JP2022083661A - Temporary structure, temporary structure assembly structure and building construction method - Google Patents

Temporary structure, temporary structure assembly structure and building construction method Download PDF

Info

Publication number
JP2022083661A
JP2022083661A JP2020195100A JP2020195100A JP2022083661A JP 2022083661 A JP2022083661 A JP 2022083661A JP 2020195100 A JP2020195100 A JP 2020195100A JP 2020195100 A JP2020195100 A JP 2020195100A JP 2022083661 A JP2022083661 A JP 2022083661A
Authority
JP
Japan
Prior art keywords
building
panel
temporary
temporary structure
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2020195100A
Other languages
Japanese (ja)
Inventor
哲平 林
Teppei Hayashi
貴洋 南野
Takahiro Minamino
誠 尾山
Makoto Oyama
悟志 松原
Satoshi Matsubara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2020195100A priority Critical patent/JP2022083661A/en
Publication of JP2022083661A publication Critical patent/JP2022083661A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

To provide a temporary structure for fall prevention with improved workability.SOLUTION: A temporary structure is a temporary handrail 20 that is used during the construction of a building and mounted on the building body. The temporary handrail 20 includes a strut member 21 extending long in the vertical direction, a base member 22 provided at the lower end of the strut member 21 and in contact with the upper surface of the construction member (beam) of the building body, and a first protruding member 23 and a second protruding member 24 that are provided at an interval in the length direction of the base member 22, protrude downward from the base member 22, and are inserted into through holes provided at an interval on the upper surface of the beam, respectively. The first protruding member 23 protrudes so as to be longer than the second protruding member 24.SELECTED DRAWING: Figure 4

Description

本発明は、仮設構造体、仮設構造体の組み付け構造及び建物施工方法に係り、特に、建物の施工中に用いられ、建物本体に取り付けられる転落防止用の仮設構造体、仮設構造体の組み付け構造及び建物施工方法に関する。 The present invention relates to a temporary structure, an assembling structure of the temporary structure, and a building construction method, and in particular, a temporary structure for preventing a fall, which is used during the construction of a building and is attached to the building body, and an assembling structure of the temporary structure. And about the building construction method.

従来、建物の施工時や施工後のメンテナンス時において、室外側から施工作業を行うために足場や手摺り等の構造体が仮設されている。
また、隣接する隣接構造物と接近して建てられる建物の施工時やメンテナンス時においては、狭小地用の専用足場(専用手摺り)が仮設されている。
Conventionally, structures such as scaffolding and handrails have been temporarily installed in order to perform construction work from the outdoor side during construction of a building or maintenance after construction.
In addition, a dedicated scaffolding (dedicated handrail) for narrow areas is temporarily installed during construction or maintenance of a building that is built close to an adjacent structure.

上記専用足場を用いれば、狭小スペースにおいて室外側から施工作業を行うことが可能であるものの、作業対象の建物と隣接構造物との間の隙間部分において専用足場を地面から立ち上げる必要があったため、建物の大きさが制約される虞があった。そのため、専用足場を地面から立ち上げる必要のない工法が検討されていた。
上記専用足場に代わる転落防止用の仮設構造体として、例えば特許文献1、2のように、建物本体の施工部材(H形鋼からなる梁)に仮設することが可能な仮設手摺りが提案されている。
Although it is possible to perform construction work from the outdoor side in a narrow space by using the above-mentioned dedicated scaffolding, it was necessary to raise the dedicated scaffolding from the ground in the gap between the building to be worked and the adjacent structure. , There was a risk that the size of the building would be restricted. Therefore, a construction method that does not require the dedicated scaffolding to be raised from the ground has been studied.
As a temporary structure for preventing falls instead of the above-mentioned dedicated scaffolding, a temporary handrail that can be temporarily installed on a construction member (beam made of H-shaped steel) of a building body has been proposed, for example, as in Patent Documents 1 and 2. ing.

特開2010-71042号公報Japanese Unexamined Patent Publication No. 2010-71042 特開2010-185185号公報Japanese Unexamined Patent Publication No. 2010-185185

そうしたなかで、既存の仮設手摺りよりも安定性に優れ、容易に取り付け及び取り外しすることが可能な仮設構造体が求められており、当該仮設構造体を用いて施工性の向上を図ることが求められていた。
特に、建物本体に対し建築用パネル(例えば外壁パネル)を取り付ける前、及び取り付ける際の転落防止対策として上記仮設構造体を有効に活用した施工技術が求められていた。
Under such circumstances, there is a demand for a temporary structure that is more stable than existing temporary handrails and can be easily attached and detached, and it is possible to improve workability by using the temporary structure. I was asked.
In particular, there has been a demand for a construction technique that effectively utilizes the temporary structure before and when the building panel (for example, an outer wall panel) is attached to the building body as a fall prevention measure.

詳しく述べると、特許文献1に記載の仮設手摺りでは、上下方向に長尺な支柱部材と、支柱部材の下端部に設けられ、建物本体の梁の上面に当接するベース部材と、ベース部材から下方に向かって突出し、梁の上部及び下部に設けられた貫通穴に挿通される一対の突出部材と、を備えている。
上記構成により、建物本体の梁を利用して簡易的に仮設手摺りを仮設することができる。
一方で、梁の上部及び下部の両方に対して仮設手摺り(一対の突出部材)を挿通させて仮設する必要があるため、建物本体の内側にいる作業者にとって仮設作業を効率良くできない虞があった。例えば、作業者が手探りで一対の突出部材を同時に挿通させる必要があった。
More specifically, in the temporary handrail described in Patent Document 1, a support member that is long in the vertical direction, a base member that is provided at the lower end of the support member and abuts on the upper surface of the beam of the building body, and a base member. It comprises a pair of projecting members that project downward and are inserted through through holes provided in the upper and lower parts of the beam.
With the above configuration, a temporary handrail can be easily temporarily installed by using the beam of the building body.
On the other hand, since it is necessary to insert a temporary handrail (a pair of protruding members) through both the upper part and the lower part of the beam for temporary installation, there is a risk that the temporary work cannot be performed efficiently for the worker inside the building body. there were. For example, the operator had to fumble to insert a pair of projecting members at the same time.

また、特許文献2に記載の仮設手摺りでは、支柱部材と、支柱部材の下端部に設けられ、梁の上面に当接するベース部材と、ベース部材から下方に突出し、梁の上部及び下部に設けられた貫通穴に挿通される1本の突出部材と、を備えている。また、梁の上部にベース部材を固定するためのクランプ部材を備えている。
上記構成の場合には、特許文献1のように作業者が手探りで一対の突出部材を挿通させることはないものの、別途クランプ部材を取り付け及び取り外しする作業が発生してしまう。また、梁の上部及び下部の両方に一対の突出部材を挿通させてはおらず、仮設手摺りの安定感に劣る虞があった。
Further, in the temporary handrail described in Patent Document 2, the support member, the base member provided at the lower end of the support member and in contact with the upper surface of the beam, and the base member protruding downward from the base member and provided at the upper and lower parts of the beam. It comprises a protruding member that is inserted through the through hole. Further, a clamp member for fixing the base member is provided on the upper part of the beam.
In the case of the above configuration, the operator does not insert the pair of projecting members by fumbling as in Patent Document 1, but the work of separately attaching and detaching the clamp member is required. Further, the pair of projecting members is not inserted through both the upper part and the lower part of the beam, and there is a possibility that the stability of the temporary handrail is inferior.

本発明は、上記の課題に鑑みてなされたものであり、本発明の目的は、施工性向上を図った仮設構造体、仮設構造体の組み付け構造及び建物施工方法を提供することにある。
また、本発明の目的は、狭小スペースにおいて安定性に優れ、容易に取り付け及び取り外しすることが可能な仮設構造体、仮設構造体の組み付け構造及び建物施工方法を提供することにある。
The present invention has been made in view of the above problems, and an object of the present invention is to provide a temporary structure, an assembly structure of the temporary structure, and a building construction method for improving workability.
Another object of the present invention is to provide a temporary structure which is excellent in stability in a narrow space and can be easily attached and detached, an assembly structure of the temporary structure, and a building construction method.

前記課題は、本発明の仮設構造体によれば、建物の施工中に用いられ、建物本体に取り付けられる転落防止用の仮設構造体であって、上下方向に長尺に延びている支柱部材と、前記支柱部材の下端部に設けられ、前記建物本体の施工部材の上面に当接するベース部材と、前記ベース部材の長さ方向又は幅方向において間隔を空けて設けられ、前記ベース部材から下方に向かってそれぞれ突出し、前記施工部材の上面に間隔を空けて設けられた貫通穴にそれぞれ挿通される第1突出部材及び第2突出部材と、を備えており、前記第1突出部材が、前記第2突出部材よりも長尺となるように突出していること、により解決される。
上記構成により、施工性向上を図った仮設構造体を実現することができる。
詳しく述べると、仮設構造体が、支柱部材と、ベース部材と、ベース部材から下方に突出し、梁の上面に設けられた貫通穴にそれぞれ挿通される第1突出部材及び第2突出部材と、を備えており、第1突出部材が第2突出部材よりも長尺に突出しているため、梁の貫通穴に対して仮設構造体(第1、第2突出部材)を挿通する作業が容易になる。すなわち、現場の作業者は、梁の貫通穴に対してより長尺な第1突出部材を先に挿通させた後に、第2突出部材を挿通させることができるため、従来のように2本の突出部材を同時に挿通させる場合と比較して仮設構造体の取り付け作業が容易になる。
特に、狭小スペースにおいては、作業者が手探りで仮設手摺りを仮設することになるため、格段に仮設構造体の取り付け作業が効率化する。
According to the temporary structure of the present invention, the problem is a temporary structure for preventing a fall, which is used during the construction of a building and is attached to the main body of the building, and has a support column member extending in a long direction in the vertical direction. , A base member provided at the lower end of the support column member and in contact with the upper surface of the construction member of the building body, and the base member provided at intervals in the length direction or the width direction of the base member, and downward from the base member. A first projecting member and a second projecting member, which project toward each other and are inserted into through holes provided at intervals on the upper surface of the construction member, are provided, and the first projecting member is the first projecting member. 2 The problem is solved by projecting so as to be longer than the projecting member.
With the above configuration, it is possible to realize a temporary structure with improved workability.
More specifically, the temporary structure comprises a strut member, a base member, and a first projecting member and a second projecting member that project downward from the base member and are inserted into through holes provided on the upper surface of the beam, respectively. Since the first projecting member protrudes longer than the second projecting member, the work of inserting the temporary structure (first and second projecting members) into the through hole of the beam becomes easy. .. That is, since the worker at the site can insert the longer first projecting member first through the through hole of the beam and then insert the second projecting member, the two projecting members can be inserted as in the conventional case. The work of attaching the temporary structure becomes easier as compared with the case where the projecting members are inserted at the same time.
In particular, in a narrow space, the worker temporarily installs the temporary handrail by groping, which greatly improves the efficiency of the installation work of the temporary structure.

このとき、前記第1突出部材、前記第2突出部材それぞれの突出先端部は、テーパー形状を有し、それぞれ先端に向かうほど細くなるように形成されており、前記第1突出部材においてテーパー形状の開始位置となる部位が、前記第2突出部材の先端よりも前記ベース部材から遠ざかる位置に配置されていると良い。
上記のように、第1、第2突出部材それぞれの突出先端部がテーパー形状を有しているため、梁の貫通穴に対して第1、第2突出部材をより容易に挿通させることができる。
また上記のように、第1突出部材においてテーパー形状の開始位置となる部位が、第2突出部材の先端よりもベース部材から遠ざかる位置に配置されている。そのため、作業者は、梁の貫通穴に第1突出部材を挿通させた後、当該第1突出部材のうちテーパー部分ではない太い部分(最大幅の部分)をガイド部として利用しながら第2突出部材を挿通させることができる。すなわち、第1突出部材の太い部分を貫通穴の縁部分に当接させて安定した状態で、第2突出部材を別の貫通穴に挿通させることができる。
At this time, the protruding tip portions of the first protruding member and the second protruding member each have a tapered shape, and are formed so as to become thinner toward the tip, respectively, and the first protruding member has a tapered shape. It is preferable that the portion to be the start position is arranged at a position farther from the base member than the tip of the second protruding member.
As described above, since the protruding tips of the first and second protruding members each have a tapered shape, the first and second protruding members can be more easily inserted into the through holes of the beam. ..
Further, as described above, the portion of the first protruding member that becomes the start position of the tapered shape is arranged at a position farther from the base member than the tip of the second protruding member. Therefore, the operator inserts the first projecting member into the through hole of the beam, and then uses the thick portion (maximum width portion) of the first projecting member, which is not the tapered portion, as the guide portion while using the second projecting member. The member can be inserted. That is, the second protruding member can be inserted into another through hole in a stable state by bringing the thick portion of the first protruding member into contact with the edge portion of the through hole.

このとき、前記ベース部材は、前記建物本体の梁の上面に当接し、前記第1突出部材及び前記第2突出部材は、前記梁の上部に間隔を空けて形成された前記貫通穴にそれぞれ挿通され、かつ、前記梁の下部に間隔を空けて形成され、前記貫通穴に対応する位置に配置された第2貫通穴にそれぞれ挿通されると良い。
上記のように、第1、第2突出部材は、梁の上部に形成された貫通穴にそれぞれ挿通され、かつ、梁の下部に形成され、貫通穴に対応する位置に配置された第2貫通穴にそれぞれ挿通されるため、従来(特許文献1、2の発明)と比較して、安定性に優れながら容易に取り付け及び取り外しすることが可能な仮設構造体となる。
At this time, the base member abuts on the upper surface of the beam of the building body, and the first projecting member and the second projecting member are inserted into the through holes formed at intervals in the upper part of the beam. It is preferable that the beam is formed at a space below the beam and is inserted into a second through hole arranged at a position corresponding to the through hole.
As described above, the first and second projecting members are inserted into the through holes formed in the upper part of the beam, respectively, and are formed in the lower part of the beam and are arranged at the positions corresponding to the through holes. Since each of them is inserted into the holes, it is a temporary structure that can be easily attached and detached while having excellent stability as compared with the conventional ones (inventions of Patent Documents 1 and 2).

また前記課題は、上記仮設構造体の組み付け構造であって、前記仮設構造体は、梁の上部に取り付けられる支柱体と、前記梁の上部において建築用パネルを取り付ける際に用いられるパネル取り付け金具を介して取り付けられる第2支柱体と、前記支柱体及び前記第2支柱体それぞれの上方部を連結する連結体と、を備えており、前記支柱体は、前記支柱部材と、前記ベース部材としての梁ベース部材と、前記第1突出部材及び前記第2突出部材と、を有しており、前記第2支柱体は、前記支柱部材と、前記支柱部材の下端部に設けられ、前記パネル取り付け金具の上面に取り付けられる金具ベース部材と、を有していること、によっても解決される。
上記構成により、仮設構造体の一方側の支柱体は、梁の上面に取り付けられ、他方側の第2支柱体は、建築用パネルを取り付けるためのパネル取り付け金具を介して取り付けられることになる。
そのため、建築用パネルを取り付けるための比較的剛性の高いパネル取り付け金具を利用することで、仮設構造体をより安定させて仮設することができる。
また、梁に予め設けられた既存部品(パネル取り付け金具)を利用しているため、他の構成部品を別途取り付ける必要がなく、施工性を向上させることができる。
また、建物本体に建築用パネルを取り付ける際の位置決め部材として仮設構造体(第2支柱体)を利用することもできる。
Further, the subject is an assembly structure of the temporary structure, in which the temporary structure includes a support column to be attached to the upper part of the beam and a panel mounting bracket used to attach a building panel on the upper part of the beam. A second strut body attached via the strut body and a connecting body connecting the upper portions of the strut body and the second strut body are provided, and the strut body includes the strut member and the base member. It has a beam base member, the first projecting member, and the second projecting member, and the second strut body is provided at the strut member and the lower end portion of the strut member, and the panel mounting bracket is provided. It is also solved by having a metal fitting base member attached to the upper surface of the above.
According to the above configuration, the support column on one side of the temporary structure is attached to the upper surface of the beam, and the second support column on the other side is attached via the panel mounting bracket for attaching the building panel.
Therefore, by using a panel mounting bracket having a relatively high rigidity for mounting a building panel, the temporary structure can be more stable and temporarily installed.
Further, since the existing parts (panel mounting brackets) provided in advance on the beam are used, it is not necessary to separately attach other components, and the workability can be improved.
Further, a temporary structure (second support column) can also be used as a positioning member when the building panel is attached to the building body.

このとき、前記支柱体及び前記第2支柱体は、前記建物本体の間口方向において所定の間隔を空けて配置され、前記支柱体は、前記間口方向に沿って長尺に延びている前記梁のうち、前記建物本体の柱に近接した梁端部に取り付けられ、前記第1突出部材は、前記第2突出部材よりも前記柱に近い位置において前記貫通穴に挿通されると良い。
一般に、建物本体の間口方向に沿って延びている梁には、当該間口方向に間隔を空けてパネル取り付け金具が複数設けられているところ、当該梁のうち、建物本体の柱に近接した梁端部においては、パネル取り付け金具が設けられていない。理由として、建物本体に建築用パネル(外壁パネル)を取り付けるときには、建物本体の柱を含めて外側から覆う必要があって、梁端部ではなく当該柱の外側面にパネル取り付け金具を設けたほうが建築用パネルを安定して取り付けられるためである。
そこで、上記の構成であれば、間口方向に沿って延びている梁の延出方向において間隔を空けることなく転落防止用の仮設構造体を連続して仮設することができ、作業者の安全性をより高めることができる。例えば、仮設構造体を設置するにあたって、パネル取り付け金具を利用可能な箇所については第2支柱体を取り付けることで安定性を確保し、パネル取り付け金具が設けられていない梁端部の箇所については支柱体を取り付けることができる。
また、梁端部において支柱体を取り付けるにあたっては、より長尺な第1突出部材が、第2突出部材よりも柱に近い位置において貫通穴に先に挿通されることで、より効率良く仮設構造体(支柱体)を取り付けることができる。
At this time, the pillar body and the second pillar body are arranged at predetermined intervals in the frontage direction of the building body, and the pillar body is a long beam extending along the frontage direction. Of these, it is preferable that the first projecting member is attached to the beam end portion close to the pillar of the building body, and the first projecting member is inserted into the through hole at a position closer to the pillar than the second projecting member.
Generally, a beam extending along the frontage direction of a building body is provided with a plurality of panel mounting brackets at intervals in the frontage direction, and among the beams, the beam end close to the pillar of the building body. The part is not provided with a panel mounting bracket. The reason is that when mounting a building panel (outer wall panel) to the building body, it is necessary to cover it from the outside including the pillar of the building body, and it is better to install the panel mounting bracket on the outer surface of the pillar instead of the beam end. This is because the building panels can be installed stably.
Therefore, with the above configuration, it is possible to continuously temporarily install a temporary structure for preventing falls without leaving a gap in the extending direction of the beam extending along the frontage direction, and the safety of the operator is achieved. Can be further enhanced. For example, when installing a temporary structure, stability is ensured by attaching a second strut body to the part where the panel mounting bracket can be used, and the strut at the beam end where the panel mounting bracket is not provided. The body can be attached.
Further, when attaching the column body at the beam end, the longer first projecting member is inserted into the through hole first at a position closer to the column than the second projecting member, so that the temporary structure is more efficient. A body (pillar) can be attached.

このとき、前記第2支柱体の前記金具ベース部材は、前記パネル取り付け金具において前記建築用パネルが取り付けられるパネル取り付け部よりも前記建物本体の内側に設けられた取り付け部に対して取り付けられ、前記仮設構造体は、前記建物本体に取り付けられたときに、前記建築用パネルの取り付け位置よりも前記建物本体の内側に位置すると良い。
上記構成により、建物本体に取り付けられた仮設構造体と、建築用パネル(例えば外壁パネル)との干渉を避けることができる。そのため、建築用パネルを取り付ける前、及び取り付ける際の転落防止対策として仮設構造体を有効利用することができ、より施工性の向上を図ることができる。
また上記構成により、仮設構造体が建物本体から外側に張り出すことがなく、仮設構造体を容易に取り付け及び取り外しすることができる。
At this time, the metal fitting base member of the second support column is attached to the mounting portion provided inside the building body rather than the panel mounting portion to which the building panel is mounted in the panel mounting bracket, and the said. When the temporary structure is attached to the building body, it is preferable that the temporary structure is located inside the building body rather than the attachment position of the building panel.
With the above configuration, it is possible to avoid interference between the temporary structure attached to the building body and the building panel (for example, the outer wall panel). Therefore, the temporary structure can be effectively used as a fall prevention measure before and when the building panel is attached, and the workability can be further improved.
Further, with the above configuration, the temporary structure does not protrude outward from the building body, and the temporary structure can be easily attached and detached.

また前記課題は、上記仮設構造体を利用した建物施工方法であって、前記施工部材に対し前記仮設構造体を取り付ける工程と、前記施工部材において前記仮設構造体よりも前記建物本体の外側に位置する部分に対し前記建築用パネルを取り付ける工程と、前記施工部材から前記仮設構造体を取り外す工程と、を含み、前記仮設構造体を取り付ける工程では、前記施工部材に設けられたそれぞれの前記貫通穴に対し、前記第1突出部材を挿通した後に前記第2突出部材を挿通することとする建物施工方法によっても解決される。 Further, the subject is a building construction method using the temporary structure, in which the step of attaching the temporary structure to the construction member and the position of the construction member outside the temporary structure are located outside the building body. In the step of attaching the temporary structure, including the step of attaching the building panel to the portion to be mounted and the step of removing the temporary structure from the construction member, each of the through holes provided in the construction member. On the other hand, it is also solved by a building construction method in which the second projecting member is inserted after the first projecting member is inserted.

本発明の仮設構造体、仮設構造体の組み付け構造及び建物施工方法によれば、建物の施工時や施工後のメンテナンス時において施工性の向上を図ることができる。
また、狭小スペースにおいて安定性に優れ、容易に取り付け及び取り外しすることが可能な仮設構造体を実現することができる。
According to the temporary structure, the assembly structure of the temporary structure, and the building construction method of the present invention, it is possible to improve the workability at the time of construction of the building and at the time of maintenance after construction.
In addition, it is possible to realize a temporary structure that is excellent in stability in a narrow space and can be easily attached and detached.

建物本体に仮設手摺りが取り付けられた状態を示す斜視図である。It is a perspective view which shows the state which the temporary handrail is attached to the building body. パネル取り付け金具を示す斜視図である。It is a perspective view which shows the panel mounting metal fittings. 別の角度から見たパネル取り付け金具を示す斜視図である。It is a perspective view which shows the panel mounting metal fittings seen from another angle. 第2パネル取り付け金具を示す斜視図である。It is a perspective view which shows the 2nd panel mounting metal fittings. 仮設手摺りを示す斜視図である。It is a perspective view which shows the temporary handrail. 梁に仮設手摺り(支柱体)を取り付けた状態を示す斜視図である。It is a perspective view which shows the state which attached the temporary handrail (post body) to the beam. 別の角度から見た斜視図である。It is a perspective view seen from another angle. パネル取り付け金具及び仮設手摺り(第2支柱体)の分解斜視図である。It is an exploded perspective view of a panel mounting bracket and a temporary handrail (second support column body). パネル取り付け金具に第2支柱体を取り付けた状態を示す斜視図である。It is a perspective view which shows the state which the 2nd support body is attached to the panel mounting metal fittings. 仮設構造体を用いた建物施工方法を示す工程図である。It is a process drawing which shows the building construction method using a temporary structure. 建物本体にパネル取り付け金具を取り付けた状態を示す模式図である。It is a schematic diagram which shows the state which the panel mounting metal fitting is attached to the building body. 梁、パネル取り付け金具に仮設手摺りを取り付けた状態を示す模式図である。It is a schematic diagram which shows the state which the temporary handrail is attached to the beam and the panel mounting bracket. パネル取り付け金具に建築用パネルを取り付ける様子を示す模式図である。It is a schematic diagram which shows the state of attaching a building panel to a panel mounting bracket. 建築用パネルを取り付けた状態を示す模式図である。It is a schematic diagram which shows the state which attached the building panel. 仮設手摺りを取り外した状態を示す模式図である。It is a schematic diagram which shows the state which the temporary handrail is removed. 建物本体に仮設手摺り及び仮設板が取り付けられた状態を示す斜視図である。It is a perspective view which shows the state which the temporary handrail and the temporary plate are attached to the building main body. 仮設板を示す斜視図である。It is a perspective view which shows the temporary plate.

以下、本発明に係る実施形態について図1-図12を参照して説明する。
本実施形態は、建物の施工中に用いられ、建物本体に取り付けられる転落防止用の仮設構造体であって、上下方向に長尺に延びている支柱部材と、支柱部材の下端部に設けられ、建物本体の施工部材(梁)の上面に当接するベース部材と、ベース部材の長さ方向において間隔を空けて設けられ、ベース部材から下方に向かってそれぞれ突出し、施工部材の上面に間隔を空けて設けられた貫通穴にそれぞれ挿通される第1突出部材及び第2突出部材と、を備えており、第1突出部材が、第2突出部材よりも長尺となるように突出していることを主な特徴とする発明に関するものである。
なお、本実施形態では「仮設手摺り」が仮設構造体に相当する。
Hereinafter, embodiments according to the present invention will be described with reference to FIGS. 1 to 12.
This embodiment is a temporary structure for fall prevention that is used during construction of a building and is attached to the main body of the building, and is provided at a support column member extending vertically in a long length and a lower end portion of the support column member. , The base member that abuts on the upper surface of the construction member (beam) of the building body and the base member are provided at intervals in the length direction of the base member. A first projecting member and a second projecting member, which are inserted into the through holes provided therein, are provided, and the first projecting member projects so as to be longer than the second projecting member. It relates to an invention as a main feature.
In this embodiment, the "temporary handrail" corresponds to the temporary structure.

本実施形態の仮設手摺りの組み付け構造では、図1に示すように、建物の施工中において、建物本体Bの梁B1又は梁B1に設けられたパネル取り付け金具1に対して仮設手摺り20が組み付けられる。
詳しく述べると、仮設手摺り20は、建物本体Bの間口方向に沿って長尺に延びている梁B1のうち、建物本体Bの柱B4に近接した位置(梁端部)に取り付けられている。
そして、仮設手摺り20が組み付けられた状態で、建物本体B(パネル取り付け金具1、10)に対して建築用パネル30を取り付けることができる。
以下、上記組み付け構造について詳しく説明する。
In the assembly structure of the temporary handrail of the present embodiment, as shown in FIG. 1, during the construction of the building, the temporary handrail 20 is attached to the beam B1 of the building body B or the panel mounting bracket 1 provided on the beam B1. Can be assembled.
More specifically, the temporary handrail 20 is attached to a position (beam end) close to the pillar B4 of the building body B among the beams B1 extending long along the frontage direction of the building body B. ..
Then, with the temporary handrail 20 assembled, the building panel 30 can be attached to the building body B (panel mounting brackets 1 and 10).
Hereinafter, the above assembly structure will be described in detail.

パネル取り付け金具1、第2パネル取り付け金具10は、図1に示すように、建物本体Bの梁B1にそれぞれ固定され、建物本体Bに建築用パネル30を取り付ける際に用いられる接合金具である。
パネル取り付け金具1は、仮設手摺り20を仮設するための接合金具としても機能し、特に狭小スペースにおいて仮設手摺り20を仮設するために利用される。
詳しく述べると、パネル取り付け金具1は、建物本体Bの上階においてH形鋼の梁B1の上面に固定されており、建物本体Bの間口方向に間隔を空けて複数配置されている。
第2パネル取り付け金具10は、パネル取り付け金具1と上下方向で重なる位置に配置され、梁B1の底面に固定されており、当該間口方向に間隔を空けて複数配置されている。
As shown in FIG. 1, the panel mounting bracket 1 and the second panel mounting bracket 10 are joint fittings that are fixed to the beam B1 of the building body B and are used when mounting the building panel 30 to the building body B.
The panel mounting bracket 1 also functions as a joining bracket for temporarily installing the temporary handrail 20, and is used for temporarily installing the temporary handrail 20 particularly in a narrow space.
More specifically, the panel mounting bracket 1 is fixed to the upper surface of the H-shaped steel beam B1 on the upper floor of the building body B, and a plurality of the panel mounting brackets 1 are arranged at intervals in the frontage direction of the building body B.
The second panel mounting bracket 10 is arranged at a position overlapping with the panel mounting bracket 1 in the vertical direction, is fixed to the bottom surface of the beam B1, and is arranged in plurality at intervals in the frontage direction.

パネル取り付け金具1は、図2A、Bに示すように、断面略L字形状の部材であって、梁B1の上フランジ部B2に当接し、梁B1よりも建物本体Bの外側に突出している底壁部1aと、底壁部1aの外側端部から連続して上方に延びている外側壁部1bと、底壁部1aの幅方向の両端部から連続してそれぞれ上方に延びており、底壁部1a及び外側壁部1bを連結している一対の補強壁部1cと、から主に構成されている。
パネル取り付け金具1の底壁部1aには、梁B1に固定するための取り付け穴2が形成されている。また、取り付け穴2を利用することで、仮設手摺り20を着脱可能に取り付けることができる。
また、外側壁部1bには、建築用パネル30を着脱可能に取り付けるためのパネル取り付け穴3が形成されている。
As shown in FIGS. 2A and 2B, the panel mounting bracket 1 is a member having a substantially L-shaped cross section, abuts on the upper flange portion B2 of the beam B1, and protrudes outside the building body B from the beam B1. The bottom wall portion 1a, the outer wall portion 1b extending continuously upward from the outer end portion of the bottom wall portion 1a, and the outer wall portion 1b extending continuously upward from both ends in the width direction of the bottom wall portion 1a, respectively. It is mainly composed of a pair of reinforcing wall portions 1c connecting the bottom wall portion 1a and the outer wall portion 1b.
A mounting hole 2 for fixing to the beam B1 is formed in the bottom wall portion 1a of the panel mounting bracket 1. Further, by using the mounting hole 2, the temporary handrail 20 can be detachably attached.
Further, the outer wall portion 1b is formed with a panel mounting hole 3 for detachably mounting the building panel 30.

取り付け穴2は、底壁部1aに対し上下方向に貫通した貫通穴であって、パネル取り付け金具1の幅方向に間隔を空けて複数形成されている。
取り付け穴2と、梁B1の上面に形成された貫通穴B2aとが上下方向に連通した状態で固定ボルト4がナット締めされることで、パネル取り付け金具1が梁B1に固定されている。
また、取り付け穴2と、図6に示す仮設手摺り20(金具ベース部材25)に形成された取り付け穴26とが上下方向に連通した状態で固定ボルト4がナット締めされることで、仮設手摺り20がパネル取り付け金具1に取り付けられている。
詳しく述べると、図6に示すように、パネル取り付け金具1の取り付け穴2と、固定ナット5と、仮設手摺り20の取り付け穴26と、固定ナット6とが上下方向に連通した状態で固定ボルト4によって締結されている。
The mounting holes 2 are through holes that penetrate in the vertical direction with respect to the bottom wall portion 1a, and are formed in plurality at intervals in the width direction of the panel mounting bracket 1.
The panel mounting bracket 1 is fixed to the beam B1 by tightening the fixing bolt 4 with a nut in a state where the mounting hole 2 and the through hole B2a formed on the upper surface of the beam B1 communicate with each other in the vertical direction.
Further, the fixing bolt 4 is tightened with a nut while the mounting hole 2 and the mounting hole 26 formed in the temporary handrail 20 (metal fitting base member 25) shown in FIG. 6 are in communication with each other in the vertical direction. The slide 20 is attached to the panel mounting bracket 1.
More specifically, as shown in FIG. 6, the fixing bolts are in a state where the mounting hole 2 of the panel mounting bracket 1, the fixing nut 5, the mounting hole 26 of the temporary handrail 20, and the fixing nut 6 are in communication with each other in the vertical direction. It is concluded by 4.

パネル取り付け穴3は、図2A、Bに示すように、外側壁部1bの上端部に形成された切り欠き穴であって、パネル取り付け金具1の幅方向に間隔を空けて一対形成されている。
パネル取り付け穴3は、図10Cに示す建築用パネル30の下端部の取り付け軸33を上方から嵌合させるための穴である。
As shown in FIGS. 2A and 2B, the panel mounting holes 3 are notch holes formed in the upper end portion of the outer wall portion 1b, and are formed in pairs at intervals in the width direction of the panel mounting bracket 1. ..
The panel mounting hole 3 is a hole for fitting the mounting shaft 33 at the lower end of the building panel 30 shown in FIG. 10C from above.

パネル取り付け穴3は、取り付け軸33を導き入れるためのガイド穴となる第1穴部3aと、第1穴部3aから連続して形成され、パネル取り付け穴3の中で取り付け軸33を嵌合させるための嵌合穴となる第2穴部3b、とから構成されている。
第1穴部3aは、略逆台形状のガイド穴であって、外側壁部1bの上端から下方に向かうに従って幅狭となるように傾斜しながら切り欠き形成されている。
第2穴部3bは、略半円形状の嵌合穴であって、取り付け軸33を着脱可能に嵌合させる縁を有しており、第1穴部3aから連続して所定の幅を有しながら下方に向かって切り欠き形成されている。
上記構成により、パネル取り付け金具1に対し建築用パネル30を上下方向から容易に取り付け及び取り外しすることができる。
The panel mounting hole 3 is formed continuously from the first hole portion 3a, which is a guide hole for guiding the mounting shaft 33, and the first hole portion 3a, and the mounting shaft 33 is fitted in the panel mounting hole 3. It is composed of a second hole portion 3b, which is a fitting hole for making the hole.
The first hole portion 3a is a guide hole having a substantially inverted trapezoidal shape, and is formed by notching while being inclined so as to become narrower downward from the upper end of the outer wall portion 1b.
The second hole portion 3b is a fitting hole having a substantially semicircular shape, has an edge for detachably fitting the mounting shaft 33, and has a predetermined width continuously from the first hole portion 3a. However, a notch is formed downward.
With the above configuration, the building panel 30 can be easily attached to and detached from the panel mounting bracket 1 from the vertical direction.

第2パネル取り付け金具10は、図3に示すように、段差形状を有する部材であって、梁B1の下フランジ部B3に当接し、梁B1よりも建物本体Bの外側に突出している上壁部10aと、上壁部10aの外側端部から下方に延びている第1外側壁部10bと、第1外側壁部10bの下端部から建物本体Bの外側に突出している底壁部10cと、底壁部10cの外側端部から下方に延びている第2外側壁部10dと、上壁部10aの幅方向の両端部からそれぞれ下方に延びており、上壁部10aから第2外側壁部10dまでを連結している一対の補強壁部10eと、を備えている。
また、第2パネル取り付け金具10は、底壁部10cの上面から上方に突出している第3外側壁部10fと、第3外側壁部10fの幅方向の両端部からそれぞれ建物本体B側に向かって延びており、第3外側壁部10f、第1外側壁部10b及び底壁部10cを連結している一対の第2補強壁部10gと、を備えている。
第2パネル取り付け金具10の上壁部10aには、梁B1に固定するための取り付け穴11が形成されている。
また、第2外側壁部10dには、建築用パネル30を固定するためのパネル固定穴12が形成されており、第3外側壁部10fには、建築用パネル30を着脱可能に取り付けるためのパネル取り付け穴13が形成されている。
As shown in FIG. 3, the second panel mounting bracket 10 is a member having a stepped shape, and is an upper wall that abuts on the lower flange portion B3 of the beam B1 and projects from the beam B1 to the outside of the building body B. The portion 10a, the first outer wall portion 10b extending downward from the outer end portion of the upper wall portion 10a, and the bottom wall portion 10c protruding outward from the lower end portion of the first outer wall portion 10b to the outside of the building body B. , The second outer wall portion 10d extending downward from the outer end portion of the bottom wall portion 10c and the second outer wall portion 10a extending downward from both ends in the width direction of the upper wall portion 10a, respectively, from the upper wall portion 10a to the second outer wall portion. It is provided with a pair of reinforcing wall portions 10e connecting the portions up to 10d.
Further, the second panel mounting bracket 10 faces the building body B side from both ends of the third outer wall portion 10f protruding upward from the upper surface of the bottom wall portion 10c and the third outer wall portion 10f in the width direction. A pair of second reinforcing wall portions 10g connecting the third outer wall portion 10f, the first outer wall portion 10b, and the bottom wall portion 10c.
A mounting hole 11 for fixing to the beam B1 is formed in the upper wall portion 10a of the second panel mounting bracket 10.
Further, a panel fixing hole 12 for fixing the building panel 30 is formed in the second outer wall portion 10d, and the building panel 30 is detachably attached to the third outer wall portion 10f. A panel mounting hole 13 is formed.

取り付け穴11は、取り付け穴2と同様の貫通穴であって、第2パネル取り付け金具10の幅方向に間隔を空けて複数形成されている。
取り付け穴11と、梁B1の底面に形成された第2貫通穴B3aとが上下方向に連通した状態で固定ボルト14がナット締めされることで、第2パネル取り付け金具10が梁B1に固定されている。
The mounting holes 11 are through holes similar to the mounting holes 2, and are formed in plurality at intervals in the width direction of the second panel mounting bracket 10.
The second panel mounting bracket 10 is fixed to the beam B1 by tightening the fixing bolt 14 with the mounting hole 11 and the second through hole B3a formed in the bottom surface of the beam B1 communicating with each other in the vertical direction. ing.

パネル固定穴12は、図3に示すように、第2外側壁部10dに対し建物本体Bの出幅方向に貫通した貫通穴であって、第2パネル取り付け金具10の幅方向に間隔を空けて複数形成されている。
パネル固定穴12に対し、図10Dに示す建築用パネル30の上端部の固定ナット35を連通させた状態でボルト固定することで、建物本体Bに建築用パネル30が固定されている。
As shown in FIG. 3, the panel fixing hole 12 is a through hole penetrating the second outer wall portion 10d in the protruding width direction of the building body B, and is spaced apart in the width direction of the second panel mounting bracket 10. Is formed in multiples.
The building panel 30 is fixed to the building body B by bolting the fixing nut 35 at the upper end of the building panel 30 shown in FIG. 10D to the panel fixing hole 12 in a state of communicating with the panel fixing hole 12.

パネル取り付け穴13は、上述のパネル取り付け穴3と同様の切り欠き穴であって、第2パネル取り付け金具10の幅方向に間隔を空けて一対形成されている。
パネル取り付け穴13は、図10Cに示す建築用パネル30の下端の第2取り付け軸34を上方から嵌合させるための穴である。
パネル取り付け穴13は、ガイド穴となる第1穴部13aと、パネル取り付け穴13の中で第2取り付け軸34を嵌合させるための嵌合穴となる第2穴部13b、とから主に構成されている。
上記構成により、複数のパネル取り付け金具1、10に対し、建築用パネル30を上下方向で複数支持させるように取り付けることができる。
The panel mounting holes 13 are notch holes similar to the panel mounting holes 3 described above, and are formed in pairs at intervals in the width direction of the second panel mounting bracket 10.
The panel mounting hole 13 is a hole for fitting the second mounting shaft 34 at the lower end of the building panel 30 shown in FIG. 10C from above.
The panel mounting hole 13 is mainly composed of a first hole portion 13a serving as a guide hole and a second hole portion 13b serving as a fitting hole for fitting the second mounting shaft 34 in the panel mounting hole 13. It is configured.
With the above configuration, the building panel 30 can be attached to the plurality of panel mounting brackets 1 and 10 so as to support a plurality of building panels 30 in the vertical direction.

仮設手摺り20は、図4-図8に示すように、建物の施工中に用いられる転落防止用の仮設構造体であって、建物本体Bに建築用パネル30を取り付ける前に取り付けられ、建築用パネル30を取り付けた後に取り外されるものである。
仮設手摺り20は、梁B1の上部に取り付けられる支柱体20Aと、梁B1の上部においてパネル取り付け金具1を介して取り付けられる第2支柱体20Bと、支柱体20A及び第2支柱体20Bそれぞれの上方部、中央部を連結する連結体20Cと、から主に構成されている。
連結体20Cは、板状の長尺体として形成されており、梁B1の長尺方向に沿って延びている。また、連結体20Cは、図1に示すように、梁B1の長尺方向に沿って複数並ぶように配置されている。詳しく述べると、一方の連結体20Cの端部と、他方の連結体20Cの端部とが重なるように配置され、重なり合った端部が支柱体(第2支柱体20B)によって支持されている。
As shown in FIGS. 4 to 8, the temporary handrail 20 is a temporary structure for preventing falls used during construction of a building, and is attached to the building body B before the building panel 30 is attached to the building. It is removed after the panel 30 is attached.
The temporary handrail 20 includes a support column 20A attached to the upper part of the beam B1, a second support column 20B attached to the upper part of the beam B1 via the panel mounting bracket 1, a support column 20A, and a second support column 20B, respectively. It is mainly composed of a connecting body 20C connecting the upper portion and the central portion.
The connecting body 20C is formed as a plate-shaped elongated body, and extends along the elongated direction of the beam B1. Further, as shown in FIG. 1, a plurality of connecting bodies 20C are arranged so as to be arranged along the long direction of the beam B1. More specifically, the end portion of one connecting body 20C and the end portion of the other connecting body 20C are arranged so as to overlap each other, and the overlapping end portion is supported by the strut body (second strut body 20B).

支柱体20Aは、図5、図6に示すように、上下方向に長尺に延びている支柱部材21と、支柱部材21の下端部に設けられ、梁B1の上面に当接する梁ベース部材22と、梁ベース部材22の長さ方向において間隔を空けて設けられ、梁ベース部材22から下方に向かってそれぞれ突出し、梁B1上に間隔を空けて設けられた貫通穴B2a(B3a)にそれぞれ挿通される第1突出部材23及び第2突出部材24と、から主に構成されている。 As shown in FIGS. 5 and 6, the strut body 20A has a strut member 21 extending in the vertical direction and a beam base member 22 provided at the lower end of the strut member 21 and in contact with the upper surface of the beam B1. And, they are provided at intervals in the length direction of the beam base member 22, project downward from the beam base member 22, and are inserted into through holes B2a (B3a) provided at intervals on the beam B1. It is mainly composed of a first protruding member 23 and a second protruding member 24.

支柱部材21は、断面矩形状の長尺な中空体である。支柱部材21の上方部、中央部には、連結体20Cの端部に設けられた係合穴20Caを着脱可能に係合させるための係合軸21aが設けられている。係合軸21aは、支柱部材21の外側面から建物本体Bの内側に向かって突出している。 The strut member 21 is a long hollow body having a rectangular cross section. An engaging shaft 21a for detachably engaging the engaging hole 20Ca provided at the end of the connecting body 20C is provided in the upper portion and the central portion of the support column member 21. The engaging shaft 21a projects from the outer surface of the support column member 21 toward the inside of the building body B.

梁ベース部材22は、仮設手摺り20の取り付け強度(曲げ強度)を確保するための部材であって、梁B1の上面に当接している。
詳しく述べると、梁ベース部材22は、支柱部材21の下端部から幅方向の両側に突出している一対の第1ベース部22aと、支柱部材21の下端部から建物本体Bの内側に突出している第2ベース部22bと、第2ベース部22bから幅方向の両側に突出し、第1ベース部22a及び第2ベース部22bを連結する一対の補強ベース部22cと、から主に構成されている。
The beam base member 22 is a member for ensuring the mounting strength (bending strength) of the temporary handrail 20, and is in contact with the upper surface of the beam B1.
More specifically, the beam base member 22 has a pair of first base portions 22a projecting from the lower end portion of the strut member 21 on both sides in the width direction, and the beam base member 22 projecting from the lower end portion of the strut member 21 to the inside of the building body B. It is mainly composed of a second base portion 22b and a pair of reinforcing base portions 22c protruding from the second base portion 22b on both sides in the width direction and connecting the first base portion 22a and the second base portion 22b.

一対の第1ベース部22a、第2ベース部22b、一対の補強ベース部22cは、それぞれ板状部材からなり、梁B1の上面に当接している。
一対の第1ベース部22aのうち、梁B1の貫通穴B2a(B3a)に対向する位置には、第1、第2突出部材23、24が溶接されている。
第2ベース部22bは、一対の第1ベース部22aの外側端部の間に配置されており、かつ、第1、第2突出部材23、24の間に配置されている。
一対の補強ベース部22cは、上下方向において支柱部材21側から梁B1側へ向かうに従って傾斜しながら広がっている。
The pair of first base portions 22a, the second base portion 22b, and the pair of reinforcing base portions 22c are each made of a plate-shaped member and are in contact with the upper surface of the beam B1.
The first and second projecting members 23 and 24 are welded to the positions of the pair of first base portions 22a facing the through holes B2a (B3a) of the beam B1.
The second base portion 22b is arranged between the outer end portions of the pair of first base portions 22a, and is arranged between the first and second projecting members 23 and 24.
The pair of reinforcing base portions 22c are inclined and expanded in the vertical direction from the support column member 21 side toward the beam B1 side.

第1突出部材23、第2突出部材24は、上下方向に長尺な棒状部材であって、第1突出部材23が、第2突出部材24よりも長尺となるように突出している。
第1突出部材23、第2突出部材24それぞれの先端部23a、24aは、テーパー形状を有し、それぞれ先端に向かうほど細くなるように形成されている。
また、第1突出部材23(先端部23a)においてテーパー形状の開始位置となる部位が、第2突出部材24の先端よりも梁ベース部材22から遠ざかる位置に配置されている。
The first projecting member 23 and the second projecting member 24 are rod-shaped members that are elongated in the vertical direction, and the first projecting member 23 projects so as to be longer than the second projecting member 24.
The tip portions 23a and 24a of the first projecting member 23 and the second projecting member 24, respectively, have a tapered shape and are formed so as to become thinner toward the tip.
Further, the portion of the first protruding member 23 (tip portion 23a) that becomes the start position of the tapered shape is arranged at a position farther from the beam base member 22 than the tip of the second protruding member 24.

上記構成において、第1突出部材23、第2突出部材24は、梁B1の上フランジ部B2に間隔を空けて形成された貫通穴B2aにそれぞれ挿通され、かつ、下フランジ部B3に間隔を空けて形成された第2貫通穴B3aにそれぞれ挿通されている。
そのため、安定性に優れながら、容易に取り付け及び取り外すことが可能な仮設手摺り20を実現できる。
In the above configuration, the first projecting member 23 and the second projecting member 24 are respectively inserted into through holes B2a formed at intervals in the upper flange portion B2 of the beam B1 and at intervals in the lower flange portion B3. It is inserted into the second through hole B3a formed in the above.
Therefore, it is possible to realize a temporary handrail 20 that can be easily attached and detached while having excellent stability.

第2支柱体20Bは、図7、図8に示すように、上下方向に長尺に延びている支柱部材21と、支柱部材21の下端部に設けられ、パネル取り付け金具1の上面に当接して取り付けられる金具ベース部材25と、から主に構成されている。 As shown in FIGS. 7 and 8, the second support column 20B is provided at the support column member 21 extending in the vertical direction and the lower end portion of the support column member 21, and abuts on the upper surface of the panel mounting bracket 1. It is mainly composed of a metal fitting base member 25 to be attached to the metal fitting base member 25.

金具ベース部材25は、パネル取り付け金具1に対し上下方向で取り付けられ、また、パネル取り付け金具1に対し建物本体Bの出幅方向で当接するように保持されている。
詳しく述べると、金具ベース部材25は、支柱部材21の下端部から幅方向の両側に突出している一対の第1ベース部25aと、支柱部材21の下端部から建物本体Bの外側に突出している第2ベース部25bと、第2ベース部25bから幅方向の両側に突出し、第1ベース部25a及び第2ベース部25bを連結する一対の補強ベース部25cと、から主に構成されている。
The metal fitting base member 25 is attached to the panel mounting metal fitting 1 in the vertical direction, and is held so as to abut against the panel mounting metal fitting 1 in the protruding width direction of the building body B.
More specifically, the metal fitting base member 25 is a pair of first base portions 25a projecting from the lower end portion of the strut member 21 on both sides in the width direction, and projecting from the lower end portion of the strut member 21 to the outside of the building body B. It is mainly composed of a second base portion 25b and a pair of reinforcing base portions 25c protruding from the second base portion 25b on both sides in the width direction and connecting the first base portion 25a and the second base portion 25b.

一対の第1ベース部25aは、パネル取り付け金具1の底壁部1aに対し固定ナット5を介して上下方向で当接している。
一対の第1ベース部25aのうち、パネル取り付け金具1の取り付け穴2に対向する位置には、パネル取り付け金具1に取り付けるための取り付け穴26がそれぞれ形成されている。
The pair of first base portions 25a are in vertical contact with the bottom wall portion 1a of the panel mounting bracket 1 via the fixing nut 5.
Of the pair of first base portions 25a, mounting holes 26 for mounting on the panel mounting bracket 1 are formed at positions facing the mounting holes 2 of the panel mounting bracket 1.

第2ベース部25bは、パネル取り付け金具1の外側壁部1bに向かって突出しており、当該外側壁部1bに建物本体Bの出幅方向で当接している。また、底壁部1aに上下方向で当接している。
詳しく述べると、第2ベース部25bは、外側壁部1bのうち、一対のパネル取り付け穴3の間の中央部分に当接している。
一対の補強ベース部25cは、略三角形状の板状部材からなり、上下方向において支柱部材21側からパネル取り付け金具1側へ向かうに従って傾斜しながら広がっている。
The second base portion 25b projects toward the outer wall portion 1b of the panel mounting bracket 1 and abuts on the outer wall portion 1b in the protruding width direction of the building body B. Further, it is in contact with the bottom wall portion 1a in the vertical direction.
More specifically, the second base portion 25b is in contact with the central portion of the outer wall portion 1b between the pair of panel mounting holes 3.
The pair of reinforcing base portions 25c are composed of substantially triangular plate-shaped members, and are inclined and expanded in the vertical direction from the support column member 21 side toward the panel mounting bracket 1 side.

建築用パネル30は、図1、図10C、Dに示すように、建物を構成する矩形板状の部材であって、具体的には、外壁パネルであって、矩形板状のパネルフレーム31と、パネルフレーム31の表面に固定されている仕上げ面材32と、から主に構成されている。
なお、建築用パネル30は、「外壁パネル」に特に限定されることなく、「腰壁パネル」や「屋根パネル」、「庇パネル」であっても良く、各種の建築用パネルを採用することができる。
As shown in FIGS. 1, 10C, and D, the building panel 30 is a rectangular plate-shaped member constituting the building, specifically, an outer wall panel, and the rectangular plate-shaped panel frame 31. , A finished surface material 32 fixed to the surface of the panel frame 31, and mainly composed of.
The building panel 30 is not particularly limited to the "outer wall panel", and may be a "waist wall panel", a "roof panel", or an "eaves panel", and various building panels shall be adopted. Can be done.

パネルフレーム31の裏面における下端部には、パネル取り付け金具1、10(柱B4に設けられた金具B4a、B4b)にそれぞれ着脱可能に取り付けるための取り付け軸33、第2取り付け軸34が突出するように設けられている。
また、パネルフレーム31の裏面における上端部には、第2パネル取り付け金具10(第2金具B4b)に固定するための固定ナット35が突出するように設けられている。
これら取り付け軸33、34及び固定ナット35は、それぞれ建築用パネル30の幅方向の両端部に一対となって配置されている。
A mounting shaft 33 and a second mounting shaft 34 for detachably attaching to the panel mounting brackets 1 and 10 (brackets B4a and B4b provided on the pillar B4) project from the lower end portion on the back surface of the panel frame 31. It is provided in.
Further, a fixing nut 35 for fixing to the second panel mounting bracket 10 (second bracket B4b) is provided so as to project from the upper end portion on the back surface of the panel frame 31.
The mounting shafts 33, 34 and the fixing nuts 35 are arranged in pairs at both ends of the building panel 30 in the width direction.

取り付け軸33は、図10C、Dに示すように、フック式の軸部材であって、パネル取り付け穴3の縁に嵌合される。
なお、第2取り付け軸34も同様にしてパネル取り付け穴13の縁に嵌合される。
As shown in FIGS. 10C and 10D, the mounting shaft 33 is a hook type shaft member and is fitted to the edge of the panel mounting hole 3.
The second mounting shaft 34 is also fitted to the edge of the panel mounting hole 13 in the same manner.

パネル取り付け金具1のパネル取り付け穴3に取り付け軸33を上方から取り付けるにあたって、図10Cに示すように、第1延出部33aがパネル取り付け穴3に挿通可能な大きさで形成されている一方で、第2延出部33bはパネル取り付け穴3には挿通できない大きさで形成されている。
すなわち、パネルフレーム31及び第2延出部33bがパネル取り付け穴3を挟み込むことで、取り付け軸33がパネル取り付け穴3の縁に嵌合される。
なお、第2取り付け軸34も同様にして、パネル取り付け穴13の縁に嵌合される。
固定ナット35は、図10Dに示すように、第2パネル取り付け金具10のパネル固定穴12に連通した状態でボルト締めされる。
When mounting the mounting shaft 33 to the panel mounting hole 3 of the panel mounting bracket 1 from above, as shown in FIG. 10C, while the first extending portion 33a is formed to have a size that allows it to be inserted into the panel mounting hole 3. The second extending portion 33b is formed in a size that cannot be inserted into the panel mounting hole 3.
That is, the panel frame 31 and the second extending portion 33b sandwich the panel mounting hole 3, so that the mounting shaft 33 is fitted to the edge of the panel mounting hole 3.
The second mounting shaft 34 is also fitted to the edge of the panel mounting hole 13 in the same manner.
As shown in FIG. 10D, the fixing nut 35 is bolted in a state of communicating with the panel fixing hole 12 of the second panel mounting bracket 10.

上記構成において、各パネル取り付け金具1、10に建築用パネル30を固定する際には、図10C、Dに示すように、まず、建築用パネル30の下端部の取り付け軸33、34をパネル取り付け穴3、13に嵌合させる。その後、建築用パネル30を建物本体B側に引き寄せて、建築用パネル30の上端部の固定ナット35を、別途設けられた第2パネル取り付け金具10のパネル固定穴12に連通させた状態で固定ボルト36によって固定する。
上記構成により、パネル取り付け金具1、10に対し建築用パネル30を上下方向から容易に取り付けることができる。
In the above configuration, when fixing the building panel 30 to the panel mounting brackets 1 and 10, first, as shown in FIGS. 10C and 10D, the mounting shafts 33 and 34 at the lower end of the building panel 30 are panel-mounted. Fit into holes 3 and 13. After that, the building panel 30 is pulled toward the building body B side, and the fixing nut 35 at the upper end of the building panel 30 is fixed in a state of communicating with the panel fixing hole 12 of the second panel mounting bracket 10 provided separately. It is fixed by the bolt 36.
With the above configuration, the building panel 30 can be easily attached to the panel mounting brackets 1 and 10 from the vertical direction.

上記構成において、図2A、Bに示すように、パネル取り付け金具1のパネル取り付け穴3が、取り付け穴2よりも建物本体Bの外側に配置されており、かつ、取り付け穴2よりも上方位置に形成されている。
そのため、パネル取り付け金具1及び仮設手摺り20が連結された部分と、パネル取り付け金具1及び建築用パネル30が連結された部分とが互いに干渉することを抑制できる。
In the above configuration, as shown in FIGS. 2A and 2B, the panel mounting hole 3 of the panel mounting bracket 1 is arranged outside the building body B with respect to the mounting hole 2, and is located above the mounting hole 2. It is formed.
Therefore, it is possible to prevent the portion to which the panel mounting bracket 1 and the temporary handrail 20 are connected and the portion to which the panel mounting bracket 1 and the building panel 30 are connected from interfering with each other.

<仮設構造体を利用した建物施工方法>
次に、仮設手摺り20を利用した建物施工方法について図9に基づいて説明する。
具体的には、図10A-図10Eに示すように、建物本体Bに設けられた梁B1、パネル取り付け金具1、10に対し仮設手摺り20を仮設し、建築用パネル30を取り付ける建物施工方法について説明する。
<Building construction method using temporary structure>
Next, a building construction method using the temporary handrail 20 will be described with reference to FIG.
Specifically, as shown in FIGS. 10A-10E, a building construction method in which a temporary handrail 20 is temporarily installed on a beam B1 and panel mounting brackets 1 and 10 provided on a building body B, and a building panel 30 is attached. Will be explained.

上記建物施工方法では、図9に示すように、まず、建物本体Bの梁B1に、建物本体Bの間口方向に間隔を空けてパネル取り付け金具1、10を複数取り付ける工程(ステップS1)から始まる。
具体的には、図10Aに示すように、梁B1の上面にパネル取り付け金具1を固定ボルト4(固定ナット5)で固定するとともに、梁B1の底面に対して第2パネル取り付け金具10を固定ボルト14で固定する。
このとき、パネル取り付け金具1と第2パネル取り付け金具10とが上下方向で重なる位置に配置されることになる。
In the above building construction method, as shown in FIG. 9, first, a process (step S1) of attaching a plurality of panel mounting brackets 1 and 10 to the beam B1 of the building body B at intervals in the frontage direction of the building body B begins. ..
Specifically, as shown in FIG. 10A, the panel mounting bracket 1 is fixed to the upper surface of the beam B1 with the fixing bolt 4 (fixing nut 5), and the second panel mounting bracket 10 is fixed to the bottom surface of the beam B1. Fix with bolt 14.
At this time, the panel mounting bracket 1 and the second panel mounting bracket 10 are arranged at overlapping positions in the vertical direction.

その後、建物本体Bの梁B1、パネル取り付け金具1それぞれに対し、仮設手摺り20を取り付ける(ステップS2)。
具体的には、図1、図10Bに示すように、梁B1に形成された所定の貫通穴B2aと、梁B1上に設けられた所定のパネル取り付け金具1とに対し、仮設手摺り20を支持させるように取り付ける。
詳しく述べると、貫通穴B2aそれぞれに対し、支柱体20Aの第1、第2突出部材23、24を挿通する。このとき、第1、第2突出部材23、24の先端部23a、24aを梁B1の下部にある第2貫通穴B3aそれぞれに対しても挿通する。
さらに詳しく述べると、より長尺な第1突出部材23を、第2突出部材24よりも柱B4に近い位置にある貫通穴B2aに先に挿通する。その後、第2突出部材24を挿通する。
そして、パネル取り付け金具1に対し、第2支柱体20Bの金具ベース部材25を取り付ける。このとき、パネル取り付け金具1に形成された一対の取り付け穴2と、金具ベース部材25に形成された一対の取り付け穴26とが連通した状態で、上記取り付け穴2、26から上方に一部突出した固定ボルト4がナット締めされることで、仮設手摺り20がパネル取り付け金具1に取り付けられる。
After that, the temporary handrail 20 is attached to each of the beam B1 and the panel mounting bracket 1 of the building body B (step S2).
Specifically, as shown in FIGS. 1 and 10B, the temporary handrail 20 is provided for the predetermined through hole B2a formed in the beam B1 and the predetermined panel mounting bracket 1 provided on the beam B1. Install to support.
More specifically, the first and second projecting members 23 and 24 of the support column 20A are inserted through the through holes B2a, respectively. At this time, the tip portions 23a and 24a of the first and second projecting members 23 and 24 are also inserted into the second through holes B3a at the lower part of the beam B1.
More specifically, the longer first projecting member 23 is first inserted into the through hole B2a located closer to the pillar B4 than the second projecting member 24. After that, the second protruding member 24 is inserted.
Then, the metal fitting base member 25 of the second support column 20B is attached to the panel mounting metal fitting 1. At this time, with the pair of mounting holes 2 formed in the panel mounting bracket 1 and the pair of mounting holes 26 formed in the bracket base member 25 communicating with each other, a part of the mounting holes 2 and 26 protrudes upward. By tightening the fixing bolt 4 with a nut, the temporary handrail 20 is attached to the panel mounting bracket 1.

その後、図10Cに示すように、パネル取り付け金具1、10のパネル取り付け穴3、13に対し建築用パネル30を取り付ける(ステップS3)。
建築用パネル30を取り付けるときには、図10Cに示すように、まず、建築用パネル30の下端部の取り付け軸33、34をパネル取り付け穴3、13に嵌合する。その後、建築用パネル30を建物本体B側に引き寄せて、図10Dに示すように、建築用パネル30の上端部の固定ナット35を、別途設けられた第2パネル取り付け金具10のパネル固定穴12に連通させた状態で固定ボルト36によって固定する。
なお、建築用パネル30を取り付けるにあたって、建物本体Bに対し間口方向に延びた仮設手摺り20を位置決め部材として有効利用することができる。
After that, as shown in FIG. 10C, the building panel 30 is attached to the panel mounting holes 3 and 13 of the panel mounting brackets 1 and 10 (step S3).
When mounting the building panel 30, as shown in FIG. 10C, first, the mounting shafts 33 and 34 at the lower end of the building panel 30 are fitted into the panel mounting holes 3 and 13. After that, the building panel 30 is pulled toward the building body B side, and as shown in FIG. 10D, the fixing nut 35 at the upper end of the building panel 30 is inserted into the panel fixing hole 12 of the second panel mounting bracket 10 separately provided. It is fixed by the fixing bolt 36 in a state where it communicates with.
When attaching the building panel 30, the temporary handrail 20 extending in the frontage direction with respect to the building body B can be effectively used as a positioning member.

その後、図10Eに示すように、パネル取り付け金具1にボルト締結された仮設手摺り20を取り外して(ステップS4)、本作業工程を終了する。 After that, as shown in FIG. 10E, the temporary handrail 20 bolted to the panel mounting bracket 1 is removed (step S4), and this work process is completed.

上記建物施工方法であれば、施工性向上を図った建物施工方法を実現できる。
詳しく述べると、長尺な梁B1のうち、柱B4に近接した梁端部において、容易に取り付け及び取り外すことができ、安定性に優れた仮設手摺りを組み付けることができる。
With the above building construction method, it is possible to realize a building construction method with improved workability.
More specifically, among the long beams B1, at the beam end portion close to the pillar B4, a temporary handrail that can be easily attached and detached and has excellent stability can be assembled.

<第2実施形態>
次に、本発明の第2実施形態について、図11、図12に基づいて説明する。
第2施形態では「仮設手摺り」及び「仮設板」が仮設構造体に相当する。
なお、第2実施形態の仮設手摺りは、上記仮設手摺り20と同様の構成であるため説明を省略する。
<Second Embodiment>
Next, the second embodiment of the present invention will be described with reference to FIGS. 11 and 12.
In the second embodiment, the "temporary handrail" and the "temporary plate" correspond to the temporary structure.
Since the temporary handrail of the second embodiment has the same configuration as the temporary handrail 20, the description thereof will be omitted.

第2実施形態の仮設板120は、建物の施工中に用いられる転落防止用の仮設構造体であって、建物本体Bに建築用パネル30を取り付ける前に取り付けられ、建築用パネル30を取り付けた後に取り外されるものである。
仮設板120は、仮設手摺り20(支柱部材21)の下方部分に取り付けられており、仮設手摺り20よりも建物本体Bの内側に配置され、建物本体Bの床パネルB5上に支持されている。なお、梁B1上に支持されていても良い。
The temporary plate 120 of the second embodiment is a temporary structure for fall prevention used during the construction of the building, and is attached before the building panel 30 is attached to the building body B, and the building panel 30 is attached. It will be removed later.
The temporary plate 120 is attached to the lower portion of the temporary handrail 20 (support member 21), is arranged inside the building body B with respect to the temporary handrail 20, and is supported on the floor panel B5 of the building body B. There is. It may be supported on the beam B1.

具体的には、仮設板120は、仮設手摺り20(支柱部材21)に取り付けられ、建物本体Bの内側に延びている一対の支柱部材121と、一対の支柱部材121の延出端部を連結する連結部材122と、から主に構成されている。
なお、支柱部材121は、断面矩形状の長尺体として形成されており、連結部材122は、板状の長尺体(幅木)として形成されている。
Specifically, the temporary plate 120 is attached to the temporary handrail 20 (post member 21), and has a pair of strut members 121 extending inside the building body B and an extending end portion of the pair of strut members 121. It is mainly composed of a connecting member 122 to be connected.
The strut member 121 is formed as a long body having a rectangular cross section, and the connecting member 122 is formed as a plate-shaped long body (skirting board).

支柱部材121の基端部には、支柱部材21に着脱可能に取り付けるための取り付け部材123が設けられている。
また、支柱部材121の延出端部には、連結部材122の長尺方向の端部を着脱可能に把持するため把持部材124が設けられている。
A mounting member 123 for detachably attaching to the strut member 21 is provided at the base end portion of the strut member 121.
Further, a gripping member 124 is provided at the extending end portion of the support column member 121 in order to detachably grip the end portion of the connecting member 122 in the long direction.

取り付け部材123は、図12に示すように、支柱部材21を内部に挿通させた状態で保持することが可能な部材であって、支柱部材121の基端部から支柱部材21に向かって突出している一対の側壁部123aと、一対の側壁部123aの突出端部を連結する連結壁部123bと、から主に構成されている。
連結壁部123bには、取り付け部材123の内部に挿通させた支柱部材21を側方から押圧するための押圧ボルト123cが取り付けられている。
押圧ボルト123cを支柱部材21の側面に押し当てることで、取り付け部材123が支柱部材21を保持することができる。
そのため、仮設手摺り20(支柱部材21)に対して仮設板120(支柱部材121)を任意の高さ位置で取り付けることができる。
As shown in FIG. 12, the mounting member 123 is a member capable of holding the strut member 21 in a state of being inserted into the inside, and protrudes from the base end portion of the strut member 121 toward the strut member 21. It is mainly composed of a pair of side wall portions 123a and a connecting wall portion 123b connecting the protruding end portions of the pair of side wall portions 123a.
A pressing bolt 123c for pressing the support column member 21 inserted inside the mounting member 123 from the side is attached to the connecting wall portion 123b.
By pressing the pressing bolt 123c against the side surface of the support column member 21, the mounting member 123 can hold the support column member 21.
Therefore, the temporary plate 120 (post member 121) can be attached to the temporary handrail 20 (post member 21) at an arbitrary height position.

把持部材124は、支柱部材121に対して伸縮可能であって、連結部材122を把持することが可能な部材である。
把持部材124は、支柱部材121の内部に挿入され、支柱部材121の延出端部から伸縮可能に延びている伸縮部124aと、伸縮部124aの延出端部から下方に突出している第1把持部124bと、支柱部材121の延出願部から下方に突出している第2把持部124cと、から主に構成されている。
支柱部材121の延出端部には、支柱部材121の内部に挿入された伸縮部124aを側方から押圧するための押圧ボルト124dが取り付けられている。
押圧ボルト124dを伸縮部124aの側面に押し当てることで、支柱部材121に対して伸縮部124aを任意の延出長さで保持することができる。
そのため、把持部材124が、連結部材122の厚さによらず、連結部材122を把持することができる。
The gripping member 124 is a member that can be expanded and contracted with respect to the support column member 121 and can grip the connecting member 122.
The gripping member 124 is inserted into the inside of the support column member 121, and has a stretchable portion 124a extending from the extension end portion of the support column member 121 so as to be expandable and contractible, and a first extending downward from the extension end portion of the expansion / contraction portion 124a. It is mainly composed of a grip portion 124b and a second grip portion 124c protruding downward from the extended application portion of the support column member 121.
A pressing bolt 124d for pressing the telescopic portion 124a inserted inside the strut member 121 from the side is attached to the extending end portion of the strut member 121.
By pressing the pressing bolt 124d against the side surface of the expansion / contraction portion 124a, the expansion / contraction portion 124a can be held with respect to the support column member 121 with an arbitrary extension length.
Therefore, the gripping member 124 can grip the connecting member 122 regardless of the thickness of the connecting member 122.

上記構成により、建築用パネル30を取り付ける前、及び取り付ける際に、施工部品等の落下防止対策として仮設板120を用いることができる。
また、仮設板120が、仮設手摺り20の下方部分に取り付けられ、仮設手摺り20よりも建物本体Bの内側に配置された状態で床パネルB5に支持されている。そのため、建物本体Bの出幅方向において仮設手摺り20がより安定して支持されることになる(仮設手摺り20の曲げ強度を高められる)。
With the above configuration, the temporary plate 120 can be used as a fall prevention measure for construction parts and the like before and when the building panel 30 is attached.
Further, the temporary plate 120 is attached to the lower portion of the temporary handrail 20 and is supported by the floor panel B5 in a state of being arranged inside the building main body B with respect to the temporary handrail 20. Therefore, the temporary handrail 20 is supported more stably in the protruding width direction of the building body B (the bending strength of the temporary handrail 20 can be increased).

なお、図9に示す建物施工方法において、仮設手摺り20に対し仮設板120を取り付ける工程は、ステップS2における仮設手摺り20を取り付ける工程の後に実行されると好ましい。あるいは、仮設手摺り20に仮設板120を予め取り付けておき、ステップS2で仮設板120付きの仮設手摺り20を取り付けることとしても良い。 In the building construction method shown in FIG. 9, it is preferable that the step of attaching the temporary plate 120 to the temporary handrail 20 is executed after the step of attaching the temporary handrail 20 in step S2. Alternatively, the temporary plate 120 may be attached to the temporary handrail 20 in advance, and the temporary handrail 20 with the temporary plate 120 may be attached in step S2.

<その他の実施形態>
上記実施形態では、図1に示すように、仮設手摺り20が「仮設構造体」に相当するものとして説明されているが、特に限定されることなく変更可能である。
例えば、仮設手摺りではなく、仮設足場であっても良い。あるいは、仮設梯子、仮設壁等であっても良い。
<Other embodiments>
In the above embodiment, as shown in FIG. 1, the temporary handrail 20 is described as corresponding to the “temporary structure”, but it can be changed without particular limitation.
For example, it may be a temporary scaffold instead of a temporary handrail. Alternatively, it may be a temporary ladder, a temporary wall, or the like.

上記実施形態では、図1に示すように、仮設手摺り20(支柱体20A)が、建物本体Bのうち梁B1に取り付けられているが、特に限定されることなく、建物本体Bの所定の施工部材に取り付けられていても良い。
また、パネル取り付け金具1、10についても同様に、建物本体Bの所定の施工部材に取り付けられていても良い。
In the above embodiment, as shown in FIG. 1, the temporary handrail 20 (post body 20A) is attached to the beam B1 of the building body B, but the building body B is not particularly limited and is predetermined. It may be attached to a construction member.
Further, the panel mounting brackets 1 and 10 may be similarly attached to a predetermined construction member of the building body B.

上記実施形態では、図1、図4に示すように、仮設手摺り20が、支柱体20Aと、第2支柱体20Bとを備えているが、特に限定されることなく、代わりに一対の支柱体20Aを備えていても良い。
なお、図1に示すように、長尺な梁B1において柱B4に近接した位置には、支柱体20Aを備える「手摺り20」を設置することとし、その他の位置には、一対の第2支柱体20Bを備えた「不図示の手摺り」を設置すると好ましい。
上記構成であれば、梁B1において柱B4に近接した位置では、「仮設手摺り20」を利用することで容易に取り付け及び取り外しすることができる。また、その他の位置では、上記「不図示の手摺り」を利用することで、より安定性を確保することができる。
In the above embodiment, as shown in FIGS. 1 and 4, the temporary handrail 20 includes a support column 20A and a second support column 20B, but is not particularly limited, and instead, a pair of support columns is used. It may be equipped with a body 20A.
As shown in FIG. 1, a "handrail 20" provided with a pillar body 20A is installed at a position close to the pillar B4 in the long beam B1, and a pair of second rails is installed at other positions. It is preferable to install a "handrail (not shown) provided with the support body 20B.
With the above configuration, the beam B1 can be easily attached and detached at a position close to the pillar B4 by using the "temporary handrail 20". Further, at other positions, more stability can be ensured by using the above-mentioned "handrail (not shown)".

上記実施形態では、図4-図6に示すように、第1突出部材23及び第2突出部材24が、梁ベース部材22の長さ方向において間隔を空けて設けられているが、特に限定されることなく、梁ベース部材22の幅方向に間隔を空けて設けられていても良い。
すなわち、第1、第2突出部材23、24が、建物本体Bの出幅方向に並ぶように設けられていても良い。
In the above embodiment, as shown in FIGS. 4 to 6, the first projecting member 23 and the second projecting member 24 are provided at intervals in the length direction of the beam base member 22, but are particularly limited. Instead, the beam base member 22 may be provided at intervals in the width direction.
That is, the first and second projecting members 23 and 24 may be provided so as to line up in the protruding width direction of the building body B.

上記実施形態では、図1、図10Dに示すように、パネル取り付け金具1、10が、建物本体Bに建築用パネル30(外壁パネル)を取り付ける際に用いられる接合金具であったが、外壁パネルに特に限定されることなく変更可能である。
例えば、パネル取り付け金具1が、建物本体Bに「腰壁パネル」や「屋根パネル」、「庇パネル」のような各種建築用パネルを取り付ける際に用いられる接合金具であっても良い。
In the above embodiment, as shown in FIGS. 1 and 10D, the panel mounting brackets 1 and 10 are the joining brackets used when the building panel 30 (outer wall panel) is attached to the building body B, but the outer wall panel. It can be changed without any particular limitation.
For example, the panel mounting bracket 1 may be a joining bracket used for mounting various building panels such as a "waist wall panel", a "roof panel", and an "eaves panel" to the building body B.

上記実施形態では、図7、図8に示すように、パネル取り付け金具1の取り付け穴2と、仮設手摺り20の取り付け穴26とが連通した状態で固定ボルト4がナット締めされることで、仮設手摺り20がパネル取り付け金具1に取り付けられているが、特に限定されることなく変更可能である。
すなわち、「取り付け穴」と、「固定ボルト」及び「固定ナット」との係合関係に特に限定されなくても良い。すなわち、パネル取り付け金具1に設けられた取り付け部2に対し、仮設手摺り20の被取り付け部26が着脱可能に取り付けられている構成であれば良い。
In the above embodiment, as shown in FIGS. 7 and 8, the fixing bolt 4 is nut-tightened with the mounting hole 2 of the panel mounting bracket 1 and the mounting hole 26 of the temporary handrail 20 communicating with each other. The temporary handrail 20 is attached to the panel mounting bracket 1, but it can be changed without particular limitation.
That is, the engagement relationship between the "mounting hole" and the "fixing bolt" and the "fixing nut" may not be particularly limited. That is, the structure may be such that the attached portion 26 of the temporary handrail 20 is detachably attached to the attachment portion 2 provided on the panel mounting bracket 1.

上記実施形態では、主として本発明に係る仮設構造体、仮設構造体の組み付け構造及び建物施工方法に関して説明した。
ただし、上記の実施形態は、本発明の理解を容易にするための一例に過ぎず、本発明を限定するものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物が含まれることは勿論である。
In the above embodiment, the temporary structure, the assembly structure of the temporary structure, and the building construction method according to the present invention have been mainly described.
However, the above embodiment is merely an example for facilitating the understanding of the present invention, and does not limit the present invention. The present invention can be modified and improved without departing from the spirit thereof, and it goes without saying that the present invention includes an equivalent thereof.

B 建物本体
B1 梁(施工部材)
B2 上フランジ部
B2a 貫通穴
B3 下フランジ部
B3a 第2貫通穴
B4 柱
B4a 金具
B4b 第2金具
B5 床パネル
1 パネル取り付け金具
1a 底壁部
1b 外側壁部
1c 補強壁部
2 取り付け穴(取り付け部)
3 パネル取り付け穴(パネル取り付け部)
3a 第1穴部
3b 第2穴部
4 固定ボルト(固定部材)
5、6 固定ナット(固定部材)
10 第2パネル取り付け金具
10a 上壁部
10b 第1外側壁部
10c 底壁部
10d 第2外側壁部
10e 補強壁部
10f 第3外側壁部
10g 第2補強壁部
11 取り付け穴
12 パネル固定穴
13 パネル取り付け穴
13a 第1穴部
13b 第2穴部
14 固定ボルト
20 仮設手摺り(仮設構造体)
20A 支柱体
20B 第2支柱体
20C 連結体
20Ca 係合穴
21 支柱部材
21a 係合軸
22 梁ベース部材(ベース部材)
22a 第1ベース部
22b 第2ベース部
22c 補強ベース部
23 第1突出部材
23a、24a 先端部
24 第2突出部材
25金具ベース部材
25a 第1ベース部
25b 第2ベース部
25c 補強ベース部
26 取り付け穴(被取り付け部)
30 建築用パネル
31 パネルフレーム
32 仕上げ面材
33 取り付け軸
33a 第1延出部
33b 第2延出部
34 第2取り付け軸
35 固定ナット
36 固定ボルト
120 仮設板(第2仮設構造体)
121 支柱部材
122 連結部材
123 取り付け部材
123a 側壁部
123b 連結壁部
123c 押圧ボルト
124 把持部材
124a 伸縮部
124b 第1把持部
124c 第2把持部
124d 押圧ボルト
B Building body B1 Beam (construction member)
B2 Upper flange part B2a Through hole B3 Lower flange part B3a Second through hole B4 Pillar B4a Metal fitting B4b Second metal fitting B5 Floor panel 1 Panel mounting metal fitting 1a Bottom wall part 1b Outer side wall part 1c Reinforcing wall part 2 Mounting hole (mounting part)
3 Panel mounting hole (panel mounting part)
3a 1st hole 3b 2nd hole 4 Fixing bolt (fixing member)
5, 6 Fixing nut (fixing member)
10 2nd panel mounting bracket 10a Upper wall 10b 1st outer wall 10c Bottom wall 10d 2nd outer wall 10e Reinforcing wall 10f 3rd outer wall 10g 2nd reinforcing wall 11 Mounting hole 12 Panel fixing hole 13 Panel mounting hole 13a 1st hole 13b 2nd hole 14 Fixing bolt 20 Temporary handrail (temporary structure)
20A Strut body 20B Second strut body 20C Connecting body 20Ca Engagement hole 21 Strut member 21a Engagement shaft 22 Beam base member (base member)
22a 1st base part 22b 2nd base part 22c Reinforcing base part 23 1st protruding member 23a, 24a Tip part 24 2nd protruding member 25 Bracket base member 25a 1st base part 25b 2nd base part 25c Reinforcing base part 26 Mounting hole (Attached part)
30 Building panel 31 Panel frame 32 Finished surface material 33 Mounting shaft 33a First extension 33b Second extension 34 Second mounting shaft 35 Fixing nut 36 Fixing bolt 120 Temporary plate (second temporary structure)
121 Strut member 122 Connecting member 123 Mounting member 123a Side wall part 123b Connecting wall part 123c Pressing bolt 124 Gripping member 124a Telescopic part 124b First gripping part 124c Second gripping part 124d Pressing bolt

Claims (7)

建物の施工中に用いられ、建物本体に取り付けられる転落防止用の仮設構造体であって、
上下方向に長尺に延びている支柱部材と、
前記支柱部材の下端部に設けられ、前記建物本体の施工部材の上面に当接するベース部材と、
前記ベース部材の長さ方向又は幅方向において間隔を空けて設けられ、前記ベース部材から下方に向かってそれぞれ突出し、前記施工部材の上面に間隔を空けて設けられた貫通穴にそれぞれ挿通される第1突出部材及び第2突出部材と、を備えており、
前記第1突出部材が、前記第2突出部材よりも長尺となるように突出していることを特徴とする仮設構造体。
It is a temporary structure for fall prevention that is used during the construction of the building and is attached to the main body of the building.
A support member that extends vertically in a long direction, and
A base member provided at the lower end of the support column member and abutting on the upper surface of the construction member of the building body,
A first which is provided at intervals in the length direction or width direction of the base member, projects downward from the base member, and is inserted into through holes provided at intervals on the upper surface of the construction member. It is provided with one protruding member and a second protruding member.
A temporary structure characterized in that the first projecting member projects so as to be longer than the second projecting member.
前記第1突出部材、前記第2突出部材それぞれの突出先端部は、テーパー形状を有し、それぞれ先端に向かうほど細くなるように形成されており、
前記第1突出部材においてテーパー形状の開始位置となる部位が、前記第2突出部材の先端よりも前記ベース部材から遠ざかる位置に配置されていることを特徴とする請求項1に記載の仮設構造体。
The protruding tip portions of the first protruding member and the second protruding member each have a tapered shape, and are formed so as to become thinner toward the tip.
The temporary structure according to claim 1, wherein the portion of the first protruding member that becomes the start position of the tapered shape is arranged at a position farther from the base member than the tip of the second protruding member. ..
前記ベース部材は、前記建物本体の梁の上面に当接し、
前記第1突出部材及び前記第2突出部材は、
前記梁の上部に間隔を空けて形成された前記貫通穴にそれぞれ挿通され、かつ、
前記梁の下部に間隔を空けて形成され、前記貫通穴に対応する位置に配置された第2貫通穴にそれぞれ挿通されることを特徴とする請求項1又は2に記載の仮設構造体。
The base member abuts on the upper surface of the beam of the building body and
The first protruding member and the second protruding member
It is inserted into the through holes formed at intervals on the upper part of the beam, and is inserted into the through holes, respectively.
The temporary structure according to claim 1 or 2, wherein the beam is formed at a space below the beam and is inserted into a second through hole arranged at a position corresponding to the through hole.
請求項1乃至3のいずれか1項に記載の仮設構造体の組み付け構造であって、
前記仮設構造体は、
梁の上部に取り付けられる支柱体と、
前記梁の上部において建築用パネルを取り付ける際に用いられるパネル取り付け金具を介して取り付けられる第2支柱体と、
前記支柱体及び前記第2支柱体それぞれの上方部を連結する連結体と、を備えており、
前記支柱体は、前記支柱部材と、前記ベース部材としての梁ベース部材と、前記第1突出部材及び前記第2突出部材と、を有しており、
前記第2支柱体は、前記支柱部材と、前記支柱部材の下端部に設けられ、前記パネル取り付け金具の上面に取り付けられる金具ベース部材と、を有していることを特徴とする仮設構造体の組み付け構造。
The assembly structure of the temporary structure according to any one of claims 1 to 3.
The temporary structure is
The stanchions attached to the top of the beam and
A second strut body attached via a panel mounting bracket used when mounting a building panel on the upper part of the beam, and
It is provided with a connecting body for connecting the upper portions of the support body and the second support body, respectively.
The strut body has the strut member, a beam base member as the base member, the first projecting member, and the second projecting member.
The second strut body is a temporary structure having a strut member and a metal fitting base member provided at a lower end portion of the strut member and attached to an upper surface of the panel mounting metal fitting. Assembly structure.
前記支柱体及び前記第2支柱体は、前記建物本体の間口方向において間隔を空けて配置され、
前記支柱体は、前記間口方向に沿って長尺に延びている前記梁のうち、前記建物本体の柱に近接した梁端部に取り付けられ、
前記第1突出部材は、前記第2突出部材よりも前記柱に近い位置において前記貫通穴に挿通されることを特徴とする請求項4に記載の仮設構造体の組み付け構造。
The strut body and the second strut body are arranged at intervals in the frontage direction of the building body.
The pillar body is attached to the beam end portion of the beam extending long along the frontage direction, which is close to the pillar of the building body.
The assembled structure of the temporary structure according to claim 4, wherein the first protruding member is inserted into the through hole at a position closer to the pillar than the second protruding member.
前記第2支柱体の前記金具ベース部材は、
前記パネル取り付け金具において前記建築用パネルが取り付けられるパネル取り付け部よりも前記建物本体の内側に設けられた取り付け部に対して取り付けられ、
前記仮設構造体は、前記建物本体に取り付けられたときに、前記建築用パネルの取り付け位置よりも前記建物本体の内側に位置することを特徴とする請求項4又は5に記載の仮設構造体の組み付け構造。
The metal fitting base member of the second support column is
In the panel mounting bracket, the building panel is mounted on the mounting portion provided inside the building body rather than the panel mounting portion on which the building panel is mounted.
The temporary structure according to claim 4 or 5, wherein the temporary structure is located inside the building body with respect to the mounting position of the building panel when the temporary structure is attached to the building body. Assembly structure.
請求項1乃至3のいずれか1項に記載の仮設構造体を利用した建物施工方法であって、
前記施工部材に対し前記仮設構造体を取り付ける工程と、
前記施工部材において前記仮設構造体よりも前記建物本体の外側に位置する部分に対し建築用パネルを取り付ける工程と、
前記施工部材から前記仮設構造体を取り外す工程と、を含み、
前記仮設構造体を取り付ける工程では、前記施工部材に設けられたそれぞれの前記貫通穴に対し、前記第1突出部材を挿通した後に前記第2突出部材を挿通することを特徴とする建物施工方法。
A building construction method using the temporary structure according to any one of claims 1 to 3.
The process of attaching the temporary structure to the construction member and
A process of attaching a building panel to a portion of the construction member located outside the building body rather than the temporary structure.
Including the step of removing the temporary structure from the construction member.
In the step of attaching the temporary structure, the building construction method is characterized in that the first projecting member is inserted and then the second projecting member is inserted into each of the through holes provided in the construction member.
JP2020195100A 2020-11-25 2020-11-25 Temporary structure, temporary structure assembly structure and building construction method Pending JP2022083661A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020195100A JP2022083661A (en) 2020-11-25 2020-11-25 Temporary structure, temporary structure assembly structure and building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020195100A JP2022083661A (en) 2020-11-25 2020-11-25 Temporary structure, temporary structure assembly structure and building construction method

Publications (1)

Publication Number Publication Date
JP2022083661A true JP2022083661A (en) 2022-06-06

Family

ID=81855477

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020195100A Pending JP2022083661A (en) 2020-11-25 2020-11-25 Temporary structure, temporary structure assembly structure and building construction method

Country Status (1)

Country Link
JP (1) JP2022083661A (en)

Similar Documents

Publication Publication Date Title
JP6129810B2 (en) Groundwork stand for outer wall panel and construction method
CN103410353B (en) Garage steel framework and mounting process
JP2022083661A (en) Temporary structure, temporary structure assembly structure and building construction method
JP2018188913A (en) Reinforcing fitting for sound insulation panel and method for reinforcing sound insulation panel
JP2021123867A (en) Building construction method and temporary structure used for building construction method
JP5439002B2 (en) Expansion unit mounting structure, expansion unit mounting method and unit type building
JP6713144B1 (en) Connecting fittings for hoisting work scaffolds and installation method
JP2000054617A (en) Working scaffold for cylindrical structure, assembly method for cylindrical structure using it and its removing method
JP2021055454A (en) Building construction method, and temporary structure used in building construction method
WO2018162796A1 (en) Method for building a roof
JP7380042B2 (en) Building column and beam connection method
JP7411260B2 (en) pillar
JP4312323B2 (en) Construction method of temporary structure
JP4116586B2 (en) Bracket for structure
JP4418338B2 (en) Exterior wall panel joint structure
JP6242176B2 (en) Elevator car floor and manufacturing method thereof
JP2019011647A (en) Exterior wall panel, exterior wall structure and exterior wall construction method
JP5574185B2 (en) Panel installation structure
JP2018003248A (en) Support post pedestal
JP3375886B2 (en) Steel column fall prevention method, slippage correction method and fixing jig
JP6867079B2 (en) Self-weight receiver for lightweight cellular concrete panels
JP2018071110A (en) Roof material support structure, construction method of roof frame
JPH1181650A (en) Scaffold support tool
JP3838556B2 (en) Corner beam extension method
JP3831871B2 (en) Extension method of climbing beam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240628

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240709

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240902