JP2806809B2 - Bolt tensioner transfer device - Google Patents
Bolt tensioner transfer deviceInfo
- Publication number
- JP2806809B2 JP2806809B2 JP25351394A JP25351394A JP2806809B2 JP 2806809 B2 JP2806809 B2 JP 2806809B2 JP 25351394 A JP25351394 A JP 25351394A JP 25351394 A JP25351394 A JP 25351394A JP 2806809 B2 JP2806809 B2 JP 2806809B2
- Authority
- JP
- Japan
- Prior art keywords
- tensioner
- ring
- shaped
- main body
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、ボルトテンショナ搬送
装置に関し、特に、複数のテンショナを作動可能な状態
で吊具で吊上げ、簡単かつ確実にスタッドボルトの締付
けを行うことができるようにするための新規な改良に関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bolt tensioner conveying device, and more particularly to a device for lifting a plurality of tensioners in an operable state with a hoist so that stud bolts can be easily and reliably tightened. Related to new improvements.
【0002】[0002]
【従来の技術】従来、用いられていたこの種のボルトテ
ンショナを搬送する手段としては、一般にテンショナを
人手にて持ち上げ、スタッドボルトに装着して、スタッ
ドボルトの締付を行い、作業終了後は、このボルトテン
ショナを再び元の位置に人手で戻していた。また、他の
手段としては、ベルト等を用いてボルトテンショナを吊
り上げるようにしていた。2. Description of the Related Art Conventionally, as a means for transporting a bolt tensioner of this kind, a tensioner is generally lifted by hand, mounted on a stud bolt, and the stud bolt is tightened. The bolt tensioner was manually returned to the original position again. As another means, a bolt tensioner is lifted using a belt or the like.
【0003】[0003]
【発明が解決しようとする課題】従来のボルトテンショ
ナの搬送手段は、以上のように構成されていたため、次
のような課題が存在していた。すなわち、 1.複数のテンショナを同時にハンドリングすることは
不可能である。 2.作業時間が掛かり過ぎる。 3.作業人員が多数必要となる。 4.テンショナ1台に対しクレーン又はチェーンブロッ
クが1台必要となり、無い場合には、吊り変えが必要と
なっていた。 5.テンショナの位置決めが困難である。 6.テンショナ操作時に重量物としてのテンショナを扱
うため危険な作業となっていた。The conventional means for transporting a bolt tensioner is constructed as described above, and therefore has the following problems. That is, 1. It is not possible to handle multiple tensioners simultaneously. 2. Work time is too long. 3. Many workers are required. 4. One crane or chain block is required for one tensioner, and when there is no tensioner, it is necessary to change the suspension. 5. It is difficult to position the tensioner. 6. It was dangerous work to handle the tensioner as a heavy object when operating the tensioner.
【0004】本発明は、以上のような課題を解決するた
めになされたもので、特に、複数のテンショナを作動可
能な状態で吊具で吊り上げ、簡単かつ確実にスタッドボ
ルトの締付けを行うことができるようにしたボルトテン
ショナ搬送装置を提供することを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above-described problems. In particular, it is possible to lift a plurality of tensioners in an operable state with a hanging tool, and to easily and securely tighten stud bolts. It is an object of the present invention to provide a bolt tensioner transfer device that can be used.
【0005】[0005]
【課題を解決するための手段】本発明によるボルトテン
ショナ搬送装置は、リング状本体に形成されたリング状
レールと、前記リング状レールに移動可能に設けられた
吊具と、前記リング状本体の内側に設けられたテンショ
ナと、よりなる構成である。According to the present invention, there is provided a bolt tensioner transfer device, comprising: a ring-shaped rail formed on a ring-shaped main body; a hanging member movably provided on the ring-shaped rail; And a tensioner provided inside.
【0006】さらに詳細には、前記吊具は、前記リング
状本体の円周に沿って形成された複数の取付穴に挿入さ
れた固定ピンを介して、任意の円周位置に固定できる構
成である。[0006] More specifically, the hanger can be fixed at an arbitrary circumferential position via fixing pins inserted into a plurality of mounting holes formed along the circumference of the ring-shaped main body. is there.
【0007】さらに詳細には、前記リング状本体には、
リング状ハンドホィールが設けられ、このリング状ハン
ドホィールを介して前記リング状本体を回転させるよう
にした構成である。More specifically, the ring-shaped main body includes:
A ring-shaped hand wheel is provided, and the ring-shaped main body is rotated via the ring-shaped hand wheel.
【0008】さらに詳細には、前記テンショナは、前記
リング状本体に設けられた1対のテンショナ取付ブラケ
ットを介して取付けられている構成である。More specifically, the tensioner is mounted via a pair of tensioner mounting brackets provided on the ring-shaped main body.
【0009】さらに詳細には、前記テンショナ取付ブラ
ケットと前記テンショナのブラケットとは、弾性を有す
る緩衝部材を介して接続されている構成である。[0009] More specifically, the tensioner mounting bracket and the bracket of the tensioner are connected via an elastic cushioning member.
【0010】[0010]
【作用】本発明によるボルトテンショナ搬送装置におい
ては、リング状本体の内側に複数のテンショナが取付け
られ、その取付位置は、予め対象物のスタッドボルトの
ピッチに合わせてあるため、吊具をクレーンで持ち上げ
ることにより複数のテンショナが同時に持ち上げられ
る。この持ち上げ状態で、リング状ハンドホィールを操
作して各テンショナを各スタッドボルトに装着させ、各
テンショナを操作することにより各スタッドボルトの締
付けを一人の作業者で行うことができる。また、この締
付作業終了後は、クレーンと吊具を介してリング状本体
を移動させることにより、安全かつ簡単に各テンショナ
を元の位置に戻すことができる。従って、作業時間の短
縮、作業人員の低減を達成でき、一般に言われる3K作
業を追放することができる。In the bolt tensioner transporting device according to the present invention, a plurality of tensioners are mounted inside the ring-shaped main body, and the mounting positions thereof are adjusted in advance to the pitch of the stud bolt of the object, so that the lifting tool is moved by a crane. The plurality of tensioners are simultaneously lifted by lifting. In this lifted state, each tensioner is mounted on each stud bolt by operating the ring-shaped hand wheel, and each stud bolt can be tightened by one operator by operating each tensioner. Further, after the completion of the tightening operation, each tensioner can be safely and easily returned to the original position by moving the ring-shaped main body via the crane and the hanging tool. Therefore, it is possible to reduce the working time and the number of working personnel, and to expel the generally referred to 3K work.
【0011】[0011]
【実施例】以下、図面と共に本発明によるボルトテンシ
ョナ搬送装置の好適な実施例について詳細に説明する。
図1から図5迄は本発明によるボルトテンショナ搬送装
置を示すもので、図1は正面図、図2は図1の1部断面
を含む平面図、図3は吊具を示す正面図、図4は図3の
断面図、図5はテンショナ取付ブラケットの拡大断面図
である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of a bolt tensioner conveying device according to the present invention will be described below in detail with reference to the drawings.
1 to 5 show a bolt tensioner conveying device according to the present invention, wherein FIG. 1 is a front view, FIG. 2 is a plan view including a partial cross section of FIG. 1, and FIG. 4 is a sectional view of FIG. 3, and FIG. 5 is an enlarged sectional view of the tensioner mounting bracket.
【0012】図1及び図2において符号1で示されるも
のは全体形状がリング状をなし、その外周位置にリング
状レール2を有するリング状本体であり、このリング状
レール2には、吊具3が円周方向に移動自在に設けられ
ている。前記吊具3は、図3及び図4に示すように、吊
具本体4の上部に1対のフック5を有し、この吊具本体
4の内側には、1対のガイドローラ6が軸7に軸受8を
介して回転自在に設けられている。1 and 2 is a ring-shaped main body having a ring-shaped overall shape and a ring-shaped rail 2 at an outer peripheral position thereof. 3 is provided movably in the circumferential direction. As shown in FIGS. 3 and 4, the hanger 3 has a pair of hooks 5 on an upper part of the hanger main body 4, and a pair of guide rollers 6 inside the hanger main body 4. 7 is rotatably provided via a bearing 8.
【0013】前記各ガイドローラ6は、軸方向において
互いに離間して配設され、この各ガイドローラ6は前記
リング状レール2の内面2aに摺接している。前記リン
グ状本体1のリング状レール2の内側には、複数の取付
穴10が所定の異なるピッチで形成されており、前記吊
具本体3のガイド穴3a及び取付穴10に挿入された固
定ピン11により、この吊具3はリング状本体1の任意
の円周位置に固定することができるように構成されてい
る。なお、この各取付穴10のピッチは種々異なるよう
に構成され、そのピッチの大小により、必要に応じて大
形又は小形の吊具3を取付けることができるように構成
されていると共に、前記固定ピン11の端部には取手1
1aが形成されている。The guide rollers 6 are disposed apart from each other in the axial direction, and each guide roller 6 is in sliding contact with the inner surface 2 a of the ring-shaped rail 2. A plurality of mounting holes 10 are formed at a predetermined different pitch inside the ring-shaped rail 2 of the ring-shaped main body 1, and the fixing pin inserted into the guide hole 3 a of the hanging body 3 and the mounting hole 10. 11, the hanging tool 3 is configured to be able to be fixed to an arbitrary circumferential position of the ring-shaped main body 1. The pitch of each of the mounting holes 10 is configured to be different from each other, and the size of the pitch is configured so that the large or small hanging tool 3 can be attached as necessary, and Handle 1 at the end of pin 11
1a is formed.
【0014】前記リング状本体1の外周位置には、接手
14を介してリング状ハンドホィール15が前記リング
状本体1と並設されており、このリング状ハンドホィー
ル15を回転することにより前記リング状本体1が一体
に回転するように構成されている。A ring-shaped hand wheel 15 is arranged at the outer peripheral position of the ring-shaped main body 1 via a joint 14 in parallel with the ring-shaped main body 1. By rotating the ring-shaped hand wheel 15, the ring-shaped hand wheel 15 is rotated. The main body 1 is configured to rotate integrally.
【0015】前記リング状本体1の内側1aには、1対
のテンショナ取付ブラケット20を介してスタッドボル
トの締付を行う周知構造のテンショナ21のブラケット
21aが若干の自由度を伴って接続ピン22を介して接
続されており、この各テンショナ取付ブラケット20は
前記内側1aに溶接等で固定されているプレート31に
接続ボルト23にて接続されている。なお、この固定位
置は、予め使用状況により選択されたテンショナ21の
大きさによって決められ、このブラケット21aの大き
さやその固定位置を任意に選定することにより、サイズ
の異なるテンショナ21を取付けることができる。On the inner side 1a of the ring-shaped main body 1, a bracket 21a of a tensioner 21 having a well-known structure for tightening stud bolts via a pair of tensioner mounting brackets 20 is provided with connection pins 22 with some degree of freedom. The tensioner mounting brackets 20 are connected by connecting bolts 23 to a plate 31 fixed to the inside 1a by welding or the like. Note that the fixing position is determined by the size of the tensioner 21 selected in advance according to the use situation, and by arbitrarily selecting the size of the bracket 21a and the fixing position thereof, the tensioners 21 having different sizes can be mounted. .
【0016】前記テンショナ取付ブラケット20は、図
5で示すように上下二又状にほぼコ字形に形成された凹
部20aを有しており、この凹部20a内に前記ブラケ
ット21aの連結リング21aAが1対のスペーサ30
を介して設けられている。前記テンショナ取付ブラケッ
ト20の穴20bに貫通して設けられた前記接続ピン2
2は前記連結リング21aAを貫通していると共に、こ
の接続ピン22と連結リング21aAとの間には、互い
に径の異なる1対の薄鉄リング40、41によって挟持
された弾性を有するゴム等のリング状の緩衝部材50が
設けられている。従って、この緩衝部材50を介して前
記テンショナ取付ブラケット20とブラケット21aと
が、テンショナ21に対して若干の自由度を伴って接続
されている。As shown in FIG. 5, the tensioner mounting bracket 20 has a concave portion 20a which is formed in a substantially U-shape in an up-and-down bifurcated manner, and a connecting ring 21aA of the bracket 21a is provided in the concave portion 20a. Pair spacer 30
Is provided via The connection pin 2 provided through the hole 20b of the tensioner mounting bracket 20
Reference numeral 2 penetrates the connection ring 21aA, and between the connection pin 22 and the connection ring 21aA, a rubber or the like having elasticity sandwiched by a pair of thin iron rings 40 and 41 having different diameters from each other. A ring-shaped buffer member 50 is provided. Therefore, the tensioner mounting bracket 20 and the bracket 21a are connected to the tensioner 21 with some degree of freedom via the buffer member 50.
【0017】また、前記テンショナ21は、周知のよう
にスタッドボルト60(図1に点線にて示しているよう
に、例えば、対象物である圧力容器フランジに設けられ
ており、二重点線で示しているのは、大径及び小径のも
のにも対応できることを表している)に、その嵌合ねじ
21Aをハンドル21Bを回転することにより挿入さ
せ、スタッドボルト60に連結させ締付動作を行うこと
ができるように構成されている。As is well known, the tensioner 21 is provided on a stud bolt 60 (for example, as shown by a dotted line in FIG. 1, for example, a pressure vessel flange as an object, and is shown by a double dotted line). Means that both large and small diameters can be accommodated), by inserting the fitting screw 21A by rotating the handle 21B and connecting it to the stud bolt 60 to perform the tightening operation. It is configured to be able to.
【0018】次に、前述の構成において、実際に圧力容
器フランジ等に設けられたスタッドボルトの締付を行う
場合について述べる。まず、図1で示すように、予め、
相手方のスタッドボルト60の取付位置に合わせて設け
られた1対のテンショナ21を有するリング状本体1
を、吊具3のフック5に、図示しないワイヤを介してク
レーン(図示しない)のフックで吊り上げ、このリング
状本体1を相手方の所定位置に搬送した後、作業者がリ
ング状ハンドホイール15を介して各テンショナ21を
スタッドボルト60の中心に移動させハンドル21Bを
回転させることにより、テンショナ21とスタッドボル
ト60は連結され、締付動作が行われる。Next, a case where stud bolts provided on a pressure vessel flange or the like are actually tightened in the above-described configuration will be described. First, as shown in FIG.
Ring-shaped main body 1 having a pair of tensioners 21 provided in accordance with the mounting position of the other stud bolt 60
Is lifted by a hook of a crane (not shown) via a hook (not shown) on a hook 5 of the hanging tool 3 and the ring-shaped main body 1 is conveyed to a predetermined position of the other party. By moving each tensioner 21 to the center of the stud bolt 60 and rotating the handle 21B, the tensioner 21 and the stud bolt 60 are connected, and a tightening operation is performed.
【0019】この締付動作終了後、各テンショナ21を
スタッドボルト60から離し、クレーンでリング状本体
1を元の位置に搬送すると、各テンショナ21はリング
状本体1と共に簡単に元の場所に戻すことができる。な
お、前述の実施例では、1対のテンショナを用いた場合
について述べたが、さらに、2個追加することも、それ
以上追加することも可能である。After the tightening operation is completed, each tensioner 21 is separated from the stud bolt 60, and the ring-shaped main body 1 is transported to the original position by a crane, and each tensioner 21 is easily returned to the original position together with the ring-shaped main body 1. be able to. In the above embodiment, the case where a pair of tensioners is used has been described. However, two or more tensioners can be added.
【0020】[0020]
【発明の効果】本発明によるボルトテンショナ搬送装置
は、以上のように構成されているため、次のような効果
を得ることができる。 1.従来テンショナを1台づつ人力にて持ち上げ締付ボ
ルトへ据え付けていた時に比べ、本発明では複数のテン
ショナを安全かつ容易に搬送でき、重量物を扱う危険性
を著しく低減させており、いわゆる3K(汚い、きつ
い、危険)の改善にも効果を発揮する。 2.従来、テンショナをベルト等により吊り上げ、据え
付けていた時に比べ、本発明では正確な位置にテンショ
ナを固定、据え付けでき、作業の繁雑を低減させてい
る。また、テンショナを他のボルトへ移動させるために
は吊り変えが必要であったのに対し、本発明では吊り変
えは一切必要無くなる。 3.一度に複数のテンショナを固定、据え付けでき、作
業時間の短縮及び作業人員の低減に効果を発揮する。 4.1台のクレーン又はチェーンブロック等で複数のテ
ンショナを同時に搬送して固定据え付けができる。The bolt tensioner transfer device according to the present invention is configured as described above, and therefore, can obtain the following effects. 1. Compared to the conventional case where tensioners are manually lifted one by one and installed on the tightening bolts, the present invention can transport a plurality of tensioners safely and easily, and significantly reduces the risk of handling heavy objects. It is also effective in improving dirty, hard and dangerous). 2. In the present invention, the tensioner can be fixed and installed at an accurate position as compared with a case where the tensioner is conventionally lifted and installed by a belt or the like, and the complexity of the operation is reduced. In addition, in order to move the tensioner to another bolt, it is necessary to change the suspension. On the other hand, in the present invention, no change is required. 3. A plurality of tensioners can be fixed and installed at one time, which is effective in reducing working time and reducing the number of workers. 4. A plurality of tensioners can be simultaneously transferred and fixedly installed by one crane or chain block.
【図1】本発明によるボルトテンショナ搬送装置を示す
正面図である。FIG. 1 is a front view showing a bolt tensioner transport device according to the present invention.
【図2】図1の1部断面を含む平面図である。FIG. 2 is a plan view including a partial cross section of FIG.
【図3】図1の吊具を示す正面図である。FIG. 3 is a front view showing the hanger of FIG. 1;
【図4】図3の断面図である。FIG. 4 is a sectional view of FIG. 3;
【図5】テンショナ取付ブラケットの拡大断面図であ
る。FIG. 5 is an enlarged cross-sectional view of a tensioner mounting bracket.
1 リング状本体 2 リング状レール 3 吊具 10 取付穴 11 固定ピン 15 リング状ハンドホイール 20 テンショナ取付ブラケット 21 テンショナ 21a ブラケット DESCRIPTION OF SYMBOLS 1 Ring-shaped main body 2 Ring-shaped rail 3 Hanging tool 10 Mounting hole 11 Fixed pin 15 Ring-shaped handwheel 20 Tensioner mounting bracket 21 Tensioner 21a Bracket
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) F16B 35/00──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 6 , DB name) F16B 35/00
Claims (5)
レール(2)と、前記リング状レール(2)に移動可能に設け
られた吊具(3)と、前記リング状本体(1)の内側に設けら
れたテンショナ(21)と、よりなることを特徴とするボル
トテンショナ搬送装置。A ring-shaped rail (2) formed on a ring-shaped body (1), a hanger (3) movably provided on the ring-shaped rail (2), and a ring-shaped body (1). ), And a tensioner (21) provided inside the bolt tensioner transport device.
円周に沿って形成された複数の取付穴(10)に挿入された
固定ピン(11)を介して、任意の円周位置に固定できるこ
とを特徴とする請求項1記載のボルトテンショナ搬送装
置。2. The hanging tool (3) can be optionally mounted via fixing pins (11) inserted into a plurality of mounting holes (10) formed along the circumference of the ring-shaped main body (1). 2. The bolt tensioner transport device according to claim 1, wherein the bolt tensioner transport device can be fixed at a circumferential position.
ンドホィール(15)が設けられ、このリング状ハンドホィ
ール(15)を介して前記リング状本体(1)を回転させる構
成としたことを特徴とする請求項1又は2記載のボルト
テンショナ搬送装置。3. The ring-shaped main body (1) is provided with a ring-shaped handwheel (15), and the ring-shaped main body (1) is rotated through the ring-shaped handwheel (15). 3. The bolt tensioner conveying device according to claim 1, wherein:
体(1)に設けられた1対のテンショナ取付ブラケット(2
0)を介して取付けられていることを特徴とする請求項1
ないし3の何れかに記載のボルトテンショナ搬送装置。4. The tensioner (21) includes a pair of tensioner mounting brackets (2) provided on the ring-shaped main body (1).
2. The method according to claim 1, wherein the mounting is performed via the first connection.
4. The bolt tensioner transport device according to any one of claims 3 to 3.
記テンショナ(21)のブラケット(21a)とは、弾性を有す
る緩衝部材(50)を介して接続されていることを特徴とす
る請求項4記載のボルトテンショナ搬送装置。5. The tensioner mounting bracket (20) and the bracket (21a) of the tensioner (21) are connected via an elastic cushioning member (50). Bolt tensioner conveyor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25351394A JP2806809B2 (en) | 1994-10-19 | 1994-10-19 | Bolt tensioner transfer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25351394A JP2806809B2 (en) | 1994-10-19 | 1994-10-19 | Bolt tensioner transfer device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08121448A JPH08121448A (en) | 1996-05-14 |
JP2806809B2 true JP2806809B2 (en) | 1998-09-30 |
Family
ID=17252424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25351394A Expired - Fee Related JP2806809B2 (en) | 1994-10-19 | 1994-10-19 | Bolt tensioner transfer device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2806809B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109869384A (en) * | 2017-12-01 | 2019-06-11 | 许晋平 | Porous type connection sheet |
-
1994
- 1994-10-19 JP JP25351394A patent/JP2806809B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08121448A (en) | 1996-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3906820A (en) | Apparatus and method for spinning pipe | |
JP2012246123A (en) | Suspension jig, and method of machining blade ring | |
JPH09301673A (en) | Metal fitting for suspending and lifting large diameter pipe | |
JP3295227B2 (en) | Work reversing device | |
KR20150000156U (en) | Pipe supporting device | |
JP2806809B2 (en) | Bolt tensioner transfer device | |
US4241575A (en) | Chain saddle assembly | |
US3206242A (en) | Split-ring hoisting clamp | |
US3172384A (en) | Pipe line clamp | |
JPS5826790A (en) | Method and device for lifting load | |
JP3670411B2 (en) | Drawing hacker | |
JP3083973B2 (en) | Hanging jig for automatic guided vehicles | |
CN214870266U (en) | Belt carrier roller replacing tool | |
US4515198A (en) | Means for detachably connecting a chain link to a skidder ring | |
CN219449051U (en) | Safe suspension device for concrete precast slab | |
JPH09124268A (en) | Suspension clamp | |
CN216375625U (en) | A clamping tools for steel pipe is transported | |
JP3010556U (en) | Long material hanging guide jig | |
US6922881B2 (en) | Method for installing and removing a continuous track drive unit | |
CN213475145U (en) | Ring forging hoist | |
CN217372130U (en) | A location mounting tool for steel ring between butt joint flange | |
CN212503854U (en) | Portable petrochemical pipeline hoist and mount are moved and are used device | |
CN207903023U (en) | For packing case lifting protective device and the packing case of the protective device is installed | |
CN216403574U (en) | Vertical hoisting and hoisting tool for industrial iron drum | |
KR20230151066A (en) | Transport tools and installation methods of transport tools |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20080724 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090724 Year of fee payment: 11 |
|
LAPS | Cancellation because of no payment of annual fees |