JP2784898B2 - Gutter structure for penetration of rainwater etc. - Google Patents

Gutter structure for penetration of rainwater etc.

Info

Publication number
JP2784898B2
JP2784898B2 JP7087426A JP8742695A JP2784898B2 JP 2784898 B2 JP2784898 B2 JP 2784898B2 JP 7087426 A JP7087426 A JP 7087426A JP 8742695 A JP8742695 A JP 8742695A JP 2784898 B2 JP2784898 B2 JP 2784898B2
Authority
JP
Japan
Prior art keywords
water
gutter
block
layer
bottom wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7087426A
Other languages
Japanese (ja)
Other versions
JPH08260553A (en
Inventor
啓 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeta Concrete Industry Ltd
Original Assignee
Maeta Concrete Industry Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeta Concrete Industry Ltd filed Critical Maeta Concrete Industry Ltd
Priority to JP7087426A priority Critical patent/JP2784898B2/en
Publication of JPH08260553A publication Critical patent/JPH08260553A/en
Application granted granted Critical
Publication of JP2784898B2 publication Critical patent/JP2784898B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Sewage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、側溝に集水した雨
水等を地中に浸透させ、地下水の保水量を増加させるた
めの雨水等の浸透用側溝構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gutter structure for infiltrating rainwater or the like for infiltrating rainwater or the like collected in a gutter into the ground to increase the amount of groundwater retained.

【0002】[0002]

【従来の技術】流域の都市化が進むにつれて、雨水の表
面流出が増加するとゝもに、地下水が減少している。こ
れは、開発によって地表面がアスファルト等で被覆され
ることによる降雨の地中への浸透量の減少,地中の保水
機能の低下,流下時間の短縮などがその主な原因である
と思われる。
2. Description of the Related Art As urbanization of a basin progresses, the surface runoff of rainwater increases and groundwater decreases. This is considered to be mainly due to the decrease in the amount of rainfall that penetrates into the ground due to the development of the ground surface covered with asphalt, the deterioration of the underground water retention function, and the reduction of the flow time. .

【0003】このような問題の解決策として、側溝に流
れ込んだ降水を河川に運び込むだけでなく、側溝の底盤
に穴をあけたり、或いは底盤をポーラス状にして、側溝
付近の地中に集水を浸透できるようにした製品も開発さ
れている。
As a solution to such a problem, not only is the precipitation flowing into the gutter carried into the river, but also a hole is made in the bottom of the gutter or the bottom is made porous to collect water in the ground near the gutter. Products that can penetrate are also being developed.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記のような
従来の側溝の場合、側溝内を流れる水は滞留することな
く流下することになる。したがって、側溝内を流れる水
の流下時間が短く、地中への水浸透量が少なくなる、と
いった問題点がある。
However, in the case of the above-described conventional gutter, water flowing in the gutter flows down without stagnating. Therefore, there is a problem that the flow time of the water flowing in the gutter is short and the amount of water permeated into the ground is reduced.

【0005】[0005]

【課題を解決するための手段】本発明は、上記のような
従来の問題点を解決するために成されたもので、水路を
集排水用側溝ブロックと、該集排水用側溝ブロック間に
適宜間隔で設置した水が滞留する浸透用側溝ブロックと
で構成することにより、地中への水浸透量が大きいもの
を提供することを目的としたものであり、その要旨は、
両側壁及び底壁からなる側溝の前記底壁に拡水穴を形成
するとゝもに、該拡水穴にポーラスコンクリート製の透
水ブロックを着脱可能となるように装着した集排水用側
溝ブロックを、砂の層の上に敷設した砕石の層で前記両
側壁及び底壁の外側を覆った状態で複数個連続して設置
し、該集排水用側溝ブロックの間に、該集排水用側溝ブ
ロックよりも溝の内高が深く且つ両側壁及び底壁からな
る側溝の前記底壁に拡水穴を形成するとゝもに、該拡水
穴にポーラスコンクリート製の透水ブロックを着脱可能
となるように装着した浸透用側溝ブロックを、その両側
壁及び底壁の外側を砕石の層で覆った状態で設置すると
ゝもに、該砕石の層中において、周壁に多数の排水孔が
穿設されており内部に砂利等を充填した水浸透管を、そ
の上端開口部が浸透用側溝ブロックの前記透水ブロック
の下面と又下端開口部が前記砕石の層の底部に形成した
砂の層又は第1砂礫層と夫々連続して設置し、更に前記
砕石の層と地山との間に透水シートを設置したことを特
徴とする雨水等の浸透用側溝構造にある。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned conventional problems, and a water channel is provided between a drainage gutter block and a drainage gutter block. By constructing with a permeate gutter block where water installed at intervals stays, the purpose is to provide a large amount of water permeating into the ground,
A water diffusion hole is formed in the bottom wall of the gutter composed of both side walls and a bottom wall, and a water collection / drainage gutter block in which a porous concrete permeable block is detachably attached to the water expansion hole is provided. A plurality of crushed stone layers laid on a layer of sand cover the both side walls and the bottom wall, and a plurality of the crushed stone layers are continuously installed in a state of being covered. When the inside height of the groove is deep and a water-spreading hole is formed in the bottom wall of the side groove composed of both side walls and the bottom wall, a water-permeable block made of porous concrete is detachably attached to the water-spreading hole. The infiltration gutter block is installed with both sides and the bottom wall covered with a layer of crushed stone. At the same time, in the layer of crushed stone, many drain holes are formed in the peripheral wall and A water infiltration tube filled with gravel, etc. The lower surface of the water-permeable block and the lower end opening of the gutter block are installed continuously with the sand layer or the first gravel layer formed at the bottom of the crushed stone layer, respectively. There is a gutter structure for permeation of rainwater or the like, characterized in that a water permeable sheet is provided therebetween.

【0006】[0006]

【発明の実施の形態】以下、本発明を図面に示す実施例
により詳細に説明するに、図1乃至図3において、1は
集排水用側溝ブロックで、図1に示すように、地下水F
があるところではこれを側溝1A内に水F’を集め、地
下水Fが無いところでは、図2に示すように、側溝1A
内を流れる水F’を地下に浸透させるものである。すな
わち、この集排水用側溝ブロック1は、左右一対の側壁
2,2と、該両側壁2,2の下端部を連結した底壁3と
から夫々構成されている。そして、前記両側壁2の下方
部には、複数個の集排水孔4,4が集排水用側溝ブロッ
ク1の長手方向に沿って一定間隔で穿設されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to an embodiment shown in the drawings. In FIGS. 1 to 3, reference numeral 1 denotes a drainage gutter block, as shown in FIG.
Where there is, the water F 'is collected in the gutter 1A, and where there is no groundwater F, as shown in FIG.
The water F 'flowing inside is infiltrated into the underground. That is, the drainage side groove block 1 is composed of a pair of left and right side walls 2, 2 and a bottom wall 3 connecting the lower ends of the side walls 2, 2. A plurality of collecting and draining holes 4 and 4 are formed at regular intervals along the longitudinal direction of the collecting and draining side groove block 1 in a lower portion of the side walls 2.

【0007】前記集排水孔4は、前記側壁2の内側面2
A側から外側面2B側に向け次第に大径となるロート状
の孔形状であって、該集排水孔4の前記外側面2B側の
開口部には大径口部4Aが形成されており、この大口径
部4Aに図示しない栓を嵌めることにより、前記集排水
孔4を閉塞できるよう構成されている。なお、図中5は
側壁2の前記外側面2Bに形成した集水用の凹状案内溝
で、前記大口径部4Aを中心としてその左右に上昇傾斜
する構成としている。
The drainage hole 4 is formed on the inner surface 2 of the side wall 2.
It has a funnel-like hole shape whose diameter gradually increases from the A side to the outer surface 2B side, and a large-diameter opening 4A is formed in the opening of the drainage hole 4 on the outer surface 2B side, The collection and drainage hole 4 can be closed by fitting a plug (not shown) into the large-diameter portion 4A. In the figure, reference numeral 5 denotes a concave guide groove for collecting water formed on the outer side surface 2B of the side wall 2, which is configured to incline to the left and right around the large diameter portion 4A.

【0008】6は集排水用側溝ブロック1の前記底壁3
に形成した長手方向に長い長方形状の拡水穴で、一定間
隔をおいて2個形成されており、各拡水穴6は着脱可能
としたポーラスコンクリート製の透水ブロック7で閉塞
されている。なお、図中6Aは前記拡水穴6の内周面に
形成した段部で、前記拡水穴6内に嵌合した透水ブロッ
ク7はこの段部6Aで支持されている。
Reference numeral 6 denotes the bottom wall 3 of the collecting / draining side gutter block 1.
The two water-spreading holes 6 are closed by a removable porous concrete water-permeable block 7 which is formed at regular intervals. In the figure, 6A is a step formed on the inner peripheral surface of the water spreading hole 6, and the water permeable block 7 fitted in the water spreading hole 6 is supported by the step 6A.

【0009】8は砂の層で、この砂の層8の上には単粒
度4号程度の砕石からなる砕石の層9が形成されてお
り、集排水用側溝ブロック1の前記両側壁2,2の外側
面2Bおよび底壁3の下面3Aは前記砕石の層9で完全
に覆われた状態で敷設されている。なお、図中10は目
詰まり防止用の透水シートで、前記砕石の層9と地山G
との間に設置されている。
Reference numeral 8 denotes a sand layer, on which a crushed stone layer 9 made of crushed stone having a single grain size of about 4 is formed. 2 and the lower surface 3A of the bottom wall 3 are laid in a state of being completely covered with the crushed stone layer 9. In the figure, reference numeral 10 denotes a water-permeable sheet for preventing clogging.
It is installed between.

【0010】11は浸透用側溝ブロックで、この浸透用
側溝ブロック11は、溝11A内を流下する水F’を地
下に拡水させるためのものであり、その構成は、図4乃
至図6に示すように、両側壁12,12、該両側壁1
2,12の下端部を連結した底壁13、前記両側壁12
の下方部に穿設した集排水孔14及び側壁12の外側面
12Bに形成した集水用の凹状案内溝14A、前記底壁
13に形成した2個の拡水穴16及び該拡水穴16の内
周面に形成した段部16A、前記拡水穴16を閉塞して
いる着脱可能としたポーラスコンクリート製の透水ブロ
ック17等からなり、これらの構成は全て前記集排水用
側溝ブロック1と同一の構成であるが、両者は側溝の内
高の大きさ(側溝の深さ)の点で相違する。
Reference numeral 11 denotes a side groove block for permeation. The side groove block for permeation 11 is for expanding water F 'flowing down in the groove 11A underground, and its structure is shown in FIGS. As shown, both side walls 12,12,
A bottom wall 13 connecting the lower ends of the two 2 and 12;
, A drainage guide hole 14A formed in the outer surface 12B of the side wall 12, a water collecting drainage hole 14 formed in a lower part of the bottom wall, two water spreading holes 16 formed in the bottom wall 13, and the water spreading hole 16. And a water-permeable block 17 made of detachable porous concrete closing the water-supply hole 16 and the like, all of which have the same configuration as the drainage-side gutter block 1. However, they differ from each other in the size of the inner height of the side groove (depth of the side groove).

【0011】すなわち、浸透用側溝ブロック11の内幅
Wと前記集排水用側溝ブロック1の内幅wとは同一大き
さ(W=w)であるが、浸透用側溝ブロック11の側溝
11Aの内高の深さHは前記集排水用側溝ブロック1の
側溝1Aの内高の深さhより大きく(H>h)形成され
ている。したがって、図7に示すように、両側溝ブロッ
ク11,1を地山Gの勾配に合わせて連続して設置した
場合、浸透用側溝ブロック11の底壁13の上面13B
は、集排水用側溝ブロック1の底壁3の上面3Bより一
段低い(Hとhの差)位置に設置されることになる。
That is, the inner width W of the side groove block 11 for penetration and the inner width w of the side groove block 1 for collecting and draining are the same (W = w), but the inner width W of the side groove block 11A of the side groove block 11 for penetration is different. The height H is greater than the inner height h of the side groove 1A of the drainage side groove block 1 (H> h). Therefore, as shown in FIG. 7, when the both-side groove blocks 11, 1 are continuously installed in accordance with the gradient of the ground G, the upper surface 13B of the bottom wall 13 of the infiltration side groove block 11 is formed.
Will be installed at a position one step lower (the difference between H and h) than the upper surface 3B of the bottom wall 3 of the drain / collecting drain groove block 1.

【0012】18Aは砂の層、18Bは第1砂礫層で、
この砂の層18A又は第1砂礫層18Bの上には、図1
及び図2に示す集排水用側溝ブロック1の敷設状態と同
じように、単粒度4号程度の砕石からなる砕石の層19
が形成されており、浸透用側溝ブロック11の前記両側
壁12,12の外側面12B及び底壁13の下面13A
は、夫々前記砕石の層19で完全に覆われている。20
は目詰まり防止用の透水シートで、前記砕石の層19と
地山Gとの間に設置されている。
18A is a layer of sand, 18B is a first gravel layer,
On this sand layer 18A or the first gravel layer 18B, FIG.
2 and a crushed stone layer 19 made of crushed stone having a single grain size of about 4 in the same manner as the laid state of the drainage gutter block 1 shown in FIG.
Are formed, and the outer side surfaces 12B of the both side walls 12, 12 of the permeation side groove block 11 and the lower surface 13A of the bottom wall 13 are formed.
Are completely covered with the crushed stone layers 19, respectively. 20
Is a permeable sheet for preventing clogging, and is provided between the crushed stone layer 19 and the ground G.

【0013】21はコンクリート又は合成樹脂等で形成
された水浸透管で、その周壁には多数の排水孔22が穿
設されており、前記砕石の層19中において、その上端
開口部21Aは浸透用側溝ブロック11の底壁13に設
置した前記透水ブロック17の下面と、又下端開口部2
1Bは前記砕石の層19の底部に形成した砂の層18A
又は第1砂礫層18Bと夫々面接して、垂直状態で設置
されていて、この水浸透管21内には砂利等23が充填
されている。
Reference numeral 21 denotes a water infiltration pipe formed of concrete or synthetic resin, etc., and a large number of drain holes 22 are formed in the peripheral wall thereof. The lower surface of the water-permeable block 17 installed on the bottom wall 13 of the
1B is a layer 18A of sand formed on the bottom of the layer 19 of crushed stone.
Alternatively, they are installed vertically in contact with the first gravel layer 18B, respectively, and the water infiltration pipe 21 is filled with gravel 23 or the like.

【0014】次に、その作用を説明するに、先ず集排水
用側溝ブロック1の場合、図1に示すように、地山G中
に地下水Fがあるところでは、地山G中の地下水Fは透
水シート10を透過して砕石の層9内に浸透する。そし
て、砕石の層9内に浸透したこの地下水Fは、集排水用
側溝ブロック1の側壁2に穿設した集排水孔4を通っ
て、及び底壁3の前記拡水穴6内に嵌合した透水ブロッ
ク7を透過して、夫々側溝1A内に流入し、側溝1A内
に集水された水F’は集排水用側溝ブロック1の排水勾
配に沿って流下する。
Next, the operation will be described. First, in the case of the drainage gutter block 1, where the groundwater F is in the ground G, as shown in FIG. It permeates through the water-permeable sheet 10 and into the crushed stone layer 9. The groundwater F permeated into the crushed stone layer 9 passes through the drainage hole 4 formed in the side wall 2 of the drainage gutter block 1 and fits into the water-spreading hole 6 in the bottom wall 3. The water F ′ that has passed through the water-permeable blocks 7 and flowed into the respective side grooves 1A, and collected in the side grooves 1A, flows down along the drainage gradient of the collecting and draining side groove blocks 1.

【0015】また、地下水Fが無いところでは、図2に
示すように、側溝1A内の水F’は集排水孔4を通っ
て、及び底壁3の前記拡水穴6内に嵌合した透水ブロッ
ク7を透過して、夫々砕石の層9内に浸透し、該砕石の
層9から透水シート10を透過し、又は砕石の層9から
砂の層8に浸透して、地山Gに浸透される。
Further, where there is no groundwater F, as shown in FIG. 2, the water F 'in the side groove 1A has passed through the drainage hole 4 and fitted into the water spreading hole 6 in the bottom wall 3. Permeate through the permeable block 7 and penetrate into the crushed stone layer 9 respectively, penetrate the permeable stone sheet 10 from the crushed stone layer 9, or penetrate into the sand layer 8 from the crushed stone layer 9 to the ground G Penetrated.

【0016】この場合、透水シート10を透過すること
により、また透水ブロック7を透過することにより、側
溝1A内の水F’に含まれている泥やゴミ等が透水シー
ト10及び透水ブロック7で濾過され、濾過された水の
みが地下に浸透される。このとき、砕石の層9の下方に
おいては、砕石の層9の底部に設置した砂の層8が泥や
ゴミ等を濾過する機能を果たすことになる。
In this case, by passing through the water-permeable sheet 10 and through the water-permeable block 7, mud, dust, and the like contained in the water F ′ in the side groove 1 A are removed by the water-permeable sheet 10 and the water-permeable block 7. Filtered and only filtered water seeps underground. At this time, below the crushed stone layer 9, the sand layer 8 provided at the bottom of the crushed stone layer 9 functions to filter mud, dust, and the like.

【0017】そして、前記透水ブロック7が側溝1A内
の水F’に含まれている泥やゴミ等で目詰まりした場合
には、これを取り替えることにより目詰まりを解消する
ことが出来るとゝもに、この透水ブロック7に代えて、
前記拡水穴6を普通コンクリート製のブロックで塞ぎ、
或いはこれと同時に集排水孔4を図示しない栓で塞ぐこ
とにより、地下への拡水を抑制する。
If the water permeable block 7 is clogged with mud or dust contained in the water F 'in the side groove 1A, the clogging can be eliminated by replacing it. Instead of this water-permeable block 7,
The water hole 6 is closed with an ordinary concrete block,
Alternatively, at the same time, the drainage hole 4 is closed with a plug (not shown), thereby suppressing underground water spreading.

【0018】つぎに、浸透用側溝ブロック11の作用を
説明するに、図4及び図5に示すように、側溝11A内
の水F’が地山Gに拡水浸透されるのは、前記集排水用
側溝ブロック1の図2で示す場合とほゞ同一であるが、
透水ブロック17を透過した水が地山Gに浸透される経
路においてのみ異なっている。
Next, the operation of the infiltration gutter block 11 will be described. As shown in FIG. 4 and FIG. Although it is almost the same as the case shown in FIG. 2 of the drain gutter block 1,
The difference is only in the path through which the water that has passed through the water-permeable block 17 penetrates the ground G.

【0019】すなわち、透水ブロック17を透過した水
は、水浸透管21の上端開口部21Aから内部に入り、
砂利23の隙間を通って水浸透管21内を流下し、下端
開口部21Bから、図4においては砂の層18Aに、又
図5においては長い水浸透管21を使用することにより
第1砂礫層18Bに夫々浸透する。
That is, the water that has passed through the water-permeable block 17 enters the interior through the upper end opening 21A of the water infiltration pipe 21,
The water flows down the inside of the water infiltration tube 21 through the gap of the gravel 23, and from the lower end opening 21B to the sand layer 18A in FIG. 4 and to the first gravel by using the long water infiltration tube 21 in FIG. Each penetrates the layer 18B.

【0020】同時に、水浸透管21内を流下する途中に
おいて、水は周壁に穿設した多数の排水孔22を通って
砕石の層19内に浸透し、該砕石の層19から透水シー
ト20を透過して、或いは砂の層18A,第1砂礫層1
8Bを浸透して地山Gに拡水される。なお、前記水浸透
管21の長さは、設置する土壌の状態に合わせて変更す
るものである。
At the same time, while flowing down the water permeation pipe 21, water penetrates into the crushed stone layer 19 through a number of drain holes 22 formed in the peripheral wall, and the water permeable sheet 20 is removed from the crushed stone layer 19. Permeate or sand layer 18A, first gravel layer 1
8B penetrates and spreads to ground G. The length of the water infiltration tube 21 is changed according to the condition of the soil to be installed.

【0021】而して、本発明では、前記構成からなる集
排水用側溝ブロック1と浸透用側溝ブロック11とを組
み合わせて設置する。すなわち、図7に示すように、集
排水用側溝ブロック1を20〜30個連続して設置し、
次に浸透用側溝ブロック11を一個設置して、集排水用
側溝ブロック1を20〜30個連続して設置するといっ
たように、繰り返しで敷設する。
Thus, in the present invention, the collecting / draining side groove block 1 and the permeating side groove block 11 having the above-described configuration are installed in combination. That is, as shown in FIG. 7, 20 to 30 drainage gutter blocks 1 are continuously installed,
Next, one permeation side groove block 11 is installed, and 20 to 30 collection / drainage side groove blocks 1 are successively installed.

【0022】そこで、図7に示すように、集排水用側溝
ブロック1では、地下に拡水できなかった側溝1A内の
水F’がこの集排水用側溝ブロック1の底壁3の上面3
Bより一段深くなっている浸透用側溝ブロック11の底
壁13の上面13Bの部分に貯留し、この貯留水を透水
ブロック17及び水浸透管21を介して地下に浸透させ
るものである。これにより地下に拡水できる水の量が多
くなり、集排水用側溝ブロック1内を流下して河川等に
排水する量を極力少なくすることができる。
Therefore, as shown in FIG. 7, in the drainage gutter block 1, the water F ′ in the gutter 1 A, which could not be spread underground, is filled with the upper surface 3 of the bottom wall 3 of the drainage gutter block 1.
B is stored in the upper surface 13B of the bottom wall 13 of the infiltration side groove block 11, which is one step deeper than B, and the stored water permeates underground through the permeation block 17 and the water permeation pipe 21. As a result, the amount of water that can be spread underground increases, and the amount of water that flows down the drainage gutter block 1 and drains into rivers and the like can be reduced as much as possible.

【0023】[0023]

【発明の効果】本発明に係る雨水等の浸透用側溝構造
は、上記の如く、両側壁及び底壁からなる側溝の前記底
壁に拡水穴を形成するとゝもに、該拡水穴にポーラスコ
ンクリート製の透水ブロックを着脱可能となるように装
着した集排水用側溝ブロックを、砂の層の上に敷設した
砕石の層で前記両側壁及び底壁の外側を覆った状態で複
数個連続して設置し、該集排水用側溝ブロックの間に、
該集排水用側溝ブロックよりも溝の内高が深く且つ両側
壁及び底壁からなる側溝の前記底壁に拡水穴を形成する
とゝもに、該拡水穴にポーラスコンクリート製の透水ブ
ロックを着脱可能となるように装着した浸透用側溝ブロ
ックを、その両側壁及び底壁の外側を砕石の層で覆った
状態で設置するとゝもに、該砕石の層中において、周壁
に多数の排水孔が穿設されており内部に砂利等を充填し
た水浸透管を、その上端開口部が浸透用側溝ブロックの
前記透水ブロックの下面と又下端開口部が前記砕石の層
の底部に形成した砂の層又は第1砂礫層と夫々連続して
設置し、更に前記砕石の層と地山との間に透水シートを
設置した構成であるから、地下水のあるところでは集水
し、又地下水のないところでは広範囲にわたって地下に
浸透させることができるとゝもに、拡水による土壌の汚
染を防止することができ、且つ透水ブロックを取り替え
ることにより目詰まりの発生を防止することができる。
又、地中の深い部分に直接水を浸透させることができ、
地下深部における保水量を増大させることができるとゝ
もに、浸透用側溝ブロックにおいて地下に拡水できる水
の量が多くなり、側溝内を流下して河川等に排水する量
を極力少なくすることができる、といった諸効果があ
る。
According to the gutter structure for infiltrating rainwater or the like according to the present invention, as described above, a water-spreading hole is formed in the bottom wall of the gutter composed of both side walls and a bottom wall. A plurality of continuous drainage gutter blocks, each of which is provided with a porous concrete water-permeable block so as to be detachable, are continuously covered with a layer of crushed stone laid on a layer of sand to cover the outer sides of the side walls and the bottom wall. And installed, between the drainage gutter block,
When the inside height of the groove is deeper than the drainage side drain block and the bottom wall of the side groove composed of both side walls and the bottom wall is formed with a water spreading hole, a porous concrete permeable block is formed in the water spreading hole. When the infiltration gutter block attached so as to be detachable is installed in a state where the both side walls and the outside of the bottom wall are covered with a layer of crushed stone, a large number of drain holes are formed in the peripheral wall in the layer of crushed stone. A water penetration tube filled with gravel and the like is drilled inside, the upper end opening of the bottom surface of the water permeable block of the penetration groove block and the lower end opening of the sand formed at the bottom of the crushed stone layer Layer or the first gravel layer, respectively, and a permeable sheet is installed between the crushed stone layer and the ground. Therefore, water is collected in places with groundwater, and in places without groundwater. Can penetrate underground extensively Kill the ゝ monitor, it is possible to prevent contamination of the soil by water spreading, and it is possible to prevent the occurrence of clogging by replacing the permeability block.
In addition, water can penetrate directly into deep parts of the ground,
While it is possible to increase the water holding capacity in the deep underground, the amount of water that can be spread underground in the infiltration gutter block increases, and the amount of water flowing down the gutter and draining to rivers, etc., should be minimized. There are various effects such as being able to do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】集排水用側溝ブロックによる浸透用側溝構造の
地下水の集水状態を示す作用説明横断面図である。
FIG. 1 is an operation explanatory cross-sectional view showing a state of collecting groundwater of a seepage gutter structure by a drainage gutter block.

【図2】集排水用側溝ブロックによる浸透用側溝構造の
側溝内の水の地下への浸透状態を示す作用説明横断面図
である。
FIG. 2 is an operation explanatory cross-sectional view showing a state in which water in a gutter of a seepage gutter structure by a drainage gutter block permeates underground.

【図3】集排水用側溝ブロックの一部切欠側面図であ
る。
FIG. 3 is a partially cutaway side view of a drainage gutter block.

【図4】浸透用側溝ブロックによる浸透用側溝構造の側
溝内の水の地下への浸透状態を示す作用説明横断面図で
ある。
FIG. 4 is an operation explanatory cross-sectional view showing a state in which water in a side groove of the seepage gutter structure by the seepage gutter block penetrates underground.

【図5】浸透用側溝ブロックによる浸透用側溝構造の側
溝内の水の地下への浸透状態を示す他実施例の作用説明
横断面図である。
FIG. 5 is an operation explanatory cross-sectional view of another embodiment showing a state in which water in a side gutter of the permeation gutter structure is penetrated into the underground by the permeation gutter block.

【図6】浸透用側溝ブロックの一部切欠側面図である。FIG. 6 is a partially cutaway side view of a penetration side groove block.

【図7】本発明に係る雨水等の浸透用側溝構造の側溝内
の水の地下への浸透状態を示す作用説明横断面図であ
る。
FIG. 7 is an operation explanatory cross-sectional view showing a state in which water in a gutter of the seepage gutter structure for rainwater or the like permeates underground according to the present invention.

【符号の説明】[Explanation of symbols]

1 集排水用側溝ブロック 1A 側溝 2(12) 側壁 3(13) 底壁 3A(13A) 下面 3B(13B) 上面 4(14) 集排水孔 6(16) 拡水穴 6A(16A) 段部 7(17) 透水ブロック 8 砂の層 9(19) 砕石の層 10 透水シート 11 浸透用側溝ブロック 18A 砂の層 18B 第1砂礫層 21 水浸透管 21A 上端開口部 21B 下端開口部 22 排水孔 23 砂利 DESCRIPTION OF SYMBOLS 1 Gutter block for drainage 1A Gutter 2 (12) Side wall 3 (13) Bottom wall 3A (13A) Lower surface 3B (13B) Upper surface 4 (14) Drainage hole 6 (16) Spread hole 6A (16A) Step 7 (17) Permeable block 8 Sand layer 9 (19) Crushed stone layer 10 Permeable sheet 11 Penetrating gutter block 18A Sand layer 18B First gravel layer 21 Water infiltration pipe 21A Upper opening 21B Lower opening 22 Drainage hole 23 Gravel

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E03F 1/00 E03F 5/04 E03F 5/10──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E03F 1/00 E03F 5/04 E03F 5/10

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 両側壁及び底壁からなる側溝の前記底壁
に拡水穴を形成するとゝもに、該拡水穴にポーラスコン
クリート製の透水ブロックを着脱可能となるように装着
した集排水用側溝ブロックを、砂の層の上に敷設した砕
石の層で前記両側壁及び底壁の外側を覆った状態で複数
個連続して設置し、該集排水用側溝ブロックの間に、該
集排水用側溝ブロックよりも溝の内高が深く且つ両側壁
及び底壁からなる側溝の前記底壁に拡水穴を形成すると
ゝもに、該拡水穴にポーラスコンクリート製の透水ブロ
ックを着脱可能となるように装着した浸透用側溝ブロッ
クを、その両側壁及び底壁の外側を砕石の層で覆った状
態で設置するとゝもに、該砕石の層中において、周壁に
多数の排水孔が穿設されており内部に砂利等を充填した
水浸透管を、その上端開口部が浸透用側溝ブロックの前
記透水ブロックの下面と又下端開口部が前記砕石の層の
底部に形成した砂の層又は第1砂礫層と夫々連続して設
置し、更に前記砕石の層と地山との間に透水シートを設
置したことを特徴とする雨水等の浸透用側溝構造。
1. A drainage hole in which a water-spreading hole is formed in the bottom wall of a side groove composed of both side walls and a bottom wall, and a water-permeable block made of porous concrete is detachably mounted in the water-spreading hole. A plurality of drain gutter blocks are continuously installed in such a manner that the outer sides of the side walls and the bottom wall are covered with a layer of crushed stone laid on a layer of sand. When the inside height of the groove is deeper than the drain side gutter block and a water spreading hole is formed in the bottom wall of the side gutter including the both side walls and the bottom wall, a porous concrete permeable block can be attached to and removed from the water spreading hole. When the perforated gutter block is installed so that both sides and the bottom wall are covered with a layer of crushed stone, a number of drain holes are formed in the peripheral wall in the layer of crushed stone. A water infiltration pipe with a gravel etc. An end opening is installed continuously with a lower surface of the water permeable block of the infiltration gutter block and a lower end opening is respectively connected to a sand layer or a first gravel layer formed at the bottom of the crushed stone layer. A gutter structure for penetration of rainwater or the like, characterized in that a permeable sheet is installed between the ground and the ground.
JP7087426A 1995-03-20 1995-03-20 Gutter structure for penetration of rainwater etc. Expired - Lifetime JP2784898B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7087426A JP2784898B2 (en) 1995-03-20 1995-03-20 Gutter structure for penetration of rainwater etc.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7087426A JP2784898B2 (en) 1995-03-20 1995-03-20 Gutter structure for penetration of rainwater etc.

Publications (2)

Publication Number Publication Date
JPH08260553A JPH08260553A (en) 1996-10-08
JP2784898B2 true JP2784898B2 (en) 1998-08-06

Family

ID=13914555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7087426A Expired - Lifetime JP2784898B2 (en) 1995-03-20 1995-03-20 Gutter structure for penetration of rainwater etc.

Country Status (1)

Country Link
JP (1) JP2784898B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6120210A (en) * 1998-07-28 2000-09-19 Hsu; Kenneth J. Use of porous medium in an integrated hydrologic circuit for water storage and transport in land reclamation, agriculture, and urban consumptions
JP2012172506A (en) * 2011-02-24 2012-09-10 Aso Shoji Kk Permeable type drainage structure and drainage ditch construction method
KR101663913B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures
KR101663914B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures
CN105862550B (en) * 2016-04-20 2018-09-18 成都建工预筑科技有限公司 A kind of urban rainwater processing system
CN105735460A (en) * 2016-04-20 2016-07-06 孔文艺 Seepage-prevention drainage ditch assembly
CN107569891A (en) * 2017-10-30 2018-01-12 贺州市瑞程科技有限公司 One kind recovery rainwater processing pond
KR101894740B1 (en) * 2017-12-06 2018-09-04 권혁중 Manhole for water permeability type
CN113026817A (en) * 2021-04-02 2021-06-25 中国矿业大学 Strip mine foundation pit reconstruction underground reservoir and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4613083A (en) * 1984-06-21 1986-09-23 Nordson Corporation Adjustable powder spray gun
JP3100196B2 (en) * 1991-09-11 2000-10-16 日本食品化工株式会社 Process for producing starch sugar
JPH0786247B2 (en) * 1992-02-04 1995-09-20 徳弘 梅沢 Multifunctional gutter

Also Published As

Publication number Publication date
JPH08260553A (en) 1996-10-08

Similar Documents

Publication Publication Date Title
JP4284665B2 (en) Drainage structure of gutter
JP2784898B2 (en) Gutter structure for penetration of rainwater etc.
JP2011074563A (en) Rainwater infiltration system
JP2008255757A (en) Street gutter for suppressing outflow
JP4608366B2 (en) Underdrain drainage structure and rainwater infiltration treatment method
JP3106307B2 (en) Dividing gutter structure
JP3140982B2 (en) Water treatment equipment using drain tube bundle
JP2662823B2 (en) Rainwater penetration structure
JP2000303546A (en) Draining structure of pavement
JPH04146Y2 (en)
JPH10168985A (en) Structure for promoting infiltration of surface water
JP2529892B2 (en) Road rainwater infiltration structure
JP2512469Y2 (en) Concrete U type drainage
JPH08253964A (en) Concrete block for road drainage and construction structure using the concrete block
JP2692951B2 (en) Seepage rainwater basin
JPH0529272Y2 (en)
JPS6251346B2 (en)
JPH0624459Y2 (en) Gutter device that infiltrates part of running water underground
JP2611864B2 (en) Rainwater penetration structure
JP2649087B2 (en) Permeable pavement structure
JPH02225735A (en) Constructing underground infiltration device
KR101718328B1 (en) Permeating-type side gutter assembly using inclined member and permeating pipe
JP2002339438A (en) Rainwater permeation facilities having mud accumulating tank
JPH0324702Y2 (en)
JPH0359218B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080529

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090529

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090529

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100529

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110529

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130529

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term