JP2556350Y2 - Electric boiler - Google Patents
Electric boilerInfo
- Publication number
- JP2556350Y2 JP2556350Y2 JP1990130900U JP13090090U JP2556350Y2 JP 2556350 Y2 JP2556350 Y2 JP 2556350Y2 JP 1990130900 U JP1990130900 U JP 1990130900U JP 13090090 U JP13090090 U JP 13090090U JP 2556350 Y2 JP2556350 Y2 JP 2556350Y2
- Authority
- JP
- Japan
- Prior art keywords
- electric
- electric heater
- priority
- boiler
- heaters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
【考案の詳細な説明】 (産業上の利用分野) 本考案は複数の電気ヒーターを装備する電気ボイラに
関するものである。DETAILED DESCRIPTION OF THE INVENTION (Industrial application field) The present invention relates to an electric boiler equipped with a plurality of electric heaters.
(従来技術とその問題点) 電気ボイラに複数個の電気ヒーターが設けられている
場合、全ての電気ヒーターを同時にON−OFFさせたので
は熱要求に対する追従性が悪いため、必要量に応じて通
電稼働する電気ヒーター数を変更することが行われてい
る。この場合、電気ヒーターは稼働優先順位に基づいて
順次通電稼働させることとなるため、稼働優先順位の高
い電気ヒーターは常に通電稼働することとなり、他の電
気ヒーターに比べて寿命が短くなるという問題が発生す
る。(Prior art and its problems) When a plurality of electric heaters are provided in an electric boiler, if all electric heaters are turned on and off at the same time, the ability to follow the heat demand is poor. The number of electric heaters that are energized and operated is changed. In this case, since the electric heaters are sequentially energized and operated based on the operation priority, the electric heater having the higher operation priority is always energized and operated. Occur.
(考案の目的) 本考案の目的は電気ボイラへの電源供給ラインに接続
されている電気機器への影響をあまり与えることなく、
電気ヒーターの稼働を平均化し、全体の寿命を延ばすこ
とにある。(Purpose of the invention) The purpose of the invention is to have little effect on the electric equipment connected to the power supply line to the electric boiler,
The aim is to average the operation of the electric heater and prolong the overall life.
(問題解決の手段) ボイラ本体に取り付けた熱要求検出装置からの信号を
受けた制御装置では通電稼働する電気ヒーターの本数を
決定し、稼働優先順位に従い電気ヒーターを通電稼働す
る。電気ヒーターの稼働優先順位は電気ボイラの運転を
開始するごとに変更を行い、また電気ヒーターへの通電
が連続して行われており、電気ヒーターの稼働優先順位
の変更が行われないまま一定時間運転したときにも電気
ヒーターの稼働優先順位を変更することで、各電気ヒー
ターの稼働時間を平均化する。(Means for Solving the Problem) The control device, which has received a signal from the heat demand detecting device attached to the boiler body, determines the number of electric heaters to be energized and operated, and energizes and operates the electric heaters according to the operation priority. The operation priority of the electric heater is changed every time the operation of the electric boiler is started, and the electric heater is continuously energized. Even during operation, the operation time of each electric heater is averaged by changing the operation priority of the electric heater.
(作用) 運転途中に電気ヒーターの稼働優先順位の変更を行う
と、通電を行っていた電気ヒーターへの通電停止と、通
電を行っていなかった電気ヒーターへの通電開始が同時
に起こるため、電流が変動し安定した電力供給が行えな
くなることがある。しかし、電気ヒーターの稼働優先順
位の変更を全ての電気ヒーターへの通電が停止している
電気ボイラの運転開始時に行うようにすると、電気ヒー
ターへの通電は行われていないので、稼働優先順位変更
の際に電流が変動することはなく、稼働優先順位の変更
を行って電気ヒーターの稼働時間を平均化することがで
きる。また、ボイラの運転開始時のみ稼働優先順位の変
更を行うようにした場合、全ての電気ヒーターへの通電
が停止することが無いまま長期間経過ようなことがある
と特定の電気ヒーターへの通電稼働が集中することにな
るが、一定稼働時間経過するごとに稼働優先順位の変更
を行うものであるため、特定の電気ヒーターへの通電が
長くなることが防がれる。電気ヒーターへの通電中に稼
働優先順位の変更を行うと電流の変動があるが、通電中
に稼働優先順位の変更を行うのは一定時間連続して電気
ヒーターへの通電が行われていた場合のみであり、一定
時間経過する前に全ての電気ヒーターへの通電が停止さ
れる運転停止となると、電気ヒーターへの通電を行って
いない状態で稼働優先順位の変更を行うことができ、経
過時間はリセットされることとなるので、大きな電流変
動を伴う通電中の稼働優先順位の変更を行う頻度を減ら
すことができ、運転中の電流の変動が小さくなり、電気
ボイラへの電源供給ラインに接続されている電気機器へ
の影響が少なくなる。(Operation) If the operation priority of the electric heater is changed during operation, the current supply to the electric heater that has been energized will be stopped and the current supplied to the non-energized heater will start at the same time. It may fluctuate and make stable power supply impossible. However, if the operation priority of the electric heater is changed at the start of operation of the electric boiler in which energization to all the electric heaters is stopped, the electric heater is not energized. In this case, the current does not fluctuate, and the operation priority of the electric heater can be changed to average the operation time of the electric heater. Also, if the operation priority is changed only at the start of boiler operation, energization of a specific electric heater may occur if a long period of time elapses without stopping the energization of all electric heaters. Although the operation is concentrated, the operation priority is changed each time a certain operation time elapses, so that the energization to a specific electric heater is prevented from becoming long. If the operation priority is changed while the electric heater is energized, the current will fluctuate.However, the operation priority will be changed during energization if the electric heater has been energized continuously for a certain period of time. If the operation stops in which the power to all the electric heaters is stopped before the certain time elapses, the operation priority can be changed without energizing the electric heater, and the elapsed time can be changed. Will be reset, reducing the frequency of changing the operation priority during energization with large current fluctuations, reducing the fluctuations in current during operation, and connecting to the power supply line to the electric boiler. The effect on the electrical equipment being used is reduced.
(実施例) 本考案の一実施例を図面を用いて説明する。第1図に
示すように、ボイラ1には熱要求検出装置2を取り付
け、熱要求検出装置2からの信号は制御装置3に取り込
まれ、その信号値と制御装置3に設定された設定値との
差異によって電気ヒーターの通電稼働数を決定し、電気
信号を電気ヒーター電気制御装置4へ伝送して、電気ヒ
ーターの通電稼働制御を行う。(Embodiment) An embodiment of the present invention will be described with reference to the drawings. As shown in FIG. 1, a heat demand detection device 2 is attached to the boiler 1, a signal from the heat demand detection device 2 is taken into a control device 3, and the signal value and a set value set in the control device 3 are obtained. The number of energizing operations of the electric heater is determined based on the difference, and an electric signal is transmitted to the electric heater electric control device 4 to control the energizing operation of the electric heater.
電源として、交流3相電源を用いた場合で、電気ヒー
ターを9本用いた場合の電気ヒーターと開閉器の関係を
示した回路図の一例が第2図である。FIG. 2 is an example of a circuit diagram showing a relationship between an electric heater and a switch when nine AC electric heaters are used in the case where an AC three-phase power supply is used as a power supply.
制御装置は、制御装置に設定された設定値STと熱要求
検出装置からの計測値ATとの差に比例定数Kを掛けた値
P=K(AT−ST)によって通電する電気ヒーターの本数
を決定する。電気ヒーターは3本で一つの組を形成して
組ごとに通電が行われており、Pの値に応じ、電気ヒー
ターを全て停止するボイラ運転停止から3組全てに通電
する場合までの4通りの制御がある。The control device determines the number of electric heaters to be energized by a value P = K (AT-ST) obtained by multiplying a difference between a set value ST set in the control device and a measurement value AT from the heat demand detection device by a proportional constant K. decide. Three sets of electric heaters form one set and energization is performed for each set. There are four ways from the stop of boiler operation to stop all electric heaters to the case of energizing all three sets according to the value of P. There is control.
Pの値が設定幅D分変動するごとに電気ヒーターのON
−OFFが変更されるが、ON−OFFのハンチングを避けるた
め、Pの値が−Dに下がってきたところで優先順位群1
の電気ヒーター組へ通電を開始し、計測値が設定値まで
上昇してPの値が0になったとき電気ヒーターへの通電
を全て停止する。同様にPの値が−2Dまで低下すると優
先順位群2の電気ヒーター組へも通電を開始して計2組
の通電とし、Pの値が−Dまで上昇したところで優先順
位群2の電気ヒーター組への通電を停止して優先順位群
1の1組のみの通電、Pの値が−3Dまで低下すると優先
順位群3へも通電を開始して計3組の電気ヒーター組へ
の通電、Pの値が−2Dまで上昇したところで優先順位群
3への通電を停止して優先順位群1・2の2組の電気ヒ
ーター組への通電とする。Each time the value of P fluctuates by the set width D, the electric heater is turned on.
-OFF is changed, but in order to avoid hunting of ON-OFF, when the value of P falls to -D, priority group 1
Is started, and when the measured value rises to the set value and the value of P becomes 0, the energization to the electric heater is all stopped. Similarly, when the value of P decreases to −2D, energization is also started to the electric heater group of priority group 2 to make a total of two electric currents, and when the value of P increases to −D, the electric heater of priority group 2 is increased. When energization of the group is stopped and only one group of the priority group 1 is energized, when the value of P decreases to −3D, energization of the priority group 3 is also started to energize a total of three electric heater groups, When the value of P rises to −2D, the power supply to the priority group 3 is stopped, and the power supply to the two electric heater groups of the priority groups 1 and 2 is performed.
具体的例として、熱要求検出装置にて温度を検出、比
例定数を1、設定幅値を3、設定値を150度とした場合
で、第4図のパターンで優先順位を変更する場合の例を
説明する。As a specific example, an example in which the temperature is detected by the heat demand detecting device, the proportional constant is 1, the set width value is 3, and the set value is 150 degrees, and the priority is changed in the pattern of FIG. Will be described.
通電する電気ヒーター組は、3本の電気ヒーターを1
組とする3組での優先順位を定め、3本1組で稼働と停
止の制御を行う。優先順位群にはパターン1〜3が定め
られており、優先順位が順番にずれるように設定してい
る。The electric heater group to be energized has three electric heaters
The priorities of the three sets are determined, and the operation and stop are controlled by one set of three sets. Patterns 1 to 3 are defined in the priority order group, and the priority orders are set so as to shift in order.
まず最初にパターン1を採用しており、パターン1で
の優先順位群1のみに通電しているとする。計測値が15
0度まで上昇すればP=0となり、それまで通電してい
たS11・S21・S31の接点を開き、全ての電気ヒーターへ
の通電を停止する。その後、検出している温度が低下し
計測値がP=−Dである147度に低下すると、優先順位
がパターン1からパターン2へ変更され、パターン2で
の優先順位群1のS12・S22・S32の接点が閉じられて通
電が開始される。さらに温度が低下し、計測値がP=−
2Dである144度に低下した時点で優先順位群2のS13・S2
3・S33の接点が閉じられて合計2組の電気ヒーター組へ
通電される。計測値がP=−3Dである141度に低下する
と優先順位群3のS11・S21・S31の接点が閉じられ、合
計3組の電気ヒーター組へ通電することとなる。検出し
ている温度が上昇している場合、計測値P=−2Dである
144度に上昇すると、優先順位群3のS11・S21・S31の接
点が開かれて、2組の電気ヒーターへのみの通電とさ
れ、さらに温度が上昇し、計測値がP=−Dである147
度に上昇した時点で優先順位群2のS13・S23・S33の接
点が開かれて、1組の電気ヒーター組のみの通電とさ
れ、計測値がP=0である150度に上昇すると優先順位
群1のS12・S22・S32の接点も開かれ、全ての電気ヒー
ターへの通電を停止する。First, it is assumed that pattern 1 is adopted first, and only the priority group 1 in pattern 1 is energized. 15 readings
When the temperature rises to 0 degrees, P = 0, and the contacts of S11, S21, and S31 that have been energized up to that point are opened, and energization to all electric heaters is stopped. Thereafter, when the detected temperature decreases and the measured value decreases to 147 degrees, which is P = -D, the priority is changed from pattern 1 to pattern 2, and S12, S22, and S22 of the priority group 1 in pattern 2 are changed. The contact of S32 is closed and energization is started. The temperature further decreases and the measured value becomes P =-
S13 / S2 of priority group 2 when it drops to 144 degrees which is 2D
3. The contacts of S33 are closed, and a total of two sets of electric heaters are energized. When the measured value drops to 141 degrees, which is P = -3D, the contacts of S11, S21, and S31 of priority group 3 are closed, and power is supplied to a total of three sets of electric heaters. When the detected temperature is rising, the measured value P = −2D
When the temperature rises to 144 degrees, the contacts of S11, S21, and S31 in priority group 3 are opened, and only two sets of electric heaters are energized, and the temperature further rises, and the measured value is P = -D. 147
When the temperature rises, the contacts of S13, S23, and S33 of priority group 2 are opened, and only one set of electric heaters is energized. When the measured value rises to 150 degrees, where P = 0, priority is set The contacts of S12, S22 and S32 of the group 1 are also opened, and the power supply to all electric heaters is stopped.
また、制御装置ではボイラの運転時間の積算も行われ
ており、優先順位の変更が行われたボイラの運転開始時
からの経過時間が設定時間に達するまでに全ての電気ヒ
ーターへの通電が停止されるボイラ停止となった場合に
は経過時間はリセットされるが、ボイラが停止せずに経
過時間が設定時間に達した場合にも優先順位の変更が行
われる。パターン1で優先順位群1のS11・S21・S31に
のみ通電している場合にボイラの運転開始時からの経過
時間が設定時間に達したとすると、パターン1からパタ
ーン2へ稼働優先順位が変更され、パターン1での優先
順位群1のS11・S21・S31への通電は停止され、パター
ン2での優先順位群1のS12・S22・S32へ通電が開始さ
れる。The controller also accumulates the operation time of the boiler, and the power supply to all electric heaters is stopped until the set time has elapsed since the start of operation of the boiler whose priority order was changed. When the boiler is stopped, the elapsed time is reset, but when the elapsed time reaches the set time without stopping the boiler, the priority is changed. If the elapsed time from the start of the operation of the boiler reaches the set time when the power is supplied only to S11, S21, and S31 of the priority group 1 in the pattern 1, the operation priority is changed from the pattern 1 to the pattern 2 Then, energization to S11, S21, and S31 of the priority group 1 in pattern 1 is stopped, and energization to S12, S22, and S32 of the priority group 1 in pattern 2 is started.
(効果) 大きな電流変動を伴う電気ヒーターの切換を運転途中
に行うことを少なくするので、運転途中の電流の変動が
小さくなり、電気ボイラへの電源供給ラインに接続され
ている電気機器への影響が少なくなった。また、稼働優
先順位の変更が行われないまま加熱を続けていた場合に
は一定稼働時間経過するごとにも稼働優先順位の変更を
行っているものであるため、特定の電気ヒーターへの通
電が長くなることが防がれ、各電気ヒーターの稼働時間
が平均化されるため、全体として電気ヒーターの寿命が
延び、交換間隔を延ばすことができた。(Effect) Since the switching of the electric heater accompanying a large current fluctuation is reduced during the operation, the fluctuation of the current during the operation is reduced, and the electric equipment connected to the power supply line to the electric boiler is affected. Has decreased. In addition, when heating is continued without changing the operation priority, the operation priority is changed every time a certain operation time elapses. Since the lengthening of the electric heaters was prevented and the operating time of each electric heater was averaged, the life of the electric heater was extended as a whole, and the replacement interval could be extended.
第1図は本考案の一実施例のボイラの電気ヒーター電気
制御装置並びに制御装置を含めた概要図、第2図は本考
案の一実施例の電気ヒーターが9本の場合の電気結線図
の一例、第3図は本考案の一実施例での計測値より通電
組数を検出する過程、第4図は電気ヒーターの優先順位
群とパターンの例、第5図は第4図の他の例を示したも
のである。 1……ボイラ本体 2……熱要求検出装置 3……制御装置 4……電気ヒーター電気制御装置FIG. 1 is a schematic diagram including an electric heater electric control device and a control device of a boiler according to one embodiment of the present invention, and FIG. 2 is an electric connection diagram in a case where there are nine electric heaters according to one embodiment of the present invention. FIG. 3 shows an example of the process of detecting the number of energized sets from the measured values in one embodiment of the present invention, FIG. 4 shows an example of priority groups and patterns of electric heaters, and FIG. 5 shows another example of FIG. This is an example. DESCRIPTION OF SYMBOLS 1 ... Boiler main body 2 ... Heat demand detection device 3 ... Control device 4 ... Electric heater electric control device
Claims (1)
部、加熱の必要性を検出するためにボイラの温度もしく
は圧力を検出する熱要求検出装置、電気ヒーターの通電
稼働を制御する制御装置を持ち、制御装置では熱要求検
出装置からの温度もしくは圧力の検出値と予め設定して
おいた設定値の比較によって加熱する電気ヒーターの本
数を決定し、稼働優先順位が上位のものから前記加熱決
定本数の電気ヒーターに通電する電気ボイラにおいて、
制御装置は電気ボイラの運転を開始するごとに電気ヒー
ターの稼働優先順位の変更を行い、また電気ヒーターへ
の通電が連続して行われており、電気ヒーターの稼働優
先順位の変更が行われないまま一定時間運転したときに
も電気ヒーターの稼働優先順位を変更する制御装置を設
けたことを特徴とする電気ボイラ。1. A heating unit comprising a plurality of electric heaters, a heat demand detecting device for detecting a temperature or a pressure of a boiler for detecting a need for heating, and a control device for controlling an energizing operation of the electric heater. The control device determines the number of electric heaters to be heated by comparing the detected value of the temperature or pressure from the heat request detection device with a preset value, and determines the number of heating heaters in order of higher operation priority. In the electric boiler that energizes the electric heater of
The controller changes the operation priority of the electric heater each time the operation of the electric boiler is started, and the energization of the electric heater is continuously performed, and the operation priority of the electric heater is not changed An electric boiler provided with a control device for changing the operation priority of the electric heater even when the electric boiler is operated for a certain period of time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1990130900U JP2556350Y2 (en) | 1990-11-30 | 1990-11-30 | Electric boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1990130900U JP2556350Y2 (en) | 1990-11-30 | 1990-11-30 | Electric boiler |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0490849U JPH0490849U (en) | 1992-08-07 |
JP2556350Y2 true JP2556350Y2 (en) | 1997-12-03 |
Family
ID=31878210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1990130900U Expired - Fee Related JP2556350Y2 (en) | 1990-11-30 | 1990-11-30 | Electric boiler |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2556350Y2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5321042B2 (en) * | 2008-12-25 | 2013-10-23 | 三浦工業株式会社 | Electric boiler |
JP6650419B2 (en) * | 2017-03-03 | 2020-02-19 | 日立グローバルライフソリューションズ株式会社 | Electric water heater |
CN114110721B (en) * | 2021-10-29 | 2023-05-05 | 西门子(中国)有限公司 | Indoor heater and heating control method thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63135702A (en) * | 1986-11-26 | 1988-06-08 | 株式会社 タクマ | Method of automatically controlling number of boiler |
-
1990
- 1990-11-30 JP JP1990130900U patent/JP2556350Y2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0490849U (en) | 1992-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103597907B (en) | Heater control device and method and program | |
CA2496725C (en) | Variable wattage control system | |
JPH0235905B2 (en) | ||
JP2556350Y2 (en) | Electric boiler | |
JP2685942B2 (en) | How to limit the peak value of power consumption | |
US8423193B2 (en) | Variable wattage control system | |
JPH09287881A (en) | Temperature control method of heating furnace | |
EP4175518B1 (en) | A hot beverage brewing apparatus | |
EP4062253B1 (en) | An energy storage system for storing thermal energy and a controller and a method for determining a temperature in the energy storage system | |
JP2578800B2 (en) | Temperature control device for iron | |
KR100456666B1 (en) | Method for operating a accumulating device | |
KR200358424Y1 (en) | Temperature control system for an electric heating product | |
JPH0785949A (en) | Electric heater apparatus | |
JPH02309382A (en) | Controller for heat fixing device | |
JPH07122349A (en) | Temperature controller for electric heating cooker | |
JPH0327831B2 (en) | ||
JPH05203168A (en) | Controller of heating apparatus | |
JPH0559558B2 (en) | ||
JPH07139746A (en) | Controlling device of electric carpet | |
JPH09148048A (en) | Sheet-form electric heater | |
JP4063006B2 (en) | rice cooker | |
JPH1061959A (en) | Temperature controller for electric heater | |
JP2003232240A (en) | Control device of cogeneration system and engine generator control method | |
JP2000075938A (en) | Temperature controller for surface type warming appliance | |
JPS58211218A (en) | Temperature control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |