JP2023148762A - Controller of injection molding machine, injection molding machine, and control method of injection molding machine - Google Patents

Controller of injection molding machine, injection molding machine, and control method of injection molding machine Download PDF

Info

Publication number
JP2023148762A
JP2023148762A JP2022056958A JP2022056958A JP2023148762A JP 2023148762 A JP2023148762 A JP 2023148762A JP 2022056958 A JP2022056958 A JP 2022056958A JP 2022056958 A JP2022056958 A JP 2022056958A JP 2023148762 A JP2023148762 A JP 2023148762A
Authority
JP
Japan
Prior art keywords
injection
injection member
mold
speed
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022056958A
Other languages
Japanese (ja)
Inventor
大吾 堀田
daigo Hotta
毅秀 山口
Takehide Yamaguchi
琢也 水梨
Takuya Mizunashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP2022056958A priority Critical patent/JP2023148762A/en
Priority to CN202211649474.XA priority patent/CN116890437A/en
Publication of JP2023148762A publication Critical patent/JP2023148762A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/64Mould opening, closing or clamping devices
    • B29C45/68Mould opening, closing or clamping devices hydro-mechanical
    • B29C45/681Mould opening, closing or clamping devices hydro-mechanical using a toggle mechanism as mould clamping device
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/77Measuring, controlling or regulating of velocity or pressure of moulding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76568Position
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76595Velocity
    • B29C2945/76598Velocity linear movement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76658Injection unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76822Phase or stage of control
    • B29C2945/76862Holding, dwelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

To provide a technique for reducing an impact that occurs when retreating an injection member in a pressure holding process.SOLUTION: Provided is a controller of an injection molding machine comprising: an injection member provided inside a cylinder for heating a molding material; and an injection driving source which fills the molding material into a molding machine by advancing the injection member. The controller has a limiting part which limits retreating speed of the injection member to a preset limited value or less in a pressure holding process of controlling a filling pressure which works from the injection member to the molding material. The limiting part, when the position of the injection member reaches a preset deceleration starting position during retreat of the injection member in the pressure holding process, controls the retreating speed of the injection member to a speed smaller than the limited value.SELECTED DRAWING: Figure 7

Description

本発明は、射出成形機の制御装置、射出成形機、及び射出成形機の制御方法に関する。 The present invention relates to an injection molding machine control device, an injection molding machine, and an injection molding machine control method.

射出成形機は、成形材料を加熱するシリンダと、シリンダの内部に設けられる射出部材と、射出部材を前進させることで成形材料を金型装置の内部に充填させる射出駆動源と、射出駆動源を制御する制御装置と、を備える(特許文献1参照)。制御装置は、充填工程と保圧工程とをこの順番で実施する。充填工程は、射出部材の移動速度の実績値が設定値になるように射出駆動源を制御することで、成形材料を金型装置の内部に充填する工程である。保圧工程は、射出部材から成形材料に作用する充填圧力の実績値が設定値になるように射出駆動源を制御することで、金型装置内での冷却収縮による不足分の成形材料を補充する工程である。 An injection molding machine has a cylinder that heats the molding material, an injection member provided inside the cylinder, an injection drive source that moves the injection member forward to fill the inside of the mold device with the molding material, and an injection drive source. and a control device for controlling (see Patent Document 1). The control device performs the filling process and the pressure holding process in this order. The filling step is a step of filling the inside of the mold device with the molding material by controlling the injection drive source so that the actual value of the moving speed of the injection member becomes the set value. In the pressure holding process, the injection drive source is controlled so that the actual value of the filling pressure acting on the molding material from the injection member becomes the set value, thereby replenishing the shortage of molding material due to cooling shrinkage within the mold equipment. This is the process of

充填工程から保圧工程への切換は、V/P切換とも呼ばれる。V/P切換の後、充填圧力の実績値が設定値よりも大きい場合、充填圧力の実績値が小さくなるように、射出部材が後退させられる。特許文献1には、保圧工程において射出部材の後退速度に制限値を設けることで、保圧工程においてスクリュが高速で後退することによる成形品の品質への悪影響を無くすことができる旨、記載されている。 Switching from the filling process to the pressure holding process is also called V/P switching. After the V/P switching, if the actual value of the filling pressure is larger than the set value, the injection member is retreated so that the actual value of the filling pressure becomes smaller. Patent Document 1 states that by setting a limit value on the retraction speed of the injection member during the pressure holding process, it is possible to eliminate the adverse effect on the quality of the molded product due to the screw retracting at high speed during the pressure holding process. has been done.

特許第3917459号公報Patent No. 3917459

ところで、シリンダの先端には、ノズルが設けられる。ノズルは、シリンダで加熱された成形材料を金型装置の内部に射出する。ノズルとシリンダの少なくとも1つの温度が低過ぎると、成形材料の粘度が射出圧に適した粘度を超え、いわゆるノズル詰まりが生じる。ノズル詰まりは、充填工程が開始され射出部材が前進させられても、成形材料がノズルから射出されない現象である。 By the way, a nozzle is provided at the tip of the cylinder. The nozzle injects the molding material heated in the cylinder into the mold device. If the temperature of at least one of the nozzle and the cylinder is too low, the viscosity of the molding material exceeds the viscosity suitable for the injection pressure, resulting in so-called nozzle clogging. Nozzle clogging is a phenomenon in which the molding material is not injected from the nozzle even when the filling process is started and the injection member is advanced.

ノズル詰まりが生じた場合、V/P切換の後、充填圧力の実績値が設定値よりも大きく、且つその偏差が大きいため、射出部材が可動範囲の後退限位置まで後退させられる恐れがあった。射出部材が後退限位置まで後退させられると、射出装置を構成する機械要素に衝撃が生じ、機械要素の寿命が短くなってしまう。 When nozzle clogging occurs, after V/P switching, the actual value of the filling pressure is larger than the set value, and the deviation is large, so there is a risk that the injection member will be retreated to the retraction limit position of the movable range. . When the injection member is retracted to the retraction limit position, an impact is generated on the mechanical elements constituting the injection device, shortening the life of the mechanical elements.

機械要素の一例として、ボールねじが挙げられる。ボールねじは、射出モータの回転運動を射出部材の直線運動に変換する。ボールねじは、ねじ軸と、ねじナットと、ねじ軸とねじナットの間で転動するボールと、を含む。ねじナットがねじ軸のストロークエンドに達することで、射出部材が後退限位置に達し、射出部材の後退が止まる。 An example of the mechanical element is a ball screw. The ball screw converts the rotational motion of the injection motor into linear motion of the injection member. A ball screw includes a screw shaft, a screw nut, and a ball that rolls between the screw shaft and the screw nut. When the screw nut reaches the stroke end of the screw shaft, the injection member reaches the retraction limit position, and the injection member stops retreating.

なお、射出部材が後退限位置まで後退させられる原因は、ノズル詰まりには限定されない。例えば、成形品の取り出し不良が生じた場合も、同様の問題が生じうる。成形品の取り出し不良が生じると、金型装置の内部に成形品が存在する状態で、充填工程が開始される。それゆえ、V/P切換の後、充填圧力の実績値が設定値よりも大きく、且つその偏差が大きいため、射出部材が可動範囲の後退限位置まで後退させられる恐れがある。 Note that the cause of the injection member being retracted to the retraction limit position is not limited to nozzle clogging. For example, a similar problem may occur if a molded product is improperly removed. If a molded product fails to be taken out, the filling process is started with the molded product still inside the mold device. Therefore, after the V/P switching, since the actual value of the filling pressure is larger than the set value and the deviation thereof is large, there is a possibility that the injection member will be retreated to the retraction limit position of the movable range.

本発明の一態様は、保圧工程において射出部材が後退させることで生じる衝撃を低減する、技術を提供する。 One aspect of the present invention provides a technique for reducing the impact caused by retreating the injection member during the pressure holding process.

本発明の一態様に係る射出成形機の制御装置は、成形材料を加熱するシリンダの内部に設けられる射出部材と、前記射出部材を前進させることで前記成形材料を金型装置の内部に充填させる射出駆動源と、を備える射出成形機の制御装置である。前記制御装置は、前記射出部材から前記成形材料に作用する充填圧力を制御する保圧工程において、前記射出部材の後退速度を予め設定された制限値以下に制限する制限部を有する。前記制限部は、前記保圧工程において、前記射出部材の後退中に、前記射出部材の位置が予め設定された減速開始位置に達すると、前記射出部材の前記後退速度を前記制限値よりも小さい速度に制御する。 A control device for an injection molding machine according to one aspect of the present invention includes an injection member provided inside a cylinder that heats molding material, and filling the inside of a mold device with the molding material by advancing the injection member. A control device for an injection molding machine including an injection drive source. The control device includes a limiter that limits the retraction speed of the injection member to a preset limit value or less in a pressure holding step that controls the filling pressure applied to the molding material from the injection member. In the pressure holding step, when the position of the injection member reaches a predetermined deceleration start position while the injection member is retracting, the restriction portion sets the retraction speed of the injection member to be smaller than the limit value. Control the speed.

本発明の一態様によれば、保圧工程において射出部材の後退中に射出部材の位置が予め設定された減速開始位置に達すると、射出部材の後退速度を制限値よりも小さい速度に制御する。これにより、仮に射出部材が後退限位置まで後退させられても、そのときの射出部材の後退速度が小さく、衝撃が小さい。従って、衝撃を低減できる。 According to one aspect of the present invention, when the position of the injection member reaches a preset deceleration start position during retraction of the injection member in the pressure holding process, the retraction speed of the injection member is controlled to a speed smaller than a limit value. . As a result, even if the injection member is retracted to the maximum retraction position, the retraction speed of the injection member at that time is small and the impact is small. Therefore, the impact can be reduced.

図1は、一実施形態に係る射出成形機の型開完了時の状態を示す図である。FIG. 1 is a diagram illustrating a state of an injection molding machine according to an embodiment when mold opening is completed. 図2は、一実施形態に係る射出成形機の型締時の状態を示す図である。FIG. 2 is a diagram showing a state of the injection molding machine according to one embodiment during mold clamping. 図3は、制御装置の構成要素の一例を機能ブロックで示す図である。FIG. 3 is a diagram showing an example of the components of the control device in functional blocks. 図4は、成形サイクルの工程の一例を示す図である。FIG. 4 is a diagram showing an example of a molding cycle process. 図5は、射出制御部の一例を示す図である。FIG. 5 is a diagram showing an example of an injection control section. 図6は、制限部の一例を示す図である。FIG. 6 is a diagram illustrating an example of a restriction section. 図7は、スクリュ速度と、充填圧力と、スクリュ位置の時間変化の一例を示す図である。FIG. 7 is a diagram showing an example of changes over time in screw speed, filling pressure, and screw position.

以下、本発明の実施形態について図面を参照して説明する。なお、各図面において同一の又は対応する構成には同一の符号を付し、説明を省略することがある。 Embodiments of the present invention will be described below with reference to the drawings. Note that in each drawing, the same or corresponding configurations are denoted by the same reference numerals, and the description thereof may be omitted.

(射出成形機)
図1は、一実施形態に係る射出成形機の型開完了時の状態を示す図である。図2は、一実施形態に係る射出成形機の型締時の状態を示す図である。本明細書において、X軸方向、Y軸方向およびZ軸方向は互いに垂直な方向である。X軸方向およびY軸方向は水平方向を表し、Z軸方向は鉛直方向を表す。型締装置100が横型である場合、X軸方向は型開閉方向であり、Y軸方向は射出成形機10の幅方向である。Y軸方向負側を操作側と呼び、Y軸方向正側を反操作側と呼ぶ。
(Injection molding machine)
FIG. 1 is a diagram illustrating a state of an injection molding machine according to an embodiment when mold opening is completed. FIG. 2 is a diagram showing a state of the injection molding machine according to one embodiment during mold clamping. In this specification, the X-axis direction, the Y-axis direction, and the Z-axis direction are directions perpendicular to each other. The X-axis direction and the Y-axis direction represent the horizontal direction, and the Z-axis direction represents the vertical direction. When the mold clamping device 100 is a horizontal type, the X-axis direction is the mold opening/closing direction, and the Y-axis direction is the width direction of the injection molding machine 10. The negative side in the Y-axis direction is called the operation side, and the positive side in the Y-axis direction is called the counter-operation side.

図1~図2に示すように、射出成形機10は、金型装置800を開閉する型締装置100と、金型装置800で成形された成形品を突き出すエジェクタ装置200と、金型装置800に成形材料を射出する射出装置300と、金型装置800に対し射出装置300を進退させる移動装置400と、射出成形機10の各構成要素を制御する制御装置700と、射出成形機10の各構成要素を支持するフレーム900とを有する。フレーム900は、型締装置100を支持する型締装置フレーム910と、射出装置300を支持する射出装置フレーム920とを含む。型締装置フレーム910および射出装置フレーム920は、それぞれ、レベリングアジャスタ930を介して床2に設置される。射出装置フレーム920の内部空間に、制御装置700が配置される。以下、射出成形機10の各構成要素について説明する。 As shown in FIGS. 1 and 2, the injection molding machine 10 includes a mold clamping device 100 that opens and closes a mold device 800, an ejector device 200 that ejects a molded product molded in the mold device 800, and a mold device 800 that ejects a molded product formed by the mold device 800. an injection device 300 that injects molding material into the mold, a moving device 400 that moves the injection device 300 forward and backward with respect to the mold device 800, a control device 700 that controls each component of the injection molding machine 10, and each of the injection molding machines 10. It has a frame 900 that supports the components. Frame 900 includes a mold clamping device frame 910 that supports mold clamping device 100 and an injection device frame 920 that supports injection device 300. The mold clamping device frame 910 and the injection device frame 920 are each installed on the floor 2 via a leveling adjuster 930. The control device 700 is arranged in the interior space of the injection device frame 920. Each component of the injection molding machine 10 will be explained below.

(型締装置)
型締装置100の説明では、型閉時の可動プラテン120の移動方向(例えばX軸正方向)を前方とし、型開時の可動プラテン120の移動方向(例えばX軸負方向)を後方として説明する。
(mold clamping device)
In the description of the mold clamping device 100, the moving direction of the movable platen 120 when the mold is closed (for example, the X-axis positive direction) is referred to as the front, and the moving direction of the movable platen 120 when the mold is opened (for example, the X-axis negative direction) is referred to as the rear. do.

型締装置100は、金型装置800の型閉、昇圧、型締、脱圧および型開を行う。金型装置800は、固定金型810と可動金型820とを含む。 The mold clamping device 100 performs mold closing, pressurization, mold clamping, depressurization, and mold opening of the mold device 800. Mold device 800 includes a fixed mold 810 and a movable mold 820.

型締装置100は例えば横型であって、型開閉方向が水平方向である。型締装置100は、固定金型810が取付けられる固定プラテン110と、可動金型820が取付けられる可動プラテン120と、固定プラテン110に対し可動プラテン120を型開閉方向に移動させる移動機構102と、を有する。 The mold clamping device 100 is, for example, horizontal, and the mold opening/closing direction is horizontal. The mold clamping device 100 includes a fixed platen 110 to which a fixed mold 810 is attached, a movable platen 120 to which a movable mold 820 is attached, and a moving mechanism 102 that moves the movable platen 120 in the mold opening/closing direction relative to the fixed platen 110. has.

固定プラテン110は、型締装置フレーム910に対し固定される。固定プラテン110における可動プラテン120との対向面に固定金型810が取付けられる。 Fixed platen 110 is fixed to mold clamping device frame 910. A fixed mold 810 is attached to a surface of the fixed platen 110 facing the movable platen 120.

可動プラテン120は、型締装置フレーム910に対し型開閉方向に移動自在に配置される。型締装置フレーム910上には、可動プラテン120を案内するガイド101が敷設される。可動プラテン120における固定プラテン110との対向面に可動金型820が取付けられる。 The movable platen 120 is arranged to be movable in the mold opening/closing direction with respect to the mold clamping device frame 910. A guide 101 for guiding the movable platen 120 is installed on the mold clamping device frame 910. A movable mold 820 is attached to a surface of the movable platen 120 facing the fixed platen 110.

移動機構102は、固定プラテン110に対し可動プラテン120を進退させることにより、金型装置800の型閉、昇圧、型締、脱圧、および型開を行う。移動機構102は、固定プラテン110と間隔をおいて配置されるトグルサポート130と、固定プラテン110とトグルサポート130を連結するタイバー140と、トグルサポート130に対して可動プラテン120を型開閉方向に移動させるトグル機構150と、トグル機構150を作動させる型締モータ160と、型締モータ160の回転運動を直線運動に変換する運動変換機構170と、固定プラテン110とトグルサポート130の間隔を調整する型厚調整機構180と、を有する。 The moving mechanism 102 moves the movable platen 120 forward and backward relative to the fixed platen 110 to close the mold, increase the pressure, clamp the mold, depressurize the mold, and open the mold. The moving mechanism 102 includes a toggle support 130 arranged at a distance from the fixed platen 110, a tie bar 140 that connects the fixed platen 110 and the toggle support 130, and a movable platen 120 that moves the movable platen 120 in the mold opening/closing direction relative to the toggle support 130. a toggle mechanism 150 that operates the toggle mechanism 150, a mold clamping motor 160 that operates the toggle mechanism 150, a motion conversion mechanism 170 that converts the rotational motion of the mold clamping motor 160 into linear motion, and a mold that adjusts the distance between the fixed platen 110 and the toggle support 130. It has a thickness adjustment mechanism 180.

トグルサポート130は、固定プラテン110と間隔をおいて配設され、型締装置フレーム910上に型開閉方向に移動自在に載置される。尚、トグルサポート130は、型締装置フレーム910上に敷設されるガイドに沿って移動自在に配置されてもよい。トグルサポート130のガイドは、可動プラテン120のガイド101と共通のものでもよい。 The toggle support 130 is arranged at a distance from the fixed platen 110 and is placed on the mold clamping device frame 910 so as to be movable in the mold opening/closing direction. Note that the toggle support 130 may be arranged to be movable along a guide laid on the mold clamping device frame 910. The guide of the toggle support 130 may be the same as the guide 101 of the movable platen 120.

尚、本実施形態では、固定プラテン110が型締装置フレーム910に対し固定され、トグルサポート130が型締装置フレーム910に対し型開閉方向に移動自在に配置されるが、トグルサポート130が型締装置フレーム910に対し固定され、固定プラテン110が型締装置フレーム910に対し型開閉方向に移動自在に配置されてもよい。 In this embodiment, the fixed platen 110 is fixed to the mold clamping device frame 910, and the toggle support 130 is arranged to be movable in the mold opening/closing direction with respect to the mold clamping device frame 910. The fixed platen 110 may be fixed to the device frame 910 and may be arranged to be movable in the mold opening/closing direction with respect to the mold clamping device frame 910.

タイバー140は、固定プラテン110とトグルサポート130とを型開閉方向に間隔Lをおいて連結する。タイバー140は、複数本(例えば4本)用いられてよい。複数本のタイバー140は、型開閉方向に平行に配置され、型締力に応じて伸びる。少なくとも1本のタイバー140には、タイバー140の歪を検出するタイバー歪検出器141が設けられてよい。タイバー歪検出器141は、その検出結果を示す信号を制御装置700に送る。タイバー歪検出器141の検出結果は、型締力の検出などに用いられる。 The tie bar 140 connects the fixed platen 110 and the toggle support 130 at a distance L in the mold opening/closing direction. A plurality of tie bars 140 (for example, four) may be used. The plurality of tie bars 140 are arranged parallel to the mold opening/closing direction, and expand according to the mold clamping force. At least one tie bar 140 may be provided with a tie bar distortion detector 141 that detects distortion of the tie bar 140. Tie bar distortion detector 141 sends a signal indicating the detection result to control device 700. The detection results of the tie bar distortion detector 141 are used for detecting mold clamping force and the like.

尚、本実施形態では、型締力を検出する型締力検出器として、タイバー歪検出器141が用いられるが、本発明はこれに限定されない。型締力検出器は、歪ゲージ式に限定されず、圧電式、容量式、油圧式、電磁式などでもよく、その取付け位置もタイバー140に限定されない。 In this embodiment, the tie bar strain detector 141 is used as a mold clamping force detector for detecting mold clamping force, but the present invention is not limited to this. The mold clamping force detector is not limited to a strain gauge type, but may be a piezoelectric type, a capacitive type, a hydraulic type, an electromagnetic type, etc., and its mounting position is not limited to the tie bar 140 either.

トグル機構150は、可動プラテン120とトグルサポート130との間に配置され、トグルサポート130に対し可動プラテン120を型開閉方向に移動させる。トグル機構150は、型開閉方向に移動するクロスヘッド151と、クロスヘッド151の移動によって屈伸する一対のリンク群と、を有する。一対のリンク群は、それぞれ、ピンなどで屈伸自在に連結される第1リンク152と第2リンク153とを有する。第1リンク152は可動プラテン120に対しピンなどで揺動自在に取付けられる。第2リンク153はトグルサポート130に対しピンなどで揺動自在に取付けられる。第2リンク153は、第3リンク154を介してクロスヘッド151に取付けられる。トグルサポート130に対しクロスヘッド151を進退させると、第1リンク152と第2リンク153とが屈伸し、トグルサポート130に対し可動プラテン120が進退する。 The toggle mechanism 150 is disposed between the movable platen 120 and the toggle support 130, and moves the movable platen 120 relative to the toggle support 130 in the mold opening/closing direction. The toggle mechanism 150 includes a crosshead 151 that moves in the mold opening/closing direction, and a pair of links that bend and expand as the crosshead 151 moves. Each of the pair of link groups includes a first link 152 and a second link 153 that are connected to each other with a pin or the like in a flexible manner. The first link 152 is swingably attached to the movable platen 120 with a pin or the like. The second link 153 is swingably attached to the toggle support 130 with a pin or the like. The second link 153 is attached to the crosshead 151 via a third link 154. When the crosshead 151 is moved forward and backward with respect to the toggle support 130, the first link 152 and the second link 153 are bent and extended, and the movable platen 120 is moved forward and backward with respect to the toggle support 130.

尚、トグル機構150の構成は、図1および図2に示す構成に限定されない。例えば図1および図2では、各リンク群の節点の数が5つであるが、4つでもよく、第3リンク154の一端部が、第1リンク152と第2リンク153との節点に結合されてもよい。 Note that the configuration of the toggle mechanism 150 is not limited to the configuration shown in FIGS. 1 and 2. For example, in FIGS. 1 and 2, the number of nodes in each link group is five, but it may be four, and one end of the third link 154 is connected to the nodes of the first link 152 and the second link 153. may be done.

型締モータ160は、トグルサポート130に取付けられており、トグル機構150を作動させる。型締モータ160は、トグルサポート130に対しクロスヘッド151を進退させることにより、第1リンク152と第2リンク153とを屈伸させ、トグルサポート130に対し可動プラテン120を進退させる。型締モータ160は、運動変換機構170に直結されるが、ベルトやプーリなどを介して運動変換機構170に連結されてもよい。 The mold clamping motor 160 is attached to the toggle support 130 and operates the toggle mechanism 150. The mold clamping motor 160 moves the crosshead 151 forward and backward relative to the toggle support 130, thereby bending and extending the first link 152 and the second link 153, and moves the movable platen 120 forward and backward relative to the toggle support 130. The mold clamping motor 160 is directly connected to the motion conversion mechanism 170, but may also be connected to the motion conversion mechanism 170 via a belt, a pulley, or the like.

運動変換機構170は、型締モータ160の回転運動をクロスヘッド151の直線運動に変換する。運動変換機構170は、ねじ軸と、ねじ軸に螺合するねじナットとを含む。ねじ軸と、ねじナットとの間には、ボールまたはローラが介在してよい。 The motion conversion mechanism 170 converts the rotational motion of the mold clamping motor 160 into linear motion of the crosshead 151. The motion conversion mechanism 170 includes a screw shaft and a screw nut that is threaded onto the screw shaft. A ball or roller may be interposed between the screw shaft and the screw nut.

型締装置100は、制御装置700による制御下で、型閉工程、昇圧工程、型締工程、脱圧工程、および型開工程などを行う。 The mold clamping device 100 performs a mold closing process, a pressure increasing process, a mold clamping process, a depressurizing process, a mold opening process, etc. under the control of the control device 700.

型閉工程では、型締モータ160を駆動してクロスヘッド151を設定移動速度で型閉完了位置まで前進させることにより、可動プラテン120を前進させ、可動金型820を固定金型810にタッチさせる。クロスヘッド151の位置や移動速度は、例えば型締モータエンコーダ161などを用いて検出する。型締モータエンコーダ161は、型締モータ160の回転を検出し、その検出結果を示す信号を制御装置700に送る。 In the mold closing process, the movable platen 120 is advanced by driving the mold clamping motor 160 to advance the crosshead 151 at a set movement speed to the mold closing completion position, and the movable mold 820 is brought into contact with the fixed mold 810. . The position and moving speed of the crosshead 151 are detected using, for example, a mold clamping motor encoder 161. The mold clamping motor encoder 161 detects the rotation of the mold clamping motor 160 and sends a signal indicating the detection result to the control device 700.

尚、クロスヘッド151の位置を検出するクロスヘッド位置検出器、およびクロスヘッド151の移動速度を検出するクロスヘッド移動速度検出器は、型締モータエンコーダ161に限定されず、一般的なものを使用できる。また、可動プラテン120の位置を検出する可動プラテン位置検出器、および可動プラテン120の移動速度を検出する可動プラテン移動速度検出器は、型締モータエンコーダ161に限定されず、一般的なものを使用できる。 Note that the crosshead position detector that detects the position of the crosshead 151 and the crosshead movement speed detector that detects the moving speed of the crosshead 151 are not limited to the mold clamping motor encoder 161, but general ones can be used. can. Furthermore, the movable platen position detector that detects the position of the movable platen 120 and the movable platen movement speed detector that detects the moving speed of the movable platen 120 are not limited to the mold clamping motor encoder 161, but may be general ones. can.

昇圧工程では、型締モータ160をさらに駆動してクロスヘッド151を型閉完了位置から型締位置までさらに前進させることで型締力を生じさせる。 In the pressure increasing process, the mold clamping motor 160 is further driven to further advance the crosshead 151 from the mold closing completion position to the mold clamping position, thereby generating mold clamping force.

型締工程では、型締モータ160を駆動して、クロスヘッド151の位置を型締位置に維持する。型締工程では、昇圧工程で発生させた型締力が維持される。型締工程では、可動金型820と固定金型810との間にキャビティ空間801(図2参照)が形成され、射出装置300がキャビティ空間801に液状の成形材料を充填する。充填された成形材料が固化されることで、成形品が得られる。 In the mold clamping process, the mold clamping motor 160 is driven to maintain the position of the crosshead 151 at the mold clamping position. In the mold clamping process, the mold clamping force generated in the pressure increasing process is maintained. In the mold clamping process, a cavity space 801 (see FIG. 2) is formed between the movable mold 820 and the fixed mold 810, and the injection device 300 fills the cavity space 801 with liquid molding material. A molded article is obtained by solidifying the filled molding material.

キャビティ空間801の数は、1つでもよいし、複数でもよい。後者の場合、複数の成形品が同時に得られる。キャビティ空間801の一部にインサート材が配置され、キャビティ空間801の他の一部に成形材料が充填されてもよい。インサート材と成形材料とが一体化した成形品が得られる。 The number of cavity spaces 801 may be one or more. In the latter case, multiple molded articles can be obtained simultaneously. An insert material may be placed in a part of the cavity space 801, and another part of the cavity space 801 may be filled with a molding material. A molded product in which the insert material and the molding material are integrated can be obtained.

脱圧工程では、型締モータ160を駆動してクロスヘッド151を型締位置から型開開始位置まで後退させることにより、可動プラテン120を後退させ、型締力を減少させる。型開開始位置と、型閉完了位置とは、同じ位置であってよい。 In the depressurization step, the mold clamping motor 160 is driven to move the crosshead 151 back from the mold clamping position to the mold opening start position, thereby retracting the movable platen 120 and reducing the mold clamping force. The mold opening start position and the mold closing completion position may be the same position.

型開工程では、型締モータ160を駆動してクロスヘッド151を設定移動速度で型開開始位置から型開完了位置まで後退させることにより、可動プラテン120を後退させ、可動金型820を固定金型810から離間させる。その後、エジェクタ装置200が可動金型820から成形品を突き出す。 In the mold opening process, the movable platen 120 is moved backward by driving the mold clamping motor 160 to move the crosshead 151 backward from the mold opening start position to the mold opening completion position at a set movement speed, and the movable mold 820 is moved between the fixed metal molds and the mold opening process. Separate from mold 810. Thereafter, the ejector device 200 ejects the molded product from the movable mold 820.

型閉工程、昇圧工程および型締工程における設定条件は、一連の設定条件として、まとめて設定される。例えば、型閉工程および昇圧工程におけるクロスヘッド151の移動速度や位置(型閉開始位置、移動速度切換位置、型閉完了位置、および型締位置を含む)、型締力は、一連の設定条件として、まとめて設定される。型閉開始位置、移動速度切換位置、型閉完了位置、および型締位置は、後側から前方に向けてこの順で並び、移動速度が設定される区間の始点や終点を表す。区間毎に、移動速度が設定される。移動速度切換位置は、1つでもよいし、複数でもよい。移動速度切換位置は、設定されなくてもよい。型締位置と型締力とは、いずれか一方のみが設定されてもよい。 Setting conditions in the mold closing process, pressure increasing process, and mold clamping process are collectively set as a series of setting conditions. For example, the moving speed and position of the crosshead 151 (including the mold closing start position, the movement speed switching position, the mold closing completion position, and the mold clamping position) and the mold clamping force in the mold closing process and the pressure increasing process are determined by a series of setting conditions. are set all together as . The mold closing start position, the moving speed switching position, the mold closing completion position, and the mold closing position are arranged in this order from the rear side toward the front, and represent the starting point and ending point of the section in which the moving speed is set. A moving speed is set for each section. There may be one or more moving speed switching positions. The moving speed switching position does not need to be set. Only one of the mold clamping position and mold clamping force may be set.

脱圧工程および型開工程における設定条件も同様に設定される。例えば、脱圧工程および型開工程におけるクロスヘッド151の移動速度や位置(型開開始位置、移動速度切換位置、および型開完了位置)は、一連の設定条件として、まとめて設定される。型開開始位置、移動速度切換位置、および型開完了位置は、前側から後方に向けて、この順で並び、移動速度が設定される区間の始点や終点を表す。区間毎に、移動速度が設定される。移動速度切換位置は、1つでもよいし、複数でもよい。移動速度切換位置は、設定されなくてもよい。型開開始位置と型閉完了位置とは同じ位置であってよい。また、型開完了位置と型閉開始位置とは同じ位置であってよい。 Setting conditions in the depressurization process and mold opening process are similarly set. For example, the moving speed and position (mold opening start position, moving speed switching position, and mold opening completion position) of the crosshead 151 in the depressurization process and the mold opening process are collectively set as a series of setting conditions. The mold opening start position, the movement speed switching position, and the mold opening completion position are arranged in this order from the front side toward the rear, and represent the start point and end point of the section in which the movement speed is set. A moving speed is set for each section. There may be one or more moving speed switching positions. The moving speed switching position does not need to be set. The mold opening start position and the mold closing completion position may be the same position. Further, the mold opening completion position and the mold closing start position may be the same position.

尚、クロスヘッド151の移動速度や位置などの代わりに、可動プラテン120の移動速度や位置などが設定されてもよい。また、クロスヘッド151の位置(例えば型締位置)や可動プラテン120の位置の代わりに、型締力が設定されてもよい。 Note that instead of the moving speed, position, etc. of the crosshead 151, the moving speed, position, etc. of the movable platen 120 may be set. Moreover, the mold clamping force may be set instead of the position of the crosshead 151 (for example, mold clamping position) or the position of the movable platen 120.

ところで、トグル機構150は、型締モータ160の駆動力を増幅して可動プラテン120に伝える。その増幅倍率は、トグル倍率とも呼ばれる。トグル倍率は、第1リンク152と第2リンク153とのなす角θ(以下、「リンク角度θ」とも呼ぶ)に応じて変化する。リンク角度θは、クロスヘッド151の位置から求められる。リンク角度θが180°のとき、トグル倍率が最大になる。 By the way, the toggle mechanism 150 amplifies the driving force of the mold clamping motor 160 and transmits it to the movable platen 120. The amplification factor is also called the toggle factor. The toggle magnification changes depending on the angle θ formed by the first link 152 and the second link 153 (hereinafter also referred to as “link angle θ”). The link angle θ is determined from the position of the crosshead 151. When the link angle θ is 180°, the toggle magnification is maximum.

金型装置800の交換や金型装置800の温度変化などにより金型装置800の厚さが変化した場合、型締時に所定の型締力が得られるように、型厚調整が行われる。型厚調整では、例えば可動金型820が固定金型810にタッチする型タッチの時点でトグル機構150のリンク角度θが所定の角度になるように、固定プラテン110とトグルサポート130との間隔Lを調整する。 When the thickness of the mold device 800 changes due to replacement of the mold device 800 or a change in the temperature of the mold device 800, the mold thickness is adjusted so that a predetermined mold clamping force is obtained during mold clamping. In the mold thickness adjustment, for example, the distance L between the fixed platen 110 and the toggle support 130 is adjusted so that the link angle θ of the toggle mechanism 150 becomes a predetermined angle at the time of mold touch when the movable mold 820 touches the fixed mold 810. Adjust.

型締装置100は、型厚調整機構180を有する。型厚調整機構180は、固定プラテン110とトグルサポート130との間隔Lを調整することで、型厚調整を行う。なお、型厚調整のタイミングは、例えば成形サイクル終了から次の成形サイクル開始までの間に行われる。型厚調整機構180は、例えば、タイバー140の後端部に形成されるねじ軸181と、トグルサポート130に回転自在に且つ進退不能に保持されるねじナット182と、ねじ軸181に螺合するねじナット182を回転させる型厚調整モータ183とを有する。 The mold clamping device 100 has a mold thickness adjustment mechanism 180. The mold thickness adjustment mechanism 180 adjusts the mold thickness by adjusting the distance L between the fixed platen 110 and the toggle support 130. The mold thickness adjustment is performed, for example, between the end of a molding cycle and the start of the next molding cycle. The mold thickness adjustment mechanism 180 is, for example, screwed into a screw shaft 181 formed at the rear end of the tie bar 140, a screw nut 182 that is rotatably but not retractably held on the toggle support 130, and screwed onto the screw shaft 181. It has a mold thickness adjustment motor 183 that rotates a screw nut 182.

ねじ軸181およびねじナット182は、タイバー140ごとに設けられる。型厚調整モータ183の回転駆動力は、回転駆動力伝達部185を介して複数のねじナット182に伝達されてよい。複数のねじナット182を同期して回転できる。尚、回転駆動力伝達部185の伝達経路を変更することで、複数のねじナット182を個別に回転することも可能である。 A screw shaft 181 and a screw nut 182 are provided for each tie bar 140. The rotational driving force of the mold thickness adjustment motor 183 may be transmitted to the plurality of threaded nuts 182 via the rotational driving force transmission section 185. A plurality of screw nuts 182 can be rotated synchronously. Note that by changing the transmission path of the rotational driving force transmission section 185, it is also possible to rotate the plurality of screw nuts 182 individually.

回転駆動力伝達部185は、例えば歯車などで構成される。この場合、各ねじナット182の外周に従動歯車が形成され、型厚調整モータ183の出力軸には駆動歯車が取付けられ、複数の従動歯車および駆動歯車と噛み合う中間歯車がトグルサポート130の中央部に回転自在に保持される。尚、回転駆動力伝達部185は、歯車の代わりに、ベルトやプーリなどで構成されてもよい。 The rotational driving force transmission section 185 is composed of, for example, a gear. In this case, a driven gear is formed on the outer periphery of each screw nut 182, a driving gear is attached to the output shaft of the mold thickness adjustment motor 183, and an intermediate gear that meshes with the plurality of driven gears and the driving gear is located at the center of the toggle support 130. is held rotatably. Note that the rotational driving force transmission section 185 may be configured with a belt, a pulley, or the like instead of a gear.

型厚調整機構180の動作は、制御装置700によって制御される。制御装置700は、型厚調整モータ183を駆動して、ねじナット182を回転させる。その結果、トグルサポート130のタイバー140に対する位置が調整され、固定プラテン110とトグルサポート130との間隔Lが調整される。尚、複数の型厚調整機構が組み合わせて用いられてもよい。 The operation of mold thickness adjustment mechanism 180 is controlled by control device 700. The control device 700 drives the mold thickness adjustment motor 183 to rotate the screw nut 182. As a result, the position of toggle support 130 with respect to tie bar 140 is adjusted, and the distance L between fixed platen 110 and toggle support 130 is adjusted. Note that a plurality of mold thickness adjustment mechanisms may be used in combination.

間隔Lは、型厚調整モータエンコーダ184を用いて検出する。型厚調整モータエンコーダ184は、型厚調整モータ183の回転量や回転方向を検出し、その検出結果を示す信号を制御装置700に送る。型厚調整モータエンコーダ184の検出結果は、トグルサポート130の位置や間隔Lの監視や制御に用いられる。尚、トグルサポート130の位置を検出するトグルサポート位置検出器、および間隔Lを検出する間隔検出器は、型厚調整モータエンコーダ184に限定されず、一般的なものを使用できる。 The distance L is detected using a mold thickness adjustment motor encoder 184. The mold thickness adjustment motor encoder 184 detects the rotation amount and rotation direction of the mold thickness adjustment motor 183 and sends a signal indicating the detection result to the control device 700. The detection results of the mold thickness adjustment motor encoder 184 are used for monitoring and controlling the position and interval L of the toggle support 130. Note that the toggle support position detector that detects the position of the toggle support 130 and the interval detector that detects the interval L are not limited to the mold thickness adjustment motor encoder 184, and general ones can be used.

型締装置100は、金型装置800の温度を調節する金型温調器を有してもよい。金型装置800は、その内部に、温調媒体の流路を有する。金型温調器は、金型装置800の流路に供給する温調媒体の温度を調節することで、金型装置800の温度を調節する。 The mold clamping device 100 may include a mold temperature regulator that adjusts the temperature of the mold device 800. The mold device 800 has a temperature control medium flow path therein. The mold temperature regulator adjusts the temperature of the mold device 800 by adjusting the temperature of the temperature regulating medium supplied to the flow path of the mold device 800.

尚、本実施形態の型締装置100は、型開閉方向が水平方向である横型であるが、型開閉方向が上下方向である竪型でもよい。 Although the mold clamping device 100 of this embodiment is a horizontal type in which the mold opening/closing direction is the horizontal direction, it may be a vertical type in which the mold opening/closing direction is the vertical direction.

尚、本実施形態の型締装置100は、駆動部として、型締モータ160を有するが、型締モータ160の代わりに、油圧シリンダを有してもよい。また、型締装置100は、型開閉用にリニアモータを有し、型締用に電磁石を有してもよい。 Although the mold clamping device 100 of this embodiment has a mold clamping motor 160 as a drive unit, it may have a hydraulic cylinder instead of the mold clamping motor 160. Moreover, the mold clamping device 100 may have a linear motor for opening and closing the mold, and may have an electromagnet for mold clamping.

(エジェクタ装置)
エジェクタ装置200の説明では、型締装置100の説明と同様に、型閉時の可動プラテン120の移動方向(例えばX軸正方向)を前方とし、型開時の可動プラテン120の移動方向(例えばX軸負方向)を後方として説明する。
(Ejector device)
In the description of the ejector device 200, similarly to the description of the mold clamping device 100, the moving direction of the movable platen 120 when closing the mold (for example, The explanation will be made assuming that the X-axis negative direction) is the rear direction.

エジェクタ装置200は、可動プラテン120に取付けられ、可動プラテン120と共に進退する。エジェクタ装置200は、金型装置800から成形品を突き出すエジェクタロッド210と、エジェクタロッド210を可動プラテン120の移動方向(X軸方向)に移動させる駆動機構220とを有する。 Ejector device 200 is attached to movable platen 120 and moves forward and backward together with movable platen 120. Ejector device 200 includes an ejector rod 210 that ejects a molded product from mold device 800, and a drive mechanism 220 that moves ejector rod 210 in the moving direction of movable platen 120 (X-axis direction).

エジェクタロッド210は、可動プラテン120の貫通穴に進退自在に配置される。エジェクタロッド210の前端部は、可動金型820のエジェクタプレート826と接触する。エジェクタロッド210の前端部は、エジェクタプレート826と連結されていても、連結されていなくてもよい。 The ejector rod 210 is arranged in a through hole of the movable platen 120 so as to be able to move forward and backward. The front end of the ejector rod 210 contacts the ejector plate 826 of the movable mold 820. The front end of the ejector rod 210 may or may not be connected to the ejector plate 826.

駆動機構220は、例えば、エジェクタモータと、エジェクタモータの回転運動をエジェクタロッド210の直線運動に変換する運動変換機構とを有する。運動変換機構は、ねじ軸と、ねじ軸に螺合するねじナットとを含む。ねじ軸と、ねじナットとの間には、ボールまたはローラが介在してよい。 The drive mechanism 220 includes, for example, an ejector motor and a motion conversion mechanism that converts the rotational motion of the ejector motor into linear motion of the ejector rod 210. The motion conversion mechanism includes a screw shaft and a screw nut that is threaded onto the screw shaft. A ball or roller may be interposed between the screw shaft and the screw nut.

エジェクタ装置200は、制御装置700による制御下で、突き出し工程を行う。突き出し工程では、エジェクタロッド210を設定移動速度で待機位置から突き出し位置まで前進させることにより、エジェクタプレート826を前進させ、成形品を突き出す。その後、エジェクタモータを駆動してエジェクタロッド210を設定移動速度で後退させ、エジェクタプレート826を元の待機位置まで後退させる。 The ejector device 200 performs an ejection process under the control of the control device 700. In the ejecting step, the ejector rod 210 is advanced from the standby position to the ejecting position at a set movement speed, thereby advancing the ejector plate 826 and ejecting the molded product. Thereafter, the ejector motor is driven to move the ejector rod 210 backward at a set movement speed, and the ejector plate 826 is moved back to its original standby position.

エジェクタロッド210の位置や移動速度は、例えばエジェクタモータエンコーダを用いて検出する。エジェクタモータエンコーダは、エジェクタモータの回転を検出し、その検出結果を示す信号を制御装置700に送る。尚、エジェクタロッド210の位置を検出するエジェクタロッド位置検出器、およびエジェクタロッド210の移動速度を検出するエジェクタロッド移動速度検出器は、エジェクタモータエンコーダに限定されず、一般的なものを使用できる。 The position and moving speed of the ejector rod 210 are detected using, for example, an ejector motor encoder. The ejector motor encoder detects the rotation of the ejector motor and sends a signal indicating the detection result to the control device 700. Note that the ejector rod position detector that detects the position of the ejector rod 210 and the ejector rod movement speed detector that detects the moving speed of the ejector rod 210 are not limited to the ejector motor encoder, and general ones can be used.

(射出装置)
射出装置300の説明では、型締装置100の説明やエジェクタ装置200の説明とは異なり、充填時のスクリュ330の移動方向(例えばX軸負方向)を前方とし、計量時のスクリュ330の移動方向(例えばX軸正方向)を後方として説明する。
(injection device)
In the description of the injection device 300, unlike the description of the mold clamping device 100 and the ejector device 200, the direction of movement of the screw 330 during filling (for example, the negative direction of the X axis) is referred to as the front, and the direction of movement of the screw 330 during metering is (For example, the X-axis positive direction) will be explained as being backward.

射出装置300はスライドベース301に設置され、スライドベース301は射出装置フレーム920に対し進退自在に配置される。射出装置300は、金型装置800に対し進退自在に配置される。射出装置300は、金型装置800にタッチし、金型装置800内のキャビティ空間801に成形材料を充填する。射出装置300は、例えば、成形材料を加熱するシリンダ310と、シリンダ310の前端部に設けられるノズル320と、シリンダ310内に進退自在に且つ回転自在に配置されるスクリュ330と、スクリュ330を回転させる計量モータ340と、スクリュ330を進退させる射出モータ350と、射出モータ350とスクリュ330の間で伝達される荷重を検出する荷重検出器360と、を有する。 The injection device 300 is installed on a slide base 301, and the slide base 301 is arranged to be movable forward and backward relative to the injection device frame 920. The injection device 300 is arranged to be movable forward and backward relative to the mold device 800. The injection device 300 touches the mold device 800 and fills the cavity space 801 in the mold device 800 with the molding material. The injection device 300 includes, for example, a cylinder 310 that heats the molding material, a nozzle 320 provided at the front end of the cylinder 310, a screw 330 that is rotatably disposed in the cylinder 310 so as to be able to move forward and backward, and rotate the screw 330. an injection motor 350 that moves the screw 330 forward and backward, and a load detector 360 that detects the load transmitted between the injection motor 350 and the screw 330.

シリンダ310は、供給口311から内部に供給された成形材料を加熱する。成形材料は、例えば樹脂などを含む。成形材料は、例えばペレット状に形成され、固体の状態で供給口311に供給される。供給口311はシリンダ310の後部に形成される。シリンダ310の後部の外周には、水冷シリンダなどの冷却器312が設けられる。冷却器312よりも前方において、シリンダ310の外周には、バンドヒータなどの第1加熱器313と第1温度検出器314とが設けられる。 The cylinder 310 heats the molding material supplied therein from the supply port 311 . The molding material includes, for example, resin. The molding material is formed into a pellet shape, for example, and is supplied to the supply port 311 in a solid state. The supply port 311 is formed at the rear of the cylinder 310 . A cooler 312 such as a water-cooled cylinder is provided on the outer periphery of the rear portion of the cylinder 310 . A first heater 313 such as a band heater and a first temperature detector 314 are provided on the outer periphery of the cylinder 310 in front of the cooler 312 .

シリンダ310は、シリンダ310の軸方向(例えばX軸方向)に複数のゾーンに区分される。複数のゾーンのそれぞれに第1加熱器313と第1温度検出器314とが設けられる。複数のゾーンのそれぞれに設定温度が設定され、第1温度検出器314の検出温度が設定温度になるように、制御装置700が第1加熱器313を制御する。 The cylinder 310 is divided into a plurality of zones in the axial direction (for example, the X-axis direction) of the cylinder 310. A first heater 313 and a first temperature detector 314 are provided in each of the plurality of zones. A set temperature is set for each of the plurality of zones, and the control device 700 controls the first heater 313 so that the temperature detected by the first temperature detector 314 becomes the set temperature.

ノズル320は、シリンダ310の前端部に設けられ、金型装置800に対し押し付けられる。ノズル320の外周には、第2加熱器323と第2温度検出器324とが設けられる。ノズル320の検出温度が設定温度になるように、制御装置700が第2加熱器323を制御する。 The nozzle 320 is provided at the front end of the cylinder 310 and is pressed against the mold device 800. A second heater 323 and a second temperature detector 324 are provided on the outer periphery of the nozzle 320. The control device 700 controls the second heater 323 so that the detected temperature of the nozzle 320 becomes the set temperature.

スクリュ330は、シリンダ310内に回転自在に且つ進退自在に配置される。スクリュ330を回転させると、スクリュ330の螺旋状の溝に沿って成形材料が前方に送られる。成形材料は、前方に送られながら、シリンダ310からの熱によって徐々に溶融される。液状の成形材料がスクリュ330の前方に送られシリンダ310の前部に蓄積されるにつれ、スクリュ330が後退させられる。その後、スクリュ330を前進させると、スクリュ330前方に蓄積された液状の成形材料がノズル320から射出され、金型装置800内に充填される。 The screw 330 is arranged within the cylinder 310 so as to be rotatable and movable back and forth. When the screw 330 is rotated, the molding material is sent forward along the spiral groove of the screw 330. The molding material is gradually melted by heat from the cylinder 310 while being sent forward. As the liquid molding material is sent forward of the screw 330 and accumulated at the front of the cylinder 310, the screw 330 is retracted. Thereafter, when the screw 330 is moved forward, the liquid molding material accumulated in front of the screw 330 is injected from the nozzle 320 and filled into the mold device 800.

スクリュ330の前部には、スクリュ330を前方に押すときにスクリュ330の前方から後方に向かう成形材料の逆流を防止する逆流防止弁として、逆流防止リング331が進退自在に取付けられる。 A backflow prevention ring 331 is attached to the front of the screw 330 so that it can move forward and backward as a backflow prevention valve that prevents the molding material from flowing backward from the front of the screw 330 when the screw 330 is pushed forward.

逆流防止リング331は、スクリュ330を前進させるときに、スクリュ330前方の成形材料の圧力によって後方に押され、成形材料の流路を塞ぐ閉塞位置(図2参照)までスクリュ330に対し相対的に後退する。これにより、スクリュ330前方に蓄積された成形材料が後方に逆流するのを防止する。 When the screw 330 is advanced, the backflow prevention ring 331 is pushed backward by the pressure of the molding material in front of the screw 330, and is moved relative to the screw 330 to a closed position (see FIG. 2) where it blocks the flow path of the molding material. fall back. This prevents the molding material accumulated in front of the screw 330 from flowing backward.

一方、逆流防止リング331は、スクリュ330を回転させるときに、スクリュ330の螺旋状の溝に沿って前方に送られる成形材料の圧力によって前方に押され、成形材料の流路を開放する開放位置(図1参照)までスクリュ330に対し相対的に前進する。これにより、スクリュ330の前方に成形材料が送られる。 On the other hand, when the screw 330 is rotated, the backflow prevention ring 331 is pushed forward by the pressure of the molding material sent forward along the spiral groove of the screw 330, and is moved to an open position where the flow path of the molding material is opened. (see FIG. 1) relative to the screw 330. As a result, the molding material is sent to the front of the screw 330.

逆流防止リング331は、スクリュ330と共に回転する共回りタイプと、スクリュ330と共に回転しない非共回りタイプのいずれでもよい。 The backflow prevention ring 331 may be either a co-rotating type that rotates together with the screw 330 or a non-co-rotating type that does not rotate together with the screw 330.

尚、射出装置300は、スクリュ330に対し逆流防止リング331を開放位置と閉塞位置との間で進退させる駆動源を有していてもよい。 Note that the injection device 300 may include a drive source that moves the backflow prevention ring 331 forward and backward relative to the screw 330 between an open position and a closed position.

計量モータ340は、スクリュ330を回転させる。スクリュ330を回転させる駆動源は、計量モータ340には限定されず、例えば油圧ポンプなどでもよい。 Metering motor 340 rotates screw 330. The drive source for rotating the screw 330 is not limited to the metering motor 340, and may be, for example, a hydraulic pump.

射出モータ350は、スクリュ330を進退させる。射出モータ350とスクリュ330との間には、射出モータ350の回転運動をスクリュ330の直線運動に変換する運動変換機構などが設けられる。運動変換機構は、例えばねじ軸と、ねじ軸に螺合するねじナットとを有する。ねじ軸とねじナットの間には、ボールやローラなどが設けられてよい。スクリュ330を進退させる駆動源は、射出モータ350には限定されず、例えば油圧シリンダなどでもよい。 The injection motor 350 moves the screw 330 forward and backward. A motion conversion mechanism or the like that converts the rotational motion of the injection motor 350 into linear motion of the screw 330 is provided between the injection motor 350 and the screw 330. The motion conversion mechanism includes, for example, a screw shaft and a screw nut that is threaded onto the screw shaft. A ball, roller, etc. may be provided between the screw shaft and the screw nut. The drive source for advancing and retracting the screw 330 is not limited to the injection motor 350, and may be, for example, a hydraulic cylinder.

荷重検出器360は、射出モータ350とスクリュ330との間で伝達される荷重を検出する。検出した荷重は、制御装置700で圧力に換算される。荷重検出器360は、射出モータ350とスクリュ330との間の荷重の伝達経路に設けられ、荷重検出器360に作用する荷重を検出する。 Load detector 360 detects the load transmitted between injection motor 350 and screw 330. The detected load is converted into pressure by the control device 700. The load detector 360 is provided in a load transmission path between the injection motor 350 and the screw 330, and detects the load acting on the load detector 360.

荷重検出器360は、検出した荷重の信号を制御装置700に送る。荷重検出器360によって検出される荷重は、スクリュ330と成形材料との間で作用する圧力に換算され、スクリュ330が成形材料から受ける圧力、スクリュ330に対する背圧、スクリュ330から成形材料に作用する圧力などの制御や監視に用いられる。 Load detector 360 sends a detected load signal to control device 700. The load detected by the load detector 360 is converted into the pressure that acts between the screw 330 and the molding material, and includes the pressure that the screw 330 receives from the molding material, the back pressure on the screw 330, and the pressure that acts on the molding material from the screw 330. Used for controlling and monitoring pressure, etc.

尚、成形材料の圧力を検出する圧力検出器は、荷重検出器360に限定されず、一般的なものを使用できる。例えば、ノズル圧センサ、又は型内圧センサが用いられてもよい。ノズル圧センサは、ノズル320に設置される。型内圧センサは、金型装置800の内部に設置される。 Note that the pressure detector for detecting the pressure of the molding material is not limited to the load detector 360, and any general pressure detector can be used. For example, a nozzle pressure sensor or an internal mold pressure sensor may be used. A nozzle pressure sensor is installed on the nozzle 320. The mold internal pressure sensor is installed inside the mold device 800.

射出装置300は、制御装置700による制御下で、計量工程、充填工程および保圧工程などを行う。充填工程と保圧工程とをまとめて射出工程と呼んでもよい。 The injection device 300 performs a metering process, a filling process, a pressure holding process, etc. under the control of the control device 700. The filling process and the pressure holding process may be collectively referred to as the injection process.

計量工程では、計量モータ340を駆動してスクリュ330を設定回転速度で回転させ、スクリュ330の螺旋状の溝に沿って成形材料を前方に送る。これに伴い、成形材料が徐々に溶融される。液状の成形材料がスクリュ330の前方に送られシリンダ310の前部に蓄積されるにつれ、スクリュ330が後退させられる。スクリュ330の回転速度は、例えば計量モータエンコーダ341を用いて検出する。計量モータエンコーダ341は、計量モータ340の回転を検出し、その検出結果を示す信号を制御装置700に送る。尚、スクリュ330の回転速度を検出するスクリュ回転速度検出器は、計量モータエンコーダ341に限定されず、一般的なものを使用できる。 In the metering process, the screw 330 is rotated at a set rotation speed by driving the metering motor 340, and the molding material is sent forward along the spiral groove of the screw 330. Along with this, the molding material is gradually melted. As the liquid molding material is sent forward of the screw 330 and accumulated at the front of the cylinder 310, the screw 330 is retracted. The rotational speed of the screw 330 is detected using, for example, a metering motor encoder 341. Measuring motor encoder 341 detects the rotation of metering motor 340 and sends a signal indicating the detection result to control device 700. Note that the screw rotation speed detector for detecting the rotation speed of the screw 330 is not limited to the metering motor encoder 341, and a general type can be used.

計量工程では、スクリュ330の急激な後退を制限すべく、射出モータ350を駆動してスクリュ330に対して設定背圧を加えてよい。スクリュ330に対する背圧は、例えば荷重検出器360を用いて検出する。スクリュ330が計量完了位置まで後退し、スクリュ330の前方に所定量の成形材料が蓄積されると、計量工程が完了する。 In the metering process, the injection motor 350 may be driven to apply a set back pressure to the screw 330 in order to limit rapid retraction of the screw 330. The back pressure on the screw 330 is detected using, for example, a load detector 360. When the screw 330 is retracted to the metering completion position and a predetermined amount of molding material is accumulated in front of the screw 330, the metering process is completed.

計量工程におけるスクリュ330の位置および回転速度は、一連の設定条件として、まとめて設定される。例えば、計量開始位置、回転速度切換位置および計量完了位置が設定される。これらの位置は、前側から後方に向けてこの順で並び、回転速度が設定される区間の始点や終点を表す。区間毎に、回転速度が設定される。回転速度切換位置は、1つでもよいし、複数でもよい。回転速度切換位置は、設定されなくてもよい。また、区間毎に背圧が設定される。 The position and rotational speed of the screw 330 in the metering process are set together as a series of setting conditions. For example, a measurement start position, a rotational speed switching position, and a measurement completion position are set. These positions are lined up in this order from the front to the rear, and represent the start and end points of the section in which the rotational speed is set. The rotation speed is set for each section. The number of rotational speed switching positions may be one or more. The rotational speed switching position does not need to be set. Further, back pressure is set for each section.

充填工程では、射出モータ350を駆動してスクリュ330を設定移動速度で前進させ、スクリュ330の前方に蓄積された液状の成形材料を金型装置800内のキャビティ空間801に充填させる。スクリュ330の位置や移動速度は、例えば射出モータエンコーダ351を用いて検出する。射出モータエンコーダ351は、射出モータ350の回転を検出し、その検出結果を示す信号を制御装置700に送る。スクリュ330の位置が設定位置に達すると、充填工程から保圧工程への切換(所謂、V/P切換)が行われる。V/P切換が行われる位置をV/P切換位置とも呼ぶ。スクリュ330の設定移動速度は、スクリュ330の位置や時間などに応じて変更されてもよい。 In the filling process, the injection motor 350 is driven to advance the screw 330 at a set moving speed, and the liquid molding material accumulated in front of the screw 330 is filled into the cavity space 801 in the mold device 800. The position and moving speed of the screw 330 are detected using, for example, an injection motor encoder 351. Injection motor encoder 351 detects rotation of injection motor 350 and sends a signal indicating the detection result to control device 700. When the position of the screw 330 reaches the set position, the filling process is switched to the pressure holding process (so-called V/P switching). The position where V/P switching is performed is also called the V/P switching position. The set moving speed of the screw 330 may be changed depending on the position of the screw 330, time, etc.

充填工程におけるスクリュ330の位置および移動速度は、一連の設定条件として、まとめて設定される。例えば、充填開始位置(「射出開始位置」とも呼ぶ。)、移動速度切換位置およびV/P切換位置が設定される。これらの位置は、後側から前方に向けてこの順で並び、移動速度が設定される区間の始点や終点を表す。区間毎に、移動速度が設定される。移動速度切換位置は、1つでもよいし、複数でもよい。移動速度切換位置は、設定されなくてもよい。 The position and movement speed of the screw 330 in the filling process are collectively set as a series of setting conditions. For example, a filling start position (also referred to as an "injection start position"), a moving speed switching position, and a V/P switching position are set. These positions are lined up in this order from the rear to the front, and represent the start and end points of the section in which the moving speed is set. A moving speed is set for each section. There may be one or more moving speed switching positions. The moving speed switching position does not need to be set.

スクリュ330の移動速度が設定される区間毎に、スクリュ330の圧力の上限値が設定される。スクリュ330の圧力は、荷重検出器360によって検出される。スクリュ330の圧力が設定圧力以下である場合、スクリュ330は設定移動速度で前進される。一方、スクリュ330の圧力が設定圧力を超える場合、金型保護を目的として、スクリュ330の圧力が設定圧力以下となるように、スクリュ330は設定移動速度よりも遅い移動速度で前進される。 The upper limit value of the pressure of the screw 330 is set for each section in which the moving speed of the screw 330 is set. The pressure of the screw 330 is detected by a load detector 360. When the pressure of the screw 330 is below the set pressure, the screw 330 is advanced at the set travel speed. On the other hand, when the pressure of the screw 330 exceeds the set pressure, the screw 330 is moved forward at a moving speed slower than the set moving speed so that the pressure of the screw 330 becomes equal to or lower than the set pressure for the purpose of protecting the mold.

尚、充填工程においてスクリュ330の位置がV/P切換位置に達した後、V/P切換位置にスクリュ330を一時停止させ、その後にV/P切換が行われてもよい。V/P切換の直前において、スクリュ330の停止の代わりに、スクリュ330の微速前進または微速後退が行われてもよい。また、スクリュ330の位置を検出するスクリュ位置検出器、およびスクリュ330の移動速度を検出するスクリュ移動速度検出器は、射出モータエンコーダ351に限定されず、一般的なものを使用できる。 In addition, after the position of the screw 330 reaches the V/P switching position in the filling process, the screw 330 may be temporarily stopped at the V/P switching position, and then the V/P switching may be performed. Immediately before the V/P switching, instead of stopping the screw 330, the screw 330 may be moved forward or backward at a very slow speed. Further, the screw position detector that detects the position of the screw 330 and the screw movement speed detector that detects the moving speed of the screw 330 are not limited to the injection motor encoder 351, and general ones can be used.

保圧工程では、射出モータ350を駆動してスクリュ330を前方に押し、スクリュ330の前端部における成形材料の圧力(以下、「保持圧力」とも呼ぶ。)を設定圧に保ち、シリンダ310内に残る成形材料を金型装置800に向けて押す。金型装置800内での冷却収縮による不足分の成形材料を補充できる。保持圧力は、例えば荷重検出器360を用いて検出する。保持圧力の設定値は、保圧工程の開始からの経過時間などに応じて変更されてもよい。保圧工程における保持圧力および保持圧力を保持する保持時間は、それぞれ複数設定されてよく、一連の設定条件として、まとめて設定されてよい。 In the pressure holding process, the injection motor 350 is driven to push the screw 330 forward, and the pressure of the molding material at the front end of the screw 330 (hereinafter also referred to as "holding pressure") is maintained at the set pressure, and the pressure inside the cylinder 310 is maintained. The remaining molding material is pushed toward the mold apparatus 800. Insufficient molding material due to cooling shrinkage within the mold device 800 can be replenished. The holding pressure is detected using the load detector 360, for example. The set value of the holding pressure may be changed depending on the elapsed time from the start of the pressure holding process. A plurality of holding pressures and a plurality of holding times for holding the holding pressure in the pressure holding step may be set, and may be set all at once as a series of setting conditions.

保圧工程では金型装置800内のキャビティ空間801の成形材料が徐々に冷却され、保圧工程完了時にはキャビティ空間801の入口が固化した成形材料で塞がれる。この状態はゲートシールと呼ばれ、キャビティ空間801からの成形材料の逆流が防止される。保圧工程後、冷却工程が開始される。冷却工程では、キャビティ空間801内の成形材料の固化が行われる。成形サイクル時間の短縮を目的として、冷却工程中に計量工程が行われてよい。 In the pressure holding process, the molding material in the cavity space 801 in the mold device 800 is gradually cooled, and when the pressure holding process is completed, the entrance of the cavity space 801 is closed with the solidified molding material. This state is called a gate seal, and backflow of the molding material from the cavity space 801 is prevented. After the pressure holding process, a cooling process is started. In the cooling process, the molding material within the cavity space 801 is solidified. A metering step may be performed during the cooling step to reduce molding cycle time.

尚、本実施形態の射出装置300は、インライン・スクリュ方式であるが、プリプラ方式などでもよい。プリプラ方式の射出装置は、可塑化シリンダ内で溶融された成形材料を射出シリンダに供給し、射出シリンダから金型装置内に成形材料を射出する。可塑化シリンダ内には、スクリュが回転自在に且つ進退不能に配置され、またはスクリュが回転自在に且つ進退自在に配置される。一方、射出シリンダ内には、プランジャが進退自在に配置される。 Although the injection device 300 of this embodiment is of an in-line screw type, it may also be of a pre-plastic type. A pre-plastic injection device supplies a molding material melted in a plasticizing cylinder to an injection cylinder, and injects the molding material from the injection cylinder into a mold device. Inside the plasticizing cylinder, a screw is arranged so as to be rotatable but not moveable, or a screw is arranged so as to be rotatable and move back and forth. On the other hand, a plunger is arranged within the injection cylinder so that it can move forward and backward.

また、本実施形態の射出装置300は、シリンダ310の軸方向が水平方向である横型であるが、シリンダ310の軸方向が上下方向である竪型であってもよい。竪型の射出装置300と組み合わされる型締装置は、竪型でも横型でもよい。同様に、横型の射出装置300と組み合わされる型締装置は、横型でも竪型でもよい。 Moreover, although the injection device 300 of this embodiment is a horizontal type in which the axial direction of the cylinder 310 is horizontal, it may be a vertical type in which the axial direction of the cylinder 310 is vertical. The mold clamping device combined with the vertical injection device 300 may be vertical or horizontal. Similarly, the mold clamping device combined with the horizontal injection device 300 may be horizontal or vertical.

(移動装置)
移動装置400の説明では、射出装置300の説明と同様に、充填時のスクリュ330の移動方向(例えばX軸負方向)を前方とし、計量時のスクリュ330の移動方向(例えばX軸正方向)を後方として説明する。
(mobile device)
In the description of the moving device 400, similarly to the description of the injection device 300, the direction of movement of the screw 330 during filling (for example, the negative direction of the X-axis) is referred to as the front, and the direction of movement of the screw 330 during metering (for example, the positive direction of the X-axis) is referred to as the front. will be explained as backward.

移動装置400は、金型装置800に対し射出装置300を進退させる。また、移動装置400は、金型装置800に対しノズル320を押し付け、ノズルタッチ圧力を生じさせる。移動装置400は、液圧ポンプ410、駆動源としてのモータ420、液圧アクチュエータとしての液圧シリンダ430などを含む。 The moving device 400 moves the injection device 300 forward and backward relative to the mold device 800. Furthermore, the moving device 400 presses the nozzle 320 against the mold device 800 to generate nozzle touch pressure. The moving device 400 includes a hydraulic pump 410, a motor 420 as a drive source, a hydraulic cylinder 430 as a hydraulic actuator, and the like.

液圧ポンプ410は、第1ポート411と、第2ポート412とを有する。液圧ポンプ410は、両方向回転可能なポンプであり、モータ420の回転方向を切換えることにより、第1ポート411および第2ポート412のいずれか一方から作動液(例えば油)を吸入し他方から吐出して液圧を発生させる。尚、液圧ポンプ410はタンクから作動液を吸引して第1ポート411および第2ポート412のいずれか一方から作動液を吐出することもできる。 Hydraulic pump 410 has a first port 411 and a second port 412. The hydraulic pump 410 is a bidirectionally rotatable pump, and by switching the rotation direction of the motor 420, the hydraulic pump 410 sucks in hydraulic fluid (for example, oil) from one of the first port 411 and the second port 412 and discharges it from the other. to generate hydraulic pressure. Note that the hydraulic pump 410 can also suck the hydraulic fluid from the tank and discharge the hydraulic fluid from either the first port 411 or the second port 412.

モータ420は、液圧ポンプ410を作動させる。モータ420は、制御装置700からの制御信号に応じた回転方向および回転トルクで液圧ポンプ410を駆動する。モータ420は、電動モータであってよく、電動サーボモータであってよい。 Motor 420 operates hydraulic pump 410. Motor 420 drives hydraulic pump 410 in a rotational direction and rotational torque according to a control signal from control device 700. Motor 420 may be an electric motor or an electric servo motor.

液圧シリンダ430は、シリンダ本体431、ピストン432、およびピストンロッド433を有する。シリンダ本体431は、射出装置300に対して固定される。ピストン432は、シリンダ本体431の内部を、第1室としての前室435と、第2室としての後室436とに区画する。ピストンロッド433は、固定プラテン110に対して固定される。 Hydraulic cylinder 430 has a cylinder body 431, a piston 432, and a piston rod 433. The cylinder body 431 is fixed to the injection device 300. The piston 432 partitions the inside of the cylinder body 431 into a front chamber 435 as a first chamber and a rear chamber 436 as a second chamber. Piston rod 433 is fixed relative to fixed platen 110.

液圧シリンダ430の前室435は、第1流路401を介して、液圧ポンプ410の第1ポート411と接続される。第1ポート411から吐出された作動液が第1流路401を介して前室435に供給されることで、射出装置300が前方に押される。射出装置300が前進され、ノズル320が固定金型810に押し付けられる。前室435は、液圧ポンプ410から供給される作動液の圧力によってノズル320のノズルタッチ圧力を生じさせる圧力室として機能する。 The front chamber 435 of the hydraulic cylinder 430 is connected to the first port 411 of the hydraulic pump 410 via the first flow path 401 . The injection device 300 is pushed forward by the hydraulic fluid discharged from the first port 411 being supplied to the front chamber 435 via the first flow path 401. The injection device 300 is advanced and the nozzle 320 is pressed against the fixed mold 810. The front chamber 435 functions as a pressure chamber that generates nozzle touch pressure of the nozzle 320 by the pressure of the working fluid supplied from the hydraulic pump 410.

一方、液圧シリンダ430の後室436は、第2流路402を介して液圧ポンプ410の第2ポート412と接続される。第2ポート412から吐出された作動液が第2流路402を介して液圧シリンダ430の後室436に供給されることで、射出装置300が後方に押される。射出装置300が後退され、ノズル320が固定金型810から離間される。 On the other hand, the rear chamber 436 of the hydraulic cylinder 430 is connected to the second port 412 of the hydraulic pump 410 via the second flow path 402 . The injection device 300 is pushed rearward by the hydraulic fluid discharged from the second port 412 being supplied to the rear chamber 436 of the hydraulic cylinder 430 via the second flow path 402. The injection device 300 is moved back, and the nozzle 320 is separated from the fixed mold 810.

尚、本実施形態では移動装置400は液圧シリンダ430を含むが、本発明はこれに限定されない。例えば、液圧シリンダ430の代わりに、電動モータと、その電動モータの回転運動を射出装置300の直線運動に変換する運動変換機構とが用いられてもよい。 Note that in this embodiment, the moving device 400 includes a hydraulic cylinder 430, but the present invention is not limited thereto. For example, instead of the hydraulic cylinder 430, an electric motor and a motion conversion mechanism that converts the rotational motion of the electric motor into linear motion of the injection device 300 may be used.

(制御装置)
制御装置700は、例えばコンピュータで構成され、図1~図2に示すようにCPU(Central Processing Unit)701と、メモリなどの記憶媒体702と、入力インターフェース703と、出力インターフェース704とを有する。制御装置700は、記憶媒体702に記憶されたプログラムをCPU701に実行させることにより、各種の制御を行う。また、制御装置700は、入力インターフェース703で外部からの信号を受信し、出力インターフェース704で外部に信号を送信する。
(Control device)
The control device 700 is composed of, for example, a computer, and includes a CPU (Central Processing Unit) 701, a storage medium 702 such as a memory, an input interface 703, and an output interface 704, as shown in FIGS. The control device 700 performs various controls by causing the CPU 701 to execute programs stored in the storage medium 702. Furthermore, the control device 700 receives signals from the outside through an input interface 703 and transmits signals to the outside through an output interface 704.

制御装置700は、計量工程、型閉工程、昇圧工程、型締工程、充填工程、保圧工程、冷却工程、脱圧工程、型開工程、および突き出し工程などを繰り返し行うことにより、成形品を繰り返し製造する。成形品を得るための一連の動作、例えば計量工程の開始から次の計量工程の開始までの動作を「ショット」または「成形サイクル」とも呼ぶ。また、1回のショットに要する時間を「成形サイクル時間」または「サイクル時間」とも呼ぶ。 The control device 700 controls the molded product by repeatedly performing a measuring process, a mold closing process, a pressurizing process, a mold clamping process, a filling process, a pressure holding process, a cooling process, a depressurizing process, a mold opening process, an ejecting process, etc. Manufacture repeatedly. A series of operations for obtaining a molded product, for example, from the start of a metering process to the start of the next metering process, is also called a "shot" or a "molding cycle." The time required for one shot is also called "molding cycle time" or "cycle time."

一回の成形サイクルは、例えば、計量工程、型閉工程、昇圧工程、型締工程、充填工程、保圧工程、冷却工程、脱圧工程、型開工程、および突き出し工程をこの順で有する。ここでの順番は、各工程の開始の順番である。充填工程、保圧工程、および冷却工程は、型締工程の間に行われる。型締工程の開始は充填工程の開始と一致してもよい。脱圧工程の完了は型開工程の開始と一致する。 One molding cycle includes, for example, a measuring process, a mold closing process, a pressure increasing process, a mold clamping process, a filling process, a pressure holding process, a cooling process, a depressurizing process, a mold opening process, and an ejecting process in this order. The order here is the starting order of each step. The filling process, pressure holding process, and cooling process are performed during the mold clamping process. The start of the mold clamping process may coincide with the start of the filling process. Completion of the depressurization process coincides with the start of the mold opening process.

尚、成形サイクル時間の短縮を目的として、同時に複数の工程を行ってもよい。例えば、計量工程は、前回の成形サイクルの冷却工程中に行われてもよく、型締工程の間に行われてよい。この場合、型閉工程が成形サイクルの最初に行われることとしてもよい。また、充填工程は、型閉工程中に開始されてもよい。また、突き出し工程は、型開工程中に開始されてもよい。ノズル320の流路を開閉する開閉弁が設けられる場合、型開工程は、計量工程中に開始されてもよい。計量工程中に型開工程が開始されても、開閉弁がノズル320の流路を閉じていれば、ノズル320から成形材料が漏れないためである。 Note that a plurality of steps may be performed simultaneously for the purpose of shortening the molding cycle time. For example, the metering step may be performed during the cooling step of the previous molding cycle, or during the clamping step. In this case, the mold closing step may be performed at the beginning of the molding cycle. Also, the filling process may be started during the mold closing process. Also, the ejection process may be started during the mold opening process. If an on-off valve is provided to open and close the flow path of the nozzle 320, the mold opening process may be started during the metering process. This is because even if the mold opening process is started during the metering process, if the on-off valve closes the flow path of the nozzle 320, the molding material will not leak from the nozzle 320.

尚、一回の成形サイクルは、計量工程、型閉工程、昇圧工程、型締工程、充填工程、保圧工程、冷却工程、脱圧工程、型開工程、および突き出し工程以外の工程を有してもよい。 In addition, one molding cycle includes processes other than the measuring process, mold closing process, pressure increase process, mold clamping process, filling process, pressure holding process, cooling process, depressurization process, mold opening process, and ejection process. It's okay.

例えば、保圧工程の完了後、計量工程の開始前に、スクリュ330を予め設定された計量開始位置まで後退させる計量前サックバック工程が行われてもよい。計量工程の開始前にスクリュ330の前方に蓄積された成形材料の圧力を削減でき、計量工程の開始時のスクリュ330の急激な後退を防止できる。 For example, after the pressure holding process is completed and before the measurement process is started, a pre-measurement suckback process may be performed in which the screw 330 is retreated to a preset measurement start position. The pressure of the molding material accumulated in front of the screw 330 before the start of the metering process can be reduced, and rapid retraction of the screw 330 at the start of the metering process can be prevented.

また、計量工程の完了後、充填工程の開始前に、スクリュ330を予め設定された充填開始位置(「射出開始位置」とも呼ぶ。)まで後退させる計量後サックバック工程が行われてもよい。充填工程の開始前にスクリュ330の前方に蓄積された成形材料の圧力を削減でき、充填工程の開始前のノズル320からの成形材料の漏出を防止できる。 Further, after the completion of the measurement process and before the start of the filling process, a post-measurement suck-back process may be performed in which the screw 330 is retreated to a preset filling start position (also referred to as "injection start position"). The pressure of the molding material accumulated in front of the screw 330 before the start of the filling process can be reduced, and leakage of the molding material from the nozzle 320 before the start of the filling process can be prevented.

制御装置700は、ユーザによる入力操作を受け付ける操作装置750や画面を表示する表示装置760と接続されている。操作装置750および表示装置760は、例えばタッチパネル770で構成され、一体化されてよい。表示装置760としてのタッチパネル770は、制御装置700による制御下で、画面を表示する。タッチパネル770の画面には、例えば、射出成形機10の設定、現在の射出成形機10の状態等の情報が表示されてもよい。また、タッチパネル770の画面には、例えば、ユーザによる入力操作を受け付けるボタン、入力欄等の操作部が表示されてもよい。操作装置750としてのタッチパネル770は、ユーザによる画面上の入力操作を検出し、入力操作に応じた信号を制御装置700に出力する。これにより、例えば、ユーザは、画面に表示される情報を確認しながら、画面に設けられた操作部を操作して、射出成形機10の設定(設定値の入力を含む)等を行うことができる。また、ユーザが画面に設けられた操作部を操作することにより、操作部に対応する射出成形機10の動作を行わせることができる。なお、射出成形機10の動作は、例えば、型締装置100、エジェクタ装置200、射出装置300、移動装置400等の動作(停止も含む)であってもよい。また、射出成形機10の動作は、表示装置760としてのタッチパネル770に表示される画面の切り替え等であってもよい。 The control device 700 is connected to an operating device 750 that accepts input operations by a user and a display device 760 that displays a screen. The operating device 750 and the display device 760 may be configured with a touch panel 770, for example, and may be integrated. The touch panel 770 serving as the display device 760 displays a screen under the control of the control device 700. Information such as the settings of the injection molding machine 10 and the current state of the injection molding machine 10 may be displayed on the screen of the touch panel 770, for example. Further, the screen of the touch panel 770 may display, for example, an operation unit such as a button or an input field that accepts an input operation by the user. The touch panel 770 serving as the operating device 750 detects an input operation on the screen by the user, and outputs a signal corresponding to the input operation to the control device 700. As a result, the user can, for example, configure the injection molding machine 10 (including inputting setting values) by operating the operation unit provided on the screen while checking the information displayed on the screen. can. Further, by the user operating an operating section provided on the screen, it is possible to cause the injection molding machine 10 to perform an operation corresponding to the operating section. Note that the operation of the injection molding machine 10 may be, for example, the operation (including stopping) of the mold clamping device 100, the ejector device 200, the injection device 300, the moving device 400, and the like. Further, the operation of the injection molding machine 10 may be switching of screens displayed on a touch panel 770 serving as the display device 760.

尚、本実施形態の操作装置750および表示装置760は、タッチパネル770として一体化されているものとして説明したが、独立に設けられてもよい。また、操作装置750は、複数設けられてもよい。操作装置750および表示装置760は、型締装置100(より詳細には固定プラテン110)の操作側(Y軸負方向)に配置される。 Note that although the operating device 750 and the display device 760 of this embodiment have been described as being integrated as the touch panel 770, they may be provided independently. Further, a plurality of operating devices 750 may be provided. The operating device 750 and the display device 760 are arranged on the operating side (Y-axis negative direction) of the mold clamping device 100 (more specifically, the fixed platen 110).

(制御装置の詳細)
次に、図3を参照して、制御装置700の構成要素の一例について説明する。なお、図3に図示される各機能ブロックは概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。各機能ブロックの全部または一部を、任意の単位で機能的または物理的に分散・統合して構成することが可能である。各機能ブロックにて行われる各処理機能は、その全部または任意の一部が、CPUにて実行されるプログラムにて実現され、あるいは、ワイヤードロジックによるハードウェアとして実現されうる。
(Details of control device)
Next, an example of the components of the control device 700 will be described with reference to FIG. 3. Note that each functional block illustrated in FIG. 3 is conceptual and does not necessarily need to be physically configured as illustrated. It is possible to configure all or part of each functional block by functionally or physically distributing and integrating it in arbitrary units. All or any part of each processing function performed by each functional block can be realized by a program executed by a CPU, or can be realized by hardware using wired logic.

図3に示すように、制御装置700は、例えば、型締制御部711と、エジェクタ制御部712と、射出制御部713と、計量制御部714と、を有する。型締制御部711は、型締装置100を制御し、図4に示す型閉工程、昇圧工程、型締工程、脱圧工程、及び型開工程を実施する。エジェクタ制御部712は、エジェクタ装置200を制御し、突き出し工程を実施する。射出制御部713は、射出装置300の射出駆動源を制御し、射出工程を実施する。射出駆動源は、例えば射出モータ350であるが、油圧シリンダなどであってもよい。射出工程は、充填工程と保圧工程を含む。射出工程は、型締工程中に行われる。計量制御部714は、射出装置300の計量駆動源を制御し、計量工程を実施する。計量駆動源は、例えば計量モータ340であるが、油圧ポンプなどであってもよい。計量工程は、冷却工程中に行われる。 As shown in FIG. 3, the control device 700 includes, for example, a mold clamping control section 711, an ejector control section 712, an injection control section 713, and a metering control section 714. The mold clamping control unit 711 controls the mold clamping device 100 and performs a mold closing process, a pressure increasing process, a mold clamping process, a depressurizing process, and a mold opening process shown in FIG. The ejector control unit 712 controls the ejector device 200 and performs the ejecting process. The injection control unit 713 controls the injection drive source of the injection device 300 and performs an injection process. The injection drive source is, for example, the injection motor 350, but may also be a hydraulic cylinder or the like. The injection process includes a filling process and a pressure holding process. The injection process is performed during the mold clamping process. The metering control unit 714 controls the metering drive source of the injection device 300 and carries out a metering process. The metering drive source is, for example, the metering motor 340, but may also be a hydraulic pump or the like. The metering process is performed during the cooling process.

充填工程は、シリンダ310の内部に設けられる射出部材の移動速度の実績値が設定値になるように射出駆動源を制御する工程である。充填工程は、射出部材を前方に移動させることで、射出部材の前方に蓄積された液状の成形材料を金型装置800の内部に充填させる工程である。射出部材は、例えばスクリュ330(図1及び図2参照)であるが、プランジャであってもよい。 The filling process is a process of controlling the injection drive source so that the actual value of the moving speed of the injection member provided inside the cylinder 310 becomes the set value. The filling step is a step of moving the injection member forward to fill the inside of the mold device 800 with the liquid molding material accumulated in front of the injection member. The injection member is, for example, a screw 330 (see FIGS. 1 and 2), but may also be a plunger.

射出部材の移動速度は、速度検出器を用いて検出する。速度検出器は、例えば射出モータエンコーダ351である。充填工程では、射出部材が前進することで、射出部材から成形材料に作用する圧力(以下、「充填圧力」とも呼ぶ。)が上昇する。充填工程は、保圧工程の直前に、射出部材を一時停止させる工程、又は射出部材を後退させる工程を含んでもよい。 The moving speed of the injection member is detected using a speed detector. The speed detector is, for example, the injection motor encoder 351. In the filling process, as the injection member moves forward, the pressure that acts on the molding material from the injection member (hereinafter also referred to as "filling pressure") increases. The filling step may include a step of temporarily stopping the injection member or a step of retracting the injection member immediately before the pressure holding step.

保圧工程は、充填圧力の実績値が設定値になるように射出駆動源を制御する工程である。保圧工程は、射出部材を前方に押すことで、金型装置800内での冷却収縮による不足分の成形材料を補充する工程である。充填圧力は、荷重検出器360などの圧力検出器を用いて検出する。圧力検出器として、ノズル圧センサ、又は型内圧センサが用いられてもよい。 The pressure holding process is a process of controlling the injection drive source so that the actual value of the filling pressure becomes the set value. The holding pressure step is a step of pushing the injection member forward to replenish the molding material that is insufficient due to cooling shrinkage within the mold device 800. Filling pressure is detected using a pressure detector such as load detector 360. A nozzle pressure sensor or a mold internal pressure sensor may be used as the pressure detector.

保圧工程は、射出制御部713によって制御する。射出制御部713は、図5に示すように、例えば、速度設定部713aと、指令作成部713bと、を有する。速度設定部713aは、充填圧力の設定値と実績値の偏差に基づき射出部材の速度の設定値を作成する。指令作成部713bは、射出部材の速度の設定値と実績値の偏差に基づき射出駆動源に対する指令(例えば電流指令)を作成する。射出駆動源は、例えば射出モータ350である。射出駆動源は、指令作成部713bの作成した指令に従って駆動される。 The pressure holding process is controlled by the injection control section 713. As shown in FIG. 5, the injection control section 713 includes, for example, a speed setting section 713a and a command creation section 713b. The speed setting unit 713a creates a set value for the speed of the injection member based on the deviation between the set value of the filling pressure and the actual value. The command creation unit 713b creates a command (for example, a current command) for the injection drive source based on the deviation between the set value and the actual value of the speed of the injection member. The injection drive source is, for example, the injection motor 350. The injection drive source is driven according to the command created by the command creation section 713b.

速度設定部713aは、充填圧力の実績値が設定値になるように射出部材の速度の設定値を作成する。充填圧力の実績値は、荷重検出器360などの圧力検出器を用いて取得する。速度設定部713aは、例えばPID演算またはPI演算によって射出部材の速度の設定値を作成する。 The speed setting unit 713a creates a set value for the speed of the injection member so that the actual value of the filling pressure becomes the set value. The actual value of the filling pressure is obtained using a pressure detector such as the load detector 360. The speed setting unit 713a creates a set value for the speed of the injection member by, for example, PID calculation or PI calculation.

指令作成部713bは、射出部材の速度の実績値が設定値になるように射出駆動源に対する指令を作成する。射出部材の速度の実績値は、射出モータエンコーダ351などの速度検出器を用いて取得する。指令作成部713bは、例えばPID演算またはPI演算によって射出駆動源に対する指令を作成する。 The command creation unit 713b creates a command to the injection drive source so that the actual value of the speed of the injection member becomes the set value. The actual value of the speed of the injection member is obtained using a speed detector such as the injection motor encoder 351. The command creation unit 713b creates commands for the injection drive source by, for example, PID calculation or PI calculation.

射出制御部713は、制限部713cを有する。制限部713cは、保圧工程において、射出部材の後退中に、射出部材の後退速度を予め設定された制限値V1以下に制限する。保圧工程において、射出部材が高速で後退することによる成形品の品質への悪影響を無くすことができる。制限値V1は、射出部材が高速で後退することによる成形品の品質への悪影響を無くすように設定する。 The injection control section 713 has a restriction section 713c. The restricting portion 713c limits the retraction speed of the injection member to a preset limit value V1 or less during the retraction of the injection member in the pressure holding process. In the pressure holding step, it is possible to eliminate the adverse effect on the quality of the molded product due to the injection member retreating at high speed. The limit value V1 is set so as to eliminate the adverse effect on the quality of the molded product due to the injection member retreating at high speed.

例えば、制限部713cは、図6に示すように、速度設定部713aによって作成した後退速度の設定値(>0)と制限値V1(V1>0)とを比較する。制限部713cは、速度設定部713aによって作成した後退速度の設定値(>0)と制限値V1(V1>0)との最小値(設定値と制限値V1が等しい場合を含む。)を、後退速度の設定値として指令作成部713bに出力する。指令作成部713bは、制限部713cの出力した設定値と実績値の偏差に基づき射出駆動源に対する指令を作成する。 For example, as shown in FIG. 6, the limiting unit 713c compares the set value (>0) of the backward speed created by the speed setting unit 713a with the limiting value V1 (V1>0). The limiter 713c sets the minimum value between the set value (>0) of the backward speed created by the speed setting unit 713a and the limit value V1 (V1>0) (including the case where the set value and the limit value V1 are equal). It is output to the command generation unit 713b as a set value of the backward speed. The command creation unit 713b creates a command for the injection drive source based on the deviation between the set value and the actual value output by the restriction unit 713c.

そこで、制限部713cは、図6に示すように、保圧工程において、射出部材の後退中に射出部材の位置を監視し、射出部材の位置に応じて後退速度の設定値を補正し、補正した設定値を指令作成部713bに出力する補正部713dを有する。補正部713dは、射出モータエンコーダ351などの位置検出器を用いて射出部材の位置を取得する。 Therefore, as shown in FIG. 6, the restriction part 713c monitors the position of the injection member while the injection member is retracting in the pressure holding process, corrects the set value of the retraction speed according to the position of the injection member, and corrects the The correction unit 713d outputs the set value to the command creation unit 713b. The correction unit 713d uses a position detector such as the injection motor encoder 351 to obtain the position of the injection member.

補正部713dは、保圧工程において、射出部材の後退中に、射出部材の位置が予め設定された減速開始位置A2(図7参照)に達すると、射出部材の後退速度の設定値を制限値V1よりも小さい速度に補正する。減速開始位置A2は、充填開始位置A3よりも後方、且つ後退限位置A0よりも前方に設定される。充填開始位置A3は、充填工程開始時の位置のことである。 In the pressure holding process, when the position of the injection member reaches a preset deceleration start position A2 (see FIG. 7) while the injection member is retracting, the correction unit 713d changes the set value of the retraction speed of the injection member to a limit value. Correct the speed to be smaller than V1. The deceleration start position A2 is set behind the filling start position A3 and ahead of the retraction limit position A0. The filling start position A3 is the position at the start of the filling process.

これにより、保圧工程において、射出部材の後退中に、射出部材の位置が減速開始位置A2に達すると、射出部材の後退速度が制限値V1よりも小さくなる。それゆえ、仮に射出部材の位置が後退限位置A0まで後退させられても、そのときの後退速度が小さく、衝撃が小さい。従って、衝撃を低減できる。また、射出部材の位置が減速開始位置A2に達するまでは、後退速度を制限値V1に制御でき、充填圧力を素早く低下できる。 Thereby, in the pressure holding step, when the position of the injection member reaches the deceleration start position A2 while the injection member is retracting, the retraction speed of the injection member becomes smaller than the limit value V1. Therefore, even if the injection member is retracted to the retraction limit position A0, the retraction speed at that time is small and the impact is small. Therefore, the impact can be reduced. Further, until the position of the injection member reaches the deceleration start position A2, the retraction speed can be controlled to the limit value V1, and the filling pressure can be quickly reduced.

補正部713dは、保圧工程において、射出部材の後退中に、射出部材の位置が予め設定された停止位置A1に達すると、射出部材の後退速度の設定値をゼロに補正する。停止位置A1は、減速開始位置A2よりも後方、且つ後退限位置A0よりも前方に設定される。これにより、保圧工程において、射出部材の後退中に、射出部材の位置が停止位置A1に達すると、射出部材が停止させられる。それゆえ、射出部材の位置が後退限位置A0まで後退させられることを無くすことができ、射出部材の位置が後退限位置A0まで後退させられることで生じる衝撃を無くすことができる。 In the pressure holding process, when the position of the injection member reaches a preset stop position A1 while the injection member is retracting, the correction unit 713d corrects the set value of the retraction speed of the injection member to zero. The stop position A1 is set behind the deceleration start position A2 and ahead of the reverse limit position A0. Thereby, in the pressure holding process, when the position of the injection member reaches the stop position A1 while the injection member is retreating, the injection member is stopped. Therefore, the position of the injection member can be prevented from being retracted to the maximum retraction position A0, and the impact caused by the position of the injection member being retracted to the maximum retraction position A0 can be eliminated.

補正部713dは、射出部材の位置が減速開始位置A2から停止位置A1に近づくほど、射出部材の後退速度を徐々に小さい速度に補正する。これにより、射出部材の位置が減速開始位置A2から停止位置A1に近づくほど、射出部材の後退速度が徐々に小さくなる。後退速度を緩やかに減速でき、振動の発生を抑制できる。 The correction unit 713d gradually corrects the backward speed of the injection member to a smaller speed as the position of the injection member approaches the stop position A1 from the deceleration start position A2. As a result, as the position of the injection member approaches the stop position A1 from the deceleration start position A2, the retraction speed of the injection member gradually decreases. It is possible to gently reduce the backward speed and suppress the occurrence of vibration.

次に、図7を参照して、スクリュ速度と、充填圧力と、スクリュ位置の時間変化の一例について説明する。図7において、スクリュ速度は射出部材の速度の一例であり、スクリュ位置は射出部材の位置の一例である。スクリュ位置は、スクリュ330の可動範囲の前進限位置からの距離で表される。スクリュ位置が前進限位置から後退するほど、スクリュ位置を表す距離が大きくなる。 Next, with reference to FIG. 7, an example of changes over time in screw speed, filling pressure, and screw position will be described. In FIG. 7, the screw speed is an example of the speed of the injection member, and the screw position is an example of the position of the injection member. The screw position is expressed as a distance from the forward limit position of the movable range of the screw 330. As the screw position retreats from the forward limit position, the distance representing the screw position increases.

図7において、t0は充填工程の開始時刻を、t1はV/P切換の時刻を、t2はスクリュ速度(後退速度)の実績値が制限値V1に達した時刻を、t3はスクリュ位置が減速開始位置A2に達した時刻を、t4はスクリュ位置が停止位置A1に達した時刻を、t5は保圧工程の終了時刻をそれぞれ表す。 In FIG. 7, t0 is the start time of the filling process, t1 is the time of V/P switching, t2 is the time when the actual value of the screw speed (backward speed) reaches the limit value V1, and t3 is the time when the screw position decelerates. t4 represents the time when the screw position reaches the stop position A1, and t5 represents the end time of the pressure holding process.

時刻t0で充填工程が開始されると、スクリュ位置が設定速度で前進する。その結果、充填圧力が上昇する。ノズル詰まり、または成形品の取り出し不良などが生じる場合、スクリュ位置が前進しても、成形材料がほとんど射出されないため、充填圧力が急激に上昇する。 When the filling process is started at time t0, the screw position advances at a set speed. As a result, the filling pressure increases. If the nozzle is clogged or the molded product is not ejected properly, the filling pressure will increase rapidly because almost no molding material will be injected even if the screw position moves forward.

その後、時刻t1でスクリュ位置がV/P切換位置に達すると、保圧工程が開始される。保圧工程では、充填圧力の実績値が設定値P1になるようにスクリュ位置が制御される。ノズル詰まりなどが生じる場合、充填圧力の実績値が設定値P1よりも大きく、且つその偏差が大きい。 Thereafter, when the screw position reaches the V/P switching position at time t1, the pressure holding process is started. In the pressure holding step, the screw position is controlled so that the actual value of the filling pressure becomes the set value P1. When nozzle clogging occurs, the actual value of the filling pressure is larger than the set value P1, and the deviation thereof is large.

従って、ノズル詰まりなどが生じる場合、時刻t1の後、充填圧力の実績値が小さくなるように、スクリュ位置が後退させられる。そうして、スクリュ速度(詳細には後退速度)が徐々に大きくなり、時刻t2で後退速度が制限値V1に達する。 Therefore, when nozzle clogging occurs, the screw position is moved back after time t1 so that the actual value of the filling pressure becomes smaller. Then, the screw speed (specifically, the retraction speed) gradually increases, and the retraction speed reaches the limit value V1 at time t2.

制限部713cは、後退速度が制限値V1を超えないように、後退速度を制限値V1に制限する。その後、時刻t3で、スクリュ位置が減速開始位置A2に達すると、制限部713cが後退速度を制限値V1よりも小さい速度に制御する。これにより、仮にスクリュ位置が後退限位置A0まで後退させられても、そのときの後退速度が小さく、衝撃が小さい。従って、衝撃を低減できる。また、スクリュ位置が減速開始位置A2に達するまでは、後退速度を制限値V1に制御でき、充填圧力を素早く低下できる。 The limiter 713c limits the backward speed to the limit value V1 so that the backward speed does not exceed the limit value V1. Thereafter, at time t3, when the screw position reaches the deceleration start position A2, the limiter 713c controls the retraction speed to a speed smaller than the limit value V1. As a result, even if the screw position is retracted to the retraction limit position A0, the retraction speed at that time is small and the impact is small. Therefore, the impact can be reduced. Further, until the screw position reaches the deceleration start position A2, the retraction speed can be controlled to the limit value V1, and the filling pressure can be quickly reduced.

その後、時刻t4で、スクリュ位置が停止位置A1に達すると、制限部713cがスクリュ330を停止させる。停止位置A1は、後退限位置A0よりも前方に設定される。従って、スクリュ位置が後退限位置A0まで後退させられることを無くすことができ、スクリュ位置が後退限位置A0まで後退させられることで生じる衝撃を無くすことができる。 Thereafter, at time t4, when the screw position reaches the stop position A1, the restricting portion 713c stops the screw 330. The stop position A1 is set ahead of the reverse limit position A0. Therefore, it is possible to prevent the screw position from being retracted to the maximum retraction position A0, and it is possible to eliminate the impact caused by the screw position being retracted to the maximum retraction position A0.

図7に示すように、時刻t3から時刻t4までの間、スクリュ位置が減速開始位置A2から停止位置A1に近づくほど、制限部713cが後退速度を徐々に小さい速度に制御する。後退速度を緩やかに減速でき、振動の発生を抑制できる。 As shown in FIG. 7, from time t3 to time t4, as the screw position approaches the stop position A1 from the deceleration start position A2, the limiter 713c gradually controls the retraction speed to a lower speed. It is possible to gently reduce the backward speed and suppress the occurrence of vibration.

以上、本発明に係る射出成形機の制御装置、射出成形機および射出成形機の制御方法の実施形態について説明したが、本発明は上記実施形態などに限定されない。特許請求の範囲に記載された範疇内において、各種の変更、修正、置換、付加、削除、及び組み合わせが可能である。それらについても当然に本発明の技術的範囲に属する。 Although the embodiments of the injection molding machine control device, the injection molding machine, and the injection molding machine control method according to the present invention have been described above, the present invention is not limited to the above embodiments. Various changes, modifications, substitutions, additions, deletions, and combinations are possible within the scope of the claims. These naturally fall within the technical scope of the present invention.

10 射出成形機
310 シリンダ
330 スクリュ(射出部材)
350 射出モータ(射出駆動源)
700 制御装置
713c 制限部
800 金型装置
10 Injection molding machine 310 Cylinder 330 Screw (injection member)
350 Injection motor (injection drive source)
700 Control device 713c Restriction section 800 Mold device

Claims (6)

成形材料を加熱するシリンダの内部に設けられる射出部材と、前記射出部材を前進させることで前記成形材料を金型装置の内部に充填させる射出駆動源と、を備える射出成形機の制御装置であって、
前記射出部材から前記成形材料に作用する充填圧力を制御する保圧工程において、前記射出部材の後退速度を予め設定された制限値以下に制限する制限部を有し、
前記制限部は、前記保圧工程において、前記射出部材の後退中に、前記射出部材の位置が予め設定された減速開始位置に達すると、前記射出部材の前記後退速度を前記制限値よりも小さい速度に制御する、射出成形機の制御装置。
A control device for an injection molding machine, comprising: an injection member provided inside a cylinder that heats molding material; and an injection drive source that moves the injection member forward to fill the inside of a mold device with the molding material. hand,
In the pressure holding step of controlling the filling pressure acting on the molding material from the injection member, the method includes a restriction portion that limits the retraction speed of the injection member to a preset limit value or less,
In the pressure holding step, when the position of the injection member reaches a predetermined deceleration start position while the injection member is retracting, the restriction portion sets the retraction speed of the injection member to be smaller than the limit value. A control device for an injection molding machine that controls speed.
前記制限部は、前記保圧工程において、前記射出部材の後退中に、前記射出部材の位置が予め設定された停止位置に達すると、前記射出部材を前記停止位置で停止させ、
前記停止位置は、前記減速開始位置よりも後方、且つ前記射出部材の可動範囲の後退限位置よりも前方に設定される、請求項1に記載の射出成形機の制御装置。
In the pressure holding step, when the position of the injection member reaches a preset stop position while the injection member is retreating, the restriction portion stops the injection member at the stop position;
The control device for an injection molding machine according to claim 1, wherein the stop position is set behind the deceleration start position and ahead of a retraction limit position of a movable range of the injection member.
前記制限部は、前記射出部材の位置が前記減速開始位置から前記停止位置に近づくほど、前記射出部材の前記後退速度を徐々に小さい速度に制御する、請求項2に記載の射出成形機の制御装置。 The control of the injection molding machine according to claim 2, wherein the restriction section controls the retraction speed of the injection member to a gradually smaller speed as the position of the injection member approaches the stop position from the deceleration start position. Device. 前記充填圧力の実績値と設定値との偏差に基づいて前記射出部材の速度の設定値を作成する速度設定部と、前記速度の実績値と設定値との偏差に基づいて前記射出駆動源に対する指令を作成する指令作成部と、を有し、
前記制限部は、前記保圧工程において、前記射出部材の後退中に、前記速度設定部によって作成した前記後退速度の設定値と前記制限値との最小値を、前記後退速度の設定値として前記指令作成部に出力する、請求項1~3のいずれか1項に記載の射出成形機の制御装置。
a speed setting unit that creates a set value for the speed of the injection member based on the deviation between the actual value and the set value of the filling pressure; a command creation unit that creates a command;
The limiting section is configured to set the minimum value between the set value of the retreat speed created by the speed setting section and the limit value as the set value of the retreat speed during the retreat of the injection member in the pressure holding step. The control device for an injection molding machine according to any one of claims 1 to 3, wherein the control device outputs the command to a command creation section.
請求項1~4のいずれか1項に記載の制御装置と、前記射出部材と、前記射出駆動源と、を備える、射出成形機。 An injection molding machine comprising: the control device according to claim 1; the injection member; and the injection drive source. 成形材料を加熱するシリンダの内部に設けられる射出部材と、前記射出部材を前進させることで前記成形材料を金型装置の内部に充填させる射出駆動源と、を備える射出成形機の制御方法であって、
前記射出部材から前記成形材料に作用する充填圧力の実績値が設定値になるように前記射出駆動源を制御する保圧工程において、前記射出部材の後退速度を予め設定された制限値以下に制限する工程と、
前記保圧工程において、前記射出部材の後退中に、前記射出部材の位置が予め設定された減速開始位置に達すると、前記射出部材の前記後退速度を前記制限値よりも小さい速度に減速させる工程と、
を有する、射出成形機の制御方法。
A method for controlling an injection molding machine comprising: an injection member provided inside a cylinder that heats molding material; and an injection drive source that advances the injection member to fill the inside of a mold device with the molding material. hand,
In the pressure holding step of controlling the injection drive source so that the actual value of the filling pressure acting on the molding material from the injection member becomes a set value, the retraction speed of the injection member is limited to a preset limit value or less. The process of
In the pressure holding step, when the position of the injection member reaches a preset deceleration start position while the injection member is retracting, the retraction speed of the injection member is reduced to a speed smaller than the limit value. and,
A method for controlling an injection molding machine, comprising:
JP2022056958A 2022-03-30 2022-03-30 Controller of injection molding machine, injection molding machine, and control method of injection molding machine Pending JP2023148762A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022056958A JP2023148762A (en) 2022-03-30 2022-03-30 Controller of injection molding machine, injection molding machine, and control method of injection molding machine
CN202211649474.XA CN116890437A (en) 2022-03-30 2022-12-21 Control device for injection molding machine, and control method for injection molding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022056958A JP2023148762A (en) 2022-03-30 2022-03-30 Controller of injection molding machine, injection molding machine, and control method of injection molding machine

Publications (1)

Publication Number Publication Date
JP2023148762A true JP2023148762A (en) 2023-10-13

Family

ID=88287796

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022056958A Pending JP2023148762A (en) 2022-03-30 2022-03-30 Controller of injection molding machine, injection molding machine, and control method of injection molding machine

Country Status (2)

Country Link
JP (1) JP2023148762A (en)
CN (1) CN116890437A (en)

Also Published As

Publication number Publication date
CN116890437A (en) 2023-10-17

Similar Documents

Publication Publication Date Title
JP6797723B2 (en) Injection molding machine
JP6918841B2 (en) Injection molding machine
JP2023126444A (en) Injection molding machine
JP7118835B2 (en) Injection molding machine
JP7317476B2 (en) Injection molding machine
JP2023148762A (en) Controller of injection molding machine, injection molding machine, and control method of injection molding machine
JP2023148763A (en) Display input device of injection molding machine, controller of injection molding machine, and control method of injection molding machine
JP7396952B2 (en) Injection molding machine
WO2022210979A1 (en) Control device for injection molding machine, injection molding machine, and control method
JP7504788B2 (en) Injection molding machine
JP2023151351A (en) Injection molding machine controller, injection molding machine, and injection molding machine control method
JP2020059165A (en) Injection molding machine
JP7395373B2 (en) Injection molding machine
US20230173728A1 (en) Controller of injection molding machine and method of controlling injection molding machine
US20230311391A1 (en) Control device of injection molding machine, injection molding machine, and method of controlling injection molding machine
JP2024072352A (en) Injection molding machine control device, injection molding machine, and injection molding machine control method
JP7293097B2 (en) Injection molding machine
JP2024088428A (en) Injection molding machine control device, injection molding machine, and injection molding machine control method
US20230173722A1 (en) Control device for injection molding machine and control method for injection molding machine
JP7297660B2 (en) mold equipment
JP2024087387A (en) Display device for injection molding machine, control device for injection molding machine, and injection molding machine
CN118219492A (en) Display device of injection molding machine, control device of injection molding machine, and injection molding machine
JP2023084850A (en) Control unit of injection molding machine and control method of injection molding machine
JP2022157892A (en) movable platen
JP2024043391A (en) Control device for injection molding machine, injection molding machine, and control method for injection molding machine