Gas sealing work equipment for pressure vesselsInfo
- Publication number
- JP2577911Y2 JP2577911Y2 JP1991102157U JP10215791U JP2577911Y2 JP 2577911 Y2 JP2577911 Y2 JP 2577911Y2 JP 1991102157 U JP1991102157 U JP 1991102157U JP 10215791 U JP10215791 U JP 10215791U JP 2577911 Y2 JP2577911 Y2 JP 2577911Y2
- Authority
- JP
- Japan
- Prior art keywords
- gas
- pressure vessel
- shell
- holding member
- plug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
Description
【0001】[0001]
【産業上の利用分野】この考案は、例えば自動車用の蓄
圧器等の圧力容器のガス封入口をガスプラグで封止する
際に使用するガス封止作業装置であって、シール性能及
び作業効率の向上を企図した圧力容器のガス封止作業装
置に関する。BACKGROUND OF THE INVENTION The present invention relates to a gas sealing operation device used for sealing a gas inlet of a pressure vessel such as an accumulator for an automobile with a gas plug. The present invention relates to a pressure vessel gas sealing operation device intended to improve the pressure.
【0002】[0002]
【従来の技術】自動車用の蓄圧器等の圧力容器において
は、容器本体であるシェルに開口したガス封入口をガス
の封入後にガスプラグで封止している。ここで、ガスプ
ラグは、シェルのガス封入口にねじ込んで固定するねじ
込み式のものが従来一般的であり、シール性能を確保す
るためにOリングが併用されている(実願昭63−36
701号参照)。2. Description of the Related Art In a pressure vessel such as an accumulator for an automobile, a gas filling port opened in a shell which is a container body is sealed with a gas plug after gas is filled. Here, the gas plug is conventionally of a screw type which is screwed into the gas inlet of the shell and fixed, and an O-ring is used in combination to secure the sealing performance (Japanese Utility Model Application No. 63-36).
No. 701).
【0003】[0003]
【考案が解決しようとする課題】前述のように従来は、
ねじ込み式のガスプラグとOリングとを使用してシェル
のガス封入口を封止しているので、ガスプラグの製造や
Oリングの組み込みに費用がかかる欠点があった。[Problems to be solved by the invention] As described above, conventionally,
Since the gas inlet of the shell is sealed using a screw-in type gas plug and an O-ring, there is a disadvantage in that it is expensive to manufacture the gas plug and to incorporate the O-ring.
【0004】また、ねじ込み式のガスプラグはその締め
付け作業や開放作業が必要であって作業効率が悪く、O
リングはその接触面粗さの管理が必要であるなど、面倒
な問題を抱えていた。Further, screw-in type gas plugs need to be tightened or opened, resulting in poor working efficiency.
The ring had troublesome problems such as the need to control the contact surface roughness.
【0005】しかも、ねじ込み式のガスプラグは故意に
開放することができるので、これを防止するためにその
外周を塗料等で覆う必要もあった。Moreover, since the screw-in type gas plug can be intentionally opened, it has been necessary to cover the outer periphery with a paint or the like in order to prevent this.
【0006】そこでこの考案は、シェルのガス封入口に
対するガスプラグのねじ込み作業やOリングの併用が不
要であって、低コストでありながら作業効率がよく、し
かもシール性能の高い圧力容器のガス封止構造が得られ
るガス封止作業装置を提供することを目的とする。Therefore, the present invention eliminates the need for screwing the gas plug into the gas inlet of the shell and the use of an O-ring, and is a low-cost, highly efficient, and highly efficient gas seal for a pressure vessel. It is an object of the present invention to provide a gas sealing operation device capable of obtaining a stop structure.
【0007】[0007]
【課題を解決するための手段】上記の目的を達成するた
めこの考案は、シェルと、該シェルの内部をガス室とオ
イル室の2室に区画する隔膜と、前記シェルに設けられ
るとともに、前記ガス室内外を連通するガス封入口と前
記オイル室内外を連通するオイル導入口と、前記ガス封
入口に挿着されてそこを封止するガスプラグとを具えた
圧力容器の前記ガスプラグを前記ガス封入口に溶接する
ための圧力容器のガス封止作業装置であって、前記ガス
封入口を下方に向けた状態で前記シェルを上下方向から
挟持する上部保持部材と電極である下部保持部材と、前
記ガスプラグを前記ガス封入口に挿着した状態で上方に
押圧する電極である押動部材とを具えた手段を採用した
ものである。 This invention for achieving the above object SUMMARY OF THE INVENTION, the shell and the gas chamber and o the inside of the shell
A diaphragm which is divided into two chambers,
And a gas filling port communicating between the gas chamber and
The oil inlet that communicates with the oil chamber and the gas seal
With a gas plug inserted into the inlet and sealing it
Welding the gas plug of the pressure vessel to the gas inlet
A pressure vessel gas sealing operation device for
With the filling port facing downward, pull the shell up and down
An upper holding member to be sandwiched and a lower holding member as an electrode;
With the gas plug inserted into the gas inlet,
Employs a means that includes a pressing member that is an electrode for pressing
Things.
【0008】[0008]
【作用】この考案は上記のような手段を採用したことに
より、ガス封入口を下方に向けた状態でシェルを上部保
持部材と下部保持部材との間で挟持するとともに、ガス
封入口にガスプラグを挿着して押動部材によって上方に
押圧し、この状態で電極である下部保持部材と押動部材
との間に通電することにより、ガスプラグがシェルのガ
ス封入口に溶接されることになる。 This invention is based on the adoption of the above means.
With the gas inlet facing downward
Between the holding member and the lower holding member,
Insert a gas plug into the filling port and push it upward with a pushing member.
Press the lower holding member and the pushing member, which are electrodes in this state.
Between the gas plug and the shell
Will be welded to the sealing hole.
【0009】[0009]
【0010】[0010]
【0011】[0011]
【実施例】以下、この考案の実施例を添付の図面を参照
して具体的に説明する。図2及び図3は縦型に構成され
た圧力容器のガス封止作業装置1の全体構成を示してお
り、その中間部には圧力容器2を保持する上部保持部材
3と、下部保持部材4とが配置されている。また上部保
持部材3を上下方向に駆動する油圧シリンダ5と、後述
する押動部材6を上下方向に駆動する油圧シリンダ7と
が上部及び下部に配置されている。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be specifically described below with reference to the accompanying drawings. FIG. 2 and FIG. 3 show the overall configuration of a vertical pressure vessel gas sealing operation device 1, in the middle of which an upper holding member 3 for holding the pressure container 2 and a lower holding member 4. And are arranged. Also, a hydraulic cylinder 5 for driving the upper holding member 3 in the vertical direction and a hydraulic cylinder 7 for driving the pushing member 6 described later in the vertical direction are arranged at the upper and lower parts.
【0012】図1は前記上部保持部材3及び下部保持部
材4付近を拡大して示している。ここで前記下部保持部
材4は、中心孔4aを有する肉厚の円筒状であり、絶縁
部材8を介して支持板9上に支持されている。そしてこ
の下部保持部材4の中心孔4aが開口する上端面には、
圧力容器2のガス封入口2aが開口する部分のシェル2
bの形状に対応した凹曲面が形成され、中心孔4aの開
口部周囲にはシールリング10が装着されている。FIG. 1 is an enlarged view of the vicinity of the upper holding member 3 and the lower holding member 4. Here, the lower holding member 4 has a thick cylindrical shape having a center hole 4 a and is supported on a support plate 9 via an insulating member 8. Then, on the upper end surface of the lower holding member 4 where the center hole 4a is opened,
Shell 2 at a portion where gas filling port 2a of pressure vessel 2 is opened
A concave curved surface corresponding to the shape b is formed, and a seal ring 10 is mounted around the opening of the center hole 4a.
【0013】また、前記下部保持部材4には、その上端
部付近に位置して中心孔4aに連通するガス供給孔4b
が穿設され、図示省略したガスボンベからホースを介し
て適宜のガスが供給されるようになっている。そしてこ
のガス供給孔4bの開口位置より下側において、中心孔
4aには絶縁ブッシュ11、12が装着されている。The lower holding member 4 has a gas supply hole 4b located near the upper end thereof and communicating with a center hole 4a.
And an appropriate gas is supplied from a gas cylinder (not shown) via a hose. Insulating bushes 11 and 12 are attached to the center hole 4a below the opening position of the gas supply hole 4b.
【0014】ここで、前記下部保持部材4の中心孔4a
に装着された絶縁ブッシュ11、12内には、油圧シリ
ンダ7により上下に駆動される押動部材6がシールリン
グ13を介して摺動自在に嵌合されている。この押動部
材6は、上端部が閉塞された冷却水通路6aが内部に形
成されたもので、この冷却水通路6aはジョイント14
を介して図示省略した冷却水の供給ホースに接続されて
いる。そしてこのような押動部材6の上端部外周は、ガ
ス供給孔4bからのガスの流入を妨げないように若干細
く形成され、上端面にはガスプラグ2cを位置決めして
保持する凹部6bが形成されている。Here, the center hole 4a of the lower holding member 4 is provided.
A push member 6 driven up and down by a hydraulic cylinder 7 is slidably fitted through a seal ring 13 in the insulating bushes 11 and 12 mounted on the boss. The pushing member 6 has a cooling water passage 6 a having a closed upper end formed therein.
Is connected to a cooling water supply hose (not shown). The outer periphery of the upper end portion of such a pushing member 6 is formed slightly thin so as not to obstruct the gas flow from the gas supply hole 4b, and a concave portion 6b for positioning and holding the gas plug 2c is formed on the upper end surface. Have been.
【0015】一方、前記絶縁部材8上には、押動部材6
を支持板9にボルト固定するための固定リング15が設
置され、この固定リング15には例えば4本のガイドロ
ッド16が立設されている。そしてこのガイドロッド1
6には圧力容器2の支持リング17が上方へ抜け止めし
て摺動自在に嵌合し、またこの支持リング17を上方へ
弾持するコイルスプリング18が各ガイドロッド16に
巻装されている。On the other hand, on the insulating member 8, a pushing member 6 is provided.
Is fixed to the support plate 9 with bolts, and, for example, four guide rods 16 are erected on the fixing ring 15. And this guide rod 1
6, a support ring 17 of the pressure vessel 2 is slidably fitted to the upper part so as to be prevented from coming off, and a coil spring 18 elastically holding the support ring 17 upward is wound around each guide rod 16. .
【0016】なお、前記支持リング17の内周面上部及
び上部保持部材3の内周面下部には、それぞれ圧力容器
2のシェル2b形状に対応した曲面が形成されている。A curved surface corresponding to the shape of the shell 2b of the pressure vessel 2 is formed in the upper portion of the inner peripheral surface of the support ring 17 and the lower portion of the inner peripheral surface of the upper holding member 3, respectively.
【0017】ここで、前記下部保持部材4及び押動部材
6は、図示省略した抵抗溶接装置に接続されてその電極
を構成している。Here, the lower holding member 4 and the pushing member 6 are connected to a resistance welding device (not shown) to form their electrodes.
【0018】図4は前記圧力容器2を示しており、シェ
ル2bの内部は隔膜であるブラダ2dによってガス室2
eとオイル室2gの2室に区画されている。シェル2b
には、ガス室2e内外を連通するガス封入口2aとオイ
ル室2g内外を連通するオイル導入口2fとがそれぞれ
貫通した状態で設けられている。ガス封入口2aにはそ
こを封止するためのガスプラグ2cが挿着されている。
ガスプラグ2cは、ガス封入口2aに嵌合する円柱部
と、円柱部と一体に形成されるシェル2b外周に接触す
るツバ部とからなるものであって、ねじ部は設けられて
いない。オイル導入口2fにはオイルプラグが挿着され
るとともに、オイルプラグの中心部にはオイル室2g内
外を連通するポートが形成されるようになっている。な
お、図中符号2iはブラダの固定部、2hはブラダの固
定部2iを保持するためのホルダ、2jはポペットをそ
れぞれ示している。 FIG. 4 shows the pressure vessel 2. The interior of the shell 2b is formed by a bladder 2d which is a gas barrier.
e and an oil chamber 2g. Shell 2b
Is connected to the gas charging port 2a communicating the inside and outside of the gas chamber 2e.
And the oil inlet 2f communicating between the inside and outside of the oil chamber 2g
It is provided in a penetrating state. The gas filling port 2a has
A gas plug 2c for sealing this is inserted.
The gas plug 2c has a cylindrical portion fitted into the gas charging port 2a.
And a flange portion which is formed integrally with the cylindrical portion and which comes into contact with the outer periphery of the shell 2b . The screw portion is provided.
Not in. An oil plug is inserted into the oil inlet 2f.
And the center of the oil plug is inside the oil chamber 2g.
A port communicating with the outside is formed. What
In the drawing, reference numeral 2i denotes a fixing portion of the bladder, and 2h denotes a fixing portion of the bladder.
A holder for holding the fixed portion 2i and a poppet 2j
Each is shown.
【0019】次に、このように構成された圧力容器のガ
ス封止作業装置1について、その作用を説明する。ま
ず、押動部材6の上端面に形成された凹部6bにガスプ
ラグ2cのツバ部を載せてその円柱部を上に向けてお
き、支持リング17には圧力容器2をガス封入口2aが
真下に向くようにして載せておく。そしてこの状態から
油圧シリンダ5を作動させ、上部保持部材3を下方に駆
動して圧力容器2を押動する。すると支持リング17が
コイルスプリング18に抗しつつガイドロッド16に沿
って下方に移動することで、圧力容器2のシェル2bが
下部保持部材4の上端面に形成された凹曲面に圧接し、
こうして圧力容器2のシェル2bが上部保持部材3と下
部保持部材4との間に挟持される。Next, the operation of the gas sealing working device 1 for a pressure vessel constructed as described above will be described. First, the flange portion of the gas plug 2c is placed on the concave portion 6b formed on the upper end surface of the pushing member 6 and the column portion thereof is directed upward, and the pressure vessel 2 is placed on the support ring 17 with the gas filling port 2a directly below. And put it so that it faces. In this state, the hydraulic cylinder 5 is operated to drive the upper holding member 3 downward to push the pressure vessel 2. Then, the support ring 17 moves downward along the guide rod 16 while opposing the coil spring 18, so that the shell 2 b of the pressure vessel 2 presses against the concave curved surface formed on the upper end surface of the lower holding member 4,
Thus, the shell 2b of the pressure vessel 2 is sandwiched between the upper holding member 3 and the lower holding member 4.
【0020】圧力容器2のシェル2bが上部保持部材3
と下部保持部材4との間に保持された状態では、シール
リング10により下部保持部材4の中心孔4aの周囲が
シールされている。そこで、図示省略したガスボンベか
らホースを介して適宜のガスを下部保持部材4のガス供
給孔4bに供給し、中心孔4aからガス封入口2aを介
して圧力容器2のガス室2e内にガスを封入する。The shell 2b of the pressure vessel 2 is
When held between the lower holding member 4 and the lower holding member 4, the periphery of the center hole 4 a of the lower holding member 4 is sealed by the seal ring 10. Therefore, an appropriate gas is supplied from a gas cylinder (not shown) to the gas supply hole 4b of the lower holding member 4 via a hose, and the gas is supplied from the center hole 4a to the gas chamber 2e of the pressure vessel 2 via the gas filling port 2a. Encapsulate.
【0021】圧力容器2のガス室2e内にガスが封入さ
れた後、油圧シリンダ7を作動させて押動部材6を上方
に押動し、ガスプラグ2cの円柱部を圧力容器2のガス
封入口2aに挿入する。そしてこの状態で押動部材6の
冷却水通路6a内に冷却水を供給しつつ、ガスプラグ2
cのツバ部に接触する押動部材6とシェル2bに接触す
る下部保持部材4とに給電してガスプラグ2cをシェル
2bのガス封入口2aに抵抗溶接する。After the gas is sealed in the gas chamber 2e of the pressure vessel 2, the hydraulic cylinder 7 is actuated to push the pushing member 6 upward, so that the cylindrical portion of the gas plug 2c is sealed by the gas sealing of the pressure vessel 2. Insert into inlet 2a. In this state, while supplying cooling water into the cooling water passage 6a of the pushing member 6, the gas plug 2
Power is supplied to the pushing member 6 that comes into contact with the brim portion c and the lower holding member 4 that comes into contact with the shell 2b, and the gas plug 2c is resistance-welded to the gas filling port 2a of the shell 2b.
【0022】上記のように構成したこの実施例による圧
力容器のガス封止作業装置1にあっては、ガスプラグ2
cでガス封入口2aを封止する場合に、ねじ込み作業を
伴わず、Oリングの併用も不要であるから、低コストで
あり作業効率がよいものである。 The pressure according to this embodiment configured as described above
In the gas sealing operation device 1 for a power container, the gas plug 2
When the gas sealing port 2a is sealed with c, no screwing work is required, and the use of an O-ring is not required, so that the cost is low and the working efficiency is high.
【0023】また、ガスプラグ2cをガス封入口2aに
挿入した状態で、ガスプラグ2cをガス封入口2aに抵
抗溶接するものであるから、シール性が極めて高く、シ
ェル2bの肉厚を薄くでき、圧力容器2を軽量化するこ
とができる。さらに、シェル2bのガス封入口2aを下
方に向けた状態で、ガス封入口2aにガスプラグ2cを
溶接するものであるから、溶接の際に発生する溶融金属
や溶接かす等がブラダ2dに付着するのを防止すること
ができ、ブラダ2dがそれらの熱によって損傷を受ける
のを防止できることになる。 Further, the gas plug 2c is connected to the gas charging port 2a.
With the gas plug 2c inserted, the gas plug 2c is
Since it is anti-welding, it has extremely high sealing properties,
The thickness of the well 2b can be reduced, and the pressure vessel 2 can be reduced in weight.
Can be. Further, the gas filling port 2a of the shell 2b is lowered.
With the gas plug 2c inserted into the gas charging port 2a.
Molten metal generated during welding because it is to be welded
To prevent dust and welding residue from adhering to the bladder 2d
Bladder 2d is damaged by their heat
Can be prevented.
【0024】なお、前記実施例では押動部材6と下部保
持部材4とで一対の電極を構成したが、下部保持部材4
の代わりにシェル2bに接触する上部保持部材3を一方
の電極として構成してもよい。In the above embodiment, a pair of electrodes is constituted by the pushing member 6 and the lower holding member 4.
Alternatively, the upper holding member 3 that contacts the shell 2b may be configured as one electrode.
【0025】[0025]
【考案の効果】この考案は前記のように、ガス封入口を
下方に向けた状態でシェルを上部保持部材と下部保持部
材との間で挟持し、この状態でガス封入口にガスプラグ
を挿着して押動部材によって上方に押圧するとともに、
電極である下部保持部材と押動部材との間に通電するこ
とにより、ガスプラグをガス封入口に溶接するように構
成したことにより、ガスプラグのねじ込み作業が不要と
なるとともに、Oリングの併用も不要となる。したがっ
て、低コストとすることができるとともに、作業効率を
高めることもできることになる。また、ガスプラグをガ
ス封入口に挿入した後に、ガスプラグをガス封入口に溶
接するものであるから、極めて高いシール性が得られる
ことになり、シェルの肉厚を薄くでき、圧力容器を軽量
化することができることになる。さらに、シェルのガス
封入口を下方に向けた状態で、ガス封入口にガスプラグ
を溶接するものであるから、溶接の際に発生する溶融金
属や溶接かす等が隔膜に付着するのを防止することがで
き、隔膜がそれらの熱によって損傷を受けるのを防止で
きることになり、品質の良好な製品を提供することがで
きることになる。 [Effects of the Invention] As described above, this invention requires a gas charging port.
Hold the shell with the upper holding member and the lower holding
Between the material and the gas plug
And pushed upward by the pushing member,
Apply current between the lower holding member, which is an electrode, and the pushing member.
With this, the gas plug is welded to the gas inlet.
This eliminates the need to screw in gas plugs.
At the same time, the use of an O-ring is not required. Accordingly
Cost and work efficiency
It can also be raised. Also, plug the gas plug
After inserting the gas plug into the gas
Very high sealing performance is obtained because of contact
This means that the shell can be made thinner and the pressure vessel lighter
Will be able to Plus, shell gas
With the gas inlet facing downward, insert a gas plug into the gas
Molten metal that is generated during welding.
Metal and welding debris can be prevented from adhering to the diaphragm.
To prevent the diaphragm from being damaged by those heat
And provide good quality products.
Will be able to.
【0026】ここで、圧力容器のガス封止作業にあたっ
てガスプラグのねじ込み作業は伴わず、Oリングの併用
も不要であるから、低コストであり作業効率もよい。Here, the gas sealing operation of the pressure vessel does not involve the screwing operation of the gas plug and the use of the O-ring is not required, so that the cost is low and the working efficiency is good.
【0027】このようにして得られる圧力容器のガス封
止構造は、ガスプラグがシェルのガス封入口に挿入され
て抵抗溶接されたものであるから、極めて高いシール性
能が得られる。このため、シェルの肉圧を薄くして圧力
容器を軽量化することもできる。In the gas sealing structure of the pressure vessel obtained in this way, a gas plug is inserted into the gas inlet of the shell and resistance welded, so that extremely high sealing performance can be obtained. For this reason, it is also possible to reduce the wall pressure of the shell and reduce the weight of the pressure vessel.
【図1】この考案による圧力容器のガス封止作業装置の
一実施例の要部構造を示す図である。FIG. 1 is a diagram showing a main part structure of an embodiment of a gas sealing work apparatus for a pressure vessel according to the present invention.
【図2】一実施例の全体構造を示す正面図である。FIG. 2 is a front view showing the entire structure of one embodiment.
【図3】一実施例の全体構造を示す側面図である。FIG. 3 is a side view showing the entire structure of one embodiment.
【図4】一実施例の装置を使用して得られる圧力容器の
半断面図である。FIG. 4 is a half sectional view of a pressure vessel obtained using the apparatus of one embodiment.
1……圧力容器のガス封止作業装置 2……圧力容器 2a……ガス封入口 2b……シェル 2c……ガスプラグ 2d……隔膜(ブラダ) 2e……ガス室 2f……オイル導入口 2g……オイル室 2h……ホルダ 2i……ブラダの固定部 2j……ポペット 3……上部保持部材 4……下部保持部材 4a……中心孔 4b……ガス供給孔 5、7……油圧シリンダ 6……押動部材 6a……冷却水通路 6b……凹部 8……絶縁部材 9……支持板 10、13……シールリング 11、12……絶縁ブッシュ 14……ジョイント 15……固定リング 16……ガイドロッド 17……支持リング 18……コイルスプリング1 ...... gas sealing operation device of the pressure vessel 2 ...... pressure vessel 2a ...... gas seal port 2b ...... shell 2c ...... gas plug 2d ...... membrane (bladder) 2e ...... gas chamber 2f ...... oil introduction port 2g ... oil chamber 2h ... holder 2i ... bladder fixing part 2j ... poppet 3 ... upper holding member 4 ... lower holding member 4a ... center hole 4b ... gas supply hole 5, 7 ... hydraulic cylinder 6 ... Pushing member 6a Cooling water passage 6b Depression 8 Insulating member 9 Support plate 10, 13 Seal ring 11, 12 Insulating bush 14 Joint 15 Fixing ring 16 ... Guide rod 17 ... Support ring 18 ... Coil spring
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) F17C 5/06 F15B 1/08──────────────────────────────────────────────────続 き Continuation of front page (58) Field surveyed (Int.Cl. 6 , DB name) F17C 5/06 F15B 1/08
Claims (1)
イル室の2室に区画する隔膜と、前記シェルに設けられ
るとともに、前記ガス室内外を連通するガス封入口と前
記オイル室内外を連通するオイル導入口と、前記ガス封
入口に挿着されてそこを封止するガスプラグとを具えた
圧力容器の前記ガスプラグを前記ガス封入口に溶接する
ための圧力容器のガス封止作業装置であって、前記ガス
封入口を下方に向けた状態で前記シェルを上下方向から
挟持する上部保持部材と電極である下部保持部材と、前
記ガスプラグを前記ガス封入口に挿着した状態で上方に
押圧する電極である押動部材とを具えたことを特徴とす
る圧力容器のガス封止作業装置。1. A shell and a gas chamber and an inside of the shell.
A diaphragm which is divided into two chambers,
And a gas filling port communicating between the gas chamber and
The oil inlet that communicates with the oil chamber and the gas seal
With a gas plug inserted into the inlet and sealing it
Welding the gas plug of the pressure vessel to the gas inlet
A pressure vessel gas sealing operation device for
With the filling port facing downward, pull the shell up and down
An upper holding member to be sandwiched and a lower holding member as an electrode;
With the gas plug inserted into the gas inlet,
A gas sealing operation device for a pressure vessel, comprising a pressing member which is an electrode for pressing .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991102157U JP2577911Y2 (en) | 1991-12-11 | 1991-12-11 | Gas sealing work equipment for pressure vessels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991102157U JP2577911Y2 (en) | 1991-12-11 | 1991-12-11 | Gas sealing work equipment for pressure vessels |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0550299U JPH0550299U (en) | 1993-07-02 |
JP2577911Y2 true JP2577911Y2 (en) | 1998-08-06 |
Family
ID=14319896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1991102157U Expired - Lifetime JP2577911Y2 (en) | 1991-12-11 | 1991-12-11 | Gas sealing work equipment for pressure vessels |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2577911Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5159659B2 (en) * | 2009-01-29 | 2013-03-06 | 日本発條株式会社 | Accumulator manufacturing equipment |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60584A (en) * | 1983-06-16 | 1985-01-05 | Toshiba Corp | Word recognition system |
-
1991
- 1991-12-11 JP JP1991102157U patent/JP2577911Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0550299U (en) | 1993-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4189528A (en) | Power module assembly | |
JP2577911Y2 (en) | Gas sealing work equipment for pressure vessels | |
CA2233529A1 (en) | Floater device for checking the liquefied gas filling level of cylinders or the like | |
CN210802796U (en) | Battery withstand voltage testing mechanism | |
CN211122444U (en) | Waterproof instrument capable of sealing waterproof rolls with different thicknesses under same pressure | |
JPH11250887A (en) | Pressure release structure for battery | |
JP3341393B2 (en) | Welding strength measuring device | |
US4075734A (en) | Door closer | |
GB2062761A (en) | Pressure vessel assemblies | |
JPS62156078A (en) | Double pressure jack | |
JPH10288270A (en) | Vacuum welding method and device for control valve and the like | |
CN218883018U (en) | Pressure plate of regulating valve | |
JPH10315083A (en) | Link type clamp device | |
JP3773163B2 (en) | Cylinder device | |
JPH084938A (en) | Opening/closing valve | |
CN218326214U (en) | Pneumatic film regulating valve | |
JPH0137177Y2 (en) | ||
CN2310375Y (en) | Oil-filling hole sealing device for electric power capacitor | |
CN212848597U (en) | Cylinder lithium cell closing device | |
CN220278714U (en) | Sealing welding device | |
CN218103868U (en) | Sealing structure of vehicle control box | |
CN214036302U (en) | High pressure energy storage ware nitrogen gas loads frock | |
JPS5853166A (en) | Fuel cell | |
JP2524688Y2 (en) | Hydraulic cylinder device with residual pressure holding valve device | |
JPS633128Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EXPY | Cancellation because of completion of term |