JP2637951B2 - Machine work method in loom - Google Patents

Machine work method in loom

Info

Publication number
JP2637951B2
JP2637951B2 JP61026196A JP2619686A JP2637951B2 JP 2637951 B2 JP2637951 B2 JP 2637951B2 JP 61026196 A JP61026196 A JP 61026196A JP 2619686 A JP2619686 A JP 2619686A JP 2637951 B2 JP2637951 B2 JP 2637951B2
Authority
JP
Japan
Prior art keywords
warp beam
loom
carrier
empty
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61026196A
Other languages
Japanese (ja)
Other versions
JPS62184153A (en
Inventor
政明 斉藤
哲憲 藤本
一 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Jidoshokki Seisakusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Jidoshokki Seisakusho KK filed Critical Toyoda Jidoshokki Seisakusho KK
Priority to JP61026196A priority Critical patent/JP2637951B2/en
Publication of JPS62184153A publication Critical patent/JPS62184153A/en
Application granted granted Critical
Publication of JP2637951B2 publication Critical patent/JP2637951B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Auxiliary Weaving Apparatuses, Weavers' Tools, And Shuttles (AREA)

Description

【発明の詳細な説明】 発明の目的 (産業上の利用分野) 本発明は、織機から空ワープビームを取り外した後に
フルワープビームを装着する機仕掛け作業の方法に関す
るものである。
Description: Object of the invention (industrial application field) The present invention relates to a method of a rigging operation of mounting a full warp beam after removing an empty warp beam from a loom.

(従来の技術) 経糸を消費された機械上の空ワープビームを織機から
取り外し、代わりにフルワープビームを織機に装着する
機仕掛け作業では、織機上の空ワープビームを機仕掛け
準備室に運搬し、かつ機仕掛け準備室から前記織機まで
フルワープビームを運搬する作業工程は不可欠であり、
従来の機仕掛け作業では空ワープビーム及びフルワープ
ビームの運搬には1台の運搬車が使用されている。
(Prior art) In the mocking work in which the empty warp beam on the machine in which the warp has been consumed is removed from the loom and a full warp beam is mounted on the loom instead, the empty warp beam on the loom is transported to the mocking preparation room, and the mocking is performed. The work process of transporting the full warp beam from the preparation room to the loom is indispensable,
In the conventional mechanical work, one carrier is used to transport the empty warp beam and the full warp beam.

(発明が解決しようとする問題点) 空ワープビーム及びフルワープビームの運搬を1台の
運搬車でまかなう作業方法では、まず機仕掛け準備室か
ら織機まで前記運搬車を移動して同運搬車に空ワープビ
ームを移載し、この空ワープビームを載せた運搬車を機
仕掛け準備室に移動して空ワープビームからフルワープ
ビームに載置替えし、このフルワープビームを載置した
運搬車を織機の仕掛け作業位置まで移動して織機上にフ
ルワープビームを装着し、さらに運搬車を機仕掛け作業
位置へ移動するという作業順序が必要である。このよう
な作業順序では機仕掛け作業1回について運搬車が機仕
掛け準備室と織機との間を2往復せざるを得ず、しかも
機仕掛け準備室において空ワープビームからフルワープ
ビームへの載置替え作業が伴うため、機台稼動効率低下
に繋がる長時間作業が避けられない。
(Problems to be Solved by the Invention) In the work method in which the empty warp beam and the full warp beam are transported by one transport vehicle, first, the transport vehicle is moved from the machine preparation preparation room to the loom, and is transferred to the locomotive. Transfer the empty warp beam, move the carrier with the empty warp beam to the mechanism preparation room, replace the empty warp beam with the full warp beam, and remove the carrier with the full warp beam. It is necessary to move to the looming work position of the loom, mount the full warp beam on the loom, and further move the transport vehicle to the looming work position. In such an operation sequence, the transport vehicle has to make two reciprocations between the machine preparation room and the loom for one time of the machine work, and furthermore, places the empty warp beam on the full warp beam in the machine preparation room. Since the replacement work is involved, it is inevitable that the work for a long time leads to a decrease in the machine operation efficiency.

発明の構成 (問題点を解決するための手段) そこで本発明では、ワープビームの支持部材と少なく
とも綜絖枠及び筬の支持部材とをそれぞれ備えた空ワー
プビーム専用運搬車及びフルワープビーム専用運搬車を
機仕掛け準備室に待機させ、前記空ワープビーム専用運
搬車は空の状態で待機させるとともに、前記フルワープ
ビーム専用運搬車はフルワープビームと同ビームの経糸
を挿通した少なくとも綜絖枠及び筬とを前記各支持部材
に支持した状態で待機させ、製織室内に配設された複数
の織機のうち機仕掛けを必要とする織機が存在すると、
同織機の機仕掛け作業位置へ機仕掛け準備室に待機して
いる空ワープビーム専用運搬車を移動配置し、前記機仕
掛け作業位置にて織機上から前記空ワープビーム専用運
搬車へ空ワープビームと少なくとも綜絖枠及び筬とを移
載した後、この空ワープビーム専用運搬車を機仕掛け準
備室へ移動し、該機仕掛け準備室にて前記空ワープビー
ム、綜絖枠及び筬を空ワープビーム専用運搬車からおろ
しておくとともに、機仕掛け準備室に待機しているフル
ワープビーム専用運搬車を前記織機の機仕掛け作業位置
へ移動配置し、同フルワープビーム専用運搬車から前記
織機へフルワープビームと少なくとも綜絖枠及び筬とを
移載した後、同フルワープビーム専用運搬車を前記機仕
掛け準備室へ移動し、該機仕掛け準備室にて前記フルワ
ープビーム専用運搬車に新しいフルワープビームと少な
くとも綜絖枠及び筬とを載置するという方法をとってい
る。
Configuration of the Invention (Means for Solving the Problems) Therefore, in the present invention, an empty warp beam dedicated transport vehicle and a full warp beam exclusive transport vehicle each including a warp beam support member and at least a heald frame and a reed support member are provided. While waiting for the empty warp beam dedicated carrier in the empty state, and the full warp beam dedicated transport vehicle has at least a heald frame and a reed through which the warp of the full warp beam and the same beam are inserted. Is held in a state of being supported by each of the support members, when there is a loom that requires a mechanism among a plurality of looms disposed in the weaving room,
Move the empty warp beam dedicated carrier waiting in the machine preparation room to the machine working position of the loom, and move the empty warp beam to the empty warp beam dedicated carrier from above the loom at the machine working position. After transferring at least the heald frame and the reed, the empty warp beam dedicated transporter is moved to the mechanism preparation room, and the empty warp beam, the heald frame and the reed are transported exclusively for the empty warp beam in the mechanism preparation room. While moving down from the car, move the full warp beam dedicated carrier waiting in the machine preparation room to the machine working position of the loom, and arrange the full warp beam from the dedicated full warp beam carrier to the loom. After transferring at least the heald frame and the reed, the full-warp beam carrier is moved to the mechanism preparation room, and the full warp beam dedicated carrier is moved there. It has taken a way that the car new full warp beam and is placed at least heddle frames and reed.

(作用) すなわち、ワープビームの支持部材と少なくとも綜絖
枠及び筬の支持部材とをそれぞれ備えた空ワープビーム
専用運搬車及びフルワープビーム専用運搬車を機仕掛け
準備室に待機させ、前記空ワープビーム専用運搬車は空
の状態で待機させるとともに、前記フルワープビーム専
用運搬車はフルワープビームと同ビームの経糸を挿通し
た少なくとも綜絖枠及び筬とを前記各支持部材に支持し
た状態で待機させたことにより、空ワープビーム専用運
搬車及びフルワープビーム専用運搬車はいずれも機仕掛
け作業1回について機仕掛け準備室と織機との間を1往
復するのみで済む。従って、両専用運搬車の運行タイミ
ングを適宜設定することにより運行時間の短縮化が可能
であり、しかも織機における空ワープビームの取り外し
作業とフルワープビームの装着作業との間に、従来必要
であった機仕掛け準備室における空ワープビームからフ
ルワープビームヘの載置替えという工程が不要となり、
織機の機仕掛け位置における機仕掛け作業の時間短縮化
が可能となる。
(Effect) That is, an empty warp beam carrier and a full warp beam carrier provided with a warp beam support member and at least a heald frame and a reed support member, respectively, are caused to stand by in a mechanism preparation room, and the empty warp beam is provided. The dedicated transport vehicle was made to stand by in an empty state, and the full warp beam dedicated transport vehicle was made to stand by while supporting the full warp beam and at least the heald frame and the reed through which the warp of the beam was inserted by the support members. As a result, both the empty warp beam carrier and the full warp beam carrier require only one round trip between the machine preparation room and the loom for one machine work. Therefore, it is possible to shorten the operation time by appropriately setting the operation timing of the two dedicated carriers, and it is conventionally necessary between the work of removing the empty warp beam and the work of mounting the full warp beam on the loom. The process of replacing the empty warp beam with the full warp beam in the machine preparation room is no longer necessary,
It is possible to reduce the time required for the looming operation at the looming position of the loom.

