JP2613821B2 - How to install the skylight - Google Patents

How to install the skylight

Info

Publication number
JP2613821B2
JP2613821B2 JP11658691A JP11658691A JP2613821B2 JP 2613821 B2 JP2613821 B2 JP 2613821B2 JP 11658691 A JP11658691 A JP 11658691A JP 11658691 A JP11658691 A JP 11658691A JP 2613821 B2 JP2613821 B2 JP 2613821B2
Authority
JP
Japan
Prior art keywords
attached
roof
frame
plate
wooden frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11658691A
Other languages
Japanese (ja)
Other versions
JPH04323453A (en
Inventor
洋一郎 飛島
Original Assignee
ワイケイケイアーキテクチュラルプロダクツ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ワイケイケイアーキテクチュラルプロダクツ株式会社 filed Critical ワイケイケイアーキテクチュラルプロダクツ株式会社
Priority to JP11658691A priority Critical patent/JP2613821B2/en
Publication of JPH04323453A publication Critical patent/JPH04323453A/en
Application granted granted Critical
Publication of JP2613821B2 publication Critical patent/JP2613821B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建物の屋根に形成した
屋根開口部に取付けられる天窓の取付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of mounting a skylight on a roof opening formed in a building roof.

【0002】[0002]

【従来の技術】天窓としては例えば実公昭63−487
29号公報に示すように、屋根に形成した開口部に木製
枠を取付け、この木製枠に固定枠体を取付け、その固定
枠体に障子を取付けたものが知られている。このような
天窓は屋根開口部と木製枠との間から雨水が室内に侵入
しないようにするために次のようにして取付けている。
屋根を構成するたる木、野地板に屋根開口部を形成し、
この屋根開口部に木製枠を取付け、木製枠の外側縦面と
野地板とに亘ってルーフィングと呼ばれる敷板を取付け
て屋根開口部と木製枠の外側縦面との隙間を閉塞し、屋
根開口部より屋根こう配方向下側(以下下部とする)に
下部屋根板を取付け、屋根開口部より屋根こう配方向上
側(以下上部とする)に雪割りを取付けると共に、屋根
開口部の左右に水切りを取付け、木製枠に固定枠を取付
けると共に、固定枠に障子を取付け、最後に屋根板を取
付けている。
2. Description of the Related Art A skylight is disclosed, for example, in Japanese Utility Model Publication No. 63-487.
As disclosed in Japanese Patent Publication No. 29-29, there is known an apparatus in which a wooden frame is attached to an opening formed in a roof, a fixed frame is attached to the wooden frame, and a shoji is attached to the fixed frame. Such a skylight is attached as follows in order to prevent rainwater from entering the room from between the roof opening and the wooden frame.
The roof opening is formed in the rafters and field boards that make up the roof,
A wooden frame is attached to the roof opening, and a floor board called roofing is attached between the outer vertical surface of the wooden frame and the base plate to close a gap between the roof opening and the outer vertical surface of the wooden frame. Attach the lower shingle to the lower part of the roof slope direction (hereinafter referred to as the lower part), attach the snow splitter above the roof opening direction (hereinafter referred to as the upper part), and attach drainers to the left and right sides of the roof opening part. A fixed frame is attached to a wooden frame, a shoji is attached to the fixed frame, and finally a shingle is attached.

【0003】[0003]

【発明が解決しようとする課題】かかる従来の天窓取付
方法であると、屋根開口部、木製枠取付けの大工作業の
後に敷板・一部屋根取付けの屋根職作業を行ない、その
後に雪割り、水切り取付け、固定枠・障子取付けの大工
作業を行ない、最後に再び仕上げ屋根職作業を行なうの
で、大工作業と屋根職作業が交互に繰り返しされるか
ら、作業が煩雑であり取付け工期が長くなってしまうと
共に、現場で組付けるので水密性の点で問題があっ
た。。
According to such a conventional method of mounting a skylight, a carpenter works on installing a roof opening and a wooden frame, and then performs a roofing work on installing a slab and a partial roof. Carpenter work for installation, fixed frame and shoji installation, and finally roof finishing work are performed again, so carpentry work and roof work are repeated alternately, which makes the work complicated and lengthens the installation period. At the same time, there was a problem in terms of watertightness because the assembly was performed on site. .

【0004】そこで、本発明は前述の課題を解決できる
ようにした天窓の取付方法を提供することを目的とす
る。
Accordingly, an object of the present invention is to provide a method of mounting a skylight that can solve the above-mentioned problems.

