JP2023146933A - Mounting unit for air conditioning facility - Google Patents

Mounting unit for air conditioning facility Download PDF

Info

Publication number
JP2023146933A
JP2023146933A JP2022054379A JP2022054379A JP2023146933A JP 2023146933 A JP2023146933 A JP 2023146933A JP 2022054379 A JP2022054379 A JP 2022054379A JP 2022054379 A JP2022054379 A JP 2022054379A JP 2023146933 A JP2023146933 A JP 2023146933A
Authority
JP
Japan
Prior art keywords
unit
air conditioning
ceiling
building
conditioning equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022054379A
Other languages
Japanese (ja)
Inventor
義信 原木
Yoshinobu Haraki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARAKI BANKIN SEISAKUSHO KK
Original Assignee
HARAKI BANKIN SEISAKUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARAKI BANKIN SEISAKUSHO KK filed Critical HARAKI BANKIN SEISAKUSHO KK
Priority to JP2022054379A priority Critical patent/JP2023146933A/en
Publication of JP2023146933A publication Critical patent/JP2023146933A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices For Blowing Cold Air, Devices For Blowing Warm Air, And Means For Preventing Water Condensation In Air Conditioning Units (AREA)

Abstract

To provide a mounting unit for an air conditioning facility, in particularly a mounting unit of an air conditioning facility mounted in commercial facilities, factories, warehouses, schools, etc.SOLUTION: The present invention provides a mounting unit for an air conditioning facility to which devices and pipes necessary for an air conditioning facility are attached, where vertical and horizontal frames constituting an upper frame among a plurality of frames constituting the unit are mounted to anchors driven into a ceiling of a building, and the unit is installed on the ceiling of the building. The above devices include, for example, an air conditioner package, a chamber duct, and a BS unit, and The above pipes include, for example, a medium pipe and a drain pipe.SELECTED DRAWING: Figure 1

Description

本発明は空調設備の取り付けユニットに関し、特に商業施設や工場、倉庫、病院、学校等に取り付ける空調設備の取り付けユニットに関する。 The present invention relates to an air conditioning equipment mounting unit, and more particularly to an air conditioning equipment mounting unit that is installed in commercial facilities, factories, warehouses, hospitals, schools, etc.

現在、商業施設や工場、倉庫、病院、学校等に取り付ける空調設備のユニット化が要望されている。特許文献1は空調設備をユニット化した発明であり、各種の配管・配線設備の施工やメンテナンスなどの作業を効率よく行う壁面設備ユニットを提供する発明である。したがって、この発明はユニット化された空調設備を建物の壁面に設置するものである。 Currently, there is a demand for unitized air conditioning equipment to be installed in commercial facilities, factories, warehouses, hospitals, schools, etc. Patent Document 1 is an invention that unitizes air conditioning equipment, and provides a wall equipment unit that efficiently performs work such as construction and maintenance of various piping and wiring equipment. Therefore, the present invention installs unitized air conditioning equipment on the wall of a building.

しかし、空調設備のユニット化は、特に作業が困難な建物の天井に取り付ける場合に有効である。従来、商業施設や工場、倉庫、病院、学校等において、照明機器や空調設備を建物の天井に施工する場合、複数の施工業者により各工程の施工が行われている。 However, unitizing air conditioning equipment is particularly effective when installing it on the ceiling of a building, which is difficult to work on. Conventionally, when installing lighting equipment or air conditioning equipment on the ceiling of a building in commercial facilities, factories, warehouses, hospitals, schools, etc., each construction process is performed by multiple contractors.

例えば、予め計画された工程手順に従い、天井の大枠部を組み込む工程、照明等を組み込む電気設備工程、吹出口、エアコンを設ける空調設備設置工程を、異なる施工業者が入れ替わり施工を行っているのが現状である。さらに、各設備工程を行う同一の施工業者の中においても、更に細分化されて異なる施工業者(例えばダクト工事では配管工、保温工、塗装工)により作業が行われている。 For example, in accordance with a pre-planned process procedure, different contractors alternately carry out the process of assembling the large frame of the ceiling, the electrical equipment process of incorporating lighting, etc., and the air conditioning equipment installation process of installing air outlets and air conditioners. This is the current situation. Furthermore, even within the same construction company that performs each equipment process, the work is further subdivided and performed by different construction companies (for example, in the case of duct construction, the work is performed by a plumber, a heat insulator, and a painter).

冷暖房用の空調設備は、例えばエアコン機能を備えたパッケージエアコンが使用され、空調設備を天井に取り付ける場合、上記パッケージエアコン(以下、単にパッケージで示す)の他に、パッケージに供給する冷媒の冷媒配管や、暖気又は冷気を安定して室内へ送る為のチャンバーダクト、室内に供給する暖気又は冷気の切り替えを行うBSユニット等の各装置を天井に取り付ける必要がある。 For air conditioning equipment for heating and cooling, for example, when a package air conditioner with an air conditioner function is used and the air conditioning equipment is mounted on the ceiling, in addition to the above package air conditioner (hereinafter referred to simply as the package), refrigerant piping for the refrigerant to be supplied to the package is used. It is necessary to install various devices on the ceiling, such as a chamber duct to stably send hot or cold air into the room, and a BS unit to switch between hot and cold air supplied into the room.

以下に、従来の空調設備を商業施設や工場、倉庫、病院、学校等の天井に取り付ける場合の例を説明する図である。
この場合、前述のように予め計画された工程手順に従い、空調設備を取り付ける天井の個所にアンカーを打設する。この場合、設置に必要な装置は上記のように、エアコン機能を備えたパッケージ、冷媒配管、チャンバーダクト、BSユニット、パッケージから延びるドレン配管等である。この為、これらの装置を個々に取り付ける必要があり、建物の天井には予め設定された個々の位置に多くのアンカーを打設する必要があった。
The following is a diagram illustrating an example of a case where conventional air conditioning equipment is attached to the ceiling of a commercial facility, factory, warehouse, hospital, school, etc.
In this case, anchors are driven at the locations on the ceiling where the air conditioning equipment will be installed, following the previously planned process steps as described above. In this case, the devices required for installation are, as described above, a package with an air conditioner function, a refrigerant pipe, a chamber duct, a BS unit, a drain pipe extending from the package, and the like. For this reason, it was necessary to install these devices individually, and it was necessary to drive many anchors at predetermined positions on the ceiling of the building.

図3は建物の天井に打設されたアンカーに個々の装置を取り付けた状態を示す図である。したがって、この例では後述する各装置を建物の天井に取り付ける為、21本のアンカー20-1~20―21を予め建物の天井のコンクリートに打設する必要がある。そして、21本のアンカーに、例えば以下の順序で各装置を取り付ける。
先ず4本のアンカー20-1~20-4にエアコン機能を備えたパッケージ21を取り付ける。この場合、パッケージ21の4隅に設けられたブレードに螺子又はボルトを使用して4本のアンカー20-1~20-4に取り付ける。
FIG. 3 is a diagram showing a state in which individual devices are attached to anchors driven into the ceiling of a building. Therefore, in this example, in order to attach each device described later to the ceiling of the building, it is necessary to cast 21 anchors 20-1 to 20-21 into the concrete of the ceiling of the building in advance. Then, each device is attached to the 21 anchors, for example, in the following order.
First, the package 21 equipped with an air conditioner function is attached to the four anchors 20-1 to 20-4. In this case, blades provided at the four corners of the package 21 are attached to four anchors 20-1 to 20-4 using screws or bolts.

次に、2本のアンカー20-5~20-6にチャンバーダクト22を取り付ける。この場合、チャンバーダクト22に延設するグラスフレキ23もバンドを介してアンカー20-7に取り付ける。 Next, the chamber duct 22 is attached to the two anchors 20-5 to 20-6. In this case, the glass flexible 23 extending to the chamber duct 22 is also attached to the anchor 20-7 via a band.

次に、4本のアンカー20-8~20-11にBSユニット24を取り付ける。この場合、BSユニット24の4隅に設けられたブレードを使用して対応する4本のアンカー20-8~20-11に取り付ける。 Next, the BS unit 24 is attached to the four anchors 20-8 to 20-11. In this case, the blades provided at the four corners of the BS unit 24 are used to attach it to the corresponding four anchors 20-8 to 20-11.

その後、冷媒配管25を束ねたバンドを使用して対応する8本のアンカー20-12~20-19に取り付け、更にドレン配管26を束ねたバンドを使用して対応する2のアンカー20-20~20-21に取り付ける。 Thereafter, the refrigerant pipes 25 are attached to the corresponding eight anchors 20-12 to 20-19 using a band that is tied together, and the drain pipes 26 are further attached to the corresponding two anchors 20-20 to 20-19 using a band that is tied together. Attach to 20-21.

特開平11-217904号公報Japanese Patent Application Publication No. 11-217904

上記のように、従来天井に空調設備を設置する場合、パッケージ、チャンバーダクト、 BSユニット等の装置や、冷媒配管、ドレン配管の取り付けの為、予め多数のアンカーを建物の天井に打設する必要があり、多くの工数が必要であった。例えば、上記図3に示す例では21本のアンカー20-1~20-21を建物の天井のコンクリートに打設する必要があり、更にアンカーに各装置を取り付ける為の螺子やボルト等も多数必要であった。 As mentioned above, when conventionally installing air conditioning equipment on the ceiling, it is necessary to drive a large number of anchors into the ceiling of the building in advance to attach devices such as packages, chamber ducts, BS units, refrigerant piping, and drain piping. This required a lot of man-hours. For example, in the example shown in Figure 3 above, it is necessary to cast 21 anchors 20-1 to 20-21 into the concrete of the ceiling of the building, and many screws and bolts are also required to attach each device to the anchors. Met.

また、パッケージ等の多くの装置や配管を建物の天井に取り付ける必要があり、夫々異なる業者が行う作業であり、多くの時間を要する。また、高所での作業であり、危険を伴う作業を多くの業者が入れ替わり立ち代わり行う効率の悪い作業であった。 Furthermore, it is necessary to attach many devices such as packages and piping to the ceiling of the building, which is a task that is performed by different companies and takes a lot of time. In addition, the work was carried out at heights, and the work was inefficient, requiring many different contractors to perform the dangerous work.

さらに、現場で建物の天井への空調設備の取り付けを行う為、パッケージや、チャンバーダクト、BSユニット等を運搬した梱包材を現場で廃棄する処理が必要であり、多くの労力を必要としていた。 Furthermore, since the air conditioning equipment was installed on the ceiling of the building on-site, the packaging materials used to transport the packages, chamber ducts, BS units, etc. had to be disposed of on-site, which required a lot of labor.

そこで、本発明は天井に空調設備を設置する際、パッケージ、チャンバーダクト、BSユニット等の装置を予め設計したユニットに工場で取り付け、当該ユニットを現場に持ち込むことによって、ユニット化された空調設備を取り付けるものであり、従来必要であった多数のアンカーを建物の天井に打設する必要がない。 Therefore, when installing air conditioning equipment on the ceiling, the present invention installs devices such as packages, chamber ducts, and BS units into pre-designed units at the factory, and then brings the units to the site, thereby creating unitized air conditioning equipment. There is no need to drive a large number of anchors into the ceiling of a building, which was required in the past.

また、現場で夫々異なる業者が個々に危険な作業を行う必要がなく、本件特許出願の発明によればアッパーに乗った作業者が1回の取り付け作業によって空調設備を建物の天井に取り付けことができる。したがって、作業工数を大幅に減らし、建物の天井への空調設備の取り付け時間も短縮することができる。 In addition, there is no need for different contractors to perform dangerous work individually at the site, and according to the invention of the patent application, a worker riding on the upper can install air conditioning equipment on the ceiling of a building in one installation operation. can. Therefore, the number of man-hours required can be significantly reduced, and the time required to install air conditioning equipment on the ceiling of a building can also be shortened.

上記課題は本発明によれば、空調設備に必要な装置と配管が取り付けられたユニットであって、建物の天井に打設されたアンカーに、上記ユニットを構成する複数のフレームの中で、上方大枠を構成する縦横のフレームを取り付け、上記ユニットを前記建物の天井に設置する空調設備の取り付けユニットを提供するものであり、上記装置は例えばエアコンパッケージとチャンバーダクトとBSユニットであり、上記配管は例えば媒配管とドレン配管である。 According to the present invention, the above-mentioned problem is solved by a unit to which equipment and piping necessary for air conditioning equipment are attached. The present invention provides an installation unit for air conditioning equipment in which vertical and horizontal frames constituting a large frame are attached and the unit is installed on the ceiling of the building. Examples include medium piping and drain piping.

本実施形態の空調設備の取り付けユニットの斜視図である。It is a perspective view of the attachment unit of the air conditioning equipment of this embodiment. 本実施形態のユニットの正面図、平面図、右側面図であり、(a)は本例のユニットの正面図であり、(b)は平面図であり、(c)は右側面図である。They are a front view, a top view, and a right side view of the unit of this embodiment, in which (a) is a front view of the unit of this example, (b) is a top view, and (c) is a right side view. . 従来の空調設備を取り付ける位置の天井に打設されたアンカーを使用して個々の装置を取り付けた状態を示す図である。It is a diagram showing a state in which individual devices are attached using anchors driven into the ceiling at positions where conventional air conditioning equipment is attached.

以下、本発明の実施形態を図面に基づいて詳細に説明する。
図1は本実施形態の空調設備の取り付けユニット1の斜視図である。また、図2は本実施形態のユニット1の正面図、平面図、右側面図であり、同図(a)は本例のユニット1の平面図であり、同図(b)は正面図であり、同図(c)は右側面図である。
Hereinafter, embodiments of the present invention will be described in detail based on the drawings.
FIG. 1 is a perspective view of an air conditioning installation installation unit 1 of this embodiment. Moreover, FIG. 2 is a front view, a top view, and a right side view of the unit 1 of this embodiment, FIG. 2(a) is a plan view of the unit 1 of this example, and FIG. 2(b) is a front view. (c) is a right side view.

両図において、本例のユニット1にはパッケージ2、チャンバーダクト3、BSユニット4、及び冷媒配管5、ドレン配管6が取り付けられる。尚、チャンバーダクト3には可撓性のグラスフレキ7も延設されている。
また、ユニット1は上記パッケージ2、チャンバーダクト3、BSユニット4や、配管がコンパクトに収納できるサイズに設計され、縦、横、斜めに螺子、ボルト、又は溶接で固定された複数のフレームで構成され、対応するフレームに各装置や配管が予め取り付けられる。
In both figures, a package 2, a chamber duct 3, a BS unit 4, a refrigerant pipe 5, and a drain pipe 6 are attached to the unit 1 of this example. Incidentally, a flexible glass flexible plate 7 is also extended to the chamber duct 3.
The unit 1 is designed to be sized to compactly store the package 2, chamber duct 3, BS unit 4, and piping, and is composed of multiple frames fixed vertically, horizontally, and diagonally with screws, bolts, or welding. Each device and piping are attached to the corresponding frame in advance.

パッケージ2は本例の空調設備の本体であり、冷暖房の空調機能を備え、パッケージ2の下面に室内への冷気又は暖気の吹き出し口が設けられている。また、グラスフレキ7が延設されたチャンバーダクト3は、建物に設けられたダクトに接続され、ダクトから供給される外気を導入し、フィルター8を介してパッケージ2に供給する。 The package 2 is the main body of the air conditioning equipment of this example, and is equipped with air conditioning functions for heating and cooling, and has an outlet for blowing cold air or hot air into the room on the bottom surface of the package 2. Further, the chamber duct 3 to which the glass flexible resin 7 is extended is connected to a duct provided in a building, introduces outside air supplied from the duct, and supplies it to the package 2 via a filter 8.

また、BSユニット4は冷媒配管5から供給されるCH2F2(R-32)等の冷媒(HFCガス)をパッケージ2に送る際の切り替えを行い、冷媒配管5aから供給される冷気をパッケージ2に送ると共に、パッケージ2からの冷媒を不図示の熱交換機に送る。したがって、冷媒配管5には冷気を搬送する冷媒配管5aと使用された冷媒を熱交換機に送る冷媒配管5bが配設されている。尚、ドレン配管6はパッケージ2内の排水を外部に排出する配管である。 The BS unit 4 also performs switching when sending a refrigerant (HFC gas) such as CH2F2 (R-32) supplied from the refrigerant pipe 5 to the package 2, and sends cold air supplied from the refrigerant pipe 5a to the package 2. At the same time, the refrigerant from the package 2 is sent to a heat exchanger (not shown). Therefore, the refrigerant pipe 5 is provided with a refrigerant pipe 5a for transporting cold air and a refrigerant pipe 5b for transporting the used refrigerant to the heat exchanger. Incidentally, the drain pipe 6 is a pipe for discharging the waste water inside the package 2 to the outside.

本例の場合、建物の天井に空調設備を設置する際に必要なこのような装置や配管は、予め工場内で本例のユニット1に取り付けられ、その後空調設備の設置場所に搬送される。 In the case of this example, such devices and piping necessary when installing air conditioning equipment on the ceiling of a building are installed in advance in the unit 1 of this example in a factory, and then transported to the installation location of the air conditioning equipment.

両図に示すように、本例のユニット1は縦方向フレーム10(同図に示すX方向フレーム)、横方向フレーム11(同図に示すY方向フレーム)、及び高さ方向フレーム12(同図に示すZ方向フレーム)で構成され、夫々のフレームは螺子又はボルトで固定されている。 As shown in both figures, the unit 1 of this example includes a vertical frame 10 (X-direction frame shown in the figure), a horizontal frame 11 (Y-direction frame shown in the figure), and a height-direction frame 12 (the Y-direction frame shown in the figure). It consists of Z-direction frames shown in Figure 1), and each frame is fixed with screws or bolts.

すなわち、本例のユニット1は、縦方向フレーム10a、10bと横方向フレーム11a、11bの上方大枠と、縦方向フレーム10c、10dと横方向フレーム11c、11dの下大枠を、4本の高さ方向フレーム12a~12dによって固定して構成されている。尚、13a、13bは補強フレームである。 That is, in the unit 1 of this example, the upper large frames of the vertical frames 10a and 10b and the horizontal frames 11a and 11b, and the lower large frames of the vertical frames 10c and 10d and the horizontal frames 11c and 11d are arranged in four heights. It is configured to be fixed by direction frames 12a to 12d. Note that 13a and 13b are reinforcing frames.

また、高さ方向フレーム12a~12dの所定位置に縦方向フレーム10e、10fと横方向フレーム11e、11fで構成される中間枠を取り付け、横方向フレーム11e、11f間の所定位置に縦方向フレーム10gと10hを架け渡して取り付け、更に縦方向フレーム10f、10h間の所定位置に横方向フレーム11gを架け渡して取り付けられている。 Further, an intermediate frame composed of vertical frames 10e, 10f and horizontal frames 11e, 11f is attached to predetermined positions of the vertical frames 12a to 12d, and a vertical frame 10g is installed at a predetermined position between the horizontal frames 11e, 11f. and 10h, and furthermore, a horizontal frame 11g is installed over a predetermined position between the vertical frames 10f and 10h.

上記構成のユニット1への各装置の取り付けは、例えばエアコンパッケージ2の場合、エアコンパッケージ2の4隅に設けられたブラケット9を使用し、前述のユニット1の縦方向フレーム10f、10hに接続パイプを介装して取り付けられている。 To attach each device to the unit 1 having the above configuration, for example, in the case of the air conditioner package 2, brackets 9 provided at the four corners of the air conditioner package 2 are used to connect pipes to the vertical frames 10f and 10h of the unit 1. It is installed with a .

チャンバーダクト3は、チャンバーダクト3の上面に立設されたパイプを介して横方向フレーム11gに取り付けられている。また、ユニット1への上記チャンバーダクト3の取り付けと同時に、チャンバーダクト3に延設するグラスフレキ7も縦方向フレーム10gに不図示の結束バンド等を介して取り付けられている。 The chamber duct 3 is attached to the horizontal frame 11g via a pipe erected on the upper surface of the chamber duct 3. Furthermore, at the same time as the chamber duct 3 is attached to the unit 1, the glass flexible board 7 extending to the chamber duct 3 is also attached to the vertical frame 10g via a binding band (not shown) or the like.

BSユニット4は、BSユニット4の4隅に設けられたブラケット9を使用し、ユニット1の縦方向フレーム10e、10gに接続パイプを介装して取り付けられている。 The BS unit 4 is attached to the vertical frames 10e and 10g of the unit 1 via connecting pipes using brackets 9 provided at the four corners of the BS unit 4.

また、冷媒配管5は上記のように、パッケージ2に冷気を送る冷媒配管5aと、使用された冷媒を熱交換機送る冷媒配管5bで構成され、夫々不図示のバンドを使用され、縦方向フレーム10f、10hに取り付けられている。また、エアコンパッケージ2からの排水を外部に排出するドレン配管7も不図示のバンド等を介装して縦方向フレーム10gに取り付けられている。 Further, as described above, the refrigerant pipe 5 is composed of the refrigerant pipe 5a that sends cold air to the package 2, and the refrigerant pipe 5b that sends the used refrigerant to the heat exchanger. , 10h. Further, a drain pipe 7 for discharging waste water from the air conditioner package 2 to the outside is also attached to the vertical frame 10g with a band (not shown) or the like interposed therebetween.

以上のように、エアコンパッケージ2、チャンバーダクト3、BSユニット4、冷媒配管5a、5b、ドレン配管6が取り付けられたユニット1は、現場に送られる。この場合、ユニット化された複数の空調設備が、トラックで現場に搬送され、現場で建物の天井に取り付けられる。 As described above, the unit 1 to which the air conditioner package 2, chamber duct 3, BS unit 4, refrigerant pipes 5a, 5b, and drain pipe 6 are attached is sent to the site. In this case, multiple units of air conditioning equipment are transported to the site by truck and installed on the ceiling of the building on site.

以上のように、本発明によればエアコンパッケージ2、チャンバーダクト3、BSユニット4等の装置が予め取り付けられたユニット1を建物の天井に設置するだけよく、例えば建物の天井に4本のアンカーを打設すればよく、従来のように多くのアンカーを建物の天井に打設する必要がない。 As described above, according to the present invention, it is only necessary to install the unit 1 to which devices such as the air conditioner package 2, the chamber duct 3, and the BS unit 4 are attached in advance on the ceiling of the building. There is no need to drive as many anchors into the ceiling of the building as in the past.

この場合、4本のアンカーを使用してユニット1(空調設備)を建物の天井に取り付けることになるが、例えばユニット1の上方大枠を構成する縦方向フレーム10a、10b、又は横方向フレーム11a、11bに4本のアンカーを取り付ける。 In this case, the unit 1 (air conditioning equipment) will be attached to the ceiling of the building using four anchors. Attach four anchors to 11b.

例えば、図2に示す縦方向フレーム10a、10bの4カ所の位置14a~14dに、例えば不図示のブラケットを取り付け、このブラケットを建物の天井に取り付けたアンカーに固定する。 For example, brackets (not shown) are attached to four positions 14a to 14d of the vertical frames 10a and 10b shown in FIG. 2, and these brackets are fixed to anchors attached to the ceiling of a building.

また、例えば図1に示す高さ方向フレーム12a~12dを上方に延設し、この延設した高さ方向フレーム12a~12dに建物の天井に取り付けたアンカーを固定するようにしてもよい。 Further, for example, the vertical frames 12a to 12d shown in FIG. 1 may be extended upward, and anchors attached to the ceiling of the building may be fixed to the extended vertical frames 12a to 12d.

このように、本発明によれば、空調設備に必要な装置が予めユニット1に取り付けられているので、夫々異なる業者が現場で行う作業が不要であり、危険を伴う高所での作業を多くの業者が行う必要がない。また、作業工数を減らし、建物の天井への空調設備の取り付け作業を効率よく行うことができる。 As described above, according to the present invention, since the equipment necessary for air conditioning equipment is installed in the unit 1 in advance, there is no need for work to be carried out by different contractors on site, and there is no need to perform work at high places, which can be dangerous. There is no need for other contractors to do this. In addition, the number of man-hours required can be reduced and the work of installing air conditioning equipment on the ceiling of a building can be done more efficiently.

尚、上記本実施形態の説明では、図1及び図2に示す構成のフレーム1を使用したが、両図に示す構成に限らず、パッケージ2、チャンバーダクト3、BSユニット4等の各装置や配管を予めコンパクトに取り付け可能なフレームであれば、同様に実施することができ、本発明の空調設備の取り付けユニットとして、上記両図に示す構成のフレーム1の構成に限定されるものではない。 In the above description of this embodiment, the frame 1 having the configuration shown in FIGS. 1 and 2 was used, but the structure is not limited to the configuration shown in both figures, and each device such as the package 2, chamber duct 3, BS unit 4, etc. Any frame to which piping can be pre-attached in a compact manner can be similarly implemented, and the installation unit for the air conditioning equipment of the present invention is not limited to the configuration of the frame 1 shown in the above two figures.

1・・・ユニット
2・・・エアコンパッケージ
3・・・チャンバーダクト
4・・・BSユニット
5、5a、5b・・冷媒配管
6・・・ドレン配管
7・・・グラスフレキ
8・・・ファイルター
9・・・ブラケット
10a~10h・・縦方向フレーム
11a~11g・・横方向フレーム
12a~12d・・高さ方向フレーム
13a、13b・・補強フレーム
14a、14b・・4カ所の位置
1... Unit 2... Air conditioner package 3... Chamber duct 4... BS unit 5, 5a, 5b... Refrigerant piping 6... Drain piping 7... Glass flexible 8... Filter 9...Brackets 10a to 10h...Vertical frames 11a to 11g...Horizontal frames 12a to 12d...Height frames 13a, 13b...Reinforcement frames 14a, 14b...4 positions

Claims (3)

空調設備に必要な装置と配管が取り付けられたユニットであって、建物の天井に打設されたアンカーに、前記ユニットを構成する複数のフレームの中で、上方大枠を構成する縦横のフレームを取り付け、前記ユニットを前記建物の天井に設置することを特徴とする空調設備の取り付けユニット。 It is a unit that is equipped with the equipment and piping necessary for air conditioning equipment, and the vertical and horizontal frames that make up the upper frame among the multiple frames that make up the unit are attached to anchors that are driven into the ceiling of the building. , an installation unit for air conditioning equipment, characterized in that the unit is installed on the ceiling of the building. 前記装置はエアコンパッケージとチャンバーダクトとBSユニットであることを特徴とする請求項1に記載の空調設備の取り付けユニット。 The air conditioner installation unit according to claim 1, wherein the device is an air conditioner package, a chamber duct, and a BS unit. 前記配管は媒配管とドレン配管であることを特徴とする請求項1、又は2に記載の空調設備の取り付けユニット。
3. The air conditioning equipment installation unit according to claim 1, wherein the piping is a medium piping and a drain piping.
JP2022054379A 2022-03-29 2022-03-29 Mounting unit for air conditioning facility Pending JP2023146933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022054379A JP2023146933A (en) 2022-03-29 2022-03-29 Mounting unit for air conditioning facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022054379A JP2023146933A (en) 2022-03-29 2022-03-29 Mounting unit for air conditioning facility

Publications (1)

Publication Number Publication Date
JP2023146933A true JP2023146933A (en) 2023-10-12

Family

ID=88286673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022054379A Pending JP2023146933A (en) 2022-03-29 2022-03-29 Mounting unit for air conditioning facility

Country Status (1)

Country Link
JP (1) JP2023146933A (en)

Similar Documents

Publication Publication Date Title
EP3409083B1 (en) Improvements in and relating to data centres
US9819159B2 (en) Low profile variable frequency controller with cooling and process
US20010047628A1 (en) Relocatable fire, storm and contaminant resistant modular building structures
WO2014024405A1 (en) Outdoor unit for refrigeration cycle device
US10808401B2 (en) Ceiling support systems
JP2011241996A (en) Refrigerator module and refrigerator system using the same
JP2023146933A (en) Mounting unit for air conditioning facility
US10161130B2 (en) Pre-fabricated, portable building with removable roof assembly
JP3993339B2 (en) Building unit and unit building
JPH11200651A (en) Clean room building and executing method therefor
JP6686149B2 (en) Air conditioner
JP7001414B2 (en) Air conditioning system and facilities
KR101715430B1 (en) Underfloor air-conditioning duct structure
JP2006125806A (en) Air-conditioning equipment, method for installing outdoor air conditioner, and method for producing air-conditioning equipment
JP2013155994A (en) Air conditioning system and clean room
JP2007100338A (en) Production facility
JPH094787A (en) Piping wiring containing frame for outdoor machine and disposing work executing method therefor
JP2019219111A (en) Air-conditioning pipe installation facility and air-conditioning piping installation method
JP6242197B2 (en) Air conditioner installation structure
US20180334811A1 (en) Method for Improving the Ventilation Effectiveness of Large Conditioned Air Plenum Environments Including Such Environments in Multilevel Raised Floor Electro-Mechanical Distribution Systems
JP6321956B2 (en) Air conditioning system and method of installing air conditioner
JP6210799B2 (en) Double floor structure
CN112240073B (en) Ceiling module for constructing clean room
JP5965209B2 (en) Unit installation equipment installation structure
JP6445763B2 (en) Thermal insulation installation structure of air conditioner