JP2597749Y2 - Integrated work transfer device - Google Patents

Integrated work transfer device

Info

Publication number
JP2597749Y2
JP2597749Y2 JP1992034206U JP3420692U JP2597749Y2 JP 2597749 Y2 JP2597749 Y2 JP 2597749Y2 JP 1992034206 U JP1992034206 U JP 1992034206U JP 3420692 U JP3420692 U JP 3420692U JP 2597749 Y2 JP2597749 Y2 JP 2597749Y2
Authority
JP
Japan
Prior art keywords
work
bucket
integrated
integrated work
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1992034206U
Other languages
Japanese (ja)
Other versions
JPH0589357U (en
Inventor
由里 竹田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOKKAICAN CO.,LTD.
Original Assignee
HOKKAICAN CO.,LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOKKAICAN CO.,LTD. filed Critical HOKKAICAN CO.,LTD.
Priority to JP1992034206U priority Critical patent/JP2597749Y2/en
Publication of JPH0589357U publication Critical patent/JPH0589357U/en
Application granted granted Critical
Publication of JP2597749Y2 publication Critical patent/JP2597749Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pile Receivers (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、複数の板状のワークを
搬送する集積ワーク搬送装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an integrated work transfer device for transferring a plurality of plate-like works.

【0002】[0002]

【従来の技術】本出願人は先に特願平3−343174
号により、矩形板状のワークが複数枚集積された集積ワ
ークをバケットに搭載し、該集積ワークの搬送方向に沿
って設けられたコンベアに前記バケットを支承して前記
集積ワークを搬送する搬送装置を提案した。該搬送装置
において使用されるバケットは、前記集積ワークを載置
する載置部と、該載置部の前後側に起立して該載置部に
載置された集積ワークの動きを前後側から規制する一対
の前後壁と、前記載置部の左右側の何れか一方側に起立
して該載置部に載置された集積ワークの動きを左右側の
何れか一方側から規制する側壁とを備えている。即ち、
前記バケットは、載置部の3方側が前後壁及び側壁によ
り包囲され、残る1方側が開放された形状となってい
る。これにより、前記バケットに集積ワークを投入する
ときには、開放された側から載置部に該集積ワークが投
入され、前記バケットの載置部に載置された集積ワーク
は、前後壁及び側壁により搬送中の揺れ等による荷崩れ
が防止される。
2. Description of the Related Art The present applicant has previously filed Japanese Patent Application No. 3-343174.
A transfer device for mounting a stacked work in which a plurality of rectangular plate-shaped works are stacked on a bucket, supporting the bucket on a conveyor provided along a transfer direction of the stacked work, and transferring the stacked work. Suggested. A bucket used in the transport device includes a mounting portion on which the integrated work is mounted, and a movement of the integrated work mounted on the mounting portion standing on the front and rear sides of the mounting portion from the front and rear sides. A pair of front and rear walls for regulating, and a side wall for standing up on one of the left and right sides of the placing section and regulating the movement of the integrated work placed on the placing section from one of the left and right sides. It has. That is,
The bucket has a shape in which three sides of the mounting portion are surrounded by front and rear walls and side walls, and the other side is open. Accordingly, when the integrated work is loaded into the bucket, the integrated work is loaded into the mounting portion from the open side, and the integrated work mounted on the mounting portion of the bucket is transported by the front and rear walls and the side walls. The collapse of the load due to shaking inside is prevented.

【0003】しかし、前記バケットは、載置部の3方側
が前後壁及び側壁により包囲されていることにより、そ
の前後方向がバケットの進行方向とされた場合にのみ集
積ワークの荷崩れは防止されるが、残る1方側が集積ワ
ークの投入のために開放されているので、搬送途中にそ
の左右方向に揺れ等が発生すると開放された側から集積
ワークの荷崩れが発生するおそれがある。また、例え
ば、集積ワークの搬送途中にバケットの進行方向をその
前後方向から左右方向に変換すると、前記バケットの開
放されている部分から集積ワークが荷崩れを起こすおそ
れがある。
However, since the bucket is surrounded by the front and rear walls and the side walls on three sides of the mounting portion, the collapse of the load of the integrated work is prevented only when the front and rear direction is the traveling direction of the bucket. However, since the remaining one side is opened for loading the accumulated work, if the right and left sway occurs during the transportation, the accumulated work may be collapsed from the opened side. Further, for example, when the traveling direction of the bucket is changed from the front-back direction to the left-right direction during the transportation of the accumulated work, the accumulated work may be collapsed from the open portion of the bucket.

【0004】[0004]

【考案が解決しようとする課題】かかる不都合を解消し
て、本考案は、集積ワークの荷崩れを確実に防止した状
態で集積ワークを搬送することができる集積ワーク搬送
装置を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention solves such inconveniences, and the present invention conveys an integrated work in a state in which the collapse of the load of the integrated work is reliably prevented.
It is intended to provide a device .

【0005】[0005]

【課題を解決するための手段】かかる目的を達成するた
めに、本考案は、板状のワークが複数枚集積された集積
ワークの搬送方向に沿って延設されたコンベアと、該コ
ンベアに支承されて前記集積ワークを搭載するバケット
と、前記コンベアのワーク投入位置において該バケット
の一方側から該バケットに集積ワークを投入するワーク
投入装置とを備える集積ワーク搬送装置において、前記
バケットは、前記集積ワークを載置する載置部と、該載
置部の集積ワークの搬送方向に沿った前後側に起立して
該載置部に載置された集積ワークの動きを前後側から規
制する一対の前後壁と、ワーク投入位置においてワーク
投入装置に対向する一方側を開放し、前記載置部の他方
側に起立して該載置部に載置された集積ワークの動きを
他方側から規制する側壁とを備え、前記載置部に、前記
集積ワークを該側壁に向かって下方に傾斜した状態で支
持する傾斜支持部材と、該載置部を上下方向に貫通する
切欠部とを設け、前記ワーク投入位置に、前記バケット
の切欠部を介して前記載置部の上方に突出して前記ワー
ク投入装置から投入される集積ワークを水平状態に案内
し、前記バケットの切欠部を介して前記コンベアの下方
位置に没入することにより該集積ワークを前記バケット
の傾斜支持部材上に載置する昇降自在の案内ローラと、
該案内ローラを昇降させる昇降手段とを設けたことを特
徴とする。
In order to achieve the above object, the present invention provides an integrated device in which a plurality of plate-like works are integrated.
A conveyor extending along the work transfer direction;
Bucket supported by the conveyor and carrying the integrated work
And the bucket at the workpiece input position of the conveyor.
Work to feed the integrated work to the bucket from one side of the work
An integrated work transfer device comprising: a charging device;
The bucket is configured such that a stacking portion on which the stacking work is mounted and a stacking portion which stands on the front and rear sides of the mounting portion along the transport direction of the stacking work and move the stacking work mounted on the mounting portion in the front and rear directions. a pair of front and rear walls to regulate from the work in the work loading position
Opening the one side facing the dosing device, the movement of the accumulating work that stands up on the other side is placed on the placing portion of the mounting section and a side wall for regulating the other side, the mounting section in, through the inclined support member which supports in an inclined downward to the accumulating work towards the side wall, the the placing portion in the vertical direction
A notch portion, and the bucket is provided at the work input position.
Projecting above the mounting section through the notch
Guides the integrated work input from the work input device in a horizontal state
And below the conveyor through the notch of the bucket.
Immersing the integrated work into the bucket
A vertically movable guide roller placed on the inclined support member of
Lifting means for raising and lowering the guide roller is provided.
Sign.

【0006】また、本考案において、前記バケットの
斜支持部材は、前記側壁に向かって次第に下方に傾斜す
る傾斜面を有し、該傾斜面上に前記集積ワークを支持す
ることを特徴とする。
In the present invention, the inclined support member of the bucket has an inclined surface that is inclined downward gradually toward the side wall, and supports the integrated work on the inclined surface. It is characterized by.

【0007】[0007]

【作用】前記バケットの載置部の一対の前後壁は、該載
置部に載置された集積ワークの搬送方向に沿った前後方
向への動きを規制して集積ワークの荷崩れを防止する。
[Action] front and rear walls of a pair of mounting portion of the bucket, prevents collapsing of accumulating work to regulate the movement in the longitudinal direction along the conveying direction of the accumulating work placed on the placing portion I do.

【0008】また、前記バケットの載置部の側壁は、
載置部にその開放された一方側から集積ワークが投入さ
れた際に該集積ワークを他方側から規制して集積ワーク
を確実に載置部上に保持する。更に、前記載置部に備え
られた傾斜支持部材は、該載置部上の集積ワークを前記
側壁に向かって下方に傾斜した状態で支持するので、前
記側壁に対向する側を開放した状態であっても、集積ワ
ークの前記側壁に対向する側への動きを該集積ワークの
自重によって規制して該集積ワークの荷崩れを防止す
る。
Further, the side walls of the mounting portion of the bucket, the
The integrated work is loaded into the receiver from one open side.
The time to regulate the said accumulating work from the other side accumulating work
Is securely held on the receiver. Furthermore, since the inclined support member provided on the mounting portion supports the integrated work on the mounting portion in a state inclined downward toward the side wall, the inclined support member is provided with the side facing the side wall opened. Even if there is
Movement of the workpiece to the side facing the side wall of the workpiece
Regulate by own weight to prevent collapse of the stacked work
You.

【0009】更に、前記バケットへのワークの投入位置
には、前記案内ローラを設けられている。該案内ローラ
は、前記バケットの載置部に集積ワークを投入する際
に、前記昇降手段によって、該バケットの切欠部を介し
てその上方に突出され、前記ワーク投入装置から投入さ
れる集積ワークを、その下方から支持して水平姿勢を維
持する。そして、案内ローラを下降させて該バケットの
切欠部を介してコンベアの下方に没入させ、バケットの
載置部上において水平姿勢に支持された集積ワークを載
置部の傾斜支持部材上に載置する。こうすることによ
り、前記ワーク投入装置から投入される集積ワークは水
平姿勢を維持して荷崩れが防止された状態で投入され
る。
[0009] Further, the position of charging the work to the bucket.
Is provided with the guide roller. The guide roller
Is used when the integrated work is put into the placing portion of the bucket.
At the same time, through the notch of the bucket
From the work input device.
Support the integrated work from below and maintain a horizontal posture.
Carry. Then, the guide roller is lowered to
Immerse under the conveyor through the notch,
Place the integrated work supported in a horizontal position on the mounting part.
It is placed on the inclined support member of the placing section. By doing this
The integrated work input from the work input device is water
It is loaded in a state where the collapse of the load is prevented while maintaining the flat posture
You.

【0010】また、前記バケットの傾斜支持部材に、前
記側壁に向かって次第に下方に傾斜する傾斜面を設ける
ことにより、集積ワークの搬送中において集積ワークに
振動等が付与されても常に該集積ワークを前記傾斜支持
部材の傾斜面に沿って案内し、集積ワークの荷崩れを防
止する。
[0010] Further, the inclined support member of the bucket is provided with an inclined surface which is gradually inclined downward toward the side wall, so that the accumulated work is conveyed to the accumulated work during conveyance.
Even if vibrations or the like are applied, the integrated work is always guided along the inclined surface of the inclined support member to prevent collapse of the load of the integrated work.
Stop.

【0011】[0011]

【実施例】本考案の実施の一例を図面に基づいて説明す
る。図1は本実施例の搬送装置に採用されるバケットの
斜視図、図2は図1示のバケットの一側面図、図3は
実施例の搬送装置におけるワークの投入時の作動説明
図、図4は図3の一部を平面視した説明図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to the drawings. Figure 1 is a perspective view of the bucket employed in conveying apparatus of the present embodiment, FIG. 2 is a side view of Figure 1 shows the bucket, FIG. 3 is present
FIG. 4 is an explanatory view of the operation of the transfer device of the embodiment when a workpiece is loaded, and FIG.

【0012】本実施例の搬送装置に採用されるバケット
1は、例えば、所定の大きさの缶胴を形成するためのボ
ディーブランク等のブリキ或いはティンフリースチール
製の矩形状の板材が所定枚数集積された積層ワークWを
搭載するものである。そして、該バケット1は、後述す
るように、コンベア2上に支承されて集積ワークWの搬
送方向に移動される。
The bucket 1 employed in the transporting apparatus of the present embodiment is composed of a predetermined number of tinplate or tin-free steel rectangular plate members such as a body blank for forming a can body having a predetermined size. On which the laminated work W is mounted. The bucket 1 is supported on a conveyor 2 and moved in the transport direction of the integrated work W, as described later.

【0013】先ず、前記バケット1の構成を説明する。
該バケット1は、図1及び図2に示すように、上面に集
積ワークWの載置部3を備える台座部4と、該載置部3
の前後側に起立する一対の前後壁5,6と、前記載置部
3の左右側の何れか一方側に起立する側壁7とを備え、
該側壁7に対向する側が開放されている。
[0013] First, the structure of the bucket 1.
As shown in FIGS. 1 and 2, the bucket 1 includes a pedestal portion 4 having a mounting portion 3 for an integrated work W on an upper surface thereof,
A pair of front and rear walls 5 and 6 standing on the front and rear sides of the vehicle, and a side wall 7 standing on one of the left and right sides of the placing section 3.
The side facing the side wall 7 is open.

【0014】前記台座部4は、その進行方向X側に突出
する一対の当接部材8,9を備えている。また、該台座
部4の略中央部の前後側には、一対のコ字形の切欠部1
0,11が形成されている。
The pedestal 4 has a pair of abutting members 8, 9 protruding in the direction of travel X thereof. In addition, a pair of U-shaped notches 1 are provided on the front and rear sides of a substantially central portion of the pedestal portion 4.
0 and 11 are formed.

【0015】更に、前記台座部4の載置部3上には、前
記側壁7に向かって次第に下方に傾斜する傾斜面12を
有する傾斜支持部材13が設けられている。
Further, on the mounting portion 3 of the pedestal portion 4, there is provided an inclined support member 13 having an inclined surface 12 inclined gradually downward toward the side wall 7.

【0016】次に、本実施例の搬送装置の作動を説明す
る。前記バケット1は、図3に示すように、集積ワーク
Wの搬送方向に延設されたコンベア2上に支承される。
このとき、図示しないが、コンベア2上には複数のバケ
ット1が支承される。該コンベア2は、上面に集積ワー
クWの搬送方向Xに図示しない駆動手段により駆動され
るローラ14を備えており、該ローラ14上に複数のバ
ケット1を停止自在に支持して所謂フリーフローコンベ
アを構成する。これにより、該コンベア2上に支承され
たバケット1は、該コンベア2の駆動によって集積ワー
クWの搬送方向に集積ワークWを搭載した状態で移動さ
れる。なお、コンベア2上の複数のバケット1は、前記
当接部材8,9によって所定間隔を存して配列された状
態となる。
Next, the operation of the transfer device of this embodiment will be described. As shown in FIG. 3, the bucket 1 is supported on a conveyor 2 extending in the transport direction of the integrated work W.
At this time, although not shown, a plurality of buckets 1 are supported on the conveyor 2. The conveyor 2 is provided with a roller 14 which is driven by a driving means (not shown) in the transport direction X of the integrated work W on the upper surface, and supports a plurality of buckets 1 on the roller 14 so as to be able to stop. Is configured. As a result, the bucket 1 supported on the conveyor 2 is moved by the driving of the conveyor 2 in a state in which the integrated work W is mounted in the transport direction of the integrated work W. The plurality of buckets 1 on the conveyor 2 are arranged at predetermined intervals by the contact members 8 and 9.

【0017】そして先ず、コンベア2上のバケット1
は、集積ワークWの投入位置で図示しない停止手段によ
って停止される。集積ワークWの投入位置には、ワーク
を所定枚数集積して集積ワークWとしてバケット1に投
入するワーク投入装置16が設けられている。従って、
バケット1は、前記側壁7に対向した開放側から集積ワ
ークWを受け取るために、その開放側を前記ワーク投入
装置16に対向させてコンベア2上に支承されている。
First, the bucket 1 on the conveyor 2
Is stopped by a stop means (not shown) at the input position of the integrated work W. At the input position of the integrated work W, there is provided a work input device 16 for collecting a predetermined number of works and inputting the integrated work W into the bucket 1. Therefore,
The bucket 1 is supported on the conveyor 2 with its open side facing the work input device 16 in order to receive the accumulated work W from the open side facing the side wall 7.

【0018】更に、図3及び図4に示すように、集積ワ
ークWの投入位置には、昇降自在の案内ローラ17,1
が設けられている。該案内ローラ17は、集積ワーク
Wの投入位置に停止状態とされたバケット1とワーク投
入装置16との間に一対設けられ、案内ローラ18は、
該バケット1の切欠部10,11に対応する前後側に一
対設けられている。また、各案内ローラ17,18は、
昇降用シリンダ19のピストンロッド20によって支持
アーム21を介して共に昇降される。即ち、各案内ロー
ラ17,18は、バケット1がコンベア2上を移動して
いるときには、共にコンベア2の下方位置に収納され、
バケット1が停止されてワーク投入装置16によって集
積ワークWが投入される際に、一方の案内ローラ17は
バケット1とワーク投入装置16との間から、他方の案
内ローラ18はバケット1の切欠部10,11から、共
に上昇される。上昇した両案内ローラ17,18は、共
に水平にバケット1の傾斜支持部材13よりも上方に位
置される。
Furthermore, as shown in FIGS. 3 and 4, the loading position of accumulating work W is vertically movable guide rollers 17,1
8 are provided. The guide rollers 17 are provided in a pair between the work 1 and the bucket 1 stopped at the input position of the integrated work W.
A pair of buckets 1 is provided on the front and rear sides corresponding to the notches 10 and 11. In addition, each guide roller 17, 18 is
It is raised and lowered together via a support arm 21 by a piston rod 20 of a lifting cylinder 19. That is, when the bucket 1 is moving on the conveyor 2, the guide rollers 17 and 18 are both stored at a position below the conveyor 2,
When the bucket 1 is stopped and the integrated work W is loaded by the work loading device 16, one guide roller 17 is located between the bucket 1 and the workpiece loading device 16, and the other guide roller 18 is located in the notch of the bucket 1. From 10 and 11, both are raised. Both the raised guide rollers 17 and 18 are positioned horizontally above the inclined support member 13 of the bucket 1.

【0019】次いで、前記ワーク投入装置16によりバ
ケット1に集積ワークWが投入される。このとき、前述
したように、集積ワークWの投入位置に案内ローラ1
7,18が設けられているので、集積ワークWが案内ロ
ーラ17,18に沿って水平に支持されてバケット1の
載置部3の上方に投入される。
Next, the integrated work W is loaded into the bucket 1 by the work loading device 16. At this time, as described above, the guide roller 1
Since the stacking work 7 and 18 are provided, the integrated work W is horizontally supported along the guide rollers 17 and 18 and is thrown above the mounting portion 3 of the bucket 1.

【0020】その後、前記案内ローラ17,18を下降
させる。これにより、集積ワークWはその投入時におい
ても、水平に投入されるので荷崩れのない状態でバケッ
ト1の載置部3に載置される。そして、該載置部3には
前記傾斜支持部材13が設けられているので、集積ワー
クWはバケット1の側壁7に向かって下方に傾斜した状
態で載置される。
Thereafter , the guide rollers 17, 18 are lowered. As a result, the integrated work W smell when its turned on
However, since they are thrown horizontally, they are placed on the placement section 3 of the bucket 1 without collapse of the load . Further , since the mounting portion 3 is provided with the inclined support member 13, the integrated work W is mounted so as to be inclined downward toward the side wall 7 of the bucket 1.

【0021】続いて、集積ワークWが搭載されたバケッ
ト1は、前記コンベア2により集積ワークWの搬送方向
に向かって移動される。
Subsequently, the bucket 1 on which the integrated work W is mounted is moved by the conveyor 2 in the conveying direction of the integrated work W.

【0022】このとき、バケット1内の集積ワークW
は、該バケット1の進行方向Xに対応する前後方向に移
動しようとしても、前記載置部3に前後壁5,6が設け
られているので、集積ワークWの前後方向へ動きが規制
されており、また該集積ワークWは、バケット1の進行
方向Xに直交する左右方向に移動しようとしても、前記
載置部3に側壁7が設けられているうえに前記傾斜支持
部材13が設けられてるので、集積ワークWの左右方向
への動きが規制されている。これにより、バケット1は
集積ワークWの荷崩れを確実に防止した状態で該集積ワ
ークWを搭載することができる。そして、例えば、集積
ワークWの搬送途中にバケット1の進行方向が、その前
後方向から左右方向に変換されても、該集積ワークW
は、前記前後壁5,6、前記側壁7及び前記傾斜支持部
材13によって荷崩れを起こすことなく搬送される。
At this time, the integrated work W in the bucket 1
However, since the front and rear walls 5 and 6 are provided on the placement section 3 even when the bucket 1 is to move in the front and rear direction corresponding to the traveling direction X of the bucket 1, the movement of the integrated work W in the front and rear direction is restricted. In addition, even if the integrated work W attempts to move in the left-right direction orthogonal to the traveling direction X of the bucket 1, the mounting portion 3 is provided with the side wall 7 and the inclined support member 13 is provided. Therefore, the movement of the integrated work W in the left-right direction is restricted. Thereby, the bucket 1 can mount the integrated work W in a state in which the collapse of the load of the integrated work W is reliably prevented. For example, even if the traveling direction of the bucket 1 is changed from the front-rear direction to the left-right direction during the transportation of the integrated work W,
Is transported by the front and rear walls 5 and 6, the side wall 7 and the inclined support member 13 without causing collapse of the load.

【0023】[0023]

【考案の効果】以上のことから明らかなように、本考
は、前記バケットの載置部の前後側に設けた前後壁によ
り該載置部に載置された集積ワークの前後方向への動き
を規制すると共に、前記載置部に傾斜支持部材を備え
て、該載置部上の集積ワークを前記側壁に向かって下方
に傾斜した状態で載置部に載置することにより、前記側
壁に対向する開放された側への集積ワークの動きを規制
するので、前後及び左右方向に対して集積ワークの荷崩
れを確実に防止することができる。
[Devised effect] As is apparent from the above that the present devised
The forward and backward walls provided on the front and rear sides of the mounting portion of the bucket regulate the movement of the integrated work placed on the mounting portion in the front-rear direction, and the mounting portion has an inclined support member. Since the integrated work on the mounting portion is mounted on the mounting portion while being inclined downward toward the side wall, the movement of the integrated work toward the open side facing the side wall is regulated. In addition, the collapse of the load of the accumulated work in the front-back and left-right directions can be reliably prevented.

【0024】更に、前記バケットへのワークの投入位置
に前記案内ローラを設けたことにより、前記ワーク投入
装置から投入される集積ワークを前記バケットの載置部
の上方に水平に案内することができ、これによって、集
積ワークの荷崩れを防止した状態で該集積ワークを前記
バケットの載置部に投入することができる。
[0024] Further, the position of loading the work into the bucket.
The work roller
The integrated work input from the device is placed on the mounting portion of the bucket.
Can be guided horizontally above the
The stacked work is stored in a state where the collapse of the stacked work is prevented.
It can be put into the mounting part of the bucket.

【0025】また、前記傾斜支持部材が、前記側壁に向
かって次第に下方に傾斜する傾斜面を有することによ
り、例えば、集積ワークの搬送中に該集積ワークに振動
が付与されても、該集積ワークは前記傾斜支持部材の傾
斜面によって前記側壁に一側縁を当接する方向に常に案
内されるので、集積ワークの荷崩れを確実に防止するこ
とができる。
Further, the inclined support member has an inclined surface which is gradually inclined downward toward the side wall, so that, for example, the integrated work is vibrated while the integrated work is being conveyed.
Is provided, the integrated work is tilted by the tilt support member.
Always plan in the direction where one side edge abuts the side wall by the slope
To prevent the collapse of the load of the accumulated work.
Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の一実施例の搬送装置に採用されるバケ
ットの斜視図。
FIG. 1 is a perspective view of a bucket employed in a transport device according to an embodiment of the present invention.

【図2】図1の一側面図。FIG. 2 is a side view of FIG. 1;

【図3】本実施例の搬送装置におけるワークの投入時の
作動説明図。
FIG. 3 is an operation explanatory diagram at the time of loading a work in the transfer device of the embodiment .

【図4】図3の一部を平面視した説明図。FIG. 4 is an explanatory view showing a part of FIG. 3 in a plan view.

【符号の説明】[Explanation of symbols]

W…集積ワーク、1…バケット、2…コンベア、3…載
置部、5,6…前後壁、7…側壁、10,11…切欠
部、12…傾斜面、13…傾斜支持部材、16…ワーク
投入装置、18…案内ローラ、19…昇降用シリンダ
(昇降手段)。
W: Integrated work, 1: Bucket, 2: Conveyor, 3: Placement section, 5, 6: Front and rear wall, 7: Side wall, 10 , 11: Notch
Part, 12: inclined surface, 13: inclined support member, 16: work
Loading device, 18 ... Guide roller, 19 ... Cylinder for lifting
(Elevating means).

Claims (2)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】板状のワークが複数枚集積された集積ワー
クの搬送方向に沿って延設されたコンベアと、該コンベ
アに支承されて前記集積ワークを搭載するバケットと、
前記コンベアのワーク投入位置において該バケットの一
方側から該バケットに集積ワークを投入するワーク投入
装置とを備える集積ワーク搬送装置において、 前記バケットは、前記 集積ワークを載置する載置部と、
該載置部の集積ワークの搬送方向に沿った前後側に起立
して該載置部に載置された集積ワークの動きを前後側か
ら規制する一対の前後壁と、ワーク投入位置においてワ
ーク投入装置に対向する一方側を開放し、前記載置部の
他方側に起立して該載置部に載置された集積ワークの動
きを他方側から規制する側壁とを備え、 前記載置部に、 前記集積ワークを該側壁に向かって下方
に傾斜した状態で支持する傾斜支持部材と、該載置部を
上下方向に貫通する切欠部とを設け、 前記ワーク投入位置に、前記バケットの切欠部を介して
前記載置部の上方に突出して前記ワーク投入装置から投
入される集積ワークを水平状態に案内し、前記バケット
の切欠部を介して前記コンベアの下方位置に没入するこ
とにより該集積ワークを前記バケットの傾斜支持部材上
に載置する昇降自在の案内ローラと、該案内ローラを昇
降させる昇降手段とを設けたことを特徴とする集積ワー
ク搬送装置。
An integrated work in which a plurality of plate-shaped works are integrated.
A conveyor extending along the transport direction of the conveyor, and the conveyor
A bucket mounted on the integrated work and supported by the
One of the buckets is placed at the work input position of the conveyor.
Work to put the integrated work into the bucket from one side
In the integrated work transport device including a device, the bucket, a mounting portion for mounting the integrated work,
A pair of front and rear walls for restricting the movement of the accumulating work placed on the placing portion and erected on the front and rear along the conveying direction of the accumulating work of the placing portion from the front and back side, Wa in the workpiece loading position
Opening the one side facing the over click-on device, and a side wall for restricting the movement of the placed accumulating work in the placing portion from the other side standing on the other side of the mounting section, before, wherein in part, the inclined support member which supports in an inclined downward to the accumulating work towards the side wall, the the placing portion
A notch penetrating in the up-down direction, and at the work input position, through a notch of the bucket.
Projecting from the work input device by projecting above the placement section.
The integrated work to be inserted is guided horizontally, and the bucket
Immersed in the position below the conveyor through the notch
The integrated work on the inclined support member of the bucket by
A vertically movable guide roller placed on the
And an elevating means for lowering and lowering.
Transport device.
【請求項2】前記バケットの傾斜支持部材は、前記側壁
に向かって次第に下方に傾斜する傾斜面を有し、該傾斜
面上に前記集積ワークを支持することを特徴とする請求
項1記載の集積ワーク搬送装置。
2. The bucket according to claim 1, wherein the inclined support member of the bucket has an inclined surface inclined gradually downward toward the side wall, and supports the integrated work on the inclined surface . Integrated work transfer device.
JP1992034206U 1992-05-22 1992-05-22 Integrated work transfer device Expired - Fee Related JP2597749Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992034206U JP2597749Y2 (en) 1992-05-22 1992-05-22 Integrated work transfer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992034206U JP2597749Y2 (en) 1992-05-22 1992-05-22 Integrated work transfer device

Publications (2)

Publication Number Publication Date
JPH0589357U JPH0589357U (en) 1993-12-07
JP2597749Y2 true JP2597749Y2 (en) 1999-07-12

Family

ID=12407687

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992034206U Expired - Fee Related JP2597749Y2 (en) 1992-05-22 1992-05-22 Integrated work transfer device

Country Status (1)

Country Link
JP (1) JP2597749Y2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57103963U (en) * 1980-12-19 1982-06-26
JPS5895066A (en) * 1981-11-30 1983-06-06 Toshiba Corp Carrying tray for paper sheet

Also Published As

Publication number Publication date
JPH0589357U (en) 1993-12-07

Similar Documents

Publication Publication Date Title
WO2019017292A1 (en) Transport vehicle and transport facility
US20210387769A1 (en) Storage container for automated storage and retrieval system
JP2597749Y2 (en) Integrated work transfer device
JP2001246529A (en) Automatic work setting device
JP7317052B2 (en) Automated warehouse system and method for transporting storage containers between an automated warehouse grid and a second location
JP2021528334A (en) Unloading components and unloading stations, as well as how to unload items from storage containers
TWI821552B (en) Traveling vehicle system
JPH0568968U (en) Aligning and feeding device for stepped columnar bodies
JPH07257748A (en) Cylindrical article carrying pallet and cylindrical article transfer facility using the pallet
CN218907285U (en) Handling device for mechanical equipment
JP3737406B2 (en) Coil material transfer device
JP4650680B2 (en) Transport equipment
JP2669221B2 (en) Transport equipment using transport containers
JP3663672B2 (en) Plate stocker equipment
JP2954776B2 (en) Rear sheet transfer equipment for automobiles
TWI725754B (en) RGV feeding system
JP2978273B2 (en) Laser processing system
JP4229327B2 (en) Blank feeder
JP2585136B2 (en) A cargo handling device having a lifting cargo receiving part
JPH0739864Y2 (en) Article carrier
JPH0637227U (en) Transport system
JPH05208713A (en) Flow rack
JP3244524B2 (en) Plate transfer support device for plate processing machine
JPS6015306A (en) Conveying device
JPH05178450A (en) Conveying device for accumulation work

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R323111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees