a floor support used for the same.

【0002】[0002]

【従来の技術】コンピュータールーム等のケーブルが多
数配線される場所においては、端末機等の機器に対する
電源を確保するためにケーブルを床下に収納配線するこ
とが行われている。そのようなケーブルを床下に収納す
る床構造物として従来は、下地床面に多数の支柱を立
て、その支柱に支持されるように床パネルを載置して床
下空間を形成し、該空間内にケーブルを収納する構造の
ものが知られている。
2. Description of the Related Art In places where a large number of cables are wired, such as in a computer room, cables are stored and wired under the floor in order to secure power for devices such as terminals. Conventionally, as a floor structure for storing such cables under the floor, a large number of pillars are erected on an underfloor surface, and a floor panel is placed so as to be supported by the pillars to form an underfloor space. A structure for accommodating a cable is known.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の床構造物にあっては、ケーブルを床下に収納
配線する場合に一旦載置された床パネルをケーブルを配
線する全域にわたって取り除き、ケーブルを収納して、
床パネルを再載置する方法が採られており、その作業が
大変面倒であった。これは、床構造物の施工は内装業者
が行い、ケーブルの配線は電気業者が行い、各々別の施
工業者によって作業が行われるからであり、床構造物の
施工時に同時に配線作業が行われることはなく、配線の
際には、折角組み立てられた床パネルをケーブルを配線
する全域にわたってもう一度取り除くことになるからで
ある。
However, in such a conventional floor structure, when cables are stored and wired under the floor, the floor panel once placed is removed over the entire area where the cables are wired, and the cables are removed. To store
The method of re-installing the floor panel has been adopted, and the work was very troublesome. This is because the construction of the floor structure is performed by the interior contractor, the wiring of the cable is performed by the electric contractor, and the work is performed by different contractors, and the wiring work is performed at the same time when the floor structure is constructed. In other words, when wiring, the assembled floor panel is once again removed over the entire area where the cables are to be wired.

【0004】また、従来の床構造物では、端末機や電話
等の機器を増設する必要が生じたときに、そのためのケ
ーブルを床下に配線するときに、既に設置されている機
器等を動かして床パネルを取り除かなければならない場
合も生じ、作業が面倒で手間を要するという問題があっ
た。
In addition, in the conventional floor structure, when it becomes necessary to add equipment such as terminals and telephones, when laying a cable therefor under the floor, the already installed equipment is moved. In some cases, the floor panel has to be removed, and there is a problem that the operation is troublesome and time-consuming.

【0005】本発明は、このような事情に鑑みなされた
ものであり、その目的とするところは、配線・配管床構
造物の収納空間内に配線・配管材を配線・配管するため
全域にわたって床パネルを取り除く作業に要する手間を
省くことができ、又、新たに配線・配管材を配線・配管
するに際し、機器を移動させることなく床下に配線・配
管材を配線・配管することができ、配線・配管作業の高
能率化を図ることができる配線・配管床構造物及びこれ
に使用される床支持材を提供することにある。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a wiring and piping material for wiring and piping in a storage space of a wiring and piping floor structure. The labor required for panel removal work can be saved, and when wiring and piping materials are newly installed, wiring and piping materials can be wired and piped under the floor without moving equipment.・Wiring / piping floor structures that can improve the efficiency of piping work
The present invention is to provide a floor supporting material used for a vehicle.

【0006】[0006]

【課題を解決するための手段】上記課題を解決するため
の手段として、まず請求項1記載の発明は、「床パネル
と、床下に配線・配管材の収納空間を形成すべく所定の
高さに前記床パネルを支持する床支持材とからなる配線
・配管床構造物であって、 前記床支持材は、前記収納空
間内に配線・配管材を布設するための布設具を案内する
案内路が前記収納空間に連続して臨むよう形成されたこ
とを特徴とする配線・配管床構造物」を、その内容とし
ている。また、請求項2記載の発明は、「床下に配線・
配管材の収納空間を形成すべく所定の高さに床パネルを
支持する床支持材であって、前記収納空間内に配線・配
管材を布設するための布設具を案内する案内路が前記収
納空間に連続して臨むよう形成されたことを特徴とする
床支持材。」を、その内容としている。
Means for Solving the Problems As means for solving the above-mentioned problems, first, the invention according to claim 1 is based on “ floor panel ”.
When the wiring comprising a floor support member to support the floor panel at a predetermined height to form the receiving space of the wiring and piping material under the floor
A pipe floor structure, wherein the floor support guides a laying tool for laying wiring and pipes in the storage space;
The guideway is formed so as to continuously face the storage space.
Wiring and piping floor structure characterized by the above. In addition, the invention according to claim 2 is based on "wiring under the floor.
Place floor panels at a predetermined height to form a storage space for piping materials
A floor support member for supporting and wiring and arranging in the storage space.
The guide path for guiding the laying equipment for laying
It is characterized by being formed so as to face the storage space continuously.
Floor support. Is the content.

【0007】[0007]

【作用】かかる本願発明によれば、案内路に布設具を通
し、布設具に配線・配管材を連結して移動させることに
より、床パネルを取り除くことなく、ケーブル等の配線
・配管材をこれらを収納する床下に形成された収納空間
内に収納することができるようになっている。
According to the present invention, the wiring and piping materials such as cables can be removed without passing through the floor panel by removing the floor panel by moving the wiring and piping material through the guiding device and connecting and moving the wiring and piping material to the mounting device. Can be stored in a storage space formed under the floor for storing the.

【0008】[0008]

【実施例】以下、本発明についての実施例を図面に基づ
いて説明する。図1には第1実施例の床支持材10と床
パネル20とからなる配線・配管床構造物が示されてい
る。この配線・配管床構造物の床支持材10は、長尺に
形成された断面逆T字形状の支持脚101と、その上部
に形成された通路102と、通路102の両側に形成さ
れた床パネル20を支持する受け部103と、受け部1
03下方に形成された中空筒状の案内路104とを有し
ており、支持脚101、通路102、受け部103及び
案内路104は一体に形成されている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a wiring / pipe floor structure including a floor support member 10 and a floor panel 20 according to the first embodiment. The floor support member 10 of the wiring / pipe floor structure includes a long support leg 101 having an inverted T-shaped cross section, a passage 102 formed on the support leg 101, and floors formed on both sides of the passage 102. Receiving portion 103 for supporting panel 20 and receiving portion 1
03, a hollow cylindrical guide path 104 formed below, and the support leg 101, the passage 102, the receiving portion 103, and the guide path 104 are integrally formed.

【0009】支持脚101は床パネル20を所定の高さ
に支持し、床下に配線・配管材の収納空間30を形成す
るように適宜の高さに形成されている。
The support legs 101 support the floor panel 20 at a predetermined height, and are formed at an appropriate height so as to form a storage space 30 for wiring and piping materials under the floor.

【0010】通路102は上方に開口し、その上面は蓋
体105によって被覆されるようになっており、床下の
収納空間30とは別に配線・配管材あるいは暖房用の温
水管等を内部に収納できるようになっている。この通路
102は本発明にあっては無くてもよいが、このような
通路102が形成されていれば、例えば、収納空間30
には強電ケーブルを、通路102には弱電ケーブルをと
言うように、各種配線・配管材を収納空間30と通路1
02と区分けして収納することができ便利である。
The passage 102 is opened upward, and the upper surface thereof is covered with a lid 105. In addition to the storage space 30 under the floor, a wiring / pipe material or a hot water pipe for heating is housed inside. I can do it. This passage 102 may not be present in the present invention, but if such a passage 102 is formed, for example, the storage space 30
, And various wiring and piping materials are stored in the storage space 30 and the passage 1.
02 and can be stored separately.

【0011】受け部103は上方へ突出した突起106
を有し、この突起106が板状の床パネル20の裏面に
形成された嵌合溝201に嵌まり、床パネル20の位置
ずれを防止して床支持材10に床パネル20が確実に組
み付けられるようになっている。
The receiving portion 103 has a projection 106 projecting upward.
The projection 106 fits into a fitting groove 201 formed on the back surface of the plate-shaped floor panel 20 to prevent the floor panel 20 from being displaced and securely assemble the floor panel 20 to the floor support member 10. It is supposed to be.

【0012】案内路104はこの例の場合中空筒状に形
成されており、その一側面である下面には長手方向に連
続するスリット107が形成されている。この案内路1
04には図1に示すような布設具40が挿通され、布設
具40の先端部401に設けられた連結孔403を有す
る板状部402を前記スリット107より外部に突出さ
せ案内路104を往復動できるようになっている。布設
具40の連結孔403には配線・配管材との連結ロープ
が締結されるようになっており、この実施例では、案内
路104を利用して布設具40を案内路104に挿通
し、往復動させることにより、配線・配管材を収納空間
30内に引き込むことができるようになっている。
In this example, the guide path 104 is formed in a hollow cylindrical shape, and a slit 107 that is continuous in the longitudinal direction is formed on one side surface of the lower surface. This guideway 1
A cloth fitting 40 as shown in FIG. 1 is inserted through the hole 104, and a plate-like portion 402 having a connection hole 403 provided at a distal end portion 401 of the cloth fitting 40 projects outward from the slit 107 to reciprocate along the guide path 104. It can move. A connection rope with a wiring / piping material is fastened to the connection hole 403 of the installation tool 40. In this embodiment, the installation tool 40 is inserted into the guide path 104 using the guide path 104, By reciprocating, the wiring / piping material can be drawn into the storage space 30.

【0013】中空筒状の案内路104に挿通される布設
具40は、連結孔403を有する板状部402が設けら
れた比較的硬質の先端部401と、この先端部401に
接続されたロープ404とから成っている。ロープ40
4は、それ自身で押し込むことのできる剛性を有し、
又、配線・配管材を引き込むときにかかるテンションに
耐え得る強度を備えている。このようなロープ404と
しては、例えば鋼線又は複数本の鋼線を編んだもの、あ
るいは合成樹脂を押出成型した棒状のもの、合成樹脂繊
維を堅く撚ったもの、FRPでロープ状に形成したもの
等を適用することができる。
The installation tool 40 inserted into the hollow cylindrical guide path 104 has a relatively hard distal end 401 provided with a plate-like portion 402 having a connection hole 403, and a rope connected to the distal end 401. 404. Rope 40
4 has a rigidity that can be pushed by itself,
Further, it has strength enough to withstand such tension when wiring and piping materials are pulled in. As such a rope 404, for example, a steel wire or a plurality of steel wires knitted, or a rod shape formed by extruding a synthetic resin, a tightly twisted synthetic resin fiber, or a rope formed by FRP Things and the like can be applied.

【0014】上記実施例の案内路104は、その一側面
である上面が受け部103の一部を構成しており、上面
には所定間隔に長孔108が形成されている。この長孔
108には上記布設具40が通り、布設具40を案内路
104に挿通させることができるようになっている。床
支持材10は全体が1〜2mの長さに形成され、直線状
に配置されて床パネル20が載置されるようになってい
る。したがって、案内路104に布設具40を挿通させ
るには床パネル20を取り除いた後、床支持材10をず
らしたり取り外したりして案内路40の端部開口を外部
に臨ませる必要がある。しかしながら、上記のように長
孔108が形成されていれば、床支持材10をずらした
り取り外したりすることなく布設具40を案内路104
に挿通させることができ、又、床支持材10の両側に支
持された床パネル20を両方とも取り除かなくても片側
の床パネル20のみ取り除くことで布設具40を案内路
104に挿通させることができる。このため配線・配管
作業を効率よくすすめることができる。
The guide path 104 of the above embodiment has one side surface, the upper surface of which constitutes a part of the receiving portion 103, and the upper surface is formed with long holes 108 at predetermined intervals. The installation tool 40 passes through the elongated hole 108, and the installation tool 40 can be inserted into the guide path 104. The floor supporting member 10 is formed to have a length of 1 to 2 m as a whole, and is arranged linearly so that the floor panel 20 is placed thereon. Therefore, in order to insert the installation tool 40 into the guide path 104, it is necessary to remove the floor panel 20 and then shift or remove the floor support member 10 so that the end opening of the guide path 40 faces the outside. However, if the long hole 108 is formed as described above, the fabric fixture 40 can be moved to the guide path 104 without shifting or removing the floor support material 10.
Also, by removing only the floor panel 20 on one side without removing both of the floor panels 20 supported on both sides of the floor support member 10, the fabric fixture 40 can be inserted into the guide path 104. it can. For this reason, wiring and piping work can be efficiently advanced.

【0015】図2には第2実施例の床支持材10と床パ
ネル20とからなる配線・配管床構造物が示されてい
る。この配線・配管床構造物の床支持材10は、長尺に
形成された支持脚111と、その上部に形成された通路
112とを有しており、第1実施例と同様の中空筒状の
案内路114を通路112の両側に備えたものである
が、案内路114は着脱自在に形成されている。又、案
内路114は長さ方向に分割され、一つの床支持材10
に対して複数の案内路114が直線状に組み合わされて
床支持部材10全体が形成されるようになっている。そ
して、案内路114が通路112の両側に取り付けられ
た状態で、案内路114の上面が床パネル20を載置す
る受け部113を構成するようになっている。
FIG. 2 shows a wiring / pipe floor structure including a floor support member 10 and a floor panel 20 according to a second embodiment. The floor support member 10 of the wiring / pipe floor structure has a long support leg 111 and a passage 112 formed on the support leg 111, and has the same hollow cylindrical shape as in the first embodiment. Are provided on both sides of the passage 112, but the guide path 114 is formed detachably. Further, the guide path 114 is divided in the length direction, and one floor support 10
The plurality of guide paths 114 are linearly combined to form the entire floor support member 10. Then, with the guide path 114 attached to both sides of the passage 112, the upper surface of the guide path 114 constitutes a receiving portion 113 on which the floor panel 20 is placed.

【0016】案内路114は、その一側面にかぎ状の引
掛部115を有し、通路112の側面に形成された掛止
溝116に引掛部115を掛止させることにより、通路
112の両側に取り付けられるようになっている。案内
路114には図1に示す布設具40と同様の形態の布設
具40が挿通されるようになっている。
The guide path 114 has a hook-shaped hook 115 on one side, and the hook 115 is hooked into a hook groove 116 formed on the side of the passage 112, so that the guide 115 is formed on both sides of the passage 112. It can be attached. The installation tool 40 having the same form as the installation tool 40 shown in FIG. 1 is inserted into the guide path 114.

【0017】上記実施例では、床パネル20を取り除い
た後、案内路114を一つ取り外せば布設具40を案内
路114に挿通させることができ、配線・配管作業を効
率よくすすめることができる。
In the above embodiment, if one guide path 114 is removed after the floor panel 20 is removed, the installation tool 40 can be inserted into the guide path 114, and the wiring and piping work can be efficiently performed.

【0018】なお、上記実施例では、案内路114の上
面が床パネル20を載置する受け部113を構成するよ
うになっているが、通路112の両側に板状の受け部を
別途設けて、これに床パネル20を載置する形態として
も良い。
In the above embodiment, the upper surface of the guide path 114 constitutes the receiving portion 113 on which the floor panel 20 is placed. However, plate-shaped receiving portions are separately provided on both sides of the passage 112. Alternatively, the floor panel 20 may be placed on this.

【0019】図3には第3実施例の床支持材10と床パ
ネル20とからなる配線・配管床構造物が示されてい
る。この配線・配管床構造物の床支持材10は、長尺に
形成された支持脚121と、その上部に形成された通路
122と、通路122の両側に形成された床パネル20
を支持する受け部123と、受け部123下方に形成さ
れたレール状の案内路124とを有している。
FIG. 3 shows a wiring / pipe floor structure including a floor support member 10 and a floor panel 20 according to the third embodiment. The floor supporting material 10 of the wiring / pipe floor structure includes a long supporting leg 121, a passage 122 formed above the supporting leg 121, and floor panels 20 formed on both sides of the passage 122.
, And a rail-shaped guide path 124 formed below the receiving portion 123.

【0020】支持脚121、通路122及び受け部12
3の形態は、図1に示す実施例と同様のものであるので
その説明は省略する。
The support leg 121, the passage 122 and the receiving part 12
The third embodiment is the same as the embodiment shown in FIG. 1 and its explanation is omitted.

【0021】この実施例においては、案内路124は断
面T字形のレール状に形成されており、これに対応する
ように先端部411に断面T字形の係合溝412を備え
た布設具40が係合案内されるようになっている。
In this embodiment, the guide path 124 is formed in the shape of a rail having a T-shaped cross section, and the installation tool 40 provided with an engagement groove 412 having a T-shaped cross section at the tip end 411 is correspondingly provided. The engagement guide is provided.

【0022】布設具40は、先端部411に連結孔41
4を有する板状部413が設けらており、連結孔414
には配線・配管材との連結ロープが締結されるようにな
っている。先端部411には剛性を備えたロープ415
が接続されている。かかる布設具40は、先端部411
の係合溝412を案内路124に係合し、往復動させる
ことにより、配線・配管材を収納空間30内に引き込む
ことができるようになっている。なお、布設具40の形
態としては、図4に示すように、係合溝412が連続し
て形成された可撓性のある棒状体により構成されたもの
であっても良い。
The installation tool 40 has a connecting hole 41 at the tip 411.
4 is provided, and a connection hole 414 is provided.
Is connected to a connecting rope with a wiring / piping material. Rope 415 with rigidity at tip 411
Is connected. The cloth installation tool 40 has a tip portion 411.
The wiring / piping material can be drawn into the storage space 30 by engaging the engaging groove 412 with the guide path 124 and reciprocating. In addition, as shown in FIG. 4, the form of the cloth installation tool 40 may be configured by a flexible rod-shaped body in which the engagement grooves 412 are continuously formed.

【0023】上記実施例において、案内路124に布設
具40を保持させるためには床パネル20を取り除いた
後、床支持材10をずらして案内路40の端部を外部に
臨ませる必要があるが、このような床支持材10の移動
作業を回避するため、図3に示す布設具40にあって
は、例えば、図5に示すようにヒンジ416によって係
合溝412が開閉する構造とし、案内路124の途中か
ら嵌め込み可能な形態としたり、あるいは先端部411
を分割体によって構成し、案内路124に装着後一体に
組み付けるようにしたりしても良い。又、図4に示す布
設具40にあっては、レール状の案内路124の途中に
切欠部を設け、この切欠部より布設具40を挿入し案内
路124に係合溝412を係合させることができるよう
にすることにより、床支持材10の移動作業を回避する
ことができる。
In the above embodiment, in order to hold the installation tool 40 in the guide path 124, it is necessary to remove the floor panel 20 and then shift the floor support member 10 so that the end of the guide path 40 faces the outside. However, in order to avoid such a work of moving the floor support member 10, the installation tool 40 shown in FIG. 3 has, for example, a structure in which an engagement groove 412 is opened and closed by a hinge 416 as shown in FIG. The guideway 124 may be fitted into the guideway 124 from the middle thereof, or the leading end 411 may be inserted.
May be constituted by a divided body, and may be integrally assembled after being mounted on the guide path 124. In the installation tool 40 shown in FIG. 4, a notch is provided in the middle of the rail-shaped guide path 124, and the installation tool 40 is inserted from the notch and the engagement groove 412 is engaged with the guide path 124. By doing so, the operation of moving the floor support 10 can be avoided.

【0024】なお、レール状の案内路124の先端は、
図3に示すように板状に形成されたものに限られず、丸
棒状に形成されたものであってもよい。その場合、布設
具40の係合溝412の形態も円形状に形成される。
The tip of the rail-shaped guide path 124 is
It is not limited to a plate-shaped member as shown in FIG. 3, but may be a round bar-shaped member. In that case, the form of the engagement groove 412 of the cloth installation tool 40 is also formed in a circular shape.

【0025】図6には第4実施例の床支持材10が示さ
れている。この床支持材10は、長尺に形成された支持
脚131と、その上部に形成された通路132と、通路
132の両側に形成された床パネルを支持する受け部1
33とを有しており、受け部133下方に別体のレール
状の案内路134が取り付けられている。
FIG. 6 shows a floor supporting member 10 according to a fourth embodiment. The floor support member 10 includes a long support leg 131, a passage 132 formed on the support leg 131, and a receiving portion 1 for supporting a floor panel formed on both sides of the passage 132.
33, and a separate rail-shaped guide path 134 is attached below the receiving portion 133.

【0026】この実施例における床支持材10は、図2
に示す床支持材10の形態と同様に、案内路134が着
脱自在に形成されたものであり、案内路134はビス1
35によって取り付けられるようになっている。又、案
内路134は長さ方向に分割され、一つの床支持材10
に対して複数の案内路134が直線状に組み合わされて
床支持部材10全体が形成されるようになっている。し
たがって、案内路134を一つ取り外すことにより図3
又は図4に示すものと同様の布設具40を案内路134
に案内させることができるようになっている。
The floor support member 10 in this embodiment is shown in FIG.
As in the form of the floor support member 10 shown in FIG.
35 for mounting. Further, the guide path 134 is divided in the length direction, and one floor support 10
The plurality of guide paths 134 are linearly combined to form the entire floor support member 10. Therefore, by removing one of the guide paths 134, FIG.
Alternatively, a fabric fixture 40 similar to that shown in FIG.
You can be guided to.

【0027】なお、図1、図2、図3及び図6に示す床
支持材10の各実施例について、支持脚101、11
1、121、131は長尺に形成された断面逆T字形状
のものとなっているが、このような支持脚は床パネル2
0を所定の高さに支持し、床下に配線・配管材の収納空
間30を形成するように構成されるものであればよく、
例えば、所定間隔に設けられた多数の支柱によって構成
されるものであってもよい。このような支柱による構造
を採れば、支柱と支柱の間に配線・配管材を通し、収納
空間において自由な配線・配管材の収納が可能となる。
又、支持脚が支柱によって構成される場合、図7に示す
ようにボルト形状の支柱141にナット142を螺合さ
せたりする等して、高さ調節できる構造としてもよい。
In each of the embodiments of the floor supporting member 10 shown in FIGS. 1, 2, 3 and 6, the supporting legs 101, 11
Reference numerals 1, 121, and 131 each have an elongated T-shaped cross section.
0 may be supported at a predetermined height, and may be configured to form a storage space 30 for wiring and piping materials under the floor,
For example, it may be constituted by a number of columns provided at predetermined intervals. By adopting such a structure using columns, wiring and piping materials can be passed between the columns to allow free storage of wiring and piping materials in the storage space.
In the case where the support legs are constituted by columns, the height may be adjusted by, for example, screwing a nut 142 to a bolt-shaped column 141 as shown in FIG.

【0028】又、床支持材10によって支持される床パ
ネル20は、床支持材10の長さに対応した幅を有する
大きさに形成したものであっても、床支持材10の長さ
の半分あるいは1/3の幅を有する大きさ等に形成した
ものであってもよい。又、床パネル20は床支持材10
に支持されるものであれば、その形態は問わない。
The floor panel 20 supported by the floor support member 10 is formed to have a width corresponding to the length of the floor support member 10, even if the floor panel 20 has a length corresponding to the length of the floor support member 10. It may be formed in a size having half or 1/3 width. The floor panel 20 is a floor support 10
Any form can be used as long as it is supported by.

【0029】又、上記実施例においては、案内路10
4、114、124、134が通路102、112、1
22、132をはさんで両側に設けられているが、片側
のみに設けられたものであってもよい。又、案内路10
4、114、124、134が複数並設したものであっ
てもよい。さらに通路102、112、122、132
内にも中空筒状又はレール状の案内路を設けてもよい。
In the above embodiment, the guideway 10
4, 114, 124, 134 are the passages 102, 112, 1
Although they are provided on both sides sandwiching 22, 22, they may be provided only on one side. Guideway 10
A plurality of 4, 114, 124, 134 may be arranged in parallel. Further, passages 102, 112, 122, 132
A hollow cylindrical or rail-shaped guide path may be provided inside.

【0030】次に、第1実施例の床支持材10を例に、
配線・配管材の具体的な配線・配管方法を説明する。ま
ず、図8に示すように、床パネル20を取り除いて収納
空間30を開口させ、案内路104に布設具40を先端
部401より挿入し、ロープ404を押し込みながら、
配線・配管材との連結地点まで送り込む。次に、図9に
示すように、配線・配管材Xの一端と布設具40の連結
孔403とに連結ロープ405を締結することにより布
設具40に配線・配管材Xを連結する。次に、図10に
示すように、ロープ404を引っ張って先端部401を
引き戻すことにより、途中の床パネル20は取り除くこ
となく、収納空間30内に配線・配管材Xを配線・配管
することができる。これにより、図11に示すように、
床下に配線・配管材Xを収納することができる。
Next, taking the floor supporting material 10 of the first embodiment as an example,
The specific wiring and piping method of the wiring and piping materials will be described. First, as shown in FIG. 8, the storage panel 30 is opened by removing the floor panel 20, the cloth fixture 40 is inserted into the guide path 104 from the distal end 401, and while the rope 404 is pushed in,
Send it to the point of connection with wiring and piping materials. Next, as shown in FIG. 9, the connection rope 405 is fastened to one end of the wiring / piping material X and the connection hole 403 of the mounting device 40 to connect the wiring / piping material X to the mounting device 40. Next, as shown in FIG. 10, by pulling the rope 404 and pulling back the tip portion 401, the wiring / piping material X can be laid / piped in the storage space 30 without removing the floor panel 20 in the middle. it can. Thereby, as shown in FIG.
The wiring and piping material X can be stored under the floor.

【0031】なお、別の布設方法として、案内路104
を往復動させた布設具40によって予備ロープ(図示せ
ず)を収納空間10内に通し、この予備ロープに配線・
配管材Xを連結し、予備ロープを引っ張って収納空間1
0内に配線・配管材Xを布設するようにしてもよい。予
備ロープは配線・配管材Xを引き込むのに十分な強度を
備えたものであればよく、材質は問わない。
As another laying method, the guideway 104
The spare rope (not shown) is passed through the storage space 10 by the cloth rig 40 that has reciprocated, and wiring and
Connecting the piping material X, pulling the spare rope and storing space 1
The wiring / piping material X may be laid in 0. The spare rope may have any strength as long as it has sufficient strength to pull in the wiring / piping material X, and the material is not limited.

【0032】また、配線・配管材Xが通信ケーブル等比
較的軽量な場合には、最初から布設具40に配線・配管
材Xを連結した状態で、布設具40を案内路104に送
り込み、収納空間30内に配線・配管材Xを配線・配管
するようにしてもよい。
If the wiring / pipe X is relatively light, such as a communication cable, the wiring / pipe X is connected to the installation / pipe 40 from the beginning, and the laying fixture 40 is fed into the guide path 104 and stored. The wiring / piping material X may be wired / piped in the space 30.

【0033】図12は、床支持材10の通路102内に
温水管X1を配管した暖房床について床下に配線・配管
材X2を収納した例を示している。本発明では、このよ
うな配線・配管床構造物の床支持材10として適用する
ことができる。なお、この配線・配管床構造物では、床
パネル20の中間に開口部211が形成され、温水管X
1から床下に逃げた暖房熱を前記開口部211より床上
に導き、室内を暖めて室内の熱循環をさせるようになっ
ている。
FIG. 12 shows an example in which a wiring / pipe X2 is stored under the floor of a heated floor in which a hot water pipe X1 is piped in the passage 102 of the floor support 10. In the present invention, it can be applied as the floor support member 10 of such a wiring and piping floor structure. In this wiring / pipe floor structure, an opening 211 is formed in the middle of the floor panel 20, and the hot water pipe X
Heating heat escaping from the floor from below 1 is led to the floor from the opening 211 to warm the room and circulate heat inside the room.

【0034】図13及び図14には第5実施例の床支持
材10が示されている。この床支持材10は、通路部材
310と脚部材320とで構成されており、長尺状に形
成された通路部材310は、上方に開口する通路315
を有した本体311と、本体311の通路315の開口
を覆う蓋体312とからなっている。この例では、一つ
の本体311に対して複数の蓋体312によって通路3
15の開口を覆うようになっている。本体311及び蓋
体312の両側には案内路154を形成するための突出
片313、314が設けられており、図14に示すよう
に、通路315の開口を蓋体312で覆ったときに、側
方にスリット155を備えた中空状の案内路154が形
成されるようになっている。突出片314は案内路15
4の蓋部を構成し、蓋体312を取り外したときに案内
路154上部が開口して、布設具40(図15参照)の
挿入可能な挿入口を形成するようになっている。そし
て、蓋体312の突出片(蓋部)314には合成樹脂又
は金属からなる床パネル20が載置されるようになって
いる。
FIGS. 13 and 14 show a floor supporting member 10 according to a fifth embodiment. The floor support member 10 includes a passage member 310 and a leg member 320. The elongated passage member 310 has a passage 315 that opens upward.
And a lid 312 that covers the opening of the passage 315 of the main body 311. In this example, the passage 3 is formed by a plurality of lids 312 for one main body 311.
15 openings are covered. Projecting pieces 313 and 314 for forming a guide path 154 are provided on both sides of the main body 311 and the lid 312. As shown in FIG. 14, when the opening of the passage 315 is covered with the lid 312, A hollow guide path 154 having a slit 155 on the side is formed. The projecting piece 314 is the guideway 15
4, the upper part of the guide path 154 is opened when the lid 312 is removed, so as to form an insertion port through which the cloth fixture 40 (see FIG. 15) can be inserted. The floor panel 20 made of synthetic resin or metal is placed on the protruding piece (cover) 314 of the cover 312.

【0035】蓋体312はアルミニウム又は合成樹脂に
より弾性復元する構造体により作製されており、同様に
アルミニウム又は合成樹脂にて作製された本体311の
通路315の両側に形成された係合突起316に係合し
て抜け止め状態に取り付けられるようになっている。こ
の係合は不用意に蓋体312が外れるのを防止するため
のものであり、蓋体312の突出片(蓋部)314を外
方にわずかに広げるか、あるいは蓋体312を上に少し
強く引き上げれば、蓋体312は容易に外すことができ
るようになっている。なお、蓋体312は単に載置され
るものであっても良く、突出片(蓋部)314が床パネ
ル20の載置面となっている上記実施例に示す床支持材
10にあっては、床パネル20が載置された状態で、蓋
体312が不用意に外れることはない。
The lid 312 is made of a structure that is elastically restored by aluminum or synthetic resin. Similarly, the lid 312 is formed by engaging projections 316 formed on both sides of the passage 315 of the main body 311 made of aluminum or synthetic resin. It is adapted to be engaged and attached in a retaining state. This engagement is for preventing the lid 312 from being accidentally detached. The projecting piece (lid) 314 of the lid 312 is slightly spread outward, or the lid 312 is slightly lifted up. If pulled up strongly, the lid 312 can be easily removed. Note that the lid 312 may be simply placed, and in the case of the floor support member 10 shown in the above embodiment in which the protruding piece (lid portion) 314 is the mounting surface of the floor panel 20. When the floor panel 20 is placed, the lid 312 does not come off accidentally.

【0036】本体311の底壁には適宜箇所に透孔31
7が設けられており、脚部材320に止め付けるビス3
50が挿通されるようになっている。又、本体311の
底壁にはドライバーを挿入するための挿入孔318が設
けられている。
In the bottom wall of the main body 311, a through hole 31
7 is provided, and a screw 3 for fixing to the leg member 320 is provided.
50 is inserted. The bottom wall of the main body 311 is provided with an insertion hole 318 for inserting a driver.

【0037】脚部材320は、床下地面に固定される固
定用ベース321と、この固定用ベース321に両側か
らのビス328により締め付け固定される支持台322
とを備えている。支持台322は、アルミニウム又は合
成樹脂にて作製され、その両側上縁には内方に突出する
嵌合突起325を有しており、この嵌合突起325と通
路部材310の本体311の底部両側に形成された凸部
319とが係合して、支持台322に対して本体311
が抜け止め状態に嵌め込まれるようになっている。支持
台322と通路部材310との間には軟質合成樹脂から
なる緩衝材340が介装されている。この緩衝材340
は、蓋体312の踏みつけ又は床パネル20の踏みつけ
によって通路部材310と支持台322との間で衝突音
等を発生させない効果があり、又、本体311の通路3
15内に温水管が収納された場合の脚部材320への熱
損失を防止する効果がある。
The leg member 320 has a fixing base 321 fixed to the floor base surface, and a support base 322 which is fixed to the fixing base 321 by screws 328 from both sides.
And The support base 322 is made of aluminum or synthetic resin, and has fitting protrusions 325 protruding inward at upper edges of both sides. The fitting protrusions 325 and both sides of the bottom of the main body 311 of the passage member 310 are provided. The main body 311 is engaged with the support base 322 by engaging with the convex portion 319 formed on the main body 311.
Are fitted in the retaining state. A buffer 340 made of a soft synthetic resin is interposed between the support 322 and the passage member 310. This cushioning material 340
Has an effect of not generating a collision sound or the like between the passage member 310 and the support base 322 by stomping on the lid 312 or stomping on the floor panel 20.
There is an effect of preventing heat loss to the leg member 320 when the hot water pipe is stored in the housing 15.

【0038】支持台322の上面にはビス取付孔323
が設けられており、これに位置対応して通路部材310
の本体311の底壁に設けられた透孔317及び緩衝材
340に設けられた透孔341とにビス350が挿通さ
れて、通路部材310と脚部材320とが長手方向にず
れないように止め付けられるようになっている。
A screw mounting hole 323 is provided on the upper surface of the support base 322.
Is provided, and the passage member 310 is
The screw 350 is inserted into the through hole 317 provided in the bottom wall of the main body 311 and the through hole 341 provided in the cushioning material 340 to stop the passage member 310 and the leg member 320 from shifting in the longitudinal direction. It can be attached.

【0039】又、支持台322の中央にはナット330
が装着されており、このナット330には、外周面に雄
ねじを有した調整ボルト331が螺合している。調整ボ
ルト331の先端331bは、固定用ベース321の底
壁に設けられた切欠333を通って床下地面F(図1
4)に当接するようになっている。調整ボルト331の
頭部にはドライバーの先端を挿入させる挿入溝331a
が形成されており、一方、支持台322にはドライバー
を挿入するための挿入孔324が設けられている。した
がって、挿入孔324を通して挿入溝331aにドライ
バーの先端を挿入し、調整ボルト331を回動させてナ
ット330に対する螺合位置を変え、固定用ベース32
1に対する支持台322の高さを変更できるようになっ
ている。この例では、通路部材310の本体311及び
緩衝材340にも挿入孔324に対応した挿入孔31
8、342が設けられており、支持台322に本体31
1を嵌め込んだ状態でも高さ調整ができるようになって
いる。
In the center of the support 322, a nut 330 is provided.
The nut 330 is screwed with an adjustment bolt 331 having an external thread on the outer peripheral surface. The tip 331b of the adjustment bolt 331 passes through a notch 333 provided in the bottom wall of the fixing base 321 and the floor base surface F (FIG. 1).
4). An insertion groove 331a for inserting the tip of the driver into the head of the adjustment bolt 331.
On the other hand, the support 322 is provided with an insertion hole 324 for inserting a driver. Therefore, the tip of the driver is inserted into the insertion groove 331a through the insertion hole 324, and the adjusting bolt 331 is rotated to change the screwing position with respect to the nut 330.
The height of the support 322 with respect to 1 can be changed. In this example, the insertion hole 31 corresponding to the insertion hole 324 is also provided in the main body 311 of the passage member 310 and the cushioning material 340.
8 and 342 are provided.
The height can be adjusted even in a state in which 1 is fitted.

【0040】又、支持台322の下部両側には、挿嵌溝
326が長手方向に沿って形成されており、図14に示
すように、ビス328が螺合するナット332が内部に
挿嵌されている。したがって、支持台322は、挿嵌溝
326内でのナット332の位置を変更することによ
り、固定用ベース321に対する支持台322の位置を
長手方向に位置調整できるようになっている。なお、固
定用ベース321の両側面には上下方向にビス328を
挿通させる挿通溝327が形成されており、支持台32
2が高さ調整されてナット332の位置が上下してもこ
れに対応できるようになっている。
Insertion grooves 326 are formed on both lower sides of the support base 322 along the longitudinal direction. As shown in FIG. 14, a nut 332 into which a screw 328 is screwed is inserted and inserted. ing. Therefore, by changing the position of the nut 332 in the insertion groove 326, the position of the support 322 with respect to the fixing base 321 can be adjusted in the longitudinal direction. In addition, insertion grooves 327 through which screws 328 are inserted in the up and down direction are formed on both side surfaces of the fixing base 321.
2 can be adjusted even if the height of the nut 2 is adjusted and the position of the nut 332 moves up and down.

【0041】固定用ベース321は合成樹脂にて作製さ
れ、コンクリートによる床下地面Fになじみ、又、床パ
ネル20上の歩行により衝突音等が発生しないように工
夫されている。なお、固定用ベース321は金属にて作
製しても良く、この場合は、合成樹脂シート等の緩衝材
を介在させるか、あるいは固定用ベース321を床下地
面Fに固定する際に下面に塗布される接着剤にゴム系あ
るいは柔軟性が付与された接着剤を用いることによって
衝突音等の発生を防止又は緩和することができる。固定
用ベース321は、そのまま床下地面Fに載置される
か、あるいは下面に塗布される接着剤又は床下地面に埋
め込まれるボルトによって固定されるようになってお
り、接着剤が塗布される場合には固定用ベース321の
底壁に設けられた多数の孔329により、余分な接着剤
を逃がすことができ、さらに固定用ベース321の底壁
上面にも接着剤を塗布してやれば、接着剤の硬化によっ
て固定用ベース321をズレないように完全に固定する
ことができる。なお、孔329には、床下地面に埋め込
まれるボルトを挿通させるのに使用しても良い。
The fixing base 321 is made of a synthetic resin, and is designed so as to fit into the floor base surface F made of concrete and to prevent a collision sound or the like from being generated by walking on the floor panel 20. The fixing base 321 may be made of metal. In this case, a cushioning material such as a synthetic resin sheet is interposed, or the fixing base 321 is applied to the lower surface when the fixing base 321 is fixed to the floor base surface F. By using a rubber-based or flexible adhesive, the occurrence of collision noise or the like can be prevented or reduced. The fixing base 321 is placed directly on the floor base surface F, or is fixed by an adhesive applied to the lower surface or a bolt embedded in the floor base surface. The excessive adhesive can be released by a large number of holes 329 provided on the bottom wall of the fixing base 321, and the adhesive is also applied to the upper surface of the bottom wall of the fixing base 321 to cure the adhesive. Thus, the fixing base 321 can be completely fixed without displacement. The holes 329 may be used to pass bolts embedded in the floor base surface.

【0042】かかる床支持材10は、図14に示すよう
に、通路部材310及び脚部材320を構成する各部材
が組み付けられ、床パネル20との組み合わせにより床
下に収納空間30を備えた配線・配管床構造物を形成す
るようになっている。そして、床支持材10の通路31
5には例えば熱交換用の温水管X1を収納し、床下の収
納空間30には通信ケーブルや電力ケーブル等の配線材
X2を収納するようにしたり、あるいは、床支持材10
の通路315には弱電ケーブルX1を収納し、床下の収
納空間30には強電ケーブルX2を収納するようにした
りして、各種配線・配管材Xを収納空間30と通路31
5とに区分けして収納することができるようになってい
る。
As shown in FIG. 14, the floor supporting member 10 is assembled with the members constituting the passage member 310 and the leg member 320, and is provided with the storage space 30 below the floor by combining with the floor panel 20. A piping floor structure is formed. And the passage 31 of the floor support 10
5 accommodates, for example, a hot water pipe X1 for heat exchange, and accommodates a wiring member X2 such as a communication cable or a power cable in a storage space 30 below the floor.
In the passage 315, the weak electric cable X1 is stored, and in the storage space 30 under the floor, the high electric cable X2 is stored.
5 and can be stored.

【0043】図15に示すように、案内路154に挿通
される布設具40は、アングル状に形成された先端部4
21と、これに接続されたロープ422とからなり、先
端部421には連結ロープ424をつなぐ連結孔423
が設けられている。又、ロープ422は、それ自身で押
し込むことのできる剛性を有し、又、配線・配管材Xを
引き込むときにかかるテンションに耐え得る強度を備え
ており、例えば鋼線又は複数本の鋼線を編んだもの、あ
るいは合成樹脂を押出成型した棒状のもの、合成樹脂繊
維を堅く撚ったもの、FRPでロープ状に形成したもの
等が使用されている。そして、この例では、布設具40
の先端部421を案内路154の側方に連続的に形成さ
れるスリット155より外部に突出させた状態で、案内
路154に挿通され、連結孔423を利用して配線・配
管材Xが連結ロープ424で連結されるようになってい
る。
As shown in FIG. 15, the installation tool 40 inserted into the guide path 154 has a tip 4 formed in an angle.
21 and a rope 422 connected thereto, and a connecting hole 423 for connecting a connecting rope 424 is provided at the tip 421.
Is provided. Further, the rope 422 has rigidity that can be pushed by itself, and has strength enough to withstand the tension when the wiring / piping material X is pulled in. For example, a steel wire or a plurality of steel wires is used. A knitted one, a rod-shaped one obtained by extrusion-molding a synthetic resin, a tightly twisted synthetic resin fiber, a rope-shaped one made of FRP, and the like are used. And, in this example, the fabric fixture 40
Is inserted into the guide path 154 in a state in which the tip 421 of the end is protruded outside from a slit 155 formed continuously on the side of the guide path 154, and the wiring / pipe material X is connected using the connection hole 423. They are connected by a rope 424.

【0044】図16には第6実施例の床支持材10が示
されている。この床支持材10は、断面逆T字形状の支
持脚部371と、上方に開口した通路372を有する通
路部373とを一体に形成し、通路372の開口を蓋体
374で覆った簡易な構造で構成されている。通路部3
73及び蓋体374の両側には案内路154を形成する
ための突出片375、376が設けられており、通路3
72の開口を蓋体374で覆ったときに、側方にスリッ
ト155を備えた中空状の案内路154が形成されるよ
うになっている。突出片376は案内路154の蓋部を
構成しており、蓋体374を取り外したときに案内路1
54上部が開口して、布設具40の挿入可能な挿入口を
形成するようになっている。そして、この例では、蓋体
374上に床パネル20が相互に隣接した状態で載置さ
れるようになっている。
FIG. 16 shows a floor supporting member 10 according to a sixth embodiment. The floor support member 10 is formed by integrally forming a support leg portion 371 having an inverted T-shaped cross section and a passage portion 373 having a passage 372 opened upward, and the opening of the passage 372 is covered with a lid 374. It has a structure. Passage 3
Projecting pieces 375 and 376 for forming the guide path 154 are provided on both sides of the cover 73 and the lid 374.
When the opening 72 is covered with the lid 374, a hollow guide path 154 having a slit 155 on the side is formed. The protruding piece 376 forms a lid of the guide path 154, and when the cover 374 is removed, the guide path 1
The upper part 54 is opened to form an insertion opening into which the cloth fixture 40 can be inserted. In this example, the floor panels 20 are placed on the lid 374 so as to be adjacent to each other.

【0045】上記図13及び図16に示す床支持材10
は、案内路154の一部が蓋部を形成して成るものであ
り、蓋部を取り除くことにより案内路の一部が開口状態
となって挿入口が形成され、この挿入口より案内路への
布設具の挿入を容易に行えるようになっている。なお、
蓋部は蓋体312、374の両側に設けられた突出片3
14、376によって一体に構成されているが、これに
限られず、蓋部は蓋体312、374とは別体で構成さ
れるものであっても良い。又、蓋部は案内路154上部
が開口するように形成されるものに限らず、案内路15
4側部が開口するように形成されるものであっても良
い。その場合、案内路154のスリット155は下方に
形成し、図13及び図16に示す蓋部と同様に、スリッ
ト155を分割線として分離するように蓋部を構成する
のが良い。これにより、蓋部の構成が簡単となり、蓋部
を有する案内路154を容易に製造することができる。
The floor support 10 shown in FIGS.
Is formed by forming a lid part of the guide path 154. By removing the lid part, a part of the guide path is opened to form an insertion port, and the insertion port is formed from the insertion port to the guide path. Can be easily inserted. In addition,
The lids are the projections 3 provided on both sides of the lids 312, 374.
14, 376, but are not limited thereto, and the lid may be formed separately from the lids 312, 374. Further, the lid is not limited to the one formed so that the upper part of the guide path 154 is opened,
It may be formed so that four sides are open. In this case, it is preferable that the slit 155 of the guide path 154 is formed below, and the lid is formed so as to separate the slit 155 as a dividing line, similarly to the lid shown in FIGS. 13 and 16. Thereby, the configuration of the lid is simplified, and the guide path 154 having the lid can be easily manufactured.

【0046】又、図13及び図16に示す床支持材10
にあっては、通路315、372を有しているが、この
ような通路315、372の無いものであっても良い。
案内路154は、通路315、372をはさんで両側に
設けられているが、片側のみに設けられたものであって
もよい。又、案内路154は複数並設したものであって
もよい。さらに、一つの本体311又は通路部373に
対して複数の蓋体312、374で覆う場合に限らず、
本体311又は通路部373の長さと同じ長さに蓋体3
12、374が構成されるものであっても良い。
The floor support 10 shown in FIGS.
Has passages 315 and 372, but may not have such passages 315 and 372.
The guide path 154 is provided on both sides with the passages 315 and 372 interposed therebetween, but may be provided on only one side. Further, a plurality of guide paths 154 may be provided side by side. Further, the present invention is not limited to the case where one body 311 or the passage portion 373 is covered with a plurality of lids 312 and 374.
The cover 3 has the same length as the main body 311 or the passage 373.
12, 374 may be configured.

【0047】さて、このような案内路154の一部が蓋
部よって構成される床支持材10についての具体的な配
線・配管方法について、第5実施例の床支持材10を例
に説明すると、まず、図17に示すように、配線・配管
材を布設したい地点間において端部の床パネル及び蓋体
312を取り除いて開口させて案内路154に挿入口を
形成し、布設具40を先端部421より挿入して、ロー
プ422を押し込みながら配線・配管材との連結地点ま
で送り込む。次に、図18に示すように、配線・配管材
Xの一端と布設具40の先端部421とを連結ロープ4
24により連結し、布設具40を引き戻す。これによ
り、図19に示すように、途中の床パネル20及び蓋体
312を取り除くことなく、床下に収納空間30内に配
線・配管材Xを引き込んで布設することができる。
Now, a specific wiring and piping method for the floor support member 10 in which a part of the guide path 154 is formed by a lid will be described with reference to the floor support member 10 of the fifth embodiment as an example. First, as shown in FIG. 17, the floor panel and the lid 312 at the end are removed and the opening is formed by removing the floor panel and the lid 312 between the points at which the wiring and piping materials are to be laid, thereby forming an insertion opening in the guide path 154. It is inserted from the part 421 and sent to the connection point with the wiring and piping material while pushing the rope 422. Next, as shown in FIG. 18, one end of the wiring / pipe material X and the distal end portion 421 of the installation tool 40 are connected to each other by the connecting rope 4.
24 and the fabric fixture 40 is pulled back. As a result, as shown in FIG. 19, the wiring / piping material X can be drawn into the storage space 30 and laid under the floor without removing the floor panel 20 and the lid 312 in the middle.

【0048】なお、別の布設方法として、案内路154
に挿通させる布設具40に予備ロープ(図示せず)を連
結して収納空間10内に予め通しておき、この予備ロー
プに配線・配管材Xを連結し、予備ロープを引っ張って
収納空間10内に配線・配管材Xを布設するようにして
もよい。この予備ロープは配線・配管材Xを引き込むの
に十分な強度を備えたものであればよく、材質は問わな
い。
As another laying method, a guideway 154 is provided.
A spare rope (not shown) is connected to the installation tool 40 to be inserted through the storage space 10 in advance, and the wiring / pipe X is connected to the spare rope, and the spare rope is pulled to pull the spare rope into the storage space 10. The wiring / piping material X may be laid on the floor. This spare rope may have any strength as long as it has sufficient strength to pull in the wiring and piping material X, and the material is not limited.

【0049】また、配線・配管材Xが通信ケーブル等比
較的軽量な場合には、最初から布設具40に配線・配管
材Xを連結した状態で、布設具40を案内路154に送
り込み、収納空間30内に配線・配管材Xを配線・配管
するようにしてもよい。
When the wiring and piping material X is relatively light, such as a communication cable, the wiring and piping material X is connected to the wiring and piping material X from the beginning, and the wiring and fitting material 40 is fed into the guide path 154 and stored. The wiring / piping material X may be wired / piped in the space 30.

【0050】[0050]

【発明の効果】以上説明したように、本発明では、床支
持材の案内路に布設具を通し、布設具に配線・配管材を
連結して引き込むことにより、途中の床パネルを取り除
くことなく、ケーブル等の配線・配管材をこれらを収納
する床下に形成された収納空間内に収納することができ
るので、全域にわたって床パネルを取り除いていた従来
の作業に比べて、作業の高能率化を図ることができる。
又、端末機や電話等の機器を増設する必要が生じた場合
にも、必要な箇所の床パネルのみ取り除けば、ケーブル
等の配線・配管材を配線・配管することができ、既設の
機器等を動かす手間を省くこともでき作業を楽にすすめ
ることができる。
As described above, according to the present invention, the installation tool is passed through the guide path of the floor support material, and the wiring and piping materials are connected to the installation tool and pulled in, so that the floor panel on the way is not removed. The wiring and piping materials, such as cables, can be stored in the storage space formed under the floor where they are stored.This improves the efficiency of the work compared to the conventional work where floor panels have been removed over the entire area. Can be planned.
Also, when it becomes necessary to add equipment such as terminals and telephones, by removing only the floor panels where necessary, wiring and piping materials such as cables can be wired and piped. It is possible to save the trouble of moving the, and to facilitate the work.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の第1実施例に係る配線・配管床構造
を示す斜視図である。
FIG. 1 is a wiring and piping floor structure according to a first embodiment of the present invention.
It is a perspective view showing an object .

【図2】 本発明の第2実施例に係る配線・配管床構造
を示す斜視図である。
FIG. 2 is a wiring and piping floor structure according to a second embodiment of the present invention.
It is a perspective view showing an object .

【図3】 本発明の第3実施例に係る配線・配管床構造
を示す斜視図である。
FIG. 3 is a wiring and piping floor structure according to a third embodiment of the present invention.
It is a perspective view showing an object .

【図4】 第3実施例に係る床支持材の案内路に案内さ
れる布設具の別例を示す斜視図である。
FIG. 4 is a perspective view showing another example of a laying tool guided on a guide path of a floor support according to a third embodiment.

【図5】 図3に示す布設具の別例を示す断面図であ
る。
FIG. 5 is a sectional view showing another example of the installation tool shown in FIG. 3;

【図6】 本発明の第4実施例に係る床支持材を示す斜
視図である。
FIG. 6 is a perspective view showing a floor support according to a fourth embodiment of the present invention.

【図7】 床支持材の支持脚の別例を示す部分断面図で
ある。
FIG. 7 is a partial sectional view showing another example of the support leg of the floor support member.

【図8】 第1実施例に係る床支持材を使用した配線・
配管床構造物についてて配線・配管材を布設する場合の
一工程を示す断面図である。
FIG. 8 shows wiring and wiring using the floor support according to the first embodiment.
It is sectional drawing which shows one process at the time of laying wiring and piping material about a piping floor structure.

【図9】 第1実施例に係る床支持材を使用した配線・
配管床構造物についてて配線・配管材を布設する場合の
一工程を示す断面図である。
FIG. 9 shows wiring and wiring using the floor support according to the first embodiment.
It is sectional drawing which shows one process at the time of laying wiring and piping material about a piping floor structure.

【図10】 第1実施例に係る床支持材を使用した配線
・配管床構造物についてて配線・配管材を布設する場合
の一工程を示す断面図である。
FIG. 10 is a cross-sectional view showing one process in the case of laying wiring and piping materials for the wiring and piping floor structure using the floor support according to the first embodiment.

【図11】 本発明の床支持材を使用した配線・配管床
構造物による配線・配管材の収納状態の一例を示す断面
図である。
FIG. 11 is a cross-sectional view showing an example of a state in which wiring and piping materials are stored in a wiring and piping floor structure using the floor support material of the present invention.

【図12】 本発明の床支持材を使用した配線・配管床
構造物による配線・配管材の収納状態の別例を示す断面
図である。
FIG. 12 is a cross-sectional view showing another example of a state in which wiring and piping materials are stored in a wiring and piping floor structure using the floor support material of the present invention.

【図13】 本発明に係る床支持材の一実施例を示す要
部分解斜視図である。
FIG. 13 is an exploded perspective view of an essential part showing one embodiment of a floor support according to the present invention.

【図14】 図13に示す床支持材の使用状態における
正面図である。
14 is a front view of the floor support shown in FIG. 13 in a used state.

【図15】 図13に示す床支持材に使用される布設具
を示す使用状態における部分斜視図である。
FIG. 15 is a partial perspective view in a use state showing a laying tool used for the floor support material shown in FIG. 13;

【図16】 本発明に係る床支持材の別の実施例を示す
使用状態における正面図である。
FIG. 16 is a front view in a use state showing another embodiment of the floor support according to the present invention.

【図17】 図13に示す床支持材を用いた配線・配管
床構造物について配線・配管材を布設する方法の一工程
を示す概略側面図である。
FIG. 17 is a schematic side view showing one step of a method of laying wiring and piping materials for the wiring and piping floor structure using the floor support material shown in FIG.

【図18】 図13に示す床支持材を用いた配線・配管
床構造物について配線・配管材を布設する方法の一工程
を示す概略側面図である。
18 is a schematic side view showing one step of a method of laying wiring and piping materials for the wiring and piping floor structure using the floor support shown in FIG.

【図19】 図13に示す床支持材を用いた配線・配管
床構造物について配線・配管材を布設する方法の一工程
を示す概略側面図である。
19 is a schematic side view showing one step of a method of laying wiring and piping materials for the wiring and piping floor structure using the floor support material shown in FIG.

【符号の説明】[Explanation of symbols]

10 床支持材 104、114、124、134、154 案内路 20 床パネル 30 収納空間 40 布設具 X 配線・配管材 DESCRIPTION OF SYMBOLS 10 Floor support material 104, 114, 124, 134, 154 Guideway 20 Floor panel 30 Storage space 40 Cloth fixture X Wiring and piping material

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 床パネルと、床下に配線・配管材の収納
空間を形成すべく所定の高さに前記床パネルを支持する
床支持材とからなる配線・配管床構造物であって、 前記床支持材は、 前記収納空間内に配線・配管材を布設
するための布設具を案内する案内路が前記収納空間に連
続して臨むよう形成されたことを特徴とする配線・配管
床構造物
[1 claim: a floor panel, a floor support and wiring and piping floor structure consisting of supporting the floor panels at a predetermined height to form the receiving space of the wiring and piping material under the floor, the The floor support member has a guide path for guiding a laying tool for laying wiring and piping material in the storage space, and the guide path is connected to the storage space.
Wiring and piping characterized by being formed so as to face each other
Floor structure .
【請求項2】 床下に配線・配管材の収納空間を形成す2. A storage space for wiring and piping material is formed under the floor.
べく所定の高さに床パネルを支持する床支持材であっA floor support that supports the floor panel at a predetermined height
て、前記収納空間内に配線・配管材を布設するための布And a cloth for laying wiring and piping material in the storage space.
設具を案内する案内路が前記収納空間に連続して臨むよThe guideway for guiding the fixtures faces the storage space continuously
う形成されたことを特徴とする床支持材。A floor support characterized by being formed.
JP32234293A 1993-02-02 1993-12-21 Wiring / pipe floor structure and floor support used for it Expired - Fee Related JP2900115B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32234293A JP2900115B2 (en) 1993-02-02 1993-12-21 Wiring / pipe floor structure and floor support used for it

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP1559893 1993-02-02
JP5-15598 1993-02-02
JP32234293A JP2900115B2 (en) 1993-02-02 1993-12-21 Wiring / pipe floor structure and floor support used for it

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP8340052A Division JPH09205709A (en) 1993-02-02 1996-12-19 Floor supporting member and laying tool for wiring/ piping floor structure

Publications (2)

Publication Number Publication Date
JPH06292318A JPH06292318A (en) 1994-10-18
JP2900115B2 true JP2900115B2 (en) 1999-06-02

Family

ID=26351780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32234293A Expired - Fee Related JP2900115B2 (en) 1993-02-02 1993-12-21 Wiring / pipe floor structure and floor support used for it

Country Status (1)

Country Link
JP (1) JP2900115B2 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150013260A1 (en) * 2006-12-08 2015-01-15 Valinge Innovation Ab Mechanical locking of floor panels
US10458125B2 (en) 2005-05-20 2019-10-29 Valinge Innovation Ab Mechanical locking system for floor panels
US10519676B2 (en) 2011-07-11 2019-12-31 Ceraloc Innovation Ab Mechanical locking system for floor panels
US10655339B2 (en) 2005-03-30 2020-05-19 Valinge Innovation Ab Mechanical locking system for panels and method of installing same
US10669723B2 (en) 2006-07-11 2020-06-02 Valinge Innovation Ab Mechanical locking of floor panels with a flexible bristle tongue
US10731358B2 (en) 2014-11-27 2020-08-04 Valinge Innovation Ab Mechanical locking system for floor panels
US10968639B2 (en) 2011-08-15 2021-04-06 Ceraloc Innovation Ab Mechanical locking system for floor panels
US10975577B2 (en) 2004-10-22 2021-04-13 Valinge Innovation Ab Mechanical locking of floor panels with a flexible tongue
US11053691B2 (en) 2006-11-15 2021-07-06 Valinge Innovation Ab Mechanical locking of floor panels with vertical folding
US11060302B2 (en) 2019-01-10 2021-07-13 Valinge Innovation Ab Unlocking system for panels
US11066835B2 (en) 2013-06-27 2021-07-20 Valinge Innovation Ab Building panel with a mechanical locking system
US11725394B2 (en) 2006-11-15 2023-08-15 Välinge Innovation AB Mechanical locking of floor panels with vertical folding

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100571293B1 (en) * 1997-02-07 2006-10-11 가부시키가이샤 주켄 산교 installation structure of placing-and-laying flooring materials

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6429565A (en) * 1987-07-25 1989-01-31 Oyo Kikaku Kk Wiring floor foundation
JP2612514B2 (en) * 1991-07-01 1997-05-21 未来工業株式会社 Wiring flooring
JP2733563B2 (en) * 1991-07-01 1998-03-30 未来工業株式会社 Floor wiring method for cables and the like, floor structure for wiring of cables and the like, floor wiring apparatus for cables and the like, and wiring floor material, lid and laying rope used for the wiring floor structure

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10975577B2 (en) 2004-10-22 2021-04-13 Valinge Innovation Ab Mechanical locking of floor panels with a flexible tongue
US11674319B2 (en) 2004-10-22 2023-06-13 Valinge Innovation Ab Mechanical locking of floor panels with a flexible tongue
US11408181B2 (en) 2005-03-30 2022-08-09 Valinge Innovation Ab Mechanical locking system for panels and method of installing same
US10655339B2 (en) 2005-03-30 2020-05-19 Valinge Innovation Ab Mechanical locking system for panels and method of installing same
US10458125B2 (en) 2005-05-20 2019-10-29 Valinge Innovation Ab Mechanical locking system for floor panels
US11053692B2 (en) 2005-05-20 2021-07-06 Valinge Innovation Ab Mechanical locking system for floor panels
US10669723B2 (en) 2006-07-11 2020-06-02 Valinge Innovation Ab Mechanical locking of floor panels with a flexible bristle tongue
US11680415B2 (en) 2006-07-11 2023-06-20 Valinge Innovation Ab Mechanical locking of floor panels with a flexible bristle tongue
US11193283B2 (en) 2006-07-11 2021-12-07 Valinge Innovation Ab Mechanical locking of floor panels with a flexible bristle tongue
US11053691B2 (en) 2006-11-15 2021-07-06 Valinge Innovation Ab Mechanical locking of floor panels with vertical folding
US11725394B2 (en) 2006-11-15 2023-08-15 Välinge Innovation AB Mechanical locking of floor panels with vertical folding
US20150013260A1 (en) * 2006-12-08 2015-01-15 Valinge Innovation Ab Mechanical locking of floor panels
US11131099B2 (en) 2006-12-08 2021-09-28 Valinge Innovation Ab Mechanical locking of floor panels
US10640989B2 (en) * 2006-12-08 2020-05-05 Valinge Innovation Ab Mechanical locking of floor panels
US10995501B2 (en) 2011-07-11 2021-05-04 Ceraloc Innovation Ab Mechanical locking system for floor panels
US10519676B2 (en) 2011-07-11 2019-12-31 Ceraloc Innovation Ab Mechanical locking system for floor panels
US10968639B2 (en) 2011-08-15 2021-04-06 Ceraloc Innovation Ab Mechanical locking system for floor panels
US11746536B2 (en) 2013-06-27 2023-09-05 Valinge Innovation Ab Building panel with a mechanical locking system
US11066835B2 (en) 2013-06-27 2021-07-20 Valinge Innovation Ab Building panel with a mechanical locking system
US10731358B2 (en) 2014-11-27 2020-08-04 Valinge Innovation Ab Mechanical locking system for floor panels
US11261608B2 (en) 2014-11-27 2022-03-01 Valinge Innovation Ab Mechanical locking system for floor panels
US11060302B2 (en) 2019-01-10 2021-07-13 Valinge Innovation Ab Unlocking system for panels
US11781324B2 (en) 2019-01-10 2023-10-10 Välinge Innovation AB Unlocking system for panels

Also Published As

Publication number Publication date
JPH06292318A (en) 1994-10-18

Similar Documents

Publication Publication Date Title
JP2900115B2 (en) Wiring / pipe floor structure and floor support used for it
KR100698470B1 (en) Cable tray for apartment house
US6283247B1 (en) Fabric retainer for acoustic structure and methods of installation
KR100340511B1 (en) The operation apparatus of the boarded ceiling for the building.
JP3725596B2 (en) Pipe fixing jig
JPH09205709A (en) Floor supporting member and laying tool for wiring/ piping floor structure
JP4182525B2 (en) Vertical mesh rack and support member attached to the vertical mesh rack
JP2599676B2 (en) Wiring and piping floor structure
KR200488658Y1 (en) Tray Structure for Fixing Cable
KR101809734B1 (en) Support electric wire for apartment house
KR100715227B1 (en) Messenger wire connection structure using architecture
JP2829566B2 (en) Floor joists with storage space for wiring and piping materials
KR200492627Y1 (en) Duct for wiring and structure equipment combining the same
JP3887793B2 (en) Cable rack
JP4558990B2 (en) Bus duct support device
CN219035773U (en) Steering fixing clamp and wiring assembly
JP4805780B2 (en) Structure consisting of wiring and piping support material and nut body
JP5070181B2 (en) Cable fixture
CN219300079U (en) Steering fixing clamp and wiring assembly
CN219035812U (en) Inner corner fixing clamp and wiring assembly
US20210194230A1 (en) Wire spacing and bracing management system
JP3326485B2 (en) Board material for wiring and piping floor blocks and wiring and piping floors
KR200345877Y1 (en) Junction box for interior wiring
KR200379060Y1 (en) Fixing structure of outlet box
JP2597928B2 (en) Underfloor wiring drawing method and wiring floor material structure

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080319

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090319

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090319

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100319

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100319

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100319

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees