JP2528275B2 - Roll-bearer bale forming device - Google Patents

Roll-bearer bale forming device

Info

Publication number
JP2528275B2
JP2528275B2 JP61056592A JP5659286A JP2528275B2 JP 2528275 B2 JP2528275 B2 JP 2528275B2 JP 61056592 A JP61056592 A JP 61056592A JP 5659286 A JP5659286 A JP 5659286A JP 2528275 B2 JP2528275 B2 JP 2528275B2
Authority
JP
Japan
Prior art keywords
conveyor
shaft
bale
bale forming
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP61056592A
Other languages
Japanese (ja)
Other versions
JPS62215324A (en
Inventor
勇 河本
円雄 戸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanma Agricultural Equipment Co Ltd
Original Assignee
Yanma Agricultural Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanma Agricultural Equipment Co Ltd filed Critical Yanma Agricultural Equipment Co Ltd
Priority to JP61056592A priority Critical patent/JP2528275B2/en
Publication of JPS62215324A publication Critical patent/JPS62215324A/en
Application granted granted Critical
Publication of JP2528275B2 publication Critical patent/JP2528275B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は圃場に散在する牧草や藁などの藁草をピック
アップ部で拾い上げてパイプコンベアによりベール形成
室に搬入しロール状のベールに形成するようにしたロー
ルベーラのベール形成装置に関する。
DETAILED DESCRIPTION OF THE INVENTION "Industrial field of application" The present invention picks up straw grass such as grass and straw scattered in a field by a pickup unit, carries it into a bale forming chamber by a pipe conveyor, and forms it into a roll-shaped bale. The present invention relates to a bale forming device for a roll baler.

「従来の技術」 当出願人等において出願済みの例えば特願昭60−7656
号のものにおいては、一方のベール形成用パイプコンベ
アの移動が側方ドアに連結するロッド或いはリンク手段
で支持されていた。
“Prior Art” For example, Japanese Patent Application No. 60-7656 filed by the present applicant.
In No. 1, the movement of one of the bale forming pipe conveyors was supported by rods or link means connected to the side doors.

「発明が解決しょうとする問題点」 しかし乍らこのようなロッド或いはリンク手段によっ
て一方のパイプコンベアの移動が支持される場合、その
移動動作がスムーズに行われないばかりでなく、ロッド
或いはリンクに移動するパイプコンベア側の支持荷重が
全てかかる状態となってこれらの支持強度の大なるもの
を必要とするなど構成及び経済上の問題があった。
"Problems to be solved by the invention" However, when the movement of one of the pipe conveyors is supported by such rod or link means, not only the movement is not performed smoothly, but also the rod or link is moved. There is a structural and economic problem such that all the supporting load on the moving pipe conveyor side is applied and a large supporting strength is required.

「問題点を解決するための手段」 然るに、本発明は、ピックアップ部で拾い上げた藁草
をパイプコンベアによりベール形成室に搬入しロール状
のベールに形成するようにした構造において、前記パイ
プコンベアの送り終端を支持するコンベア軸にガイドロ
ーラを設けると共に、該ローラの移動を許容するコンベ
ア移動用ローラガイド溝をベール形成室側壁側に開設
し、かつ前記コンベア軸と回動支点用プーリ軸との間に
コンベアガイドを架設したことを特徴とする。
"Means for Solving the Problems" However, the present invention is a structure in which the straw picked up by the pickup unit is carried into a bale forming chamber by a pipe conveyor to form a bale in the form of a roll, A guide roller is provided on the conveyor shaft that supports the feed end, and a conveyor moving roller guide groove that allows the movement of the roller is opened on the side wall of the bale forming chamber, and the conveyor shaft and the rotation fulcrum pulley shaft are It is characterized in that a conveyor guide is installed between them.

「作用」 而して本発明によれば、前記ローラとローラガイド溝
とによるガイド手段でもってパイプコンベアを移動案内
させることができて、このパイプコンベアの移動をスム
ーズ且つ容易なものとさせることができるばかりでな
く、コンベアガイドの強度も低減させることができ、し
かもパイプコンベアの駆動回転にも支障なく、構成上の
至便化が図れ経済性にも秀れる。
[Operation] According to the present invention, the pipe conveyor can be moved and guided by the guide means formed by the roller and the roller guide groove, and the movement of the pipe conveyor can be made smooth and easy. Not only can this be done, but the strength of the conveyor guide can also be reduced, and the drive rotation of the pipe conveyor is not hindered, which makes the construction more convenient and economical.

「実施例」 以下本発明の一実施例を図面に基づいて詳述する。Embodiment An embodiment of the present invention will be described below in detail with reference to the drawings.