【0005】[0005]

【課題を解決するための手段】木製枠の外側面にあらか
じめ先付け敷板を4周連続して取付けると共に、下部ス
カート、水切り板、雪割り、固定枠体を取付けてユニッ
ト体とし、この木製枠を屋根開口部に挿入して取付ける
ことで先付け敷板を野地板上面に接触させ、その後に敷
板と屋根板を取付けるようにした方法。
Means for Solving the Problems A preinstalled slab is attached to the outer surface of the wooden frame in advance four times in a row, and a lower skirt, a drainer, a snow splitter, and a fixed frame are attached to form a unit body. A method in which the pre-installed slab is brought into contact with the top surface of the baseboard by inserting it into the roof opening and then installing the slab and the roof slab.

【0006】[0006]

【作 用】大工作業の後に屋根職作業を実施すること
で天窓を取付けできる。
[Operation] A roof window can be installed by performing roof work after carpentry work.

【0007】[0007]

【実 施 例】図1、図2に示すように、屋根1はたる
木2、野地板3、屋根板4等より成り、野地板3の開口
部5と木枠6とにより屋根開口部7を構成してある。前
記屋根開口部7には木製枠8の下部が挿されて取付ブラ
ケット9で連結され、この木製枠8に固定枠体10が取
付けてあり、その固定枠体10に障子11がヒンジ12
で開閉自在に取付けてある。前記木製枠8は上部枠材2
0、下部枠材21、左右枠材22,22で方形枠状とな
り、下部枠材21及び左右枠材22,22の下端面と外
側縦面下部とに亘ってクランク形状の支持用金属板23
がそれぞれ取付けられ、この支持用金属板23の上横片
23aが野地板3の開口縁上部に接し、各枠材の外側縦
面上部と野地板3の上面とに亘って断面L字状で4周連
続した先付け敷板24がそれぞれ取付けてあり、下部枠
材21に取付けた先付け敷板24に下部スカート25が
取付けられ、この下部スカート25は鉛製となって下端
縁25aが屋根板4の上に重ね合せてあり、左右枠材2
2,22に取付けた先付け敷板24に左右の水切り板2
6がそれぞれ取付けてある。さらに前記固定枠体10は
上部枠30と下部枠31と左右枠32,32とで方形枠
状となり、各枠が木製枠8の各枠材上端面にビス33で
連結され、上部枠30の外側縦面に雪割り34がビス3
5で取付けてある。
[Embodiment] As shown in FIGS. 1 and 2, a roof 1 is composed of a rafter 2, a base plate 3, a roof plate 4, etc., and a roof opening 7 is formed by an opening 5 of the base plate 3 and a wooden frame 6. It is composed. A lower portion of a wooden frame 8 is inserted into the roof opening 7 and connected with a mounting bracket 9. A fixed frame 10 is attached to the wooden frame 8, and a sliding door 11 is hinged to the fixed frame 10.
It is attached to open and close freely. The wooden frame 8 is the upper frame material 2
0, the lower frame member 21, the left and right frame members 22, 22 form a rectangular frame shape, and the crank-shaped supporting metal plate 23 extends over the lower end surfaces of the lower frame member 21, the left and right frame members 22, 22 and the lower portion of the outer vertical surface.
The upper horizontal piece 23a of the supporting metal plate 23 is in contact with the upper opening edge of the base plate 3, and has an L-shaped cross section over the upper outer vertical surface of each frame material and the upper surface of the base plate 3. A front skirting board 24 that is continuous for four rounds is attached to each, and a lower skirt 25 is attached to the front skirting board 24 attached to the lower frame member 21. Left and right frame material 2
Left and right draining boards 2
6 are attached respectively. Further, the fixed frame body 10 has a rectangular frame shape with an upper frame 30, a lower frame 31, and left and right frames 32, 32, and each frame is connected to an upper end surface of each frame material of the wooden frame 8 with a screw 33. Snow split 34 screw 3 on the outside vertical surface
5 is attached.

【0008】次に天窓の取付け順序を説明する。図3に
示すように、野地板3に開口部5を形成すると共に、木
枠6を取付けて屋根開口部7とする。あらかじめ工場等
で木製枠8に先付け敷板24、下部スカート25、水切
り板26、雪割り34を取付けると共に、木製枠8に固
定枠体10を取付けてユニット体Aとし、このユニット
体Aを現場まで運搬してその木製枠8を図4に示すよう
に屋根開口部7に挿入して金属板23の上横片23aを
野地板3の開口縁上部に載置し、左右の位置決めをして
取付けブラケット9を木枠6に固着してユニット体Aを
屋根開口部7に取付する。この後に障子11を取付け
る。以上は大工作業となる。図5に示すように、先付け
敷板24の下縁部と下部スカート25をめくり上げてそ
の下に下部敷板40を貼り、図6に示すように先付け敷
板24の左右縁部をめくり上げてその下に左右敷板41
を貼り、図7に示すように先付け敷板24の上縁部の上
から上部敷板42を貼る。図8に示すように、下部スカ
ート25をめくり上げて屋根板4を先付け敷板24の下
端縁の上に重ね合せて取付け、図9に示すように、下部
スカート25の上面と先付け敷板24の左右縁の上及び
上部敷板42の上に屋根板4をそれぞれ取付ける。以上
は屋根職作業である。
Next, the order of mounting the skylights will be described. As shown in FIG. 3, an opening 5 is formed in the base plate 3, and a wooden frame 6 is attached to form a roof opening 7. At the factory or the like, the leading board 24, the lower skirt 25, the drainer 26, and the snow splitter 34 are attached to the wooden frame 8 in advance, and the fixed frame 10 is attached to the wooden frame 8 to form a unit body A. The wooden frame 8 is transported and inserted into the roof opening 7 as shown in FIG. 4, and the upper horizontal piece 23a of the metal plate 23 is placed on the upper edge of the opening of the base plate 3, and the left and right positioning is performed. The unit body A is attached to the roof opening 7 by fixing the bracket 9 to the wooden frame 6. Thereafter, the shoji screen 11 is attached. The above is a carpentry operation. As shown in FIG. 5, the lower edge portion of the pre-attached slab 24 and the lower skirt 25 are turned up, and the lower pedestal plate 40 is adhered under the lower skirt 25. As shown in FIG. Left and right floor plate 41
Then, as shown in FIG. 7, the upper sole plate 42 is attached from above the upper edge portion of the leading sole plate 24. As shown in FIG. 8, the lower skirt 25 is turned up, and the roof shingle 4 is mounted on the lower end edge of the leading slab 24 so as to overlap with the lower skirt 25. As shown in FIG. The shingle 4 is attached on the rim and on the upper floor plate 42, respectively. The above is roofing work.

【0009】[0009]

【発明の効果】屋根開口部とあらかじめ組み立てたユニ
ット体の木製枠取付けの大工作業を終わった後に敷板、
屋根板の取付けの屋根職作業を行なうことができ、短時
間に天窓を取付けできると共に、ユニット体はあらかじ
め組立て現場では木製枠を取付ければ良いから水密性を
向上できる。
According to the present invention, after finishing the carpenter's work of attaching the wooden frame to the roof opening and the unit body assembled in advance, the floor plate,
It is possible to perform roofing work for installing a shingle, to install a skylight in a short time, and to improve watertightness because a wooden frame may be attached to a unit body at an assembly site in advance.

【図面の簡単な説明】[Brief description of the drawings]

【図1】天窓取付け状態の屋根こう配方向の断面図であ
る。
FIG. 1 is a cross-sectional view in a roof slope direction with a skylight mounted.

【図2】天窓取付け状態の屋根こう配方向と直角方向の
断面図である。
FIG. 2 is a cross-sectional view in a direction perpendicular to a roof slope direction with a skylight mounted.

【図3】屋根開口部の斜視図である。FIG. 3 is a perspective view of a roof opening.

【図4】木製枠取付け状態の斜視図である。FIG. 4 is a perspective view showing a state in which a wooden frame is attached.

【図5】敷板取付け状態の斜視図である。FIG. 5 is a perspective view showing a mounting state of the floor plate.

【図6】敷板取付け状態の斜視図である。FIG. 6 is a perspective view showing a mounting state of a floor plate.

【図7】敷板取付け状態の斜視図である。FIG. 7 is a perspective view showing a mounting state of the floor plate.

【図8】屋根板取付け状態の斜視図である。FIG. 8 is a perspective view of a roof shingle mounted state.

【図9】屋根板取付け状態の斜視図である。FIG. 9 is a perspective view showing a state in which a roof plate is attached.

【符号の説明】[Explanation of symbols]

1 屋根、2 たる木、3 野地板、4 屋根板、7
屋根開口部、8 木製枠、10 固定枠体、11 障
子、24 先付け敷板、25 下部スカート、26水切
り板、34 雪割り、40 下部敷板、41 左右敷
板、42 上部敷板、A ユニット体。
1 roof, 2 barrels, 3 basement boards, 4 shingles, 7
Roof opening, 8 wooden frame, 10 fixed frame, 11 shoji, 24 pre-installed slab, 25 lower skirt, 26 drainer, 34 snow split, 40 lower slab, 41 left and right slab, 42 upper slab, A unit body.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 木製枠8の外周面に先付け敷板24を4
周連続して取付け、この先付け敷板24の下部に下部ス
カート25を取付け、左右に水切り板26を取付け、上
部に雪割り34を取付けると共に、前記木製枠8に固定
枠体10を取付けてユニット体Aとし、 この木製枠8を野地板3の屋根開口部7に挿入して取付
けて先付け敷板24を野地板3の上面に接触させ、 先付け敷板24の下縁部、側縁部をめくり上げて下部敷
板40、左右敷板41,41を野地板3に取付け、先付
け敷板24の上縁部上に上部敷板42を取付け、 下部
スカート25をめくり上げて下部敷板40上に屋根板4
を取付け、この下部スカート25の上と先付け敷板24
の上と上部敷板42の上に亘って屋根板4を取付けるよ
うにした天窓の取付方法。
1. A front mounting plate 24 is attached to the outer peripheral surface of the wooden
The lower body 25 is attached to the lower part of the pre-installed flooring plate 24, the drainboards 26 are attached to the left and right sides, the snow splitter 34 is attached to the upper part, and the fixed frame 10 is attached to the wooden frame 8 to form a unit body. A, the wooden frame 8 is inserted into and attached to the roof opening 7 of the base plate 3 so that the pre-attached slat 24 is in contact with the upper surface of the base plate 3 and the lower edge and side edges of the pre-attached slab 24 are turned up. The lower floor board 40, the left and right floor boards 41, 41 are attached to the field board 3, the upper floor board 42 is mounted on the upper edge of the leading floor board 24, the lower skirt 25 is turned up, and the roof panel 4 is placed on the lower floor board 40.
On the lower skirt 25 and
A method of mounting a skylight in which the roof shingle 4 is mounted on the upper floor plate 42 and the upper floor plate 42.
JP11658691A 1991-04-22 1991-04-22 How to install the skylight Expired - Fee Related JP2613821B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11658691A JP2613821B2 (en) 1991-04-22 1991-04-22 How to install the skylight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11658691A JP2613821B2 (en) 1991-04-22 1991-04-22 How to install the skylight

Publications (2)

Publication Number Publication Date
JPH04323453A JPH04323453A (en) 1992-11-12
JP2613821B2 true JP2613821B2 (en) 1997-05-28

Family

ID=14690805

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11658691A Expired - Fee Related JP2613821B2 (en) 1991-04-22 1991-04-22 How to install the skylight

Country Status (1)

Country Link
JP (1) JP2613821B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5673520A (en) * 1994-05-26 1997-10-07 Yannucci, Iii; Alfred Skylight and/or chimney water diversion device

Also Published As

Publication number Publication date
JPH04323453A (en) 1992-11-12

Similar Documents

Publication Publication Date Title
JPH0748936A (en) External-wall remodeling structure of building
JP2613821B2 (en) How to install the skylight
JP2001065129A (en) Waterproofing structure of parapet
JP3469107B2 (en) Fixed structure of corner ridge tile and draining board used for it
JP3334432B2 (en) Window shutter frame structure
JPS6246774Y2 (en)
JP2599080B2 (en) Keraba gable
JP2503051Y2 (en) Building ventilation structure
JP3399628B2 (en) Outer wall trunk waterproof structure
JP2944961B2 (en) Eave ceiling mounting structure
JPH054489Y2 (en)
JPS63284344A (en) Roof panel
JPH075143Y2 (en) Wall
JPH078699Y2 (en) Eave ceiling support structure
JPS5846215Y2 (en) Installation equipment for new and old renovated window frames
JPH0354513Y2 (en)
JPH057370Y2 (en)
JPH08270064A (en) Balcony unit
JP4567864B2 (en) Bay window unit and bay window unit construction method
JPH08326172A (en) Wall edge drip structure
JP2892136B2 (en) Parapet waterproof structure
JPH04110888U (en) Rain protection structure at the bottom of the opening
JPH11222921A (en) External floor waterproof structure
JPH0893065A (en) Water drip material for exterior wall panel
JPH0886054A (en) Water drip device of lower end of transverse wall in gambrel roof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees