JP2752894B2 - File transfer device - Google Patents

File transfer device

Info

Publication number
JP2752894B2
JP2752894B2 JP5277204A JP27720493A JP2752894B2 JP 2752894 B2 JP2752894 B2 JP 2752894B2 JP 5277204 A JP5277204 A JP 5277204A JP 27720493 A JP27720493 A JP 27720493A JP 2752894 B2 JP2752894 B2 JP 2752894B2
Authority
JP
Japan
Prior art keywords
request
queue
communication path
transfer
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5277204A
Other languages
Japanese (ja)
Other versions
JPH07129480A (en
Inventor
健夫 榊原
邦浩 柚木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON DENKI SOFUTOEA KK
NEC Corp
Original Assignee
NIPPON DENKI SOFUTOEA KK
Nippon Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON DENKI SOFUTOEA KK, Nippon Electric Co Ltd filed Critical NIPPON DENKI SOFUTOEA KK
Priority to JP5277204A priority Critical patent/JP2752894B2/en
Publication of JPH07129480A publication Critical patent/JPH07129480A/en
Application granted granted Critical
Publication of JP2752894B2 publication Critical patent/JP2752894B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Information Transfer Between Computers (AREA)
  • Computer And Data Communications (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Information Transfer Systems (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、ホストコンピュータ
間で行われるファイル転送に関し、特に、ファイル転送
の緊急度に応じた優先順位をつけて実行するファイル転
送装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a file transfer performed between host computers, and more particularly, to a file transfer apparatus which executes a file transfer with a priority according to the urgency of the file transfer.

【0002】[0002]

【従来の技術】従来のホストコンピュータ間のファイル
転送は、相手のホストコンピュータ毎に、ファイル転送
のための通信パスを開設し、ファイル転送要求の先着順
に待ち行列に登録し、順次に実行する方法がとられてい
る。
2. Description of the Related Art Conventional file transfer between host computers is performed by establishing a communication path for file transfer for each partner host computer, registering the file transfer request in a queue in a first-come-first-served manner, and sequentially executing the request. Has been taken.

【0003】[0003]

【発明が解決しようとする課題】上述した従来の方法で
は、ファイル転送要求が全て同じレベルの緊急度である
として扱われるので、転送に優先順位を付けるため、フ
ァイル転送の要求者である業務処理プログラム自身がフ
ァイル転送に優先順位付けを行っている。しかし、ファ
イル転送の要求者が緊急度によってファイル転送要求の
順番付けを行っても、ファイル転送をスケジュールする
転送スケジューリング制御部、あるいは通信パスにファ
イルを送出する転送処理部で、先着の転送要求が実行さ
れているとき、それが完了しないうちは、後着であるが
緊急度の高いファイル転送を実行できない。したがっ
て、優先順位を持たせたファイル転送でも、定例的なス
ケジュールされたファイル転送以外は、優先順位の実効
を発揮できない。
In the above-mentioned conventional method, all file transfer requests are treated as having the same level of urgency. The program itself prioritizes file transfers. However, even if the requester of the file transfer orders the file transfer requests according to the degree of urgency, the transfer scheduling control unit that schedules the file transfer or the transfer processing unit that sends the file to the communication path does not receive the first transfer request. When it is running, it will not be able to perform late-arrival but urgent file transfers until it is completed. Therefore, even with the file transfer having the priority, the priority cannot be exercised except for the regularly scheduled file transfer.

【0004】[0004]

【課題を解決するための手段】この発明の目的は、ホス
トコンピュータ間のファイル転送を、それの緊急度に応
じる優先順位を付けて実行するファイル転送装置の提供
である。
SUMMARY OF THE INVENTION An object of the present invention is to provide a file transfer apparatus for executing a file transfer between host computers with a priority order according to the urgency of the file transfer.

【0005】そのため、この発明の、ホストコンピュー
タ間のファイル転送をそれの緊急度によって優先順位を
つけて実行するためにホストコンピュータが備えるファ
イル転送装置は、前記ファイル転送の緊急度に対応して
設けられる順位待ち行列に前記ファイル転送の要求を登
録し、前記要求の緊急度に対応して設けられる通信パス
が空き状況であるとき、前記要求の実行をスケジュール
する転送スケジューリング制御部と、前記通信パスがフ
ァイル転送の実行によって使用中であるか、あるいは終
了によって空き状況であるかを記憶する空き状況管理テ
ーブルと、前記転送スケジューリング制御部がスケジュ
ールしたファイル転送の要求を空き待ち行列に登録し、
前記空き待ち行列に登録された要求の緊急度に対応する
通信パスを選択し、前記通信パスを通じてファイル転送
を実行し、前記通信パスが使用中であるか、または空き
状況であるかを前記空き状況管理テーブルに登録する転
送処理部と、を備える。
Therefore, according to the present invention, the file transfer device provided in the host computer for executing the file transfer between the host computers in accordance with the priority according to the urgency thereof is provided corresponding to the urgency of the file transfer. A transfer scheduling control unit for registering the file transfer request in a priority queue, and when a communication path provided corresponding to the urgency of the request is idle, scheduling the execution of the request; Is used by the execution of the file transfer, or an empty status management table that stores whether it is an empty status by the end, and register the file transfer request scheduled by the transfer scheduling control unit in the empty queue,
Selecting a communication path corresponding to the urgency of the request registered in the empty queue, executing a file transfer through the communication path, and determining whether the communication path is in use or in an idle state; And a transfer processing unit for registering in the status management table.

【0006】[0006]

【実施例】次に、この発明について図面を参照して説明
する。
Next, the present invention will be described with reference to the drawings.

【0007】この発明の一実施例の構成を示す図1を参
照すると、このファイル転送装置1は、ファイル転送の
要求元である業務処理部(図示せず)からファイル転送
の緊急度を付した要求を受理し、それの緊急度に対応す
る高順位、あるいは中順位、または低順位の順位待ち行
列にその要求を登録し、その要求の緊急度に相当する通
信パスが空き状況にあるとき、該要求の実行をスケジュ
ールする転送スケジューリング制御部2と、スケジュー
ルされた要求を優先空き待ち行列、あるいは通常空き待
ち行列に登録し、優先空き待ち行列あるいは通常空き待
ち行列に対応する通信パスを通じてファイル転送を実行
し、該通信パスの使用中あるいは空き状況を空き状況管
理テーブル3に登録する転送処理部4と、高順位の緊急
度に対応する優先転送通信パス5と、高順位あるいは中
順位の緊急度に対応する共有要求通信パス6と、中順位
あるいは低順位の緊急度に対応する通常通信パス7と、
を有する。また、空き状況管理テーブル3の細部を説明
する図6を参照すると、優先通信パス41,共有要求通
信パス42および通常通信パス43のそれぞれが、ファ
イル転送の終了によって空き状況であるとき「0」の指
標が、また、ファイル転送の実行によって使用中である
とき「1」の指標が、それぞれの通信パスに対応する欄
44,45および46に設定される。
Referring to FIG. 1 showing the configuration of an embodiment of the present invention, the file transfer apparatus 1 assigns the urgency of file transfer from a business processing unit (not shown) which is a file transfer request source. When a request is received and the request is registered in a high-, medium-, or low-priority queue corresponding to its urgency, and a communication path corresponding to the urgency of the request is available, A transfer scheduling control unit for scheduling the execution of the request; registering the scheduled request in a priority free queue or a normal free queue; and transferring a file through a communication path corresponding to the priority free queue or the normal free queue. And a transfer processing unit 4 for registering the busy or idle state of the communication path in the idle state management table 3 and a priority corresponding to a high-order urgency. A communication path 5 feed, a sharing request communication path 6 corresponding to the urgency of high rank or medium rank, the normal communication paths 7 corresponding to the urgency of the middle rank or low rank,
Having. Referring to FIG. 6, which describes details of the availability management table 3, "0" indicates that each of the priority communication path 41, the sharing request communication path 42, and the normal communication path 43 is empty due to the end of the file transfer. The index of “1” is set in the columns 44, 45 and 46 corresponding to the respective communication paths when the index is in use by executing the file transfer.

【0008】次に、ファイル転送装置の動作を説明する
図2を参照すると、転送スケジューリング制御部2は、
高順位の緊急度のファイル転送要求を登録する高順位待
ち行列21と、中順位の緊急度のファイル転送要求を登
録する中順位待ち行列22と、低順位の緊急度のファイ
ル転送要求を登録する低順位待ち行列23と、備える。
また、高順位待ち行列21と中順位待ち行列22と低順
位待ち行列23とは、高、中、低の順番にファイル転送
要求が登録されているか否かが走査される。そして、転
送スケジューリング制御部2は、走査の順に高順位待ち
行列21に登録されているファイル転送要求があると
き、優先転送通信パス5と共有要求通信パス6のうち少
なくとも一つが空き状況にあることを空き状況管理テー
ブル3によって検知すると、転送処理部4にその要求を
送付し、優先空き待ち行列31に登録する。次に、転送
スケジューリング制御部2は中順位待ち行列22に登録
されているファイル転送要求があるとき、共有要求通信
パス6と通常要求通信パス7のうち少なくとも一つが空
き状況にあることを空き状況管理テーブル3によって検
知し、転送処理部4にその要求の実行をスケジュール
し、通常空き待ち行列32に登録する。また更に、転送
スケジューリング制御部2は低順位待ち行列23に登録
されているファイル転送要求があるとき、通常要求通信
パス7が空き状況にあることを空き状況管理テーブル3
によって検知すると、転送処理部4にその要求を送付
し、通常空き待ち行列32に登録する。
Next, referring to FIG. 2 for explaining the operation of the file transfer device, the transfer scheduling control unit 2
A high-order queue 21 for registering a file transfer request with a high-order urgency, a middle-order queue 22 for registering a file transfer request with a medium-order urgency, and a file transfer request with a low-order urgency. And a low-order queue 23.
The high-order queue 21, the middle-order queue 22, and the low-order queue 23 are scanned for file transfer requests registered in the order of high, middle, and low. Then, when there is a file transfer request registered in the high-order queue 21 in the order of scanning, the transfer scheduling control unit 2 determines that at least one of the priority transfer communication path 5 and the sharing request communication path 6 is idle. Is detected by the vacancy status management table 3, the request is sent to the transfer processing unit 4 and registered in the priority queuing queue 31. Next, when there is a file transfer request registered in the middle-rank queue 22, the transfer scheduling control unit 2 determines that at least one of the shared request communication path 6 and the normal request communication path 7 is idle. The request is detected by the management table 3, the execution of the request is scheduled in the transfer processing unit 4, and registered in the normal empty queue 32. Further, when there is a file transfer request registered in the low-priority queue 23, the transfer scheduling control unit 2 determines that the normal request communication path 7 is in a vacant state.
When the request is detected, the request is sent to the transfer processing unit 4 and registered in the normal empty queue 32.

【0009】更に、転送処理部4は、優先空き待ち行列
31、通常空き待ち行列32の順番で要求が登録されて
いるか否かを走査する。そして、転送処理部4は、優先
空き待ち行列31に要求が登録されているとき、空き状
況の優先転送通信パス5あるいは共有要求通信パス6の
うちの高位の空き通信パスを通じ、ファイル転送要求を
実行し、該通信パスが使用中であることを示す「1」の
指標を空き状況管理テーブル3に記憶させる。また、転
送処理部4は、通常空き待ち行列32に要求が登録され
ているとき、空き状況の共有要求通信パス6あるいは通
常要求通信パス7のうちの高位の空き通信パスを通じ、
ファイル転送要求を実行し、該当する通信パスを使用中
であることを示す「1」の指標を空き状況管理テーブル
3に記憶させる。
[0009] Further, the transfer processing unit 4 scans the priority empty queue 31 and the normal empty queue 32 in order to see if the request is registered. When the request is registered in the priority free queue 31, the transfer processing unit 4 sends the file transfer request through the higher priority free communication path of the free transfer priority communication path 5 or the shared request communication path 6. Then, the index of “1” indicating that the communication path is in use is stored in the availability management table 3. Further, when the request is registered in the normal idle queue 32, the transfer processing unit 4 transmits the request through the higher-level empty communication path out of the shared request communication path 6 in the empty state or the normal request communication path 7.
The file transfer request is executed, and an index of “1” indicating that the corresponding communication path is being used is stored in the availability management table 3.

【0010】次に、転送スーケジューリング部2の動作
を示す流れ図3を参照し、ファイル転送要求の受理によ
って開始する動作を例示する図4(a)と、ファイル転
送が終了し、使用していた通信パスの空き通知を転送処
理部4から受理したときの動作を例示する図4(b)と
を援用し、動作を説明する。
Next, referring to a flow chart 3 showing the operation of the transfer scheduling unit 2, FIG. 4A exemplifying an operation started by receiving a file transfer request, and FIG. The operation will be described with reference to FIG. 4B exemplifying the operation when the communication path availability notification received from the transfer processing unit 4 has been used.

【0011】先ず、転送スケジューリング制御部2は、
例示する図4(a)を参照すると、業務処理部から緊急
度が中順位のファイル転送要求を受理すると(図3のス
テップ201)、それを中順位待ち行列22に登録する
(ステップ202)。そして、転送スケジューリング制
御部2は、高順位待ち行列から中順位待ち行列、低順位
待ち行列の順に走査し(ステップ203)、高順位待ち
行列21に登録されている要求を見つける(ステップ2
04のY)。転送スケジューリング制御部2は、高順位
待ち行列21に対応する優先転送通信パス5あるいは共
有要求通信パス6が空いているか否かを空き状況管理テ
ーブル3によって、検査する。空き状況管理テーブル3
の優先転送通信パス441および共有要求通信パス45
1が共に「0」であるので空き状況にある(ステップ2
05のY)。そして、転送スケジューリング制御部2
は、高順位待ち行列21に登録されている要求を転送処
理部4に送付し、転送処理部4の優先空き待ち行列31
に登録する(ステップ206)。
First, the transfer scheduling control unit 2
Referring to FIG. 4A, when a file transfer request with a middle priority is received from the business processing unit (Step 201 in FIG. 3), it is registered in the middle queue 22 (Step 202). Then, the transfer scheduling control unit 2 scans from the high-order queue to the middle-order queue and then to the low-order queue (step 203), and finds a request registered in the high-order queue 21 (step 2).
04 Y). The transfer scheduling control unit 2 checks whether or not the priority transfer communication path 5 or the sharing request communication path 6 corresponding to the high-order queue 21 is vacant by using the vacancy management table 3. Vacancy management table 3
Priority transfer communication path 441 and share request communication path 45
Since both 1 are "0", there is an empty state (step 2
05 Y). Then, the transfer scheduling control unit 2
Sends the request registered in the high-order queue 21 to the transfer processing unit 4, and
(Step 206).

【0012】次に、ファイル転送の実行が終了したとき
の転送スケジューリング制御部2の動作は、例示する図
4(b)を参照すると、転送処理部4からファイル転送
終了による通信パスの終了通知を受理すると(ステップ
207)、転送スケジューリング制御部2は、順位待ち
行列を走査し(ステップ203)、中順位待ち行列に登
録されている要求を見つける(ステップ204のY)。
中順位待ち行列22に対応する共有要求通信パス6ある
いは通常通信パス7が空いているか否かを空き状況管理
テーブル3によって、検査する(ステップ205)。転
送スケジューリング制御部2は空き状況管理テーブル3
の共有通信パス452および通常要求通信パス462が
空き状況を示す「0」であることを判定する(ステップ
205のY)。そして、転送スケジューリング制御部2
は中順位待ち行列22に登録されている要求を転送処理
部4に送付し、転送処理部4の通常空き待ち行列32に
登録する(ステップ206)。
Next, the operation of the transfer scheduling controller 2 when the execution of the file transfer is completed will be described with reference to FIG. Upon acceptance (step 207), the transfer scheduling control unit 2 scans the rank queue (step 203) and finds a request registered in the middle rank queue (Y in step 204).
Whether the share request communication path 6 or the normal communication path 7 corresponding to the middle-rank queue 22 is vacant is checked by using the vacancy management table 3 (step 205). The transfer scheduling control unit 2 has an empty status management table 3
It is determined that the shared communication path 452 and the normal request communication path 462 are “0” indicating an empty state (Y in step 205). Then, the transfer scheduling control unit 2
Sends the request registered in the middle-ranking queue 22 to the transfer processing unit 4 and registers it in the normal empty queue 32 of the transfer processing unit 4 (step 206).

【0013】転送処理部4が転送スケジューリング制御
部2からスケジュールされた転送要求を受理するときの
動作を例示する図6(a)と、通信パスから転送終了通
知を受理するときの動作を例示する図6(b)とを援用
し、流れ図5を参照して、転送処理部4の動作を説明す
ると、転送処理部4は、転送スケジューリング制御部2
の中順位待ち行列23から転送要求を受理すると(ステ
ップ301)、転送要求を通常空き待ち行列32に登録
する(ステップ302)。転送処理部4は、空き待ち行
列を高位から走査し、優先空き待ち行列に登録されてい
る要求を見つけて(ステップ304のY)、優先空き待
ち行列31に対応する空き状況管理テーブル3の優先通
信パス443および共有要求通信パス453が両方とも
「0」であるので、高位の通信パスである優先要求通信
パス5を通じ(ステップ305のY)、優先空き待ち行
列31に登録されている要求の転送を実行する(ステッ
プ306)。そして、転送処理部4は空き状況管理テー
ブル3の優先転送通信パス443の「0」を「1」にし
て、使用中にする(ステップ307)。更に、転送処理
部4は、図6(b)を参照すると、転送終了通知を受理
すると(ステップ308)、転送終了した通常通信パス
464を使用中の「1」から空き状況の「0」にして、
転送終了を転送スケジューリング制御部2に通知する
(ステップ309)。更に、転送処理部4は、優先空き
待ち行列31および通常空き待ち行列32を高位から走
査し、通常空き待ち行列32に登録されている要求のフ
ァイル転送を通常要求通信パス7を通じ、実行する(ス
テップ304乃至307)。転送スケジューリング制御
部2あるいは転送処理部4の動作において、それぞれの
待ち行列に登録されている要求がないとき、それぞれ自
身の動作を終了させる。
FIG. 6A illustrates the operation when the transfer processing unit 4 receives a transfer request scheduled from the transfer scheduling control unit 2, and the operation when the transfer processing unit 4 receives a transfer end notification from the communication path. The operation of the transfer processing unit 4 will be described with reference to a flowchart 5 with reference to FIG. 6B.
When a transfer request is received from the middle-order queue 23 (step 301), the transfer request is registered in the normal empty queue 32 (step 302). The transfer processing unit 4 scans the vacant queue from the highest order, finds a request registered in the priority queuing queue (Y in step 304), and searches the priority in the vacancy status management table 3 corresponding to the priority queuing queue 31. Since both the communication path 443 and the sharing request communication path 453 are “0”, the request registered in the priority empty queue 31 is passed through the higher priority communication path 5 (Y in step 305). Execute transfer (step 306). Then, the transfer processing unit 4 sets “0” of the priority transfer communication path 443 of the empty state management table 3 to “1” to make the priority transfer communication path 443 in use (step 307). Further, referring to FIG. 6B, when receiving the transfer end notification (step 308), the transfer processing unit 4 changes the normal communication path 464 whose transfer has been completed from “1” in use to “0” in the idle state. hand,
The transfer scheduling controller 2 is notified of the end of the transfer (step 309). Further, the transfer processing unit 4 scans the priority free queue 31 and the normal free queue 32 from the highest order, and executes the file transfer of the request registered in the normal free queue 32 through the normal request communication path 7 ( Steps 304 to 307). In the operation of the transfer scheduling control unit 2 or the transfer processing unit 4, when there is no request registered in each queue, each operation ends.

【0014】[0014]

【発明の効果】以上説明したようにこの発明によれば、
ファイル転送要求の緊急度のそれぞれに対応する優先度
を持つ通信パスと、対応する順位待ち行列および空き待
ち行列とをを予じめ設けることによって、例えば、緊急
度が中順位あるいは低順位の長時間を要するファイルの
転送をしているとき、緊急を要するファイルの転送要求
が発生した場合、通信パスのうち優先転送通信パスは、
高順位要求に割り当てることができるので、何ら通信パ
スの空き待ちを生じないで高順位の緊急度ファイル転送
が行われる。また、この発明によれば、様様な業務でフ
ァイル転送を行う場合、それぞれの緊急度を考慮して、
転送スケジューリングを組むことができるので、一連の
ファイル転送処理の効率および柔軟性を向上させること
ができる。
As described above, according to the present invention,
By providing in advance a communication path having a priority corresponding to each urgency of a file transfer request, and a corresponding priority queue and an empty queue, for example, the urgency can be set to a medium or low priority. When transferring a file that requires time and a transfer request for an urgent file occurs, the priority transfer communication path among the communication paths is:
Since the request can be assigned to the high-order request, the high-order urgency file transfer is performed without any waiting for the communication path to be idle. Also, according to the present invention, when performing file transfer in various tasks, each urgency is taken into consideration,
Since transfer scheduling can be set, the efficiency and flexibility of a series of file transfer processes can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例の構成を示す図である。FIG. 1 is a diagram showing a configuration of an embodiment of the present invention.

【図2】図1におけるファイル転送要求の緊急度に対応
する順位待ち行列と、優先順位を有する通信パスに対応
する空き待ち行列とによるファイル転送の優先度制御を
説明する図である。
FIG. 2 is a diagram illustrating priority control of file transfer by a priority queue corresponding to the urgency of a file transfer request and an empty queue corresponding to a communication path having a priority in FIG. 1;

【図3】図1の転送スケジューリング制御部の動作の流
れ図である。
FIG. 3 is a flowchart of an operation of a transfer scheduling control unit in FIG. 1;

【図4】子図(a)および(b)は、それぞれ転送スケ
ジューリング制御部に転送要求を登録するときの動作を
例示する図、および転送終了したときの動作を例示する
図である。
FIGS. 4A and 4B are diagrams illustrating an operation when registering a transfer request in a transfer scheduling control unit, and a diagram illustrating an operation when transfer is completed, respectively;

【図5】図1の転送処理部の動作の流れ図である。FIG. 5 is a flowchart of the operation of the transfer processing unit in FIG. 1;

【図6】子図(a)および(b)は、それぞれ転送処理
部がスケジュールした転送要求を登録するときの動作を
例示する図、および転送終了したときの動作を例示する
図である。
FIGS. 6A and 6B are diagrams illustrating an operation when the transfer processing unit registers the transfer request scheduled by the transfer processing unit, and a diagram illustrating the operation when the transfer is completed;

【図7】空き状況管理テーブルの構成を示す図である。FIG. 7 is a diagram showing a configuration of an empty state management table.

【符号の説明】[Explanation of symbols]

1 ファイル転送装置 2 転送スケジューリング制御部 3 空き状況管理テーブル 4 転送処理部 5 優先転送通信パス 6 共有要求通信パス 7 通常通信パス 21 高順位待ち行列 22 中順位待ち行列 23 低順位待ち行列 31 優先空き待ち行列 32 通常空き待ち行列 DESCRIPTION OF SYMBOLS 1 File transfer apparatus 2 Transfer scheduling control unit 3 Availability management table 4 Transfer processing unit 5 Priority transfer communication path 6 Sharing request communication path 7 Normal communication path 21 High-order queue 22 Medium-order queue 23 Low-order queue 31 Priority free Queue 32 Normally empty queue

フロントページの続き (56)参考文献 特開 昭61−5361(JP,A) 特開 昭60−123950(JP,A) (58)調査した分野(Int.Cl.6,DB名) G06F 13/00 G06F 12/00 G06F 13/38 H04L 13/00Continuation of the front page (56) References JP-A-61-5361 (JP, A) JP-A-60-123950 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) G06F 13 / 00 G06F 12/00 G06F 13/38 H04L 13/00

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ホストコンピュータ間のファイル転送を
それの緊急度によって優先順位をつけて実行するために
ホストコンピュータが備えるファイル転送装置は、 前記ファイル転送の緊急度に対応して設けられる順位待
ち行列に前記ファイル転送の要求を登録し、前記要求の
緊急度に対応して設けられる通信パスが空き状況である
とき、前記要求の実行をスケジュールする転送スケジュ
ーリング制御部と、 前記通信パスがファイル転送の実行によって使用中であ
るか、あるいは終了によって空き状況であるかを記憶す
る空き状況管理テーブルと、 前記転送スケジューリング制御部がスケジュールしたフ
ァイル転送の要求を空き待ち行列に登録し、前記空き待
ち行列に登録された要求の緊急度に対応する通信パスを
選択し、前記通信パスを通じてファイル転送を実行し、
前記通信パスが使用中であるか、または空き状況である
かを前記空き状況管理テーブルに登録する転送処理部
と、を備えることを特徴とするファイル転送装置。
1. A file transfer device provided in a host computer for executing a file transfer between host computers in a priority order according to its urgency, the order queue being provided according to the urgency of the file transfer. Registering the request for file transfer, and when a communication path provided corresponding to the urgency of the request is idle, a transfer scheduling control unit that schedules execution of the request; and An empty status management table that stores whether it is in use by execution or is empty by termination, and registers a file transfer request scheduled by the transfer scheduling control unit in an empty queue, and in the empty queue Select a communication path corresponding to the registered request urgency, and To perform file transfer,
A transfer processing unit for registering whether the communication path is in use or in an empty state in the empty state management table.
【請求項2】 前記転送スケジューリング制御部は、 前記緊急度の高順位の要求を高順位待ち行列に、また前
記緊急度の中順位の要求を中順位待ち行列に、あるいは
前記緊急度の低順位の要求を低順位待ち行列にそれぞれ
登録し、前記登録がなされるときあるいは前記ファイル
転送の終了通知を受理したとき、前記高順位待ち行列お
よび中順位待ち行列および低順位待ち行列を順に前記要
求が登録されているか否かを走査し、前記通信パスのう
ち、前記高順位に対応する優先転送通信パスおよび前記
中順位に対応する共有要求通信パスのいずれか一方の前
記通信パスが空き状況であるとき、前記高順位待ち行列
に登録されている前記要求の実行をスケジュールし、前
記共有要求通信パスおよび前記低順位に対応する通常要
求通信パスのいずれか一方の前記通信パスが空き状況で
あるとき、前記中順位待ち行列に登録されている前記要
求の実行をスケジュールし、前記通常要求通信パスが空
き状況であるとき、前記低順位行列に登録されている前
記要求の実行をスケジュールすることを特徴とする請求
項1記載のファイル転送装置。
2. The transfer scheduling control unit according to claim 1, wherein said high-priority request is placed in a high-priority queue, said intermediate request is placed in a medium-priority queue, or said low-priority request is placed in a low-priority queue. Are registered in the low-priority queue, and when the registration is made or when the notification of the end of the file transfer is received, the request is transmitted through the high-priority queue, the middle-priority queue, and the low-priority queue in order. It scans whether or not the communication path is registered, and among the communication paths, one of the priority transfer communication path corresponding to the higher order and the share request communication path corresponding to the middle order is in an idle state. When the execution of the request registered in the high-order queue is scheduled, any one of the shared request communication path and the low-order normal request communication path When one of the communication paths is idle, the execution of the request registered in the middle queue is scheduled to be executed.When the normal request communication path is idle, the request is registered in the low queue. 2. The file transfer device according to claim 1, wherein the execution of the request is scheduled.
【請求項3】 前記転送処理部は、 前記転送スケジューリング制御部によってスケジュール
された前記高順位待ち行列の要求を優先空き待ち行列
に、前記転送スケジューリング制御部によってスケジュ
ールされた前記中順位待ち行列の要求あるいは前記低順
位待ち行列の要求を通常空き待ち行列に、それぞれ登録
し、前記登録がなされたとき、あるいは前記ファイル転
送の終了通知の受理によって前記終了通知を前記転送ス
ケジューリング制御部に通知するとともに通信パスの使
用中の登録を前記空き状況管理テーブルから抹消された
とき、前記優先空き待ち行列および前記通常空き待ち行
列の順に走査し、前記優先空き待ち行列に前記要求が登
録されているとき、前記要求を空き状況にある前記優先
転送通信パスあるいは前記共有要求通信パスのいずれか
高い優先順位の通信パスを通じて実行し、前記通信パス
が使用中であることを前記空き状況管理テーブルに登録
し、前記通常待ち行列に要求が登録されているとき、前
記要求を前記空き状況にある前記共有転送通信パスある
いは前記通常要求通信パスのいずれか高い優先順位の通
信パスを通じて実行し、前記通信パスが使用中であるこ
とを前記空き状況管理テーブルに登録することを特徴と
する請求項1記載のファイル転送装置。
3. The transfer processing unit, wherein the request of the high-order queue scheduled by the transfer scheduling control unit is assigned to a priority free queue, and the request of the medium-order queue scheduled by the transfer scheduling control unit is set. Alternatively, the request of the low-order queue is registered in a normal empty queue, and the completion notification is notified to the transfer scheduling control unit when the registration is made or upon receipt of the completion notification of the file transfer, and communication is performed. When the in-use registration of the path is deleted from the free space management table, the priority free queue and the normal free queue are scanned in order, and when the request is registered in the priority free queue, The priority transfer communication path or the sharing request communication in which a request is available The communication path is executed through a communication path having a higher priority, and the fact that the communication path is in use is registered in the availability management table.When a request is registered in the normal queue, the request is The method is executed through the higher priority communication path of the shared transfer communication path or the normal request communication path in the vacant state, and the fact that the communication path is in use is registered in the vacant state management table. The file transfer device according to claim 1, wherein
【請求項4】 前記空き状況管理テーブルは、 前記優先転送通信パスおよび共有要求通信パスおよび通
常要求通信パスのそれぞれに対し、使用中であるとき
「1」を登録し、空き状況であるとき「0」を登録する
ことを特徴とする請求項1記載のファイル転送装置。
4. The vacancy management table registers “1” for each of the priority transfer communication path, the sharing request communication path, and the normal request communication path when it is in use and “ 2. The file transfer device according to claim 1, wherein "0" is registered.
JP5277204A 1993-11-08 1993-11-08 File transfer device Expired - Fee Related JP2752894B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5277204A JP2752894B2 (en) 1993-11-08 1993-11-08 File transfer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5277204A JP2752894B2 (en) 1993-11-08 1993-11-08 File transfer device

Publications (2)

Publication Number Publication Date
JPH07129480A JPH07129480A (en) 1995-05-19
JP2752894B2 true JP2752894B2 (en) 1998-05-18

Family

ID=17580263

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5277204A Expired - Fee Related JP2752894B2 (en) 1993-11-08 1993-11-08 File transfer device

Country Status (1)

Country Link
JP (1) JP2752894B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5333932B2 (en) * 2009-07-17 2013-11-06 日本電気株式会社 Disk array device and control method thereof

Also Published As

Publication number Publication date
JPH07129480A (en) 1995-05-19

Similar Documents

Publication Publication Date Title
US7316017B1 (en) System and method for allocatiing communications to processors and rescheduling processes in a multiprocessor system
JP2004038758A (en) Storage controller, control method for storage controller, and program
EP0317466A2 (en) Reverse flow control mechanism and method
US7606958B2 (en) Interrupt control method, interrupt control apparatus and interrupt control medium
JPH0727503B2 (en) Data transfer control method and interface system
JPH08171526A (en) Input/output interface device and its control method
AU603876B2 (en) Multiple i/o bus virtual broadcast of programmed i/o instructions
JP2752894B2 (en) File transfer device
JPH09282288A (en) Plural-computer operation system
JP3225711B2 (en) Job processing system and job processing execution device
JPH01305461A (en) Right of using bus control system
JPH04162155A (en) File transfer control system
JPH0512173A (en) Information processor
JP2812274B2 (en) Transaction load balancing system for loosely coupled multi-computer systems
JP3112287B2 (en) Message management processor
JP3050131B2 (en) Arbitration method
JPH04367037A (en) Computer system
JPS6079461A (en) Load dispersing system
JPS61143858A (en) File share method for plural operating systems
JPS6314236A (en) Job control system
JPH0258151A (en) Common bus system
JP2576934B2 (en) Memory-mapped interrupt method
JPH0833830B2 (en) Schedule device
JPH05257718A (en) Process controller
JPH07120346B2 (en) Interprocessor communication distributed processing method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980127

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080227

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100227

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100227

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110227

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110227

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees