JP2505541Y2 - String threading device for binding unit of grain culm - Google Patents

String threading device for binding unit of grain culm

Info

Publication number
JP2505541Y2
JP2505541Y2 JP1993043295U JP4329593U JP2505541Y2 JP 2505541 Y2 JP2505541 Y2 JP 2505541Y2 JP 1993043295 U JP1993043295 U JP 1993043295U JP 4329593 U JP4329593 U JP 4329593U JP 2505541 Y2 JP2505541 Y2 JP 2505541Y2
Authority
JP
Japan
Prior art keywords
string
binding
rod
cord
flexible rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1993043295U
Other languages
Japanese (ja)
Other versions
JPH0623419U (en
Inventor
中山  実
Original Assignee
セイレイ工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by セイレイ工業株式会社 filed Critical セイレイ工業株式会社
Priority to JP1993043295U priority Critical patent/JP2505541Y2/en
Publication of JPH0623419U publication Critical patent/JPH0623419U/en
Application granted granted Critical
Publication of JP2505541Y2 publication Critical patent/JP2505541Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案の目的は、バインダー等の
穀稈結束部における、紐ブレーキ装置への紐通しを容易
にする為の技術である。
BACKGROUND OF THE INVENTION The object of the present invention is to provide a technique for facilitating threading through a string braking device at a grain culm bundling portion such as a binder.

【0002】[0002]

【従来技術】バインダー等の紐通しにおいては、結束紐
が紐ブレーキ装置やたるみ取り杆や紐ガイド杆等を通過
させ、最終的には結束部のニードルの紐孔を通す必要が
あり、その手順が複雑であり、該作業をバインダーの搬
送ガイド板の下方の狭い位置でする必要があることか
ら、オペレーターに面倒がられる作業となっていたので
ある。該紐通し作業を簡略化する従来技術としては、特
開昭61−104913号公報や、実開昭54−732
25号公報や、特開昭61−60413号公報に記載の
如き技術があったのである。
2. Description of the Related Art When stringing a binder or the like, it is necessary to pass a string cord through a string brake device, a slack removing rod, a string guide rod, etc., and finally through a string hole of a needle of a binding part. However, since the work is complicated and it is necessary to perform the work in a narrow position below the binder conveyance guide plate, the work is troublesome for the operator. As a conventional technique for simplifying the stringing work, there are JP-A-61-104913 and JP-A-54-732.
There are techniques such as those described in Japanese Patent Laid-Open No. 25 and Japanese Patent Laid-Open No. 61-60413.

【0003】しかし、特開昭61−104913号公報
に記載の技術においては、板バネにより構成した紐通し
可撓杆に、結束紐を係合する前の段階において、紐ケー
スと板バネとの係止部との間に、紐ブレーキ装置が配置
されており、この部分はオペレーターが手動により紐通
しをする必要があったのである。また、該特開昭61−
60413号公報においては、結束紐を圧縮気体により
搬送するものであり、紐搬送の確実性が低かったのであ
る。
However, in the technique disclosed in Japanese Patent Laid-Open No. Sho 61-104913, the cord case and the leaf spring are connected to each other before the binding cord is engaged with the string-passing flexible rod constituted by the leaf spring. A string brake device was arranged between the locking part and this part, and the operator had to manually thread the part. Further, the above-mentioned JP-A-61-1
In Japanese Patent No. 60413, the binding cord is conveyed by compressed gas, and the reliability of the cord conveyance is low.

【0004】[0004]

【考案が解決しようとする課題】本考案は以上の従来技
術の不具合を解消するものであり、従来はオペレーター
が手動にて行っていた、紐ブレーキ装置を通過する紐通
しを、紐通し可撓杆の通過に連動して自動的に行い、オ
ペレーターは紐通しハンドル3の操作のみで、紐ブレー
キ装置を通過する操作も自動的に行わせたものである。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems of the prior art. In the prior art, the string passing through the string brake device, which was manually performed by the operator, is flexible. The operation is automatically performed in conjunction with the passage of the rod, and the operator only operates the string passing handle 3 to automatically perform the operation of passing the string brake device.

【0005】[0005]

【課題を解決するための手段】本考案の目的は以上の如
くであり、次に該目的を達成する為の構成を説明する。
紐ケース32と、先端に紐係止突起5を設けた紐通し可
撓杆4の繰り出し機構24と、紐係止突起5に結束紐M
を係止した状態で紐通し可撓杆4が通過するガイドパイ
プ1とを順に配置した穀稈結束部における紐通し装置に
おいて、繰り出し機構24とガイドパイプ1との間に、
紐ブレーキ装置10とたるみ取り杆7を介装し、該紐ブ
レーキ装置10とたるみ取り杆7を、紐係止突起5に結
束紐Mを係止した状態で、結束紐Mと紐通し可撓杆4が
同時に通過するものである。
The object of the present invention is as described above. Next, the structure for achieving the object will be described.
A string case 32, a feeding mechanism 24 of the string-placing flexible rod 4 provided with a string locking projection 5 at the tip, and a binding string M for the string locking projection 5.
In the string threading device in the grain culm bundling section in which the guide pipe 1 through which the stringing flexible rod 4 passes in the state of being locked, is arranged between the feeding mechanism 24 and the guide pipe 1.
The cord brake device 10 and the slack removal rod 7 are interposed, and
Connect the rake device 10 and the slack removal rod 7 to the string locking protrusion 5.
With the tie string M locked, the tie string M and the stringable flexible rod 4
It passes at the same time .

【0006】[0006]

【実施例】本考案の目的・構成は以上の如くであり、次
に添付の図面に示した実施例の構成と作用を説明する。
図1は紐通し装置を付設したバインダーの平面図、図2
は紐通し装置の紐セット状態における平面図、図3は紐
通し終了状態の平面図、図4は結束装置部における紐の
状態を示す平面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The purpose and construction of the present invention are as described above. Next, the construction and operation of the embodiment shown in the accompanying drawings will be described.
1 is a plan view of a binder provided with a string threading device, FIG.
FIG. 4 is a plan view of the stringing device in a string set state, FIG. 3 is a plan view of a stringing completed state, and FIG.

【0007】図1において全体構成から説明する。バイ
ンダーは前端に引起し装置Bを配置し、該引起し装置B
の後部に搬送ガイド板Cを立設し、刈り取られた穀稈を
側方へ搬送ガイドしている。該引起し装置Bと搬送ガイ
ド板Cの間の下方に、結束装置が配置され、ニードル1
8の結束クラッチドア28が搬送通路の近辺に配置され
ているのである。紐ケース32はエンジンEと搬送ガイ
ド板Cとの間のミッション装置の上方に配置され、結束
紐筒Aが該紐ケース32の上に載置されている。該結束
紐筒Aより結束紐Mの端部を取出し、ニードル18の紐
孔まで紐通しするのである。
The overall configuration will be described with reference to FIG. The binder has a raising device B arranged at the front end thereof.
A conveyance guide plate C is provided upright on the rear part of the rear side to guide the cut grain culms to the side. A binding device is arranged below the raising device B and the conveyance guide plate C, and the needle 1
The bundling clutch door 28 of No. 8 is arranged near the transport passage. The cord case 32 is arranged above the mission device between the engine E and the transport guide plate C, and the binding cord cylinder A is placed on the cord case 32. The end portion of the binding cord M is taken out from the binding cord cylinder A and threaded through the cord hole of the needle 18.

【0008】本考案の紐通し装置は操作ハンドル13の
右側の枠の上に固設されている。該操作ハンドル13の
右側の部分に沿って、収納パイプ2を配置し、該収納パ
イプ2内に紐通し可撓杆4の後部を収納しているのであ
る。29は結束装置の放出杆である。
The stringing device of the present invention is fixed on the right frame of the operating handle 13. The storage pipe 2 is arranged along the right side portion of the operation handle 13, and the rear portion of the flexible rod 4 through which the string is threaded is stored in the storage pipe 2. 29 is a discharge rod of the binding device.

【0009】次に図2・図3・図4の図面に基づいて、
本考案の要部の構成を説明する。操作ハンドル13の上
に支持板14を固設している。該支持板14の下面に繰
り出し機構24を配置している。該繰り出し機構24を
操作するレバー連結部3aが、操作ハンドル13と直角
方向に突出されている。そして該レバー連結部3aの端
部に紐通しハンドル3が固設されている。該紐通しハン
ドル3を操作ハンドル13と直角方向に引っ張ることに
より、リコイル軸15が回転し可撓杆繰り出し輪体6が
駆動されるのである。またオペレーターが紐通しハンド
ル3を離すと繰り出し機構24内のリコイルバネの巻き
戻し力により、レバー連結部3aと紐通しハンドル3は
巻き戻されるのである。紐通しハンドル3を押し引き操
作すると、可撓杆繰り出し輪体6の回転により、紐通し
可撓杆4を繰り出すのである。可撓杆繰り出し輪体6の
円周上に近接して、ガイドローラー8を配置しており、
該可撓杆繰り出し輪体6とガイドローラー8の両者によ
り紐通し可撓杆4を係合して、繰り出すものである。
Next, based on the drawings of FIGS. 2, 3 and 4,
The structure of the main part of the present invention will be described. A support plate 14 is fixed on the operation handle 13. A feeding mechanism 24 is arranged on the lower surface of the support plate 14. A lever connecting portion 3a for operating the feeding mechanism 24 is projected in a direction perpendicular to the operation handle 13. A string threading handle 3 is fixed to the end of the lever connecting portion 3a. By pulling the stringing handle 3 in the direction perpendicular to the operation handle 13, the recoil shaft 15 is rotated and the flexible rod feeding wheel body 6 is driven. When the operator releases the stringing handle 3, the lever connecting portion 3a and the stringing handle 3 are unwound by the unwinding force of the recoil spring in the feeding mechanism 24. When the string-placing handle 3 is pushed and pulled, the string-placing flexible rod 4 is unwound by the rotation of the flexible rod unwind wheel 6. A guide roller 8 is arranged close to the circumference of the flexible rod feeding wheel body 6,
The flexible rod 4 is engaged with the stringable flexible rod 4 by both the ring 6 and the guide roller 8.

【0010】本実施例においては、紐通し可撓杆4はワ
イヤーの外周にスクリュウ突起を巻き付けた構成として
おり、該スクリュウ突起に同じくギア状に構成した可撓
杆繰り出し輪体6の歯部が噛合して、繰り出すべく構成
しているのである。該紐通し可撓杆4はこの可撓杆繰り
出し輪体6の回転により、収納パイプ2からガイドパイ
プ1の方向へ結束紐Mを引っ掛けて繰り出される作用を
し、かつ曲がりくねって配置されたガイドパイプ1の内
部を撓みながら通過する為に、可撓性を具備している必
要があるのである。故に該紐通し可撓杆4は結束紐Mの
抵抗に負けない剛性と、ガイドパイプ1の曲がりに沿っ
て撓む性質のある杆であれば良いものである。本実施例
はワイヤーの外周にスクリュウ突起を付設したが、合成
樹脂の杆を摩擦により繰り出したり、また歯部を設けて
ラック状に構成したものであっても良いものである。ま
た可撓杆繰り出し輪体6も合成樹脂性のギアまたは摩擦
体であっても良いものである。
In the present embodiment, the stringing flexible rod 4 has a structure in which a screw projection is wound around the outer circumference of the wire, and the tooth portion of the flexible rod feeding wheel body 6 which is also formed in a gear shape on the screw projection. It is configured to mesh and feed. The stringing flexible rod 4 has a function of being pulled out by hooking the binding cord M from the storage pipe 2 toward the guide pipe 1 by the rotation of the flexible rod feeding ring 6, and is also arranged in a meandering manner. It is necessary to have flexibility in order to pass through the inside of 1 while bending. Therefore, the stringable flexible rod 4 may be any rod as long as it has a rigidity that is not defeated by the resistance of the binding cord M, and has a property of bending along the bending of the guide pipe 1. In this embodiment, a screw projection is attached to the outer circumference of the wire, but a synthetic resin rod may be fed out by friction, or a toothed portion may be provided to form a rack. Further, the flexible rod feeding wheel body 6 may also be a synthetic resin gear or a friction body.

【0011】収納パイプ2は可撓杆繰り出し輪体6との
係合部において前後に分割されており、後部収納パイプ
2bは完全に紐通し可撓杆4を収納する役目をしている
が、前部収納パイプ2aは結束紐Mと紐係止突起5との
セットを行うセット溝2cを切欠溝状に構成しているの
である。該セット溝2cに於ける結束紐Mのセット状態
は図2の如くに構成されているのである。紐通し可撓杆
4の先端に固設された紐係止突起5は、紐通し可撓杆4
が繰り出し機構24により巻き戻された状態で、図2の
如く前部収納パイプ2a内の、セット溝2cよりも後部
に収納されるのである。
The storage pipe 2 is divided into front and rear at an engaging portion with the flexible rod feeding wheel body 6, and the rear storage pipe 2b has a role of completely storing the flexible rod 4 through which the string is passed. The front part storage pipe 2a has a set groove 2c in which the binding string M and the string locking projection 5 are set in a notched groove shape. The set state of the binding string M in the set groove 2c is configured as shown in FIG. The string locking projection 5 fixedly provided at the tip of the string-placing flexible rod 4 is provided with the string-placing flexible rod 4.
In the state of being unwound by the feeding mechanism 24, it is housed in the rear of the set groove 2c in the front housing pipe 2a as shown in FIG.

【0012】支持板14の前端には紐案内板23が配置
されており、該紐案内板23により紐ケース32の結束
紐筒Aより引き出された結束紐Mを案内し、該結束紐M
は紐案内板23のガイド孔23aを通過して、ガイドパ
イプ1に挿入されるのである。該ガイド孔23aは紐を
引っ掛けることのないように、引出し方向へ円弧状のガ
イド面を設けている。
A string guide plate 23 is arranged at the front end of the support plate 14, and the string guide plate 23 guides the binding string M pulled out from the binding string tube A of the string case 32 and the binding string M.
Is passed through the guide hole 23a of the string guide plate 23 and inserted into the guide pipe 1. The guide hole 23a is provided with an arcuate guide surface in the pulling-out direction so that the cord is not hooked.

【0013】結束紐Mはニードル18の紐孔18aを紐
通しされる以前にたるみによる結束ミスをなくす為の紐
ブレーキ装置10とたるみ取り杆7を通過する必要があ
り、この操作も紐通しハンドル3を引っ張ることにより
自動的に出来るように構成している。即ち紐案内板23
のガイド孔23aを出た直前の位置に、紐ブレーキ装置
10とブレーキローラー12が制動バネ19により押圧
状態で配置されており、該紐ブレーキ装置10とブレー
キローラー12により結束紐Mが押圧されることにより
摩擦制動力が作用するのである。20は制動バネ19の
制動力調整ハンドルである。
Before the string 18a of the needle 18 is threaded, the binding string M must pass through the string braking device 10 and the slack removing rod 7 for eliminating a binding error due to slack, and this operation is also a string threading handle. It is configured so that it can be automatically performed by pulling 3. That is, the string guide plate 23
The cord brake device 10 and the brake roller 12 are arranged in a pressed state by the braking spring 19 at a position immediately before exiting the guide hole 23a of the device, and the cord M is pressed by the cord brake device 10 and the brake roller 12. As a result, the friction braking force acts. Reference numeral 20 denotes a braking force adjusting handle of the braking spring 19.

【0014】次にたるみ取り杆7の構成について説明す
る。たるみ取り杆7は、結束紐Mの前後端を係止してお
いて、その中央部をバネ力のあるリング状の杆により引
っ張っておく構成であり、本構成においては、ガイドパ
イプ1を後部ガイドパイプ1bと前部ガイドパイプ1a
とに2分し、該分断部より結束紐Mをたるみ取り杆7の
方向に取り出しているのである。故に該たるみ取り杆7
は、ガイドパイプ1よりも離した位置にリング部分を配
置しておく必要があり、このたるみ取り杆7に紐通し可
撓杆4を通すのは困難なのである。故に紐通しをする場
合には、たるみ取り杆7をガイドパイプ1の同心上に配
置する必要があるのである。
Next, the structure of the slack eliminating rod 7 will be described. The slack removing rod 7 has a structure in which the front and rear ends of the binding cord M are locked, and the central portion thereof is pulled by a ring-shaped rod having a spring force. Guide pipe 1b and front guide pipe 1a
The binding cord M is taken out in the direction of the slack removing rod 7 from the dividing portion. Therefore, the slack removing rod 7
It is necessary to arrange the ring portion at a position separated from the guide pipe 1, and it is difficult to pass the stringing flexible rod 4 through the slack eliminating rod 7. Therefore, when stringing, it is necessary to arrange the slack eliminating rod 7 concentrically with the guide pipe 1.

【0015】また、紐通し可撓杆4とその先端の紐係止
突起5は、該紐ブレーキ装置10とブレーキローラー1
2の間を通過していく必要があるのであるが、制動状態
では通過が不可能であるので、紐通し時には該紐ブレー
キ装置10を解除する装置が設けられているのである。
そして該紐ブレーキ装置10の解除と同時に、たるみ取
り杆7も紐通し時には、ガイドパイプ1の同心位置に回
動する装置が配置されているのである。即ち紐通し配置
レバー9がこの役目をするものである。紐通し配置レバ
ー9はリコイル軸15に枢支したアーム16に固設され
ており、該紐通し配置レバー9を回動することにより、
アーム16が回動し、該アーム16と係合したセットア
ーム17が回動されるのである。セットアーム17はブ
レーキローラー12のブレーキローラー軸22に固設さ
れており、該ブレーキローラー軸22の上端にブレーキ
解除カム21が紐通し配置レバー9の回動により移動し
て、下端を枢支された紐ブレーキ装置10の上端を開く
のである。そして該ブレーキ解除カム21により紐ブレ
ーキ装置10を開いた空間を紐係止突起5と紐通し可撓
杆4が通過可能としているのである。
Further, the string-passing flexible rod 4 and the string-locking projection 5 at the tip of the flexible-rod 4 are connected to the string brake device 10 and the brake roller 1.
It is necessary to pass between the two, but since it is impossible to pass in the braking state, a device for releasing the cord brake device 10 at the time of threading the cord is provided.
At the same time that the cord brake device 10 is released, when the slack removing rod 7 is threaded, a device for rotating the guide pipe 1 to the concentric position is arranged. That is, the string passing lever 9 has this function. The string passing lever 9 is fixed to the arm 16 pivotally supported by the recoil shaft 15. By rotating the string passing lever 9,
The arm 16 rotates, and the set arm 17 engaged with the arm 16 rotates. The set arm 17 is fixed to the brake roller shaft 22 of the brake roller 12, and the brake release cam 21 is moved to the upper end of the brake roller shaft 22 by the rotation of the string passing lever 9, and the lower end is pivotally supported. The upper end of the cord brake device 10 is opened. The brake releasing cam 21 allows the string locking projection 5 and the string-passing flexible rod 4 to pass through the space where the string brake device 10 is opened.

【0016】同時にたるみ取り杆7の基部を構成する巻
きバネ部がブレーキローラー軸22に固設されており、
該たるみ取り杆7は紐通し配置レバー9の回動により、
図3の如くガイドパイプ1と同心位置に回動されるので
ある。該紐通し配置レバー9の回動により、巻きバネに
より支持されたたるみ取り杆7がガイドパイプ1の同心
位置を行き過ぎることの無いように、たるみ取り杆スト
ッパー11が、たるみ取り杆7と反対側のガイドパイプ
1の側面に配置されているのである。該構成により紐通
しをする場合には、まず紐通し配置レバー9を回動して
図3の如く紐通し状態とし、図2のセット溝2cの位置
に結束紐Mをセットした状態で、紐通しハンドル3を引
っ張ることにより、紐通し可撓杆4と紐係止突起5が収
納パイプ2から押し出され、先端に結束紐Mを引っ掛け
て、開いた状態の紐ブレーキ装置10を通過し、同心状
の位置に配置したたるみ取り杆7を通過し、ガイドパイ
プ1内を案内されて、ニードル18の先端と略直角方向
に出て、紐孔18a内を通過した位置でストッパー4a
により紐通し可撓杆4の突出状態が停止するものであ
る。オペレーターは紐孔18aを通過した状態の結束紐
Mを取り出して、図4の状態に引っ掛けてセットするの
である。
At the same time, a winding spring portion which constitutes the base of the slack removing rod 7 is fixed to the brake roller shaft 22.
The slack removing rod 7 is rotated by the string passing lever 9,
As shown in FIG. 3, the guide pipe 1 is rotated to a concentric position. The slack eliminating rod stopper 11 is provided on the opposite side of the slack eliminating rod 7 so that the slack eliminating rod 7 supported by the winding spring does not go over the concentric position of the guide pipe 1 by the rotation of the string passing lever 9. It is arranged on the side surface of the guide pipe 1. In the case of threading with this structure, first, the threading arrangement lever 9 is rotated to bring the threading state as shown in FIG. 3, and the binding thread M is set at the position of the setting groove 2c of FIG. By pulling the through handle 3, the string passing flexible rod 4 and the string locking protrusion 5 are pushed out from the storage pipe 2, the binding string M is hooked at the tip, and the string braking device 10 in the opened state is passed through to concentric. Passing through the slack eliminating rod 7 arranged at a circular position, being guided in the guide pipe 1, exiting in a direction substantially perpendicular to the tip of the needle 18, and passing through the cord hole 18a, the stopper 4a
Thus, the projecting state of the stringable flexible rod 4 is stopped. The operator takes out the binding cord M that has passed through the cord hole 18a, hooks it in the state of FIG. 4, and sets it.

【0017】図4において結束装置部分の平面図を示し
ており、結束紐Mは結節フレーム27の右端に固設され
た位置決め片25に係止して位置を正確に決め、終端は
収納状態の放出杆29の駆動用のクランクアーム部に設
けた係止片26に引っ掛けて止めておくのである。該状
態で結束クラッチドア28を引いてクラッチを入れて、
空の状態で結束作用をさせると、ニードル18により結
束紐Mが、結節フレーム27内の、結節ビル30と結節
ホルダー31部へ結束紐Mを案内し、結節ホルダー31
に保持した状態を作り出すのである。その後に紐切り刃
で切断された結束紐Mの端部は放出杆29の回動により
手繰り寄せられるので、係止片26から外して取り去れ
ば紐通し作業は終了するのである。33はパッカーであ
る。
FIG. 4 shows a plan view of the binding device portion, in which the binding string M is locked to a positioning piece 25 fixedly provided at the right end of the knot frame 27 to accurately determine the position, and the terminal end is in the stored state. It is hooked on the locking piece 26 provided on the crank arm portion for driving the discharge rod 29 and stopped. In this state, pull the binding clutch door 28 to put in the clutch,
When the binding action is performed in the empty state, the binding string M is guided by the needle 18 to the knot building 30 and the knot holder 31 in the knot frame 27, and the knot holder 31
It creates the state of being held at. After that, the end of the binding string M cut by the string cutting blade is pulled by the rotation of the discharging rod 29, so that the string threading operation is completed if it is removed from the locking piece 26 and removed. 33 is a packer.

【0018】図5は繰り出し機構の側面断面図、図6は
支持板14と紐通し配置レバー9の部分の後面図であ
る。該支持板14は操作ハンドル13の上に固設されて
おり、内部に繰り出し機構24が配置されているのであ
る。繰り出し機構24はレバー連結部3aを巻き取るワ
イヤープーリー24aと、その内部に配置して、紐通し
ハンドル3を引くと巻き取られてエネルギーを蓄積し、
紐通しハンドル3を離すと該エネルギーによりレバー連
結部3aをワイヤープーリー24aに巻き取る操作をす
るリコイルバネ24bにより構成されている。ワイヤー
プーリー24aはリコイル軸15と固設されており、リ
コイルバネ24bは外端をワイヤープーリー24aに固
定し、内端は支持板14の一部に固設しているのであ
る。そしてリコイル軸15にアーム16が枢支されてお
り、該アーム16に紐通し配置レバー9が固設されてい
る。該紐通し配置レバー9の操作状態を維持するガイド
溝14aが支持板14の後面に構成されているのであ
る。34は繰り出し装置のカバーである。
FIG. 5 is a side sectional view of the feeding mechanism, and FIG. 6 is a rear view of a portion of the support plate 14 and the string passing lever 9. The support plate 14 is fixed on the operation handle 13, and the feeding mechanism 24 is arranged inside. The feeding mechanism 24 is arranged inside the wire pulley 24a that winds up the lever connecting portion 3a, and is pulled inside when the stringing handle 3 is pulled to accumulate energy,
It is composed of a recoil spring 24b that operates to wind the lever connecting portion 3a around the wire pulley 24a by the energy when the stringing handle 3 is released. The wire pulley 24a is fixed to the recoil shaft 15, the recoil spring 24b has an outer end fixed to the wire pulley 24a, and an inner end fixed to a part of the support plate 14. An arm 16 is pivotally supported on the recoil shaft 15, and a string-placing lever 9 is fixed to the arm 16. A guide groove 14a for maintaining the operation state of the string passing lever 9 is formed on the rear surface of the support plate 14. Reference numeral 34 is a cover of the feeding device.

【0019】図7は紐通しハンドル3を引き出した状態
で維持する装置を示す平面断面図、図8は係止部3bを
係合可能とした係止溝14aを示す側面図、図9は紐通
し可撓杆4の先端がニードル18の紐孔18aを通過し
た状態を示す平面断面図である。本構成は図9の如く、
非結束状態で収納されているニードル18の紐孔18a
に、紐通し可撓杆4の先端がガイドパイプ1にガイドさ
れて、突入し挿通されるのである。そしてその状態で
は、結束紐Mの先端は紐係止突起5に係止された二重折
り状態であるから、そのまま紐通し可撓杆4を後退させ
ると、紐係止突起5との摩擦力により結束紐Mが再度ガ
イドパイプ1の内部へ引き戻される可能性があるのであ
る。故にオペレーターは紐通しハンドル3を一杯に引っ
張って、図9の状態を維持して、紐係止突起5から結束
紐Mを引き外して、結節ホルダー31につかませたりす
る作業をしなければならないのである。
FIG. 7 is a plan sectional view showing a device for maintaining the string-threading handle 3 in a pulled-out state, FIG. 8 is a side view showing a locking groove 14a capable of engaging the locking portion 3b, and FIG. 9 is a string. FIG. 7 is a plan sectional view showing a state in which a tip of a through flexible rod 4 has passed through a cord hole 18 a of a needle 18. This configuration is as shown in FIG.
String hole 18a of the needle 18 stored in the unbound state
In addition, the tip end of the stringable flexible rod 4 is guided by the guide pipe 1 and is inserted and inserted. In this state, the tip of the binding string M is in a double-folded state in which it is locked by the string locking projection 5, so if the string-passing flexible rod 4 is retracted as it is, the frictional force with the string locking projection 5 is increased. Therefore, the binding string M may be pulled back into the guide pipe 1 again. Therefore, the operator has to pull the string-threading handle 3 as much as possible to maintain the state of FIG. is there.

【0020】本構成においては、レバー連結部3aが通
過するガイド筒14bの一部に係止溝14aを設け、ま
たレバー連結部3aの最終ストローク位置に係止部3b
を設け、該係止部3bを引き出した状態で、係止溝14
aに係止可能としたものである。ガイド筒14bはレバ
ー連結部3aが繰り出し機構24にいっぱいまで巻きこ
まれた場合には、該紐通しハンドル3が接当して、それ
以上の繰り出し機構24の巻き込みを阻止する役目もし
ているのである。
In this structure, the engaging groove 14a is provided in a part of the guide tube 14b through which the lever connecting portion 3a passes, and the engaging portion 3b is provided at the final stroke position of the lever connecting portion 3a.
Is provided, and with the locking portion 3b pulled out, the locking groove 14
It can be locked to a. When the lever connecting portion 3a is fully wound into the feeding mechanism 24, the guide tube 14b also comes into contact with the stringing handle 3 to prevent the winding of the feeding mechanism 24 further. .

【0021】以上のような構成において、紐通し操作の
工程を説明する。まず紐通し配置レバー9を機体外側方
へ引き、紐セット溝2cへ結束紐Mをセットする。次に
紐通しハンドル3を一杯に引き、紐通し可撓杆4がパイ
プ1とニードル18の紐孔18aを抜けた時点で、レバ
ー連結部3aを係止溝14aで係止する。次に紐孔18
aを通過した結束紐Mの先端を掴み、紐を結節カバーの
位置決め片25に止め、先端を放出杆29のクランク部
に設けた係止片26に止める。次に紐通しハンドル3を
元に戻し、紐通し配置レバー9を機体内方に戻し、ドア
28を引いてクラッチを入れ、ニードル18を回転させ
て結束紐Mを紐ホルダー31に掴ませるのである。
The steps of the stringing operation in the above structure will be described. First, pull the string passing lever 9 to the outside of the machine to set the binding string M in the string setting groove 2c. Next, the stringing handle 3 is pulled fully, and when the flexible stringing rod 4 has passed through the string hole 18a of the pipe 1 and the needle 18, the lever connecting portion 3a is locked by the locking groove 14a. Next, the string hole 18
The tip of the binding string M that has passed through a is grasped, the string is fixed to the positioning piece 25 of the knot cover, and the tip is fixed to the locking piece 26 provided on the crank portion of the discharge rod 29. Next, the stringing handle 3 is returned to its original position, the stringing arrangement lever 9 is returned to the inside of the machine body, the door 28 is pulled to engage the clutch, and the needle 18 is rotated to grip the binding string M on the string holder 31. .

【0022】[0022]

【考案の効果】本考案は以上の如く構成したので、次の
ような効果を奏するものである。第1に、従来の如く、
紐ケースと、自動紐通し装置との間に、紐ブレーキ装置
とたるみ取り杆が配置されていた場合には、紐ブレーキ
装置とたるみ取り杆を通過する紐通しは、撓み易い結束
紐Mを持って手動で行う必要があったので、面倒な操作
となっていたのである。本考案においては、紐係止突起
5が結束紐Mを係止した状態で通過する経路に、紐ブレ
ーキ装置10とたるみ取り杆7を設け、該紐ブレーキ装
置10は、紐係止突起5に結束紐Mが係止状態で、結束
紐Mと紐通し可撓杆4を同時に、通過させることが出来
るので、オペレーターが別に結束紐Mだけを持って、撓
み易い状態の結束紐Mを、紐ブレーキ装置10とたるみ
取り杆7に通す操作をする必要が無くなったのである。
Since the present invention is constructed as described above, it has the following effects. First, as in the past,
When the cord brake device and the slack removal rod are arranged between the cord case and the automatic cord threading device, the cord string passing through the cord brake device and the slackness removal rod has the binding cord M which is easy to bend. Since it had to be done manually, it was a troublesome operation. In the present invention, a cord brake device 10 and a slack removing rod 7 are provided in a path through which the cord locking protrusion 5 passes the cord M in a locked state. When the binding cord M is in the locked state, the binding cord M and the string-passing flexible rod 4 can be passed at the same time, so that the operator separately holds only the binding cord M, and the binding cord M in a flexible state is It is no longer necessary to operate the brake device 10 and the slack removal rod 7.

【0023】第2に、紐係止突起5が紐をニードル18
に通す作業を終了し、紐通し可撓杆4がたるみ取り杆7
と紐ブレーキ装置10を通過して、最初の位置に戻る
と、たるみ取り杆7と、紐ブレーキ装置10は、たるみ
取りと制動作用を行なうので、結束作業時においては、
結束紐Mはたるみの無い状態で、確実な結束作業を行う
ことが出来るのである。
Secondly, the string locking protrusion 5 pulls the string 18
After the work of passing through the cable is finished, the flexible rod 4 through which the string is slackened is removed.
Passes through the string brake device 10 and returns to the initial position
The slack removal rod 7 and the string brake device 10
Since it takes up and brakes, when binding,
The binding string M does not have any slack and performs a reliable binding operation.
You can do it.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の紐通し装置を付設したバインダーの平
面図。
FIG. 1 is a plan view of a binder provided with a string threading device of the present invention.

【図2】本考案の要部である紐通し装置の紐セット状態
における平面図。
FIG. 2 is a plan view of a string threading device, which is a main part of the present invention, in a string set state.

【図3】紐通し終了状態の平面図。FIG. 3 is a plan view showing a state where the stringing is completed.

【図4】結束装置部における紐の状態を示す平面図。FIG. 4 is a plan view showing a state of a cord in the binding device section.

【図5】繰り出し機構の側面断面図。FIG. 5 is a side sectional view of the feeding mechanism.

【図6】支持板14と紐通し配置レバー9の部分の後面
図。
FIG. 6 is a rear view of a portion of a support plate 14 and a string passing lever 9.

【図7】本考案の要部である紐通しハンドル3を引き出
した状態で維持する装置を示す平面断面図。
FIG. 7 is a plan sectional view showing an apparatus for maintaining the stringing handle 3 which is the main part of the present invention in a pulled-out state.

【図8】係止部3bを係合可能とした係止溝14aを示
す側面図。
FIG. 8 is a side view showing a locking groove 14a with which a locking portion 3b can be engaged.

【図9】紐通し可撓杆4の先端がニードル18の紐孔1
8aを通過した状態を示す平面断面図。
9 is a string hole 1 of the needle 18 at the tip of the flexible rod 4
8a is a cross-sectional plan view showing a state of passing through 8a. FIG.

【符号の説明】[Explanation of symbols]

A 結束紐筒 M 結束紐 1 ガイドパイプ 2 収納パイプ 3 紐通しハンドル 3a レバー連結部 3b 係止部 4 紐通し可撓杆 4a ストッパー 5 紐係止突起 6 可撓杆繰り出し輪体 7 たるみ取り杆 8 ガイドローラー 9 紐通し配置レバー 14 支持板 14a 係止溝 14b ガイド筒 24 繰り出し機構 A Bundling cord cylinder M Bundling cord 1 Guide pipe 2 Storage pipe 3 String passing handle 3a Lever connecting part 3b Locking part 4 String passing flexible rod 4a Stopper 5 String locking projection 6 Flexible rod feeding ring 7 Folding rod 8 Guide roller 9 String passing lever 14 Support plate 14a Locking groove 14b Guide tube 24 Feeding mechanism

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 紐ケース32と、先端に紐係止突起5を
設けた紐通し可撓杆4の繰り出し機構24と、紐係止突
起5に結束紐Mを係止した状態で紐通し可撓杆4が通過
するガイドパイプ1とを順に配置した穀稈結束部におけ
る紐通し装置において、繰り出し機構24とガイドパイ
プ1との間に、紐ブレーキ装置10とたるみ取り杆7を
介装し、該紐ブレーキ装置10とたるみ取り杆7を、紐
係止突起5に結束紐Mを係止した状態で、結束紐Mと紐
通し可撓杆4が同時に通過することを特徴とする穀稈結
束部における紐通し装置。
1. A cord case 32, a string-pulling-out mechanism 24 for a string-placing flexible rod 4 provided with a string-locking projection 5 at its tip, and a string-placing member 5 which can be threaded with the binding string M locked therein. In the string threading device in the grain culm bundling part in which the guide pipe 1 through which the flexible rod 4 passes is sequentially arranged, the string brake device 10 and the slack removing rod 7 are provided between the feeding mechanism 24 and the guide pipe 1.
The cord brake device 10 and the slack removing rod 7 are
With the binding string M locked to the locking projection 5, the binding string M and the string
A string threading device in a grain culm bundling part, wherein the through flexible rod 4 passes at the same time .
JP1993043295U 1993-08-06 1993-08-06 String threading device for binding unit of grain culm Expired - Lifetime JP2505541Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993043295U JP2505541Y2 (en) 1993-08-06 1993-08-06 String threading device for binding unit of grain culm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993043295U JP2505541Y2 (en) 1993-08-06 1993-08-06 String threading device for binding unit of grain culm

Publications (2)

Publication Number Publication Date
JPH0623419U JPH0623419U (en) 1994-03-29
JP2505541Y2 true JP2505541Y2 (en) 1996-07-31

Family

ID=12659802

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993043295U Expired - Lifetime JP2505541Y2 (en) 1993-08-06 1993-08-06 String threading device for binding unit of grain culm

Country Status (1)

Country Link
JP (1) JP2505541Y2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6235311Y2 (en) * 1977-10-31 1987-09-08
JPS5521527A (en) * 1978-08-01 1980-02-15 Toshiba Corp Corrosion resistant magnetic alloy
JPS5632206A (en) * 1979-08-17 1981-04-01 Kubota Ltd Feeder for string of bundling machine
JPS57193680A (en) * 1981-05-23 1982-11-29 Delta Kogyo Co Cable drive type wind regulator
JPS5849130A (en) * 1981-09-17 1983-03-23 松下電器産業株式会社 Floor nozzle of electric cleaner
JPS61104913A (en) * 1984-10-25 1986-05-23 株式会社クボタ Cord passing device for bundling device

Also Published As

Publication number Publication date
JPH0623419U (en) 1994-03-29

Similar Documents

Publication Publication Date Title
GB2137582A (en) An automatic bundle-tying tool
JPS61104913A (en) Cord passing device for bundling device
JP2505541Y2 (en) String threading device for binding unit of grain culm
JPH0636659Y2 (en) String threading device in grain culm bundling machine
JP2505540Y2 (en) String threading device for binding unit of grain culm
JPH0649153Y2 (en) String threading device for binding unit of grain culm
JPH0438673Y2 (en)
JPH07112386B2 (en) String threading device for binding unit of grain culm
JPH0437396Y2 (en)
JP2750851B2 (en) Automatic threading device
JPH0437399Y2 (en)
JP2750852B2 (en) Automatic threading device
JPH0649152Y2 (en) String threading device for binding unit of grain culm
JPH07112387B2 (en) String threading device for binding unit of grain culm
JPH0437397Y2 (en)
JPH07114598B2 (en) Automatic stringing device
JPH0437398Y2 (en)
JP2505541Z (en)
JPH0824470B2 (en) String threading device for binding unit of grain culm
JPH0437400Y2 (en)
JPH0440437Y2 (en)
JPS63223A (en) String brake apparatus in straw bundling part
JPS63146716A (en) String passing apparatus in bundler
JPH0822181B2 (en) Strapping device for binding machine
JPH0628988Y2 (en) String threading device for binding unit of grain culm

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080328

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20090328

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100328

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100328

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees