JP2653641B2 - River revetment method and hohari block used for it - Google Patents
River revetment method and hohari block used for itInfo
- Publication number
- JP2653641B2 JP2653641B2 JP6681995A JP6681995A JP2653641B2 JP 2653641 B2 JP2653641 B2 JP 2653641B2 JP 6681995 A JP6681995 A JP 6681995A JP 6681995 A JP6681995 A JP 6681995A JP 2653641 B2 JP2653641 B2 JP 2653641B2
- Authority
- JP
- Japan
- Prior art keywords
- slope
- block
- retaining wall
- tension
- tension block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、洪水により大量の水が
河川を流れたときに、流水によって堤防が壊れないよう
にするために、堤防の川側法面に設置される河川護岸に
ついての工法とそれに使用する法張ブロックに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a river revetment installed on the slope on the river side of a levee so that the levee is not damaged by running water when a large amount of water flows through the river due to flooding. Concerning the construction method and the tension block used for it.
【0002】[0002]
【従来の技術】日本経済の高度経済成長期においては、
量的な豊かさの追及の基で河川事業においても治水・利
水の上で必要となる機能を持つ施設のみの整備を行な
い、でき上がった施設は殺伐としたコンクリート護岸の
堤防が続く風景を作り出してしまう結果となった。[Prior Art] During the high economic growth period of the Japanese economy,
Based on the pursuit of quantitative affluence, only the facilities that have the functions required for flood control and water use will be developed in river projects, and the completed facilities will create a landscape of dying concrete dykes. The result was.
【0003】近年、国民は量的な豊かさから質的な豊か
さを求めるようになり、これに応えて河川事業において
も、水辺の美しさや潤いを維持し、更に生物の生息にも
配慮するような川づくりを基調とした社会資本の整備が
積極的に行われるようになってきた。[0003] In recent years, the people have demanded qualitative richness from quantitative richness, and in response, river businesses have maintained the beauty and moistness of the waterside and also considered the inhabitation of living organisms. The development of social capital based on the creation of rivers has been actively carried out.
【0004】従来、上記流れに沿う河川護岸工法とそれ
に使用する法張ブロックとして、次のようなものがあ
る。まず、法張ブロックとしては、図9及び図10に示
すように、法面上に設置する方形板状のブロック本体2
1と、該ブロック本体21の前端に起立する立上部22
とからなっており、立上部22の外側から擬木土留壁2
3をボルト及びナットなどの連結具24により取付け得
るようになっている。尚、ブロック本体21の周縁には
連結用鉄筋25が突設してあり、隣接する法張ブロック
と相互に連結している。[0004] Conventionally, there are the following river revetment methods along the above flow and the tension blocks used for them. First, as the tension block, as shown in FIGS. 9 and 10, a rectangular plate-shaped block body 2 to be installed on the slope.
1 and a rising portion 22 standing at the front end of the block body 21
From the outside of the rising part 22
3 can be attached by a connecting tool 24 such as a bolt and a nut. A rebar 25 for connection is provided on the periphery of the block body 21 so as to connect with the adjacent tension block.
【0005】次に、上記構成の法張ブロックを用いて河
川護岸を施工する場合は、 (1)堤防法面を掘削する (2)法面の法先に法留工を設置する (3)切削した法面に砕石を設置する (4)護岸控え厚さを確保するために砕石上に裏込コン
クリートを打設する (5)裏込コンクリート上に法張ブロックを横一直線と
なるように設置する (6)各法張ブロックから突設している鉄筋を相互に溶
接して隣接する相互の法張ブロックを連結する (7)各法張ブロック間の隙間にコンクリートを詰める (8)各法張ブロックの立上部に擬木土留壁を連結具に
より取付ける (9)各擬木土留壁の内側に土壌を詰める (10)土壌を詰めて階段状になったステップ部に芝を張
る の以上の施工手順を経て河川護岸を完成していた。Next, in the case of constructing a river revetment using the above-structured stretched block, (1) excavate a dike slope (2) install a mooring at the slope tip (3) Install crushed stone on the cut slope (4) Place backfill concrete on the crushed stone to secure the thickness of the revetment (5) Install the tension block on the backfill concrete in a horizontal straight line (6) Reinforced bars protruding from each of the tension blocks are welded to each other to connect adjacent tension blocks. (7) Concrete is filled in the gap between the tension blocks. (8) Each method Attach the artificial wood retaining wall to the upper part of the tension block with a connecting tool. (9) Fill the inside of each artificial wooden retaining wall with the soil. (10) Fill the soil with the grass on the stepped steps. The river revetment was completed through.
【0006】しかしながら、従来の法張ブロックを使用
する上記工法では、隣接する法張ブロックを相互に結合
する溶接作業が必要な上、河川護岸に対応させるための
護岸控え厚みとして不足する分を予め別にコンクリート
で打設する作業もしなければならなく、しかもコンクリ
ートを別に打設するので、法張ブロックとの一体化が図
れず護岸強度が十分に期待できないという問題点があっ
た。また、法張ブロックと擬木土留壁とをボルトなどの
連結具により連結しているため、その連結作業が厄介な
上、表面に露出する連結部分が水と接して腐蝕するおそ
れもあった。However, in the above-mentioned construction method using the conventional tension block, welding work for connecting adjacent tension blocks to each other is required, and the shortage of the thickness of the revetment for supporting the river revetment is insufficient in advance. In addition to the work of pouring concrete, since concrete is also poured separately, there is a problem in that it cannot be integrated with the tension block and the revetment strength cannot be expected sufficiently. In addition, since the connecting member such as a bolt connects the lawn block and the pseudo-wood soil retaining wall, the connecting operation is troublesome, and the connecting portion exposed on the surface may be corroded by contact with water.
【0007】[0007]
【発明が解決しようとする課題】そこで本発明は前記事
情に基づいてなされたものであり、所定の護岸控え厚み
を確実に確保できるとともに、法張ブロックとの一体化
が図られて堅牢な護岸を造ることができ、しかも施工作
業も容易且つ能率的に行うことができ、また腐蝕の懸念
の全くない河川護岸工法とそれに使用する法張ブロック
を提供することを目的とする。SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and a predetermined seawall retaining thickness can be reliably ensured, and a rigid seawall can be obtained by integrating the seawall. It is an object of the present invention to provide a river revetment method that can be used for construction, can be easily and efficiently constructed, and has no fear of corrosion, and a tension block used for the method.
【0008】[0008]
【課題を解決するための手段】本発明による河川護岸工
法は、整地した法面の法先に法留工を設置するととも
に、法面上に砕石を敷設し、次に、下面に一対の脚部を
設け且つ上面に土留壁を植設するための支持段部と土留
壁のアンカー筋を挿入するための貫通孔を形成した法張
ブロックを、該支持段部が横一列となるように前記砕石
上に順次配列し、次いで、貫通孔に土留壁下端のアンカ
ー筋を挿入してブロック下面からその一部を突出すると
ともに、支持段部上に土留壁を横一列に起立し、さらに
次いで、一対の脚部によって形成される法面の砕石と法
張ブロック下面との空隙にコンクリートを充填して、ア
ンカー筋と共に法張ブロックと一体的に固化した後、土
留壁の内側に土壌を詰めて法面の法先から法肩にかけて
階段状のステップを形成したことを特徴とする。According to the river revetment method of the present invention, a pier is installed on a slope of a leveled slope, crushed stone is laid on the slope, and then a pair of legs are provided on the lower surface. A tension block having a step and a through hole for inserting a retaining wall on the upper surface and an anchor bar of the retaining wall, and the supporting step is arranged in a horizontal row. Sequentially arranged on the crushed stone, then insert the anchor bar at the bottom of the soil retaining wall into the through hole to project a part of it from the bottom surface of the block, stand up the soil retaining wall in a horizontal row on the supporting step, and then, Concrete is filled in the void between the crushed stone on the slope formed by a pair of legs and the lower surface of the tension block, and after solidifying with the anchor block together with the anchor reinforcement, the soil is filled inside the retaining wall. Step-like steps from the slope tip to the shoulder It is characterized in that form.
【0009】また、その河川護岸工法で使用する法張ブ
ロックは、法面に配列し設置する法張ブロックであっ
て、ブロック本体の下面に、護岸控え厚に対応する一対
の脚部を設け、ブロック本体の上面に、階段施工用の土
留壁を植設するための複数段の支持段部を、法面を横切
る方向に形成してあり、前記支持段部には、土留壁下端
のアンカー筋を挿入する貫通孔を間隔を保って穿設して
あることを特徴とする。[0009] Further, the bank tension block used in the river bank construction method is a bank tension block arranged and installed on the slope, and a pair of legs corresponding to the thickness of the bank protection is provided on the lower surface of the block body. On the upper surface of the block body, a plurality of steps of support steps for planting a retaining wall for stair construction are formed in a direction crossing the slope, and the supporting steps have anchor bars at the lower end of the retaining wall. It is characterized in that through holes for inserting are provided at intervals.
【0010】[0010]
【作用】法張ブロックの下面には、護岸控え厚に対応し
た一対の脚部が設けてあり、且つ一対の脚部によって形
成される法面の砕石と法張ブロック下面との空隙にコン
クリートを充填するため、所定の護岸控え厚が確保でき
るとともに、法張ブロックとの一体化が図られる。また
この際、アンカー筋を貫通孔に挿入して支持段部上に起
立させておけば、前記の空隙に充填するコンクリートに
よって法張ブロックに土留壁が固定される。A pair of legs are provided on the lower surface of the lawn block corresponding to the thickness of the seawall, and concrete is filled into the gap between the crushed stone formed by the pair of legs and the lower surface of the lawn block. Because of the filling, a predetermined seawall thickness can be secured, and integration with the lawn block is achieved. Further, at this time, if the anchor streak is inserted into the through hole and stood upright on the support step, the soil retaining wall is fixed to the tension block by the concrete filling the void.
【0011】[0011]
【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1乃至図3は本発明による法張ブロックであ
り、コンクリートによって成形された法張ブロック1
は、方形板状のブロック本体2の上面には、鋸歯形をし
た3本の支持段部3,3,3が等間隔を保って横方向に
連続して形成してあり、そのうち1本の支持段部3はブ
ロック本体2の下縁に合致する位置に設けてある。そし
て前記各支持段部3は、法面に法張ブロック1を設置し
た際の勾配に対して法面の法肩側が略水平面状になるよ
うになっている。この水平状となる支持段部3の面に
は、適間隔を保ち横一列にブロック本体2の下面に達す
る貫通孔4が穿設してあり、図4に示すPC擬木土留壁
5の下端から延出するアンカー筋6を挿入できるように
なっている。Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 show a tension block according to the present invention, which is a tension block 1 made of concrete.
On the upper surface of the rectangular plate-shaped block main body 3, three saw tooth-shaped support step portions 3, 3, 3 are continuously formed in the lateral direction at equal intervals, and one of them is formed. The support step portion 3 is provided at a position matching the lower edge of the block body 2. Further, each of the support step portions 3 is configured such that the slope side of the slope is substantially horizontal with respect to the slope when the slope block 1 is installed on the slope. Through-holes 4 reaching the lower surface of the block main body 2 are formed in a horizontal row on the surface of the support step portion 3 which is horizontal, from the lower end of the PC artificial wood soil retaining wall 5 shown in FIG. The extending anchor muscle 6 can be inserted.
【0012】ブロック本体2の下面には、護岸控え厚に
対応する一対の脚部7,7が、それぞれ前記貫通孔4の
位置に重ならないように縦方向に突設してある。On the lower surface of the block main body 2, a pair of leg portions 7, 7 corresponding to the thickness of the revetment are vertically provided so as not to overlap the positions of the through holes 4.
【0013】上記構成される法張ブロックを用いて河川
護岸を造る手順を図5乃至図7に基づいて説明する。ま
ず、施工する堤防の法面10の表土を削り取って整地状
態の法面11に形成する(図5の(A)(B)参照)。
次に、法面11の法先に法留工12を設置する(図5の
(C)参照)。次いで前記法面11の全域にわたって砕
石13を敷設する(図5の(D)参照)。A procedure for forming a river bank using the above-structured block will be described with reference to FIGS. First, the topsoil on the slope 10 of the embankment to be constructed is scraped off to form the slope 11 in a leveled condition (see FIGS. 5A and 5B).
Next, the slanting structure 12 is installed at the tip of the slope 11 (see FIG. 5C). Next, a crushed stone 13 is laid over the entire slope 11 (see FIG. 5D).
【0014】その後、敷設した砕石13上に前記構成の
法張ブロック1を、各支持段部3が横に隣接する他の法
張ブロック1の支持段部3と横一直線上になるように順
次配列する(図6の(A)参照)。尚、この際、各支持
段部3は法面の勾配に沿って配置される法張ブロック1
に対して略水平状面を有している。次いで、各法張ブロ
ック1に穿設してある貫通孔4に、擬木土留壁のアンカ
ー筋6を挿入し、間隔をあけることなく横一直線上にP
C擬木土留壁5を支持段部3上に起立していく(図6の
(B)参照)。その後、各法張ブロックの一対の脚部
7,7によって形成されるブロック本体2と法面の砕石
13との空隙14にコンクリート15を充填する(図6
の(C)参照)。この際、充填されるコンクリート15
がブロック本体2の下面から突き出しているアンカー筋
6と共に各法張ブロック1と一体的に固化し、PC擬木
土留壁5も同時に強固に固定される。尚、このコンクリ
ートの実際の充填作業では、法張ブロックを法先から法
肩方向へ数段突き合わせた状態毎にコンクリートを注入
し充填することを法肩に至るまで順次繰り返しながら行
うものである。After that, the tension block 1 having the above-mentioned structure is sequentially placed on the laid crushed stones 13 so that each support step portion 3 is in horizontal alignment with the support step portions 3 of the other tension extension blocks 1 which are laterally adjacent to each other. Arrange (see (A) of FIG. 6). At this time, each of the supporting step portions 3 is arranged along the slope of the slope, and the tension block 1 is arranged.
Has a substantially horizontal surface. Next, the anchor muscles 6 of the pseudo-wood soil retaining wall are inserted into the through-holes 4 formed in each of the tension blocks 1, and P is placed in a horizontal straight line without any space.
The C pseudo-wood soil retaining wall 5 is erected on the support step portion 3 (see FIG. 6B). Then, concrete 15 is filled into the gap 14 between the block body 2 formed by the pair of leg portions 7, 7 of each of the tension blocks and the crushed stone 13 on the slope (FIG. 6).
(See (C)). At this time, the concrete 15 to be filled
Together with the anchor bars 6 projecting from the lower surface of the block body 2 are solidified integrally with each of the tensioned blocks 1, and the PC pseudo wood soil retaining wall 5 is also firmly fixed at the same time. In the actual filling work of the concrete, the concrete is poured and filled every time the tension blocks are abutted from the tip of the toe in the direction of the shoulder in several steps until the shoulder is repeated.
【0015】最後にPC擬木土留壁5の内側に土壌16
を詰めて法面の法先から法肩までに至る階段状のステッ
プを形成し、さらに該ステップに芝17を植付けて河川
護岸を完成するものである(図7参照)。Finally, soil 16 is placed inside the PC artificial wood soil retaining wall 5.
To form a step-like step from the tip of the slope to the shoulder of the slope, and turf 17 is planted in the step to complete the river revetment (see FIG. 7).
【0016】この河川護岸工法に使用する法張ブロック
としては、前述した3本の支持段部を有する法張ブロッ
クに替えて、図8に示すように2本の支持段部3,3を
定間隔に形成してある法張ブロック1を用いてもよい。As the tension block used for this river revetment method, the above tension block having three support steps is replaced with two support steps 3 and 3 as shown in FIG. The normal tension blocks 1 formed at intervals may be used.
【0017】[0017]
【発明の効果】本発明によれば、使用する法張ブロック
には護岸控え厚に対応した一対の脚部を突設してあり、
当該脚部によって形成される空隙にコンクリートを充填
することにより護岸の施工を行うものであるため、その
充填コンクリートと法張ブロックとの一体化が確実に図
られて強度に優れた護岸を提供でき、しかもその施工の
効率化並びに省力化をも図ることができる。According to the present invention, a pair of leg portions corresponding to the thickness of the revetment are provided in a protruding manner on the tension block to be used,
Since the revetment is constructed by filling concrete into the voids formed by the legs, the filled concrete and the lawn block can be reliably integrated, and a revetment with excellent strength can be provided. Moreover, the efficiency and labor saving of the construction can be achieved.
【0018】また、土留壁のアンカー筋を法張ブロック
にあけてある穴に挿入するだけで空隙に充填するコンク
リートによって法張ブロックに土留壁を固定できるの
で、階段部を施工する作業が至極容易且つ迅速にでき、
しかも充填コンクリーによって法張ブロックと一体的に
固定される土留壁の取付強度は強固であり、且つ腐蝕す
るおそれも全くない。さらに、一箇の法張ブロックに複
数段の階段を施工することができるので、施工の迅速化
をも図ることもできる。Further, since the anchoring bar of the retaining wall can be fixed to the retaining block by concrete filling the gap simply by inserting the anchor bar of the retaining wall into the hole formed in the retaining block, the work of constructing the stairs is extremely easy. And quickly
In addition, the mounting strength of the retaining wall fixed integrally with the tension block by the filling concrete is strong, and there is no possibility of corrosion. Furthermore, since it is possible to construct a plurality of stairs on a single upholstered block, it is possible to speed up the construction.
【図1】本発明の法張ブロックの一実施例を示す斜視図
である。FIG. 1 is a perspective view showing an embodiment of a tension block of the present invention.
【図2】図1のX−X線矢視の断面図ある。FIG. 2 is a sectional view taken along line XX of FIG.
【図3】図1のY−Y線矢視の断面図ある。3 is a cross-sectional view taken along the line YY of FIG.
【図4】本発明で使用する土留壁の一例を示す斜視図で
ある。FIG. 4 is a perspective view showing an example of a retaining wall used in the present invention.
【図5】(A)(B)(C)(D)本発明による工法の
序盤の施工手順を示す説明図である。5 (A), (B), (C), and (D) are explanatory views showing a construction procedure of the opening stage of the construction method according to the present invention.
【図6】(A)(B)(C)本発明による工法の中盤の
施工手順を示す説明図である。6 (A), (B), and (C) are explanatory views showing the procedure for constructing the middle section of the construction method according to the present invention.
【図7】本発明による工法の終盤の施工手順を示す説明
図である。FIG. 7 is an explanatory view showing a construction procedure of the final stage of the construction method according to the present invention.
【図8】本発明による法張ブロックの他の実施例を示す
斜視図である。FIG. 8 is a perspective view showing another embodiment of the tension block according to the present invention.
【図9】従来工法で使用されていた法張ブロック及び該
ブロックと土留壁との連結状態を示す斜視図である。FIG. 9 is a perspective view showing a tension block used in the conventional method and a connection state between the block and the retaining wall.
【図10】図9の断面図である。10 is a cross-sectional view of FIG.
1 法張ブロック 2 ブロック本体 3 支持段部 4 貫通孔 5 土留壁 6 アンカー筋 7 脚部 11 整地した法面 12 法留工 13 砕石 14 空隙 15 コンクリート 16 土壌 DESCRIPTION OF SYMBOLS 1 Legal block 2 Block main body 3 Support step part 4 Through-hole 5 Soil wall 6 Anchor bar 7 Leg 11 Ground leveled slope 12 Horidome 13 Crushed stone 14 Void 15 Concrete 16 Soil
───────────────────────────────────────────────────── フロントページの続き (72)発明者 佐々木 昌明 富山県新湊市新堀34番地 共栄コンクリ ート株式会社内 (56)参考文献 特公 平5−85685(JP,B2) ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Masaaki Sasaki 34 Shinbori, Shinminato City, Toyama Prefecture Kyoei Concrete Co., Ltd. (56) References Japanese Patent Publication 5-85685 (JP, B2)
Claims (2)
(12)を設置すると共に、法面上に砕石(13)を敷
設し、次に、下面に一対の脚部(7,7)を設け且つ上
面に土留壁(5)を植設するための支持段部(3)と土
留壁のアンカー筋(6)を挿入するための貫通孔(4)
を形成した法張ブロック(1)を、該支持段部(3)が
横一列となるように前記砕石(13)上に順次配列し、
次いで、貫通孔(4)に土留壁下端のアンカー筋(6)
を挿入してブロック下面からその一部を突出すると共
に、支持段部(3)上に土留壁(5)を横一列に起立
し、さらに次いで、一対の脚部(7,7)によって形成
される法面の砕石(13)と法張ブロック(1)下面と
の空隙(14)にコンクリート(15)を充填して、ア
ンカー筋(6)と共に法張ブロック(1)と一体的に固
化した後、土留壁(5)の内側に土壌(16)を詰めて
法面の法先から法肩にかけて階段状のステップを形成し
たことを特徴とする河川護岸工法。1. A method for setting a slope (11) on a slope of a leveled slope (11), laying crushed stone (13) on the slope, and a pair of legs (7) on a lower surface. , 7) and a supporting step portion (3) for implanting a retaining wall (5) on the upper surface and a through hole (4) for inserting an anchor bar (6) of the retaining wall (6).
Arranging the tension block (1) on which the supporting steps (3) are formed on the crushed stone (13) so that the supporting steps (3) are in a horizontal row.
Then, anchor holes (6) at the lower end of the retaining wall are placed in the through holes (4).
And a part of the block is protruded from the lower surface of the block, and the retaining wall (5) is erected in a horizontal row on the supporting step (3), and then formed by a pair of legs (7, 7). Concrete (15) was filled into the void (14) between the crushed stone (13) on the slope and the lower surface of the tension block (1) and solidified together with the anchor reinforcement (6) together with the tension block (1). After that, the river bank protection method is characterized in that the soil (16) is packed inside the retaining wall (5) to form a step-like step from the slope tip to the shoulder.
(1)であって、ブロック本体(2)の下面に、護岸控
え厚に対応する一対の脚部(7,7)を設け、ブロック
本体(2)の上面に、階段施工用の土留壁(5)を植設
するための複数段の支持段部(3)を、法面を横切る方
向に形成してあり、前記支持段部(3)には、土留壁下
端のアンカー筋(6)を挿入する貫通孔(4)を間隔を
保って穿設してあることを特徴とする法張ブロック。2. A tension block (1) arranged and arranged on a slope, wherein a pair of leg portions (7, 7) corresponding to the thickness of the revetment is provided on the lower surface of the block body (2), On the upper surface of the main body (2), a plurality of support steps (3) for planting a retaining wall (5) for stair construction are formed in a direction crossing the slope, and the support steps (3) are formed. In 3), a tension block, characterized in that through holes (4) for inserting the anchor streaks (6) at the lower end of the soil retaining wall are formed at intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6681995A JP2653641B2 (en) | 1995-02-28 | 1995-02-28 | River revetment method and hohari block used for it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6681995A JP2653641B2 (en) | 1995-02-28 | 1995-02-28 | River revetment method and hohari block used for it |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08232238A JPH08232238A (en) | 1996-09-10 |
JP2653641B2 true JP2653641B2 (en) | 1997-09-17 |
Family
ID=13326851
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6681995A Expired - Fee Related JP2653641B2 (en) | 1995-02-28 | 1995-02-28 | River revetment method and hohari block used for it |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2653641B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113944117A (en) * | 2021-10-29 | 2022-01-18 | 成都未来智隧科技有限公司 | Slope protection structure |
-
1995
- 1995-02-28 JP JP6681995A patent/JP2653641B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08232238A (en) | 1996-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7076925B2 (en) | Integrated footings | |
CA2420991C (en) | Integrated footings | |
US2803113A (en) | Erosion preventive device | |
JP2653641B2 (en) | River revetment method and hohari block used for it | |
JP2000144769A (en) | Method of landslide protection work for preparing housing lot | |
JP2000096586A (en) | Hollow block for hiding opening and laying method therefor | |
KR20040046148A (en) | Vegetation block, and method for constructing vegetation retaining wall and bank protection using the block | |
KR100705934B1 (en) | Interval adjusting device of gardening block and anchor block | |
JPH10280443A (en) | Block for slope face, and slope face construction forming method | |
JPH073747A (en) | Concrete block for boulder levee | |
JP2000054344A (en) | Structure for face of slope and revetment retaining wall and construction method therefor | |
JP3249048B2 (en) | Bridge type fishway | |
JP2004308244A (en) | Retaining-wall block, partitioning board and method for constructing retaining wall | |
KR102724785B1 (en) | Landscape retaining wall structure | |
JP3016040U (en) | Front empty loading Rear kneading soil retaining wall | |
JP3227020U (en) | Levee reinforcement device | |
JP2781166B2 (en) | Wooden capsule for earthwork and civil engineering construction method using the same | |
KR200405490Y1 (en) | Basic structure of a bank | |
JP3582024B2 (en) | Channel type woodwork sinking block and woodwork sinking work | |
JPH0321709A (en) | Revetment retaining wall block body with road plate and road widening method using block body | |
JP3119291B2 (en) | Construction method of cast-in-place frame | |
JPS6397721A (en) | Slope frame construction work | |
JP3423699B2 (en) | Concrete block used for revetment etc. | |
JPH10212714A (en) | River improving method and river structure | |
JPS61261528A (en) | Retaining wall with sheathing plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |