JP2517230Y2 - Concrete formwork support member - Google Patents

Concrete formwork support member

Info

Publication number
JP2517230Y2
JP2517230Y2 JP1992052503U JP5250392U JP2517230Y2 JP 2517230 Y2 JP2517230 Y2 JP 2517230Y2 JP 1992052503 U JP1992052503 U JP 1992052503U JP 5250392 U JP5250392 U JP 5250392U JP 2517230 Y2 JP2517230 Y2 JP 2517230Y2
Authority
JP
Japan
Prior art keywords
concrete
auxiliary
main
strut
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1992052503U
Other languages
Japanese (ja)
Other versions
JPH0624015U (en
Inventor
一男 田口
Original Assignee
伸光企業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 伸光企業株式会社 filed Critical 伸光企業株式会社
Priority to JP1992052503U priority Critical patent/JP2517230Y2/en
Publication of JPH0624015U publication Critical patent/JPH0624015U/en
Application granted granted Critical
Publication of JP2517230Y2 publication Critical patent/JP2517230Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は河川の仕切堰やダム等を
構築する際に使用されるコンクリート施工用型枠を保持
するためのの支持部材に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supporting member for holding a concrete construction form used when constructing a partition weir or dam of a river.

【0002】[0002]

【従来の技術】一般に、河川のダムや仕切堰の傾斜表面
は、図8に示すように下部と上部が異なった勾配で形成
されている。このような構造物を構築する際、コンクリ
ート型枠(一般には金属で作られたメタルフォームが広
く使用されている)を支持するための長尺の型枠支持部
材は勾配が変わる毎に組変えを行っている。即ち、施工
すべき構造物の勾配に応じてその都度支持部材の基部を
別途用意した連結用ブラケット等のジョイント部材によ
って先に施工されたコンクリート等の基盤体に保持させ
ている。
2. Description of the Related Art Generally, an inclined surface of a river dam or a partition weir is formed with different slopes at a lower portion and an upper portion as shown in FIG. When constructing such a structure, the long form supporting members for supporting concrete form (metal foam made of metal is widely used) are changed every time the slope changes. It is carried out. That is, the base portion of the supporting member is held by the joint member such as the connecting bracket prepared separately according to the gradient of the structure to be constructed on the base body such as concrete that has been constructed previously.

【0003】[0003]

【考案が解決しようとする課題】このように斜面の勾配
が異なる毎に、コンクリート型枠支持部材を組変えする
ことは大変煩雑で手間を要すると共に、型枠支持部材を
基盤体に連結固定するためのブラケット等のジョイント
部材を必要とし、部品点数が増え、その管理が面倒でト
ータルコストが高くつく等の問題点がある。
It is very cumbersome and time-consuming to change the concrete form supporting members each time the slope of the slope is different, and the form supporting members are connected and fixed to the base body. Therefore, there is a problem that a joint member such as a bracket is required, the number of parts is increased, the management is troublesome, and the total cost is high.

【0004】そこで本考案は、異なった2つ以上の勾配
面をもつダムや仕切堰を施工するに際して、連結用のジ
ョイント部材を使用することなく固定基盤体に安定保持
させることができ、しかも勾配の変化に係わりなく順次
下方から上方にスライドさせて使用することができるコ
ンクリート型枠支持部材を提供し、以って上記した従来
課題の解決を図ることを主たる目的とするものである。
Therefore, according to the present invention, when a dam or partition weir having two or more different sloped surfaces is constructed, it can be stably held on the fixed base body without using a joint member for connection, and the slope The purpose of the present invention is to provide a concrete form supporting member that can be used by sequentially sliding it from the lower side to the upper side irrespective of changes in the above conditions, thereby solving the above-mentioned conventional problems.

【0005】[0005]

【問題を解決するための手段】上記目的を達成するため
に、本考案に係るコンクリート型枠支持部材にあって
は、コンクリート施工面に向かって貫通するボルト挿入
用開口部(3)…を備えた長尺の主支柱(1)と、該主
支柱(1)の下端部でコンクリート施工面に平行な横軸
(4)を介して回動可能に連結され且つ主支柱(1)の
ボルト挿入用開口部(3)と同様なボルト挿入用開口部
(5)を備えた比較的短尺の補助支柱(2)と、該補助
支柱(2)と前記主支柱(1)とを回動自在に連結する
コンクリート施行面に平行な横軸(4)と、これら両支
柱(1),(2)を直角状から直線状までの任意の角度
固定するロック手段(7)とから成る構造としたもの
である。
In order to achieve the above object, a concrete form supporting member according to the present invention comprises a bolt insertion opening (3) penetrating toward a concrete construction surface. And a long main strut (1), which is rotatably connected at the lower end of the main strut (1) via a horizontal axis (4) parallel to the concrete construction surface, and the main strut (1) is inserted with a bolt. A relatively short auxiliary strut (2) having a bolt insertion opening (5) similar to the opening (3), and the auxiliary strut (2) and the main strut (1) being rotatable. connect
A horizontal axis (4) parallel to the concrete surface and both of these supports
Any angle from right angle to straight line for pillars (1) and (2)
The structure is composed of a locking means (7) fixed to the.

【0006】[0006]

【作用】本考案の支持部材(A)は上記の如く構成され
たものであるから、後述するようにダムや仕切堰をコン
クリート施工するに際して、他の連結用ジョイント部材
を使用することなく主支柱(1)に回動可能に付設され
た補助支柱(2)によって固定基盤に安定保持させるこ
とができ、しかも勾配面の変化に応じて主支柱(1)と
補助支柱(2)との連結角度を変えることにより順次上
方にスライドさせて使用することができてコンクリート
型枠の組設作業を簡略化することができる。
Since the supporting member (A) of the present invention is constructed as described above, when the dam and the partition weir are concrete-constructed as will be described later, the main strut without using other joint members for connection. The auxiliary strut (2) rotatably attached to (1) can be stably held on the fixed base, and the connection angle between the main strut (1) and the auxiliary strut (2) according to the change of the sloped surface. It can be used by sequentially sliding it upwards by changing, and the work of assembling the concrete formwork can be simplified.

【0007】[0007]

【実施例】以下図面について本考案の実施例を説明す
る。図1乃至図4において、符号(A)は本考案に係る
コンクリート型枠支持部材を示すものであって、この支
持部材(A)は長尺の主支柱(1)と短尺の補助支柱
(2)とから成り、アングル状又はチャンネル状或いは
H状に形成された金属型材、又は四角筒状の金属材によ
って形成されている。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 4, reference numeral (A) indicates a concrete form supporting member according to the present invention, and the supporting member (A) is a long main pillar (1) and a short auxiliary pillar (2). ) And a metal mold material formed in an angle shape, a channel shape, or an H shape, or a square tube-shaped metal material.

【0008】前記主支柱(1)の下端部でコンクリート
施工面に平行な横軸(4)を介して補助支柱(2)が回
動可能に連結されており、且つこれらの両支柱(1),
(2)には長さ方向に適当な間隔を隔ててコンクリート
施工面に向かって貫通する複数のボルト挿入用開口部
(3)…並びに(5)…が設けられている。これらの開
口部(3),(5)は支柱(1),(2)が1本の型材
や筒材で形成されている場合は、ボルトを挿入できる径
の孔で形成されるが、支柱(1),(2)が、二枚のフ
ラットな長尺板や二本の型枠を並設して、並設対面間を
横桟ではしご状につなぎ合せて形成したものにあって
は、横桟の間に形成される空間部を利用する。更に、該
補助支柱(2)と前記主支柱(1)との連結部には、両
支柱(1),(2)の自由な回動を阻止して両者を固定
するロック手段(7)が設けられている。
An auxiliary column (2) is rotatably connected at the lower end of the main column (1) via a horizontal axis (4) parallel to the concrete construction surface, and both columns (1) are rotatably connected. ,
(2) is provided with a plurality of bolt insertion openings (3) ... And (5) ... Penetrating toward the concrete construction surface at appropriate intervals in the length direction. These openings (3) and (5) are formed with holes having a diameter into which a bolt can be inserted when the columns (1) and (2) are formed of a single mold material or tubular material. In (1) and (2), two flat long plates or two formwork are arranged side by side, and the side-by-side facings are connected by a cross bar in a ladder shape. , The space formed between the horizontal rails is used. Further, a lock means (7) for preventing the free rotation of the support columns (1) and (2) and fixing them is provided at a connecting portion between the auxiliary support column (2) and the main support column (1). It is provided.

【0009】図4はこのロック手段の一例を示すもので
あって、横軸(4)を中心とする仮想円にそって複数の
ピン挿入孔(8)…が主支柱(1)又は補助支柱(2)
に設けられ、この任意のピン挿入孔(8)に補助支柱
(2)又は主支柱(1)に形成したピン孔(9)からピ
ン(10)を挿入することによって両者を所望の角度で
連結した姿勢で固定できるようになっている。
FIG. 4 shows an example of this locking means, in which a plurality of pin insertion holes (8) ... Are arranged along a virtual circle centered on the horizontal axis (4) as the main support column (1) or the auxiliary support column. (2)
, And the pin (10) is inserted from the pin hole (9) formed in the auxiliary column (2) or the main column (1) into this arbitrary pin insertion hole (8) to connect them at a desired angle. It can be fixed in a fixed posture.

【0010】上記の如く構成したコンクリート型枠支持
部材(A)を用いいて図8に示すような断面形状をもつ
河川のダム(B)を構築する場合について説明すると、
先ず図8の(イ)の部分を構築する場合、図1に示すよ
うに水平な固定基盤(11)に補助支柱(2)をボルト
挿通用開口部(5)を介して固定ボルト(12)により
定着させ、主支柱(1)を施工すべきダムの勾配にそっ
て傾斜させた後、ロック手段(7)によりその姿勢を安
定させる。次いで主支柱(1)の背面にそってコンクリ
ート型枠(C)…を組みつけてフックボルト(13)…
により固定しする。
A case of constructing a river dam (B) having a cross-sectional shape as shown in FIG. 8 using the concrete formwork support member (A) constructed as described above will be described.
First, when constructing the part (a) of FIG. 8, as shown in FIG. 1, the auxiliary support column (2) is attached to the horizontal fixing base (11) through the bolt insertion opening (5) and the fixing bolt (12). The main support pillar (1) is fixed along with the inclination of the dam to be constructed, and then the posture is stabilized by the locking means (7). Next, the concrete formwork (C) is assembled along the back surface of the main column (1), and the hook bolts (13) are attached.
To fix.

【0011】尚、必要あればピックテールアンカー(1
4)によって主支柱(1)を補強した後、コンクリート
を所定高まで流し込み硬化させる。次いで図8の(ロ)
の部分を施工するときは、図2に示すように、補助支柱
(2)を図1の固定基盤(11)から取り外して主支柱
(1)と直線状にしてロック手段(7)で固定し、補助
支柱(2)を先に施工したコンクリートに埋め込んだア
ンカーボルト(15)により安定固定させたあと、前記
と同様にコンクリート型枠(C)…を取り付けてコンク
リートを打設する。この際、必要あれば作業用足場
(D)をブラケット(16)等により主支柱(1)や補
助支柱(2)に取り付ければよい。
If necessary, the pick tail anchor (1
After reinforcing the main pillars (1) by 4), concrete is poured to a predetermined height and hardened. Then (b) in FIG.
When constructing the part of, the auxiliary column (2) is removed from the fixed base (11) of FIG. 1 to be linear with the main column (1) and fixed by the locking means (7) as shown in FIG. After the auxiliary columns (2) are stably fixed by the anchor bolts (15) embedded in the previously constructed concrete, the concrete formwork (C) is attached in the same manner as above and the concrete is poured. At this time, if necessary, the work scaffold (D) may be attached to the main strut (1) or the auxiliary strut (2) by a bracket (16) or the like.

【0012】次いで図8の(ハ)の部分を施工する場合
は、図3に示すように、補助支柱(2)を主支柱(1)
に対して必要な角度に回動してロック手段(7)で固定
したあと、補助支柱(2)を上段の硬化コンクリートに
埋め込んだアンカーボルト(15)によって定着させ
て、前記と同様にコンクリート型枠(C)…を取り付
け、コンクリートを打設するものである。このようにし
て何ら他の固定用のジョイント部材を用いることなく、
支持部材を順次上方にスライドさせて使用することがで
きる。
Next, when constructing the portion (c) of FIG. 8, as shown in FIG. 3, the auxiliary column (2) is replaced with the main column (1).
After rotating to the required angle with respect to and fixing with the locking means (7), the auxiliary columns (2) are fixed by the anchor bolts (15) embedded in the hardened concrete in the upper stage, and the concrete mold is used as described above. The frame (C) ... is attached and concrete is poured. In this way, without using any other fixing joint member,
The support member can be used by sequentially sliding it upward.

【0013】本考案における主支柱(1)と補助支柱
(2)の自由回動を阻止するロック手段(7)は、上記
実施例の外に種々の方法をとることができる。例えば、
図5に示すように、主支柱(1)と補助支柱(2)とに
またがってターンバックル(17)を設けて、このター
ンバックル(17)の長さを調整することにより、横軸
(4)を支点とする両支柱(1)、(2)の回動変位と
固定を同時に行うことができ、また、図6に示すように
主支柱(1)又は補助支柱(2)の何れか一方、例えば
補助支柱(2)に枢着(18)した調整杆(19)に長
さ方向にそって複数のピン孔(20)…を設け、この任
意のピン孔(20)に主支柱(1)の突出ボスに形成し
た孔からピン(22)を挿入することによってロック手
段(7)を構成してもよい。
The lock means (7) for preventing the free rotation of the main strut (1) and the auxiliary strut (2) in the present invention can take various methods other than the above embodiment. For example,
As shown in FIG. 5, a turnbuckle (17) is provided so as to straddle the main support column (1) and the auxiliary support column (2), and the length of the turnbuckle (17) is adjusted, whereby the horizontal axis (4 ) As a fulcrum, both of the columns (1) and (2) can be rotationally displaced and fixed at the same time, and either the main column (1) or the auxiliary column (2) as shown in FIG. , A plurality of pin holes (20) are provided along the lengthwise direction in the adjusting rod (19) pivotally attached (18) to the auxiliary column (2), and the main column (1) is provided in this arbitrary pin hole (20). The locking means (7) may be constructed by inserting the pin (22) through the hole formed in the protruding boss of FIG.

【0014】また、図面は省略するが、該ロック手段
(7)は、例えば前記図4に示した主支柱(1)と補助
支柱(2)との接当面間にそれぞれ菊座金具を対向させ
て固着し、横軸(4)を緊締ボルトに変えて、これを弛
めて両支柱(1),(2)の角度を変えることによっ
て、菊座金具どうしの相対角度を変更し、ボルトを締め
付けることによって、菊座金具どうしを噛み合わせて両
支柱(1),(2)の角度姿勢を固定するようにしても
よく、また、一般に知られているラチェットとラチェッ
トホイールとを用いたラチェット機構によって両支柱
(1),(2)の角度変更及び角度固定を行うようにし
てもよい。
Although not shown in the drawings, the locking means (7) has, for example, chrysanthemum metal fittings facing each other between the contact surfaces of the main support column (1) and the auxiliary support column (2) shown in FIG. Then, fix the horizontal axis (4) to a tightening bolt, loosen it and change the angle of both columns (1) and (2) to change the relative angle between the chrysanthemum metal fittings. By tightening, the chrysanthemum metal fittings may be meshed with each other to fix the angular postures of the columns (1) and (2), and a ratchet mechanism using a generally known ratchet and ratchet wheel. It is also possible to change and fix the angles of both columns (1) and (2).

【0015】以上本考案の代表的な実施例について説明
したが、本考案は必ずしも上記実施例構造のみに限定さ
れるものでなく、本考案の構成要件を備え、且つ効果を
有する範囲内で適宜変更して実施できることは勿論であ
る。
Although the representative embodiments of the present invention have been described above, the present invention is not necessarily limited to the structure of the above-mentioned embodiments, and may be appropriately provided that the constituent features of the present invention are provided and the effects are obtained. Of course, it can be changed and implemented.

【0016】[0016]

【考案の効果】本考案のコンクリート型枠支持部材は、
上記のごとく構成されたものであるから、ダムや仕切堰
をコンクリート施工するに際して、他の連結用ジョイン
ト部材を使用することなく主支柱に付設された補助支柱
によって固定基盤に安定保持させることができ、しかも
勾配面の変化に応じて主支柱と補助支柱との連結角度を
変えることにより順次上方にスライドさせて使用するこ
とができ、これによりコンクリート型枠の組設作業が簡
略化すると共にトータルコストの大幅な低減化を図るこ
とができる優れた効果がある。
[Effect of the Invention] The concrete form supporting member of the present invention is
Since it is configured as described above, it is possible to stably hold it on the fixed base with auxiliary columns attached to the main columns without using other connecting joint members when constructing concrete for dams and partition weirs. Moreover, by changing the connection angle between the main support column and the auxiliary support column according to the change of the slope surface, it can be used by sequentially sliding it upwards, which simplifies the work of assembling the concrete formwork and reduces the total cost. There is an excellent effect that can significantly reduce

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係る支持部材の第一の使用態様を示す
側面図。
FIG. 1 is a side view showing a first usage mode of a support member according to the present invention.

【図2】上記支持部材の第二の使用態様を示す側面図。FIG. 2 is a side view showing a second usage mode of the support member.

【図3】上記支持部材の第三の使用態様を示す断面図。FIG. 3 is a cross-sectional view showing a third usage mode of the support member.

【図4】本考案の支持部材におけるロック手段の一例を
示す拡大側面図。
FIG. 4 is an enlarged side view showing an example of locking means in the support member of the present invention.

【図5】上記ロック手段の他の実施例を示す拡大断面
図。
FIG. 5 is an enlarged sectional view showing another embodiment of the locking means.

【図6】上記ロック手段の更に他の実施例を示す断面
図。
FIG. 6 is a sectional view showing still another embodiment of the locking means.

【図7】施工されるダムの一例を示す正面図。FIG. 7 is a front view showing an example of a dam to be constructed.

【図8】上記ダムの縦断面図である。FIG. 8 is a vertical sectional view of the dam.

【符号の説明】[Explanation of symbols]

(1)主支柱 (2)補助支柱 (3)ボルト挿入用開口部 (4)横軸 (5)ボルト挿入用開口部 (7)ロック手段 (1) Main column (2) Auxiliary column (3) Bolt insertion opening (4) Horizontal axis (5) Bolt insertion opening (7) Locking means

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 コンクリート施工面に向かって貫通する
ボルト挿入用開口部(3)…を備えた長尺の主支柱
(1)と、該主支柱(1)の下端部でコンクリート施工
面に平行な横軸(4)を介して回動可能に連結され且つ
主支柱(1)のボルト挿入用開口部(3)と同様なボル
ト挿入用開口部(5)を備えた比較的短尺の補助支柱
(2)と、該補助支柱(2)と前記主支柱(1)とを回
動自在に連結するコンクリート施行面に平行な横軸
(4)と、これら両支柱(1),(2)を直角状から直
線状までの任意の角度に固定するロック手段(7)とか
ら成るコンクリート型枠支持部材。
1. A long main strut (1) having a bolt insertion opening (3) penetrating toward a concrete construction surface, and a lower end of the main strut (1) parallel to the concrete construction surface. Auxiliary post having a bolt insertion opening (5) similar to the bolt insertion opening (3) of the main strut (1), which is rotatably connected via a horizontal axis (4). and (2), the auxiliary strut (2) and the main strut (1) and the times
A horizontal axis parallel to the concrete execution surface that is movably connected
(4) and both of these columns (1), (2) straight from the right angle
A concrete formwork support member comprising a locking means (7) for fixing at an arbitrary angle up to a linear shape .
JP1992052503U 1992-07-01 1992-07-01 Concrete formwork support member Expired - Lifetime JP2517230Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992052503U JP2517230Y2 (en) 1992-07-01 1992-07-01 Concrete formwork support member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992052503U JP2517230Y2 (en) 1992-07-01 1992-07-01 Concrete formwork support member

Publications (2)

Publication Number Publication Date
JPH0624015U JPH0624015U (en) 1994-03-29
JP2517230Y2 true JP2517230Y2 (en) 1996-11-20

Family

ID=12916535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992052503U Expired - Lifetime JP2517230Y2 (en) 1992-07-01 1992-07-01 Concrete formwork support member

Country Status (1)

Country Link
JP (1) JP2517230Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6138528B2 (en) * 2013-03-14 2017-05-31 日鐵住金建材株式会社 Connection structure and connection method of steel sheet piles used for the outer wall of the levee body
CN111926712B (en) * 2020-08-12 2021-09-17 中交武汉港湾工程设计研究院有限公司 Intelligent construction method for main tower with large inclination angle

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5797053U (en) * 1980-12-05 1982-06-15

Also Published As

Publication number Publication date
JPH0624015U (en) 1994-03-29

Similar Documents

Publication Publication Date Title
US4202149A (en) Construction device
JPS607108B2 (en) Curtain wall renovation method
JP2517230Y2 (en) Concrete formwork support member
JPH09324433A (en) Reinforcing work method for existing earth retaining slope regarding cut face slope or the like
PT88987B (en) LANDING COATING SYSTEM
JP3384820B2 (en) Prefabricated bridge pier
CN114382170B (en) Construction method of upper prefabricated vertical component
EP0107460A2 (en) Method of constructing concrete structure
EP0058851B1 (en) Building structure of prefabricated elements
JPH07122253B2 (en) Concrete formwork support member
JP3707017B2 (en) Construction method of wall and its formwork
JP2607882B2 (en) Wall structure of embankment structure
JP2901834B2 (en) Formwork for legal block
JP3304316B2 (en) Upper muscle spacer
JPH0235951Y2 (en)
JP3612356B2 (en) Installation structure of concrete formwork
JPS5932685Y2 (en) Support for foundation reinforcement assembly
KR100296353B1 (en) Formwork for concrete beams
JP3459184B2 (en) Formwork support
JPS594093Y2 (en) Rebar separator
KR200143184Y1 (en) Support for wall forms
JPH0352813Y2 (en)
JP2560598B2 (en) RC reverse construction method
JPH0674590B2 (en) Block for building legal framework and method for building legal framework
JPS6355581B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term