(実施例) 以下、本発明を具体化した一実施例を図面に基づいて
説明する。
(Embodiment) Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図に示すように製織室1内には多数の織機2,2Aが
整列配置されている。同図において横列の織機群間には
1つ置きに溝状の作業レールRが載置されており、各織
機2,2Aの機台後部側が作業レールRを挟んで対向されて
いる。製織室1から離れた所には機仕掛け準備室23が設
けられており、製織室1内の作業レールRに接続する一
対の待機レールR1,R2が載置されている。一方の待機レ
ールR1上にはフルワープビーム3を載置したフルワープ
ビーム専用運搬車4が常には待機しており、他方の待機
レールR2上には空ワープビーム専用運搬車5が常には待
機している。
As shown in FIG. 1, a large number of looms 2 and 2A are arranged in a weaving room 1. In this figure, groove-shaped work rails R are placed every other between the rows of looms, and the rear portions of the looms of the looms 2, 2A face each other with the work rail R interposed therebetween. At a location remote from the weaving room 1, a machine preparation room 23 is provided, on which a pair of standby rails R1, R2 connected to a work rail R in the weaving room 1 is mounted. A full-warp beam carrier 4 carrying a full warp beam 3 is always on standby on one standby rail R1, and an empty warp beam carrier 4 is always on the other standby rail R2. doing.

空ワープビーム専用運搬車5が第2図に示されている
とともに、フルワープビーム専用運搬車4が第3図に示
されており、両専用運搬車4,5は同一の構成である。そ
こで、第2図に示す空ワープビーム専用運搬車5の構成
についてのみ説明すると、待機レールR1,R2及び作業レ
ールR内を転動案内されるキャスタ6に支持される支持
台7の左右両端部上面には空ワープビーム移載用の主油
圧シリンダ8、同シリンダ8に連結された補助油圧シリ
ンダ9、移載案内用の油圧シリンダ10がそれぞれ設置さ
れている。主油圧シリンダ8の駆動ロッド8aの先端部に
はワープビーム軸11を載置支持する支持凹部8bが設けら
れており、同凹部8bにワープビーム軸11を載置した状態
で主及び補助の両油圧シリンダ8,9を作動することによ
り空ワープビーム22を織機2から支持台7側へ移載し得
るようになっている。油圧シリンダ10の駆動ロッド10a
には移載案内及び転倒防止用のレバー12が連結されてい
る。
An empty warp beam carrier 4 is shown in FIG. 2 and a full warp beam carrier 4 is shown in FIG. 3, and both carrier vehicles 4 and 5 have the same configuration. Therefore, only the configuration of the empty warp beam carrier 5 shown in FIG. 2 will be described. The left and right ends of the support 7 supported by the casters 6 rollingly guided in the standby rails R1, R2 and the work rail R will be described. On the upper surface, a main hydraulic cylinder 8 for transferring an empty warp beam, an auxiliary hydraulic cylinder 9 connected to the cylinder 8, and a hydraulic cylinder 10 for guiding the transfer are respectively installed. At the tip of the drive rod 8a of the main hydraulic cylinder 8, there is provided a support recess 8b for mounting and supporting the warp beam shaft 11, and both the main and auxiliary shafts are mounted with the warp beam shaft 11 mounted on the recess 8b. By operating the hydraulic cylinders 8, 9, the empty warp beam 22 can be transferred from the loom 2 to the support 7 side. Drive rod 10a of hydraulic cylinder 10
Is connected to a lever 12 for transfer guide and overturn prevention.

両主油圧シリンダ8の基端部間には一対の昇降用油圧
シリンダ13が立設されており、その駆動ロッド13aが先
端部には水平動用の油圧シリンダ14が貫設支持されてい
る。油圧シリンダ14の駆動ロッド14aの先端部には支持
ハンガー15が吊下支持されており、同支持ハンガー15に
は一対の支持フック16,17及び把持器18が吊下支持され
ている。支持フック16は経糸切断検出用のドロッパ装置
19Aを載置支持し、支持フック17は複数枚の綜絖枠20Aを
吊下支持し、把持器18は筬21Aを把持して支持し得るよ
うになっている。すなわち、空ワープビーム専用運搬車
5は、第2図に示す機仕掛け作業位置においてレバー12
を織機2側に接続し、この状態で油圧シリンダ13,14を
作動することにより支持フック16,17及び把持器18を織
機上に近接配置し、これら各部材にドロッパ装置19A、
綜絖枠20A及び筬21Aを移載するとともに、主及び補助の
両油圧シリンダ8,9を作動して織機2上の空ワープビー
ム22の支持合7側へ移載するものであり、空ワープビー
ム22の残糸T1はドロッパ載置19A、綜絖枠20A及び筬21A
に挿通維持される。なお、運搬車5の走行及び各油圧シ
リンダ8,9,10,13,14の作動は支持台7上の制御装置Cに
より制御されるようになっている。
A pair of elevating hydraulic cylinders 13 are erected between the base ends of the two main hydraulic cylinders 8, and a driving rod 13 a has a front end supported by a hydraulic cylinder 14 for horizontal movement. A support hanger 15 is suspended and supported at the tip of the drive rod 14a of the hydraulic cylinder 14, and a pair of support hooks 16 and 17 and a gripper 18 are suspended and supported by the support hanger 15. Support hook 16 is a dropper device for detecting warp cut
The support hook 17 supports the plurality of heald frames 20A in a suspended manner, and the gripper 18 can grip and support the reed 21A. That is, the empty warp beam carrier 5 moves the lever 12 in the mechanism setting operation position shown in FIG.
Is connected to the loom 2 side, and by operating the hydraulic cylinders 13 and 14 in this state, the support hooks 16 and 17 and the gripper 18 are arranged close to the loom, and a dropper device 19A is attached to each of these members.
The heald frame 20A and the reed 21A are transferred and the main and auxiliary hydraulic cylinders 8 and 9 are operated to transfer the heap frame 20A to the support 7 of the empty warp beam 22 on the loom 2. Residual thread T1 is dropper mounting 19A, heald frame 20A and reed 21A
Is maintained. The traveling of the transport vehicle 5 and the operations of the hydraulic cylinders 8, 9, 10, 13, and 14 are controlled by the control device C on the support base 7.

第3図に示すフルワープビーム専用運搬車4で前記機
仕掛け作業位置において支持台7上のフルワープビーム
3が織機2側に移載され、支持フック16,17及び把持器1
8に支持され、かつフルワープビーム3の経糸Tを通さ
れたドロッパ装置19B、綜絖枠20B及び筬21Bが織機2の
所定位置に移載される。
The full warp beam 3 on the support base 7 is transferred to the loom 2 at the mocking work position by the full warp beam carrier 4 shown in FIG. 3, and the support hooks 16 and 17 and the gripper 1 are moved.
The dropper device 19B, the heald frame 20B, and the reed 21B, which are supported by the warp 8 and passed through the warp T of the full warp beam 3, are transferred to a predetermined position of the loom 2.

さて、第1図に示すようにフルワープビーム3を載置
したフルワープビーム専用運搬車4及び空ワープビーム
専用運搬車5が機仕掛け準備室23で待機している。製織
室1内の多数の織機のうち例えば織機2Aのワープビーム
の経糸T1が消費されると、ワープビーム径検出機(図示
略)からの信号に基づいて空ワープビーム専用運搬車5
が第2,4図に示すように織機2Aの機仕掛け作業位置へ移
動配置される。そして、前記のように空ワープビーム2
2、その経糸T1を通されたドロッパ装置19A、綜絖枠20
A、筬21Aの各経通し部材が織機2A側から空ワープビーム
専用運搬車5側へ移載される。
Now, as shown in FIG. 1, a full warp beam carrier 4 and an empty warp beam carrier 5 on which the full warp beam 3 is mounted are waiting in the device preparation room 23. When the warp T1 of the warp beam of the weaving machine 2A is consumed, for example, among the many looms in the weaving room 1, the empty warp beam dedicated carrier 5 based on the signal from the warp beam diameter detector (not shown).
Is moved and arranged to the looming work position of the loom 2A as shown in FIGS. And the sky warp beam 2 as described above
2.Dropper device 19A, heddle frame 20 through which warp T1 is passed
A, the threading members of the reed 21A are transferred from the loom 2A to the empty warp beam dedicated carrier 5 side.

続いて、第5図に示すように空ワープビーム22及び各
経通し部材19A,20A,21Aを載置した空ワープビーム専用
運搬車5は織機2Aの機仕掛け作業位置から機仕掛け準備
室23へ移動され、同運搬車5と入れ換わりにフルワープ
ビーム専用運搬車4が第3,5図に示すように機仕掛け準
備室23から織機2Aの機仕掛け作業位置へ移動配置され
る。そして、フルワープビーム4、その経糸T2を通され
たドロッパ装置19B、綜絖枠20B、筬21Bの各経通し部材
がフルワープビーム専用運搬車4側から織機2A側へ移載
された後、第6図に示すようにフルワープビーム専用運
搬車4が機仕掛け準備室23へ移動配置される。機仕掛け
準備室23へ移動配置されたフルワープビーム専用運搬車
4にはフルワープビーム3及び経通し部材19B,20B,21B
が載置され、これら各部材を載置されたフルワープビー
ム専用運搬車4は空ワープビーム専用運搬車5とともに
機仕掛け準備室23内で待機する。
Subsequently, as shown in FIG. 5, the empty warp beam dedicated carrier 5 on which the empty warp beam 22 and the threading members 19A, 20A, 21A are placed is moved from the looming work position of the loom 2A to the looming preparation room 23. The full-warp beam carrier 4 is moved and replaced with the carrier 5 from the machine-preparation room 23 to the machine-working position of the loom 2A as shown in FIGS. After the full warp beam 4, the dropper device 19B, the heald frame 20B, and the reed 21B, through which the warp T2 is passed, are transferred from the full warp beam dedicated transport vehicle 4 side to the loom 2A side, As shown in FIG. 6, the full-warp beam carrier 4 is moved to the mechanism preparation room 23. The full-warp beam carrier 4 moved to the mechanical preparation room 23 has a full-warp beam 3 and passing members 19B, 20B, 21B.
The full-warp beam carrier 4 on which these members are placed stands together with the empty warp beam carrier 5 in the mechanism preparation room 23.

フルワープビーム専用運搬車4及び空ワープビーム専
用運搬車5という2台の専用運搬車を用いて機仕掛け作
業を行なう本実施では、各専用運搬車4,5は機仕掛け作
業1回について機仕掛け準備室23と織機の機仕掛け作業
位置との間を1往復するのみで済む。従って、各専用運
搬車4,5の運行タイミングを適宜設定することにより、
各運搬車4,5の運行時間の短縮化が可能である。しか
も、織機の機仕掛け作業位置における織機からの空ワー
プビーム及び経通し部材の取り外し及び織機へのフルワ
ープビーム及び経通し部材の装着という交換作業を間を
置くことなく円滑に行なうことができ、機械の機仕掛け
作業位置における機仕掛け作業の時間短縮化が可能であ
る。すなわち、運搬車1台のみを用いる従来の機仕掛け
作業では織機における空ワープビームの取り外し作業と
フルワープビームの装着作業との間に機仕掛け準備室に
おける空ワープビームとフルワープビームとの交換作業
が介在するため、織機の機仕掛け作業位置における機仕
掛け作業の長時間化が避けられないが、本実施例では織
機における空ワープビーム22の取り外し作業とフルワー
プビーム3の装着作業との間には機仕掛け準備室23にお
けるワープビーム交換作業は介在しない。このような織
機の機仕掛け作業位置における機仕掛け作業の時間短縮
は織機の稼動効率向上に繋がる。
In this embodiment, two dedicated carriers, a full-warp beam carrier 4 and an empty warp beam carrier 5, are used to carry out the work. Only one reciprocation between the preparation room 23 and the loom working position of the loom is required. Therefore, by appropriately setting the operation timing of each dedicated carrier 4,5,
It is possible to shorten the operation time of each transport vehicle 4,5. Moreover, the replacement work of removing the empty warp beam and the threading member from the loom in the loom working position of the loom and attaching the full warp beam and the threading member to the loom can be performed smoothly without a pause. It is possible to reduce the time required for the mechanical work at the mechanical work position of the machine. That is, in the conventional looming operation using only one carrier, the work of exchanging the empty warp beam and the full warp beam in the looming preparation room is performed between the operation of removing the empty warp beam and the operation of mounting the full warp beam on the loom. However, it is unavoidable that the length of the looming work at the looming work position of the loom is prolonged, but in this embodiment, between the work of removing the empty warp beam 22 and the work of mounting the full warp beam 3 on the loom. Does not involve the warp beam exchange work in the mechanism preparation room 23. Such a reduction in the time required for the loom operation at the loom operation position of the loom leads to an improvement in the operating efficiency of the loom.

本発明はもちろん前記実施例のみ限定されるものでは
なく、例えばフルワープビーム専用運搬車4及び空ワー
プビーム専用運搬車5の台数組み合わせを適宜変更する
ことも可能である。
The present invention is, of course, not limited to the above-described embodiment. For example, the combination of the number of the full-warp beam carrier 4 and the number of the empty warp beam carrier 5 can be appropriately changed.

発明の効果 以上詳述したように、フルワープビーム専用運搬車及
び空ワープビーム専用運搬車という2種類の運搬車を用
いる本発明の機仕掛け作業方法によれば、織機の稼動効
率向上に繋がる織機の機仕掛け作業位置における織仕掛
け作業の時間短縮化を図り得るという優れた効果を奏す
る。
Effect of the Invention As described in detail above, according to the mechanism working method of the present invention using two types of transport vehicles, a full warp beam dedicated transport vehicle and an empty warp beam dedicated transport vehicle, the loom leads to an improvement in the operating efficiency of the loom. And the time required for the weaving work at the machine working position can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

図面は本発明を具体化した一実施例を示し、第1図はフ
ルワープビーム専用及び空ワープビーム専用の両運搬車
が機仕掛け準備室に待機している状態を示す略体平面
図、第2図は織機の機仕掛け作業位置に配置された空ワ
ープビーム専用運搬車を示す側面図、第3図は機仕掛け
作業位置に配置されたフルワープビーム専用運搬車を示
す側面図、第4〜6図はいずれも機仕掛け作業を説明す
る略体殆平面図である。 織機……2,2A、フルワープビーム……3、フルワープビ
ーム専用運搬車……4、空ワープビーム専用運搬車……
5、空ワープビーム……22、機仕掛け準備室……23。
FIG. 1 shows an embodiment of the present invention, and FIG. 1 is a schematic plan view showing a state where both full-warp beam-only and empty warp-beam-only carriers are standing by in a machine preparation room. FIG. 2 is a side view showing an empty warp beam dedicated carrier arranged at a loom working position of the loom; FIG. 3 is a side view showing a full warp beam exclusive carrier arranged at a loom working position; FIG. 6 is a schematic plan view almost illustrating the mechanism work. Loom ... 2,2A, full warp beam ... 3, full warp beam carrier ... 4, empty warp beam carrier ...
5. Empty warp beam ... 22, Mechanism preparation room ... 23.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特公 昭56−42696(JP,B2) 特公 昭57−53899(JP,B2) 特公 昭59−44420(JP,B2) ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-B-56-42696 (JP, B2) JP-B-57-53899 (JP, B2) JP-B-59-44420 (JP, B2)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】ワープビームの支持部材と少なくとも綜絖
枠及び筬の支持部材とをそれぞれ備えた空ワープビーム
専用運搬車及びフルワープビーム専用運搬車を機仕掛け
準備室に待機させ、前記空ワープビーム専用運搬車は空
の状態で待機させるとともに、前記フルワープビーム専
用運搬車はフルワープビームと同ビームの経糸を挿通し
た少なくとも綜絖枠及び筬とを前記各支持部材に支持し
た状態で待機させ、製織室内に配設された複数の織機の
うち機仕掛けを必要とする織機が存在すると、同織機の
機仕掛け作業位置へ機仕掛け準備室に待機している空ワ
ープビーム専用運搬車を移動配置し、前記機仕掛け作業
位置にて織機上から前記空ワープビーム専用運搬車へ空
ワープビームと少なくとも綜絖枠及び筬とを移載した
後、この空ワープビーム専用運搬車を機仕掛け準備室へ
移動し、該機仕掛け準備室にて前記空ワープビーム、綜
絖枠及び筬を空ワープビーム専用運搬車からおろしてお
くとともに、機仕掛け準備室に待機しているフルワープ
ビーム専用運搬車を前記織機の機仕掛け作業位置へ移動
配置し、同フルワープビーム専用運搬車から前記織機へ
フルワープビームと少なくとも綜絖枠及び筬とを移載し
た後、同フルワープビーム専用運搬車を前記機仕掛け準
備室へ移動し、該機仕掛け準備室にて前記フルワープビ
ーム専用運搬車に新しいフルワープビームと少なくとも
綜絖枠及び筬とを載置しておく織機おける機仕掛け作業
方法。
An empty warp beam carrier and a full warp beam carrier provided with a warp beam support member and at least a heald frame and a reed support member, respectively; A dedicated carrier is made to stand by in an empty state, and the full warp beam dedicated carrier is made to stand by in a state where a full warp beam and at least a heald frame and a reed through which the warp of the beam is inserted are supported by the respective support members, If there is a loom that requires a mechanism among the multiple looms arranged in the weaving room, the empty warp beam dedicated carrier waiting in the machine preparation room is moved to the machine working position of the same loom. After transferring the empty warp beam, at least the heald frame and the reed from the loom to the empty warp beam dedicated carrier at the loom work position, the empty warp beam The empty dedicated warp beam, the heald frame and the reed are removed from the empty dedicated warp beam carrier while the empty dedicated warp beam is moved to the mechanical ready preparation room. The full-warp beam carrier is moved to the loom work position of the loom, and the full-warp beam and at least the heald frame and the reed are transferred from the full-warp beam carrier to the loom. A beam-only carrier is moved to the machine-preparation room, and a loom on a loom in which a new full-warp beam and at least a heald frame and a reed are placed in the carrier-only carrier. Working method.
JP61026196A 1986-02-07 1986-02-07 Machine work method in loom Expired - Lifetime JP2637951B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61026196A JP2637951B2 (en) 1986-02-07 1986-02-07 Machine work method in loom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61026196A JP2637951B2 (en) 1986-02-07 1986-02-07 Machine work method in loom

Publications (2)

Publication Number Publication Date
JPS62184153A JPS62184153A (en) 1987-08-12
JP2637951B2 true JP2637951B2 (en) 1997-08-06

Family

ID=12186734

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61026196A Expired - Lifetime JP2637951B2 (en) 1986-02-07 1986-02-07 Machine work method in loom

Country Status (1)

Country Link
JP (1) JP2637951B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1156146A1 (en) * 2000-05-15 2001-11-21 Brintons Limited A carpet weaving loom

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5854679B2 (en) * 1979-09-14 1983-12-06 マックス株式会社 Flexible parallel ruler scale balance device
JPS5753899A (en) * 1980-09-17 1982-03-31 Toshiba Corp Semiconductor storage device

Also Published As

Publication number Publication date
JPS62184153A (en) 1987-08-12

Similar Documents

Publication Publication Date Title
US4934413A (en) Warp arrangement and carrier system for an automatic loom
JP2637951B2 (en) Machine work method in loom
US5287895A (en) Equipment for transporting and handling weft-yarn stock bobbins
JPS6328948A (en) Start apparatus in loom
JP2625678B2 (en) Machinery in loom
JPS62206066A (en) Machine start device in loom
JPS6342944A (en) Machine start apparatus in loom
JPS62223345A (en) Machine start apparatus in loom
US1339507A (en) Warp-replenishing mechanism
JPH07116655B2 (en) Device for weaving machines
JP2625676B2 (en) Machinery in loom
JP2629175B2 (en) Machinery in loom
JP3074945B2 (en) Pipe replacement method and pipe replacement device in roving machine
JPH11512152A (en) Loom
JP2536141B2 (en) Warp beam slip prevention device
US6041830A (en) Displaceable warp beam support bearing for warp beams arranged one above the other
JPS62184154A (en) Looming preparation method in loom
JP2732494B2 (en) Machinery in loom
JPS62223344A (en) Machine start apparatus in loom
JPS62184149A (en) Looming apparatus in loom
JPH03505761A (en) Transport of spinnable strand packages in and to the creel of a spinning machine
JPS6359450A (en) Machine start apparatus in loom
JP2524054Y2 (en) Heald frame mounting guide device for loom
JPS63105154A (en) Looming apparatus in loom
US5247969A (en) Feeding and removing weft yarn stock bobbins to a loom bobbin frame