JP2628611B2 - Remote monitoring device - Google Patents

Remote monitoring device

Info

Publication number
JP2628611B2
JP2628611B2 JP22739888A JP22739888A JP2628611B2 JP 2628611 B2 JP2628611 B2 JP 2628611B2 JP 22739888 A JP22739888 A JP 22739888A JP 22739888 A JP22739888 A JP 22739888A JP 2628611 B2 JP2628611 B2 JP 2628611B2
Authority
JP
Japan
Prior art keywords
monitoring device
monitoring
line
equipment
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP22739888A
Other languages
Japanese (ja)
Other versions
JPH0276099A (en
Inventor
重和 小山
潔 池ノ谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP22739888A priority Critical patent/JP2628611B2/en
Publication of JPH0276099A publication Critical patent/JPH0276099A/en
Application granted granted Critical
Publication of JP2628611B2 publication Critical patent/JP2628611B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)
  • Alarm Systems (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明は遠隔監視装置、特に周期的に行われる電話回
線の回線状態の確認試験に伴う時間及び経費を節減する
遠隔装置に関する。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a remote monitoring device, and more particularly to a remote device that saves time and money involved in a test for periodically checking the state of a telephone line.

<従来の技術> 例えば特開昭59−94199号公報に開示されているよう
に、ビルに設置されている設備機器の作動状態、火災の
発生、不審者の侵入などを、ビルに設けられた端末装置
が監視し、異常が発生すると警備会社やサービス会社の
監視センタに、一般の加入電話回線を使用して通報する
遠隔ビル管理システムが、近年では各種のビルに広く採
用されている。
<Prior Art> For example, as disclosed in Japanese Patent Application Laid-Open No. 59-94199, the operating state of equipment installed in a building, the occurrence of a fire, the intrusion of a suspicious person, etc. are provided in a building. In recent years, a remote building management system that uses a general subscriber telephone line to notify a monitoring center of a security company or service company when an abnormality is monitored by a terminal device has been widely adopted in various buildings.

この遠隔ビル管理システムを採用すると、ビルの管理
人が不要となるので、人件費を削減することが可能とな
る。
Adopting this remote building management system eliminates the need for a building manager, thus reducing labor costs.

一方、この遠隔ビル管理システムでは、少なくとも電
話回線の状態が、被監視局と監視局間とで、データの授
受を行える適正レベル値を確保可能で、且つ選択的に回
線を閉結出来なければ、監視局に対してのデータの確実
な伝送は行えない。このような場合には、ビル内で異常
が発生しても、監視局ではその状態を検視することが出
来ない。
On the other hand, in this remote building management system, at least the state of the telephone line must be able to secure an appropriate level value at which data can be exchanged between the monitored station and the monitoring station, and if the line cannot be selectively closed. Cannot reliably transmit data to the monitoring station. In such a case, even if an abnormality occurs in the building, the state cannot be inspected by the monitoring station.

この問題を解決するための遠隔監視制御装置が、特開
昭61−121551号公報で提案されている。この提案に係る
遠隔監視制御装置では、監視局から被監視局に対して、
ビルの設備機器をスケジユール制御するための制御命令
データを周期的に送出させ、それに合せて加入電話回線
の状態確認を行つている。
A remote monitoring and control device for solving this problem has been proposed in Japanese Patent Application Laid-Open No. 61-121551. In the remote monitoring and control device according to this proposal, the monitoring station sends the monitored station
Control command data for scheduling control of building equipment is periodically transmitted, and the state of the subscriber telephone line is checked accordingly.

この方式では、被監視局が増加するに従つて、監視局
側の負担が増大し記憶容量が増加して行くので、一般に
は被監視局側に、設置された環境条件に対応したスケジ
ユール制御データを具備させ、そのスケジユール制御デ
ータに基づいた制御を行つている。
In this method, as the number of monitored stations increases, the load on the monitoring station increases and the storage capacity increases. Therefore, generally, the schedule control data corresponding to the installed environmental conditions is provided on the monitored station side. And performs control based on the schedule control data.

<発明が解決しようとする課題> 前述の提案に係る遠隔監視制御装置においては、予め
設定された回線状態の確認試験周期期間内に、監視局は
被監視局からの異常状態の発報を受信することがある。
<Problem to be Solved by the Invention> In the remote monitoring control device according to the above-mentioned proposal, the monitoring station receives the notification of the abnormal state from the monitored station within the preset line state confirmation test period. May be.

また、保守作業には被監視局側の機能試験の一つとし
て発報確認作業が含まれているので、回線状態の確認試
験周期期間内に、監視局が被監視局からの保守作業によ
る発報を受信することがある。
In addition, since the maintenance work includes a report check operation as one of the function tests on the monitored station side, the monitoring station issues a maintenance work from the monitored station within the period of the line state check test cycle. Information may be received.

このように、被監視局からの異常状態の発報や、被監
視局からの保守作業時の発報を、監視局が受信した場合
には、これで回線状態の機能が確認されたことになる。
As described above, when the monitoring station receives the notification of the abnormal state from the monitored station and the notification during the maintenance work from the monitored station, it is confirmed that the function of the line state has been confirmed. Become.

従つて、同一の回線状態の確認試験周期期間内におい
て、前述の発報動作が行われた被監視局に対して、監視
局から回線状態の確認試験を行うのは、無駄に電話料金
が課せられるだけで意味がない。また、被監視局が増加
すると、回線状態の確認試験に要する時間が増大するの
で、不要な確認試験は省くことが望ましい。
Therefore, during the same line state confirmation test period, performing a line state confirmation test from the monitoring station to the monitored station that has performed the above-described alerting operation is a wasteful telephone charge. It is meaningless just to be able to. Further, when the number of monitored stations increases, the time required for the line state confirmation test increases, so it is desirable to omit unnecessary confirmation tests.

本発明は、前述したようなこの種の遠隔監視装置の現
状に鑑みてなされたものであり、その目的は、回線状態
の確認試験を効率的に行つて、確認試験の処理対応時間
を短縮すると共に、電話料金を削減することが出来る遠
隔監視装置を提供することにある。
The present invention has been made in view of the current situation of such a remote monitoring device as described above, and an object of the present invention is to efficiently perform a line state confirmation test and reduce the processing response time of the confirmation test. It is another object of the present invention to provide a remote monitoring device capable of reducing telephone charges.

<課題を解決するための手段> 前記目的を達成するために、設備機器が設置される建
物に設けられ、前記設備機器からの情報を取り込んで、
前記設備機器の監視を行う第1の監視装置と、前記建物
に対して遠隔地に配置された監視センタに設けられ、前
記第1の監視装置と、電話回線で接続された第2の監視
装置とを具備し、前記監視センタで前記設備機器の状態
を監視し、予め定められた所定周期毎に、前記第2の監
視装置から前記第1の監視装置に対して、周期的な呼出
しを行い、この呼出しに応答した前記第1の監視装置か
ら電送される情報を基にして、前記電話回線の回線状態
の確認試験を行うように構成された遠隔監視装置におい
て、前記所定周期期間内に、前記第1の監視装置が前記
設備機器の異常状態を検知し、或は前記第1の監視装置
に人為的に発報条件が与えられることにより、前記第1
の監視装置から前記第2の監視装置に発報が送信される
と、これを記憶する記憶手段と、この記憶手段への記憶
に基づいて、前記発報動作を行つた第1の監視装置に対
して次回の回線状態確認周期までは、前記第2の監視装
置からの回線状態の確認試験を中止する制御手段とが、
前記第2の監視装置に設けられた構成となつている。
<Means for Solving the Problems> In order to achieve the object, provided in a building in which equipment is installed, taking in information from the equipment,
A first monitoring device for monitoring the facility equipment, and a second monitoring device provided at a monitoring center remote from the building and connected to the first monitoring device via a telephone line The monitoring center monitors the state of the facility equipment, and performs a periodic call from the second monitoring device to the first monitoring device at predetermined intervals. Based on information transmitted from the first monitoring device in response to the call, a remote monitoring device configured to perform a confirmation test of the line state of the telephone line; The first monitoring device detects an abnormal state of the equipment, or the first monitoring device is artificially given an alarm condition, thereby causing the first monitoring device to perform the first monitoring.
When an alarm is transmitted from the monitoring device to the second monitoring device, a storage unit for storing the alarm is sent to the first monitoring device that has performed the alarm operation based on the storage in the storage unit. On the other hand, control means for stopping the line state confirmation test from the second monitoring device until the next line state confirmation cycle,
The configuration is provided in the second monitoring device.

<作用> 本発明では、監視センタに設けられた第2の監視装置
から、予め定められた所定周期毎に、建物に設けられた
第1の監視装置に対して、周期的な呼出しを行い、この
呼出しに応答した第1の監視装置から伝送される情報を
基に、電話回線の回線状態の確認試験が行われる。
<Operation> In the present invention, a periodic call is made from the second monitoring device provided in the monitoring center to the first monitoring device provided in the building at every predetermined period, Based on the information transmitted from the first monitoring device in response to the call, a confirmation test of the line state of the telephone line is performed.

この場合、第2の監視装置の記憶手段に、第1の監視
装置が回線状態の確認試験の周期期間内に設備機器の異
常による発報或は人為的な保守作業時の発報を、第2の
監視装置に送信したことが記憶されているか否かが確認
される。記憶手段に第1の監視装置の発報が記憶されて
いると、第2の監視装置の制御手段が作動して、次回の
回線状態の確認周期までは、第2の監視装置からの発報
を行つた第1の監視装置に対する回線状態の確認試験は
中止される。
In this case, in the storage means of the second monitoring device, the first monitoring device stores a notification due to an abnormality in the equipment or a notification at the time of artificial maintenance work within the cycle period of the line state confirmation test. It is confirmed whether the transmission to the second monitoring device is stored. When the notification of the first monitoring device is stored in the storage unit, the control unit of the second monitoring device operates, and the notification from the second monitoring device is performed until the next line state confirmation cycle. The test of checking the line status for the first monitoring device that performed the above is stopped.

このようにして、本発明によると、回線状態の確認試
験時間を短縮し、電話料金を削減した状態で、監視セン
タでのビルの設備機器などの監視が行われる。
In this way, according to the present invention, the monitoring center monitors the equipment and the like of the building at the monitoring center in a state where the test time for checking the line state is shortened and the telephone charge is reduced.

<実施例> 以下、本発明の実施例を第1図乃至第3図を用いて詳
細に説明する。
<Example> Hereinafter, an example of the present invention will be described in detail with reference to FIGS.

ここで、第1図は実施例の要部の構成を示すブロツク
図、第2図は実施例の全体構成を示すブロツク図、第3
図は実施例の動作を示すフローチヤートである。
Here, FIG. 1 is a block diagram showing a configuration of a main part of the embodiment, FIG. 2 is a block diagram showing an entire configuration of the embodiment, and FIG.
The figure is a flowchart showing the operation of the embodiment.

第2図に示すように、被監視建物に設備機器S1〜Sn
…M1〜Mnが設置され、さらに設備機器S1〜Sn……M1〜Mn
の状態情報をそれぞれ取り込んで監視を行う第1の監視
装置T1〜Tnが設けられている。
As shown in FIG. 2, equipment S 1 to S n ...
… M 1 to M n are installed, and further, equipment S 1 to S n …… M 1 to M n
First monitoring device T 1 through T n which performs status information of the monitored capture respectively provided.

一方、警備会社やサービス会社の監視センタには第2
の監視装置Cが設けられ、第2の監視装置Cと前述の第
1の監視装置T1〜Tn間は、それぞれ電話回線L1〜Lnで接
続されている。
On the other hand, the monitoring centers of security companies and service companies
Are provided, and the second monitoring device C and the first monitoring devices T 1 to T n are connected by telephone lines L 1 to L n , respectively.

また、第1図に示すように、第1の監視装置Tには、
設備機器Sが接続される端末処理部BSと、この端末処理
部BSに接続される通信制御部HSが設けられ、通信制御部
HSは電話回線Lに接続されている。
As shown in FIG. 1, the first monitoring device T includes:
A terminal processing unit BS connected to the equipment S and a communication control unit HS connected to the terminal processing unit BS are provided.
HS is connected to telephone line L.

一方、第2の監視装置Cには、電話回線Lが接続され
る通信制御部HCが設けられ、この通信制御部HCに中央処
理部CPが接続され、中央処理部CPには回線チエツク処理
部CP1と回線チエツク起動判定部CP2が設けられている。
また、中央処理部CPには、記憶部HD、表示部CR及び印字
部PRが接続されている。
On the other hand, the second monitoring device C is provided with a communication control unit HC to which the telephone line L is connected, a central processing unit CP is connected to the communication control unit HC, and a line check processing unit is connected to the central processing unit CP. A CP 1 and a line check activation determining unit CP 2 are provided.
The storage unit HD, the display unit CR, and the printing unit PR are connected to the central processing unit CP.

第2の監視装置Cには、第1の監視装置T1〜Tnを介し
て、設備機器S1〜Sn……M1〜Mnの監視を行うと共に、予
め定められた所定周期期間毎に、第1の監視装置T1〜Tn
に対して呼出しを行い、この呼出しに応答して第1の監
視装置T1〜Tnから伝送される情報に基づいて、電話回線
L1〜Lnの回線状態の確認試験を行うように構成されてい
る。
The second monitoring device C monitors the equipment S 1 to S n ... M 1 to M n via the first monitoring devices T 1 to T n , and performs a predetermined predetermined period of time. Each of the first monitoring devices T 1 to T n
Making a call to, based on the information transmitted from the first monitoring device T 1 through T n in response to this call, the telephone line
It is configured to perform a confirmation test of the line status of L 1 ~L n.

第1の監視装置T1〜Tnは、それぞれ設備機器S1〜Sn
…M1〜Mnの状態情報を取込んでいて状態が異常となつた
場合、或は設備機器の保守作業で点検発報が発せられる
と、端末処理部BSにこの異常情報或は点検情報を取込
み、通信制御部HSから電話回線Lを介して、第2の監視
装置Cの通信制御部HCにこれらの情報を伝送するように
構成されている。
The first monitoring devices T 1 to T n are respectively provided with facility devices S 1 to S n .
... If M 1 ~M n state not captures and state information of it was abnormal and summer, or when the inspection onset report is issued in the maintenance of the equipment, the abnormality information or inspection information to the terminal processing unit BS The information is transmitted from the communication control unit HS to the communication control unit HC of the second monitoring device C via the telephone line L.

また、第1の監視装置T1〜Tnから伝送されるこれらの
情報は、第2の監視装置Cにおいて中央処理部CPによ
り、記憶部HDに記憶され、表示部CRに表示され、さらに
印字部PRで印字されるようになつている。
Further, the information transmitted from the first monitoring device T 1 through T n is the central processing unit CP in the second monitoring device C, stored in the memory unit HD, is displayed on the display unit CR, further printing It is designed to be printed in the PR section.

このような構成の実施例において、記憶部HDが記憶手
段を構成し、回線チエツク処理部CP1と回線チエツク起
動判定部CP2が制御手段を構成している。
In an embodiment of such a configuration, storage unit HD constitutes a storage means, the line a checking unit CP 1 and the line a checking activation determination unit CP 2 constitute a control means.

次に、実施例の動作を第3図を用いて詳細に説明す
る。
Next, the operation of the embodiment will be described in detail with reference to FIG.

第3図のステツプ101において、第2の監視装置Cの
中央処理部CPが、第1の監視装置Tよりの異常情報或は
点検情報の発報を確認すると、中央処理部CPはこれらの
発報データを取り込み、ステツプ102に進んで発報デー
タの表示部CRによる画像表示と、印字部PRによる印字を
行ない、第1の監視装置Tの監視する設備機器Sに状態
異常が発生し、或はその点検情報の発報が行われたこと
を通報する。
In step 101 of FIG. 3, when the central processing unit CP of the second monitoring device C confirms that abnormal information or inspection information has been issued from the first monitoring device T, the central processing unit CP generates these information. Then, the process proceeds to step 102, where the image data is displayed on the display unit CR of the alarm data and printed by the printing unit PR, and a state abnormality occurs in the equipment S monitored by the first monitoring device T. Informs that the inspection information has been issued.

次にステツプ103において、回線チエツク起動判定部C
P2により、第1の監視装置Tからの異常情報或は点検情
報の発報のあつたことが、記憶部HDに書き込まれる。
Next, in step 103, the circuit check activation determining section C
The P 2, a first abnormality information or inspection information from the monitoring device T may been made of alarm, is written into the storage unit HD.

そこで、ステツプ104において、中央処理部CPによ
り、電話回線L1〜Lnの回線状態の確認試験(回線のチエ
ツク)の起動時刻であるか否かの判定が行われ、YESで
あるとステツプ105に進んで、回線チエツク起動処理判
定部CP2が起動される。回線チエツク起動処理判定部CP2
は、ステツプ105において、記憶部HDを読み取り当該回
線状態の確認試験周期期間内に、第1の監視装置から発
報があつたか否かの判定を行う。
Therefore, at step 104, the central processing unit CP, a determination is made of whether the start time of the confirmation test line state of the telephone line L 1 ~L n (a checking line), step 105 is YES proceed to the line a checking start determination unit CP 2 is activated. Line check activation processing judgment unit CP 2
In step 105, the storage unit HD is read, and it is determined whether or not an alert has been issued from the first monitoring device during the period of the line state confirmation test cycle.

ステツプ105の判定がNOであると、ステツプ106に進ん
で、回線チエツク起動判定部CP2によつて回線チエツク
処理部CP1が起動され、当該電話回線Lの回線状態の確
認試験が行われる。この回線状態の確認試験の終了後、
第1の監視装置Tと第2の監視装置Cは、回線状態の確
認試験周期期間内の状態となる。
When the judgment at step 105 is NO, the routine proceeds to step 106, the line a checking activation determination unit by connexion line a checking unit CP 1 to CP 2 is started, identification of the line state of the telephone line L is performed. After the completion of this line status confirmation test,
The first monitoring device T and the second monitoring device C are in a state within the line state confirmation test period.

また、ステツプ105の判定がYESであると当該第1の監
視装置Tからはすでに発報が、第2の監視装置Cに伝送
され、電話回線Lの回線状態の機能確認が行われたもの
として、電話回線Lの回線状態の確認試験は行われず、
第1の監視装置Tと第2の監視装置Cと、回線状態の確
認試験周期期間内の状態となる。
If the determination in step 105 is YES, it is assumed that an alert has already been transmitted from the first monitoring device T to the second monitoring device C, and that the function of the line state of the telephone line L has been confirmed. , The test for checking the state of the telephone line L is not performed,
The first monitoring device T, the second monitoring device C, and the line status are in the period of the confirmation test cycle.

さらに、第3図のフローチヤートにおいて、ステツプ
101の判定がNOであると、ステツプ104に進み、ステツプ
104の判定がNOであると、ステツプ101に進む。
Further, in the flowchart of FIG.
If the determination at 101 is NO, the process proceeds to step 104, and the process proceeds to step 104.
If the determination at 104 is NO, the process proceeds to step 101.

このように、実施例においては回線状態の確認試験周
期期間内に、被監視装置に設置されている第1の監視装
置Tから、監視センタの第2の監視装置Cに対して、異
常情報或は点検情報の発報があると、発報のあつた第1
の監視装置Tが第2の監視装置Cの記憶部HDに記憶され
る。
As described above, in the embodiment, the abnormality information or the abnormality information is transmitted from the first monitoring device T installed in the monitored device to the second monitoring device C of the monitoring center within the period of the line state confirmation test cycle. , When there is a report of inspection information, the first
Of the monitoring device T is stored in the storage unit HD of the second monitoring device C.

そして、記憶部HDに記憶された第1の監視装置Tに
は、次回の回線状態の確認試験周期まで、回線状態の確
認を行わないようにすることにより、回線状態の確認試
験時間を短縮し、回線状態の確認試験に必要な電話料金
を削減して、高監視能力の遠隔監視を行うことが出来
る。
The first monitoring device T stored in the storage unit HD does not check the line state until the next line state check test cycle, thereby shortening the line state check test time. In addition, it is possible to perform remote monitoring with a high monitoring capability by reducing telephone charges required for a test for checking a line state.

<発明の効果> 以上詳細に説明したように、本発明によると、回線状
態の確認試験時間を短縮し、且つ必要な電話料金を削減
して、効率的に高監視能力の遠隔監視を行うことが出来
る。
<Effects of the Invention> As described in detail above, according to the present invention, it is possible to shorten the time required for the test of checking the line status, reduce the necessary telephone charges, and efficiently perform remote monitoring with high monitoring capability. Can be done.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の実施例の要部の構成を示すブロツク
図、第2図は本発明の実施例の全体構成を示すブロツク
図、第3図は本発明の実施例の動作を示すフローチヤー
トである。 T、T1〜Tn……第1の監視装置、C……第2の監視装
置、S、S1〜Sn、M1〜Mn……設備機器、BS……端末処理
部、HS、HC……通信制御部、CP……中央処理部、CP1
…回線チエツク処理部、CP2……回線チエツク起動判定
部、HD……記憶部、CD……表示部、PR……印字部、L、
L1〜Ln……電話回線。
FIG. 1 is a block diagram showing a configuration of a main part of an embodiment of the present invention, FIG. 2 is a block diagram showing an entire configuration of the embodiment of the present invention, and FIG. 3 is a flow chart showing an operation of the embodiment of the present invention. It is a chart. T, T 1 ~T n ...... first monitoring device, C ...... second monitoring device, S, S 1 ~S n, M 1 ~M n ...... equipment, BS ...... terminal processing unit, HS , HC …… Communication control unit, CP …… Central processing unit, CP 1
… Line check processing unit, CP 2 … Line check activation judgment unit, HD… Storage unit, CD… Display unit, PR… Print unit, L,
L 1 -L n … phone line.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】設備機器が設置される建物に設けられ、前
記設備機器からの情報を取り込んで、前記設備機器の監
視を行う第1の監視装置と、前記建物に対して遠隔地に
配置された監視センタに設けられ、前記第1の監視装置
と電話回線で接続された第2の監視装置とを具備し、前
記監視センタで前記設備機器の状態を監視し、予め定め
られた所定周期毎に、前記第2の監視装置から前記第1
の監視装置に対して、周期的な呼出しを行い、この呼出
しに応答した前記第1の監視装置から伝送される情報を
基にして、前記電話回線の回線状態の確認試験を行うよ
うに構成された遠隔監視装置において、前記所定周期期
間内に、前記第1の監視装置が前記設備機器の異常状態
を検知し、或は前記第1の監視装置に人為的に発報条件
が与えられることにより、前記第1の監視装置から、前
記第2の監視装置に発報が送信されると、これを記憶す
る記憶手段と、この記憶手段への記憶に基づいて、前記
発報動作を行つた第1の監視装置に対して、次回の回線
状態確認周期までは、前記第2の監視装置からの回線状
態の確認試験を中止する制御手段とが、前記第2の監視
装置に設けられていることを特徴とする遠隔監視装置。
A first monitoring device that is provided in a building in which the equipment is installed, takes in information from the equipment and monitors the equipment, and a first monitoring device that is located at a remote location with respect to the building. A monitoring center provided at the monitoring center, and a second monitoring device connected to the first monitoring device via a telephone line, wherein the monitoring center monitors the state of the equipment at a predetermined cycle. The second monitoring device sends the first
A periodic call to the monitoring device, and a confirmation test of the line state of the telephone line based on information transmitted from the first monitoring device in response to the call. In the remote monitoring device, the first monitoring device detects an abnormal state of the equipment within the predetermined period, or the alarm condition is artificially given to the first monitoring device. When an alarm is transmitted from the first monitoring device to the second monitoring device, a storage unit that stores the alarm and a second device that performs the alarm operation based on the storage in the storage unit. Control means for stopping the line state confirmation test from the second monitoring apparatus until the next line state confirmation cycle for the one monitoring apparatus; A remote monitoring device.
JP22739888A 1988-09-13 1988-09-13 Remote monitoring device Expired - Lifetime JP2628611B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22739888A JP2628611B2 (en) 1988-09-13 1988-09-13 Remote monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22739888A JP2628611B2 (en) 1988-09-13 1988-09-13 Remote monitoring device

Publications (2)

Publication Number Publication Date
JPH0276099A JPH0276099A (en) 1990-03-15
JP2628611B2 true JP2628611B2 (en) 1997-07-09

Family

ID=16860201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22739888A Expired - Lifetime JP2628611B2 (en) 1988-09-13 1988-09-13 Remote monitoring device

Country Status (1)

Country Link
JP (1) JP2628611B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2791241B2 (en) * 1991-10-22 1998-08-27 株式会社日立ビルシステム Elevator call inspection equipment

Also Published As

Publication number Publication date
JPH0276099A (en) 1990-03-15

Similar Documents

Publication Publication Date Title
US6255945B1 (en) Communication path integrity supervision in a network system for automatic alarm data communication
JP2003212447A (en) Elevator remote supervisory system
JP2628611B2 (en) Remote monitoring device
JP2000099866A (en) Remote monitoring device
JP3383750B2 (en) Elevator remote monitoring system
JPH07240803A (en) Remote supervisory system for elevator
JP2542269B2 (en) No-ringing communication system
JP3162241B2 (en) Elevator abnormal data collection device
JPH10243122A (en) Communication system, and transmitter receiver used for the communication system
JP4249368B2 (en) Line telephone monitoring system
JPH07143243A (en) Centralized monitor and control system
KR200306297Y1 (en) Status diagnosis device of unmanned base station
JP2950965B2 (en) Remote monitoring device
JPS5994199A (en) Remote management system for building
JP2693580B2 (en) Elevator remote maintenance equipment
JP2735681B2 (en) Remote monitoring device
JP2848364B2 (en) Alarm transmission device
KR910005332B1 (en) Integrated remote data service system
JPH04115653A (en) Automatic communication equipment
JPH05130251A (en) Remote supervisory center equipment
KR100905577B1 (en) Method and Apparatus of Base Station Call Device Test in a mobile communication system
JP3457884B2 (en) Initial setting method of monitoring terminal device.
JPH06152798A (en) Remote monitoring center device
JPH10261182A (en) Emergency announcing device
JPH1042347A (en) Mobile telephone system and base station testing method