JP2886502B2 - Construction method of transparent ceiling - Google Patents

Construction method of transparent ceiling

Info

Publication number
JP2886502B2
JP2886502B2 JP8188789A JP18878996A JP2886502B2 JP 2886502 B2 JP2886502 B2 JP 2886502B2 JP 8188789 A JP8188789 A JP 8188789A JP 18878996 A JP18878996 A JP 18878996A JP 2886502 B2 JP2886502 B2 JP 2886502B2
Authority
JP
Japan
Prior art keywords
ceiling
plate
length
projecting
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8188789A
Other languages
Japanese (ja)
Other versions
JPH1018503A (en
Inventor
修 丸山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANKAI PURAIUTSUDO KK
Original Assignee
NANKAI PURAIUTSUDO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANKAI PURAIUTSUDO KK filed Critical NANKAI PURAIUTSUDO KK
Priority to JP8188789A priority Critical patent/JP2886502B2/en
Publication of JPH1018503A publication Critical patent/JPH1018503A/en
Application granted granted Critical
Publication of JP2886502B2 publication Critical patent/JP2886502B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、和室天井等に用い
られる目透天井の施工方法に関し、さらに詳述すると、
施工を簡便にするとともに、施工にかかるコストを低減
可能な目透天井の施工方法に関する。
BACKGROUND OF THE INVENTION The present invention relates to a method for constructing a transparent ceiling used for a Japanese-style ceiling and the like.
The present invention relates to a method of constructing a transparent ceiling which can simplify the construction and reduce the cost for the construction.

【0002】[0002]

【従来の技術】従来、和室天井等に用いられる目透天井
用の天井板として、実開平6−35436号に示すもの
が知られている。図4に示すように、この目透天井用の
天井板72は、下面に化粧加工が施された長方形状の天
井板本体74と、外側面中間部に長さ方向に沿って挿入
溝76を形成した角柱状の縦桟78と、外側面中間部に
長さ方向に沿って挿入溝80を形成した角柱状縦桟82
とを備え、挿入溝80に長尺の目地板84を予め嵌め込
んで固定するとともに、両縦桟78、82の下面を天井
板本体74の上面幅方向両端部にそれぞれ固定し、かつ
両縦桟78、82間に横桟を配設したものである。前記
天井板72では、縦桟78における挿入溝76の上部突
出部が下部突出部より長く形成されるとともに、縦桟8
2における挿入溝80の上部及び下部突出部が同じ長さ
に形成されている。
2. Description of the Related Art Conventionally, as a ceiling plate for a transparent ceiling used for a ceiling of a Japanese-style room or the like, the one shown in Japanese Utility Model Laid-Open No. 6-35436 is known. As shown in FIG. 4, the ceiling plate 72 for a transparent ceiling has a rectangular ceiling plate body 74 having a lower surface subjected to decorative processing, and an insertion groove 76 in a middle portion of the outer surface along the length direction. A prismatic vertical bar 78 formed and a prismatic vertical bar 82 having an insertion groove 80 formed in the middle part of the outer surface along the length direction.
A long joint plate 84 is fitted in the insertion groove 80 in advance and fixed, and the lower surfaces of the vertical bars 78 and 82 are fixed to both ends in the width direction of the upper surface of the ceiling plate main body 74, respectively. A cross bar is provided between the cross bars 78 and 82. In the ceiling plate 72, the upper protruding portion of the insertion groove 76 in the vertical bar 78 is formed to be longer than the lower protruding portion.
The upper and lower protruding portions of the insertion groove 80 in 2 are formed to have the same length.

【0003】このような天井板72を用いた目透天井の
施工は、次の手順で行われる。すなわち、張り始めの天
井板72aを天井施工下地面86に対して位置決めした
後、縦桟78における挿入溝76の上部突出部に下面か
ら釘材88を打ち込み、その後、次の天井板72bを、
その挿入溝80に係合固定した目地板84を天井板72
aの挿入溝76に嵌め込みながら天井施工下地面86に
対して位置決めする。この状態で、天井板72bの縦桟
78における挿入溝76の上部突出部に下面から釘材8
8を打ち込み、該天井板72bを天井施工下地面86に
固定する。そして、同様の作業を続けることにより、隣
接する挿入溝76、80それぞれの下部突出部同士の間
に隙間(目地部)を形成した目透天井が施工される。
[0003] Construction of a transparent ceiling using such a ceiling plate 72 is performed in the following procedure. That is, after positioning the ceiling plate 72a at the beginning of tensioning with respect to the ceiling construction base surface 86, the nail member 88 is driven into the upper protruding portion of the insertion groove 76 of the vertical rail 78 from below, and then the next ceiling plate 72b is
The joint plate 84 engaged with the insertion groove 80 is fixed to the ceiling plate 72.
a while being fitted in the insertion groove 76 of FIG. In this state, the nail member 8 is inserted from the lower surface into the upper protruding portion of the insertion groove 76 in the vertical rail 78 of the ceiling plate 72b.
Then, the ceiling plate 72b is fixed to the ceiling construction base surface 86. Then, by continuing the same operation, a see-through ceiling in which a gap (joint portion) is formed between the lower projecting portions of the adjacent insertion grooves 76 and 80 is constructed.

【0004】[0004]

【発明が解決しようとする課題】このような従来の天井
板では、目透天井を比較的容易に施工できるものの、天
井板72に目地板84を予め組み付けておく作業が必要
であるとともに、目地板84を挿入溝80に対して固定
するための多量の接着剤等が必要である。このため、天
井板の単価が高くなって施工にかかるコストが増大して
しまう。
In such a conventional ceiling panel, a transparent ceiling can be constructed relatively easily, but it is necessary to assemble a joint panel 84 to the ceiling panel 72 in advance, and it is also necessary to install the joint panel 84 in advance. A large amount of adhesive or the like for fixing the base plate 84 to the insertion groove 80 is required. For this reason, the unit price of the ceiling plate increases, and the cost for construction increases.

【0005】本発明は、上記事情に鑑みてなされたもの
で、施工を簡便化するとともに、施工にかかるコストを
低減可能な目透天井の施工方法を提供することを目的と
する。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a method of constructing a transparent ceiling which can simplify the construction and reduce the cost for the construction.

【0006】[0006]

【課題を解決するための手段】本発明は、上記目的を達
成するため、天井板本体と、角柱状主部の外側面上下方
向中間部に長さ方向に沿って第1係合溝を形成した一方
の縦桟と、角柱状主部の外側面上下方向中間部に長さ方
向に沿って第2係合溝を形成した他方の縦桟とを備え、
一方の縦桟における第1係合溝上部の第1突出部の該係
合溝底部からの突出長を該係合溝下部の第2突出部の同
突出長よりも長く、他方の縦桟における第2係合溝上部
の第3突出部の該係合溝底部からの突出長を該係合溝下
部の第4突出部の同突出長より短く形成し、かつ第1突
出部と第3突出部それぞれの前記突出長を合わせた長さ
を第2突出部と第4突出部それぞれの前記突出長を合わ
せた長さより長くした天井板と、前記天井板の第1突出
部の第1係合溝底部からの突出長及び第3突出部の第2
係合溝底部からの突出長を合わせた長さとほぼ等しい幅
寸法を有する目地板とを用い、天井施工下地面に対して
天井板本体を位置決めし、その第1係合溝に目地板を係
合させた状態で、該目地板の前記第1突出部の外端部に
対応する部分の下面から、第1突出部の外端部及び天井
施工下地面に対して釘材を打ち込んだ後、次の天井板に
おける第2係合溝を前記目地板に係合させて位置決め
し、目地板に打ち込まれた前記釘材を、前記次の天井板
の第4突出部で覆うことを特徴とする目透天井の施工方
法を提供する。
According to the present invention, in order to achieve the above object, a first engaging groove is formed along a longitudinal direction in a ceiling plate main body and a vertically intermediate portion on an outer surface of a prismatic main portion. One vertical rail, and the other vertical rail in which a second engagement groove is formed along the length direction in the middle part of the outer surface of the prismatic main part in the vertical direction,
The projecting length of the first projecting portion above the first engaging groove from the bottom of the engaging groove in one of the longitudinal beams is longer than the projecting length of the second projecting portion below the engaging groove in the other longitudinal beam. The projecting length of the third projecting portion above the second engaging groove from the bottom of the engaging groove is formed shorter than the projecting length of the fourth projecting portion below the engaging groove, and the first projecting portion and the third projecting portion are formed. A ceiling plate having a length obtained by combining the projection lengths of the respective portions longer than a length obtained by combining the projection lengths of the second projection portion and the fourth projection portion, and a first engagement of the first projection portion of the ceiling plate. Projection length from groove bottom and second of third projection
Using a joint plate having a width dimension substantially equal to the length of the projecting length from the bottom of the engagement groove, positioning the ceiling plate main body with respect to the ceiling construction base surface, and engaging the joint plate with the first engagement groove. In the joined state, after nailing the outer joint of the first protrusion from the lower surface of a portion corresponding to the outer end of the first protrusion of the joint plate with the nail material, The second engaging groove in the next ceiling plate is positioned by engaging with the joint plate, and the nail material driven into the joint plate is covered with the fourth protrusion of the next ceiling plate. Provide a method of installing a transparent ceiling.

【0007】本発明の目透天井の施工方法では、天井施
工下地面に対して先に位置決めした天井板の第1係合溝
に目地板を係合させて、該目地板の前記第1突出部の外
端部に対応する部分の下面から、第1突出部の外端部及
び天井施工下地面に対して釘材を打ち込むことにより、
係合溝上部の第1突出部の外端部を目地板と共に同じ釘
材で固定した後、第1係合溝から突出した目地板に次の
天井板の第2係合溝を係合させて、該係合溝下部の第4
突出部により、目地板の下面に露呈する釘材の頭部を覆
い隠すことができる。したがって、本発明の施工方法に
よれば、簡便な作業で目透天井を施工でき、さらに、天
井板を天井施工下地面に固定する釘材で目地板も同時に
固定できるので、目地板の固定に接着剤等が要らず、施
工にかかるコストの低減化が図られる。
In the method for installing a transparent ceiling according to the present invention, the joint plate is engaged with the first engagement groove of the ceiling plate previously positioned with respect to the ceiling construction base surface, and the first projection of the joint plate is formed. By driving a nail material from the lower surface of the portion corresponding to the outer end of the portion to the outer end of the first protrusion and the ceiling construction base surface,
After fixing the outer end of the first projecting portion above the engaging groove together with the joint plate with the same nail material, the second engaging groove of the next ceiling plate is engaged with the joint plate projecting from the first engaging groove. The fourth of the lower part of the engagement groove
The protruding portion can cover the head of the nail material exposed on the lower surface of the joint plate. Therefore, according to the construction method of the present invention, the transparent ceiling can be constructed by a simple operation, and furthermore, the joint plate can be simultaneously fixed with the nail material for fixing the ceiling plate to the ceiling construction base surface, so that the joint plate can be fixed. Adhesives and the like are not required, and the cost for construction can be reduced.

【0008】[0008]

【発明の実施の形態】次に、実施形態例により本発明を
具体的に示すが、本発明は下記実施形態例に限定される
ものではない。図1は本発明の実施に用いる天井板を単
体で示す側面断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the present invention will be specifically described with reference to embodiments, but the present invention is not limited to the following embodiments. FIG. 1 is a side sectional view showing a ceiling plate used alone for implementing the present invention.

【0009】図1に示すように、天井板2は、下面に化
粧加工が施された長方形状の天井板本体4と、角柱状主
部の外側面上下方向中間部に長さ方向に沿って第1係合
溝6を形成した縦桟8と、角柱状主部の外側面上下方向
中間部に長さ方向に沿って第2係合溝10を形成した縦
桟12とを備え、両縦桟8、10の下面を天井板本体4
の上面幅方向両端部にそれぞれ固定し、かつ両縦桟8、
12間に図示しない横桟を配設したものである。第1、
第2係合溝6、10はそれぞれ、長尺の目地板14を係
合可能な上下方向幅を有している。
As shown in FIG. 1, a ceiling plate 2 has a rectangular ceiling plate main body 4 having a decorative surface formed on a lower surface, and a longitudinally extending middle portion in the vertical direction on the outer surface of a prismatic main portion. A vertical bar 8 having a first engaging groove 6 formed therein and a vertical bar 12 having a second engaging groove 10 formed along a length direction in a vertically intermediate portion of an outer side surface of a prismatic main portion. The underside of the crosspieces 8 and 10 is
Are fixed at both ends in the width direction of the upper surface of the
A horizontal rail (not shown) is provided between the twelve. First,
Each of the second engagement grooves 6 and 10 has a vertical width in which the long joint plate 14 can be engaged.

【0010】また、第1係合溝6上部の第1突出部16
の該係合溝6底部からの突出長aが、該係合溝6下部の
第2突出部18の同突出長bよりも長く形成されてお
り、第2係合溝10上部の第3突出部20の該係合溝1
0底部からの突出長cが、該係合溝10下部の第4突出
部22の同突出長dより短く形成されている。さらに、
第1突出部16と第3突出部20それぞれの突出長を合
わせた長さ(a+c)が、第2突出部18と第4突出部
22それぞれの突出長を合わせた長さ(b+d)より長
くされており、隣接する天井板2同士の第1係合溝6及
び10に目地板14を係合させたとき、一方の天井板2
a(図2参照)における第1突出部16と目地板14が
重なった部分に、他方の天井板2b(図2参照)におけ
る第4突出部22が重なるように構成されている。ま
た、目地板14は、第1突出部16の第1係合溝6底部
からの突出長a及び第3突出部20の第2係合溝10底
部からの突出長cを合わせた長さとほぼ等しい幅寸法e
を有している。
Further, the first protrusion 16 above the first engagement groove 6 is formed.
Is formed to be longer than the protruding length b of the second protruding portion 18 below the engaging groove 6, and the third protruding length above the second engaging groove 10. The engagement groove 1 of the portion 20
The projecting length c from the bottom of the engagement groove 10 is shorter than the projecting length d of the fourth projecting portion 22 below the engaging groove 10. further,
The total length (a + c) of the first protrusions 16 and the third protrusions 20 is longer than the total length (b + d) of the second protrusions 18 and the fourth protrusions 22. When the joint plate 14 is engaged with the first engagement grooves 6 and 10 of the adjacent ceiling plates 2, one of the ceiling plates 2
The fourth projection 22 of the other ceiling plate 2b (see FIG. 2) is configured to overlap the portion where the first projection 16 and the joint plate 14 overlap in FIG. In addition, the joint plate 14 has a length substantially equal to the sum of the length a of the first protrusion 16 protruding from the bottom of the first engagement groove 6 and the length c of the third protrusion 20 protruding from the bottom of the second engagement groove 10. Equal width dimension e
have.

【0011】したがって、図2において、位置決めした
天井板2aの第1係合溝6に係合させた目地板14の、
第1突出部16の外端部に対応する部分の下面に釘材8
8をほぼ垂直に打ち込んで天井施工下地面86に固定し
た後、目地板14の外端側に、次の天井板2bの第2係
合溝10を係合させることにより、目地板14の下面に
露呈した釘材88の頭部を覆い隠すことができる。
Therefore, in FIG. 2, the joint plate 14 engaged with the first engaging groove 6 of the positioned ceiling plate 2a is
The nail material 8 is provided on the lower surface of the portion corresponding to the outer end of the first protrusion 16.
8 is fixed to the ceiling construction base surface 86 by being driven almost vertically, and the second engagement groove 10 of the next ceiling plate 2b is engaged with the outer end side of the joint plate 14 so that the lower surface of the joint plate 14 The head of the nail 88 exposed to the user can be covered.

【0012】このような構成の天井板2を用いて目透天
井を施工する場合は、次のように作業を行う。すなわ
ち、図2と図3に示すように、天井施工下地面86の一
隅に張り始めの天井板2aを位置決めしておき、該天井
板2aの第1係合溝6に目地板14を嵌め込んで、目地
板14の外端部を第1突出部16より外方にやや突出さ
せる。その後、目地板14の第1突出部16の外端部に
対応する部分の下面に釘材88をほぼ垂直に打ち込ん
で、目地板14を天井板2aと共に天井施工下地面86
に固定する。これにより、天井板2aが、天井施工下地
面86に対して完全に取り付けられる。
In the case of constructing a transparent ceiling using the ceiling plate 2 having such a structure, the following operation is performed. That is, as shown in FIGS. 2 and 3, the ceiling plate 2 a which is being stretched is positioned at one corner of the ceiling construction base surface 86, and the joint plate 14 is fitted into the first engagement groove 6 of the ceiling plate 2 a. Then, the outer end of the joint plate 14 is slightly protruded outward from the first protrusion 16. Thereafter, a nail material 88 is driven almost vertically into the lower surface of the joint plate 14 at a portion corresponding to the outer end of the first projecting portion 16, and the joint plate 14 and the ceiling plate 2 a are subjected to ceiling construction base surface 86.
Fixed to. Thereby, the ceiling plate 2a is completely attached to the ceiling construction base surface 86.

【0013】その後、次なる天井板2bを、先の天井板
2aと共に固定した目地板14にその第2係合溝10を
係合させながら接合し、位置決めする。この状態で、前
回と同様に、天井板2bの第1係合溝6に目地板14を
嵌め込み、目地板14の第1突出部16の外端部に対応
する部分の下面に釘材88を打ち込んで、第1突出部1
6を目地板14と共に天井施工下地面86に固定する。
これにより、天井板2bが、縦桟12側を天井板2aの
縦桟8側に接合した状態で天井施工下地面86に取り付
けられる。さらに、同様の作業を続けて、天井施工下地
面86に複数枚の天井板2a、2b、2c…を横一列状
に取り付ける。
Thereafter, the next ceiling plate 2b is joined to the joint plate 14 fixed together with the previous ceiling plate 2a while engaging the second engagement groove 10, and positioned. In this state, the joint plate 14 is fitted into the first engagement groove 6 of the ceiling plate 2b as before, and the nail material 88 is attached to the lower surface of the joint plate 14 at the portion corresponding to the outer end of the first projection 16. Drive into the first protrusion 1
6 is fixed to the ceiling construction base surface 86 together with the joint plate 14.
Thereby, the ceiling board 2b is attached to the ceiling construction base surface 86 in a state where the vertical rail 12 side is joined to the vertical rail 8 side of the ceiling panel 2a. Further, the same operation is continued, and a plurality of ceiling boards 2a, 2b, 2c,...

【0014】このような作業で天井施工下地面86に取
り付けられた複数の天井板2a、2b、2c…による天
井は、隣接する天井板同士の第1突出部16及び第3突
出部20を合わせた寸法と、第2突出部18及び第4突
出部22を合わせた寸法との違いによって、第2及び第
4突出部18、22の間に所定幅の隙間が形成され、こ
の隙間が目地溝24を形成する。このように、複数の天
井板2a、2b、2c…により、目地溝24を備えしか
も該目地溝24から釘材88の頭部が露呈しない見栄え
の良い目透天井を、簡単に施工することができる。この
ように、本発明に係る天井板2によれば、簡便な作業で
目透天井を施工できるとともに、天井板2を天井施工下
地面86に固定する釘材88で目地板14も同時に固定
できるので、目地板14の固定に接着剤等が要らず、施
工にかかるコストの低減化を図ることが可能となる。
The ceiling formed by the plurality of ceiling plates 2a, 2b, 2c,... Attached to the ceiling construction base surface 86 by such a work is the same as the first projection portion 16 and the third projection portion 20 of adjacent ceiling plates. A gap having a predetermined width is formed between the second and fourth projecting portions 18 and 22 due to a difference between the dimension of the second projecting portion 18 and the dimension of the fourth projecting portion 22. 24 are formed. In this manner, the plurality of ceiling plates 2a, 2b, 2c,... Makes it possible to easily construct a good-looking transparent ceiling that has the joint groove 24 and does not expose the head of the nail material 88 from the joint groove 24. it can. As described above, according to the ceiling plate 2 according to the present invention, the transparent ceiling can be constructed by a simple operation, and the joint plate 14 can be fixed at the same time with the nail material 88 for fixing the ceiling plate 2 to the ceiling construction base surface 86. Therefore, an adhesive or the like is not required for fixing the joint plate 14, and it is possible to reduce the cost for construction.

【0015】[0015]

【発明の効果】以上のように本発明によれば、簡便な作
業で目透天井を施工でき、しかも天井板を天井施工下地
面に固定する釘材で目地板も同時に固定できるので、目
地板の固定に接着剤等が要らず、施工にかかるコストの
低減化を図ることが可能となる。
As described above, according to the present invention, a transparent ceiling can be constructed by a simple operation, and a joint panel can be fixed at the same time with a nail material for fixing the ceiling panel to a ceiling construction base surface. An adhesive or the like is not required for fixing, so that it is possible to reduce the cost for construction.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る天井板の一例を示す正面断面図で
ある。
FIG. 1 is a front sectional view showing an example of a ceiling plate according to the present invention.

【図2】同天井板を用いて天井施工下地面に格子天井を
施工した状態を示す正面断面図である。
FIG. 2 is a front sectional view showing a state where a lattice ceiling is constructed on a ceiling construction base surface using the ceiling plate.

【図3】同天井板を用いて天井施工下地面に格子天井を
施工した状態を示す底面図である。
FIG. 3 is a bottom view showing a state where a lattice ceiling is constructed on a ceiling construction base surface using the ceiling plate.

【図4】従来の天井板を用いて天井施工下地面に格子天
井を施工した状態を示す正面断面図である。
FIG. 4 is a front sectional view showing a state in which a lattice ceiling is constructed on a ceiling construction base surface using a conventional ceiling plate.

【符号の説明】[Explanation of symbols]

2 天井板 6 第1係合溝 8 縦桟 10 第2係合溝 12 縦桟 14 目地板 16 第1突出部 18 第2突出部 20 第3突出部 22 第4突出部 24 目地部 86 天井施工下地面 88 釘材 2 Ceiling plate 6 First engaging groove 8 Vertical bar 10 Second engaging groove 12 Vertical bar 14 Joint plate 16 First projecting unit 18 Second projecting unit 20 Third projecting unit 22 Fourth projecting unit 24 Joint projecting unit 86 Ceiling construction Lower ground 88 Nail material

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】天井板本体と、角柱状主部の外側面上下方
向中間部に長さ方向に沿って第1係合溝を形成した一方
の縦桟と、角柱状主部の外側面上下方向中間部に長さ方
向に沿って第2係合溝を形成した他方の縦桟とを備え、
一方の縦桟における第1係合溝上部の第1突出部の該係
合溝底部からの突出長を該係合溝下部の第2突出部の同
突出長よりも長く、他方の縦桟における第2係合溝上部
の第3突出部の該係合溝底部からの突出長を該係合溝下
部の第4突出部の同突出長より短く形成し、かつ第1突
出部と第3突出部それぞれの前記突出長を合わせた長さ
を第2突出部と第4突出部それぞれの前記突出長を合わ
せた長さより長くした天井板と、 前記天井板の第1突出部の第1係合溝底部からの突出長
及び第3突出部の第2係合溝底部からの突出長を合わせ
た長さとほぼ等しい幅寸法を有する目地板とを用い、 天井施工下地面に対して天井板本体を位置決めし、その
第1係合溝に目地板を係合させた状態で、該目地板の前
記第1突出部の外端部に対応する部分の下面から、第1
突出部の外端部及び天井施工下地面に対して釘材を打ち
込んだ後、次の天井板における第2係合溝を前記目地板
に係合させて位置決めし、目地板に打ち込まれた前記釘
材を、前記次の天井板の第4突出部で覆うことを特徴と
する目透天井の施工方法。
A vertical bar having a first engaging groove formed along a length direction in a middle portion of a main portion of the ceiling plate in a vertical direction on an outer surface of the main portion; And the other vertical crossbar formed with a second engagement groove along the length direction in the middle part in the direction,
The projecting length of the first projecting portion above the first engaging groove from the bottom of the engaging groove in one of the longitudinal beams is longer than the projecting length of the second projecting portion below the engaging groove in the other longitudinal beam. The projecting length of the third projecting portion above the second engaging groove from the bottom of the engaging groove is formed shorter than the projecting length of the fourth projecting portion below the engaging groove, and the first projecting portion and the third projecting portion are formed. A ceiling plate having a length obtained by combining the projection lengths of the respective portions longer than a length obtained by combining the projection lengths of the second projection portion and the fourth projection portion; and a first engagement of the first projection portion of the ceiling plate. A joint plate having a width dimension substantially equal to the sum of the length of the protrusion from the groove bottom and the length of the third protrusion protruding from the bottom of the second engagement groove; In a state where the joint plate is positioned and the joint plate is engaged with the first engagement groove, a portion of the joint plate corresponding to the outer end of the first protrusion is formed. From the surface, the first
After the nail material is driven into the outer end portion of the protrusion and the ceiling construction base surface, the second engagement groove in the next ceiling plate is engaged with the joint plate and positioned, and the nail is driven into the joint plate. A method for constructing a transparent ceiling, wherein the nail material is covered with the fourth protrusion of the next ceiling plate.
JP8188789A 1996-06-28 1996-06-28 Construction method of transparent ceiling Expired - Fee Related JP2886502B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8188789A JP2886502B2 (en) 1996-06-28 1996-06-28 Construction method of transparent ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8188789A JP2886502B2 (en) 1996-06-28 1996-06-28 Construction method of transparent ceiling

Publications (2)

Publication Number Publication Date
JPH1018503A JPH1018503A (en) 1998-01-20
JP2886502B2 true JP2886502B2 (en) 1999-04-26

Family

ID=16229829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8188789A Expired - Fee Related JP2886502B2 (en) 1996-06-28 1996-06-28 Construction method of transparent ceiling

Country Status (1)

Country Link
JP (1) JP2886502B2 (en)

Also Published As

Publication number Publication date
JPH1018503A (en) 1998-01-20

Similar Documents

Publication Publication Date Title
JP2886502B2 (en) Construction method of transparent ceiling
JPH0443071Y2 (en)
JPH053632Y2 (en)
JP2001311239A (en) Method of joining woody panel
JP3727443B2 (en) Frame mounting method and apparatus
JPH0681416A (en) Structure of floor panel
JP2522222Y2 (en) Wall mounting equipment in buildings
JP2579104Y2 (en) Stud clasp
JPH0830369B2 (en) Partition device with top plate
JPH0741828Y2 (en) Door frame structure
JPH06288024A (en) Panel material and construction method for wall surface using said material
JP2886497B2 (en) Construction method of transparent ceiling
JP2649144B2 (en) Two-by-four wall structure
JPH0347059Y2 (en)
JPH1061011A (en) Column joint element
JPH0732832Y2 (en) Door structure
JP2003278299A (en) Metal joint for deck floor and joint structure
JP2534427Y2 (en) Joint structure of wall panel and floor panel
JPH0347058Y2 (en)
JP2521682Y2 (en) Connection structure of side wall of unit room
JP2001173203A (en) Mounting structure for outer wall material and wall panel with outer wall material
JPH08312025A (en) Fixing structure of wall panel
JPH10212776A (en) Pannel connection structure
JP2569687Y2 (en) Construction structure around independent columns between floor panels
JP2849381B1 (en) Ceiling board for transparent ceiling

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090212

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090212

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100212

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110212

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120212

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130212

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140212

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees