JP2561529Y2 - Foundation anchor bolt - Google Patents

Foundation anchor bolt

Info

Publication number
JP2561529Y2
JP2561529Y2 JP10331591U JP10331591U JP2561529Y2 JP 2561529 Y2 JP2561529 Y2 JP 2561529Y2 JP 10331591 U JP10331591 U JP 10331591U JP 10331591 U JP10331591 U JP 10331591U JP 2561529 Y2 JP2561529 Y2 JP 2561529Y2
Authority
JP
Japan
Prior art keywords
anchor bolt
foundation
support plate
bolt
foundation concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP10331591U
Other languages
Japanese (ja)
Other versions
JPH0547040U (en
Inventor
柔幸 滝本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP10331591U priority Critical patent/JP2561529Y2/en
Publication of JPH0547040U publication Critical patent/JPH0547040U/en
Application granted granted Critical
Publication of JP2561529Y2 publication Critical patent/JP2561529Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】この考案は、型枠内で打設される
基礎コンクリートに、この打設時に基礎コンクリート内
に下部を埋め込まれて立設される基礎アンカーボルトに
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation anchor bolt which is erected in a foundation concrete which is to be cast in a formwork with a lower part embedded in the concrete.

【0002】[0002]

【従来の技術】従来、型枠内に基礎コンクリートを打設
し、この基礎コンクリートの打設時に基礎アンカーボル
トの下部を埋め込むには、図5乃至図7に示すような施
工手順によって行っていた。
2. Description of the Related Art Conventionally, in order to lay foundation concrete in a formwork and bury the lower part of a foundation anchor bolt at the time of laying the foundation concrete, a construction procedure as shown in FIGS. .

【0003】すなわち、図5に示すように、型枠1、1
の上端面11、11間に支持プレート2を載置して、こ
の支持プレート2に基礎アンカーボルト3を垂下状態で
支持させてから、この型枠1、1内に基礎コンクリート
4を打設していた。
[0003] That is, as shown in FIG.
After the supporting plate 2 is placed between the upper end surfaces 11 and 11 and the foundation anchor bolts 3 are supported by the supporting plate 2 in a hanging state, the foundation concrete 4 is poured into the formwork 1 and 1. I was

【0004】そして、この基礎コンクリート4の天端4
1のレベル出しをするには、金属製の前記型枠1の内面
の所定高さ(打設する基礎コンクリート4の天端41の
高さ)に下端面が位置するように磁石5を着磁して、型
枠1、1内におけるこの磁石5の下端面まで基礎コンク
リート4を打設していた。
[0004] The top 4 of the foundation concrete 4
In order to obtain the level 1, the magnet 5 is magnetized so that the lower end face is positioned at a predetermined height of the inner surface of the metal mold 1 (the height of the top end 41 of the foundation concrete 4 to be cast). Then, the foundation concrete 4 was cast to the lower end face of the magnet 5 in the molds 1 and 1.

【0005】そして、この基礎コンクリート4の打設が
終了した後に、図6に示すように、基礎コンクリート4
の天端41の適宜箇所に複数個の釘6を、その頭部61
が基礎コンクリート4上に流し込まれるレベラー7の天
端71の高さ位置になるように打ち込んで立設した後
に、この基礎コンクリート4上にレベラー7を流し込ん
でいた。
After the placement of the foundation concrete 4 is completed, as shown in FIG.
A plurality of nails 6 at appropriate positions on the top end 41 of the
Was poured into the base concrete 4 so as to be at the level of the top end 71 of the leveler 7 to be poured onto the base concrete 4, and then the leveler 7 was poured onto the base concrete 4.

【0006】また、レベラー7が流し込まれて硬化する
ときに、その天端71における基礎アンカーボルト3の
周囲部分が沈下することがあり、この部分に取付ける独
立柱等の高さや垂直に狂いを生ずる恐れがあった。
Further, when the leveler 7 is poured and hardened, the peripheral portion of the foundation anchor bolt 3 at the top end 71 may sink, and the height and vertical deviation of the independent columns and the like attached to this portion may occur. There was fear.

【0007】そこで、この沈下した部分71aの高さを
調整するために、図7に示すように、基礎アンカーボル
ト3の周囲の沈下部分71aにスペーサ8を配置してい
た。
Therefore, in order to adjust the height of the sunk portion 71a, as shown in FIG. 7, a spacer 8 is arranged on the sunk portion 71a around the base anchor bolt 3.

【0008】尚、図5、図6において、符号9は、型枠
1、1の上端面11、11に載置された支持プレート2
に、基礎アンカーボルト3の上端のボルト部31を取付
け支持させるために、このボルト部31の支持プレート
2上面から突出した部分に螺着されたナットである。
In FIGS. 5 and 6, reference numeral 9 denotes a support plate 2 mounted on upper end surfaces 11 of the molds 1 and 1.
In order to attach and support the bolt portion 31 at the upper end of the base anchor bolt 3, a nut is screwed to a portion of the bolt portion 31 protruding from the upper surface of the support plate 2.

【0009】[0009]

【考案が解決しようとする課題】ところが、上記した従
来の基礎コンクリート打設作業と基礎アンカーボルト3
の埋め込み作業においては、型枠1、1内に打設される
基礎コンクリート4の天端41のレベル出しを行う作業
と、この基礎コンクリート4上に流し込まれるレベラー
7の天端71のレベル出しを行う作業と、このレベラー
7の天端71における基礎アンカーボルト3の周囲に生
じる沈下部分71aの高さ調整を行う作業とを別々に行
わなくてはならなかった。
However, the above-mentioned conventional foundation concrete placing operation and the foundation anchor bolt 3 are to be solved.
In the embedding work, the leveling of the top end 41 of the foundation concrete 4 cast into the formwork 1, 1 and the leveling of the top end 71 of the leveler 7 poured onto the foundation concrete 4 are performed. The work to be performed and the work to adjust the height of the sinking portion 71a generated around the foundation anchor bolt 3 at the top end 71 of the leveler 7 must be performed separately.

【0010】このために、作業工程が多くなって、作業
時間が長くなるとともに手間がかかるので作業効率が悪
く、面倒であるといった問題があった。
[0010] For this reason, there is a problem that the number of work steps increases, the work time becomes longer, and labor is required, so that work efficiency is poor and troublesome.

【0011】しかも、前記した一連の作業に、磁石5と
釘6とスペーサ8の3つの部材を必要とするので、部品
点数が多くなるといった問題があった。
In addition, since a series of operations described above requires three members, the magnet 5, the nail 6, and the spacer 8, there is a problem that the number of parts increases.

【0012】この考案の目的は、上記従来の問題を解決
することにある。
An object of the present invention is to solve the above-mentioned conventional problems.

【0013】即ち、型枠内に打設される基礎コンクリー
トの天端のレベル出しと、この基礎コンクリート上に流
し込まれるレベラーの天端のレベル出しとを同時に行な
うことができ、かつ、レベラーの天端における沈下部分
の高さ調整を行なう必要のない基礎アンカーボルトを提
供することである。
That is, the leveling of the top of the foundation concrete poured into the formwork and the leveling of the top of the leveler poured onto the basic concrete can be performed at the same time. It is an object of the present invention to provide a foundation anchor bolt which does not require height adjustment of a submerged portion at an end.

【0014】[0014]

【課題を解決するための手段】この考案は、上記目的を
達成するために、上端にボルト部を備えたアンカーボル
ト本体と、前記ボルト部に螺着される埋込みナットから
なり、この埋込みナットの下面が基礎コンクリートの天
端を示す基準面とされ、同じく上面が前記基礎コンクリ
ート上に流し込まれるレベラーの天端を示す基準面とさ
れている。
In order to achieve the above object, the present invention comprises an anchor bolt body having a bolt portion at an upper end, and an embedded nut screwed into the bolt portion. The lower surface is a reference surface indicating the top of the foundation concrete, and the upper surface is also a reference surface indicating the top of the leveler to be poured onto the foundation concrete.

【0015】[0015]

【作用】まず、基礎コンクリートが打設される型枠の上
端面間に架け渡された支持プレート等にアンカーボルト
本体の上端のボルト部を支持させて、このアンカーボル
ト本体を型枠内で垂下させる。
[Function] First, the bolt at the upper end of the anchor bolt body is supported by a support plate or the like bridged between the upper end faces of the form on which the foundation concrete is cast, and the anchor bolt body is suspended in the form. Let it.

【0016】次に、このアンカーボルト本体のボルト部
に螺着された埋込みナットを、その下面が型枠内で打設
される基礎コンクリートの天端と一致するように位置決
めする。尚、この埋込みナットの位置決めは、前記した
垂下支持する前に行ってもよい。
Next, the embedding nut screwed to the bolt portion of the anchor bolt body is positioned so that the lower surface thereof coincides with the top end of the foundation concrete cast in the formwork. The positioning of the embedded nut may be performed before the above-described hanging support.

【0017】この状態で、前記した型枠内に基礎コンク
リートを、その天端が埋込みナットの下面に位置するよ
うに、打設する。
In this state, the foundation concrete is poured into the above-mentioned formwork so that the top end thereof is located on the lower surface of the embedding nut.

【0018】この基礎コンクリートの打設が終了した後
に、この基礎コンクリート上にレベラーを流し込む。
After the casting of the foundation concrete is completed, a leveler is poured onto the foundation concrete.

【0019】このとき、前記した埋込みナットの上面が
レベラーの天端を示す基準面とされているので、レベラ
ーはその天端が埋込みナットの上面に位置するまで流し
込む。
At this time, since the upper surface of the embedding nut is a reference surface indicating the top end of the leveler, the leveler is poured until the top end is located on the upper surface of the embedding nut.

【0020】そして、このレベラーが硬化した後に、ア
ンカーボルト本体の周囲におけるレベラーの天端に沈下
部分が生じても、この沈下部分の高さ調整が前記した埋
込みナットによって自動的に行われる。
After the leveler has hardened, even if a subsidence portion is formed at the top end of the leveler around the anchor bolt main body, the height adjustment of the subsidence portion is automatically performed by the embedded nut.

【0021】[0021]

【実施例】以下、この考案に係る基礎アンカーボルトの
実施例について、図面に基づいて説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a basic anchor bolt according to the present invention.

【0022】尚、この実施例を示す図1乃至図4におい
て、従来と同じものには同じ符号を用いる。
In FIGS. 1 to 4 showing this embodiment, the same components as those of the prior art are denoted by the same reference numerals.

【0023】図1はこの考案に係る基礎アンカーボルト
の一実施例のものを型枠へ支持させる以前の状態を示す
分解斜視図、図2は図1の基礎アンカーボルトを2重構
成の支持プレート等を介して型枠に垂下支持させた状態
を示す斜視図、図3は図2の状態から基礎コンクリート
を型枠内に打設した後の状態を示す側面図、図4は図3
の状態から基礎コンクリート上にレベラーを流し込んで
硬化させた後に、支持プレート等を取り外して基礎アン
カーボルトの下部が基礎コンクリートに埋め込まれてそ
の上端のボルト部が上方に突出して立設された状態を示
す斜視図である。
FIG. 1 is an exploded perspective view showing an embodiment of a foundation anchor bolt according to the present invention before it is supported on a mold, and FIG. 2 is a supporting plate having a double construction of the foundation anchor bolt of FIG. FIG. 3 is a perspective view showing a state where the foundation concrete is suspended from the form via the like, FIG. 3 is a side view showing a state after the foundation concrete is cast into the form from the state of FIG. 2, and FIG.
After pouring the leveler onto the foundation concrete from the state of the above and hardening, remove the support plate etc., and embed the lower part of the foundation anchor bolt in the foundation concrete and the upper end bolt part protrudes upward and stands upright FIG.

【0024】この考案に係る基礎アンカーボルト10
は、上端にボルト部101を備えたアンカーボルト本体
102と、前記したボルト部101に螺着される埋込み
ナット103からなるものである。
The foundation anchor bolt 10 according to the present invention
Is composed of an anchor bolt main body 102 having a bolt portion 101 at an upper end, and an embedded nut 103 screwed to the bolt portion 101 described above.

【0025】そして、後述するように、この埋込みナッ
ト103の下面103aが基礎コンクリート4の天端4
1を示す基準面とされ、同じく上面103bが前記した
基礎コンクリート4上に流し込まれるレベラー7の天端
71を示す基準面とされている。
As will be described later, the lower surface 103a of the embedding nut 103 is
1, and the upper surface 103b is also a reference surface indicating the top end 71 of the leveler 7 to be poured onto the foundation concrete 4 described above.

【0026】前記した埋込みナット103は、平面形状
が略円弧状卍字形に形成されていて、中央に雌ねじ部1
03dが設けられ、外側四方に向けて爪形状部103e
が設けられている。
The embedding nut 103 has a substantially arc-shaped swastika shape in plan view, and has a female screw portion 1 in the center.
03d are provided, and the claw-shaped portions 103e
Is provided.

【0027】基礎コンクリート4は、型枠1、1内に打
設される。
The base concrete 4 is cast into the formwork 1, 1.

【0028】この型枠1、1の上端面11、11間に
は、第1の支持プレート21が架け渡される。
A first support plate 21 is bridged between the upper end surfaces 11, 11 of the molds 1, 1.

【0029】即ち、この第1の支持プレート21の長手
方向両端部下面に下向きに突設された複数個(この実施
例では両端部それぞれ2本ずつ計4本)の段付きピン2
1aが、型枠1、1における外向きに折曲された上辺部
1A、1Aの上端面11、11から下面に向けて設けら
れた複数個のピン挿入孔12に挿入される(図3参照)
ことによって、この第1の支持プレート21が位置決め
された状態で型枠1、1の上端面11、11間に架け渡
される。
That is, a plurality of stepped pins 2 (in this embodiment, two at each end, a total of four) are provided on the lower surfaces at both ends in the longitudinal direction of the first support plate 21.
1a is inserted into a plurality of pin insertion holes 12 provided from the upper end surfaces 11, 11 of the outwardly bent upper sides 1A, 1A of the molds 1, 1 to the lower surface (see FIG. 3). )
As a result, the first support plate 21 is bridged between the upper end surfaces 11 of the molds 1 in the positioned state.

【0030】この第1の支持プレート21には、長手方
向中央部寄り部分に、幅方向に向けて平面形状長方形の
開口部21bが開設されている。
The first support plate 21 has an opening 21b of a flat rectangular shape in the width direction at a portion near the center in the longitudinal direction.

【0031】そして、この開口部21bの両型枠側縁部
間に、2枚の第2の支持プレート22が架け渡される。
Then, two second support plates 22 are bridged between the edges of the opening 21b on both sides of the formwork.

【0032】即ち、これら第2の支持プレート22に
は、その長手方向両端部近傍箇所の下面に、段付きピン
22a、22aが下向きに突設されていて、これらの段
付きピン22a、22aが前記した第1の支持プレート
21の開口部21bの両型枠側縁部近傍箇所に設けられ
たピン挿入孔21c、21cに挿入される(図3参照)
ことによって、これら第2の支持プレート22が位置決
めされた状態で、第1の支持プレート21の開口部21
bの両型枠側縁部間に架け渡される。
That is, the second support plate 22 has stepped pins 22a, 22a projecting downward on the lower surface near the both ends in the longitudinal direction, and these stepped pins 22a, 22a are provided. The first support plate 21 is inserted into the pin insertion holes 21c, 21c provided near the edges of both sides of the formwork of the opening 21b of the first support plate 21 (see FIG. 3).
Thus, in a state where the second support plate 22 is positioned, the opening 21 of the first support plate 21 is formed.
It is bridged between the both side edges of the formwork.

【0033】更に、これら第2の支持プレート22の長
手方向中央部であって幅方向中央部には、アンカーボル
ト挿入用の貫通孔22bが設けられていて、この貫通孔
22bに前記した基礎アンカーボルト10におけるアン
カーボルト本体102の上端のボルト部101が挿通さ
れて、第1の支持プレート22の上面側でこのボルト部
101にナット9Aが螺着される。
Further, a through hole 22b for inserting an anchor bolt is provided at a center portion in the longitudinal direction and a center portion in the width direction of the second support plate 22, and the through hole 22b is provided in the through hole 22b. The bolt portion 101 at the upper end of the anchor bolt main body 102 of the bolt 10 is inserted, and the nut 9 </ b> A is screwed to the bolt portion 101 on the upper surface side of the first support plate 22.

【0034】このことによって、基礎アンカーボルト1
0は、第1の支持プレート21と第2の支持プレート2
2に支持されて型枠1、1内に垂下される。
With this, the foundation anchor bolt 1
0 is the first support plate 21 and the second support plate 2
2 and is suspended in the molds 1 and 1.

【0035】尚、基礎アンカーボルト10におけるアン
カーボルト本体102上端のボルト部101には、この
ボルト部101を第2の支持プレート22に支持させる
前に埋込みナット103が螺着されている。このとき、
埋込みナット103をボルト部101の最下端まで螺込
むことで、その高さ方向の位置決めがなされるようにな
っている。
An embedding nut 103 is screwed into the bolt portion 101 at the upper end of the anchor bolt main body 102 of the base anchor bolt 10 before the bolt portion 101 is supported by the second support plate 22. At this time,
By screwing the embedding nut 103 to the lowermost end of the bolt portion 101, positioning in the height direction is performed.

【0036】次に、上記構成の基礎アンカーボルト10
の作用即ち使用態様について説明する。
Next, the basic anchor bolt 10 having the above structure
The operation, ie, the mode of use, will be described.

【0037】まず、基礎コンクリート4が打設される型
枠1、1の上端面11、11間に架け渡された第1の支
持プレート21の開口部21bの両型枠側縁部間に、基
礎アンカーボルト10におけるアンカーボルト本体10
2上端のボルト部101を支持させた第2の支持プレー
ト22を架け渡して、基礎アンカーボルト10のアンカ
ーボルト本体102を型枠1、1内で垂下させる(図2
参照)。
First, between the side edges of the opening 21b of the first support plate 21 bridged between the upper end surfaces 11, 11 of the forms 1, 1 on which the foundation concrete 4 is cast. Anchor bolt body 10 in foundation anchor bolt 10
(2) The second support plate 22 supporting the bolt portion 101 at the upper end is bridged, and the anchor bolt main body 102 of the foundation anchor bolt 10 is suspended in the molds 1 and 1 (FIG. 2).
reference).

【0038】次に、このアンカーボルト本体102上端
のボルト部101に螺着された埋込みナット103を、
その下面103aが型枠1、1内で打設される基礎コン
クリート4の天端41と一致するように位置決めする。
尚、この埋込みナット103の位置決めは、前記した垂
下支持する前に行ってもよい。
Next, the embedded nut 103 screwed to the bolt portion 101 at the upper end of the anchor bolt body 102 is
The lower surface 103a is positioned so as to coincide with the top end 41 of the foundation concrete 4 cast in the formwork 1, 1.
The positioning of the embedded nut 103 may be performed before the above-described hanging support.

【0039】この状態で、前記した型枠1、1内に基礎
コンクリート4を、その天端41が埋込みナット103
の下面103aに位置するように、打設する(図3参
照)。
In this state, the foundation concrete 4 is placed in the above-mentioned formwork 1, 1, and the top end 41 is embedded in the nut 103.
(See FIG. 3).

【0040】この基礎コンクリート4の打設が終了した
後に、この基礎コンクリート4上にレベラー7を流し込
む。
After the placement of the foundation concrete 4 is completed, a leveler 7 is poured onto the foundation concrete 4.

【0041】このとき、前記した埋込みナット103の
上面103bがレベラー7の天端71を示す基準面とさ
れているので、レベラー7はその天端71が埋込みナッ
ト103の上面103bに位置するまで流し込む。
At this time, since the upper surface 103b of the embedding nut 103 serves as a reference surface indicating the top end 71 of the leveler 7, the leveler 7 is poured until the top end 71 is located on the upper surface 103b of the embedding nut 103. .

【0042】尚、上記した実施例における埋込みナット
103は、平面形状が略円弧状卍字形に形成されてい
て、外側四方に向けて爪形状部103eが設けられてい
るから、基礎コンクリート4の打設時において、この基
礎コンクリート4に基礎アンカーボルト10が斜めにな
った状態でそのアンカーボルト本体102の下部が埋設
されたときに、この埋込みナット103の爪形状部10
3eをハンマー等で叩くことによって、周辺のコンクリ
ートから分離し、アンカーボルト本体102上端のボル
ト部101を垂直状態にする台直しを行なうことができ
る利点がある。
The embedding nut 103 in the above-described embodiment has a substantially arc-shaped swastika shape in plan view and is provided with claw-shaped portions 103e toward four sides on the outside. At the time of installation, when the lower part of the anchor bolt main body 102 is buried in the foundation concrete 4 in a state where the foundation anchor bolt 10 is inclined, the claw-shaped part 10 of the embedding nut 103 is formed.
By hitting 3e with a hammer or the like, there is an advantage that it can be separated from the surrounding concrete and can be reverted so that the bolt portion 101 at the upper end of the anchor bolt main body 102 is in a vertical state.

【0043】更に尚、上記した実施例では、支持プレー
トを第1の支持プレート21と第2の支持プレート22
の二重構成としたことによって、支持プレート(第1の
支持プレート21)の型枠への載置と、支持プレート
(第2の支持プレート22)による基礎アンカーボルト
10の支持とを分離して行うことができるので、この作
業が行い易い利点がある。また、コンクリート打設時
に、一方のアンカーボルト本体102が傾いた際、第2
の支持プレート22のみを持上げて修正することができ
る。
Further, in the above-described embodiment, the support plate is formed of the first support plate 21 and the second support plate 22.
And the support plate (first support plate 21) placed on the form and the support plate (second support plate 22) supporting the base anchor bolt 10 are separated. Since this operation can be performed, there is an advantage that this operation can be easily performed. Also, when one of the anchor bolt bodies 102 is tilted during concrete placement, the second
Can be lifted and corrected.

【0044】次に、実際に使用したこの考案の基礎アン
カーボルト10の各部の寸法について例示する。
Next, the dimensions of each part of the actually used basic anchor bolt 10 of the present invention will be described.

【0045】アンカーボルト本体102の直径が14m
mであって、ボルト部101における埋込みボルト10
3上面より上部に出た部分の長さが40mmであり、埋
込みナット103の最外周面間の直径が30mmで、厚
さが9mmであるものを使用した。
The diameter of the anchor bolt body 102 is 14 m
m, the embedded bolt 10 in the bolt portion 101
3 The length of the portion protruding above the upper surface was 40 mm, the diameter between the outermost peripheral surfaces of the embedded nut 103 was 30 mm, and the thickness was 9 mm.

【0046】[0046]

【考案の効果】以上説明したように、この考案では、ア
ンカーボルト本体上端のボルト部に螺着される埋込みナ
ットの下面が基礎コンクリートの天端を示す基準面とさ
れ、同じく上面が前記した基礎コンクリート上に流し込
まれるレベラーの天端を示す基準面とされているから、
型枠内に打設される基礎コンクリートの天端のレベル出
しと、この基礎コンクリート上に流し込まれるレベラー
の天端のレベル出しとを、一つの部材である埋込みナッ
トによって行うことができる。
As described above, in this invention, the lower surface of the embedded nut screwed into the bolt at the upper end of the anchor bolt main body is the reference surface indicating the top end of the foundation concrete, and the upper surface is also the above-mentioned foundation. Because it is the reference surface indicating the top of the leveler poured on concrete,
The leveling of the top of the foundation concrete poured into the formwork and the leveling of the top of the leveler poured onto the foundation concrete can be performed by the embedded nut, which is one member.

【0047】しかも、この埋込みナットによって、基礎
アンカーボルトの周囲におけるレベラーの天端が沈下し
ても、埋込みナットの上面は正確な高さにあるから、そ
のナット上に独立柱等を設置することで正確に設置で
き、従来のようにスペーサで調整する必要がない。
Further, even if the top end of the leveler around the foundation anchor bolt sinks due to the embedded nut, the upper surface of the embedded nut is at an accurate height. And can be installed accurately without the need for adjustment with spacers as in the past.

【0048】したがって、従来のように、基礎コンクリ
ートの天端のレベル出しとレベラーの天端のレベル出し
とレベラーの天端に生じる沈下部分の高さ調整に多くの
部材を必要とすることがなく、これらの各作業を一つの
部材である埋込みナットによって行うことができるの
で、部品点数を少なくすることができる。
Therefore, unlike the prior art, many members are not required for leveling the top of the foundation concrete, leveling the top of the leveler, and adjusting the height of the sinking portion generated at the top of the leveler. Since each of these operations can be performed by the embedded nut, which is one member, the number of parts can be reduced.

【0049】しかも、前記した各作業を一連の連続した
作業で行うことができるので、作業能率を向上させるこ
とができる。
Further, since each of the above-described operations can be performed as a series of continuous operations, the operation efficiency can be improved.

【0050】更に、基礎アンカーボルトが、上端にボル
ト部を備えたアンカーボルト本体と、前記したボルト部
ち螺着される埋込みナットだけで構成されているので、
構造が簡単で安価に提供することができる。
Further, since the foundation anchor bolt is composed only of the anchor bolt main body having the bolt portion at the upper end and the embedded nut screwed into the bolt portion,
The structure is simple and can be provided at low cost.

【0051】加えて、そのアンカーボルト本体を支持す
るため取付けられる支持プレートを型枠に取付ける別の
支持プレートの上面へ取付けるようにしているので、例
えば、実施例のように、複数本のアンカーボルトを同一
個所に設けた場合でも、コンクリート打設時の傾きを個
別に修正できるという効果がある。
In addition, since the support plate for supporting the anchor bolt body is mounted on the upper surface of another support plate for mounting on the formwork, for example, as in the embodiment, a plurality of anchor bolts are provided. When the concrete is provided in the same place, the inclination at the time of placing concrete can be individually corrected.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この考案に係る基礎アンカーボルトの一実施例
のものを型枠へ支持させる以前の状態を示す分解斜視図
である。
FIG. 1 is an exploded perspective view showing a state before an embodiment of a foundation anchor bolt according to the present invention is supported on a formwork.

【図2】図1の基礎アンカーボルトを2重構成の支持プ
レート等を介して型枠に垂下支持させた状態を示す斜視
図である。
FIG. 2 is a perspective view showing a state in which the foundation anchor bolt of FIG. 1 is suspended and supported on a mold via a double supporting plate or the like.

【図3】図2の状態から基礎コンクリートを型枠内に打
設した後の状態を示す側面図である。
FIG. 3 is a side view showing a state after the foundation concrete has been poured into the formwork from the state of FIG. 2;

【図4】図3の状態から基礎コンクリート上にレベラー
を流し込んで硬化させた後に、支持プレート等を取り外
して基礎アンカーボルトの下部が基礎コンクリートに埋
め込まれてその上端のボルト部が上方に突出して立設さ
れた状態を示す斜視図である。
FIG. 4 shows a state in which the leveler is poured onto the foundation concrete from the state shown in FIG. 3 and hardened, the support plate or the like is removed, the lower part of the foundation anchor bolt is embedded in the foundation concrete, and the upper end bolt part protrudes upward. It is a perspective view which shows the state which stood up.

【図5】従来の基礎アンカーボルトの下部を基礎コンク
リート内に埋設するとともに、従来の基礎コンクリート
の天端のレベル出しを行う状態を示す斜視図である。
FIG. 5 is a perspective view showing a state in which a lower portion of a conventional foundation anchor bolt is buried in foundation concrete and a top end of the conventional foundation concrete is leveled.

【図6】図5の状態から従来のレベラーの天端のレベル
出しを行う状態を示す斜視図である。
6 is a perspective view showing a state in which the leveling of the top end of the conventional leveler is performed from the state of FIG.

【図7】図6の状態から従来のレベラーの天端の沈下部
分の高さ調整を行う状態を示す斜視図である。
FIG. 7 is a perspective view showing a state in which the height of the lowering portion of the top end of the conventional leveler is adjusted from the state of FIG.

【符号の説明】[Explanation of symbols]

4 基礎コンクリート 7 レベラー 10 基礎アンカーボルト 21 第1の支持プレート 22 第2の支持プレート 41 天端 71 天端 101 ボルト部 102 アンカーボルト本体 103 埋込みナット 103a 下面 103b 上面 Reference Signs List 4 foundation concrete 7 leveler 10 foundation anchor bolt 21 first support plate 22 second support plate 41 top end 71 top end 101 bolt part 102 anchor bolt main body 103 embedded nut 103a bottom surface 103b top surface

Claims (2)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 上端にボルト部を備えたアンカーボルト
本体と、前記ボルト部に螺着される埋込みナットからな
り、この埋込みナットの下面が基礎コンクリートの天端
を示す基準面とされ、同じく上面が前記基礎コンクリー
ト上に流し込まれるレベラーの天端を示す基準面とされ
ていることを特徴とする基礎アンカーボルト。
1. An anchor bolt body having a bolt portion at an upper end thereof, and an embedded nut screwed into the bolt portion, a lower surface of the embedded nut being a reference surface indicating a top end of the foundation concrete, and an upper surface of the same. Is a reference surface indicating a top end of a leveler poured onto the foundation concrete.
【請求項2】 埋込みナット上方においてアンカーボル
ト本体のボルト部へ取付けられる支持プレートを備え、
この支持プレートを型枠上端に設置される別の支持プレ
ート上へ取付けるようにしたことを特徴とする請求項1
の基礎アンカーボルト。
2. A support plate attached to a bolt portion of an anchor bolt body above the embedding nut,
2. The support plate according to claim 1, wherein said support plate is mounted on another support plate provided at the upper end of the mold.
Foundation anchor bolt.
JP10331591U 1991-11-19 1991-11-19 Foundation anchor bolt Expired - Fee Related JP2561529Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10331591U JP2561529Y2 (en) 1991-11-19 1991-11-19 Foundation anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10331591U JP2561529Y2 (en) 1991-11-19 1991-11-19 Foundation anchor bolt

Publications (2)

Publication Number Publication Date
JPH0547040U JPH0547040U (en) 1993-06-22
JP2561529Y2 true JP2561529Y2 (en) 1998-01-28

Family

ID=14350772

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10331591U Expired - Fee Related JP2561529Y2 (en) 1991-11-19 1991-11-19 Foundation anchor bolt

Country Status (1)

Country Link
JP (1) JP2561529Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6529009B2 (en) * 2016-03-09 2019-06-12 丸中建設有限会社 Construction method of foundation for building

Also Published As

Publication number Publication date
JPH0547040U (en) 1993-06-22

Similar Documents

Publication Publication Date Title
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
JPH05214731A (en) Column base fixing device
JP2561529Y2 (en) Foundation anchor bolt
JP2004218348A (en) Laying method for concrete block
KR101182201B1 (en) Assembly form for boundary stone
JP2780861B2 (en) Block structure for foundation construction
JPH10317391A (en) Foundation structure for steel tower and method for constructing the same
JP2000240068A (en) Anchor bolt fixing device
JPS5920489Y2 (en) Anchor bolt mounting structure
JP2002356853A (en) Anchor bolt location setting jig
JPH0571242U (en) Steel pillar anchor device
JP2829626B2 (en) Structure of concrete block and method of stacking concrete block on slope
JP3368360B2 (en) How to install a packer plate for equipment installation
JPH0128124Y2 (en)
JP2585411Y2 (en) Foundation structure
JPH05339951A (en) Foundation made of precast concrete
JPS5841121A (en) Installing method for anchor bolt and positioning member employed in said method
JP2001059226A (en) Concrete footing level setter and column installation method to concrete footing
JPH11140883A (en) Positioning support device for anchor bolt for construction of foundation
JPH0988084A (en) Supporter of level metal fitting for column base
JPH0427960Y2 (en)
JP3017084U (en) Jig for level adjustment of side form
JPH04315663A (en) Support metal for foundation forming mold
JPH0725389Y2 (en) Formwork for manhole
JP2972972B2 (en) How to fix anchor bolt

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees