JP2023181242A - Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method - Google Patents

Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method Download PDF

Info

Publication number
JP2023181242A
JP2023181242A JP2023178688A JP2023178688A JP2023181242A JP 2023181242 A JP2023181242 A JP 2023181242A JP 2023178688 A JP2023178688 A JP 2023178688A JP 2023178688 A JP2023178688 A JP 2023178688A JP 2023181242 A JP2023181242 A JP 2023181242A
Authority
JP
Japan
Prior art keywords
reinforcing bar
bar insertion
precast member
insertion hole
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2023178688A
Other languages
Japanese (ja)
Inventor
博幸 竹内
Hiroyuki Takeuchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2023178688A priority Critical patent/JP2023181242A/en
Publication of JP2023181242A publication Critical patent/JP2023181242A/en
Pending legal-status Critical Current

Links

Images

Abstract

To provide: a method for forming a steel bar insertion hole of a precast member which makes the boundary of the steel bar insertion hole into a finish sufficient for expecting adhesion force to a steel bar without using a spiral type sheath tube and can realize cost reduction; a precast member joining method of inserting a steel bar into the steel bar insertion hole so as to be securely fixed; and a precast member.SOLUTION: Provided is a method for forming a steel bar insertion hole of a precast member in which a single tube 32 is inserted inside a synthetic resin flexible conduit tube 31 in which many irregularities in the tubular circumferential direction are repeatedly formed in the tubular longitudinal direction, to produce a flask material 30 for a steel bar insertion hole, the single tube is removed from a precast member which is produced by installing concrete in a flask for a precast member arranged with the flask material for a steel bar insertion hole and the synthetic resin flexible conduit tube is then removed to eliminate the flask material for a steel bar insertion hole, so that a steel bar insertion hole in which irregularities corresponding to the irregularities of the synthetic resin flexible conduit tube are formed on its inner circumferential face is formed at the precast member.SELECTED DRAWING: Figure 1

Description

本発明は、プレキャスト部材に鉄筋挿入孔を形成する方法、その鉄筋挿入孔に鉄筋を挿入し定着させるプレキャスト部材の接合方法およびプレキャスト部材に関する。 The present invention relates to a method for forming reinforcing bar insertion holes in a precast member, a method for joining precast members in which reinforcing bars are inserted and fixed in the reinforcing bar insertion holes, and a precast member.

RC造建物の柱、梁をプレキャスト(PCa)部材とした場合、その接合部(柱梁)における梁主筋は、通し配筋となるかまたは接合部内で機械式継ぎ手となる場合が多い。一方、柱梁接合部もPCa化する構工法が幾つか提案されているが、柱梁接合部を含むすべての部材がPCa化された構工法として実用化されているのは、LRV工法あるいはスクライム工法の2工法である。これらの工法の詳細を見ると、前者については、接合部から両方向に半スパン分延びるPCa梁の梁主筋は、接合される梁PCaに組み込まれた機械式継ぎ手にグラウト接合される。PCa梁部分接合後に、柱梁接合部の柱主筋貫通孔を柱PCa下端の柱主筋(長さ≧接合部高さ+定着長さ)が貫通し、かつ1層下の柱PCa(機械式継ぎ手)にグラウト定着する機構が基本となっている。後者については、柱PCaは、上部が柱梁接合部と一体となった形状で、梁PCaの梁主筋は、(柱せい+定着長さ)以上の長さを有し、片側から柱梁接合部を貫通し、逆側の梁PCaの雌孔(機械式継ぎ手)にグラウト定着する機構が基本となっている。これらの構工法は、いずれもこれまで常識的に捉えられていた鉄筋の接合方法を、一方は部材全体を貫通し、なおかつ逆側の部材に定着させると言う、発想の転換を図り、他方は、部材中央で両方からの定着で、部材内で一体化を図ると言う、常識外れの継ぎ手方法となっている。 When the columns and beams of an RC building are made of precast (PCa) members, the main beam reinforcement at the joints (columns and beams) is often through reinforcement or mechanical joints within the joints. On the other hand, several construction methods have been proposed in which the column-beam joints are also made of PCa, but the only construction methods that have been put into practical use in which all members including the column-beam joints are made of PCa are the LRV method or the SCREAM construction method. There are two construction methods. Looking at the details of these construction methods, in the former case, the main beam reinforcements of the PCa beams that extend half a span in both directions from the joint are grouted to mechanical joints built into the PCa beams to be joined. After PCa beam parts are joined, the column main reinforcement at the lower end of the column PCa (length ≧ joint height + anchoring length) passes through the column main reinforcement penetration hole of the column-beam joint, and the column PCa one layer below (mechanical joint ) The basic mechanism is that the grout is fixed on the grout. Regarding the latter, the column PCa has a shape in which the upper part is integrated with the column-beam joint, and the beam main reinforcement of the beam PCa has a length of (column length + anchorage length) or more, and the column-beam joint is connected from one side. The basic mechanism is that the grout penetrates through the section and is fixed in the female hole (mechanical joint) of the beam PCa on the opposite side. Both of these construction methods aim to change the idea of joining reinforcing bars, which had been conventionally understood until now, by penetrating the entire member and fixing it to the member on the opposite side. This is an unconventional joint method in which the parts are fixed from both sides at the center of the part to achieve integration within the part.

この部材内を貫通する鉄筋挿入孔の作製方法に着目すると、PCa部材の鉄筋挿入孔の型枠材にスパイラル形シース管を用いる方法と、紙ボイド管と薄肉塩ビ管を用いる方法が公知であるが、前者のスパイラル形のシース管を型枠材として使用する方法は、シース管に螺旋形の節形が刻んであるため、コンクリートとの付着が良く、厚みが薄型でも剛性に富み、コンクリート圧が作動しても挿入孔の形状を保持できるため多く使用されている。 Focusing on methods for making reinforcing bar insertion holes penetrating the interior of the member, there are two known methods: one using a spiral sheathed pipe as the formwork material for the reinforcing bar insertion hole in a PCa member, and the other using a paper void pipe and a thin-walled PVC pipe. However, in the former method of using a spiral sheathed pipe as a formwork material, the sheathed pipe has spiral knots cut into it, so it adheres well to concrete, has high rigidity even if it is thin, and has a high resistance to concrete pressure. It is widely used because the shape of the insertion hole can be maintained even when the insertion hole is activated.

特許文献1は、PCa部材にシース管を用いずに容易に貫通孔内に凹凸を設けるために、単管パイプにビニールホースを被せ、ビニールホースの周囲にゴムひもを螺旋状に巻き付け、PCa部材施工用の治具とし、この治具を型枠内の貫通孔を形成する予定の位置に固定し、コンクリートを打設し、所定の強度を発現後、単管パイプ、ビニールホース、ゴムひもの順に治具を除去し、治具を除去した跡は主筋の貫通孔となり、その内面には螺旋状に延びた凹部が形成された状態となることにより、PCa部材にシース管レスで主筋貫通孔を形成し、かつ、貫通孔の内面に容易に凹凸を設けるようにしたPCa部材の製造方法を開示する(図5)。 Patent Document 1 discloses that in order to easily provide unevenness in the through hole of the PCa member without using a sheath pipe, a vinyl hose is placed over a single pipe, a rubber string is wound spirally around the vinyl hose, and the PCa member is This jig is used as a construction jig, and this jig is fixed in the position where the through hole is planned to be formed in the formwork, concrete is poured, and after achieving the specified strength, the single pipe, vinyl hose, and rubber string are The jigs are removed in order, and the remains of the removed jigs become through-holes for the main reinforcement, and by forming a spirally extending recess on the inner surface, the through-holes for the main reinforcement can be formed in the PCa member without a sheath tube. Disclosed is a method for manufacturing a PCa member in which the inner surface of the through hole is easily provided with unevenness (FIG. 5).

特開2018-135686号公報Japanese Patent Application Publication No. 2018-135686

従来のスパイラル形シース管を用いる方法は、同形のシース管を所定位置に据えるだけであるが、最終的にグラウト材注入孔が管の途中になる場合、注入孔のジョイントが複雑な形状になったり、管径の種類が限定されているため、鉄筋との間隙が相対的に大きくなり、グラウト材が必要以上に多くなる可能性がある。また、結果的に捨て型枠となるため、全貫通孔長分の材料が必要となる。すなわち、スパイラル形のシース管は、捨て型枠であり、その価格と取付け手間を考慮すると決して安価とは言えず、また、挿入する鉄筋の径よりも大きな径のシース管を用いる必要があるため、配筋が交差する箇所では、その配置に制限が生じる可能性が高い。 In the conventional method of using a spiral sheathed pipe, the sheathed pipe of the same shape is simply installed in a predetermined position, but if the grout injection hole is ultimately placed in the middle of the pipe, the joint of the injection hole has a complicated shape. In addition, because the types of pipe diameters are limited, the gap between the pipes and the reinforcing bars becomes relatively large, and there is a possibility that more grout material will be used than necessary. Moreover, since the result is a waste formwork, material for the entire length of the through hole is required. In other words, a spiral sheathed pipe is a disposable formwork, and considering its price and installation time, it cannot be said to be cheap.Also, it is necessary to use a sheathed pipe with a diameter larger than the diameter of the reinforcing bar to be inserted. , there is a high possibility that there will be restrictions on the placement of reinforcing bars at locations where they intersect.

また、紙ボイド管と薄肉塩ビ管を用いる方法は、シース管と同様に、そのままで型枠材として使用でき、剥離剤を塗布するなどすれば、転用も可能となるが、何れにしても、出来形面が打ち放しになるため、鉄筋の付着力が大幅に低減される可能性が大きい。 In addition, in the method of using paper void pipes and thin-walled PVC pipes, they can be used as formwork materials as they are, just like sheathed pipes, and can be repurposed by applying a release agent, but in any case, Since the finished surface is exposed, there is a high possibility that the adhesion force of the reinforcing bars will be significantly reduced.

特許文献1の方法は、シース管を用いない工法の実現のため単管パイプにビニールホースを被せ、ビニールホースの周囲にゴムひもを螺旋状に巻き付けた治具を型枠内に固定するが、ビニールホースの周囲に巻き付けたゴムひもにより螺旋状に延びた溝を形成することから、きちんとした溝形状にならない場合が多く、鉄筋の付着力が低減する可能性が大きい。また、プレキャスト部材からのゴムひも撤去も手間がかかり容易ではない。 In the method of Patent Document 1, in order to realize a construction method that does not use a sheathed pipe, a vinyl hose is placed over a single pipe, and a jig in which a rubber cord is spirally wound around the vinyl hose is fixed in a formwork. Since a spiral groove is formed using a rubber cord wrapped around the vinyl hose, the groove often does not have a proper shape, and there is a high possibility that the adhesion of the reinforcing bars will be reduced. Furthermore, removing the rubber cord from the precast member is time-consuming and not easy.

プレキャスト(PCa)工法によるプレキャスト率を高めるには、主筋の貫通孔がポイントとなることは、LRV工法やスクライム工法の部材構成を見ても明らかである。しかしながら、構造的には貫通孔内の鉄筋付着力を担保する必要があり、界面を形成するグラウト材が貫通孔内の全域に渡り密実に注入されることが必要条件となる。さらに、貫通孔とグラウト材の接触面にも付着力が期待されるが、ボイド材や塩ビ管では、接触面が円滑となるため、界面で破断する可能性が大きく、少なくともシース管ほどの付着力は期待できない。 It is clear from the component configurations of the LRV construction method and the scrim construction method that the main reinforcement hole is the key to increasing the precast rate using the precast (PCa) construction method. However, structurally, it is necessary to ensure the adhesion of the reinforcing bars within the through-hole, and it is a necessary condition that the grout material forming the interface be injected densely over the entire area within the through-hole. Furthermore, adhesion is expected at the contact surface between the through hole and the grout material, but with void material and PVC pipe, the contact surface is smooth, so there is a high possibility of rupture at the interface, and at least as much adhesion as with the sheath pipe. You can't expect it to hold well.

本発明は、上述のような従来技術の問題に鑑み、スパイラル形のシース管を用いずに、鉄筋挿入孔の界面を鉄筋への付着力が期待できる仕上げとし、脱型・転用可能な材料構成とし、低コスト化を実現可能なプレキャスト(PCa)部材の鉄筋挿入孔の形成方法、その鉄筋挿入孔に鉄筋を挿入し確実に定着させるプレキャスト部材の接合方法およびプレキャスト部材を提供することを目的とする。 In view of the problems of the prior art as described above, the present invention provides a material structure that can be removed from molds and used for other purposes by finishing the interface of the reinforcing bar insertion hole with a finish that can be expected to have strong adhesion to the reinforcing bars without using a spiral-shaped sheath pipe. The purpose of the present invention is to provide a method for forming reinforcing bar insertion holes in a precast (PCa) member that can realize cost reduction, a method for joining precast members that inserts reinforcing bars into the reinforcing bar insertion holes, and securely fixes the reinforcing bars, and a precast member. do.

上記目的を達成するためのプレキャスト部材の鉄筋挿入孔の形成方法は、プレキャスト部材に鉄筋挿入孔を形成する方法であって、
管周方向の凹凸が管長手方向に繰り返し多数形成された合成樹脂製可撓電線管の内側に単管を挿入して鉄筋挿入孔用型枠材を作製する工程と、前記鉄筋挿入孔用型枠材をプレキャスト部材用型枠に配置する工程と、前記プレキャスト部材用型枠にコンクリートを打設する工程と、前記コンクリート打設により作製されたプレキャスト部材から前記単管を取り外す工程と、前記プレキャスト部材から前記合成樹脂製可撓電線管を取り外すことで前記鉄筋挿入孔用型枠材を除去する工程と、を含み、
前記鉄筋挿入孔用型枠材の除去により前記合成樹脂製可撓電線管の凹凸に対応した凹凸が内周面に形成された鉄筋挿入孔を前記プレキャスト部材に形成するものである。
A method for forming reinforcing bar insertion holes in a precast member to achieve the above object is a method of forming reinforcing bar insertion holes in a precast member, comprising:
A step of inserting a single tube into the inside of a synthetic resin flexible electrical conduit tube in which a large number of irregularities in the tube circumferential direction are repeatedly formed in the longitudinal direction of the tube to produce a formwork material for reinforcing bar insertion holes, and a mold for the reinforcing bar insertion holes. a step of placing a frame material in a precast member form; a step of pouring concrete into the precast member form; a step of removing the single pipe from the precast member produced by the concrete pouring; and a step of removing the single pipe from the precast member. a step of removing the reinforcing bar insertion hole formwork material by removing the synthetic resin flexible conduit from the member;
By removing the reinforcing bar insertion hole formwork material, a reinforcing bar insertion hole is formed in the precast member, the inner circumferential surface of which has concavities and convexities corresponding to the concavities and convexities of the synthetic resin flexible conduit.

このプレキャスト部材の鉄筋挿入孔の形成方法によれば、管周方向の凹凸が管長手方向に繰り返し多数形成された合成樹脂製可撓電線管の内側に単管を挿入し作製した鉄筋挿入孔用型枠材をプレキャスト部材用型枠に配置し、コンクリート打設後にプレキャスト部材から単管を取り外し合成樹脂製可撓電線管を取り外すことで鉄筋挿入孔用型枠材を脱型した後にプレキャスト部材にできる鉄筋挿入孔には、その内周面において合成樹脂製可撓電線管の凹凸に対応した孔周方向の凹凸が孔長手方向に多数形成される。この鉄筋挿入孔の内周面における多数の凹凸は、比較的硬質な合成樹脂製可撓電線管の凹凸によって形状が明瞭で品質のよい仕上げとなる。そのため、このプレキャスト部材の鉄筋挿入孔に鉄筋が挿入され、充填材が充填されることで、鉄筋挿入孔内に形成された凹凸面により充填材の充分な付着力を得ることができる。このようにして、従来のスパイラル形のシース管を用いずに鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることができる。また、電気工事の分野で多用され比較的廉価な市販品である合成樹脂製可撓電線管を転用し、シース管を使用せずに済むので、材料費がかさまずにコスト的に有利である。 According to this method for forming reinforcing bar insertion holes in precast members, the reinforcing bar insertion holes are made by inserting a single pipe into the inside of a synthetic resin flexible conduit tube in which a large number of irregularities in the pipe circumferential direction are repeatedly formed in the longitudinal direction of the pipe. The formwork material is placed in the formwork for the precast member, and after concrete pouring, the single tube is removed from the precast member and the synthetic resin flexible conduit is removed. The resulting reinforcing bar insertion hole has a large number of concavities and convexities in the longitudinal direction of the hole, which correspond to the concavities and convexities of the synthetic resin flexible conduit, on its inner peripheral surface. The numerous irregularities on the inner circumferential surface of the reinforcing bar insertion hole are caused by the irregularities of the relatively hard synthetic resin flexible conduit tube, resulting in a clear shape and a high-quality finish. Therefore, by inserting a reinforcing bar into the reinforcing bar insertion hole of this precast member and filling it with a filler, sufficient adhesion force of the filler can be obtained due to the uneven surface formed in the reinforcing bar insertion hole. In this way, sufficient fixing force of the reinforcing bars can be obtained within the reinforcing bar insertion hole without using the conventional spiral sheath pipe, and the reinforcing bars and the precast member can be reliably integrated. In addition, synthetic resin flexible conduit tubes, which are often used in the field of electrical work and are relatively inexpensive commercially available products, are repurposed, eliminating the need for sheathed tubes, which is advantageous in terms of cost without increasing material costs. .

上記プレキャスト部材の鉄筋挿入孔の形成方法において、前記合成樹脂製可撓電線管に予め全長に渡って切れ目を入れておき、前記単管を抜いてから前記合成樹脂製可撓電線管を前記切れ目から内側に折り曲げて外せるようにすることで前記プレキャスト部材からの取り外しが容易になる。 In the method for forming a reinforcing bar insertion hole in a precast member, a cut is made in advance over the entire length of the synthetic resin flexible electrical conduit, and after the single tube is pulled out, the synthetic resin flexible electrical conduit is inserted into the synthetic resin flexible electrical conduit at the cut. By bending it inward and removing it, it can be easily removed from the precast member.

また、必要に応じて前記単管の外周に鉄筋カバーを配置してから、前記単管を前記合成樹脂製可撓電線管の内側に挿入することが好ましい。これにより、単管の引き抜きがより容易になる。 Further, it is preferable that a reinforcing bar cover is placed around the outer periphery of the single tube, if necessary, and then the single tube is inserted inside the synthetic resin flexible conduit. This makes it easier to pull out the single tube.

また、前記鉄筋カバーに予め全長に渡って切れ目を入れておき、前記単管を抜いてから前記鉄筋カバーを前記切れ目から内側に折り曲げて外せるようにすることで取り外しが容易になる。 Further, by making a cut in advance over the entire length of the reinforcing bar cover, and removing the single pipe by bending the reinforcing bar cover inward from the cut, it is easy to remove the reinforcing bar cover.

上記目的を達成するためのプレキャスト部材の接合方法は、上述のプレキャスト部材の鉄筋挿入孔の形成方法により第1プレキャスト部材の第1鉄筋挿入孔および第2プレキャスト部材の第2鉄筋挿入孔をそれぞれ形成し、前記第1および第2鉄筋挿入孔に鉄筋を挿入し、次に、充填材を前記第1および第2鉄筋挿入孔内に充填して前記鉄筋を定着させることで前記第1プレキャスト部材と前記第2プレキャスト部材とを接合するものである。 A method for joining precast members to achieve the above object is to form a first reinforcing bar insertion hole in a first precast member and a second reinforcing bar insertion hole in a second precast member by the above-described method for forming reinforcing bar insertion holes in a precast member. Then, reinforcing bars are inserted into the first and second reinforcing bar insertion holes, and then a filler is filled into the first and second reinforcing bar insertion holes to fix the reinforcing bars, thereby forming the first precast member. The second precast member is joined to the second precast member.

このプレキャスト部材の接合方法によれば、上述のプレキャスト部材の鉄筋挿入孔の形成方法により形成した第1および第2鉄筋挿入孔に鉄筋を挿入し、次に、充填材を充填することで、第1,第2プレキャスト部材の第1,第2鉄筋挿入孔内において充填材の充分な付着力を得ることができる。このようにして、従来のスパイラル形のシース管を用いずに鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることで第1プレキャスト部材と第2プレキャスト部材とを確実に接合させることができる。 According to this precast member joining method, reinforcing bars are inserted into the first and second reinforcing bar insertion holes formed by the above-described method for forming reinforcing bar insertion holes in a precast member, and then the first reinforcing bar is filled with a filler material. Sufficient adhesive force of the filler can be obtained in the first and second reinforcing bar insertion holes of the first and second precast members. In this way, sufficient fixing force of the reinforcing bars is obtained within the reinforcing bar insertion hole without using the conventional spiral sheath pipe, and the reinforcing bars and the precast member are reliably integrated. It is possible to reliably join the precast member.

上記目的を達成するためのプレキャスト部材は、上述のプレキャスト部材の鉄筋挿入孔の形成方法により形成された鉄筋挿入孔を有する。 A precast member for achieving the above object has reinforcing bar insertion holes formed by the above-described method for forming reinforcing bar insertion holes in a precast member.

このプレキャスト部材によれば、鉄筋挿入孔には、その内周面において合成樹脂製可撓電線管の凹凸に対応した孔周面の凹凸が孔長手方向に多数形成されている。この鉄筋挿入孔の内周面における多数の凹凸は、硬質な合成樹脂製可撓電線管の凹凸によって形状が明瞭で品質のよい仕上げとなっている。このプレキャスト部材の鉄筋挿入孔に鉄筋が挿入され充填材が充填されると、鉄筋挿入孔内において充填材による充分な付着力を得ることができ、鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることができる。 According to this precast member, the reinforcing bar insertion hole has a large number of irregularities formed in the longitudinal direction of the hole on its inner peripheral surface, corresponding to the irregularities of the synthetic resin flexible electric conduit. The numerous irregularities on the inner circumferential surface of this reinforcing bar insertion hole are caused by the irregularities of the flexible electrical conduit tube made of hard synthetic resin, resulting in a clear shape and a high-quality finish. When reinforcing bars are inserted into the reinforcing bar insertion holes of this precast member and filled with filler material, sufficient adhesion force can be obtained by the filler material within the reinforcing bar insertion holes, and sufficient anchoring force of the reinforcing bars can be obtained within the reinforcing bar insertion holes. As a result, the reinforcing bars and the precast member can be reliably integrated.

本発明のプレキャスト部材の鉄筋挿入孔の形成方法、プレキャスト部材の接合方法およびプレキャスト部材によれば、スパイラル形のシース管を用いずに、鉄筋挿入孔の界面を鉄筋への付着力が期待できる仕上げにすることができるとともに、脱型・転用可能な材料構成にできることから、低コスト化を実現することができ、また、プレキャスト部材の鉄筋挿入孔に鉄筋を挿入し、鉄筋とプレキャスト部材とを確実に一体化でき、プレキャスト部材同士を確実に接合できる。 According to the method for forming a reinforcing bar insertion hole in a precast member, the method for joining a precast member, and the precast member of the present invention, the interface of the reinforcing bar insertion hole is finished so that it can be expected to have strong adhesion to the reinforcing bar without using a spiral sheath pipe. In addition, it is possible to reduce costs by making the material composition removable and reusable.In addition, by inserting reinforcing bars into the reinforcing bar insertion holes of precast members, it is possible to securely connect the reinforcing bars and precast members. The precast members can be reliably joined together.

本実施形態による単管と合成樹脂製可撓電線管とから構成した鉄筋挿入孔形成のための型枠材の作製工程を示す外観図(a)、作製後の型枠材の外観図(b)および型枠材を端部から見た側面図(c)である。(a) An external view showing the manufacturing process of a formwork material for forming reinforcing bar insertion holes made of a single tube and a synthetic resin flexible conduit according to the present embodiment, and an external view (b) of the formwork material after manufacturing. ) and a side view (c) of the formwork material seen from the end. 図1の合成樹脂製可撓電線管の部分側面図(a)および管長手方向に切断してみた断面図(b)である。FIG. 2 is a partial side view (a) and a cross-sectional view (b) taken along the longitudinal direction of the synthetic resin flexible electrical conduit shown in FIG. 1. FIG. 鉄筋カバーを単管に被せて構成した鉄筋挿入孔形成のための型枠材の図1(c)と同様の側面図である。It is a side view similar to FIG.1(c) of the formwork material for forming a reinforcing-bar insertion hole comprised by covering a single pipe with a reinforcing-bar cover. 本実施形態におけるプレキャスト部材である柱梁接合部の要部側断面図である。It is a sectional side view of the main part of the column-beam joint part which is a precast member in this embodiment. 本実施形態におけるプレキャスト部材である梁部材の要部側断面図である。It is a sectional side view of the main part of the beam member which is a precast member in this embodiment. 図4の柱梁接合部および図5の梁部材に形成された鉄筋挿入孔の要部断面図である。6 is a sectional view of a main part of a reinforcing bar insertion hole formed in the column-beam joint of FIG. 4 and the beam member of FIG. 5. FIG. 本実施形態による鉄筋挿入孔の形成工程およびプレキャスト部材同士の接合工程を説明するためのフローチャートである。It is a flowchart for explaining the process of forming reinforcing bar insertion holes and the process of joining precast members together according to the present embodiment. 図4の柱梁接合部の鉄筋挿入孔と図5の梁部材の鉄筋挿入孔とに対し梁主筋を挿入する状況を示す側断面図である。FIG. 6 is a side sectional view showing a situation in which the main beam reinforcement is inserted into the reinforcing bar insertion hole of the column-beam joint of FIG. 4 and the reinforcing bar insertion hole of the beam member of FIG. 5; 本実験例でコンクリート部材に形成した鉄筋挿入孔の外観写真である。This is a photograph of the appearance of a reinforcing bar insertion hole formed in a concrete member in this experimental example.

以下、本発明を実施するための形態について図面を用いて説明する。図1は本実施形態による単管と合成樹脂製可撓電線管とから構成した鉄筋挿入孔形成のための型枠材の作製工程を示す外観図(a)、作製後の型枠材の外観図(b)および型枠材を端部から見た側面図(c)である。図2は、図1の合成樹脂製可撓電線管の部分側面図(a)および管長手方向に切断してみた断面図(b)である。図3は、鉄筋カバーを単管に被せて構成した鉄筋挿入孔形成のための型枠材の図1(c)と同様の側面図である。 EMBODIMENT OF THE INVENTION Hereinafter, the form for implementing this invention is demonstrated using drawings. FIG. 1 is an external view (a) showing the manufacturing process of a formwork material for forming reinforcing bar insertion holes made of a single pipe and a synthetic resin flexible conduit according to the present embodiment, and an appearance of the formwork material after manufacturing. They are figure (b) and a side view (c) which looked at formwork material from an end. FIG. 2 is a partial side view (a) of the synthetic resin flexible electrical conduit shown in FIG. 1, and a cross-sectional view (b) taken along the length of the tube. FIG. 3 is a side view similar to FIG. 1(c) of a formwork material for forming reinforcing bar insertion holes configured by covering a single pipe with a reinforcing bar cover.

図1(a)~(c)のように、合成樹脂製可撓電線管31の内側に塩ビ管や鋼管等からなる単管32を挿入する(図2(b)参照)ことで、鉄筋挿入孔形成のための型枠材30を作製する。なお、単管32として実際に使用する鉄筋と同じ径の鉄筋や棒鋼を用いてもよい。 As shown in FIGS. 1(a) to 1(c), reinforcing steel can be inserted by inserting a single pipe 32 made of PVC pipe, steel pipe, etc. inside the synthetic resin flexible conduit 31 (see FIG. 2(b)). A formwork material 30 for forming holes is produced. Note that a reinforcing bar or steel bar having the same diameter as the reinforcing bar actually used may be used as the single pipe 32.

図2(a)(b)のように、合成樹脂製可撓電線管31は、管周方向に一周形成された凹部31aと、凹部31aと隣接して一体に一周形成された凸部31bと、を有し、凹部31aと凸部31bとが管長手方向に繰り返し多数形成されている。なお、合成樹脂製可撓電線管31は、内部に電線を通すようにしてコンクリートに埋設もしくは露出して使用され、電気工事の分野で多用されているもので、PF管やCD管として市販されており、多数の内径サイズの製品も用意されている。 As shown in FIGS. 2(a) and 2(b), the synthetic resin flexible electrical conduit 31 has a concave portion 31a formed around the pipe circumferentially, and a convex portion 31b integrally formed around the concave portion 31a. , and a large number of concave portions 31a and convex portions 31b are repeatedly formed in the longitudinal direction of the tube. In addition, the synthetic resin flexible electrical conduit 31 is used by being buried in concrete or exposed so as to pass the electric wire inside, and is widely used in the field of electrical work, and is commercially available as PF pipe or CD pipe. The product is available in a number of inner diameter sizes.

また、鉄筋挿入孔形成用型枠材30の長さは、作製されるプレキャスト部材における鉄筋挿入孔の長さに応じて設定される。鉄筋挿入孔形成用型枠材30の径は、合成樹脂製可撓電線管31の外径に対応し、PF管・CD管の既定のサイズ(内径)から鉄筋径に応じて選択される。単管32の外径は、鉄筋挿入孔に挿入される鉄筋の径に応じて選定される。 Moreover, the length of the reinforcing bar insertion hole forming formwork material 30 is set according to the length of the reinforcing bar insertion hole in the precast member to be produced. The diameter of the reinforcing bar insertion hole forming formwork material 30 corresponds to the outer diameter of the synthetic resin flexible electrical conduit 31, and is selected from the predetermined size (inner diameter) of the PF pipe/CD pipe according to the reinforcing bar diameter. The outer diameter of the single pipe 32 is selected depending on the diameter of the reinforcing bar inserted into the reinforcing bar insertion hole.

また、合成樹脂製可撓電線管31の内径と単管32の外径との関係から、必要に応じて図3のように、スチレンボイド等からなる鉄筋カバー33を単管32に被せてから、この単管32を合成樹脂製可撓電線管31の内側に挿入することで鉄筋挿入孔形成用型枠材30Aとしてもよい。 In addition, due to the relationship between the inner diameter of the synthetic resin flexible conduit 31 and the outer diameter of the single tube 32, if necessary, as shown in FIG. By inserting this single tube 32 inside the flexible electrical conduit tube 31 made of synthetic resin, it may be used as a formwork material 30A for forming reinforcing bar insertion holes.

また、合成樹脂製可撓電線管31には、予め全長に渡って切れ目を入れておき、鉄筋挿入孔形成用型枠材30の脱型時に、単管32を抜いてから合成樹脂製可撓電線管31を切れ目から内側に折り曲げるようにして外せるようにすることが好ましい。また、図3の場合にも鉄筋カバー33に予め全長に渡って切れ目を入れておき、鉄筋挿入孔形成用型枠材30の脱型時に、単管32を抜いてから鉄筋カバー33を切れ目から内側に折り曲げるようにして外せるようにすることが好ましい。 In addition, cuts are made in advance over the entire length of the synthetic resin flexible electrical conduit 31, and when removing the reinforcing bar insertion hole forming formwork 30, the single pipe 32 is pulled out and then the synthetic resin flexible electrical conduit 31 is cut. It is preferable that the electric conduit 31 can be removed by bending it inward from the cut. Also, in the case of FIG. 3, a cut is made in advance over the entire length of the reinforcing bar cover 33, and when demolding the formwork material 30 for forming reinforcing bar insertion holes, the single pipe 32 is pulled out and the reinforcing bar cover 33 is inserted through the cut. It is preferable to bend it inward so that it can be removed.

次に、図1,図2の鉄筋挿入孔形成用型枠材30により鉄筋挿入孔を形成するプレキャスト部材の例を説明する。図4は、本実施形態におけるプレキャスト部材である柱梁接合部の要部側断面図である。図5は、同じくプレキャスト部材である梁部材の要部側断面図である。図6は、図4の柱梁接合部および図5の梁部材に形成された鉄筋挿入孔の要部断面図である。 Next, an example of a precast member for forming reinforcing bar insertion holes using the reinforcing bar insertion hole forming formwork material 30 shown in FIGS. 1 and 2 will be described. FIG. 4 is a sectional side view of a main part of a column-beam joint that is a precast member in this embodiment. FIG. 5 is a side cross-sectional view of a main part of a beam member which is also a precast member. FIG. 6 is a sectional view of a main part of the reinforcing bar insertion hole formed in the column-beam joint of FIG. 4 and the beam member of FIG. 5.

図4のように、柱梁接合部11は、柱と梁との接合部を含むプレキャスト部材であって、複数の柱主筋11dと、柱主筋11dに直交して接続する複数の柱内せん断補強筋11eとが配置され、破線で示すように、後工程で梁主筋が挿入される複数の鉄筋挿入孔17が水平方向に貫通した横孔として形成されている。なお、柱梁接合部11には複数の鉄筋挿入孔17に充填材を注入し充填するための複数の注入管20が配置されている。 As shown in FIG. 4, the column-beam joint 11 is a precast member including a joint between a column and a beam, and includes a plurality of column main reinforcements 11d and a plurality of intra-column shear reinforcements connected orthogonally to the column main reinforcements 11d. As shown by broken lines, a plurality of reinforcing bar insertion holes 17 into which beam main reinforcing bars will be inserted in a later process are formed as horizontal holes penetrating in the horizontal direction. Note that a plurality of injection pipes 20 for injecting and filling the plurality of reinforcing bar insertion holes 17 with filler are arranged in the column-beam joint 11 .

図5のように、梁部材12は、図4の柱梁接合部11と接合されるプレキャスト部材であって、梁部材端部から水平方向の所定距離に機械式充填継ぎ手15が配置され、図5の破線で示すように、機械式充填継ぎ手15から梁部材端部まで、後工程で梁主筋が挿入される複数の鉄筋挿入孔18が横孔として形成されている。機械式充填継ぎ手15の一方側には複数の梁主筋12aと、梁主筋12a等に直交して接続する複数のせん断補強筋12bとが配置されており、複数の梁主筋12aが梁部材12に定着されている。 As shown in FIG. 5, the beam member 12 is a precast member to be joined to the column-beam joint 11 of FIG. As shown by the broken line 5, a plurality of reinforcing bar insertion holes 18 are formed as horizontal holes from the mechanical filling joint 15 to the end of the beam member, into which beam main reinforcements will be inserted in a later process. On one side of the mechanical filling joint 15, a plurality of beam main reinforcements 12a and a plurality of shear reinforcing bars 12b connected orthogonally to the beam main reinforcements 12a etc. are arranged. It is established.

図4の柱梁接合部11は、所定の型枠(図示省略)にコンクリートを打設することで作製されるが、鉄筋挿入孔17は、所定の型枠(図示省略)に図1,図2の鉄筋挿入孔形成用型枠材30を配置し、コンクリート打設後に脱型することで形成される。図5の梁部材12は、所定の型枠(図示省略)にコンクリートを打設することで作製されるが、鉄筋挿入孔18は、所定の型枠(図示省略)に図1,図2の鉄筋挿入孔形成用型枠材30を配置し、コンクリート打設後に脱型することで形成される。 The column-beam joint 11 in Fig. 4 is made by pouring concrete into a predetermined formwork (not shown), but the reinforcing bar insertion holes 17 are made in a predetermined formwork (not shown) in Figs. It is formed by arranging the formwork material 30 for forming reinforcing bar insertion holes No. 2 and removing the mold after pouring concrete. The beam member 12 in FIG. 5 is manufactured by pouring concrete into a predetermined formwork (not shown), and the reinforcing bar insertion holes 18 are formed in the predetermined formwork (not shown) as shown in FIGS. 1 and 2. It is formed by arranging the formwork material 30 for forming reinforcing bar insertion holes and removing the mold after pouring concrete.

図6のように、図4の柱梁接合部11の鉄筋挿入孔17および図5の梁部材12の鉄筋挿入孔18の内周面には、合成樹脂製可撓電線管31の凹部31aに対応した周方向に一周の凸部Aと、凸部31bに対応した周方向に一周の凹部Bとが孔軸方向に繰り返し多数形成される。 As shown in FIG. 6, the recess 31a of the synthetic resin flexible conduit 31 is provided on the inner peripheral surface of the reinforcing bar insertion hole 17 of the column-beam joint 11 in FIG. 4 and the reinforcing bar insertion hole 18 of the beam member 12 in FIG. A large number of corresponding protrusions A that extend around the circumferential direction and recesses B that extend around the circumference that correspond to the protrusions 31b are repeatedly formed in the hole axis direction.

次に、プレキャスト部材における鉄筋挿入孔の形成工程およびプレキャスト部材同士の接合工程について図1~図8を参照して説明する。図7は、本実施形態による鉄筋挿入孔の形成工程およびプレキャスト部材同士の接合工程を説明するためのフローチャートである。図8は、図4の柱梁接合部の鉄筋挿入孔と図5の梁部材の鉄筋挿入孔とに対し梁主筋を挿入する状況を示す側断面図である。 Next, the process of forming reinforcing bar insertion holes in precast members and the process of joining precast members together will be described with reference to FIGS. 1 to 8. FIG. 7 is a flowchart for explaining the process of forming reinforcing bar insertion holes and the process of joining precast members together according to this embodiment. FIG. 8 is a side sectional view showing a state in which the main beam reinforcement is inserted into the reinforcing bar insertion hole of the column-beam joint of FIG. 4 and the reinforcing bar insertion hole of the beam member of FIG. 5.

まず、プレキャスト部材における鉄筋挿入孔の形成工程S01~S16について説明するが、本形成工程では、図3のように、鉄筋カバー33を被せた単管32を合成樹脂製可撓電線管31の内部に挿入した型枠材30Aを用いる。 First, the steps S01 to S16 for forming reinforcing bar insertion holes in a precast member will be explained. In this forming step, as shown in FIG. The formwork material 30A inserted into the mold is used.

図1~図3のように、鋼管からなる単管32にスチレンボイドからなる鉄筋カバー33を被せ(S01)、この単管32を合成樹脂製可撓電線管31の内側に挿入し(S02)、鉄筋挿入孔形成用型枠材30Aを作製する(S03)。 As shown in FIGS. 1 to 3, a reinforcing bar cover 33 made of styrene void is placed on a single tube 32 made of steel (S01), and this single tube 32 is inserted inside a flexible electrical conduit 31 made of synthetic resin (S02). , a formwork material 30A for forming reinforcing bar insertion holes is produced (S03).

次に、鉄筋挿入孔形成用型枠材30Aをプレキャスト部材用型枠(図示省略)に取り付け(S04)、プレキャスト部材に形成される鉄筋挿入孔の位置を調整する(S05)。次に、プレキャスト部材用型枠内にコンクリートを打設し(S06)、所定期間経過後、プレキャスト部材用型枠を取り外し(S07)、プレキャスト部材が表出する。なお、かかるプレキャスト部材は、図4の柱梁接合部11や図5の梁部材12であってよい。 Next, the reinforcing bar insertion hole forming formwork material 30A is attached to a precast member formwork (not shown) (S04), and the position of the reinforcing bar insertion hole formed in the precast member is adjusted (S05). Next, concrete is poured into the precast member formwork (S06), and after a predetermined period of time, the precast member formwork is removed (S07) to expose the precast member. Note that such a precast member may be the column-beam joint 11 in FIG. 4 or the beam member 12 in FIG. 5.

次に、鉄筋挿入孔形成用型枠材30Aの脱型を準備する(S08)。すなわち、プレキャスト部材の所定面において単管32を表出させ(S09)、単管32を抜いて取り外す(S10)。次に、スチレンボイド(鉄筋カバー33)を表出させ(S11)、スチレンボイドを取り外す(S12)。このとき、スチレンボイドには全長に渡って切れ目を入れているので、スチレンボイドを容易に内側に折り曲げるようにして外すことができ容易に取り外すことができる。 Next, demolding of the reinforcing bar insertion hole forming formwork material 30A is prepared (S08). That is, the single tube 32 is exposed on a predetermined surface of the precast member (S09), and the single tube 32 is pulled out and removed (S10). Next, the styrene void (reinforcing bar cover 33) is exposed (S11), and the styrene void is removed (S12). At this time, since the styrene void is cut along its entire length, the styrene void can be easily bent inward and removed, making it easy to remove.

次に、合成樹脂製可撓電線管31を表出させ(S13)、合成樹脂製可撓電線管31を取り外すことで、鉄筋挿入孔形成用型枠材30Aの脱型が完了する(S14)。このとき、合成樹脂製可撓電線管31には全長に渡って切れ目を入れているので、合成樹脂製可撓電線管31を容易に内側に折り曲げるようにして外すことができ容易にプレキャスト部材から取り外すことができる。 Next, the synthetic resin flexible electrical conduit 31 is exposed (S13), and the synthetic resin flexible electrical conduit 31 is removed, thereby completing demolding of the reinforcing bar insertion hole forming formwork material 30A (S14). . At this time, since the synthetic resin flexible electrical conduit 31 is cut along its entire length, the synthetic resin flexible electrical conduit 31 can be easily bent inward and removed, and easily removed from the precast member. Can be removed.

次に、鉄筋挿入孔形成用型枠材30Aの脱型によりたとえば図4の柱梁接合部11,図5の梁部材12に鉄筋挿入孔17,18が表出し(S15)、かかる鉄筋挿入孔17,18の出来形を確認する(S16)。 Next, by demolding the formwork material 30A for forming reinforcing bar insertion holes, reinforcing bar insertion holes 17 and 18 are exposed in, for example, the column-beam joint 11 in FIG. 4 and the beam member 12 in FIG. 5 (S15), and the reinforcing bar insertion holes The finished shapes of 17 and 18 are confirmed (S16).

以上のようにして、図4の柱梁接合部11や図5の梁部材12のプレキャスト部材に鉄筋挿入孔17,18を形成できるが、かかる鉄筋挿入孔17,18の内周面には、図6のように、合成樹脂製可撓電線管31の凹部31aに対応した周方向に一周の凸部Aと、凸部31bに対応した周方向に一周の凹部Bとが孔軸方向に繰り返し多数形成されている。かかる凸部Aと凹部Bとは、比較的硬質な合成樹脂製可撓電線管31の凹部31aと凸部31bによって形状が明瞭で品質のよい仕上げとなっている。このため、鉄筋挿入孔に鉄筋が挿入され充填材が充填されると、鉄筋挿入孔内において充填材の充分な付着力を得ることができる。このようにして、従来のスパイラル形のシース管を用いずに鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることができる。また、電気工事の分野で多用され比較的廉価な市販品である合成樹脂製可撓電線管を転用し、シース管を使用せずに済むので、材料費がかさまずにコスト的に有利である。 As described above, the reinforcing bar insertion holes 17 and 18 can be formed in the precast member of the column-beam joint 11 in FIG. 4 and the beam member 12 in FIG. As shown in FIG. 6, a convex part A that goes around the circumferential direction corresponding to the concave part 31a of the synthetic resin flexible conduit 31 and a concave part B that goes around the circumferential direction that corresponds to the convex part 31b are repeated in the hole axis direction. Many are formed. The convex portion A and the concave portion B have a clear shape and a high-quality finish due to the concave portion 31a and the convex portion 31b of the flexible electrical conduit 31 made of relatively hard synthetic resin. Therefore, when the reinforcing bars are inserted into the reinforcing bar insertion holes and filled with the filler, sufficient adhesive force of the filler can be obtained within the reinforcing bar insertion holes. In this way, sufficient fixing force of the reinforcing bars can be obtained within the reinforcing bar insertion holes without using the conventional spiral sheath pipe, and the reinforcing bars and the precast member can be reliably integrated. In addition, synthetic resin flexible electrical conduit, which is a relatively inexpensive commercially available product that is often used in the field of electrical work, is used, eliminating the need for sheathed pipes, which is advantageous in terms of cost without increasing material costs. .

また、特許文献1のように、単管パイプにビニールホースを被せ、ビニールホースの周囲にゴムひもを螺旋状に巻き付けた型枠材により形成した鉄筋挿入孔の内周面は、ゴムひもによる螺旋状の溝形状が柔らかなビニールホースとゴムひもとによって形成されるため溝形状が不明瞭で不充分な品質となり易いのに対し、本実施形態によれば、比較的硬質な合成樹脂製可撓電線管31を用い、その外周面の多数の凹部31aと凸部31bとが、打設されたコンクリートにより変形され難いので、内周面の溝形状が明瞭で品質のよい鉄筋挿入孔を形成できる。このため、鉄筋挿入孔内において充填材による充分な付着力を得ることができる。また、特許文献1ではビニールホースの周囲にゴムひもを螺旋状に巻き付けるという面倒な工程が必要であるが、本実施形態の形成方法では、単管32を合成樹脂製可撓電線管31の内部に挿入するだけで型枠材を作製でき、簡単な工程で済む。 In addition, as in Patent Document 1, the inner circumferential surface of the reinforcing bar insertion hole is formed by a formwork material in which a vinyl hose is wrapped around a single pipe and a rubber string is wound spirally around the vinyl hose. The shape of the groove is formed by a soft vinyl hose and a rubber cord, which tends to result in an unclear groove shape and insufficient quality. Since the conduit 31 is used, and the numerous recesses 31a and protrusions 31b on its outer circumferential surface are not easily deformed by the poured concrete, a high-quality reinforcing bar insertion hole with a clear groove shape on the inner circumferential surface can be formed. . Therefore, it is possible to obtain sufficient adhesion force by the filler within the reinforcing bar insertion hole. Further, in Patent Document 1, a troublesome step of spirally wrapping a rubber cord around the vinyl hose is required, but in the forming method of the present embodiment, the single tube 32 is attached to the inside of the synthetic resin flexible electrical conduit 31. Formwork material can be created by simply inserting it into the mold, making it a simple process.

次に、プレキャスト部材同士の接合工程S17~S19について説明すると、図8のように、柱梁接合部11の鉄筋挿入孔17から梁部材12の鉄筋挿入孔18へと挿入する梁主筋である鉄筋14を用意し(S17)、柱梁接合部11に対し梁部材12を支保材等により支持し位置決めした状態で、鉄筋14を柱梁接合部11の鉄筋挿入孔17から挿入し梁部材12の鉄筋挿入孔18へと挿入し、鉄筋14の先端を梁部材12内の機械式充填継ぎ手15内に挿入し適切な位置に固定する(S18)。 Next, to explain the joining steps S17 to S19 between precast members, as shown in FIG. 14 is prepared (S17), and with the beam member 12 supported and positioned with supporting material etc. in the column-beam joint 11, the reinforcing bars 14 are inserted from the reinforcing bar insertion hole 17 of the column-beam joint 11, and the beam member 12 is inserted into the beam member 12. The reinforcing bar 14 is inserted into the reinforcing bar insertion hole 18, and the tip of the reinforcing bar 14 is inserted into the mechanical filling joint 15 in the beam member 12 and fixed at an appropriate position (S18).

次に、柱梁接合部11に予め設けた注入管20を通してグラウド材等の充填材を鉄筋挿入孔17へ注入することで、図6のように鉄筋挿入孔17と鉄筋14とから形成される孔内充填空間Sに充填材を充填する(S19)。かかる充填材の注入により鉄筋挿入孔17から梁部材12の鉄筋挿入孔18と鉄筋14とによる孔内充填空間Sおよび機械式充填継ぎ手15内にまで充填材が充填される。 Next, by injecting a filler such as grout into the reinforcing bar insertion hole 17 through the injection pipe 20 previously provided in the column-beam joint 11, the reinforcing bar insertion hole 17 and the reinforcing bar 14 are formed as shown in FIG. The hole filling space S is filled with a filler material (S19). By injecting the filler, the filler is filled from the reinforcing bar insertion hole 17 to the in-hole filling space S between the reinforcing bar insertion hole 18 of the beam member 12 and the reinforcing bar 14 and the mechanical filling joint 15.

以上のようにして、柱梁接合部11の鉄筋挿入孔17および梁部材12の鉄筋挿入孔18内の孔内充填空間S(図6)に充填材を充填することで、柱梁接合部11の鉄筋挿入孔17および梁部材12の鉄筋挿入孔18において充填材の硬化後に充分な付着力を得ることができる。このようにして、従来のスパイラル形のシース管を用いずに鉄筋挿入孔17,18内で充分な鉄筋14の定着力を得て鉄筋14と柱梁接合部11、梁部材12とを確実に一体化させることで柱梁接合部11と梁部材12とを確実に接合させることができる。 As described above, by filling the filling space S (FIG. 6) in the reinforcing bar insertion hole 17 of the column-beam joint 11 and the reinforcing bar insertion hole 18 of the beam member 12 with the filler material, the column-beam joint 11 Sufficient adhesion force can be obtained after the filler hardens in the reinforcing bar insertion holes 17 and the reinforcing bar insertion holes 18 of the beam member 12. In this way, sufficient fixing force of the reinforcing bars 14 can be obtained within the reinforcing bar insertion holes 17 and 18 without using the conventional spiral-shaped sheath pipe, and the reinforcing bars 14, column-beam joints 11, and beam members 12 can be securely connected. By integrating them, the column-beam joint 11 and the beam member 12 can be reliably joined.

なお、図8において、鉄筋14は柱梁接合部11の鉄筋挿入孔17および梁部材12の鉄筋挿入孔18に挿入されると、柱梁接合部11の図8の右側に突き出るが、柱梁接合部11の右側には、もう一つの梁部材(図示省略)が配置され、鉄筋14の突き出し部分が鉄筋挿入孔18と同様の鉄筋挿入孔に挿入され、充填材により定着されるように構成できる。 In addition, in FIG. 8, when the reinforcing bars 14 are inserted into the reinforcing bar insertion holes 17 of the column-beam joint 11 and the reinforcing bar insertion holes 18 of the beam member 12, they protrude to the right side of the column-beam joint 11 in FIG. Another beam member (not shown) is arranged on the right side of the joint 11, and the protruding portion of the reinforcing bar 14 is inserted into a reinforcing bar insertion hole similar to the reinforcing bar insertion hole 18, and is fixed by a filler. can.

(実験例)
次に、本実施形態の鉄筋挿入孔の形成方法によってコンクリート部材に鉄筋挿入孔を形成した実験例について説明する。本実験例では、合成樹脂製可撓電線管内径53mm、スチレンボイドt=5mm、単管外径42.7mmとして図3と同様の鉄筋挿入孔形成用型枠材を作製し、型枠内に配置し固定した後、コンクリート打設をし、型枠を取り外してコンクリート部材を表出させ、コンクリート部材から鉄筋挿入孔形成用型枠材を除去した。図9にコンクリート部材に形成された鉄筋挿入孔の外観写真を示す。図9から鉄筋挿入孔の内周面は、合成樹脂製可撓電線管の外周の凹凸に対応して凹凸形状が明瞭で品質のよい仕上げとなっていることがわかる。
(Experiment example)
Next, an experimental example in which reinforcing bar insertion holes were formed in a concrete member using the reinforcing bar insertion hole forming method of this embodiment will be described. In this experiment example, a formwork material for forming reinforcing bar insertion holes similar to that shown in Fig. 3 was prepared with a synthetic resin flexible conduit tube inner diameter of 53 mm, styrene void T = 5 mm, and a single tube outer diameter of 42.7 mm, and placed in the formwork. After fixing, concrete was poured, the formwork was removed to expose the concrete member, and the formwork material for forming reinforcing bar insertion holes was removed from the concrete member. Figure 9 shows a photograph of the appearance of a reinforcing bar insertion hole formed in a concrete member. It can be seen from FIG. 9 that the inner circumferential surface of the reinforcing bar insertion hole has a clear uneven shape that corresponds to the unevenness on the outer periphery of the synthetic resin flexible conduit tube, and has a high-quality finish.

以上のように本発明を実施するための形態について説明したが、本発明はこれらに限定されるものではなく、本発明の技術的思想の範囲内で各種の変形が可能である。たとえば、図4,図5ではプレキャスト部材として柱梁接合部や梁部材を例にしたが、本発明はこれに限定されず、他のプレキャスト部材の鉄筋挿入孔にも適用できることはもちろんである。 Although the embodiments of the present invention have been described above, the present invention is not limited thereto, and various modifications can be made within the scope of the technical idea of the present invention. For example, in FIGS. 4 and 5, a column-beam joint or a beam member is used as an example of a precast member, but the present invention is not limited thereto, and can of course be applied to reinforcing bar insertion holes of other precast members.

また、図7の鉄筋挿入孔の形成工程S01~S16では図3の型枠材30Aを用いたが、鉄筋カバー33を用いずに図1の単管32を合成樹脂製可撓電線管31の内部に挿入した型枠材30を用いてもよいことはもちろんであり、この場合、図7の工程S01,S12が省略される。 In addition, in the reinforcing bar insertion hole forming steps S01 to S16 in FIG. 7, the formwork material 30A in FIG. 3 was used, but the single pipe 32 in FIG. Of course, it is also possible to use the formwork material 30 inserted inside, and in this case, steps S01 and S12 in FIG. 7 are omitted.

本発明によれば、スパイラル形のシース管を用いずに、プレキャスト部材の鉄筋挿入孔の界面を鉄筋への付着力が期待できる仕上げにすることができるとともに、脱型・転用可能な材料構成にできることから、低コスト化を実現することができる。プレキャスト部材の鉄筋挿入孔に鉄筋を挿入し鉄筋とプレキャスト部材とを確実に一体化でき、プレキャスト部材同士を確実に接合できるため、かかる接合工程を含む各種施工工事において品質の向上およびコスト減を図ることができる。 According to the present invention, the interface of the reinforcing bar insertion hole of a precast member can be finished with a finish that can be expected to have strong adhesion to the reinforcing bar without using a spiral sheath pipe, and the material composition can be removed and reused. As a result, cost reduction can be achieved. The reinforcing bars can be inserted into the reinforcing bar insertion holes of the precast members to reliably integrate the reinforcing bars and the precast members, and the precast members can be reliably joined to each other, thereby improving quality and reducing costs in various construction works including such joining processes. be able to.

11 柱梁接合部(プレキャスト部材)
12 梁部材(プレキャスト部材)
14 鉄筋
17,18 鉄筋挿入孔
30,30A 鉄筋挿入孔用型枠材
31 合成樹脂製可撓電線管
31a 合成樹脂製可撓電線管の凹部
31b 合成樹脂製可撓電線管の凸部
32 単管
33 鉄筋カバー
A 鉄筋挿入孔の内周面の凸部
B 鉄筋挿入孔の内周面の凹部
S 孔内充填空間
11 Column beam joint (precast member)
12 Beam member (precast member)
14 Reinforcing bars 17, 18 Reinforcing bar insertion holes 30, 30A Formwork material for reinforcing bar insertion holes 31 Synthetic resin flexible electrical conduit 31a Concave portion 31b of synthetic resin flexible electrical conduit Convex portion 32 of synthetic resin flexible electrical conduit 33 Reinforcing bar cover A Convex portion B on the inner circumferential surface of the reinforcing bar insertion hole Recessed portion S on the inner circumferential surface of the reinforcing bar insertion hole Hole filling space

本発明は、プレキャスト部材に鉄筋挿入孔を形成する方法、その鉄筋挿入孔に鉄筋を挿入し定着させるプレキャスト部材の接合方法およびプレキャスト部材の製造方法に関する。
The present invention relates to a method of forming reinforcing bar insertion holes in a precast member, a method of joining precast members in which reinforcing bars are inserted and fixed in the reinforcing bar insertion holes, and a method of manufacturing a precast member.

本発明は、上述のような従来技術の問題に鑑み、スパイラル形のシース管を用いずに、鉄筋挿入孔の界面を鉄筋への付着力が期待できる仕上げとし、脱型・転用可能な材料構成とし、低コスト化を実現可能なプレキャスト(PCa)部材の鉄筋挿入孔の形成方法、その鉄筋挿入孔に鉄筋を挿入し確実に定着させるプレキャスト部材の接合方法およびプレキャスト部材の製造方法を提供することを目的とする。
In view of the problems of the prior art as described above, the present invention provides a material structure that can be removed from molds and used for other purposes by finishing the interface of the reinforcing bar insertion hole with a finish that can be expected to have strong adhesion to the reinforcing bars without using a spiral-shaped sheath pipe. To provide a method for forming a reinforcing bar insertion hole in a precast (PCa) member that can realize cost reduction, a method for joining a precast member in which reinforcing bars are inserted into the reinforcing bar insertion hole and securely fixed therein, and a method for manufacturing a precast member. With the goal.

上記目的を達成するためのプレキャスト部材の鉄筋挿入孔の形成方法は、プレキャスト部材に鉄筋挿入孔を形成する方法であって、
単管の外周に鉄筋カバーを配置する工程と、管周方向の凹凸が管長手方向に繰り返し多数形成された合成樹脂製可撓電線管の内側に前記単管を挿入して鉄筋挿入孔用型枠材を作製する工程と、前記鉄筋挿入孔用型枠材をプレキャスト部材用型枠に配置する工程と、前記プレキャスト部材用型枠にコンクリートを打設する工程と、前記コンクリート打設により作製されたプレキャスト部材から前記単管を取り外す工程と、前記プレキャスト部材から前記合成樹脂製可撓電線管を取り外すことで前記鉄筋挿入孔用型枠材を除去する工程と、を含み、
前記鉄筋挿入孔用型枠材の除去により前記合成樹脂製可撓電線管の凹凸に対応した凹凸が内周面に形成された鉄筋挿入孔を前記プレキャスト部材に形成するものである。
A method for forming reinforcing bar insertion holes in a precast member to achieve the above object is a method of forming reinforcing bar insertion holes in a precast member, comprising:
A process for arranging a reinforcing bar cover around the outer periphery of the single pipe, and inserting the single pipe into the inside of a synthetic resin flexible electrical conduit tube in which a large number of irregularities in the pipe circumferential direction are repeatedly formed in the longitudinal direction of the pipe to form a reinforcing bar insertion hole mold. A step of producing a frame material, a step of arranging the formwork material for the reinforcing bar insertion hole in a formwork for a precast member, a step of pouring concrete into the formwork for a precast member, and a step of producing the concrete by the concrete pouring. removing the single pipe from the precast member; and removing the reinforcing bar insertion hole formwork material by removing the synthetic resin flexible conduit from the precast member,
By removing the reinforcing bar insertion hole formwork material, a reinforcing bar insertion hole is formed in the precast member, the inner circumferential surface of which has concavities and convexities corresponding to the concavities and convexities of the synthetic resin flexible conduit.

このプレキャスト部材の鉄筋挿入孔の形成方法によれば、管周方向の凹凸が管長手方向に繰り返し多数形成された合成樹脂製可撓電線管の内側に、外周に鉄筋カバーが配置された単管を挿入し作製した鉄筋挿入孔用型枠材をプレキャスト部材用型枠に配置し、コンクリート打設後にプレキャスト部材から単管を取り外し合成樹脂製可撓電線管を取り外すことで鉄筋挿入孔用型枠材を脱型した後にプレキャスト部材にできる鉄筋挿入孔には、その内周面において合成樹脂製可撓電線管の凹凸に対応した孔周方向の凹凸が孔長手方向に多数形成される。この鉄筋挿入孔の内周面における多数の凹凸は、比較的硬質な合成樹脂製可撓電線管の凹凸によって形状が明瞭で品質のよい仕上げとなる。そのため、このプレキャスト部材の鉄筋挿入孔に鉄筋が挿入され、充填材が充填されることで、鉄筋挿入孔内に形成された凹凸面により充填材の充分な付着力を得ることができる。このようにして、従来のスパイラル形のシース管を用いずに鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることができる。また、電気工事の分野で多用され比較的廉価な市販品である合成樹脂製可撓電線管を転用し、シース管を使用せずに済むので、材料費がかさまずにコスト的に有利である。
According to this method of forming a reinforcing bar insertion hole in a precast member, a reinforcing bar cover is arranged on the outer periphery of a single tube inside a synthetic resin flexible conduit tube in which a large number of irregularities in the circumferential direction are repeatedly formed in the longitudinal direction of the tube. The formwork material for the reinforcing bar insertion hole prepared by inserting the above is placed in the formwork for the precast member, and after concrete pouring, the single tube is removed from the precast member and the synthetic resin flexible conduit is removed to create the formwork for the reinforcing bar insertion hole. A reinforcing bar insertion hole formed in a precast member after demolding the material has a large number of concavities and convexities in the longitudinal direction of the hole, which correspond to the concavities and convexities of the synthetic resin flexible conduit, on the inner circumferential surface of the hole. The numerous irregularities on the inner circumferential surface of the reinforcing bar insertion hole are caused by the irregularities of the relatively hard synthetic resin flexible conduit tube, resulting in a clear shape and a high-quality finish. Therefore, by inserting a reinforcing bar into the reinforcing bar insertion hole of this precast member and filling it with a filler, sufficient adhesion force of the filler can be obtained due to the uneven surface formed in the reinforcing bar insertion hole. In this way, sufficient fixing force of the reinforcing bars can be obtained within the reinforcing bar insertion holes without using the conventional spiral sheath pipe, and the reinforcing bars and the precast member can be reliably integrated. In addition, synthetic resin flexible electrical conduit, which is a relatively inexpensive commercially available product that is often used in the field of electrical work, is used, eliminating the need for sheathed pipes, which is advantageous in terms of cost without increasing material costs. .

上記目的を達成するためのプレキャスト部材の製造方法は、上述のプレキャスト部材の鉄筋挿入孔の形成方法により鉄筋挿入孔を形成するものである
A method for manufacturing a precast member to achieve the above object is to form reinforcing bar insertion holes using the above-described method for forming reinforcing bar insertion holes in a precast member.

この製造方法により製造されたプレキャスト部材によれば、鉄筋挿入孔には、その内周面において合成樹脂製可撓電線管の凹凸に対応した孔周面の凹凸が孔長手方向に多数形成されている。この鉄筋挿入孔の内周面における多数の凹凸は、硬質な合成樹脂製可撓電線管の凹凸によって形状が明瞭で品質のよい仕上げとなっている。このプレキャスト部材の鉄筋挿入孔に鉄筋が挿入され充填材が充填されると、鉄筋挿入孔内において充填材による充分な付着力を得ることができ、鉄筋挿入孔内で充分な鉄筋の定着力を得て鉄筋とプレキャスト部材とを確実に一体化させることができる。
According to the precast member manufactured by this manufacturing method , the reinforcing bar insertion hole has many irregularities in the longitudinal direction of the hole corresponding to the irregularities of the synthetic resin flexible conduit tube on the inner peripheral surface thereof. There is. The numerous irregularities on the inner circumferential surface of this reinforcing bar insertion hole are caused by the irregularities of the flexible electrical conduit tube made of hard synthetic resin, resulting in a clear shape and a high-quality finish. When reinforcing bars are inserted into the reinforcing bar insertion holes of this precast member and filled with filler material, sufficient adhesion force can be obtained by the filler material within the reinforcing bar insertion holes, and sufficient anchoring force of the reinforcing bars can be obtained within the reinforcing bar insertion holes. As a result, the reinforcing bars and the precast member can be reliably integrated.

本発明のプレキャスト部材の鉄筋挿入孔の形成方法、プレキャスト部材の接合方法およびプレキャスト部材の製造方法によれば、スパイラル形のシース管を用いずに、鉄筋挿入孔の界面を鉄筋への付着力が期待できる仕上げにすることができるとともに、脱型・転用可能な材料構成にできることから、低コスト化を実現することができ、また、プレキャスト部材の鉄筋挿入孔に鉄筋を挿入し、鉄筋とプレキャスト部材とを確実に一体化でき、プレキャスト部材同士を確実に接合できる。
According to the method of forming a reinforcing bar insertion hole in a precast member, the method of joining a precast member, and the method of manufacturing a precast member of the present invention, the interface of the reinforcing bar insertion hole can be bonded to the reinforcing bar without using a spiral sheath pipe. It is possible to achieve a desired finish and to create a material composition that can be demolded and reused, making it possible to reduce costs.In addition, the reinforcing bars can be inserted into the reinforcing bar insertion holes of the precast parts, and the reinforcing bars and the precast parts can be separated. can be reliably integrated, and precast members can be reliably joined together.

Claims (6)

プレキャスト部材に鉄筋挿入孔を形成する方法であって、
管周方向の凹凸が管長手方向に繰り返し多数形成された合成樹脂製可撓電線管の内側に単管を挿入して鉄筋挿入孔用型枠材を作製する工程と、
前記鉄筋挿入孔用型枠材をプレキャスト部材用型枠に配置する工程と、
前記プレキャスト部材用型枠にコンクリートを打設する工程と、
前記コンクリート打設により作製されたプレキャスト部材から前記単管を取り外す工程と、
前記プレキャスト部材から前記合成樹脂製可撓電線管を取り外すことで前記鉄筋挿入孔用型枠材を除去する工程と、を含み、
前記鉄筋挿入孔用型枠材の除去により前記合成樹脂製可撓電線管の凹凸に対応した凹凸が内周面に形成された鉄筋挿入孔を前記プレキャスト部材に形成するプレキャスト部材の鉄筋挿入孔の形成方法。
A method for forming reinforcing bar insertion holes in a precast member, the method comprising:
A step of inserting a single tube inside a flexible electrical conduit tube made of synthetic resin in which a large number of irregularities in the circumferential direction are repeatedly formed in the longitudinal direction of the tube to create a formwork material for a reinforcing bar insertion hole;
arranging the reinforcing bar insertion hole formwork material in a precast member formwork;
a step of pouring concrete into the formwork for the precast member;
a step of removing the single pipe from the precast member produced by the concrete pouring;
a step of removing the reinforcing bar insertion hole formwork material by removing the synthetic resin flexible conduit from the precast member;
A reinforcing bar insertion hole of the precast member is formed in the precast member, the reinforcing bar insertion hole having an inner circumference formed with unevenness corresponding to the unevenness of the synthetic resin flexible conduit by removing the reinforcing bar insertion hole formwork material. Formation method.
前記合成樹脂製可撓電線管に予め全長に渡って切れ目を入れておき、前記単管を抜いてから前記合成樹脂製可撓電線管を前記切れ目から内側に折り曲げて外せるようにする請求項1に記載のプレキャスト部材の鉄筋挿入孔の形成方法。 Claim 1: A cut is made in advance over the entire length of the synthetic resin flexible electrical conduit, and after the single tube is removed, the synthetic resin flexible electrical conduit can be bent inward from the cut and removed. A method for forming reinforcing bar insertion holes in a precast member as described in . 前記単管の外周に鉄筋カバーを配置してから、前記単管を前記合成樹脂製可撓電線管の内側に挿入する請求項1または2に記載のプレキャスト部材の鉄筋挿入孔の形成方法。 3. The method for forming a reinforcing bar insertion hole in a precast member according to claim 1, wherein a reinforcing bar cover is placed around the outer periphery of the single tube, and then the single tube is inserted into the inside of the synthetic resin flexible electrical conduit. 前記鉄筋カバーに予め全長に渡って切れ目を入れておき、前記単管を抜いてから前記鉄筋カバーを前記切れ目から内側に折り曲げて外せるようにする請求項3に記載のプレキャスト部材の鉄筋挿入孔の形成方法。 A reinforcing bar insertion hole of a precast member according to claim 3, wherein cuts are made in advance over the entire length of the reinforcing bar cover, and after the single pipe is pulled out, the reinforcing bar cover can be removed by bending inward from the cuts. Formation method. 請求項1乃至4のいずれかに記載のプレキャスト部材の鉄筋挿入孔の形成方法により第1プレキャスト部材の第1鉄筋挿入孔および第2プレキャスト部材の第2鉄筋挿入孔をそれぞれ形成し、前記第1および第2鉄筋挿入孔に鉄筋を挿入し、次に、充填材を前記第1および第2鉄筋挿入孔内に充填して前記鉄筋を定着させることで前記第1プレキャスト部材と前記第2プレキャスト部材とを接合するプレキャスト部材の接合方法。 The first reinforcing bar insertion hole of the first precast member and the second reinforcing bar insertion hole of the second precast member are respectively formed by the method for forming reinforcing bar insertion holes of a precast member according to any one of claims 1 to 4, and and the first precast member and the second precast member by inserting reinforcing bars into the second reinforcing bar insertion holes, and then filling the first and second reinforcing bar insertion holes with a filler material to fix the reinforcing bars. A method for joining precast members. 請求項1乃至4のいずれかに記載のプレキャスト部材の鉄筋挿入孔の形成方法により形成された鉄筋挿入孔を有するプレキャスト部材。 A precast member having a reinforcing bar insertion hole formed by the method for forming a reinforcing bar insertion hole in a precast member according to any one of claims 1 to 4.
JP2023178688A 2020-03-16 2023-10-17 Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method Pending JP2023181242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023178688A JP2023181242A (en) 2020-03-16 2023-10-17 Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020044950A JP7461180B2 (en) 2020-03-16 2020-03-16 Method for forming reinforcing bar insertion holes in precast members, method for joining precast members, and method for manufacturing precast members
JP2023178688A JP2023181242A (en) 2020-03-16 2023-10-17 Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2020044950A Division JP7461180B2 (en) 2020-03-16 2020-03-16 Method for forming reinforcing bar insertion holes in precast members, method for joining precast members, and method for manufacturing precast members

Publications (1)

Publication Number Publication Date
JP2023181242A true JP2023181242A (en) 2023-12-21

Family

ID=77850363

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2020044950A Active JP7461180B2 (en) 2020-03-16 2020-03-16 Method for forming reinforcing bar insertion holes in precast members, method for joining precast members, and method for manufacturing precast members
JP2023178688A Pending JP2023181242A (en) 2020-03-16 2023-10-17 Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2020044950A Active JP7461180B2 (en) 2020-03-16 2020-03-16 Method for forming reinforcing bar insertion holes in precast members, method for joining precast members, and method for manufacturing precast members

Country Status (1)

Country Link
JP (2) JP7461180B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114308986A (en) * 2022-01-05 2022-04-12 索泰克(北京)岩土科技有限公司 Tendon taking assembly and manufacturing method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005220522A (en) 2004-02-03 2005-08-18 Giken:Kk Sleeve pipe device for forming through hole, method of mounting sleeve pipe for forming through hole, and method of removing the same
JP6393476B2 (en) 2013-12-25 2018-09-19 株式会社竹中工務店 Column beam connection structure
JP6267587B2 (en) 2014-05-23 2018-01-24 鹿島建設株式会社 Method for manufacturing concrete structure and opening forming member

Also Published As

Publication number Publication date
JP7461180B2 (en) 2024-04-03
JP2021146504A (en) 2021-09-27

Similar Documents

Publication Publication Date Title
JP2023181242A (en) Method for forming steel bar insertion hole of precast member, precast member joining method and precast member production method
JP5329364B2 (en) Precast steel pipe concrete composite pile and its manufacturing method
JP2016194223A (en) Method for introducing pre-stress to cast-in-place concrete
US3988103A (en) Collapsible mandrel for making fiber tubes
KR101043027B1 (en) Complex pile and fabrication method for the same
US4087502A (en) Method of making a collapsible foam mandrel
JP6267587B2 (en) Method for manufacturing concrete structure and opening forming member
JP2011042971A (en) Method for manufacturing precast concrete member
KR101616953B1 (en) Manufacturing Method of Precast Concrete Hollow Column with Inner Shear Groove, and Column Structure using such Precast Concrete Hollow Column
JP2008069519A (en) Precast concrete member, and manufacturing method therefor
KR101859146B1 (en) Manufacturing Method of Combination Pile
JP3719795B2 (en) Composite joint pile and manufacturing method thereof
JPH04330143A (en) Method for fabricating and placing rpc column
JP4243889B2 (en) Synthetic pipe
JP2006272624A (en) Rubber mold for forming hole in concrete molded product and its manufacturing method
KR101223027B1 (en) Embeded fixing unit for Unbonded single strand
JP3961679B2 (en) Reinforcing bar connector, reinforced concrete laterally divided manufacturing method and reinforced concrete manufactured by laterally divided manufacturing method
KR102512472B1 (en) Steel plate And Steel plate inserting PHC Pile
JP4971233B2 (en) Manhole repair method
JP7013132B2 (en) Manufacturing method of precast concrete member and precast concrete member
JPH061118B2 (en) Conduit connection method for manholes, etc.
JP6737722B2 (en) Body joint structure and concrete pouring method
JP4708236B2 (en) Ready-made concrete pile with internal protrusion and method for manufacturing the same
JP2005171534A (en) Grout injection passageway forming method in concrete joining section and grout injection passageway forming material
JP2018071153A (en) Concrete member junction structure and concrete member joining method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231027

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231027