第1図はベーラ部の断面説明図、第2図は全体側面
図、第3図は同平面図であり、図中(1)は走行クロー
ラ(2)を有する機台、(3)は前記機台(1)に搭載
するベーラ部、(4)は前記ベーラ部前方に昇降可能に
装設してピックアップガイド板(5)を有するピックア
ップ部、(6)は前記機台(1)後方に装設してエンジ
ン(7)を内設するエンジン部、(8)は前記エンジン
部(6)後方の機体左右中央に配設する操作パネル
(9)を有する運転操作部、(10)は前記ベーラ部
(3)前側に内設する結束装置、(11)は前記運転操作
部(8)左側に配設する作業クラッチレバー、(12)は
前記ピックアップ部(4)の支持高さを調節するピック
アップ昇降調節ハンドル、(13)は前記操作パネル
(9)に備える走行クラッチレバー、(14)(14)は左
右サイドクラッチレバー、(15)は副変速レバーであ
る。
FIG. 1 is a cross-sectional explanatory view of a baler portion, FIG. 2 is an overall side view, and FIG. 3 is a plan view thereof. In the figure, (1) is a machine base having a traveling crawler (2), and (3) is the above-mentioned. A baler unit mounted on the machine base (1), (4) a pickup unit having a pickup guide plate (5) mounted so as to be able to move up and down in front of the baler unit, and (6) a rear part of the machine base (1). An engine part which is installed and has an engine (7) installed therein, (8) is a driving operation part having an operation panel (9) arranged in the left and right center of the body behind the engine part (6), and (10) is the above-mentioned A bundling device provided on the front side of the baler part (3), (11) a work clutch lever arranged on the left side of the driving operation part (8), and (12) adjusting the support height of the pickup part (4). A pickup lifting adjustment handle, (13) a traveling clutch lever provided on the operation panel (9), 14) (14) left and right side clutch lever (15) is a sub shift lever.

前記ベーラ部(3)には彎曲形状のベール形成用主パ
イプコンベア(16)及びベール整形部材である副パイプ
コンベア(17)を対向状に配設してベール形成室(18)
を形成するもので、第4図乃至第5図に示す如く前記副
パイプコンベア(17)は駆動スプロケット(19)とアイ
ドラ(20)間にチェンガイド(21)及びチェン張りガイ
ド(22)を介し左右の副エンドレスチェン(23)(23)
を張架させ、これら左右のチェン(23)(23)間にボル
ト(24)を介し等間隔に複数の副ベール形成パイプ(2
5)…を横架させている。
A curved bale forming main pipe conveyor (16) and a sub pipe conveyor (17) which is a bale shaping member are arranged in the bailer section (3) so as to face each other, and the bale forming chamber (18) is formed.
As shown in FIGS. 4 to 5, the auxiliary pipe conveyor (17) has a chain guide (21) and a chain tension guide (22) between the drive sprocket (19) and the idler (20). Left and right secondary endless chains (23) (23)
And a plurality of sub bale forming pipes (2) at equal intervals via bolts (24) between the left and right chains (23) (23).
5) ... is placed horizontally.

また第6図にも示す如く、前記主パイプコンベア(1
6)は前記ベーラ部(3)の略中央上方に設ける駆動ス
プロケット(26)と、前記ベーラ部(3)の前方に設け
てピックアップ部(4)に臨ませるアイドルスプロケッ
ト(27)間に、各一対の上下チェンガイド(28)(29)
及びテンションローラ(30)(31)を介し左右の主エン
ドレスチェン(32)(32)を張架させ、これら左右のチ
ェン(32)(32)間にボルト(33)を介し等間隔に複数
の主ベール形成パイプ(34)を横架させている。
As shown in FIG. 6, the main pipe conveyor (1
6) is provided between the drive sprocket (26) provided substantially above the center of the baler section (3) and the idle sprocket (27) provided in front of the baler section (3) and facing the pickup section (4). A pair of upper and lower chain guides (28) (29)
The left and right main endless chains (32) (32) are stretched via the tension rollers (30) (31), and a plurality of bolts (33) are equally spaced between the left and right chains (32) (32). The main bale forming pipe (34) is laid horizontally.

さらに、前記アイドルスプロケット(27)のスプロケ
ット軸(27a)と同一軸心上にピックアップ回動支点筒
軸(35)を備え、該筒軸(35)に前記ピックアップ部
(4)のピックアップケース(36)基端を上下動自在に
支持すると共に、前記ケース(36)に偏心軸(37)を介
し複数のピックアップフィンガー(38)を支持するピッ
クアップドラム(39)を装設させている。またさらに前
記駆動スプロケット(19)(26)のスプロケット軸(19
a)(26a)に一体固設する動力用入力スプロケット(4
0)(41)を、副カウンタプーリ(42)の小径部(42a)
に各チェン(43)(44)を介し連動連結すると共に、該
副カウンタプーリ(42)の大径部(42b)をエンジン側
の主カウンタプーリ(45)にチェン(46)を介し連動連
結させ、前記エンジン(7)出力でもって主副パイプコ
ンベア(16)(17)並びにピックアップドラム(39)を
同時に回転させるように構成している。そして前記ピッ
クアップドラム(39)の回転時、該ドラム(39)外側に
適宜突出させるピックアップフィンガー(38)により圃
場の藁草を拾い上げ、前記主パイプコンベア(16)によ
り直接ベール形成室(18)内にその藁草を搬入すると共
に、該室(18)におけるコンベア(16)と副パイプコン
ベア(17)との回転でもってロール状のベール(A)に
藁草を形成し、このベール(A)形成完了後ベール
(A)外周に前記結束装置(10)のトワイン(47)によ
る結束を施して、ベール形成室(18)左側の側方ドア
(48)より機外にベール(A)を取出すように構成した
ものである。
Furthermore, a pickup rotation fulcrum cylinder shaft (35) is provided on the same axis as the sprocket shaft (27a) of the idle sprocket (27), and the cylinder shaft (35) has a pickup case (36) of the pickup section (4). ) A pickup drum (39) is mounted on the case (36) so as to support the base end so as to be vertically movable and to support a plurality of pickup fingers (38) via an eccentric shaft (37). Still further, the sprocket shaft (19) of the drive sprocket (19) (26) is
a) Power input sprocket (4a) fixed to (26a)
0) (41) to the small diameter part (42a) of the sub-counter pulley (42)
And the large diameter portion (42b) of the sub-counter pulley (42) is linked to the main counter pulley (45) on the engine side through the chain (46). The main and sub pipe conveyors (16, 17) and the pickup drum (39) are simultaneously rotated by the output of the engine (7). When the pick-up drum (39) is rotated, pick-up fingers (38) appropriately protruding to the outside of the drum (39) pick up straw grass in the field, and the main pipe conveyor (16) directly inside the bale forming chamber (18). The straw grass is carried into the roll-shaped bale (A) by the rotation of the conveyor (16) and the sub pipe conveyor (17) in the chamber (18), and the straw grass is formed into the bale (A). After formation is completed, the outer periphery of the bale (A) is bound by the twine (47) of the bundling device (10), and the bale (A) is taken out of the machine through the side door (48) on the left side of the bale forming chamber (18). It is configured as follows.

また、前記主パイプコンベア(16)における各パイプ
(34)とパイプ(34)との間に断面略L形状の藁草補助
搬送板(49)を配設するもので、左右のチェン(32)
(32)に搬送板(49)の両端をボルト(50)を介し取付
け、該搬送板(49)の上端鋸面(49a)を上方に臨ま
せ、各パイプ(34)による藁草搬送時その搬送を助長す
るように構成している。
In addition, a straw-assisting carrier plate (49) having a substantially L-shaped cross section is arranged between each pipe (34) in the main pipe conveyor (16), and the left and right chains (32) are arranged.
Both ends of the conveyor plate (49) are attached to the (32) via bolts (50), the upper end saw surface (49a) of the conveyor plate (49) is faced upward, and when conveying straw grass by each pipe (34). It is configured to facilitate transportation.

さらに、前記副パイプコンベア(17)におけるチェン
張りガイド(22)は、ガイド本体(51)にチェンガイド
(52)の一方を支点軸(53)を介し他方を軸(54)及び
長孔(55)を介し揺動可能に支持していて、前記軸(5
4)に固設するボルト(56)調節でもって前記チェン(2
3)に対するチェンガイド(52)の張り代を適宜調節す
るように構成している。
Furthermore, the chain tension guide (22) in the sub pipe conveyor (17) has a guide body (51) in which one of the chain guides (52) is provided with a fulcrum shaft (53) and the other with a shaft (54) and an elongated hole (55). ) Is swingably supported via the shaft (5
4) Adjust the bolt (56) fixed to the chain (2)
The tension of the chain guide (52) with respect to 3) is adjusted appropriately.

またさらに、前記主パイプコンベア(16)における一
対のチェンガイド(29)はこの両端を前記スプロケット
軸(26a)と副カウンタプーリ(42)の副カウンタプー
リ軸(57)とに上下枢着板(58)(59)を介し支持させ
たもので、副カウンタプーリ軸(57)を側板(3a)に支
承する軸受(60)に、プーリ軸(57)と同一軸心状に下
枢着板(59)を揺動自在に支持する一方、前記スプロケ
ット軸(26a)を支持するガイドローラ(61)を、前記
プーリ軸(57)を中心として側板(3a)に円弧状に開設
するローラガイド溝(62)に樹脂ガイド部材(63)を介
して支持させ、前記プーリ軸(57)を中心としてチェン
ガイド(29)上端側を揺動可能とさせることにより、主
パイプコンベア(16)の送り終端側である半円形状のベ
ール形成部(16a)を後方側に移動させベール形成室(1
8)を拡大可能とするように構成している。
Furthermore, a pair of chain guides (29) in the main pipe conveyor (16) have upper and lower pivoting plates (29) attached to both ends of the chain guides (29) to the sprocket shaft (26a) and the sub counter pulley shaft (57) of the sub counter pulley (42). 58) (59) supported by a bearing (60) that supports the sub-counter pulley shaft (57) on the side plate (3a), and a lower pivoting plate (a) that is coaxial with the pulley shaft (57). The guide roller (61), which supports the sprocket shaft (26a) while supporting the sprocket shaft (26a) in a swingable manner, is formed in an arc shape on the side plate (3a) about the pulley shaft (57) as a roller guide groove ( 62) is supported via a resin guide member (63), and the upper end side of the chain guide (29) can be swung about the pulley shaft (57) so that the feed end side of the main pipe conveyor (16) Move the semicircular bale forming part (16a) that is Lumpur forming chamber (1
8) is configured to be expandable.

