JP2540573Y2 - Temporary scaffolding device under slab - Google Patents
Temporary scaffolding device under slabInfo
- Publication number
- JP2540573Y2 JP2540573Y2 JP1991105311U JP10531191U JP2540573Y2 JP 2540573 Y2 JP2540573 Y2 JP 2540573Y2 JP 1991105311 U JP1991105311 U JP 1991105311U JP 10531191 U JP10531191 U JP 10531191U JP 2540573 Y2 JP2540573 Y2 JP 2540573Y2
- Authority
- JP
- Japan
- Prior art keywords
- hanging
- bolt
- metal fitting
- long nut
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
Description
【考案の詳細な説明】[Detailed description of the invention]
【0001】[0001]
【産業上の利用分野】本考案は、デッキプレートをスラ
ブ下型枠に使用したスラブ下仮設足場装置に関し、特に
本考案は、デッキプレートの下側に突出する断面下広が
り形の突条を利用した仮設足場装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary scaffolding device under a slab using a deck plate as a lower frame of a slab. To a temporary scaffolding device.
【0002】[0002]
【従来の技術及びその課題】コンクリートスラブの下側
(天井側)にダクトや電気配線などの吊り下げ工事を行
う場合、従来では、鋼管や丸太によって床面からスラブ
下側まで足場を組み上げていた。しかしながら、このよ
うに床面側に足場を仮設すると、足場が邪魔になって床
面仕上げなどの床側の作業が行えない上に、通行や材料
などの運搬に支障を来たし、また足場が大掛かりなもの
となってその組立て、撤去作業に多大な手間を要し、施
工費の高騰を来す要因ともなっていた。2. Description of the Related Art Conventionally, when a work such as a duct or electric wiring is suspended below a concrete slab (ceiling side), a scaffold is assembled from a floor surface to a lower side of the slab by steel pipes or logs. . However, if the scaffold is temporarily installed on the floor surface in this way, the scaffold will hinder the work on the floor side such as finishing the floor surface, and will hinder traffic and transport of materials, etc. It took a lot of time to assemble and remove it, which caused a rise in construction costs.
【0003】[0003]
【課題を解決するための手段】本考案は上記のような従
来の問題点を解消し得るスラブ下仮設足場装置を提供す
ることを目的とするものであって、その手段を後述する
実施例の参照符号を付して示すと、スラブ下型枠を構成
するデッキプレート2の下側に突出する断面下広がり形
突条3に係脱自在な吊り金具4と、この吊り金具4に係
脱自在に結合された吊索係止具14と、この吊索係止具
14に吊り下げられた足場板支持材吊り下げ用吊索5と
から成り、前記吊り金具4は、金具本体8と、この金具
本体8に設けられた開閉自在な左右一対の挟持片9と、
金具本体8から下方に突出して引下げにより前記挟持片
9を閉動させるボルト12と、前記金具本体8の下側で
前記ボルト12に螺嵌する長ナット13とから構成さ
れ、前記吊索係止具14は、前記長ナット13に下端側
から螺嵌されたボルト15により前記吊り金具4に結合
された構成となっている。SUMMARY OF THE INVENTION An object of the present invention is to provide a temporary scaffolding device under a slab which can solve the above-mentioned conventional problems. The reference numerals are used to denote the hanging metal fittings 4 which are detachable from the projecting ridges 3 which extend downward from the deck plate 2 constituting the lower slab formwork, and which are detachable from the hanging metal fittings 4. And a hanging rope 5 for suspending a scaffolding plate supporting material suspended from the hanging rope locking tool 14, and the hanging metal fitting 4 includes a metal fitting body 8, A pair of left and right holding pieces 9 that can be opened and closed freely provided on the metal fitting body 8;
A bolt 12 protruding downward from the metal fitting body 8 and closing the holding piece 9 by pulling down; and a long nut 13 screwed into the bolt 12 below the metal fitting body 8, and The fixture 14 is configured to be coupled to the hanging bracket 4 by a bolt 15 screwed into the long nut 13 from the lower end side.
【0004】[0004]
【実施例】実施例について図面を参照して説明すると、
図1はスラブ下仮設足場装置を示しており、この図にお
いて1はコンクリートスラブで、その下面にデッキプレ
ート2が一体的に添装され、このデッキプレート2には
下側に突出する多数の断面下広がり形の突条3が一定間
隔おきに突設されている。本考案の足場装置は、例えば
中間の一つの突条3を隔ててその左右両側の突条3にそ
れぞれ吊り金具4を一定間隔おきに係着し、各吊り金具
4に吊索5を係脱自在に係止し、図2に示すように左右
対をなす吊索5によって鋼管からなる足場板支持材6の
両端を吊持し、こうして吊持した複数の足場板支持材6
上に足場板7を載設するようにしたものである。Embodiments will be described with reference to the drawings.
FIG. 1 shows a temporary scaffolding device under a slab. In this figure, reference numeral 1 denotes a concrete slab, on which a deck plate 2 is integrally attached on the lower surface, and a plurality of cross sections projecting downward from the deck plate 2. The downwardly extending ridges 3 are provided at regular intervals. In the scaffolding device of the present invention, for example, hanging metal fittings 4 are fixedly attached to the left and right ridges 3 at regular intervals, with one intermediate ridge 3 therebetween, and the hanging cable 5 is disengaged from each hanging metal 4. As shown in FIG. 2, both ends of a scaffold plate support member 6 made of a steel pipe are hung by a pair of left and right hanging cables 5 as shown in FIG.
The scaffold plate 7 is mounted on the top.
【0005】前記各吊り金具4は、図3〜図5に示すよ
うに、断面上向きコ字形の金具本体8に、左右一対の挟
持片9を、水平横方向に間隔を隔てた2本の支軸10に
よりそれぞれ開閉自在に軸支すると共に、この一対の挟
持片9を閉動方向に付勢する板ばね11を両挟持片9と
前記金具本体8との間に介装し、この金具本体8におけ
る前記両支軸10間の中央部に縦に貫通させた挟持片ロ
ック用のボルト12の頭部を前記両挟持片9の内端部上
に位置させ、前記金具本体8の下方に突出する前記ボル
ト12に、長ナット13のほぼ上半部を螺嵌させ、更に
この長ナット13の下半部に、リング状の吊索係止具1
4を取り付けたボルト15を螺合してなるものである。As shown in FIGS. 3 to 5, each of the hanging brackets 4 has a pair of right and left holding pieces 9 mounted on a bracket body 8 having a U-shaped cross section and two supports spaced horizontally in a horizontal direction. A leaf spring 11 for supporting the pair of holding pieces 9 in the closing direction is interposed between the holding pieces 9 and the metal fitting body 8 while being pivotally supported by a shaft 10 so as to be freely openable and closable. 8, the head of a locking piece locking bolt 12 vertically penetrated into the center between the two support shafts 10 is positioned on the inner end of the both holding pieces 9 and protrudes below the metal fitting body 8. Approximately the upper half of the long nut 13 is screwed into the bolt 12 to be fixed, and the lower half of the long nut 13 is further fitted with the ring-shaped hanging cable anchor 1.
4 is screwed together with a bolt 15 attached thereto.
【0006】この吊り金具4は、図5に示すように、長
ナット13を緩ませた状態において、左右両挟持片9が
板ばね11の付勢力によって実線図示のような閉鎖姿勢
に保持されていると共に、前記ボルト12の頭部下面と
左右各挟持片9の内端部との間に隙間があるため両挟持
片9の上端部に板ばね11の付勢力を上回る下向きの荷
重をかけることによって支軸10を中心に上端部が互い
に離れる方向に揺動、つまり開動して、仮想線図示のよ
うな開放姿勢となり、その荷重を取り去ると、板ばね1
1の付勢力で元の閉鎖姿勢に復帰する。また、図5に示
される状態から、前記長ナット13を締め付けると、両
挟持片9の底壁内端部が、板バネ11及び金具本体8と
共に長ナット13の上端面と前記ボルト12の頭部下面
との間に挟着固定され、それによって左右両挾持片9は
閉鎖姿勢にロックされる。As shown in FIG. 5, in the state in which the long nut 13 is loosened, the left and right holding pieces 9 are held in the closed position as shown by the solid line by the urging force of the leaf spring 11, as shown in FIG. In addition, since there is a gap between the lower surface of the head of the bolt 12 and the inner ends of the left and right holding pieces 9, a downward load exceeding the urging force of the leaf spring 11 is applied to the upper ends of the holding pieces 9. As a result, the upper end swings around the support shaft 10 in a direction away from each other, that is, opens, and assumes an open posture as shown by the imaginary line.
It returns to the original closed position with the urging force of 1. Further, when the long nut 13 is tightened from the state shown in FIG. The left and right holding pieces 9 are locked in a closed position.
【0007】したがって、この吊り金具4を前記デッキ
プレート2の下広がり形の突条3に取り付けるには、長
ナット13を予め緩めておいて、この長ナット13を持
って、デッキプレート2の突条部3に対し左右両挟持片
9の上端傾斜部9aを三角状突条3の底辺両角部に押し
付けると、その押し付けに伴って両挟持片9の傾斜部9
aに作用する下向きの荷重により両挟持片9が開動し、
三角状突条3は前記傾斜部9aに誘導案内されて両挟持
片9の間に突入嵌合し、それにより吊り金具4は仮止め
状態となる。この仮止め状態の吊り金具4を突条3に沿
ってスライドさせながら取付位置の調整を行う。取付位
置の調整後、長ナット13を回転させて締結する。この
長ナット13の締結により、両挟持片9は図1に示すよ
うな閉鎖状態に固定される。その後、この長ナット13
の下半部に、図5に示すように吊索係止具14を取り付
けたボルト15を螺合し緊締する。Therefore, in order to attach the suspension fitting 4 to the downwardly extending projection 3 of the deck plate 2, the long nut 13 is loosened in advance, and the projection of the deck plate 2 is held by the long nut 13. When the upper end inclined portions 9a of the left and right holding pieces 9 are pressed against the ridges 3 against the bottom corners of the triangular ridge 3, the inclined portions 9a of the both holding pieces 9 are pressed.
The two holding pieces 9 are opened by a downward load acting on a.
The triangular ridge 3 is guided and guided by the inclined portion 9a, and rushes between the two holding pieces 9, whereby the suspension fitting 4 is temporarily fixed. The mounting position is adjusted while sliding the hanging metal fitting 4 in the temporarily fixed state along the ridge 3. After the adjustment of the mounting position, the long nut 13 is rotated and fastened. By fastening the long nut 13, both holding pieces 9 are fixed in a closed state as shown in FIG. After that, this long nut 13
As shown in FIG. 5, a bolt 15 to which a hanging cable anchor 14 is attached is screwed into the lower half part of the cable and tightened.
【0008】一方、前記各吊索5には、図6に示すよう
にその両端にフック16が固着連結してある。しかし
て、各吊索5は、その一端部を吊索係止具14に通し、
また他端部を足場板支持材6に巻回し、長さを調整した
上で、図6のように両端のフック16をそれぞれ、当該
吊索5を構成するリンク5aに係入して固定する。On the other hand, hooks 16 are fixedly connected to both ends of each of the hanging lines 5 as shown in FIG. Thus, one end of each hanging cable 5 is passed through the hanging cable locking device 14,
In addition, the other end is wound around the scaffold plate support member 6, and after adjusting the length, the hooks 16 at both ends are engaged with and fixed to the link 5 a constituting the hanging cable 5 as shown in FIG. 6. .
【0009】各吊索5によって足場板支持材6を所定高
さに支持したならば、図1、図2のように当該足場板支
持材6上に足場板7を載設し、それによってスラブ下仮
設足場装置の組立てを終える。こうして組立てた足場装
置の足場板7上に人が乗って、スラブの下側(天井側)
におけるダクトや電気配線などの吊り下げ工事を行うこ
とができる。When the scaffold plate support member 6 is supported at a predetermined height by each of the hanging cables 5, the scaffold plate 7 is mounted on the scaffold plate support member 6 as shown in FIGS. Finish the assembly of the lower temporary scaffolding device. A person rides on the scaffold plate 7 of the scaffold device assembled in this manner, and the lower side (ceiling side) of the slab.
Can be used to suspend ducts and electrical wiring.
【0010】また、所定箇所での作業を終えて別の場所
に足場装置を移動したり、また全ての作業を終了して足
場装置を撤去する場合には、足場板7を取り外し、各足
場板支持材6を吊索5から抜き取り、吊索5を取り外
し、そして各吊り金具4の長ナット13を緩めて、各吊
り金具4をデッキプレート2の突条3に沿って所要位置
まで移動するか、また撤去の場合には各吊り金具4を下
方に引っ張って突条から抜き取ればよい。In order to move the scaffolding device to another place after completing the work at a predetermined location, or to remove the scaffolding device after finishing all the work, remove the scaffolding plate 7 and remove each scaffolding plate. Pull out the support material 6 from the hanging cable 5, remove the hanging cable 5, loosen the long nut 13 of each hanging metal 4, and move each hanging metal 4 to the required position along the ridge 3 of the deck plate 2. In the case of removal, each hanging metal fitting 4 may be pulled downward and pulled out from the ridge.
【0011】この実施例では、吊索としてチェンを使用
したが、ロープその他適当なものを使用してもよい。ま
た吊り金具4の挟持片9を閉動方向に付勢する板ばね1
1は本考案に必須のものではない。In this embodiment, a chain is used as the suspension cable, but a rope or any other suitable material may be used. A leaf spring 1 for urging the holding piece 9 of the hanging member 4 in the closing direction.
1 is not essential to the present invention.
【0012】[0012]
【考案の作用及び効果】以上のように本考案のスラブ下
仮設足場装置を使用することにより、スラブ下コンクリ
ート型枠を兼用するデッキプレートの下側に突出する断
面下広がり形の突条と吊り金具、及び吊索を利用して、
当該デッキプレートの下側適当高さに作業足場を仮設す
ることができるのであるが、特に本考案の構成によれ
ば、デッキプレートの突条に係止させる吊り金具の挟持
片を閉動させるための長ナットにボルトを利用して吊索
係止具を吊り下げるものであるから、部品点数が少なく
て安価に実施し得るばかりでなく、前記長ナットを締め
付け方向に回転操作して挟持片を閉動させた後、当該長
ナットにボルトをねじ込んで吊索係止具を連結するとき
のボルトねじ込み方向が長ナットの締め付け方向である
から、デッキプレート側の突条に対する吊り金具の挟持
片が弛む恐れもなく、安全性も向上する。[Operation and effect of the present invention] As described above, by using the temporary scaffolding device under the slab of the present invention, the projecting ridges and suspensions having a cross section that expands below the deck plate that also serves as the concrete formwork under the slab and project downward. Using metal fittings and slings,
The work scaffold can be temporarily installed at an appropriate height below the deck plate. In particular, according to the configuration of the present invention, the closing piece of the hanging metal fitting to be locked to the ridge of the deck plate is closed. Since the hanging cable anchor is hung using a bolt on the long nut, not only can the number of parts be reduced and the cost can be reduced, but also the holding piece can be rotated by tightening the long nut in the tightening direction. After the closing movement, the bolt is screwed into the long nut to connect the hanging rope locking tool, and the bolt screwing direction is the tightening direction of the long nut. There is no risk of sagging, and safety is improved.
【図1】 本考案に係るスラブ下仮設足場装置を示す側
面図である。FIG. 1 is a side view showing a temporary scaffolding device under a slab according to the present invention.
【図2】 同上の足場装置の下方部分を示す斜視図であ
る。FIG. 2 is a perspective view showing a lower portion of the scaffold device.
【図3】 吊り金具の一例を示す斜視図である。FIG. 3 is a perspective view showing an example of a hanging bracket.
【図4】 同上の吊り金具の縦断側面図である。FIG. 4 is a vertical sectional side view of the hanging bracket.
【図5】 同上の吊り金具の作動状態を示す縦断正面図
である。FIG. 5 is a vertical sectional front view showing an operating state of the above-mentioned hanging bracket.
【図6】 足場装置における吊索の取り付け状態を示す
斜視図である。FIG. 6 is a perspective view showing a mounting state of a suspension cable in the scaffolding device.
1 スラブ 2 デッキプレート 3 下広がり形の突条 4 吊り金具 5 吊索(チェン) 6 足場板支持材 7 足場板 8 金具本体 9 左右一対の挟持片 11 板ばね 12 挟持片閉動操作用ボルト 13 長ナット 14 吊索係止具 15 吊索係止具取り付け用ボルト DESCRIPTION OF SYMBOLS 1 Slab 2 Deck plate 3 Spreading ridge below 4 Suspension metal fitting 5 Hanging cable (chain) 6 Scaffolding board support material 7 Scaffolding board 8 Metal fitting main body 9 Left and right pair of holding pieces 11 Leaf spring 12 Holding piece closing operation bolt 13 Long nut 14 Hanging cable anchor 15 Bolt for hanging cable anchor
Claims (1)
下側に突出する断面下広がり形突条に係脱自在な吊り金
具と、この吊り金具に係脱自在に結合された吊索係止具
と、この吊索係止具に吊り下げられた足場板支持材吊り
下げ用吊索とから成り、 前記吊り金具は、金具本体と、この金具本体に設けられ
た開閉自在な左右一対の挟持片と、金具本体から下方に
突出して引下げにより前記挟持片を閉動させるボルト
と、前記金具本体の下側で前記ボルトに螺嵌する長ナッ
トとから構成され、 前記吊索係止具は、前記長ナットに下端側から螺嵌され
たボルトにより前記吊り金具に結合されている スラブ下
仮設足場装置。1. A deck plate constituting a lower slab formwork.
A hanging hook that can be attached to and detached from a ridge that extends downward and projects downward.
And a suspension cord locking device removably connected to the lifting device
And a scaffold plate support suspended from the suspension
A hanging cable, and the hanging metal fitting is provided on the metal fitting main body and the metal fitting main body.
And a pair of left and right holding pieces that can be opened and closed
A bolt that protrudes and closes the holding piece by pulling down
And a long nut screwed into the bolt below the bracket body.
And the hanging cord locking tool is screwed into the long nut from the lower end side.
A temporary scaffolding device under the slab, which is connected to the hanging metal by a bolt .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991105311U JP2540573Y2 (en) | 1991-11-27 | 1991-11-27 | Temporary scaffolding device under slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991105311U JP2540573Y2 (en) | 1991-11-27 | 1991-11-27 | Temporary scaffolding device under slab |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0547209U JPH0547209U (en) | 1993-06-22 |
JP2540573Y2 true JP2540573Y2 (en) | 1997-07-09 |
Family
ID=14404163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1991105311U Expired - Lifetime JP2540573Y2 (en) | 1991-11-27 | 1991-11-27 | Temporary scaffolding device under slab |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2540573Y2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5510728B2 (en) * | 2010-06-21 | 2014-06-04 | 株式会社ダイフク | Hanging walkway |
JP5828856B2 (en) * | 2013-04-01 | 2015-12-09 | 株式会社国元商会 | Scaffolding bracket |
JP6685594B2 (en) * | 2016-03-16 | 2020-04-22 | 三機工業株式会社 | Hanging support and support structure |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59190810U (en) * | 1983-06-03 | 1984-12-18 | 株式会社東芝 | Building ceiling structure |
JPH0314519Y2 (en) * | 1986-04-07 | 1991-03-29 | ||
JPH01244002A (en) * | 1988-03-22 | 1989-09-28 | Three Tec:Kk | Temporary hanger |
-
1991
- 1991-11-27 JP JP1991105311U patent/JP2540573Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0547209U (en) | 1993-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20040182291A1 (en) | Suspended storage shelf | |
US5163799A (en) | Wall panel lifting and supporting device | |
JP2540573Y2 (en) | Temporary scaffolding device under slab | |
US5484125A (en) | Appliance mounting system | |
JPH05178561A (en) | Installation method for guide rail for elevator | |
US4475626A (en) | Scaffold bracket | |
JP7464426B2 (en) | Lifting jig and construction method using the lifting jig | |
JP2748812B2 (en) | Guide rail lifting device for elevators | |
JPH092774A (en) | Heavy object suspending device | |
JPH1160138A (en) | Hoisting tool for crane | |
JP3479734B2 (en) | Method and apparatus for hanging installation of air conditioner outdoor unit | |
JPH0438029Y2 (en) | ||
US6082493A (en) | Method and apparatus for suspending worker's scaffolds over the sides of buildings | |
JPH0648253Y2 (en) | Hanging air conditioner installation device | |
JP3066363B2 (en) | Hanging bracket | |
JPH0448271Y2 (en) | ||
JP3632512B2 (en) | Installation method of air conditioner outdoor unit | |
JP2539245Y2 (en) | Ceiling suspension bracket for deck plate | |
JPH0314519Y2 (en) | ||
JPH052744Y2 (en) | ||
JPH0748866Y2 (en) | Scaffolding structure for cable laying | |
JPH0530332Y2 (en) | ||
JP2559503Y2 (en) | Panel hanging | |
JPH083546Y2 (en) | Hanging bracket to attach to the deck plate | |
JP2869359B2 (en) | Gondola hanging hardware |