JP2770904B2 - Tunnel prelining method - Google Patents

Tunnel prelining method

Info

Publication number
JP2770904B2
JP2770904B2 JP7073194A JP7073194A JP2770904B2 JP 2770904 B2 JP2770904 B2 JP 2770904B2 JP 7073194 A JP7073194 A JP 7073194A JP 7073194 A JP7073194 A JP 7073194A JP 2770904 B2 JP2770904 B2 JP 2770904B2
Authority
JP
Japan
Prior art keywords
pipe
ground
injection
tunnel
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7073194A
Other languages
Japanese (ja)
Other versions
JPH07279577A (en
Inventor
光也 天野
彰 樋口
丈夫 渡辺
順矩 北川
勝美 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIGUCHI GIKO KK
Kajima Corp
Mitsui Zosen KK
Original Assignee
HIGUCHI GIKO KK
Kajima Corp
Mitsui Zosen KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIGUCHI GIKO KK, Kajima Corp, Mitsui Zosen KK filed Critical HIGUCHI GIKO KK
Priority to JP7073194A priority Critical patent/JP2770904B2/en
Publication of JPH07279577A publication Critical patent/JPH07279577A/en
Application granted granted Critical
Publication of JP2770904B2 publication Critical patent/JP2770904B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地質条件の悪いトンネ
ル工事で、地山の安定化を計る補助工法であるプレライ
ニング工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a prelining method which is an auxiliary method for stabilizing the ground in tunnel construction with poor geological conditions.

【0002】[0002]

【従来の技術】プレライニング工法は、先受工法とも呼
ばれ、地質の悪い条件における大断面トンネル工事にお
いて、地山の安定化を計る補助工法の一つである。
2. Description of the Related Art The prelining method is also referred to as a pre-installation method, and is one of auxiliary methods for stabilizing the ground in large-section tunnel construction under poor geological conditions.

【0003】近年地質条件の悪い場所での施工が増える
傾向にあり、種々の先受工法が開発されており、その概
要は図17ないし図18に示すように、トンネルアーチ
の外周に沿って鋼管等の補強管Pを角度θ、例えば12
0°に亙って打設し、その補強管Pと地山Yの間の空隙
にセメントミルク等の強化材Cを注入することにより、
トンネル掘進に先だって切羽Rの前方の地中に傘状の補
強材アーチAを形成する工法である。なお、図において
1 は掘削スラリを排出するためのエアーを送るエアー
供給チューブ、H2 はエアー抜きチューブを示す。
[0003] In recent years, there has been a tendency to increase construction in places with poor geological conditions, and various pre-installation methods have been developed. The outline of the method is as shown in Figs. Of the reinforcing pipe P at an angle θ, for example, 12
By pouring over 0 ° and injecting a reinforcing material C such as cement milk into a gap between the reinforcing pipe P and the ground Y,
This is a method of forming an umbrella-shaped reinforcing material arch A in the ground in front of the face R prior to tunnel excavation. Incidentally, the air supply tube, H 2 H 1 is sending air for discharging drilling slurry in the figure shows the air vent tube.

【0004】この先受工法については地山の条件に応じ
て、種々の工法が開発されており、それぞれ次の一長一
端がある。
Various methods have been developed for this prior receiving method in accordance with the conditions of the ground, and each method has the following advantages.

【0005】例えは、トレビチューブ工法は、高価な大
型専用機を使用し、トンネル内での移動に手間取る上、
補強材として特殊なパイプを使うため工事費が高くな
る。また礫層に対しては穿孔性能が著しく低下し、場合
によっては穿孔不能になることもある。
[0005] For example, the Trevi tube method uses an expensive large dedicated machine, takes time to move in a tunnel,
Construction costs are high because special pipes are used as reinforcement. In addition, the perforation performance of the gravel layer is significantly reduced, and in some cases, the perforation becomes impossible.

【0006】次に、比較的廉価な工法としてAGF工法
がある。この工法の特徴は拡径ビットを使って二重管方
式でφ100mm程度の鋼製パイプを打設する。穿孔機
としては油圧ジャンボを使用する。
Next, there is an AGF method as a relatively inexpensive method. The feature of this method is that a steel pipe with a diameter of about 100 mm is cast in a double-pipe system using an enlarged diameter bit. A hydraulic jumbo is used as the drilling machine.

【0007】打設終了後、内管と拡径ビットを引き抜い
てからシリカレジン等の硬化剤を注入する。ここで、パ
イプの外周には小さな穴を数多くあけてあり、ここから
硬化剤はパイプ周囲の地山に浸透する。すなわち、鋼管
は薬液注入におけるストレーナの役割も果たしている。
しかしながら、注入時パッカーは口元にあるため先端部
では圧力が上がらず地山へ浸透しにくい上、パイプ外周
へ硬化剤の浸透具合の確認は注入量の計測で行っている
ものの充分とは言えない欠点がある。
After the completion of the casting, the inner tube and the enlarged bit are pulled out, and then a hardening agent such as silica resin is injected. Here, a number of small holes are formed in the outer periphery of the pipe, from which the hardener penetrates into the ground around the pipe. That is, the steel pipe also plays a role of a strainer in injecting a chemical solution.
However, at the time of injection, the packer is at the mouth, so the pressure does not increase at the tip and it is difficult to penetrate into the ground, and the degree of penetration of the hardener into the pipe outer periphery is confirmed by measuring the injection amount, but it is not sufficient There are drawbacks.

【0008】また、ドリルジャンボを使用し、トップハ
ンマーによる穿孔法のため打設パイプ径には限界があ
り、あまり大きくできない。そのため礫層には弱い。
In addition, the diameter of a casting pipe is limited by a drilling method using a drill jumbo and a top hammer, so that the diameter cannot be too large. Therefore, it is weak to the gravel layer.

【0009】また、拡径ビットも信頼性に欠ける点があ
る。
[0009] In addition, the diameter expansion bit also lacks reliability.

【0010】[0010]

【発明が解決しようとする課題】前述の従来の先受工法
の問題点を要約すると、 (1) 補強材としてパイプの外周に穴加工を施した特
製のものを使用しており高価である。
SUMMARY OF THE INVENTION Problems to be solved by the conventional prior construction method described above can be summarized as follows: (1) As a reinforcing material, a specially-made one in which a hole is formed in the outer periphery of a pipe is used, which is expensive.

【0011】(2) 硬化剤が補強材としてのパイプの
周囲への浸透状況の確認が困難で信頼性に欠ける。
(2) It is difficult to confirm the state of penetration of the curing agent around the pipe as a reinforcing material, and the reliability is lacking.

【0012】(3) 礫層の穿孔性能が悪く、場合によ
っては穿孔不能になるケースもある。
(3) Perforation performance of the gravel layer is poor, and in some cases, perforation cannot be performed.

【0013】(4) 施工機に汎用性と機動性をもたせ
るためトンネルジャンボを活用している工法(AGF工
法)の場合、二重管による拡径ビットを採用している
が、拡径ビットの信頼性にやや不安がある(礫層の場
合)。
(4) In the case of the construction method using the tunnel jumbo (AGF construction method) in order to provide the construction machine with versatility and mobility, an enlarged bit using a double pipe is employed. There is some anxiety about reliability (in the case of gravel layer).

【0014】(5) 礫層に対応して、ロータリーパー
カッションタイプの大型トップハンマーを採用した場
合、パイプに打撃が加わるため厚肉のパイプを必要とす
るため補強材が高価になる。また、大径パイプを打設し
ようとすると重量も大きくなりハンドリングに問題が生
じる。
(5) When a rotary percussion type large top hammer is used in response to the gravel layer, the pipe is hit and a thick pipe is required, so that the reinforcing material is expensive. Further, when attempting to cast a large-diameter pipe, the weight becomes large, which causes a problem in handling.

【0015】等があげられる。And the like.

【0016】本発明は、かかる問題点を解決することを
目的としてなされたものである。
The present invention has been made to solve such a problem.

【0017】[0017]

【課題を解決するための手段】本発明によれば、地質条
件の悪いトンネル工事で、トンネルアーチの外周に沿っ
て鋼管等の補強管を打設し、補強管と地山との間の空隙
及び補強管内部にセメントミルク等の硬化剤を注入する
ことにより、トンネル掘進に先だって切羽前方の地山の
安定化を計る補助工法において、先端にロストビット付
ダウンザホールドリルを装着した内管とビット径よりも
小径の外管とからなる二重管を回転させてダウンザホー
ルドリルにより地山を穿孔し、穿孔終了後、ロストビッ
トと補強材となる外管を地中に残してダウンザホールド
リルと内管を引き抜き、次いで硬化剤注入を行い、硬化
剤注入については、まずパッカーを管先端部に置き外管
を回転させながら加圧注入して補強管外注入を行い、次
いで注入圧でパッカーを口元側へ押し下げながら補強管
内注入を行うようになっている。
According to the present invention, in a tunnel construction with poor geological conditions, a reinforcing pipe such as a steel pipe is cast along the outer periphery of the tunnel arch to form a gap between the reinforcing pipe and the ground. In addition, by injecting a hardening agent such as cement milk into the inside of the reinforcing pipe, in the auxiliary method of stabilizing the ground in front of the face prior to tunnel excavation, the inner pipe with a down the hole drill with a lost bit at the tip and the bit diameter Rotate a double pipe consisting of an outer pipe with a smaller diameter than the outer pipe, drill the ground with a down-the-hole drill, and after the drilling is completed, leave the lost pipe and the outer pipe that serves as a reinforcing material in the ground to remove the down-the-hole drill and the inner pipe. Pull out and then inject hardener.For injecting hardener, first place the packer at the tip of the pipe, pressurize and inject while rotating the outer pipe, perform outer injection of the reinforcing pipe, and then pack with the injection pressure. It is adapted to perform a reinforcing tube injection while down on the over to the mouth side.

【0018】[0018]

【作用】トンネル掘進に先だって切羽前方の地中に傘状
の補強材アーチが形成され、この補強材アーチにより地
質の悪い条件においても大断面トンネル掘進が可能とな
る。
An umbrella-shaped reinforcing material arch is formed in the ground in front of the face prior to tunnel excavation, and the reinforcing material arch enables a large-section tunnel excavation even in poor geological conditions.

【0019】施工に際し駆動は、パイプ後端に既存の削
岩機を接続して回転駆動し、穿孔はダウンザホールドリ
ルで行い外管は単に後追いで回転するだけであり、補強
材となる外管には打撃を加えないため市販の薄肉ガス管
が使用できる。
In the construction, the existing rock drill is connected to the rear end of the pipe and driven to rotate. The drilling is performed by a down-the-hole drill, and the outer pipe is simply rotated by the trailing edge. Since no impact is applied, a commercially available thin gas pipe can be used.

【0020】硬化剤は補強材となる外管外周に沿って浸
透し、口元から出てくるので、硬化剤の注入状況を目視
で確認できるので確実に行える。
Since the hardener penetrates along the outer periphery of the outer tube serving as a reinforcing material and emerges from the mouth, the injection state of the hardener can be visually confirmed, so that the hardener can be surely performed.

【0021】また、注入圧でパッカーを押し下げながら
補強管内注入を行うため、硬化剤に絶えず圧力が加わ
り、注入効果を高めることができる。
Further, since the injection into the reinforcing pipe is performed while the packer is being pushed down by the injection pressure, the pressure is constantly applied to the curing agent, and the injection effect can be enhanced.

【0022】[0022]

【実施例】図1ないし図3に本発明を実施するプレライ
ニング穿孔機Jの一例を示し、既存のアンカードリルの
ごとく、クローラ又はホイール式の台車、図示の例では
クローラ式の台車1にマスト2及びブーム4を備え、こ
のマスト2上を詳細を後述する二重管を接続した削岩機
7がパイプを回転しつつ直線移動する。マスト2はブー
ム4を介して油圧シリンダ3、5、6により俯仰し、ま
た図4に示すように角度θ、例えば120°の範囲旋回
する。
1 to 3 show an example of a prelining drilling machine J embodying the present invention. Like a conventional anchor drill, a crawler or wheel type bogie, in the illustrated example, a crawler type bogie 1 has a mast. 2 and a boom 4, and on the mast 2, a rock drill 7 to which a double pipe described in detail below is connected moves linearly while rotating the pipe. The mast 2 is raised by hydraulic cylinders 3, 5, and 6 via a boom 4, and is turned within a range of an angle θ, for example, 120 °, as shown in FIG.

【0023】まず図5ないし図10を参照して施工手順
の概要を説明する。
First, the outline of the construction procedure will be described with reference to FIGS.

【0024】トンネルT内に搬入した吹付けロボットF
により鏡部Rのコンクリート吹付けを行う(図5)。次
いで作業車Kをコンクリート吹付けを終えた鏡部Rに近
接させ、その後方に前述の穿孔機Jを配置して作業機械
の据え付けを行う(図6)。次いでパイプハンドリング
車Lで吊持した二重管Pを穿孔機Jにセットし、穿孔機
Jを駆動して穿孔とパイプ推進を行う(図7)。次いで
ロストビットと補強材となる外管を地中に残してドリル
及び内管を回収する(図8)。次いで穿孔機Jを撤去
し、グラウト機材車Mによりグラウト材を圧送してグラ
ウト注入を行う(図9)。次いで機材を撤去する(図1
0)。これを繰り返し切羽Rの前方の地中に傘状の補強
材アーチA(図18)を形成する。
The spraying robot F carried into the tunnel T
Concrete spraying of the mirror part R is carried out (FIG. 5). Next, the work vehicle K is brought close to the mirror portion R where the concrete spraying has been completed, and the above-described drilling machine J is disposed behind the work portion K to install the work machine (FIG. 6). Next, the double pipe P suspended by the pipe handling vehicle L is set on the drill J, and the drill J is driven to perform drilling and pipe propulsion (FIG. 7). Next, the drill and the inner tube are recovered while leaving the lost bit and the outer tube serving as a reinforcing material in the ground (FIG. 8). Next, the drilling machine J is removed, and the grout material is pressure-fed by the grout equipment vehicle M to perform grout injection (FIG. 9). Then remove the equipment (Fig. 1
0). This is repeated to form an umbrella-shaped reinforcing material arch A (FIG. 18) in the ground in front of the face R.

【0025】次に図11ないし図13を参照して穿孔、
外管注入、管内注入について詳述する。
Next, referring to FIG. 11 to FIG.
The outer tube injection and the inner tube injection will be described in detail.

【0026】二重管Pは内管10と外管11とからな
り、内管10の先端にはロストビット13が付いたダウ
ンザホールドリル(ハンマー)12が装着されており、
ドリル12とビット13の取付けは凹凸と孔14との係
合であり、詳細を後述する態様で容易に脱着できるよう
に連結されている。外管11はビット13のビット径よ
りも小径のものである。二重管Pを前述のプレライニン
グ穿孔機Jの削岩機7(図1)にスイベル16を介して
接続する。削岩機7を作動し二重管Pを回転駆動して地
山Yを穿孔し、同時に二重管Pを地山Y中に推進する。
その際、ビット13に設けた孔15よりエアーを噴出
し、このエアーによりスライムSを排出する(図1
1)。この際、穿孔はダウンザホールドリル12で行い
外管11は単に後追い回転するだけであり、補強材とな
る外管11には打撃を加えないため市販の薄肉ガス管を
使用することができる。
The double pipe P is composed of an inner pipe 10 and an outer pipe 11, and a down-the-hole drill (hammer) 12 with a lost bit 13 is attached to the tip of the inner pipe 10.
The attachment of the drill 12 and the bit 13 is an engagement between the concave and convex and the hole 14, and is connected so that it can be easily attached and detached in a manner described later in detail. The outer tube 11 has a smaller diameter than the bit diameter of the bit 13. The double pipe P is connected via a swivel 16 to the rock drilling machine 7 (FIG. 1) of the prelining drill J described above. The rock drill 7 is actuated to rotate and drive the double pipe P to pierce the ground Y, and at the same time to push the double pipe P into the ground Y.
At this time, air is blown out from a hole 15 provided in the bit 13 and the slime S is discharged by the air (FIG. 1).
1). At this time, the perforation is performed by the down-the-hole drill 12 and the outer tube 11 simply rotates in a backward direction. Since the outer tube 11 serving as a reinforcing material is not hit, a commercially available thin gas tube can be used.

【0027】穿孔終了後、ロストビット13と補強材と
なる外管11を地山Yに残してダウンザホールドリル1
2の内管10を引き抜き、硬化剤注入を行う。
After the drilling is completed, the lost bit 13 and the outer pipe 11 serving as a reinforcing material are left in the ground Y to make the down-the-hole drill 1
The inner tube 10 of 2 is pulled out and a hardener is injected.

【0028】外管注入については、先端にパッカー17
を装着した管18を外管11内に挿入し、パッカー17
を外管11の先端部にセットし、また外管11のトンネ
ル挿通面に台座21を、外管11の口元にストッパー2
2(図20)を設ける。管18内を通るホース19をグ
ラウト機材車M(図9)のポンプ側に接続し、外管11
を回転させながら注入口20より外管11と地山Yとの
間の空隙にセメントミルク等の硬化剤Cを注入する(図
12)。その際、硬化剤Cは外管11の外周に沿って浸
透し、口元から出てくるので注入確認できる。
For outer tube injection, packer 17
Is inserted into the outer tube 11 and the packer 17 is inserted.
Is set at the tip of the outer tube 11, the pedestal 21 is placed on the tunnel insertion surface of the outer tube 11, and the stopper 2 is placed at the mouth of the outer tube 11.
2 (FIG. 20) are provided. The hose 19 passing through the pipe 18 is connected to the pump side of the grout equipment vehicle M (FIG. 9), and the outer pipe 11
Is rotated, the hardener C such as cement milk is injected into the space between the outer pipe 11 and the ground Y through the injection port 20 (FIG. 12). At that time, the curing agent C permeates along the outer periphery of the outer tube 11 and comes out from the mouth, so that the injection can be confirmed.

【0029】管内注入については、注入圧でパッカー1
7が口元側へ後退し外管11内にセメントミルク等の硬
化剤Cを注入する(図13)。パッカー17は口元まで
来るとストッパー22で止められる。
For in-pipe injection, packer 1
7 retreats to the mouth side and injects hardening agent C such as cement milk into outer tube 11 (FIG. 13). When the packer 17 reaches the mouth, it is stopped by the stopper 22.

【0030】前述の作業を例えば120°の範囲に亙っ
て行い、切羽前方の地中に傘状の補強材アーチA(図1
8)を形成する。これにより地山Yは安定し地山崩壊を
起すことなくトンネル掘進がなされる。
The above operation is performed, for example, over a range of 120 °, and an umbrella-shaped reinforcing material arch A (FIG.
8) is formed. Thereby, the ground Y is stabilized and the tunnel excavation is performed without causing the ground collapse.

【0031】図14及び図15にドリルとビットとの接
続態様を示し、ビット13の内側には180°対向して
ピッチの異なる凹凸部が形成されており、またドリルの
シャンクロッド12Sにはこれに対応してかみ合う様に
外周に凹凸部が形成されている。ビット13内にシャン
クロッド12Sを挿入し、ビット凹凸部の突き当部
(a)、(b)にシャンクロッド凹凸部が突き当るまで
回転させることによってビット13がシャンクロッド1
2Sに結合される。
FIGS. 14 and 15 show the manner of connection between the drill and the bit. In the bit 13, concavo-convex portions having different pitches are formed inside the bit 13 so as to face each other at 180 °. An uneven portion is formed on the outer periphery so as to mesh with the shape. By inserting the shank rod 12S into the bit 13 and rotating the shank rod 1 until the shank rod uneven portion abuts against the abutting portions (a) and (b) of the bit uneven portion, the bit 13 is
Combined with 2S.

【0032】図16に本発明において好適に使用できる
パッカー17を示し、注入パイプ30の先端には逆止弁
31が設けられており、その後方に突起部32が形成さ
れている。ゴム製のパッカー袋体34がカシメリング3
5により固定されており、このパッカー袋体34内につ
る巻きバネ36が設けられている。つる巻きバネ36は
中心部を端部よく大きくしたタイコ型のものであり、こ
の中心部の径がバネの収縮、伸長により変化することを
利用したものである。突起32の近くで前方に補強管よ
りやや小径のスペーサー37が設けられており、また注
入パイプ30の後端部に形成したネジ33にリング38
がねじ込まれており、このリング38をねじ込み調節し
てバネ39のバネ力を変えることによりケーシング40
の内壁への押付け力が調節される。ケーシングとして前
記の二重管Pの外管11が採用される。
FIG. 16 shows a packer 17 which can be suitably used in the present invention. A check valve 31 is provided at the tip of the injection pipe 30 and a projection 32 is formed behind the check valve 31. Rubber packer bag 34 is caulking 3
5 and a helical spring 36 is provided in the packer bag 34. The helical spring 36 is of a Tyco type having a large center portion with a large end portion, and utilizes the fact that the diameter of the center portion changes due to contraction and expansion of the spring. A spacer 37 having a slightly smaller diameter than the reinforcing pipe is provided in front of the projection 32 and a ring 33 is formed on a screw 33 formed at the rear end of the injection pipe 30.
The ring 38 is screwed in and adjusted to change the spring force of the spring 39 so that the casing 40
The pressing force against the inner wall is adjusted. The outer tube 11 of the double tube P is employed as a casing.

【0033】使用に際し、パッカーをケーシング内に挿
入する時は、注入パイプ30の外周突起部32をスペー
サー37に突き当てた状態でさらに押し込んで行う。こ
れによりパッカー袋体34内のバネ36が伸びてバネ3
6の中心部の径が小さくなり、パッカーが強くケーシン
グ40内壁に圧接されるのを防ぐ。注入時は、注入パイ
プ30の外周突起部32はスペーサー37から離れ、バ
ネ36の中心部の径が大きくなり、パッカーは強くケー
シング40内壁に圧接する。
At the time of use, when inserting the packer into the casing, the packer is further pushed in with the outer peripheral projection 32 of the injection pipe 30 abutting against the spacer 37. As a result, the spring 36 in the packer bag body 34 expands and the spring 3
The diameter of the central portion of the casing 6 is reduced, and the packer is prevented from being strongly pressed against the inner wall of the casing 40. During injection, the outer peripheral projection 32 of the injection pipe 30 is separated from the spacer 37, the diameter of the center of the spring 36 is increased, and the packer is strongly pressed against the inner wall of the casing 40.

【0034】[0034]

【発明の効果】【The invention's effect】

(1) 補強材として、薄肉の比較的径の大きい市販の
ガス管を特別な加工なしに使える。
(1) As a reinforcing material, a commercially available thin gas pipe having a relatively large diameter can be used without any special processing.

【0035】(2) 硬化剤の注入状況を目視で確認で
きるので確実に行える。
(2) The state of injection of the curing agent can be confirmed visually, so that it can be surely performed.

【0036】(3) 硬化剤に絶えず圧力を加えながら
注入を行うため注入効果を上げることができる。
(3) Since the injection is performed while constantly applying pressure to the curing agent, the injection effect can be improved.

【0037】(4) 打設本数を少なく出来るため、工
期短縮につながる。
(4) Since the number of castings can be reduced, the construction period is shortened.

【0038】(5) 穿孔機はコンパクトで小まわりが
きき、作業性が良いうえロックボルト、水抜き用等の穿
孔も可能で汎用性がある。
(5) The drilling machine is compact, has a small workability, has good workability, and is also versatile because it can also be used for drilling rock bolts and draining water.

【0039】(6) 礫層等、地質条件の悪い地山にも
実施でき、広範囲に対応可能である。
(6) The present invention can be applied to a ground with bad geological conditions, such as a gravel layer, and can be used in a wide range.

【0040】以上のことから、本発明の工法は低い機材
費で高い作業効率を達成できるので、従来工法に比べ工
事の大幅低減が可能となる。
From the above, the construction method of the present invention can achieve high working efficiency with low equipment cost, so that the construction can be greatly reduced as compared with the conventional construction method.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の工法で使用される穿孔機の一例を示す
側面図。
FIG. 1 is a side view showing an example of a drilling machine used in the method of the present invention.

【図2】本発明の工法で使用される穿孔機の一例を示す
平面図。
FIG. 2 is a plan view showing an example of a drilling machine used in the method of the present invention.

【図3】本発明の工法で使用される穿孔機の一例を示す
正面図。
FIG. 3 is a front view showing an example of a punch used in the method of the present invention.

【図4】施工範囲を示す正面図。FIG. 4 is a front view showing a construction range.

【図5】本発明の工法の施工手順を示す鏡部コンクリー
ト吹付け図。
FIG. 5 is a mirror concrete spraying diagram showing a construction procedure of the method of the present invention.

【図6】本発明の工法の施工手順を示す作業機械据え付
け図。
FIG. 6 is a work machine installation diagram showing a construction procedure of the method of the present invention.

【図7】本発明の工法の施工手順を示す穿孔、パイプ推
進図。
FIG. 7 is a drilling and pipe propulsion diagram showing a construction procedure of the method of the present invention.

【図8】本発明の工法の施工手順を示すドリル及び内管
回収図。
FIG. 8 is a drawing of a drill and an inner pipe showing a construction procedure of the method of the present invention.

【図9】本発明の工法の施工手順を示すグラウト注入
図。
FIG. 9 is a grout injection diagram showing the construction procedure of the method of the present invention.

【図10】本発明の工法の施工手順を示す機械撤去図。FIG. 10 is a machine removal view showing a construction procedure of the construction method of the present invention.

【図11】本発明の工法における穿孔工程を示す縦断面
図。
FIG. 11 is a longitudinal sectional view showing a drilling step in the method of the present invention.

【図12】本発明の工法における外管注入工程を示す縦
断面図。
FIG. 12 is a longitudinal sectional view showing an outer tube injection step in the method of the present invention.

【図13】本発明の工法における内管注入工程を示す縦
断面図。
FIG. 13 is a longitudinal sectional view showing an inner pipe injection step in the method of the present invention.

【図14】シャンクロッドにビットを結合する態様の結
合前を示す図。
FIG. 14 is a diagram showing a state before a bit is connected to a shank rod before connection.

【図15】シャンクロッドにビットを結合する態様の結
合後を示す図。
FIG. 15 is a view showing a state in which a bit is coupled to a shank rod after coupling;

【図16】本発明の工法で使用されるパッカーの一例を
示す詳細縦断面図。
FIG. 16 is a detailed vertical sectional view showing an example of a packer used in the method of the present invention.

【図17】トンネルプレライニング工法の概要を示す縦
断面図。
FIG. 17 is a longitudinal sectional view showing an outline of a tunnel prelining method.

【図18】トンネルプレライニング工法の概要を示す横
断面図。
FIG. 18 is a cross-sectional view showing an outline of a tunnel prelining method.

【図19】トンネルプレライニング工法の概要を示す要
部の詳細縦断面図。
FIG. 19 is a detailed vertical sectional view of a main part showing an outline of a tunnel prelining method.

【図20】本発明で用いられるストッパを示す図。FIG. 20 is a diagram showing a stopper used in the present invention.

【符号の説明】[Explanation of symbols]

10・・・内管 11・・・外管 12・・・ハンマー 12S・・・シャンクロッド 13・・・ロストビット 14・・・孔 16・・・スイベル 17・・・パッカー 18・・・管 19・・・ホース 20・・・グラウト注入口 21・・・台座 22・・・ストッパー P・・・二重管 C・・・グラウト S・・・スラリー T・・・トンネル Y・・・地山 DESCRIPTION OF SYMBOLS 10 ... Inner tube 11 ... Outer tube 12 ... Hammer 12S ... Shank rod 13 ... Lost bit 14 ... Hole 16 ... Swivel 17 ... Packer 18 ... Tube 19 ... Hose 20 ... Grout inlet 21 ... Pedestal 22 ... Stopper P ... Double tube C ... Grout S ... Slurry T ... Tunnel Y ... Land

───────────────────────────────────────────────────── フロントページの続き (72)発明者 樋口 彰 東京都江戸川区篠崎町2丁目35番地 株 式会社樋口技工内 (72)発明者 渡辺 丈夫 岡山県玉野市玉3丁目1番1号 三井造 船株式会社 玉野事業所内 (72)発明者 北川 順矩 東京都中央区築地5丁目6番4号 三井 造船株式会社内 (72)発明者 前田 勝美 東京都中央区築地5丁目6番4号 三井 造船株式会社内 (58)調査した分野(Int.Cl.6,DB名) E21D 9/04──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Akira Higuchi 2-35, Shinozaki-cho, Edogawa-ku, Tokyo Inside Higuchi Engineering Co., Ltd. (72) Inventor Takeo Watanabe 3-1-1, Tamano, Tamano-shi, Okayama Mitsui (72) Inventor Junnori Kitagawa 5-6-4 Tsukiji, Chuo-ku, Tokyo Mitsui Engineering & Shipbuilding Co., Ltd. (72) Katsumi Maeda 5-6-4 Tsukiji, Chuo-ku, Tokyo Mitsui Engineering & Shipbuilding Co., Ltd. Incorporated (58) Fields surveyed (Int.Cl. 6 , DB name) E21D 9/04

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地質条件の悪いトンネル工事で、トンネル
アーチの外周に沿って鋼管等の補強管を打設し、補強管
と地山との間の空隙及び補強管内部にセメントミルク等
の硬化剤を注入することにより、トンネル掘進に先だっ
て切羽前方の地山の安定化を計る補助工法において、先
端にロストビット付ダウンザホールドリルを装着した内
管とビット径よりも小径の外管とからなる二重管を回転
させてダウンザホールドリルにより地山を穿孔し、穿孔
終了後、ロストビットと補強材となる外管を地中に残し
てダウンザホールドリルと内管を引き抜き、次いで硬化
剤注入を行い、硬化剤注入については、まずパッカーを
管先端部に置き外管を回転させながら加圧注入して補強
管外注入を行い、次いで注入圧でパッカーを口元側へ押
し下げながら補強管内注入を行うことを特徴とするトン
ネルプレライニング工法。
In a tunnel construction with poor geological conditions, a reinforcing pipe such as a steel pipe is cast along the outer periphery of a tunnel arch to harden cement milk or the like in a gap between the reinforcing pipe and the ground and inside the reinforcing pipe. In the auxiliary construction method to stabilize the ground in front of the cutting face prior to tunnel excavation by injecting an agent, an inner pipe equipped with a down-the-hole drill with a lost bit at the tip and an outer pipe smaller in diameter than the bit diameter Rotate the heavy pipe to pierce the ground with a down-the-hole drill, and after the drilling is completed, pull out the down-the-hole drill and the inner pipe, leaving the lost bit and the outer pipe that is the reinforcing material in the ground, then inject a hardener and cure. For agent injection, first place the packer at the end of the tube, press the tube while rotating the outer tube to perform injection outside the reinforcing tube, and then reinforce while pushing down the packer to the mouth with the injection pressure. Tunnel pre lining method which is characterized in that the inner injection.
JP7073194A 1994-04-08 1994-04-08 Tunnel prelining method Expired - Fee Related JP2770904B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7073194A JP2770904B2 (en) 1994-04-08 1994-04-08 Tunnel prelining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7073194A JP2770904B2 (en) 1994-04-08 1994-04-08 Tunnel prelining method

Publications (2)

Publication Number Publication Date
JPH07279577A JPH07279577A (en) 1995-10-27
JP2770904B2 true JP2770904B2 (en) 1998-07-02

Family

ID=13439979

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7073194A Expired - Fee Related JP2770904B2 (en) 1994-04-08 1994-04-08 Tunnel prelining method

Country Status (1)

Country Link
JP (1) JP2770904B2 (en)

Also Published As

Publication number Publication date
JPH07279577A (en) 1995-10-27

Similar Documents

Publication Publication Date Title
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
US3665717A (en) Method and apparatus for installing elongated rods in unstable earth formations
JP3890528B2 (en) Tunnel construction method
JP2770904B2 (en) Tunnel prelining method
JP3673186B2 (en) Concrete pile setting method and pile head gripping device
JP3731181B2 (en) Construction method of winged pile
JP2533853B2 (en) Pile construction method
JPH10266196A (en) Installation method for pipe and steel pipe pile, and steel pipe pile
CN210509213U (en) Rock pillar reinforcement system in small clear distance tunnel
JPH04146398A (en) Laying of pipeline through embankment
JP3221895B2 (en) Construction method of large-diameter underground wall body and excavation equipment for burying pipes
JPH01131715A (en) Ground improving work by horizontal injection of chemical grout
JP3675705B2 (en) Ground reinforcement method
JP2003184499A (en) Large diameter lock bolt anchor for natural ground reinforcement
JP3184456B2 (en) How to receive shield machine into the arrival shaft
JPH10176483A (en) Reinforcement and reinforcing pipe, and reinforcing and repairing method for embedded body in underground by use of the pipe
JPH0941369A (en) Method of remodeling and reinforcing construction of pile
JPH06100062B2 (en) Propulsion method and joints for propulsion method
JP5068678B2 (en) Earth retaining method and excavation member for earth retaining member standing construction used therefor
JP3177908B2 (en) Starting method of shield excavator
JP2000310094A (en) Prelining reinforcing construction technique for natural ground
JPS6039812B2 (en) Steel sheet pile construction method
JPS5945075B2 (en) Tunnel excavation method that precedes the primary lining
JP2777267B2 (en) Underground tunnel joining method and shaft shaft used for the method
JPS62296006A (en) Method and apparatus for back-filling of tunnel and grouting of surrounding ground for improvement

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980402

LAPS Cancellation because of no payment of annual fees