また、前記ガイド(21)(22)(28)(29)における
各チェン(23)(32)の接触部には、例えば高密度ポリ
エチレンよりなる樹脂ガイド部材(64)を一体付設して
いて、これらガイド(21)(22)(28)(29)の騒音防
止と耐摩耗性向上を図り、チェン(23)(32)をスムー
ズに滑動させるように構成している。
Further, a resin guide member (64) made of, for example, high-density polyethylene is integrally attached to a contact portion of each chain (23) (32) in the guide (21) (22) (28) (29), The guides (21) (22) (28) (29) are configured to prevent noise and improve wear resistance, and to smoothly slide the chains (23) (32).

ところで、前記主パイプコンベア(16)の回動支点軸
である前記プーリ軸(57)は、該コンベア(16)の送り
始端側である直線状の藁草導入部(16b)と送り後端側
のベール形成部(16a)との交差点(E)と、ベール形
成室(18)の中心(C)とを結ぶライン(l)状で、且
つ点(E)位置近傍つまりコンベア(16)の往復コンベ
ア部間の隙間に配設して、前記プーリ軸(57)を中心と
してコンベア(16)のベール形成部(16a)を移動させ
た際前記交差点(E)位置の移動を最小に抑制させるこ
とによって、ベール形成室(18)拡大時のベール(A)
の落ち込みを防止するとともに、ベール形成部(16a)
とベール(A)の接触面積を小とさせることによって、
前記側方ドア(48)よりのベール(A)機外取出しを容
易とさせるように構成している。
By the way, the pulley shaft (57), which is a rotation fulcrum shaft of the main pipe conveyor (16), has a linear straw introduction portion (16b) and a feeding rear end side which are the feeding start end side of the conveyor (16). Line (1) connecting the intersection (E) with the bale forming part (16a) and the center (C) of the bale forming chamber (18) and near the point (E), that is, the conveyor (16) reciprocating. Arranged in a gap between the conveyor parts to minimize movement of the intersection (E) position when the bale forming part (16a) of the conveyor (16) is moved around the pulley shaft (57). The bale (A) when expanding the bale forming chamber (18)
Of the bale formation part (16a)
By reducing the contact area between the bale (A) and
The bail (A) is easily removed from the machine through the side door (48).

また、前記主パイプコンベア(16)のベール形成部
(16a)終端は、ベール形成室(18)の中心(C)を通
る垂線(t)の上方近傍まで延設していて、該コンベア
(16)より副パイプコンベア(17)側に送り継がれる藁
草がこれらコンベア(16)(17)外側に飛び出ることな
く中心(C)方向に向って落ちるように構成している。
Further, the end of the bale forming part (16a) of the main pipe conveyor (16) is extended up to near the vertical line (t) passing through the center (C) of the bale forming chamber (18), and the conveyor (16) ) From the sub pipe conveyor (17) side, the straw grass is configured to fall toward the center (C) direction without jumping outside of these conveyors (16) (17).

さらに前記副パイプコンベア(17)は、前記交差点
(E)と中心(C)を結ぶライン(l)の延長線上より
前方側に配設して、該コンベア(17)によるベール
(A)の支持面積を最小のものに抑制することによっ
て、前記側方ドア(48)よりのベール(A)機外取出し
を容易とさせるように構成している。
Further, the sub pipe conveyor (17) is arranged on the front side of the extension line of the line (1) connecting the intersection (E) and the center (C) to support the bale (A) by the conveyor (17). By limiting the area to the minimum, the bale (A) can be easily taken out from the side door (48).

第7図乃至第9図に示す如く、前記主パイプコンベア
(16)のベール形成部(16a)を移動させるチェンガイ
ド(29)は、前記側方ドア(48)にリンク機構(65)を
介し連動連結させるもので、前記リンク機構(65)は前
記側方ドア(48)の回動支点軸(66)に一体固設する回
動アーム(67)と、該アーム(67)に取付長さ調節自在
に連結するロッド(68)と、ベーラ部左側板(3a)に軸
(69)を介し基端を揺動自在に支持させ且つピン(70)
を介し先端を前記ロッド(68)他端に連結させる第1揺
動板(71)と、該揺動板(71)にピン(72)を介し下端
を連結させる連結板(73)と、前記側板(3a)の回動支
点軸(74)に基端を揺動自在に支持させ且つ軸(75)を
介し先端を前記連結板(73)の上端に連結させる揺動ア
ーム(76)と、前記側板(3a)の内側で前記支点軸(7
4)に基端を固設する揺動アーム(77)と、該アーム(7
7)にピン(78)を介し一端を連結させる連結板(79)
と、前記側板(3a)に軸(80)を介し基端を揺動自在に
支持させ一端側をピン(81)を介し前記連結板(79)他
端に連結させる第2揺動板(82)と、前記枢着板(58)
と第2揺動板(82)とをそれぞれピン(83)(84)を介
し連結させるガイド連結板(85)と、前記連結板(73)
と軸(75)間にバネ圧調節自在に張設するベール圧縮用
バネ(86)とからなり、前記ドア(48)の閉封時バネ
(86)力で主パイプコンベア(16)の終端を前動位置に
位置保持すると共に、前記ドア(48)の開放時リンク機
構(65)を介し主パイプコンベア(16)の終端を後部開
放位置まで一定角度(β)移動させるように構成してい
る。
As shown in FIGS. 7 to 9, the chain guide (29) for moving the bale forming part (16a) of the main pipe conveyor (16) is connected to the side door (48) via a link mechanism (65). The link mechanism (65) is connected in an interlocking manner, and the link mechanism (65) has a rotation arm (67) integrally fixed to the rotation fulcrum shaft (66) of the side door (48) and a mounting length of the arm (67). A rod (68) that is adjustably connected to the left side plate (3a) of the baler part has a base end swingably supported by a shaft (69) and a pin (70).
A first oscillating plate (71) for connecting the tip to the other end of the rod (68) through a connecting plate (73) for connecting the lower end to the oscillating plate (71) through a pin (72); A swing arm (76) having a base end swingably supported by a swing fulcrum shaft (74) of the side plate (3a) and a tip end connected to an upper end of the connecting plate (73) via a shaft (75); Inside the side plate (3a), the fulcrum shaft (7
4) A swing arm (77) whose base end is fixedly mounted, and the arm (7).
Connecting plate (79) that connects one end to 7) via pin (78)
And a second swing plate (82) which has a base end swingably supported by the side plate (3a) via a shaft (80) and has one end connected to the other end of the connecting plate (79) via a pin (81). ) And the pivot board (58)
A guide connecting plate (85) for connecting the second swing plate (82) and the second swing plate (82) via pins (83) (84), respectively, and the connecting plate (73).
And a bail compression spring (86) stretched between the shaft (75) so that the spring pressure can be adjusted. The closing force of the spring (86) at the time of closing the door (48) causes the main pipe conveyor (16) to end. It is configured to hold the position in the forward movement position and move the end of the main pipe conveyor (16) to the rear opening position by a certain angle (β) via the link mechanism (65) when the door (48) is opened. .

前記バネ(86)は下端を連結板(73)の偏心軸(87)
に、上端を調節ボルト(88)を介し前記軸(75)に連結
させるもので、前記偏心軸(87)は連結板(73)の固定
片(89)に回動可能に支持させ、ハンドル(90)操作に
よって多段にバネ(86)力を調節し得るように構成して
いる。
The lower end of the spring (86) is an eccentric shaft (87) of the connecting plate (73).
The upper end is connected to the shaft (75) through an adjusting bolt (88), and the eccentric shaft (87) is rotatably supported by a fixing piece (89) of a connecting plate (73), and a handle ( 90) The spring (86) force can be adjusted in multiple steps by operation.

また、ベール(A)の直径が一定以上の仕上り直径と
なったときその外周接触圧により検知するベール圧検出
スイッチ(91)を左側板(3a)外側に設けるもので、前
記連結板(73)に固設した固定取付板(92)に軸ボルト
(93)を介し回動自在にスイッチ操作部材(94)を取付
け、該操作部材(94)に固設するL形アーム(95)を前
記スイッチ(91)のアクチュエータ(91a)に接触させ
るべく設けると共に、前記取付板(92)の固定ピン(9
6)とL形アーム(95)間に支点越えバネ(97)を張架
させている。また前記調節ボルト(88)の先端に係合す
る圧力調節ナット(88a)に、ボルト(98)を介してベ
ール圧検出部材(99)を一体取付けして、該検出部材
(99)に検出作動ピン(100)を一体固設すると共に、
該作動ピン(100)に当接させる上下係合板(101)(10
2)を前記操作部材(94)に固設させて、通常の主パイ
プコンベア(16)の閉動状態時にあっては前記バネ(9
7)で操作部材(94)を時計方向側に引張って前記スイ
ッチ(91)をオフ維持する一方、ベール(A)直径が一
定以上となりその接触圧によってバネ(86)力に抗し主
パイプコンベア(16)が軸(57)を中心に一定角度
(α)後方に開くとき、前記軸(74)を中心に揺動アー
ム(76)の軸(75)を連結板(73)の長孔(73a)に沿
わせ上動させ、第8図仮想線に示す如く前記作動ピン
(100)及び上係合板(101)を介し操作部材(94)を反
時計方向に回転させ前記軸(93)に対しバネ(97)を支
点越えさせて、このとき操作部材(94)のL形アーム
(95)によってスイッチ(91)のアクチュエータ(91
a)を押圧してスイッチ(91)をオン作動させ警報装置
を駆動し作業者にベール(A)の形成完了を報知せしめ
るように構成している。
Further, a bail pressure detection switch (91) for detecting the outer peripheral contact pressure when the diameter of the bale (A) becomes a fixed diameter or more is provided outside the left side plate (3a), and the connecting plate (73) is provided. A switch operating member (94) is rotatably attached to a fixed mounting plate (92) fixed to the switch via an axial bolt (93), and an L-shaped arm (95) fixed to the operating member (94) is attached to the switch. It is provided so as to contact the actuator (91a) of (91) and the fixing pin (9) of the mounting plate (92) is provided.
A fulcrum crossing spring (97) is stretched between 6) and the L-shaped arm (95). Further, the bail pressure detecting member (99) is integrally attached to the pressure adjusting nut (88a) engaging with the tip of the adjusting bolt (88) through the bolt (98), and the detecting operation is performed on the detecting member (99). While fixing the pin (100) integrally,
Upper and lower engagement plates (101) (10) that are brought into contact with the operation pin (100).
2) is fixed to the operating member (94), and the spring (9) is fixed when the normal main pipe conveyor (16) is closed.
While the operation member (94) is pulled clockwise by 7) and the switch (91) is kept off, the diameter of the bail (A) becomes a certain value or more and the contact pressure resists the force of the spring (86) to prevent the main pipe conveyor. When the (16) opens rearward at a constant angle (α) about the shaft (57), the shaft (75) of the swing arm (76) is connected to the elongated hole (of the connecting plate (73) about the shaft (74). 73a) to move upward and rotate the operating member (94) counterclockwise through the operating pin (100) and the upper engaging plate (101) as shown in phantom line in FIG. The spring (97) is moved beyond the fulcrum, and at this time, the L-shaped arm (95) of the operating member (94) causes the actuator (91) of the switch (91).
A) is pressed to turn on the switch (91) to drive an alarm device to notify the operator of the completion of the formation of the bale (A).

また、前記操作部材(94)にインジゲータ(103)の
基端を固設させ、該インジゲータ(103)の後端を後面
カバー(3b)の案内溝(3c)よりカバー(3b)後方に延
出させ、ベール(A)形成に伴うスイッチ(91)のオン
オフの確認をこのインジゲータ(103)で行う一方、振
動などによって操作部材(94)が支点越えしたときなど
外部よりこのリセットを行うように構成している。
Further, the base end of the indicator (103) is fixed to the operation member (94), and the rear end of the indicator (103) extends rearward of the cover (3b) from the guide groove (3c) of the rear cover (3b). The indicator (103) is used to confirm the on / off state of the switch (91) accompanying the formation of the bale (A), while the reset is performed from the outside when the operating member (94) crosses the fulcrum due to vibration or the like. are doing.

本実施例は上記の如く構成するものにして、ピックア
ップ部(4)によって拾い上げられた乾草は主パイプコ
ンベア(16)によってベール形成室(18)内に搬入さ
れ、主副パイプコンベア(16)(17)でもってロール状
のベール(A)に形成される。そして今ベール(A)の
直径が設定の一定直径以上に形成される状態のとき、そ
のベール(A)圧によって主パイプコンベア(16)の前
記チェンガイド(16)がバネ(86)に抗して軸(57)を
中心に一定角度(α)後方に押し拡げられるもので、こ
の状態のとき各要素(85)(82)(79)(77)(74)
(76)(75)(88)(99)(100)(101)の順に作用が
伝わって、操作部材(94)を軸(93)を中心に反時計方
向に回動させる。そしてこの結果前記バネ(97)が支点
越えして前記アーム(95)がスイッチ(91)をオン作動
するもので、このスイッチ(91)がオンとなるとき警報
装置が駆動して、ベール(A)の形成完了を作業者に報
知する。なおこの場合軸(75)は連結板(73)の長孔
(73a)内を移動し、側方ドア(48)とは関係なく動作
する。その後ベール(A)外周に前記結束装置(10)よ
り供給されるトワイン(47)を巻き付け、この結束完了
後前記側方ドア(48)を開放状態とすることにより、自
動的に前記主パイプコンベア(16)の終端つまりベール
形成部(16a)が前記軸(57)を中心に一定角度(β)
後方に移動し、ベール(A)に対する該コンベア(16)
の押圧解除が行われてその取出しが行われるものであ
る。
This embodiment is configured as described above, and the hay picked up by the pickup section (4) is carried into the bale forming chamber (18) by the main pipe conveyor (16), and the main and sub pipe conveyors (16) ( 17) to form a roll-shaped bale (A). Then, when the diameter of the bale (A) is now formed to be equal to or larger than the set constant diameter, the bail (A) pressure causes the chain guide (16) of the main pipe conveyor (16) to resist the spring (86). It can be spread backward by a certain angle (α) around the shaft (57). In this state, each element (85) (82) (79) (77) (74)
The action is transmitted in the order of (76), (75), (88), (99), (100), and (101), and the operation member (94) is rotated counterclockwise about the shaft (93). As a result, the spring (97) crosses the fulcrum and the arm (95) turns on the switch (91). When the switch (91) is turned on, the alarm device is driven to turn on the bail (A). ) Is notified to the operator. In this case, the shaft (75) moves in the long hole (73a) of the connecting plate (73) and operates independently of the side door (48). After that, the twine (47) supplied from the bundling device (10) is wound around the outer periphery of the bale (A), and after the bundling is completed, the side door (48) is opened to automatically open the main pipe conveyor. The end of (16), that is, the bale forming part (16a) has a constant angle (β) about the shaft (57).
The conveyor (16) that moves to the rear and is for the bale (A)
The pressure is released and the product is taken out.

而してこのベール(A)の取出し時にあっては、前記
コンベア(16)の藁草導入部(16b)とベール形成部(1
6a)との交差点(E)と、ベール形成室(18)の中心
(C)とを結ぶライン(l)上で、且つコンベア(16)
の往復コンベア部間の隙間に前記軸(57)を配設するも
のであるから、前記コンベア(16)の移動時つまり拡大
時ベール(A)に対する該コンベア(16)の接触面積は
極めて小さなものとなってその取出しを容易とさせるば
かりでなく、前記交差点(E)位置の高低変位差も小さ
なものにできてコンベア(16)開放時のベール(A)の
落ち込みも防止でき一層その取出しを容易とさせること
ができる。
When the bale (A) is taken out, the straw introduction part (16b) and the bale forming part (1) of the conveyor (16) are used.
On the line (l) connecting the intersection (E) with 6a) and the center (C) of the bale forming chamber (18), and the conveyor (16)
Since the shaft (57) is arranged in the gap between the reciprocating conveyor parts, the contact area of the conveyor (16) with respect to the bale (A) during movement of the conveyor (16) is very small. In addition to facilitating its removal, the difference in height displacement of the intersection (E) can be made small, and the bale (A) can be prevented from falling when the conveyor (16) is opened, which facilitates removal. Can be

また副パイプコンベア(17)も前記ライン(l)の延
長線上の前方側に配設されていて、ベール(A)との接
触面積も最小に抑制しているので、ベール(A)取出し
時における該コンベア(17)による抵抗も極めて小さな
ものにできる。
Further, the sub pipe conveyor (17) is also arranged on the front side of the extension line of the line (l), and the contact area with the bale (A) is suppressed to the minimum, so that the bale (A) is taken out. The resistance due to the conveyor (17) can be made extremely small.

さらに、前記主パイプコンベア(16)の終端をベール
形成室(18)の中心(C)を通る垂線(t)の該室(1
8)上方近傍まで延設しているので、このコンベア(1
6)の終端より送り出される藁草は少なくとも略水平方
向より下向き方向に移動する状態となってコンベア(1
6)(17)より外側には飛び出ることが防止される。さ
らに前記主パイプコンベア(16)の終端は前記リンク機
構(65)とガイドローラ(61)との二つの手段により側
板(3a)に支持されるものであるから、その支持強度が
分散され各々の強度を低減させることができると共に、
該コンベア(16)の移動をスムーズに行わしめることが
できる。
Furthermore, the end (1) of the main pipe conveyor (16) is a vertical line (t) passing through the center (C) of the bale forming chamber (18).
8) This conveyor (1
The straw grass fed from the end of 6) moves at least in the downward direction from the horizontal direction.
6) It is prevented from jumping outside from (17). Further, since the end of the main pipe conveyor (16) is supported by the side plate (3a) by the two means of the link mechanism (65) and the guide roller (61), the supporting strength of each side is dispersed. The strength can be reduced and
The conveyor (16) can be moved smoothly.

またさらに、前記主パイプコンベア(16)のチェンガ
イド(29)の一端を前記軸(57)に、また他端を前記ガ
イドローラ(61)を介しローラガイド溝(62)に支持さ
せることによって、該ガイド(29)の両端部を安定よく
側板(3a)に保持できるもので、このためチェンガイド
(29)全体がベール圧などによって歪んだり変形したり
することが防止されてこのガイド(29)自体の強度も低
減させることができると共に、コンベア(16)の回転自
体にも悪影響を与えることがない。
Furthermore, by supporting one end of the chain guide (29) of the main pipe conveyor (16) on the shaft (57) and the other end on the roller guide groove (62) via the guide roller (61), Since both ends of the guide (29) can be stably held by the side plate (3a), the entire chain guide (29) is prevented from being distorted or deformed by bale pressure or the like, and this guide (29) is prevented. The strength of itself can be reduced, and the rotation of the conveyor (16) itself is not adversely affected.

「発明の効果」 以上実施例から明らかなように本発明は、ピックアッ
プ部(4)で拾い上げた藁草をパイプコンベア(16)に
よりベール形成室(18)に搬入しロール状のベール
(A)に形成するようにした構造において、前記パイプ
コンベア(16)の送り終端を支持するコンベア軸(26
a)にガイドローラ(61)を設けると共に、該ローラ(6
1)の移動を許容するコンベア移動用ローラガイド溝(6
2)をベール形成室(18)側壁側に開設し、かつ前記コ
ンベア軸(26a)と回動支点用プーリ軸(57)との間に
コンベアガイド(29)を架設したもので、前記ローラ
(61)とローラガイド溝(62)とによるガイド手段でも
ってパイプコンベア(16)を移動案内させることができ
て、このパイプコンベア(16)の移動をスムーズ且つ容
易なものとさせることができるばかりでなく、コンベア
ガイド(29)の強度も低減させることができ、しかもパ
イプコンベア(16)の駆動回転にも支障なく、構成上の
至便化が図れ経済性にも秀れるなどの顕著な効果を奏す
る。
"Effects of the Invention" As is apparent from the above embodiments, according to the present invention, the straw bale (A) in which the straw grass picked up by the pickup section (4) is carried into the bale forming chamber (18) by the pipe conveyor (16). In the structure designed to be formed in the above, a conveyor shaft (26
The guide roller (61) is provided on a) and the roller (6
Conveyor moving roller guide groove (6)
2) is provided on the side wall of the bale forming chamber (18), and a conveyor guide (29) is installed between the conveyor shaft (26a) and the rotation fulcrum pulley shaft (57). The pipe conveyor (16) can be moved and guided by the guide means by the 61) and the roller guide groove (62), and the movement of the pipe conveyor (16) can be made smooth and easy. In addition, the strength of the conveyor guide (29) can be reduced, the driving rotation of the pipe conveyor (16) is not hindered, the structure is convenient, and the economy is excellent. .

【図面の簡単な説明】[Brief description of drawings]

第1図はベーラ部の断面説明図、第2図は全体の側面
図、第3図は同平面図、第4図はベーラ部の駆動説明
図、第5図は副パイプコンベア部の説明図、第6図は主
パイプコンベア部の説明図、第7図はリンク機構部の側
面説明図、第8図は同拡大説明図、第9図は同平面説明
図である。 (4)…ピックアップ部 (16)…パイプコンベア (18)…ベール形成室 (26a)…コンベア軸 (29)…コンベアガイド(チェンガイド) (57)…軸 (61)…ガイドローラ (62)…ローラガイド溝 (A)…ベール
FIG. 1 is a cross-sectional explanatory view of the baler portion, FIG. 2 is a side view of the whole, FIG. 3 is a plan view thereof, FIG. 4 is a driving explanatory view of the baler portion, and FIG. 6 is an explanatory view of the main pipe conveyor section, FIG. 7 is a side view of the link mechanism section, FIG. 8 is an enlarged view of the same, and FIG. 9 is a plan view of the same. (4) ... Pickup part (16) ... Pipe conveyor (18) ... Bale forming chamber (26a) ... Conveyor shaft (29) ... Conveyor guide (chain guide) (57) ... Shaft (61) ... Guide roller (62) ... Roller guide groove (A) ... Bale

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】ピックアップ部(4)で拾い上げた藁草を
パイプコンベア(16)によりベール形成室(18)に搬入
しロール状のベール(A)に形成するようにした構造に
おいて、前記パイプコンベア(16)の送り終端を支持す
るコンベア軸(26a)にガイドローラ(61)を設けると
共に、該ローラ(61)の移動を許容するコンベア移動用
ローラガイド溝(62)をベール形成室(18)側壁側に開
設し、かつ前記コンベア軸(26a)と回動支点用プーリ
軸(57)との間にコンベアガイド(29)を架設したこと
を特徴とするロールベーラのベール形成装置。
1. A structure in which the straw grass picked up by a pickup section (4) is carried into a bale forming chamber (18) by a pipe conveyor (16) and formed into a roll-shaped bale (A). A guide roller (61) is provided on a conveyor shaft (26a) that supports the feed end of (16), and a conveyor moving roller guide groove (62) that allows the roller (61) to move is provided with a bale forming chamber (18). A bale forming apparatus for a roll baler, which is provided on a side wall side, and a conveyor guide (29) is provided between the conveyor shaft (26a) and a rotation fulcrum pulley shaft (57).
JP61056592A 1986-03-13 1986-03-13 Roll-bearer bale forming device Expired - Fee Related JP2528275B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61056592A JP2528275B2 (en) 1986-03-13 1986-03-13 Roll-bearer bale forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61056592A JP2528275B2 (en) 1986-03-13 1986-03-13 Roll-bearer bale forming device

Publications (2)

Publication Number Publication Date
JPS62215324A JPS62215324A (en) 1987-09-22
JP2528275B2 true JP2528275B2 (en) 1996-08-28

Family

ID=13031465

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61056592A Expired - Fee Related JP2528275B2 (en) 1986-03-13 1986-03-13 Roll-bearer bale forming device

Country Status (1)

Country Link
JP (1) JP2528275B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4680115B2 (en) * 2006-03-31 2011-05-11 株式会社タカキタ Forming device in roll baler

Also Published As

Publication number Publication date
JPS62215324A (en) 1987-09-22

Similar Documents

Publication Publication Date Title
JPS6328322A (en) Baler for forming harvested article into roll
JP2528275B2 (en) Roll-bearer bale forming device
JP2528274B2 (en) Roll-bearer bale forming device
JP2528273B2 (en) Roll-bearer bale forming device
JPH0510590Y2 (en)
JP2556681B2 (en) Roll bearer safety device
JPH0420186Y2 (en)
JPH076756Y2 (en) Roll baler
JPS62215322A (en) Bale forming apparatus of roll baler
JP2558456B2 (en) Roll bearer discharging device
JP2521089B2 (en) Roll-baler baler discharging device
JPH0445485Y2 (en)
JPH0813223B2 (en) Bale removal device for roll baler
JPH0420185Y2 (en)
JPH07132019A (en) Roll baler
JP2528277B2 (en) Roll bearer binding method
JP2607232B2 (en) Roll baler
JPH0445483Y2 (en)
JP2707144B2 (en) String winding take-out device in roll baler
JPS61202631A (en) Bundler of roll baler
JP2565321B2 (en) Roll-baler baler discharging device
JP2607231B2 (en) Roll Baler Bundling Method
JPH0538604Y2 (en)
JPH0538605Y2 (en)
JPH0454768Y2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees