JP2022077187A - Crop production management system, information processing method, and program - Google Patents

Crop production management system, information processing method, and program Download PDF

Info

Publication number
JP2022077187A
JP2022077187A JP2020187921A JP2020187921A JP2022077187A JP 2022077187 A JP2022077187 A JP 2022077187A JP 2020187921 A JP2020187921 A JP 2020187921A JP 2020187921 A JP2020187921 A JP 2020187921A JP 2022077187 A JP2022077187 A JP 2022077187A
Authority
JP
Japan
Prior art keywords
work
amount
unit
period
unit period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020187921A
Other languages
Japanese (ja)
Other versions
JP6892085B1 (en
Inventor
克己 大山
Katsumi Oyama
隆彦 佐藤
Takahiko Sato
崇史 松尾
Takashi Matsuo
潤 藤岡
Jun Fujioka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Minori Lab Inc
Takahiko Agro Business Co Ltd
University Public Corporation Osaka
Chasqui Co Ltd
Original Assignee
Minori Lab Inc
Takahiko Agro Business Co Ltd
University Public Corporation Osaka
Chasqui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Minori Lab Inc, Takahiko Agro Business Co Ltd, University Public Corporation Osaka, Chasqui Co Ltd filed Critical Minori Lab Inc
Priority to JP2020187921A priority Critical patent/JP6892085B1/en
Application granted granted Critical
Publication of JP6892085B1 publication Critical patent/JP6892085B1/en
Publication of JP2022077187A publication Critical patent/JP2022077187A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide a crop production management system, crop production management program, and crop production management method that does not impose a heavy burden on agricultural work managers, etc. even if the actual amount of work does not reach the required amount of work or if the work is canceled due to bad weather or personal reasons of workers, etc.SOLUTION: A crop production management system 1 comprises: a planned work amount distribution unit 100P for distributing a planned work amount for a specific period consisting of a plurality of unit periods to the unit periods; an actual work amount input unit 100S for inputting an actual work amount in the unit period in association with the corresponding unit period; an insufficient work amount unit period specifying unit 100Q for specifying the unit period in which the actual work amount is less than the planned work amount; and an insufficient work amount additional distribution unit 100R for additionally distributing the insufficient work amount to the unit period in which the actual work amount is not input by the actual work amount input unit, wherein the insufficient work amount is obtained by subtracting the actual work amount from the planned work amount in the unit period specified by the insufficient work amount unit period specifying unit.SELECTED DRAWING: Figure 14

Description

本発明は、農作業の管理のための農作物生産管理システム、情報処理方法、およびプログラムに関する。 The present invention relates to a crop production control system, an information processing method, and a program for managing agricultural work.

端末とサーバとを備える農作物生産管理システムであって、前記端末は、対象となる作業日に予定される作業を割り当てられた担当者を表す画像を第1のエリアに表示しつつ、作業割り当ての候補者を示す画像を第2のエリアに表示し、前記サーバは、前記候補者毎の作業遂行能力に基づいて前記第2のエリアの候補者を順位付けして前記順位に基づいて前記第2のエリアの候補者を表す画像を前記第1のエリアに自動的に移動させるための入力操作を受け付けて自動割当処理を実行し、前記自動割当処理に従って前記端末における前記第2のエリアの前記候補者を表す画像を前記第1のエリアに作業を割り当てられた担当者として表示する、農作物生産管理システムが過去に提案されている(例えば、特許第6632104号公報等参照)。この農作物生産管理システムでは、端末からの入力操作が行われると、農作業に人員を割り当てる処理が自動的に行われる。このため、この農作物生産管理システムでは、作業可能な人員が多い場合であっても、人員の割り当てを迅速且つ容易に行うことができる。 A crop production management system including a terminal and a server, wherein the terminal displays an image showing a person assigned to work scheduled on a target work day in the first area, and assigns work. An image showing the candidate is displayed in the second area, and the server ranks the candidates in the second area based on the work performance ability of each candidate, and the second area is based on the ranking. An input operation for automatically moving an image representing a candidate for the area of the above area to the first area is received, an automatic allocation process is executed, and the candidate for the second area in the terminal according to the automatic allocation process. Agricultural production management systems have been proposed in the past that display an image representing a person as a person assigned work to the first area (see, for example, Japanese Patent No. 6632104). In this crop production management system, when an input operation is performed from a terminal, a process of allocating personnel to farm work is automatically performed. Therefore, in this crop production management system, even when there are many workable personnel, it is possible to quickly and easily allocate the personnel.

特許第6632104号公報Japanese Patent No. 6632104

ところで、上述の農作物生産管理システムでは、農作業管理者などは、作業予定日毎に作業必要量(作業予定量)を入力する必要がある。このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じる度に作業予定日毎に作業必要量を振り分ける手作業を行わなければならず、農作業管理者などの負担が比較的重かった。 By the way, in the above-mentioned agricultural product production management system, the agricultural work manager or the like needs to input the required work amount (planned work amount) for each scheduled work day. For this reason, it is necessary to perform manual work to allocate the required work amount to each scheduled work day every time the work actual amount does not reach the work required amount, or when the work is canceled due to bad weather or the convenience of the workers. The burden on agricultural work managers was relatively heavy.

本発明の目的は、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけることがない農作物生産管理システムを提供することにある。 An object of the present invention is to produce a crop that does not impose a heavy burden on the agricultural work manager or the like even if the actual amount of work does not reach the required amount of work, or even if the work is stopped due to bad weather or the convenience of workers. It is to provide a production control system.

本発明の第1局面に係る農作物生産管理システムは、作業予定量分配部と、作業実績量入力部と、作業量不足単位期間特定部と、作業不足量追加分配部とを備える。作業予定量分配部は、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力部は、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定部は、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配部は、作業量不足単位期間特定部により特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業実績量入力部により作業実績量が入力されていない単位期間に追加分配する。 The crop production management system according to the first aspect of the present invention includes a planned work amount distribution unit, a work record amount input unit, a work amount shortage unit period specifying unit, and a work shortage amount additional distribution unit. The scheduled work amount distribution unit distributes the planned work amount for a specific period consisting of a plurality of unit periods to the unit period. The work actual amount input unit inputs the work actual amount in the unit period in association with the corresponding unit period. The work amount shortage unit period specifying unit specifies a unit period in which the actual work amount is less than the planned work amount. The work shortage additional distribution unit inputs the work shortage amount obtained by subtracting the work actual amount from the planned work amount in the unit period specified by the work amount shortage unit period specific unit, and the work actual amount is input by the work actual amount input unit. Additional distribution in unit periods that have not been done.

この農作物生産管理システムでは、作業実績量が作業予定量を下回る単位期間が特定され、特定された単位期間における作業不足量が、作業実績量が入力されていない単位期間に追加分配される。このため、この農作物生産管理システムでは、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけずにすむ。 In this crop production management system, a unit period in which the actual work amount is less than the planned work amount is specified, and the work shortage amount in the specified unit period is additionally distributed to the unit period in which the actual work amount is not input. For this reason, this crop production management system puts a heavy burden on the agricultural work manager, etc., even if the actual amount of work does not reach the required amount of work, or if the work is canceled due to bad weather or the convenience of workers. You don't have to.

本発明の第2局面に係る農作物生産管理システムは、第1局面に係る農作物生産管理システムであって、作業不足量追加分配部は、(a)単位期間における作業候補者の人数および(b)単位期間における作業候補者の作業遂行能力の少なくとも一方に基づいて、作業不足量を単位期間に追加分配する。 The agricultural product production management system according to the second aspect of the present invention is the agricultural product production management system according to the first aspect, and the work shortage additional distribution unit is (a) the number of work candidates in a unit period and (b). The work shortage is additionally distributed to the unit period based on at least one of the work performance of the work candidate in the unit period.

この農作物生産管理システムでは、例えば、作業実施可能量(作業候補者の作業スピードや、作業候補者の作業時間などから求められる想定値)が多い単位期間に作業不足量を多めに追加分配することができる。また、例えば、作業実施可能量が少ない単位期間に作業不足量を少なめに追加分配することができる。このため、この農作物生産管理システムでは、作業計画を適切に調整することができる。 In this crop production management system, for example, a large amount of work shortage is additionally distributed in a unit period in which the workable amount (estimated value obtained from the work speed of the work candidate and the work time of the work candidate) is large. Can be done. Further, for example, the work shortage amount can be additionally distributed in a small amount during a unit period in which the workable amount is small. Therefore, in this crop production management system, the work plan can be appropriately adjusted.

本発明の第3局面に係る農作物生産管理システムは、第1局面または第2局面に係る農作物生産管理システムであって、作業量超過単位期間特定部と、作業超過量減算部とをさらに備える。作業量超過単位期間特定部は、作業実績量が作業予定量を上回る単位期間を特定する。作業超過量減算部は、作業量超過単位期間特定部により特定された単位期間において作業実績量から作業予定量を差し引いて求められる作業超過量を、作業実績量が未入力である少なくとも一つの単位期間に対応する作業予定量から差し引く。 The crop production management system according to the third aspect of the present invention is the crop production management system according to the first phase or the second aspect, and further includes a work amount excess unit period specifying unit and a work excess amount subtraction unit. The work amount excess unit period specifying unit specifies a unit period in which the actual work amount exceeds the planned work amount. The work excess amount subtraction unit is at least one unit in which the work excess amount is not input for the work excess amount obtained by subtracting the planned work amount from the work actual amount in the unit period specified by the work amount excess unit period specific unit. Subtract from the planned work amount corresponding to the period.

この農作物生産管理システムでは、作業が計画以上に進んだ場合にその後の作業日数や作業時間を削ることができる。このため、この農作物生産管理システムでは、作業が計画以上に進んだ場合に積極的に作業候補者に休息を与えることができる。 With this crop production management system, if the work progresses beyond the plan, the number of working days and working hours can be reduced. Therefore, in this crop production management system, when the work progresses beyond the plan, the work candidate can be positively given a rest.

本発明の第4局面に係る農作物生産管理プログラムは、作業予定量分配ステップと、作業実績量入力受付ステップと、作業量不足単位期間特定ステップと、作業不足量追加分配ステップとを備える。作業予定量分配ステップでは、コンピュータは、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力受付ステップでは、コンピュータは、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定ステップでは、コンピュータは、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配ステップでは、コンピュータは、作業量不足単位期間特定ステップにおいて特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業実績量入力受付ステップにおいて作業実績量が入力されていない単位期間に追加分配する。 The crop production management program according to the fourth aspect of the present invention includes a planned work amount distribution step, a work actual amount input reception step, a work amount shortage unit period specifying step, and a work shortage amount additional distribution step. In the scheduled work amount distribution step, the computer distributes the scheduled work amount for a specific period consisting of a plurality of unit periods to the unit period. In the work actual amount input reception step, the computer inputs the work actual amount in the unit period in association with the corresponding unit period. In the work shortage unit period identification step, the computer identifies a unit period in which the actual work amount is less than the planned work amount. In the work shortage additional distribution step, the computer performs the work shortage amount obtained by subtracting the work actual amount from the work planned amount in the unit period specified in the work amount shortage unit period specific step in the work actual amount input reception step. Additional distribution is made to the unit period for which the actual amount is not entered.

このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合にこの農作物生産管理プログラムが実行されると、農作業管理者などに重い負担をかけずにすむ。 For this reason, if this crop production management program is executed on a day when the actual amount of work does not reach the required amount of work, or when the work is canceled due to bad weather, the convenience of workers, etc., it will be heavy for the farm work manager. You don't have to burden yourself.

本発明の第5局面に係る農作物生産管理方法は、作業予定量分配ステップと、作業実績量入力受付ステップと、作業量不足単位期間特定ステップと、作業不足量追加分配ステップとを備える。作業予定量分配ステップでは、コンピュータは、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力受付ステップでは、コンピュータは、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定ステップでは、コンピュータは、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配ステップでは、コンピュータは、作業量不足単位期間特定ステップにおいて特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業実績量入力受付ステップにおいて作業実績量が入力されていない単位期間に追加分配する。 The crop production management method according to the fifth aspect of the present invention includes a planned work amount distribution step, a work actual amount input reception step, a work amount shortage unit period specifying step, and a work shortage amount additional distribution step. In the scheduled work amount distribution step, the computer distributes the scheduled work amount for a specific period consisting of a plurality of unit periods to the unit period. In the work actual amount input reception step, the computer inputs the work actual amount in the unit period in association with the corresponding unit period. In the work shortage unit period identification step, the computer identifies a unit period in which the actual work amount is less than the planned work amount. In the work shortage additional distribution step, the computer performs the work shortage amount obtained by subtracting the work actual amount from the work planned amount in the unit period specified in the work amount shortage unit period specific step in the work actual amount input reception step. Additional distribution is made to the unit period for which the actual amount is not entered.

このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合にこの農作物生産管理方法が実施されると、農作業管理者などに重い負担をかけずにすむ。 For this reason, if this crop production control method is implemented on days when the actual amount of work does not reach the required amount of work, or when work is canceled due to bad weather, work personnel, etc., it will be heavy for agricultural work managers and the like. You don't have to burden yourself.

本発明の実施形態に係る農作物生産管理システムの全体構成を示すイメージ図である。It is an image diagram which shows the whole structure of the crop production management system which concerns on embodiment of this invention. 本発明の実施形態に係るサーバの構成を示すブロック図である。It is a block diagram which shows the structure of the server which concerns on embodiment of this invention. 本発明の実施形態に係る作業マスタデータを示すイメージ図である。It is an image diagram which shows the work master data which concerns on embodiment of this invention. 本発明の実施形態に係る作業実績データを示すイメージ図である。It is an image diagram which shows the work performance data which concerns on embodiment of this invention. 本発明の実施形態に係るシフト希望データを示すイメージ図である。It is an image diagram which shows the shift desired data which concerns on embodiment of this invention. 本発明の実施形態に係る区画データを示すイメージ図である。It is an image diagram which shows the section data which concerns on embodiment of this invention. 本発明の実施形態に係る割り当てデータを示すイメージ図である。It is an image diagram which shows the allocation data which concerns on embodiment of this invention. 本発明の実施形態に係る端末の構成を示すブロック図である。It is a block diagram which shows the structure of the terminal which concerns on embodiment of this invention. 本発明の実施形態に係る農作業に関する計画立案の全体的な処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the whole processing of the planning about the agricultural work which concerns on embodiment of this invention. 本発明の実施形態に係るシフト希望シートのイメージ図である。It is an image diagram of the shift request sheet which concerns on embodiment of this invention. 本発明の実施形態に係る作業不足量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work shortage amount which concerns on embodiment of this invention. 変形例(B)に係る作業必要量および作業不足量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work necessary amount and work shortage amount which concerns on the modification (B). 変形例(H)に係る作業超過量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work excess amount which concerns on the modification (H). 本発明の実施形態に係る農作物生産管理システムの機能構成を示すブロック図である。It is a block diagram which shows the functional structure of the crop production management system which concerns on embodiment of this invention.

以下、図面を参照しつつ、本発明の実施形態について説明する。以下の説明では、同一の部品には同一の符号を付してある。それらの名称および機能も同じである。したがって、それらについての詳細な説明は繰り返さない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description, the same parts are designated by the same reference numerals. Their names and functions are the same. Therefore, the detailed description of them will not be repeated.

<農作物生産管理システムの全体構成>
農作物生産管理システム1は、図1に示されるように、主たる装置として、農作業の管理のためのサービスを提供するためのサーバ100、検知器200、端末300などから構成されている。以下、これらの構成要素について詳述する。
<Overall configuration of crop production management system>
As shown in FIG. 1, the crop production management system 1 is composed of a server 100 for providing a service for managing agricultural work, a detector 200, a terminal 300, and the like as a main device. Hereinafter, these components will be described in detail.

1.サーバ
サーバ100は、インターネットに接続され、農作業の管理のためのサービスを提供する。サーバ100は、図2に示されるように、主たる構成要素として、CPU(Central Processing Unit)110と、メモリ120と、操作部140と、通信インターフェイス160とを含む。
1. 1. Server The server 100 is connected to the Internet and provides a service for managing agricultural work. As shown in FIG. 2, the server 100 includes a CPU (Central Processing Unit) 110, a memory 120, an operation unit 140, and a communication interface 160 as main components.

(1)CPU
CPU110は、メモリ120に記憶されているプログラムを実行することによって、サーバ100の各部を制御する。例えば、CPU110は、メモリ120に格納されているプログラムを実行し、各種のデータを参照することによって、図14の処理などを実現する。
(1) CPU
The CPU 110 controls each part of the server 100 by executing a program stored in the memory 120. For example, the CPU 110 executes a program stored in the memory 120 and refers to various data to realize the processing of FIG. 14 and the like.

(2)メモリ
メモリ120は、各種のRAM、各種のROMなどによって実現され、サーバ100に内包されているものであってもよいし、サーバ100の各種インターフェイスに着脱可能なものであってもよいし、サーバ100からアクセス可能な他の装置の記録媒体であってもよい。メモリ120は、CPU110によって実行される人員配置プログラムを含む種々のプログラムや、CPU110によるプログラムの実行により生成されたデータ、入力されたデータ、作業マスタデータ121、作業実績データ122、シフト希望データ123、区画データ124、割り当てデータ125、作業計画表データ126、その他の本発明の実施形態に係るサービスに利用されるデータなどを記憶する。
(2) Memory The memory 120 may be realized by various RAMs, various ROMs, etc., and may be included in the server 100 or may be detachable from various interfaces of the server 100. However, it may be a recording medium of another device accessible from the server 100. The memory 120 includes various programs including a staffing program executed by the CPU 110, data generated by executing the program by the CPU 110, input data, work master data 121, work record data 122, shift desired data 123, and so on. It stores partition data 124, allocation data 125, work plan table data 126, and other data used for services according to the embodiment of the present invention.

作業マスタデータ121は、図3に示されるように、作業名、平均的な作業スピード、例えば通常のレベルの作業者が1時間に完了できるレーンの数、などの対応関係を農作業毎に格納する。 As shown in FIG. 3, the work master data 121 stores the correspondence such as the work name, the average work speed, for example, the number of lanes that a normal level worker can complete in one hour, and the like for each farm work. ..

作業実績データ122は、図4に示されるように、作業者としての従業員、作業日、作業の種類、作業の時間、作業のスピード、例えば作業者が実際に1時間で作業が完了できたレーンの数などの対応関係を格納する。 As shown in FIG. 4, the work record data 122 shows the employee as a worker, the work day, the type of work, the time of work, the speed of work, for example, the worker can actually complete the work in one hour. Stores correspondence such as the number of lanes.

シフト希望データ123は、図5に示されるように、作業者としての従業員、日付、作業に参加することが可能な時間帯、作業に参加する時間などの対応関係を格納する。 As shown in FIG. 5, the shift request data 123 stores a correspondence relationship such as an employee as a worker, a date, a time zone in which the work can be participated, and a time to participate in the work.

区画データ124は、図6に示されるように、区画名、区画に含まれるエリアの広さ、例えばレーンの数、などの対応関係を区画毎に格納する。 As shown in FIG. 6, the division data 124 stores correspondences such as the division name and the size of the area included in the division, for example, the number of lanes, for each division.

割り当てデータ125は、図7に示されるように、既に作業を割り当てられている作業者や時間帯などの対応関係を日付毎や区画毎や作業毎に格納する。 As shown in FIG. 7, the allocation data 125 stores correspondences such as workers and time zones to which work has already been assigned for each date, each section, and each work.

作業計画表データ126は、図11に示されるように、中期計画の期間(例えば、1から数週間単位)、中期計画における作業必要量、短期計画の期間、短期計画の期間毎に出勤することを希望する作業者(以下、「出勤希望者」という)、短期計画の期間毎の各種作業量などの対応関係を日付毎に格納する。 As shown in FIG. 11, the work plan table data 126 shall be attended every period of the medium-term plan (for example, from 1 to several weeks), the work requirement in the medium-term plan, the period of the short-term plan, and the period of the short-term plan. The correspondence relationship such as the worker who desires (hereinafter referred to as "working applicant") and various work amounts for each period of the short-term plan is stored for each date.

(3)操作部
操作部140は、サービスの管理者などの命令を受け付けて、当該命令をCPU110に入力する。
(3) Operation unit The operation unit 140 receives an instruction from a service administrator or the like and inputs the instruction to the CPU 110.

(4)通信インターフェイス
通信インターフェイス160は、インターネット、キャリア網、ルータ400などを介して、端末300などの他の装置にCPU110からのデータを送信する。逆に、通信インターフェイス160は、インターネット、キャリア網、ルータ400などを介して端末300などの他の装置からのデータを受信して、CPU110に受け渡す。
(4) Communication interface The communication interface 160 transmits data from the CPU 110 to other devices such as the terminal 300 via the Internet, a carrier network, a router 400, and the like. On the contrary, the communication interface 160 receives data from another device such as the terminal 300 via the Internet, a carrier network, a router 400, and the like, and passes the data to the CPU 110.

2.検知器
検知器200は、農場の作物レーンの端や農作業エリアの端などに設置されるものである。例えば、検知器200は、作業者のスマートフォン500がQRコード(登録商標)等を読み取って当該情報をサーバ100にアップロードすることによって作業者が所定の量の作業を開始または終了したことを検知するためのものである。あるいは、検知器200は、農場の作物レーンの端や農作業エリアの端などに設置され、所定の作業が開始または終了した農作業者を検知したり識別したりする。例えば、検知器200は、作業服などに取り付けられるRFIDを検知する近距離無線通信機であったり、作業者のスマートフォン500の画面のQRコード(登録商標)を読み取るための画像センサであったり、作業者の顔を検知するための画像センサであってもよい。ただし、作業者の作業スピードは、検知器200によって作業の開始または終了を検知する方法に限らず、管理者などが直接的に作業者の作業スピードに関する情報を端末300に入力するものであってもよい。
2. 2. Detector The detector 200 is installed at the end of the crop lane of the farm, the end of the farm work area, or the like. For example, the detector 200 detects that the worker has started or finished a predetermined amount of work by reading the QR code (registered trademark) or the like and uploading the information to the server 100 by the worker's smartphone 500. Is for. Alternatively, the detector 200 is installed at the edge of the crop lane of the farm, the edge of the farm work area, or the like, and detects or identifies a farm worker who has started or finished a predetermined work. For example, the detector 200 may be a short-range wireless communication device that detects RFID attached to work clothes or the like, or an image sensor for reading a QR code (registered trademark) on the screen of a worker's smartphone 500. It may be an image sensor for detecting the face of the worker. However, the work speed of the worker is not limited to the method of detecting the start or end of the work by the detector 200, and the administrator or the like directly inputs the information on the work speed of the worker to the terminal 300. May be good.

3.端末
端末300は、農作業や農場の管理者などに使用され、農作業の予定を作成したり確認したりするためのものである。本発明の実施形態においては、端末300は、パーソナルコンピュータ、タブレット端末、スマートフォンなどによって実現される。また、端末300は、ルータ400、インターネット、キャリア網などを介して、サーバ100が提供する各種のサービスを利用可能である。端末300は、図8に示されるように、主たる構成要素として、CPU310、メモリ320、ディスプレイ330、操作部340、通信インターフェイス360、スピーカ370などを含む。
3. 3. Terminal The terminal 300 is used by farm work, farm managers, and the like to create and confirm farm work schedules. In the embodiment of the present invention, the terminal 300 is realized by a personal computer, a tablet terminal, a smartphone, or the like. Further, the terminal 300 can use various services provided by the server 100 via the router 400, the Internet, the carrier network, and the like. As shown in FIG. 8, the terminal 300 includes a CPU 310, a memory 320, a display 330, an operation unit 340, a communication interface 360, a speaker 370, and the like as main components.

(1)CPU
CPU310は、メモリ320あるいは外部の記憶媒体に記憶されているプログラムを実行することによって、端末300の各部を制御する。
(1) CPU
The CPU 310 controls each part of the terminal 300 by executing a program stored in the memory 320 or an external storage medium.

(2)メモリ
メモリ320は、各種のRAMや、各種のROMなどによって実現される。メモリ320は、CPU310によって実行されるプログラムや、CPU310によるプログラムの実行により生成されたデータ、サーバ100から受信したデータ、操作部340を介して入力されたデータなどを記憶する。
(2) Memory The memory 320 is realized by various RAMs, various ROMs, and the like. The memory 320 stores a program executed by the CPU 310, data generated by executing the program by the CPU 310, data received from the server 100, data input via the operation unit 340, and the like.

(3)ディスプレイ
ディスプレイ330は、CPU310からの信号に基づいて、文字や画像などを出力する。例えば、CPU310は、通信インターフェイス360を介してサーバ100から受信したテキストや画像などに基づいて、図11に示されるような作業計画表データ126をディスプレイ330に表示する。
(3) Display The display 330 outputs characters, images, and the like based on the signal from the CPU 310. For example, the CPU 310 displays the work plan table data 126 as shown in FIG. 11 on the display 330 based on the text, the image, and the like received from the server 100 via the communication interface 360.

(4)操作部
操作部340は、マウス、キーボード、ボタン、タッチパネルなどによって実現され、ユーザからの命令を受け付けて、当該命令をCPU310に入力する。なお、ディスプレイ330および操作部340は、タッチパネルを構成してもよい。
(4) Operation unit The operation unit 340 is realized by a mouse, a keyboard, a button, a touch panel, or the like, receives a command from a user, and inputs the command to the CPU 310. The display 330 and the operation unit 340 may form a touch panel.

(5)通信インターフェイス
通信インターフェイス360は、無線LAN通信あるいは有線LANなどの通信モジュールによって実現される。通信インターフェイス360は、有線通信あるいは無線通信によってサーバ100などの他の装置との間でデータを送受信する。例えば、図14のサーバ100の処理に合わせて、CPU310は、操作部340を介したクリック命令、ドラッグアンドドロップ命令、その他の各種の入力情報を、通信インターフェイス360を介してサーバ100に送信したり、通信インターフェイス360を介してサーバ100から受信したデータに基づいてディスプレイ330に図11に示されるような画面を表示したりする。
(5) Communication interface The communication interface 360 is realized by a communication module such as wireless LAN communication or wired LAN. The communication interface 360 transmits / receives data to / from another device such as the server 100 by wired communication or wireless communication. For example, in accordance with the processing of the server 100 of FIG. 14, the CPU 310 transmits a click command, a drag-and-drop command, and various other input information via the operation unit 340 to the server 100 via the communication interface 360. , A screen as shown in FIG. 11 is displayed on the display 330 based on the data received from the server 100 via the communication interface 360.

(6)スピーカ
スピーカ370は、CPU310からの信号に基づいて、音声を出力する。
(6) Speaker The speaker 370 outputs sound based on the signal from the CPU 310.

<本発明の実施形態に係る農作物生産管理システム1の動作概要>
ここでは、図9を参照して、本発明の実施形態に係る農作物生産管理システム1の全体的な動作概要について説明する。
<Outline of operation of crop production control system 1 according to the embodiment of the present invention>
Here, with reference to FIG. 9, an outline of the overall operation of the crop production control system 1 according to the embodiment of the present invention will be described.

(ステップS100)
まず、農場の管理者などが、サーバ100から提供される農作業管理サービスを利用しながら、自身の端末300を用いて自身の農場に関する数か月から1年程度の単位の長期計画を策定する。
(Step S100)
First, a farm manager or the like formulates a long-term plan for a farm of several months to one year using his / her own terminal 300 while using the farm work management service provided from the server 100.

(ステップS200)
そして、入力された長期計画に基づいて、サーバ100から提供される農作業管理サービスを利用しながら、農場の管理者などが、端末300を用いて、1から数週間単位の中期計画を策定する。
(Step S200)
Then, based on the input long-term plan, the farm manager or the like uses the terminal 300 to formulate a medium-term plan in units of one to several weeks while using the farm work management service provided from the server 100.

より詳細には、CPU110は、通信インターフェイス160を介して端末300から、中期計画の期間や中期計画における作業必要量を受け付け、図11に示されるような画面データを作成する。例えば、CPU110は、中期計画の期間(例えば、図11に示されるような8/1~8/5)、中期計画における作業必要量(例えば、図11に示されるような作業必要量:500)の入力、作業場所などを受け付ける。 More specifically, the CPU 110 receives the period of the medium-term plan and the work required amount in the medium-term plan from the terminal 300 via the communication interface 160, and creates screen data as shown in FIG. For example, the CPU 110 has a period of the medium-term plan (for example, 8/1 to 8/5 as shown in FIG. 11) and a work requirement in the medium-term plan (for example, a work requirement as shown in FIG. 11: 500). Input, work place, etc. are accepted.

次に、CPU110は、通信インターフェイス160を介して端末300から中期計画の期間に対する短期計画の期間を受け付け、短期計画の期間毎における作業の種類を受け付ける。例えば、CPU110は、短期計画の期間(例えば、図11に示されるような8/1,8/2,8/3,8/4,8/5等の日付)の入力を受け付ける。 Next, the CPU 110 receives the period of the short-term plan for the period of the medium-term plan from the terminal 300 via the communication interface 160, and receives the type of work for each period of the short-term plan. For example, the CPU 110 accepts inputs for a short-term plan period (eg, dates such as 8/1, 8/2, 8/3, 8/4, 8/5, etc., as shown in FIG. 11).

次に、CPU110は、中期計画における作業必要量を基に、短期計画の期間毎における作業必要量を設定する。ここで、CPU110は、中期計画における作業必要量を均等に分割し、短期計画の期間毎に分配する。例えば、CPU110は、図11(A)に示されるように、中期計画における作業必要量(500)を、短期計画の期間毎に100ずつ均等に分配し、短期計画の期間毎における作業必要量を設定している。 Next, the CPU 110 sets the work requirement for each period of the short-term plan based on the work requirement in the medium-term plan. Here, the CPU 110 evenly divides the work required amount in the medium-term plan and distributes it for each period of the short-term plan. For example, as shown in FIG. 11A, the CPU 110 evenly distributes the work requirement (500) in the medium-term plan by 100 for each period of the short-term plan, and sets the work requirement for each period of the short-term plan. It is set.

次に、CPU110は、シフト希望データ123を参照して、出勤希望者が作業を希望する時間帯および出勤希望者の作業時間を読み出す。 Next, the CPU 110 refers to the shift request data 123, and reads out the time zone in which the person who wants to go to work wants to work and the work time of the person who wants to go to work.

次に、CPU110は、作業実績データ122を参照して、出勤希望者の過去x日間(例えば、過去1週間分)の作業スピードの平均値を計算する。なお、CPU110は、作業実績データ122に過去の作業スピードが蓄積されていない場合、作業マスタデータ121から標準的な作業スピードを取得してもよい。 Next, the CPU 110 calculates the average value of the work speeds of the past x days (for example, the past one week) of the person who wants to go to work with reference to the work record data 122. If the past work speed is not accumulated in the work record data 122, the CPU 110 may acquire a standard work speed from the work master data 121.

次に、CPU110は、短期計画の期間毎における作業実施可能量(作業スピード×作業時間)を計算する。例えば、図11に示される8/1における作業実施可能量(160)は、(Aの作業スピード×Aの作業時間)+(Dの作業スピード×Dの作業時間)+(Fの作業スピード×Fの作業時間)+(Gの作業スピード×Gの作業時間)で計算される。なお、ここで、短期計画の期間毎に計算される作業実施可能量は、中期計画策定時を基準とした過去x日間の出勤希望者の作業スピードで計算される。例えば、8/1~8/5の中期計画を7/31に策定した場合、8/1,8/2,8/3,8/4,8/5の短期計画の期間毎における作業実施可能量は、7/31以前のx日間の出勤希望者の作業スピードで計算される。 Next, the CPU 110 calculates the workable amount (work speed × work time) for each period of the short-term plan. For example, the workable amount (160) in 8/1 shown in FIG. 11 is (work speed of A × work time of A) + (work speed of D × work time of D) + (work speed of F ×). It is calculated by (working time of F) + (working speed of G x working time of G). Here, the workable amount calculated for each period of the short-term plan is calculated based on the work speed of those who wish to go to work for the past x days based on the time when the medium-term plan is formulated. For example, if the medium-term plan from 8/1 to 8/5 is formulated on 7/31, work can be carried out every period of the short-term plan of 8/1, 8/2, 8/3, 8/4, 8/5. The amount is calculated based on the work speed of those who wish to go to work for x days before 7/31.

(ステップS300)
なお、端末300は、農場の作業者毎に入力されたシフトの希望に基づいてシフト予定データを作成する。ここでは、農場の管理者などが、端末300を用いて、農場の作業者毎の、作業への参加が可能な日時に関する情報や作業への参加が不可能な日時に関する情報などをサーバ100にアップロードする。例えば、作業者は、図3に示されるようなシフト希望シートに、作業の参加を希望する日時を書き込んでもよい。この場合、農場の管理者などが、端末300や他のスキャナーなどを用いて当該シフト希望シートを読み込んで、端末300またはサーバ100で画像解析をすることによって、作業者毎のシフトの希望をサーバ100に自動的に蓄積させる。
(Step S300)
The terminal 300 creates shift schedule data based on the shift request input for each farm worker. Here, the farm manager or the like uses the terminal 300 to send information on the date and time when the farm worker can participate in the work, information on the date and time when the work cannot be participated, and the like to the server 100. Upload. For example, the worker may write the date and time when he / she wishes to participate in the work on the shift request sheet as shown in FIG. In this case, the farm manager or the like reads the shift request sheet using the terminal 300 or another scanner, and performs image analysis on the terminal 300 or the server 100 to obtain the shift request for each worker on the server. It is automatically accumulated in 100.

(ステップS350)
そして、短期計画が行われている段階で、ステップS500で入力される作業の実績に基づいて、中期計画の調整が行われる。
(Step S350)
Then, at the stage where the short-term plan is being carried out, the medium-term plan is adjusted based on the work results input in step S500.

より詳細には、CPU110は、図11(A)に示されるように、ステップS500において作業実績量が入力されている場合に、短期計画の期間毎における作業必要量と作業実績量とを比較する。そして、CPU110は、図11(A)に示されるように、作業実績量が作業必要量よりも少ない場合に、作業不足量を自動的に計算する。そして、CPU110は、作業不足量を分割し、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配する。例えば、図11(A)→(B)に示されるように、8/2において作業不足量(60)が計算された場合に、8/2における作業不足量(60)は、分割されて8/2より後の短期計画の期間毎における作業必要量に追加分配されている。 More specifically, as shown in FIG. 11A, when the work actual amount is input in step S500, the CPU 110 compares the work required amount and the work actual amount for each period of the short-term plan. .. Then, as shown in FIG. 11A, the CPU 110 automatically calculates the work shortage amount when the work actual amount is smaller than the work required amount. Then, the CPU 110 divides the work shortage amount and additionally distributes it to the work required amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For example, as shown in FIGS. 11 (A) → (B), when the work shortage amount (60) is calculated in 8/2, the work shortage amount (60) in 8/2 is divided into 8 It is additionally distributed to the work requirement for each period of the short-term plan after / 2.

なお、ここで、CPU110は、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業実施可能量に基づいて、作業不足量を分割している。例えば、図11(A)→(B)では、8/2における作業不足量(60)が、8/3における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=1:7:4の比で分割されている。そして、8/3における作業必要量に5が追加分配され、8/4における作業必要量に35が追加分配され、8/5における作業必要量に20が追加分配されている。また、図示しないが、8/2における作業不足量(60)が、8/3における出勤希望者の人数:8/4における出勤希望者の人数:8/5における出勤希望者の人数=4:5:4の比で分割され、8/2,8/3,8/4それぞれに追加分配されてもよい。 Here, the CPU 110 divides the work shortage amount based on the work enablement amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For example, in FIGS. 11 (A) to 11 (B), the work shortage amount (60) on 8/2 is the workable amount on 8/3-workable amount: workable amount on 8/4-workable amount: 8 It is divided by the ratio of workable amount at / 5 work required amount = 1: 7: 4. Then, 5 is additionally distributed to the work required amount on 8/3, 35 is additionally distributed to the work required amount on 8/4, and 20 is additionally distributed to the work required amount on 8/5. Although not shown, the amount of work shortage (60) on 8/2 is the number of applicants for work on 8/3: the number of applicants for work on 8/4: the number of applicants for work on 8/5 = 4: It may be divided at a ratio of 5: 4 and additionally distributed to each of 8 / 2,8 / 3,8 / 4.

(ステップS400)
そして、農場の管理者などは、図11に示される画面データ、各作業者のシフトの希望を参照して、サーバ100から提供される農作業管理サービスを利用しながら、毎時間帯に参加する出勤希望者に作業を割り当てたりする。
(Step S400)
Then, the farm manager or the like refers to the screen data shown in FIG. 11 and each worker's desire to shift, and while using the farm work management service provided by the server 100, attends work every hour. Assign work to those who want it.

なお、ここで、出勤希望者に作業を割り当てる方法として、例えば、CPU110が通信インターフェイス160を介して端末300からのドラッグアンドドロップ操作を受け付けて出勤希望者に作業を割り当てる方法や、CPU110が「出勤希望者の作業スピード順」、「出勤希望者の累積作業時間順」、「出勤希望者の作業スピード+出勤希望者の累積作業時間順」、「無作為」などの選出方法によって出勤希望者に作業を自動的に割り当てる方法などが考えられる。 Here, as a method of allocating the work to the person who wants to go to work, for example, a method in which the CPU 110 accepts a drag-and-drop operation from the terminal 300 via the communication interface 160 and assigns the work to the person who wants to go to work, or the CPU 110 "goes to work". For those who wish to go to work by selection methods such as "order of work speed of applicants", "order of cumulative work hours of applicants for work", "work speed of applicants for work + cumulative work hours of applicants for work", "random work" A method of automatically allocating work can be considered.

(ステップS500)
その後、作業を割り当てられた出勤希望者による作業実績の結果がサーバ100にアップロードされる。本発明の実施形態において、図11に示されるような作業実績量や、作業者毎の所定量の作業に実際にかかった時間などが、検知器200などを利用して計測され、自動的にサーバ100にアップロードされる。そして、サーバ100は、アップロードされた作業実績の結果をもとに作業実績データ122や作業計画表データ126などを更新する。例えば、サーバ100は、図11(B)に示されるように、8/1の作業が終えた段階で作業実績量(100)を反映し、8/2の作業が終えた段階で作業実績量(40)を反映する。
(Step S500)
After that, the result of the work results by the person who wants to go to work assigned the work is uploaded to the server 100. In the embodiment of the present invention, the actual amount of work as shown in FIG. 11 and the time actually taken for a predetermined amount of work for each worker are measured by using a detector 200 or the like and automatically. It is uploaded to the server 100. Then, the server 100 updates the work result data 122, the work plan table data 126, and the like based on the uploaded work result result. For example, as shown in FIG. 11B, the server 100 reflects the actual work amount (100) at the stage when the work of 8/1 is completed, and the actual amount of work at the stage when the work of 8/2 is completed. Reflect (40).

(ステップS600、S700)
その他、病害虫に関する記録や、収穫や出荷、売上の記録などがサーバ100にアップロードされる。なお、ステップS600およびS700おいて、これまでの入力データはまとめてサーバ100にアップロードされてもよいし、ステップ毎に入力データがアップロードされてもよいし、1つのデータを入力するたびに当該データがサーバ100にアップロードされてもよい。
(Steps S600, S700)
In addition, records related to pests, harvests, shipments, sales records, etc. are uploaded to the server 100. In steps S600 and S700, the input data so far may be collectively uploaded to the server 100, the input data may be uploaded for each step, or the data may be uploaded each time one data is input. May be uploaded to the server 100.

(ステップS800)
そして、中期計画終了日である場合(ステップS800にてYESである場合)、ステップS900の処理が実行される。また、中期計画終了日ではない場合(ステップS800にてNOである場合)、サーバ100および端末300においてステップS350からの処理が繰り返される。
(Step S800)
Then, when it is the end date of the medium-term plan (YES in step S800), the process of step S900 is executed. If it is not the end date of the medium-term plan (NO in step S800), the process from step S350 is repeated in the server 100 and the terminal 300.

(ステップS900)
そして、農場の管理者などからの終了操作(ステップS900にてYESである場合)を受け付けると今回の作業は終了し、農場の管理者などからの次の中期計画策定のための命令(ステップS900にてNOである場合)を受け付けるとステップS200またはステップS300からの処理が繰り返される。
(Step S900)
Then, when the end operation (if YES in step S900) is received from the farm manager or the like, this work is completed and the order for the next medium-term plan formulation from the farm manager or the like (step S900). If NO) is accepted, the process from step S200 or step S300 is repeated.

以上の通り、本発明の実施形態に係る農作物生産管理システム1は、全体として、図14の機能ブロック図に示されるように、入力装置300A、長期計画作成部100A、中期計画作成部100B、短期計画作成部100C、シフト予定作成部100D、作業スピード計算部100E、作業記録入力部100F、病害虫入力部100G、収出荷・売上記録入力部100H、記憶部120A、画面生成部100K、表示装置300B、作業計画調整部100Iなどを有する。なお、図14に示されるように、中期計画作成部100Bは特許請求の範囲に記載の作業予定量分配部100Pを含み、作業記録入力部100Fは特許請求の範囲に記載の作業実績量入力部100Sを含み、作業計画調整部100Iは特許請求の範囲に記載の作業量不足単位期間特定部100Qおよび作業不足量追加分配部100Rを含む。 As described above, the agricultural product production management system 1 according to the embodiment of the present invention has an input device 300A, a long-term plan creation unit 100A, a medium-term plan creation unit 100B, and a short-term plan as a whole, as shown in the functional block diagram of FIG. Plan creation unit 100C, shift schedule creation unit 100D, work speed calculation unit 100E, work record input unit 100F, pest input unit 100G, collection / shipment / sales record input unit 100H, storage unit 120A, screen generation unit 100K, display device 300B, It has a work plan adjustment unit 100I and the like. As shown in FIG. 14, the medium-term plan creation unit 100B includes the work schedule amount distribution unit 100P described in the claims, and the work record input unit 100F is the work record input unit 100F described in the claims. 100S is included, and the work plan adjustment unit 100I includes the work amount shortage unit period specifying unit 100Q and the work shortage amount additional distribution unit 100R described in the claims.

そして、入力装置300Aは、例えば、検知器200や端末300の操作部340などによって実現される。表示装置300Bは、例えば、端末300のディスプレイ330などによって実現される。記憶部120Aは、例えば、サーバ100のメモリ120などによって実現される。長期計画作成部100Aは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS100などに対応する。中期計画作成部100Bは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS200などに対応する。短期計画作成部100Cは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS400などに対応する。シフト予定作成部100Dは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS300などに対応する。作業スピード計算部100Eは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現される。作業記録入力部100Fは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS500などに対応する。病害虫入力部100Gは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS600などに対応する。収出荷・売上記録入力部100Hは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS700などに対応する。画面生成部100Kは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、端末300に提供するための、図11に示されるようなWebページを作成する。作業計画調整部100Iは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS350などに対応する。 The input device 300A is realized by, for example, a detector 200, an operation unit 340 of the terminal 300, or the like. The display device 300B is realized by, for example, the display 330 of the terminal 300. The storage unit 120A is realized by, for example, the memory 120 of the server 100. The long-term plan creation unit 100A is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S100 of FIG. The medium-term plan creation unit 100B is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to step S200 of FIG. The short-term plan creation unit 100C is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S400 of FIG. The shift schedule creation unit 100D is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S300 of FIG. The work speed calculation unit 100E is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120. The work record input unit 100F is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S500 of FIG. The pest input unit 100G is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S600 of FIG. The receipt / shipment / sales record input unit 100H is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S700 of FIG. The screen generation unit 100K creates, for example, a Web page as shown in FIG. 11 which is realized by the CPU 110 of the server 100 executing the program of the memory 120 and provided to the terminal 300. The work plan adjustment unit 100I is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S350 of FIG.

<本発明の実施形態に係る農作物生産管理システムの特徴>
(1)
本発明の実施形態に係る農作物生産管理システム1では、サーバ100のCPU110が、短期計画の期間毎における作業必要量と作業実績量とを比較し、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算する。そして、サーバ100のCPU110は、作業不足量を分割し、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配する。このため、この農作物生産管理システム1では、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけずにすむ。
<Characteristics of the crop production management system according to the embodiment of the present invention>
(1)
In the agricultural product production management system 1 according to the embodiment of the present invention, when the CPU 110 of the server 100 compares the work required amount and the work actual amount for each period of the short-term plan, and the work actual amount is smaller than the work required amount. Automatically calculate the amount of work shortage. Then, the CPU 110 of the server 100 divides the work shortage amount and additionally distributes it to the work required amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For this reason, in this agricultural product production management system 1, even if the actual amount of work does not reach the required amount of work, or the work is canceled due to bad weather, the convenience of workers, etc., a heavy burden is placed on the agricultural work manager and the like. You don't have to call.

(2)
本発明の実施形態に係る農作物生産管理システム1では、作業実施可能量または出勤希望者数の人数に基づいて、作業不足量を短期計画の期間に追加分配することができる。このため、この農作物生産管理システム1では、作業計画を適切に調整することができる。
(2)
In the crop production management system 1 according to the embodiment of the present invention, the work shortage amount can be additionally distributed during the short-term plan period based on the workable amount or the number of people who wish to go to work. Therefore, in this crop production management system 1, the work plan can be appropriately adjusted.

<変形例>
(A)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎に天気・災害情報を設定し、天気・災害情報が雨、雪、台風(例えば、作業を困難にするもの)などである短期計画の期間毎における作業必要量を調整してもよい。例えば、CPU110は、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間における作業必要量を分割して、雨、雪、台風などの天気・災害情報が設定されていない短期計画の期間毎における作業必要量に追加分配する。例えば、図12(A)→(B)に示されるように、8/3に雨が設定されている場合に、8/3における作業必要量(100)は、分割されて8/3を除いた短期計画の期間毎における作業必要量に追加分配されている。なお、CPU110は、天気予報サービスと連動して短期計画の期間毎に予想される天気・災害情報を設定するか、通信インターフェイス160を介して端末300から入力される天気・災害情報を短期計画の期間毎に設定する。
<Modification example>
(A)
Although not mentioned in the previous embodiment, the CPU 110 sets the weather / disaster information for each period of the short-term plan, and the weather / disaster information is rain, snow, typhoon (for example, something that makes work difficult). The work requirement may be adjusted for each period of a short-term plan. For example, the CPU 110 divides the work required amount in the period of the short-term plan in which the weather / disaster information such as rain, snow, and typhoon is set, and the weather / disaster information such as rain, snow, and typhoon is not set. Additional distribution to the work requirement for each period of the short-term plan. For example, as shown in FIGS. 12 (A) → (B), when rain is set on 8/3, the work requirement (100) on 8/3 is divided and excludes 8/3. It is additionally distributed to the work requirement for each period of the short-term plan. The CPU 110 sets the expected weather / disaster information for each period of the short-term plan in conjunction with the weather forecast service, or sets the weather / disaster information input from the terminal 300 via the communication interface 160 for the short-term plan. Set for each period.

なお、図12では、CPU110は、雨、雪、台風などの天気・災害情報が設定されていない短期計画の期間における作業実施可能量に基づいて、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間における作業必要量を分割している。例えば、図12(A)→(B)では、8/3における作業必要量(100)が、8/1における作業可能量-作業必要量:8/2における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=6:3:7:4の比で分割されている。そして、8/1における作業必要量に30が追加分配され、8/2における作業必要量に15が追加分配され、8/4における作業必要量に35が追加分配され、8/5における作業必要量に20が追加分配されている。なお、図示しないが、8/3における作業必要量(100)が、8/1における出勤希望者の人数:8/2における出勤希望者の人数:8/4における出勤希望者の人数:8/5における出勤希望者の人数=4:3:5:4の比で分割され、8/1,8/2,8/4,8/5それぞれに追加分配されてもよい。 In FIG. 12, the CPU 110 provides weather / disaster information such as rain, snow, and typhoon based on the workable amount during the short-term plan period in which the weather / disaster information such as rain, snow, and typhoon is not set. The work requirement for the set short-term plan period is divided. For example, in FIGS. 12 (A) → (B), the work required amount (100) in 8/3 is the workable amount in 8/1-workable amount: workable amount in 8/2-work required amount: 8. It is divided by the ratio of workable amount in / 4-workable amount: workable amount in 8/5-workable amount = 6: 3: 7: 4. Then, 30 is additionally distributed to the work required amount on 8/1, 15 is additionally distributed to the work required amount on 8/2, 35 is additionally distributed to the work required amount on 8/4, and the work required on 8/5. 20 is additionally distributed to the quantity. Although not shown, the required work amount (100) on 8/3 is the number of applicants for work on 8/1: the number of applicants for work on 8/2: the number of applicants for work on 8/4: 8 / It may be divided in the ratio of the number of applicants for work in 5 = 4: 3: 5: 4, and may be additionally distributed to each of 8/1, 8/2, 8/4, 8/5.

なお、変形例(A)が適用された場合、CPU110は、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間には、分割された作業不足量を追加分配しない。例えば、図12(B)→(C)に示されるように、8/2において作業不足量(11)が計算された場合に、雨が設定されている8/3には、8/2における作業不足量(11)分割した作業不足量が追加分配されていない。 When the modification (A) is applied, the CPU 110 does not additionally distribute the divided work shortage during the period of the short-term plan in which the weather / disaster information such as rain, snow, and typhoon is set. For example, as shown in FIG. 12 (B) → (C), when the work shortage amount (11) is calculated in 8/2, the rain is set in 8/3 in 8/2. Work shortage (11) The divided work shortage is not additionally distributed.

(B)
変形例(A)が適用される場合、CPU110は、雨、雪、台風などの天気・災害情報が短期計画の期間に設定されていても、作業場所によっては、その短期計画の期間における作業必要量を分割して他の短期計画の期間における作業必要量に追加分配しなくてもよい。例えば、雨が設定されていたとしても作業場所がビニールハウスなどであれば、雨の影響を受けずに作業を行うことができるからである。かかる場合、CPU110は、端末300からの作業場所の入力を受け付けて作業計画表データ126に作業場所を設定し、作業場所とその作業場所で作業可能な天気・災害情報とを関連付けたデータなどを読み込む。そして、CPU110は、読み込んだデータを参照し、雨、雪、台風などの天気・災害情報が設定されている場合に他の短期計画の期間における作業必要量に追加分配するかどうかを判断する。または、CPU110は、作業計画表データ126にチェックボックスを表示させ、端末300からチェックボックスにチェックを入れる操作等がされたかどうかで他の短期計画の期間における作業必要量に追加分配するかどうかを判断する。
(B)
When the modification (A) is applied, the CPU 110 needs to work in the short-term plan period depending on the work place even if the weather / disaster information such as rain, snow, and typhoon is set in the short-term plan period. It is not necessary to divide the amount and additionally distribute it to the work requirement in the period of other short-term plans. For example, even if rain is set, if the work place is a vinyl house or the like, the work can be performed without being affected by the rain. In such a case, the CPU 110 accepts the input of the work place from the terminal 300, sets the work place in the work plan table data 126, and inputs the data associated with the work place and the weather / disaster information that can be worked at the work place. Read. Then, the CPU 110 refers to the read data and determines whether or not to additionally distribute the work required amount in the period of another short-term plan when the weather / disaster information such as rain, snow, and typhoon is set. Alternatively, the CPU 110 displays a check box in the work plan table data 126, and determines whether to additionally distribute to the work required amount in the period of another short-term plan depending on whether or not the operation of checking the check box is performed from the terminal 300. to decide.

(C)
先の実施形態に係る農作物生産管理システム1では、CPU110は、中期計画における作業必要量を均等に分割し、短期計画の期間毎に分配していた。しかし、CPU110は、短期計画の期間毎における作業実施可能量の計算結果や短期計画の期間毎における出勤希望者数などに基づいて、中期計画における作業必要量を不均等に分割し、短期計画の期間毎に分配してもよい。例えば、CPU110は、分割した中期計画における作業必要量のうち最も大きいものを作業実施可能量が最も大きい(または、出勤希望者数が最も多いなど)短期計画の期間に分配したり、分割した中期計画における作業必要量のうち最も小さいものを作業実施可能量が最も小さい(または、出勤希望者数が最も少ないなど)短期計画の期間に分配したりする。
(C)
In the crop production management system 1 according to the previous embodiment, the CPU 110 evenly divides the work required amount in the medium-term plan and distributes it for each period of the short-term plan. However, the CPU 110 unevenly divides the work required amount in the medium-term plan based on the calculation result of the workable amount in each period of the short-term plan and the number of applicants for work in each period of the short-term plan, and the short-term plan It may be distributed by period. For example, the CPU 110 distributes the largest amount of work required in the divided medium-term plan to the period of the short-term plan having the largest workable amount (or the largest number of applicants for work, etc.), or the divided medium-term plan. The smallest amount of work required in the plan may be distributed to the period of the short-term plan with the smallest workable amount (or the least number of applicants for work, etc.).

(D)
先の実施形態に係る農作物生産管理システム1では、作業実績量などが、検知器200などを利用して計測され、自動的にサーバ100にアップロードされていた。しかし、農場の管理者などが端末300を用いて作業実績量などを入力することで、サーバ100に作業実績量などが蓄積されてもよい。
(D)
In the crop production management system 1 according to the previous embodiment, the actual amount of work and the like are measured by using the detector 200 and the like, and are automatically uploaded to the server 100. However, the farm manager or the like may accumulate the work record amount or the like on the server 100 by inputting the work record amount or the like using the terminal 300.

(E)
先の実施形態に係る農作物生産管理システム1では、CPU110は、作業実績量が入力されている場合に、短期計画の期間毎における作業必要量と作業実績量とを比較し、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算していた。しかし、CPU110は、端末300から作業不足量を入力する操作を受け付け、受け付けた作業不足量を設定して作業不足が発生していることを判定してもよい。
(E)
In the crop production management system 1 according to the previous embodiment, when the actual work amount is input, the CPU 110 compares the required amount of work and the actual work amount for each period of the short-term plan, and the actual work amount is the work. The amount of work shortage was automatically calculated when it was less than the required amount. However, the CPU 110 may accept an operation for inputting a work shortage amount from the terminal 300, set the accepted work shortage amount, and determine that a work shortage has occurred.

(F)
先の実施形態に係る農作物生産管理システム1では、CPU110は、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算し、作業不足量を分割して作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配していた。しかし、CPU110は、端末300からの操作(例えば、端末300に表示される調整ボタンをマウスポインタでクリックする操作など)が行われた場合にのみ作業不足量を計算し、その作業不足量を分割して作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配してもよい。かかる場合、CPU110が図9に示されるステップS350の処理を繰り返す必要がなくなる。
(F)
In the crop production management system 1 according to the previous embodiment, the CPU 110 automatically calculates the work shortage amount when the work actual amount is smaller than the work required amount, divides the work shortage amount, and the work shortage occurs. It was additionally distributed to the work requirement for each period of the short-term plan after the period of the short-term plan. However, the CPU 110 calculates the work shortage amount only when an operation from the terminal 300 (for example, an operation of clicking the adjustment button displayed on the terminal 300 with the mouse pointer) is performed, and divides the work shortage amount. Then, it may be additionally distributed to the work requirement for each period of the short-term plan after the period of the short-term plan in which the work shortage occurs. In such a case, the CPU 110 does not need to repeat the process of step S350 shown in FIG.

(G)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎における作業実績量の初期値を0に設定しておいてもよい。かかる場合、CPU110は、作業不足が発生している短期計画の期間を、短期計画の期間毎に設けられたチェックボックスにチェックが入っているかなどの情報に基づいて特定する。または、CPU110は、作業不足が発生している短期計画の期間を、作業が行われて作業実績量に0以外の数値が入力されたことを認識して作業必要量から作業実績量を差し引き、その差が正の値であることをもって特定する。
(G)
Although not mentioned in the previous embodiment, the CPU 110 may set the initial value of the work actual amount for each period of the short-term plan to 0. In such a case, the CPU 110 specifies the period of the short-term plan in which the work shortage occurs based on the information such as whether the check box provided for each period of the short-term plan is checked. Alternatively, the CPU 110 recognizes that the work has been performed and a numerical value other than 0 has been input to the work actual amount during the short-term plan period in which the work shortage has occurred, and subtracts the work actual amount from the work required amount. It is specified by the fact that the difference is a positive value.

(H)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎における作業必要量と作業実績量とを比較して、作業実績量が作業必要量よりも多いと判断した場合に、作業超過量を計算してもよい。そして、CPU110は、作業超過量が発生した短期計画の期間より後の短期計画の期間毎における作業必要量から作業超過量分を差し引いてもよい。例えば、図13(A)→(B)に示されるように、8/2において作業超過量(30)が発生した場合に、CPU110は、作業超過量を均等に分割し、8/3,8/4,8/5における作業必要量から分割した作業超過量を差し引いてもよい。なお、図示しないが、CPU110は、作業実施可能量の計算結果や出勤希望者数などに基づいて作業超過量を不均等に分割し、作業超過が発生した短期計画の期間より後の期間における作業必要量から分割した作業超過量を差し引いてもよい。例えば、CPU110は、8/2における作業超過量(30)を、8/3における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=1:7:4の比で分割する。そして、CPU110は、例えば、作業可能量-作業必要量の値が大きい短期計画の期間からは分割後の値が小さい作業超過量を差し引くようにし、作業可能量-作業必要量の値が小さい短期計画の期間からは分割後の値が大きい作業超過量を差し引くようにする。なお、図示しないが、CPU110は、作業超過が発生した短期計画の期間より後のいずれか1期間における作業必要量から作業超過量を差し引いてもよい。例えば、CPU110は、出勤回数の多い出勤希望者が居る短期計画の期間の作業必要量から作業超過量を差し引いてもよいし、出勤が連続している出勤希望者が居る短期計画の期間の作業必要量から作業超過量を差し引いてもよい。
(H)
Although not mentioned in the previous embodiment, the CPU 110 compares the work required amount and the work actual amount for each period of the short-term plan, and when it is determined that the work actual amount is larger than the work required amount, the work is performed. The excess amount may be calculated. Then, the CPU 110 may subtract the work excess amount from the work requirement amount for each short-term plan period after the short-term plan period in which the work excess amount occurs. For example, as shown in FIGS. 13A → 13B, when the work excess amount (30) occurs in 8/2, the CPU 110 evenly divides the work excess amount into 8/3, 8 The divided work excess amount may be subtracted from the work requirement amount at / 4, 8/5. Although not shown, the CPU 110 unevenly divides the excess work amount based on the calculation result of the workable amount and the number of applicants for work, and the work in the period after the short-term plan period in which the excess work occurs. The divided work excess amount may be subtracted from the required amount. For example, the CPU 110 sets the work excess amount (30) on 8/2 as the workable amount on 8/3-workable amount on 8/4-workable amount on 8/4-workable amount on 8/5-work. Divide by the ratio of required amount = 1: 7: 4. Then, the CPU 110, for example, subtracts the work excess amount having a small post-division value from the period of the short-term plan having a large workable amount-work required amount, and has a short-term workable amount-work required amount value. The amount of work excess with a large post-division value should be deducted from the planning period. Although not shown, the CPU 110 may subtract the work excess amount from the work requirement amount in any one period after the period of the short-term plan in which the work excess occurs. For example, the CPU 110 may subtract the excess work amount from the work required amount in the short-term plan period in which there are many attendance applicants, or the work in the short-term plan period in which there are continuous attendance applicants. The excess work amount may be subtracted from the required amount.

変形例(H)が適用された農作物生産管理システム1では、作業超過が発生した短期計画の期間より後の期間における作業必要量を削ることができ、作業が計画以上に進んだ場合に積極的に出勤希望者に休息を与えることができる。 In the crop production management system 1 to which the modification (H) is applied, it is possible to reduce the amount of work required in the period after the period of the short-term plan in which the overwork occurred, and it is positive when the work progresses beyond the plan. It is possible to give a rest to those who wish to go to work.

なお、変形例(H)が適用された場合、図14に示される作業計画調整部100Iに、特許請求の範囲に記載の作業量超過単位期間特定部および作業超過量減算部が含まれることになる。 When the modification (H) is applied, the work plan adjustment unit 100I shown in FIG. 14 includes a work amount excess unit period specifying unit and a work excess amount subtraction unit described in the claims. Become.

(I)
先の実施形態では言及しなかったが、短期計画の期間毎に例えばチェックボックスが配設され、特定のチェックボックスにチェックが入れられた場合に、CPU110は、その短期計画の期間における作業実績量を0にしてもよい。かかる場合、その短期計画の期間における作業必要量は、チェックボックスにチェックが入れられたタイミング(または、チェックボックスにチェックが入れられた後に更新ボタンがクリックされたタイミングなど)で、他の短期計画の期間に分配されることになる。
(I)
Although not mentioned in the previous embodiment, for example, when a check box is arranged for each period of the short-term plan and a specific check box is checked, the CPU 110 performs the work actual amount in the period of the short-term plan. May be 0. In such a case, the work requirement for the period of the short-term plan is the timing when the check box is checked (or the timing when the update button is clicked after the check box is checked), and the other short-term plans. Will be distributed during the period of.

(J)
先の実施形態に係る農作物生産管理システム1のサーバ100や端末300などの各装置の役割の一部または全部を他の装置が実行してもよい。例えば、図14に示される長期計画作成部100A、中期計画作成部100B、短期計画作成部100Cと、シフト予定作成部100D、作業スピード計算部100E、作業記録入力部100F、病害虫入力部100G、収出荷・売上記録入力部100H、画面生成部100K、作業計画調整部100Iが、端末300や他の装置によって実現されてもよい。
(J)
Other devices may perform a part or all of the roles of each device such as the server 100 and the terminal 300 of the crop production management system 1 according to the above embodiment. For example, the long-term plan creation unit 100A, the medium-term plan creation unit 100B, the short-term plan creation unit 100C, the shift schedule creation unit 100D, the work speed calculation unit 100E, the work record input unit 100F, the pest input unit 100G, and the sales shown in FIG. The shipping / sales record input unit 100H, the screen generation unit 100K, and the work plan adjustment unit 100I may be realized by the terminal 300 or another device.

あるいは、中期計画作成部100Bの一部または全部、作業計画調整部100Iの一部または全部、作業記録入力部100Fの一部または全部が、端末300のCPU310が、メモリ320のプログラムを実行することによって実現されてもよい。この場合は、中期計画作成部100B、作業計画調整部100I、作業記録入力部100Fにおける処理の一部または全部を実行するためのプログラムを、端末300がインターネットなどを介してダウンロード可能であることが好ましい。 Alternatively, part or all of the medium-term plan creation unit 100B, part or all of the work plan adjustment unit 100I, and part or all of the work record input unit 100F, the CPU 310 of the terminal 300 executes the program of the memory 320. May be realized by. In this case, the terminal 300 may be able to download a program for executing a part or all of the processes in the medium-term plan creation unit 100B, the work plan adjustment unit 100I, and the work record input unit 100F via the Internet or the like. preferable.

(K)
先の実施形態に係る農作物生産管理システム1やプログラムなどは、農作業に関する作業計画の調整を行うためのものであったが、上記の技術は、他の作業計画の調整に適用することができる。例えば、工場における作業計画や、建築現場における作業計画など、あらゆる作業計画の調整に適用することができる。
(K)
The crop production control system 1 and the program according to the previous embodiment were for adjusting the work plan related to the agricultural work, but the above technique can be applied to the adjustment of other work plans. For example, it can be applied to the adjustment of any work plan such as a work plan at a factory or a work plan at a construction site.

なお、上記変形例(A)~(K)は各例単独で適用されてもよいし、複数の例が組み合わされて適用されてもよい。 The modified examples (A) to (K) may be applied individually to each example, or may be applied in combination of a plurality of examples.

今回開示された実施形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した説明ではなく、特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 The embodiments disclosed this time should be considered to be exemplary and not restrictive in all respects. The scope of the present invention is shown by the scope of claims, not the above description, and is intended to include all modifications within the meaning and scope equivalent to the scope of claims.

1 :農作物生産管理システム
100 :サーバ
110 :CPU
100P :作業予定量分配部
100Q :作業量不足単位期間特定部
100R :作業不足量追加分配部
100S :作業実績量入力部

1: Agricultural product production management system 100: Server 110: CPU
100P: Scheduled work amount distribution unit 100Q: Work amount shortage unit period specification unit 100R: Work shortage amount additional distribution unit 100S: Work record amount input unit

本発明は、農作業の管理のための農作物生産管理システム、情報処理方法、およびプログラムに関する。 The present invention relates to a crop production control system, an information processing method, and a program for managing agricultural work.

端末とサーバとを備える農作物生産管理システムであって、前記端末は、対象となる作業日に予定される作業を割り当てられた担当者を表す画像を第1のエリアに表示しつつ、作業割り当ての候補者を示す画像を第2のエリアに表示し、前記サーバは、前記候補者毎の作業遂行能力に基づいて前記第2のエリアの候補者を順位付けして前記順位に基づいて前記第2のエリアの候補者を表す画像を前記第1のエリアに自動的に移動させるための入力操作を受け付けて自動割当処理を実行し、前記自動割当処理に従って前記端末における前記第2のエリアの前記候補者を表す画像を前記第1のエリアに作業を割り当てられた担当者として表示する、農作物生産管理システムが過去に提案されている(例えば、特許第6632104号公報等参照)。この農作物生産管理システムでは、端末からの入力操作が行われると、農作業に人員を割り当てる処理が自動的に行われる。このため、この農作物生産管理システムでは、作業可能な人員が多い場合であっても、人員の割り当てを迅速且つ容易に行うことができる。 A crop production management system including a terminal and a server, wherein the terminal displays an image showing a person assigned to work scheduled on a target work day in the first area, and assigns work. An image showing the candidate is displayed in the second area, and the server ranks the candidates in the second area based on the work performance ability of each candidate, and the second area is based on the ranking. An input operation for automatically moving an image representing a candidate for the area of the above area to the first area is received, an automatic allocation process is executed, and the candidate for the second area in the terminal according to the automatic allocation process. Agricultural production management systems have been proposed in the past that display an image representing a person as a person assigned work to the first area (see, for example, Japanese Patent No. 6632104). In this crop production management system, when an input operation is performed from a terminal, a process of allocating personnel to farm work is automatically performed. Therefore, in this crop production management system, even when there are many workable personnel, it is possible to quickly and easily allocate the personnel.

特許第6632104号公報Japanese Patent No. 6632104

ところで、上述の農作物生産管理システムでは、農作業管理者などは、作業予定日毎に作業必要量(作業予定量)を入力する必要がある。このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じる度に作業予定日毎に作業必要量を振り分ける手作業を行わなければならず、農作業管理者などの負担が比較的重かった。 By the way, in the above-mentioned agricultural product production management system, the agricultural work manager or the like needs to input the required work amount (planned work amount) for each scheduled work day. For this reason, it is necessary to perform manual work to allocate the required work amount to each scheduled work day every time the work actual amount does not reach the work required amount, or when the work is canceled due to bad weather or the convenience of the workers. The burden on agricultural work managers was relatively heavy.

本発明の目的は、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけることがない農作物生産管理システムを提供することにある。 An object of the present invention is to produce a crop that does not impose a heavy burden on the agricultural work manager or the like even if the actual amount of work does not reach the required amount of work, or even if the work is stopped due to bad weather or the convenience of workers. It is to provide a production control system.

本発明の第1局面に係る農作物生産管理システムは、作業予定量分配部と、作業実績量入力部と、作業量不足単位期間特定部と、作業不足量追加分配部とを備える。作業予定量分配部は、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力部は、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定部は、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配部は、作業量不足単位期間特定部により特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業不足量が求められた単位期間の次の単位期間が開始されるまでに、作業実績量入力部により作業実績量が入力されていない単位期間に追加分配する。 The crop production management system according to the first aspect of the present invention includes a planned work amount distribution unit, a work record amount input unit, a work amount shortage unit period specifying unit, and a work shortage amount additional distribution unit. The scheduled work amount distribution unit distributes the planned work amount for a specific period consisting of a plurality of unit periods to the unit period. The work actual amount input unit inputs the work actual amount in the unit period in association with the corresponding unit period. The work amount shortage unit period specifying unit specifies a unit period in which the actual work amount is less than the planned work amount. The work shortage additional distribution unit determines the work shortage amount obtained by subtracting the actual work amount from the planned work amount in the unit period specified by the work amount shortage unit period specific unit, after the unit period in which the work shortage amount is obtained. By the time the unit period of is started , additional distribution is performed to the unit period in which the actual work amount has not been input by the actual work amount input unit.

この農作物生産管理システムでは、作業実績量が作業予定量を下回る単位期間が特定され、特定された単位期間における作業不足量が、作業実績量が入力されていない単位期間に追加分配される。このため、この農作物生産管理システムでは、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけずにすむ。 In this crop production management system, a unit period in which the actual work amount is less than the planned work amount is specified, and the work shortage amount in the specified unit period is additionally distributed to the unit period in which the actual work amount is not input. For this reason, this crop production management system puts a heavy burden on the agricultural work manager, etc., even if the actual amount of work does not reach the required amount of work, or if the work is canceled due to bad weather or the convenience of workers. You don't have to.

本発明の第2局面に係る農作物生産管理システムは、第1局面に係る農作物生産管理システムであって、作業不足量追加分配部は、(a)単位期間における作業候補者の人数および(b)単位期間における作業候補者の作業遂行能力の少なくとも一方に基づいて、作業不足量を単位期間に追加分配する。 The agricultural product production management system according to the second aspect of the present invention is the agricultural product production management system according to the first aspect, and the work shortage additional distribution unit is (a) the number of work candidates in a unit period and (b). The work shortage is additionally distributed to the unit period based on at least one of the work performance of the work candidate in the unit period.

この農作物生産管理システムでは、例えば、作業実施可能量(作業候補者の作業スピードや、作業候補者の作業時間などから求められる想定値)が多い単位期間に作業不足量を多めに追加分配することができる。また、例えば、作業実施可能量が少ない単位期間に作業不足量を少なめに追加分配することができる。このため、この農作物生産管理システムでは、作業計画を適切に調整することができる。 In this crop production management system, for example, a large amount of work shortage is additionally distributed in a unit period in which the workable amount (estimated value obtained from the work speed of the work candidate and the work time of the work candidate) is large. Can be done. Further, for example, the work shortage amount can be additionally distributed in a small amount during a unit period in which the workable amount is small. Therefore, in this crop production management system, the work plan can be appropriately adjusted.

本発明の第3局面に係る農作物生産管理システムは、第1局面または第2局面に係る農作物生産管理システムであって、作業量超過単位期間特定部と、作業超過量減算部とをさらに備える。作業量超過単位期間特定部は、作業実績量が作業予定量を上回る単位期間を特定する。作業超過量減算部は、作業量超過単位期間特定部により特定された単位期間において作業実績量から作業予定量を差し引いて求められる作業超過量を、作業実績量が未入力である少なくとも一つの単位期間に対応する作業予定量から差し引く。 The crop production management system according to the third aspect of the present invention is the crop production management system according to the first phase or the second aspect, and further includes a work amount excess unit period specifying unit and a work excess amount subtraction unit. The work amount excess unit period specifying unit specifies a unit period in which the actual work amount exceeds the planned work amount. The work excess amount subtraction unit is at least one unit in which the work excess amount is not input for the work excess amount obtained by subtracting the planned work amount from the work actual amount in the unit period specified by the work amount excess unit period specific unit. Subtract from the planned work amount corresponding to the period.

この農作物生産管理システムでは、作業が計画以上に進んだ場合にその後の作業日数や作業時間を削ることができる。このため、この農作物生産管理システムでは、作業が計画以上に進んだ場合に積極的に作業候補者に休息を与えることができる。 With this crop production management system, if the work progresses beyond the plan, the number of working days and working hours can be reduced. Therefore, in this crop production management system, when the work progresses beyond the plan, the work candidate can be positively given a rest.

本発明の第4局面に係る農作物生産管理プログラムは、作業予定量分配ステップと、作業実績量入力受付ステップと、作業量不足単位期間特定ステップと、作業不足量追加分配ステップとを備える。作業予定量分配ステップでは、コンピュータは、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力受付ステップでは、コンピュータは、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定ステップでは、コンピュータは、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配ステップでは、コンピュータは、作業量不足単位期間特定ステップにおいて特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業不足量が求められた単位期間の次の単位期間が開始されるまでに、作業実績量入力受付ステップにおいて作業実績量が入力されていない単位期間に追加分配する。 The crop production management program according to the fourth aspect of the present invention includes a planned work amount distribution step, a work actual amount input reception step, a work amount shortage unit period specifying step, and a work shortage amount additional distribution step. In the scheduled work amount distribution step, the computer distributes the scheduled work amount for a specific period consisting of a plurality of unit periods to the unit period. In the work actual amount input reception step, the computer inputs the work actual amount in the unit period in association with the corresponding unit period. In the work shortage unit period identification step, the computer identifies a unit period in which the actual work amount is less than the planned work amount. In the work shortage additional distribution step, the computer determines the work shortage amount obtained by subtracting the actual work amount from the planned work amount in the unit period specified in the work shortage unit period specific step, and the work shortage amount is obtained. By the time the next unit period of the period is started, additional distribution is performed to the unit period in which the actual work amount is not input in the work actual amount input acceptance step.

このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合にこの農作物生産管理プログラムが実行されると、農作業管理者などに重い負担をかけずにすむ。 For this reason, if this crop production management program is executed on a day when the actual amount of work does not reach the required amount of work, or when the work is canceled due to bad weather, the convenience of workers, etc., it will be heavy for the farm work manager. You don't have to burden yourself.

本発明の第5局面に係る農作物生産管理方法は、作業予定量分配ステップと、作業実績量入力受付ステップと、作業量不足単位期間特定ステップと、作業不足量追加分配ステップとを備える。作業予定量分配ステップでは、コンピュータは、複数の単位期間から成る特定期間の作業予定量を単位期間に分配する。作業実績量入力受付ステップでは、コンピュータは、単位期間における作業実績量を、対応する単位期間に関連付けて入力する。作業量不足単位期間特定ステップでは、コンピュータは、作業実績量が作業予定量を下回る単位期間を特定する。作業不足量追加分配ステップでは、コンピュータは、作業量不足単位期間特定ステップにおいて特定された単位期間において作業予定量から作業実績量を差し引いて求められる作業不足量を、作業不足量が求められた単位期間の次の単位期間が開始されるまでに、作業実績量入力受付ステップにおいて作業実績量が入力されていない単位期間に追加分配する。 The crop production management method according to the fifth aspect of the present invention includes a planned work amount distribution step, a work actual amount input reception step, a work amount shortage unit period specifying step, and a work shortage amount additional distribution step. In the scheduled work amount distribution step, the computer distributes the scheduled work amount for a specific period consisting of a plurality of unit periods to the unit period. In the work actual amount input reception step, the computer inputs the work actual amount in the unit period in association with the corresponding unit period. In the work shortage unit period identification step, the computer identifies a unit period in which the actual work amount is less than the planned work amount. In the work shortage additional distribution step, the computer determines the work shortage amount obtained by subtracting the actual work amount from the planned work amount in the unit period specified in the work shortage unit period specific step, and the work shortage amount is obtained. By the time the next unit period of the period is started, additional distribution is performed to the unit period in which the actual work amount is not input in the work actual amount input acceptance step.

このため、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合にこの農作物生産管理方法が実施されると、農作業管理者などに重い負担をかけずにすむ。 For this reason, if this crop production control method is implemented on days when the actual amount of work does not reach the required amount of work, or when work is canceled due to bad weather, work personnel, etc., it will be heavy for agricultural work managers and the like. You don't have to burden yourself.

本発明の実施形態に係る農作物生産管理システムの全体構成を示すイメージ図である。It is an image diagram which shows the whole structure of the crop production management system which concerns on embodiment of this invention. 本発明の実施形態に係るサーバの構成を示すブロック図である。It is a block diagram which shows the structure of the server which concerns on embodiment of this invention. 本発明の実施形態に係る作業マスタデータを示すイメージ図である。It is an image diagram which shows the work master data which concerns on embodiment of this invention. 本発明の実施形態に係る作業実績データを示すイメージ図である。It is an image diagram which shows the work performance data which concerns on embodiment of this invention. 本発明の実施形態に係るシフト希望データを示すイメージ図である。It is an image diagram which shows the shift desired data which concerns on embodiment of this invention. 本発明の実施形態に係る区画データを示すイメージ図である。It is an image diagram which shows the section data which concerns on embodiment of this invention. 本発明の実施形態に係る割り当てデータを示すイメージ図である。It is an image diagram which shows the allocation data which concerns on embodiment of this invention. 本発明の実施形態に係る端末の構成を示すブロック図である。It is a block diagram which shows the structure of the terminal which concerns on embodiment of this invention. 本発明の実施形態に係る農作業に関する計画立案の全体的な処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the whole processing of the planning about the agricultural work which concerns on embodiment of this invention. 本発明の実施形態に係るシフト希望シートのイメージ図である。It is an image diagram of the shift request sheet which concerns on embodiment of this invention. 本発明の実施形態に係る作業不足量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work shortage amount which concerns on embodiment of this invention. 変形例(B)に係る作業必要量および作業不足量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work necessary amount and work shortage amount which concerns on the modification (B). 変形例(H)に係る作業超過量の分配処理の流れを示すイメージ図である。It is an image diagram which shows the flow of the distribution processing of the work excess amount which concerns on the modification (H). 本発明の実施形態に係る農作物生産管理システムの機能構成を示すブロック図である。It is a block diagram which shows the functional structure of the crop production management system which concerns on embodiment of this invention.

以下、図面を参照しつつ、本発明の実施形態について説明する。以下の説明では、同一の部品には同一の符号を付してある。それらの名称および機能も同じである。したがって、それらについての詳細な説明は繰り返さない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description, the same parts are designated by the same reference numerals. Their names and functions are the same. Therefore, the detailed description of them will not be repeated.

<農作物生産管理システムの全体構成>
農作物生産管理システム1は、図1に示されるように、主たる装置として、農作業の管理のためのサービスを提供するためのサーバ100、検知器200、端末300などから構成されている。以下、これらの構成要素について詳述する。
<Overall configuration of crop production management system>
As shown in FIG. 1, the crop production management system 1 is composed of a server 100 for providing a service for managing agricultural work, a detector 200, a terminal 300, and the like as a main device. Hereinafter, these components will be described in detail.

1.サーバ
サーバ100は、インターネットに接続され、農作業の管理のためのサービスを提供する。サーバ100は、図2に示されるように、主たる構成要素として、CPU(Central Processing Unit)110と、メモリ120と、操作部140と、通信インターフェイス160とを含む。
1. 1. Server The server 100 is connected to the Internet and provides a service for managing agricultural work. As shown in FIG. 2, the server 100 includes a CPU (Central Processing Unit) 110, a memory 120, an operation unit 140, and a communication interface 160 as main components.

(1)CPU
CPU110は、メモリ120に記憶されているプログラムを実行することによって、サーバ100の各部を制御する。例えば、CPU110は、メモリ120に格納されているプログラムを実行し、各種のデータを参照することによって、図14の処理などを実現する。
(1) CPU
The CPU 110 controls each part of the server 100 by executing a program stored in the memory 120. For example, the CPU 110 executes a program stored in the memory 120 and refers to various data to realize the processing of FIG. 14 and the like.

(2)メモリ
メモリ120は、各種のRAM、各種のROMなどによって実現され、サーバ100に内包されているものであってもよいし、サーバ100の各種インターフェイスに着脱可能なものであってもよいし、サーバ100からアクセス可能な他の装置の記録媒体であってもよい。メモリ120は、CPU110によって実行される人員配置プログラムを含む種々のプログラムや、CPU110によるプログラムの実行により生成されたデータ、入力されたデータ、作業マスタデータ121、作業実績データ122、シフト希望データ123、区画データ124、割り当てデータ125、作業計画表データ126、その他の本発明の実施形態に係るサービスに利用されるデータなどを記憶する。
(2) Memory The memory 120 may be realized by various RAMs, various ROMs, etc., and may be included in the server 100 or may be detachable from various interfaces of the server 100. However, it may be a recording medium of another device accessible from the server 100. The memory 120 includes various programs including a staffing program executed by the CPU 110, data generated by executing the program by the CPU 110, input data, work master data 121, work record data 122, shift desired data 123, and so on. It stores partition data 124, allocation data 125, work plan table data 126, and other data used for services according to the embodiment of the present invention.

作業マスタデータ121は、図3に示されるように、作業名、平均的な作業スピード、例えば通常のレベルの作業者が1時間に完了できるレーンの数、などの対応関係を農作業毎に格納する。 As shown in FIG. 3, the work master data 121 stores the correspondence such as the work name, the average work speed, for example, the number of lanes that a normal level worker can complete in one hour, and the like for each farm work. ..

作業実績データ122は、図4に示されるように、作業者としての従業員、作業日、作業の種類、作業の時間、作業のスピード、例えば作業者が実際に1時間で作業が完了できたレーンの数などの対応関係を格納する。 As shown in FIG. 4, the work record data 122 shows the employee as a worker, the work day, the type of work, the time of work, the speed of work, for example, the worker can actually complete the work in one hour. Stores correspondence such as the number of lanes.

シフト希望データ123は、図5に示されるように、作業者としての従業員、日付、作業に参加することが可能な時間帯、作業に参加する時間などの対応関係を格納する。 As shown in FIG. 5, the shift request data 123 stores a correspondence relationship such as an employee as a worker, a date, a time zone in which the work can be participated, and a time to participate in the work.

区画データ124は、図6に示されるように、区画名、区画に含まれるエリアの広さ、例えばレーンの数、などの対応関係を区画毎に格納する。 As shown in FIG. 6, the division data 124 stores correspondences such as the division name and the size of the area included in the division, for example, the number of lanes, for each division.

割り当てデータ125は、図7に示されるように、既に作業を割り当てられている作業者や時間帯などの対応関係を日付毎や区画毎や作業毎に格納する。 As shown in FIG. 7, the allocation data 125 stores correspondences such as workers and time zones to which work has already been assigned for each date, each section, and each work.

作業計画表データ126は、図11に示されるように、中期計画の期間(例えば、1から数週間単位)、中期計画における作業必要量、短期計画の期間、短期計画の期間毎に出勤することを希望する作業者(以下、「出勤希望者」という)、短期計画の期間毎の各種作業量などの対応関係を日付毎に格納する。 As shown in FIG. 11, the work plan table data 126 shall be attended every period of the medium-term plan (for example, from 1 to several weeks), the work requirement in the medium-term plan, the period of the short-term plan, and the period of the short-term plan. The correspondence relationship such as the worker who desires (hereinafter referred to as "working applicant") and various work amounts for each period of the short-term plan is stored for each date.

(3)操作部
操作部140は、サービスの管理者などの命令を受け付けて、当該命令をCPU110に入力する。
(3) Operation unit The operation unit 140 receives an instruction from a service administrator or the like and inputs the instruction to the CPU 110.

(4)通信インターフェイス
通信インターフェイス160は、インターネット、キャリア網、ルータ400などを介して、端末300などの他の装置にCPU110からのデータを送信する。逆に、通信インターフェイス160は、インターネット、キャリア網、ルータ400などを介して端末300などの他の装置からのデータを受信して、CPU110に受け渡す。
(4) Communication interface The communication interface 160 transmits data from the CPU 110 to other devices such as the terminal 300 via the Internet, a carrier network, a router 400, and the like. On the contrary, the communication interface 160 receives data from another device such as the terminal 300 via the Internet, a carrier network, a router 400, and the like, and passes the data to the CPU 110.

2.検知器
検知器200は、農場の作物レーンの端や農作業エリアの端などに設置されるものである。例えば、検知器200は、作業者のスマートフォン500がQRコード(登録商標)等を読み取って当該情報をサーバ100にアップロードすることによって作業者が所定の量の作業を開始または終了したことを検知するためのものである。あるいは、検知器200は、農場の作物レーンの端や農作業エリアの端などに設置され、所定の作業が開始または終了した農作業者を検知したり識別したりする。例えば、検知器200は、作業服などに取り付けられるRFIDを検知する近距離無線通信機であったり、作業者のスマートフォン500の画面のQRコード(登録商標)を読み取るための画像センサであったり、作業者の顔を検知するための画像センサであってもよい。ただし、作業者の作業スピードは、検知器200によって作業の開始または終了を検知する方法に限らず、管理者などが直接的に作業者の作業スピードに関する情報を端末300に入力するものであってもよい。
2. 2. Detector The detector 200 is installed at the end of the crop lane of the farm, the end of the farm work area, or the like. For example, the detector 200 detects that the worker has started or finished a predetermined amount of work by reading the QR code (registered trademark) or the like and uploading the information to the server 100 by the worker's smartphone 500. Is for. Alternatively, the detector 200 is installed at the edge of the crop lane of the farm, the edge of the farm work area, or the like, and detects or identifies a farm worker who has started or finished a predetermined work. For example, the detector 200 may be a short-range wireless communication device that detects RFID attached to work clothes or the like, or an image sensor for reading a QR code (registered trademark) on the screen of a worker's smartphone 500. It may be an image sensor for detecting the face of the worker. However, the work speed of the worker is not limited to the method of detecting the start or end of the work by the detector 200, and the administrator or the like directly inputs the information on the work speed of the worker to the terminal 300. May be good.

3.端末
端末300は、農作業や農場の管理者などに使用され、農作業の予定を作成したり確認したりするためのものである。本発明の実施形態においては、端末300は、パーソナルコンピュータ、タブレット端末、スマートフォンなどによって実現される。また、端末300は、ルータ400、インターネット、キャリア網などを介して、サーバ100が提供する各種のサービスを利用可能である。端末300は、図8に示されるように、主たる構成要素として、CPU310、メモリ320、ディスプレイ330、操作部340、通信インターフェイス360、スピーカ370などを含む。
3. 3. Terminal The terminal 300 is used by farm work, farm managers, and the like to create and confirm farm work schedules. In the embodiment of the present invention, the terminal 300 is realized by a personal computer, a tablet terminal, a smartphone, or the like. Further, the terminal 300 can use various services provided by the server 100 via the router 400, the Internet, the carrier network, and the like. As shown in FIG. 8, the terminal 300 includes a CPU 310, a memory 320, a display 330, an operation unit 340, a communication interface 360, a speaker 370, and the like as main components.

(1)CPU
CPU310は、メモリ320あるいは外部の記憶媒体に記憶されているプログラムを実行することによって、端末300の各部を制御する。
(1) CPU
The CPU 310 controls each part of the terminal 300 by executing a program stored in the memory 320 or an external storage medium.

(2)メモリ
メモリ320は、各種のRAMや、各種のROMなどによって実現される。メモリ320は、CPU310によって実行されるプログラムや、CPU310によるプログラムの実行により生成されたデータ、サーバ100から受信したデータ、操作部340を介して入力されたデータなどを記憶する。
(2) Memory The memory 320 is realized by various RAMs, various ROMs, and the like. The memory 320 stores a program executed by the CPU 310, data generated by executing the program by the CPU 310, data received from the server 100, data input via the operation unit 340, and the like.

(3)ディスプレイ
ディスプレイ330は、CPU310からの信号に基づいて、文字や画像などを出力する。例えば、CPU310は、通信インターフェイス360を介してサーバ100から受信したテキストや画像などに基づいて、図11に示されるような作業計画表データ126をディスプレイ330に表示する。
(3) Display The display 330 outputs characters, images, and the like based on the signal from the CPU 310. For example, the CPU 310 displays the work plan table data 126 as shown in FIG. 11 on the display 330 based on the text, the image, and the like received from the server 100 via the communication interface 360.

(4)操作部
操作部340は、マウス、キーボード、ボタン、タッチパネルなどによって実現され、ユーザからの命令を受け付けて、当該命令をCPU310に入力する。なお、ディスプレイ330および操作部340は、タッチパネルを構成してもよい。
(4) Operation unit The operation unit 340 is realized by a mouse, a keyboard, a button, a touch panel, or the like, receives a command from a user, and inputs the command to the CPU 310. The display 330 and the operation unit 340 may form a touch panel.

(5)通信インターフェイス
通信インターフェイス360は、無線LAN通信あるいは有線LANなどの通信モジュールによって実現される。通信インターフェイス360は、有線通信あるいは無線通信によってサーバ100などの他の装置との間でデータを送受信する。例えば、図14のサーバ100の処理に合わせて、CPU310は、操作部340を介したクリック命令、ドラッグアンドドロップ命令、その他の各種の入力情報を、通信インターフェイス360を介してサーバ100に送信したり、通信インターフェイス360を介してサーバ100から受信したデータに基づいてディスプレイ330に図11に示されるような画面を表示したりする。
(5) Communication interface The communication interface 360 is realized by a communication module such as wireless LAN communication or wired LAN. The communication interface 360 transmits / receives data to / from another device such as the server 100 by wired communication or wireless communication. For example, in accordance with the processing of the server 100 of FIG. 14, the CPU 310 transmits a click command, a drag-and-drop command, and various other input information via the operation unit 340 to the server 100 via the communication interface 360. , A screen as shown in FIG. 11 is displayed on the display 330 based on the data received from the server 100 via the communication interface 360.

(6)スピーカ
スピーカ370は、CPU310からの信号に基づいて、音声を出力する。
(6) Speaker The speaker 370 outputs sound based on the signal from the CPU 310.

<本発明の実施形態に係る農作物生産管理システム1の動作概要>
ここでは、図9を参照して、本発明の実施形態に係る農作物生産管理システム1の全体的な動作概要について説明する。
<Outline of operation of crop production control system 1 according to the embodiment of the present invention>
Here, with reference to FIG. 9, an outline of the overall operation of the crop production control system 1 according to the embodiment of the present invention will be described.

(ステップS100)
まず、農場の管理者などが、サーバ100から提供される農作業管理サービスを利用しながら、自身の端末300を用いて自身の農場に関する数か月から1年程度の単位の長期計画を策定する。
(Step S100)
First, a farm manager or the like formulates a long-term plan for a farm of several months to one year using his / her own terminal 300 while using the farm work management service provided from the server 100.

(ステップS200)
そして、入力された長期計画に基づいて、サーバ100から提供される農作業管理サービスを利用しながら、農場の管理者などが、端末300を用いて、1から数週間単位の中期計画を策定する。
(Step S200)
Then, based on the input long-term plan, the farm manager or the like uses the terminal 300 to formulate a medium-term plan in units of one to several weeks while using the farm work management service provided from the server 100.

より詳細には、CPU110は、通信インターフェイス160を介して端末300から、中期計画の期間や中期計画における作業必要量を受け付け、図11に示されるような画面データを作成する。例えば、CPU110は、中期計画の期間(例えば、図11に示されるような8/1~8/5)、中期計画における作業必要量(例えば、図11に示されるような作業必要量:500)の入力、作業場所などを受け付ける。 More specifically, the CPU 110 receives the period of the medium-term plan and the work required amount in the medium-term plan from the terminal 300 via the communication interface 160, and creates screen data as shown in FIG. For example, the CPU 110 has a period of the medium-term plan (for example, 8/1 to 8/5 as shown in FIG. 11) and a work requirement in the medium-term plan (for example, a work requirement as shown in FIG. 11: 500). Input, work place, etc. are accepted.

次に、CPU110は、通信インターフェイス160を介して端末300から中期計画の期間に対する短期計画の期間を受け付け、短期計画の期間毎における作業の種類を受け付ける。例えば、CPU110は、短期計画の期間(例えば、図11に示されるような8/1,8/2,8/3,8/4,8/5等の日付)の入力を受け付ける。 Next, the CPU 110 receives the period of the short-term plan for the period of the medium-term plan from the terminal 300 via the communication interface 160, and receives the type of work for each period of the short-term plan. For example, the CPU 110 accepts inputs for a short-term plan period (eg, dates such as 8/1, 8/2, 8/3, 8/4, 8/5, etc., as shown in FIG. 11).

次に、CPU110は、中期計画における作業必要量を基に、短期計画の期間毎における作業必要量を設定する。ここで、CPU110は、中期計画における作業必要量を均等に分割し、短期計画の期間毎に分配する。例えば、CPU110は、図11(A)に示されるように、中期計画における作業必要量(500)を、短期計画の期間毎に100ずつ均等に分配し、短期計画の期間毎における作業必要量を設定している。 Next, the CPU 110 sets the work requirement for each period of the short-term plan based on the work requirement in the medium-term plan. Here, the CPU 110 evenly divides the work required amount in the medium-term plan and distributes it for each period of the short-term plan. For example, as shown in FIG. 11A, the CPU 110 evenly distributes the work requirement (500) in the medium-term plan by 100 for each period of the short-term plan, and sets the work requirement for each period of the short-term plan. It is set.

次に、CPU110は、シフト希望データ123を参照して、出勤希望者が作業を希望する時間帯および出勤希望者の作業時間を読み出す。 Next, the CPU 110 refers to the shift request data 123, and reads out the time zone in which the person who wants to go to work wants to work and the work time of the person who wants to go to work.

次に、CPU110は、作業実績データ122を参照して、出勤希望者の過去x日間(例えば、過去1週間分)の作業スピードの平均値を計算する。なお、CPU110は、作業実績データ122に過去の作業スピードが蓄積されていない場合、作業マスタデータ121から標準的な作業スピードを取得してもよい。 Next, the CPU 110 calculates the average value of the work speeds of the past x days (for example, the past one week) of the person who wants to go to work with reference to the work record data 122. If the past work speed is not accumulated in the work record data 122, the CPU 110 may acquire a standard work speed from the work master data 121.

次に、CPU110は、短期計画の期間毎における作業実施可能量(作業スピード×作業時間)を計算する。例えば、図11に示される8/1における作業実施可能量(160)は、(Aの作業スピード×Aの作業時間)+(Dの作業スピード×Dの作業時間)+(Fの作業スピード×Fの作業時間)+(Gの作業スピード×Gの作業時間)で計算される。なお、ここで、短期計画の期間毎に計算される作業実施可能量は、中期計画策定時を基準とした過去x日間の出勤希望者の作業スピードで計算される。例えば、8/1~8/5の中期計画を7/31に策定した場合、8/1,8/2,8/3,8/4,8/5の短期計画の期間毎における作業実施可能量は、7/31以前のx日間の出勤希望者の作業スピードで計算される。 Next, the CPU 110 calculates the workable amount (work speed × work time) for each period of the short-term plan. For example, the workable amount (160) in 8/1 shown in FIG. 11 is (work speed of A × work time of A) + (work speed of D × work time of D) + (work speed of F ×). It is calculated by (working time of F) + (working speed of G x working time of G). Here, the workable amount calculated for each period of the short-term plan is calculated based on the work speed of those who wish to go to work for the past x days based on the time when the medium-term plan is formulated. For example, if the medium-term plan from 8/1 to 8/5 is formulated on 7/31, work can be carried out every period of the short-term plan of 8/1, 8/2, 8/3, 8/4, 8/5. The amount is calculated based on the work speed of those who wish to go to work for x days before 7/31.

(ステップS300)
なお、端末300は、農場の作業者毎に入力されたシフトの希望に基づいてシフト予定データを作成する。ここでは、農場の管理者などが、端末300を用いて、農場の作業者毎の、作業への参加が可能な日時に関する情報や作業への参加が不可能な日時に関する情報などをサーバ100にアップロードする。例えば、作業者は、図3に示されるようなシフト希望シートに、作業の参加を希望する日時を書き込んでもよい。この場合、農場の管理者などが、端末300や他のスキャナーなどを用いて当該シフト希望シートを読み込んで、端末300またはサーバ100で画像解析をすることによって、作業者毎のシフトの希望をサーバ100に自動的に蓄積させる。
(Step S300)
The terminal 300 creates shift schedule data based on the shift request input for each farm worker. Here, the farm manager or the like uses the terminal 300 to send information on the date and time when the farm worker can participate in the work, information on the date and time when the work cannot be participated, and the like to the server 100. Upload. For example, the worker may write the date and time when he / she wishes to participate in the work on the shift request sheet as shown in FIG. In this case, the farm manager or the like reads the shift request sheet using the terminal 300 or another scanner, and performs image analysis on the terminal 300 or the server 100 to obtain the shift request for each worker on the server. It is automatically accumulated in 100.

(ステップS350)
そして、短期計画が行われている段階で、ステップS500で入力される作業の実績に基づいて、中期計画の調整が行われる。
(Step S350)
Then, at the stage where the short-term plan is being carried out, the medium-term plan is adjusted based on the work results input in step S500.

より詳細には、CPU110は、図11(A)に示されるように、ステップS500において作業実績量が入力されている場合に、短期計画の期間毎における作業必要量と作業実績量とを比較する。そして、CPU110は、図11(A)に示されるように、作業実績量が作業必要量よりも少ない場合に、作業不足量を自動的に計算する。そして、CPU110は、作業不足量を分割し、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配する。例えば、図11(A)→(B)に示されるように、8/2において作業不足量(60)が計算された場合に、8/2における作業不足量(60)は、分割されて8/2より後の短期計画の期間毎における作業必要量に追加分配されている。 More specifically, as shown in FIG. 11A, when the work actual amount is input in step S500, the CPU 110 compares the work required amount and the work actual amount for each period of the short-term plan. .. Then, as shown in FIG. 11A, the CPU 110 automatically calculates the work shortage amount when the work actual amount is smaller than the work required amount. Then, the CPU 110 divides the work shortage amount and additionally distributes it to the work required amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For example, as shown in FIGS. 11 (A) → (B), when the work shortage amount (60) is calculated in 8/2, the work shortage amount (60) in 8/2 is divided into 8 It is additionally distributed to the work requirement for each period of the short-term plan after / 2.

なお、ここで、CPU110は、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業実施可能量に基づいて、作業不足量を分割している。例えば、図11(A)→(B)では、8/2における作業不足量(60)が、8/3における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=1:7:4の比で分割されている。そして、8/3における作業必要量に5が追加分配され、8/4における作業必要量に35が追加分配され、8/5における作業必要量に20が追加分配されている。また、図示しないが、8/2における作業不足量(60)が、8/3における出勤希望者の人数:8/4における出勤希望者の人数:8/5における出勤希望者の人数=4:5:4の比で分割され、8/2,8/3,8/4それぞれに追加分配されてもよい。 Here, the CPU 110 divides the work shortage amount based on the work enablement amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For example, in FIGS. 11 (A) to 11 (B), the work shortage amount (60) on 8/2 is the workable amount on 8/3-workable amount: workable amount on 8/4-workable amount: 8 It is divided by the ratio of workable amount at / 5 work required amount = 1: 7: 4. Then, 5 is additionally distributed to the work required amount on 8/3, 35 is additionally distributed to the work required amount on 8/4, and 20 is additionally distributed to the work required amount on 8/5. Although not shown, the amount of work shortage (60) on 8/2 is the number of applicants for work on 8/3: the number of applicants for work on 8/4: the number of applicants for work on 8/5 = 4: It may be divided at a ratio of 5: 4 and additionally distributed to each of 8 / 2,8 / 3,8 / 4.

(ステップS400)
そして、農場の管理者などは、図11に示される画面データ、各作業者のシフトの希望を参照して、サーバ100から提供される農作業管理サービスを利用しながら、毎時間帯に参加する出勤希望者に作業を割り当てたりする。
(Step S400)
Then, the farm manager or the like refers to the screen data shown in FIG. 11 and each worker's desire to shift, and while using the farm work management service provided by the server 100, attends work every hour. Assign work to those who want it.

なお、ここで、出勤希望者に作業を割り当てる方法として、例えば、CPU110が通信インターフェイス160を介して端末300からのドラッグアンドドロップ操作を受け付けて出勤希望者に作業を割り当てる方法や、CPU110が「出勤希望者の作業スピード順」、「出勤希望者の累積作業時間順」、「出勤希望者の作業スピード+出勤希望者の累積作業時間順」、「無作為」などの選出方法によって出勤希望者に作業を自動的に割り当てる方法などが考えられる。 Here, as a method of allocating the work to the person who wants to go to work, for example, a method in which the CPU 110 accepts a drag-and-drop operation from the terminal 300 via the communication interface 160 and assigns the work to the person who wants to go to work, or the CPU 110 "goes to work". For those who wish to go to work by selection methods such as "order of work speed of applicants", "order of cumulative work hours of applicants for work", "work speed of applicants for work + cumulative work hours of applicants for work", "random work" A method of automatically allocating work can be considered.

(ステップS500)
その後、作業を割り当てられた出勤希望者による作業実績の結果がサーバ100にアップロードされる。本発明の実施形態において、図11に示されるような作業実績量や、作業者毎の所定量の作業に実際にかかった時間などが、検知器200などを利用して計測され、自動的にサーバ100にアップロードされる。そして、サーバ100は、アップロードされた作業実績の結果をもとに作業実績データ122や作業計画表データ126などを更新する。例えば、サーバ100は、図11(B)に示されるように、8/1の作業が終えた段階で作業実績量(100)を反映し、8/2の作業が終えた段階で作業実績量(40)を反映する。
(Step S500)
After that, the result of the work results by the person who wants to go to work assigned the work is uploaded to the server 100. In the embodiment of the present invention, the actual amount of work as shown in FIG. 11 and the time actually taken for a predetermined amount of work for each worker are measured by using a detector 200 or the like and automatically. It is uploaded to the server 100. Then, the server 100 updates the work result data 122, the work plan table data 126, and the like based on the uploaded work result result. For example, as shown in FIG. 11B, the server 100 reflects the actual work amount (100) at the stage when the work of 8/1 is completed, and the actual amount of work at the stage when the work of 8/2 is completed. Reflect (40).

(ステップS600、S700)
その他、病害虫に関する記録や、収穫や出荷、売上の記録などがサーバ100にアップロードされる。なお、ステップS600およびS700おいて、これまでの入力データはまとめてサーバ100にアップロードされてもよいし、ステップ毎に入力データがアップロードされてもよいし、1つのデータを入力するたびに当該データがサーバ100にアップロードされてもよい。
(Steps S600, S700)
In addition, records related to pests, harvests, shipments, sales records, etc. are uploaded to the server 100. In steps S600 and S700, the input data so far may be collectively uploaded to the server 100, the input data may be uploaded for each step, or the data may be uploaded each time one data is input. May be uploaded to the server 100.

(ステップS800)
そして、中期計画終了日である場合(ステップS800にてYESである場合)、ステップS900の処理が実行される。また、中期計画終了日ではない場合(ステップS800にてNOである場合)、サーバ100および端末300においてステップS350からの処理が繰り返される。
(Step S800)
Then, when it is the end date of the medium-term plan (YES in step S800), the process of step S900 is executed. If it is not the end date of the medium-term plan (NO in step S800), the process from step S350 is repeated in the server 100 and the terminal 300.

(ステップS900)
そして、農場の管理者などからの終了操作(ステップS900にてYESである場合)を受け付けると今回の作業は終了し、農場の管理者などからの次の中期計画策定のための命令(ステップS900にてNOである場合)を受け付けるとステップS200またはステップS300からの処理が繰り返される。
(Step S900)
Then, when the end operation (if YES in step S900) is received from the farm manager or the like, this work is completed and the order for the next medium-term plan formulation from the farm manager or the like (step S900). If NO) is accepted, the process from step S200 or step S300 is repeated.

以上の通り、本発明の実施形態に係る農作物生産管理システム1は、全体として、図14の機能ブロック図に示されるように、入力装置300A、長期計画作成部100A、中期計画作成部100B、短期計画作成部100C、シフト予定作成部100D、作業スピード計算部100E、作業記録入力部100F、病害虫入力部100G、収出荷・売上記録入力部100H、記憶部120A、画面生成部100K、表示装置300B、作業計画調整部100Iなどを有する。なお、図14に示されるように、中期計画作成部100Bは特許請求の範囲に記載の作業予定量分配部100Pを含み、作業記録入力部100Fは特許請求の範囲に記載の作業実績量入力部100Sを含み、作業計画調整部100Iは特許請求の範囲に記載の作業量不足単位期間特定部100Qおよび作業不足量追加分配部100Rを含む。 As described above, the agricultural product production management system 1 according to the embodiment of the present invention has an input device 300A, a long-term plan creation unit 100A, a medium-term plan creation unit 100B, and a short-term plan as a whole, as shown in the functional block diagram of FIG. Plan creation unit 100C, shift schedule creation unit 100D, work speed calculation unit 100E, work record input unit 100F, pest input unit 100G, collection / shipment / sales record input unit 100H, storage unit 120A, screen generation unit 100K, display device 300B, It has a work plan adjustment unit 100I and the like. As shown in FIG. 14, the medium-term plan creation unit 100B includes the work schedule amount distribution unit 100P described in the claims, and the work record input unit 100F is the work record input unit 100F described in the claims. 100S is included, and the work plan adjustment unit 100I includes the work amount shortage unit period specifying unit 100Q and the work shortage amount additional distribution unit 100R described in the claims.

そして、入力装置300Aは、例えば、検知器200や端末300の操作部340などによって実現される。表示装置300Bは、例えば、端末300のディスプレイ330などによって実現される。記憶部120Aは、例えば、サーバ100のメモリ120などによって実現される。長期計画作成部100Aは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS100などに対応する。中期計画作成部100Bは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS200などに対応する。短期計画作成部100Cは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS400などに対応する。シフト予定作成部100Dは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS300などに対応する。作業スピード計算部100Eは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現される。作業記録入力部100Fは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS500などに対応する。病害虫入力部100Gは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS600などに対応する。収出荷・売上記録入力部100Hは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS700などに対応する。画面生成部100Kは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、端末300に提供するための、図11に示されるようなWebページを作成する。作業計画調整部100Iは、例えば、サーバ100のCPU110がメモリ120のプログラムを実行することによって実現され、図9のステップS350などに対応する。 The input device 300A is realized by, for example, a detector 200, an operation unit 340 of the terminal 300, or the like. The display device 300B is realized by, for example, the display 330 of the terminal 300. The storage unit 120A is realized by, for example, the memory 120 of the server 100. The long-term plan creation unit 100A is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S100 of FIG. The medium-term plan creation unit 100B is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to step S200 of FIG. The short-term plan creation unit 100C is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S400 of FIG. The shift schedule creation unit 100D is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S300 of FIG. The work speed calculation unit 100E is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120. The work record input unit 100F is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S500 of FIG. The pest input unit 100G is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S600 of FIG. The receipt / shipment / sales record input unit 100H is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S700 of FIG. The screen generation unit 100K creates, for example, a Web page as shown in FIG. 11 which is realized by the CPU 110 of the server 100 executing the program of the memory 120 and provided to the terminal 300. The work plan adjustment unit 100I is realized, for example, by the CPU 110 of the server 100 executing the program of the memory 120, and corresponds to the step S350 of FIG.

<本発明の実施形態に係る農作物生産管理システムの特徴>
(1)
本発明の実施形態に係る農作物生産管理システム1では、サーバ100のCPU110が、短期計画の期間毎における作業必要量と作業実績量とを比較し、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算する。そして、サーバ100のCPU110は、作業不足量を分割し、作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配する。このため、この農作物生産管理システム1では、作業実績量が作業必要量に達しない日や、天候悪化・作業人員の都合等により作業中止日が生じた場合でも、農作業管理者などに重い負担をかけずにすむ。
<Characteristics of the crop production management system according to the embodiment of the present invention>
(1)
In the agricultural product production management system 1 according to the embodiment of the present invention, when the CPU 110 of the server 100 compares the work required amount and the work actual amount for each period of the short-term plan, and the work actual amount is smaller than the work required amount. Automatically calculate the amount of work shortage. Then, the CPU 110 of the server 100 divides the work shortage amount and additionally distributes it to the work required amount for each short-term plan period after the short-term plan period in which the work shortage occurs. For this reason, in this agricultural product production management system 1, even if the actual amount of work does not reach the required amount of work, or the work is canceled due to bad weather, the convenience of workers, etc., a heavy burden is placed on the agricultural work manager and the like. You don't have to call.

(2)
本発明の実施形態に係る農作物生産管理システム1では、作業実施可能量または出勤希望者数の人数に基づいて、作業不足量を短期計画の期間に追加分配することができる。このため、この農作物生産管理システム1では、作業計画を適切に調整することができる。
(2)
In the crop production management system 1 according to the embodiment of the present invention, the work shortage amount can be additionally distributed during the short-term plan period based on the workable amount or the number of people who wish to go to work. Therefore, in this crop production management system 1, the work plan can be appropriately adjusted.

<変形例>
(A)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎に天気・災害情報を設定し、天気・災害情報が雨、雪、台風(例えば、作業を困難にするもの)などである短期計画の期間毎における作業必要量を調整してもよい。例えば、CPU110は、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間における作業必要量を分割して、雨、雪、台風などの天気・災害情報が設定されていない短期計画の期間毎における作業必要量に追加分配する。例えば、図12(A)→(B)に示されるように、8/3に雨が設定されている場合に、8/3における作業必要量(100)は、分割されて8/3を除いた短期計画の期間毎における作業必要量に追加分配されている。なお、CPU110は、天気予報サービスと連動して短期計画の期間毎に予想される天気・災害情報を設定するか、通信インターフェイス160を介して端末300から入力される天気・災害情報を短期計画の期間毎に設定する。
<Modification example>
(A)
Although not mentioned in the previous embodiment, the CPU 110 sets the weather / disaster information for each period of the short-term plan, and the weather / disaster information is rain, snow, typhoon (for example, something that makes work difficult). The work requirement may be adjusted for each period of a short-term plan. For example, the CPU 110 divides the work required amount in the period of the short-term plan in which the weather / disaster information such as rain, snow, and typhoon is set, and the weather / disaster information such as rain, snow, and typhoon is not set. Additional distribution to the work requirement for each period of the short-term plan. For example, as shown in FIGS. 12 (A) → (B), when rain is set on 8/3, the work requirement (100) on 8/3 is divided and excludes 8/3. It is additionally distributed to the work requirement for each period of the short-term plan. The CPU 110 sets the expected weather / disaster information for each period of the short-term plan in conjunction with the weather forecast service, or sets the weather / disaster information input from the terminal 300 via the communication interface 160 for the short-term plan. Set for each period.

なお、図12では、CPU110は、雨、雪、台風などの天気・災害情報が設定されていない短期計画の期間における作業実施可能量に基づいて、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間における作業必要量を分割している。例えば、図12(A)→(B)では、8/3における作業必要量(100)が、8/1における作業可能量-作業必要量:8/2における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=6:3:7:4の比で分割されている。そして、8/1における作業必要量に30が追加分配され、8/2における作業必要量に15が追加分配され、8/4における作業必要量に35が追加分配され、8/5における作業必要量に20が追加分配されている。なお、図示しないが、8/3における作業必要量(100)が、8/1における出勤希望者の人数:8/2における出勤希望者の人数:8/4における出勤希望者の人数:8/5における出勤希望者の人数=4:3:5:4の比で分割され、8/1,8/2,8/4,8/5それぞれに追加分配されてもよい。 In FIG. 12, the CPU 110 provides weather / disaster information such as rain, snow, and typhoon based on the workable amount during the short-term plan period in which the weather / disaster information such as rain, snow, and typhoon is not set. The work requirement for the set short-term plan period is divided. For example, in FIGS. 12 (A) → (B), the work required amount (100) in 8/3 is the workable amount in 8/1-workable amount: workable amount in 8/2-work required amount: 8. It is divided by the ratio of workable amount in / 4-workable amount: workable amount in 8/5-workable amount = 6: 3: 7: 4. Then, 30 is additionally distributed to the work required amount on 8/1, 15 is additionally distributed to the work required amount on 8/2, 35 is additionally distributed to the work required amount on 8/4, and the work required on 8/5. 20 is additionally distributed to the quantity. Although not shown, the required work amount (100) on 8/3 is the number of applicants for work on 8/1: the number of applicants for work on 8/2: the number of applicants for work on 8/4: 8 / It may be divided in the ratio of the number of applicants for work in 5 = 4: 3: 5: 4, and may be additionally distributed to each of 8/1, 8/2, 8/4, 8/5.

なお、変形例(A)が適用された場合、CPU110は、雨、雪、台風などの天気・災害情報が設定されている短期計画の期間には、分割された作業不足量を追加分配しない。例えば、図12(B)→(C)に示されるように、8/2において作業不足量(11)が計算された場合に、雨が設定されている8/3には、8/2における作業不足量(11)分割した作業不足量が追加分配されていない。 When the modification (A) is applied, the CPU 110 does not additionally distribute the divided work shortage during the period of the short-term plan in which the weather / disaster information such as rain, snow, and typhoon is set. For example, as shown in FIG. 12 (B) → (C), when the work shortage amount (11) is calculated in 8/2, the rain is set in 8/3 in 8/2. Work shortage (11) The divided work shortage is not additionally distributed.

(B)
変形例(A)が適用される場合、CPU110は、雨、雪、台風などの天気・災害情報が短期計画の期間に設定されていても、作業場所によっては、その短期計画の期間における作業必要量を分割して他の短期計画の期間における作業必要量に追加分配しなくてもよい。例えば、雨が設定されていたとしても作業場所がビニールハウスなどであれば、雨の影響を受けずに作業を行うことができるからである。かかる場合、CPU110は、端末300からの作業場所の入力を受け付けて作業計画表データ126に作業場所を設定し、作業場所とその作業場所で作業可能な天気・災害情報とを関連付けたデータなどを読み込む。そして、CPU110は、読み込んだデータを参照し、雨、雪、台風などの天気・災害情報が設定されている場合に他の短期計画の期間における作業必要量に追加分配するかどうかを判断する。または、CPU110は、作業計画表データ126にチェックボックスを表示させ、端末300からチェックボックスにチェックを入れる操作等がされたかどうかで他の短期計画の期間における作業必要量に追加分配するかどうかを判断する。
(B)
When the modification (A) is applied, the CPU 110 needs to work in the short-term plan period depending on the work place even if the weather / disaster information such as rain, snow, and typhoon is set in the short-term plan period. It is not necessary to divide the amount and additionally distribute it to the work requirement in the period of other short-term plans. For example, even if rain is set, if the work place is a vinyl house or the like, the work can be performed without being affected by the rain. In such a case, the CPU 110 accepts the input of the work place from the terminal 300, sets the work place in the work plan table data 126, and inputs the data associated with the work place and the weather / disaster information that can be worked at the work place. Read. Then, the CPU 110 refers to the read data and determines whether or not to additionally distribute the work required amount in the period of another short-term plan when the weather / disaster information such as rain, snow, and typhoon is set. Alternatively, the CPU 110 displays a check box in the work plan table data 126, and determines whether to additionally distribute to the work required amount in the period of another short-term plan depending on whether or not the operation of checking the check box is performed from the terminal 300. to decide.

(C)
先の実施形態に係る農作物生産管理システム1では、CPU110は、中期計画における作業必要量を均等に分割し、短期計画の期間毎に分配していた。しかし、CPU110は、短期計画の期間毎における作業実施可能量の計算結果や短期計画の期間毎における出勤希望者数などに基づいて、中期計画における作業必要量を不均等に分割し、短期計画の期間毎に分配してもよい。例えば、CPU110は、分割した中期計画における作業必要量のうち最も大きいものを作業実施可能量が最も大きい(または、出勤希望者数が最も多いなど)短期計画の期間に分配したり、分割した中期計画における作業必要量のうち最も小さいものを作業実施可能量が最も小さい(または、出勤希望者数が最も少ないなど)短期計画の期間に分配したりする。
(C)
In the crop production management system 1 according to the previous embodiment, the CPU 110 evenly divides the work required amount in the medium-term plan and distributes it for each period of the short-term plan. However, the CPU 110 unevenly divides the work required amount in the medium-term plan based on the calculation result of the workable amount in each period of the short-term plan and the number of applicants for work in each period of the short-term plan, and the short-term plan It may be distributed by period. For example, the CPU 110 distributes the largest amount of work required in the divided medium-term plan to the period of the short-term plan having the largest workable amount (or the largest number of applicants for work, etc.), or the divided medium-term plan. The smallest amount of work required in the plan may be distributed to the period of the short-term plan with the smallest workable amount (or the least number of applicants for work, etc.).

(D)
先の実施形態に係る農作物生産管理システム1では、作業実績量などが、検知器200などを利用して計測され、自動的にサーバ100にアップロードされていた。しかし、農場の管理者などが端末300を用いて作業実績量などを入力することで、サーバ100に作業実績量などが蓄積されてもよい。
(D)
In the crop production management system 1 according to the previous embodiment, the actual amount of work and the like are measured by using the detector 200 and the like, and are automatically uploaded to the server 100. However, the farm manager or the like may accumulate the work record amount or the like on the server 100 by inputting the work record amount or the like using the terminal 300.

(E)
先の実施形態に係る農作物生産管理システム1では、CPU110は、作業実績量が入力されている場合に、短期計画の期間毎における作業必要量と作業実績量とを比較し、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算していた。しかし、CPU110は、端末300から作業不足量を入力する操作を受け付け、受け付けた作業不足量を設定して作業不足が発生していることを判定してもよい。
(E)
In the crop production management system 1 according to the previous embodiment, when the actual work amount is input, the CPU 110 compares the required amount of work and the actual work amount for each period of the short-term plan, and the actual work amount is the work. The amount of work shortage was automatically calculated when it was less than the required amount. However, the CPU 110 may accept an operation for inputting a work shortage amount from the terminal 300, set the accepted work shortage amount, and determine that a work shortage has occurred.

(F)
先の実施形態に係る農作物生産管理システム1では、CPU110は、作業実績量が作業必要量よりも少ない場合に作業不足量を自動的に計算し、作業不足量を分割して作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配していた。しかし、CPU110は、端末300からの操作(例えば、端末300に表示される調整ボタンをマウスポインタでクリックする操作など)が行われた場合にのみ作業不足量を計算し、その作業不足量を分割して作業不足が発生した短期計画の期間より後の短期計画の期間毎における作業必要量に追加分配してもよい。かかる場合、CPU110が図9に示されるステップS350の処理を繰り返す必要がなくなる。
(F)
In the crop production management system 1 according to the previous embodiment, the CPU 110 automatically calculates the work shortage amount when the work actual amount is smaller than the work required amount, divides the work shortage amount, and the work shortage occurs. It was additionally distributed to the work requirement for each period of the short-term plan after the period of the short-term plan. However, the CPU 110 calculates the work shortage amount only when an operation from the terminal 300 (for example, an operation of clicking the adjustment button displayed on the terminal 300 with the mouse pointer) is performed, and divides the work shortage amount. Then, it may be additionally distributed to the work requirement for each period of the short-term plan after the period of the short-term plan in which the work shortage occurs. In such a case, the CPU 110 does not need to repeat the process of step S350 shown in FIG.

(G)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎における作業実績量の初期値を0に設定しておいてもよい。かかる場合、CPU110は、作業不足が発生している短期計画の期間を、短期計画の期間毎に設けられたチェックボックスにチェックが入っているかなどの情報に基づいて特定する。または、CPU110は、作業不足が発生している短期計画の期間を、作業が行われて作業実績量に0以外の数値が入力されたことを認識して作業必要量から作業実績量を差し引き、その差が正の値であることをもって特定する。
(G)
Although not mentioned in the previous embodiment, the CPU 110 may set the initial value of the work actual amount for each period of the short-term plan to 0. In such a case, the CPU 110 specifies the period of the short-term plan in which the work shortage occurs, based on information such as whether or not the check box provided for each period of the short-term plan is checked. Alternatively, the CPU 110 recognizes that the work has been performed and a numerical value other than 0 has been input to the work actual amount during the short-term plan period in which the work shortage has occurred, and subtracts the work actual amount from the work required amount. It is specified by the fact that the difference is a positive value.

(H)
先の実施形態では言及しなかったが、CPU110は、短期計画の期間毎における作業必要量と作業実績量とを比較して、作業実績量が作業必要量よりも多いと判断した場合に、作業超過量を計算してもよい。そして、CPU110は、作業超過量が発生した短期計画の期間より後の短期計画の期間毎における作業必要量から作業超過量分を差し引いてもよい。例えば、図13(A)→(B)に示されるように、8/2において作業超過量(30)が発生した場合に、CPU110は、作業超過量を均等に分割し、8/3,8/4,8/5における作業必要量から分割した作業超過量を差し引いてもよい。なお、図示しないが、CPU110は、作業実施可能量の計算結果や出勤希望者数などに基づいて作業超過量を不均等に分割し、作業超過が発生した短期計画の期間より後の期間における作業必要量から分割した作業超過量を差し引いてもよい。例えば、CPU110は、8/2における作業超過量(30)を、8/3における作業可能量-作業必要量:8/4における作業可能量-作業必要量:8/5における作業可能量-作業必要量=1:7:4の比で分割する。そして、CPU110は、例えば、作業可能量-作業必要量の値が大きい短期計画の期間からは分割後の値が小さい作業超過量を差し引くようにし、作業可能量-作業必要量の値が小さい短期計画の期間からは分割後の値が大きい作業超過量を差し引くようにする。なお、図示しないが、CPU110は、作業超過が発生した短期計画の期間より後のいずれか1期間における作業必要量から作業超過量を差し引いてもよい。例えば、CPU110は、出勤回数の多い出勤希望者が居る短期計画の期間の作業必要量から作業超過量を差し引いてもよいし、出勤が連続している出勤希望者が居る短期計画の期間の作業必要量から作業超過量を差し引いてもよい。
(H)
Although not mentioned in the previous embodiment, the CPU 110 compares the work required amount and the work actual amount for each period of the short-term plan, and when it is determined that the work actual amount is larger than the work required amount, the work is performed. The excess amount may be calculated. Then, the CPU 110 may subtract the work excess amount from the work requirement amount for each short-term plan period after the short-term plan period in which the work excess amount occurs. For example, as shown in FIGS. 13A → 13B, when the work excess amount (30) occurs in 8/2, the CPU 110 evenly divides the work excess amount into 8/3, 8 The divided work excess amount may be subtracted from the work requirement amount at / 4, 8/5. Although not shown, the CPU 110 unevenly divides the excess work amount based on the calculation result of the workable amount and the number of applicants for work, and the work in the period after the short-term plan period in which the excess work occurs. The divided work excess amount may be subtracted from the required amount. For example, the CPU 110 sets the work excess amount (30) on 8/2 as the workable amount on 8/3-workable amount on 8/4-workable amount on 8/4-workable amount on 8/5-work. Divide by the ratio of required amount = 1: 7: 4. Then, the CPU 110, for example, subtracts the work excess amount having a small post-division value from the period of the short-term plan having a large workable amount-work required amount, and has a short-term workable amount-work required amount value. The amount of work excess with a large post-division value should be deducted from the planning period. Although not shown, the CPU 110 may subtract the work excess amount from the work requirement amount in any one period after the period of the short-term plan in which the work excess occurs. For example, the CPU 110 may subtract the excess work amount from the work required amount in the short-term plan period in which there are many attendance applicants, or the work in the short-term plan period in which there are continuous attendance applicants. The excess work amount may be subtracted from the required amount.

変形例(H)が適用された農作物生産管理システム1では、作業超過が発生した短期計画の期間より後の期間における作業必要量を削ることができ、作業が計画以上に進んだ場合に積極的に出勤希望者に休息を与えることができる。 In the crop production management system 1 to which the modification (H) is applied, it is possible to reduce the amount of work required in the period after the period of the short-term plan in which the overwork occurred, and it is positive when the work progresses beyond the plan. It is possible to give a rest to those who wish to go to work.

なお、変形例(H)が適用された場合、図14に示される作業計画調整部100Iに、特許請求の範囲に記載の作業量超過単位期間特定部および作業超過量減算部が含まれることになる。 When the modification (H) is applied, the work plan adjustment unit 100I shown in FIG. 14 includes a work amount excess unit period specifying unit and a work excess amount subtraction unit described in the claims. Become.

(I)
先の実施形態では言及しなかったが、短期計画の期間毎に例えばチェックボックスが配設され、特定のチェックボックスにチェックが入れられた場合に、CPU110は、その短期計画の期間における作業実績量を0にしてもよい。かかる場合、その短期計画の期間における作業必要量は、チェックボックスにチェックが入れられたタイミング(または、チェックボックスにチェックが入れられた後に更新ボタンがクリックされたタイミングなど)で、他の短期計画の期間に分配されることになる。
(I)
Although not mentioned in the previous embodiment, for example, when a check box is arranged for each period of the short-term plan and a specific check box is checked, the CPU 110 performs the work actual amount in the period of the short-term plan. May be 0. In such a case, the work requirement for the period of the short-term plan is the timing when the check box is checked (or the timing when the update button is clicked after the check box is checked), and the other short-term plans. Will be distributed during the period of.

(J)
先の実施形態に係る農作物生産管理システム1のサーバ100や端末300などの各装置の役割の一部または全部を他の装置が実行してもよい。例えば、図14に示される長期計画作成部100A、中期計画作成部100B、短期計画作成部100Cと、シフト予定作成部100D、作業スピード計算部100E、作業記録入力部100F、病害虫入力部100G、収出荷・売上記録入力部100H、画面生成部100K、作業計画調整部100Iが、端末300や他の装置によって実現されてもよい。
(J)
Other devices may perform a part or all of the roles of each device such as the server 100 and the terminal 300 of the crop production management system 1 according to the above embodiment. For example, the long-term plan creation unit 100A, the medium-term plan creation unit 100B, the short-term plan creation unit 100C, the shift schedule creation unit 100D, the work speed calculation unit 100E, the work record input unit 100F, the pest input unit 100G, and the sales shown in FIG. The shipping / sales record input unit 100H, the screen generation unit 100K, and the work plan adjustment unit 100I may be realized by the terminal 300 or another device.

あるいは、中期計画作成部100Bの一部または全部、作業計画調整部100Iの一部または全部、作業記録入力部100Fの一部または全部が、端末300のCPU310が、メモリ320のプログラムを実行することによって実現されてもよい。この場合は、中期計画作成部100B、作業計画調整部100I、作業記録入力部100Fにおける処理の一部または全部を実行するためのプログラムを、端末300がインターネットなどを介してダウンロード可能であることが好ましい。 Alternatively, part or all of the medium-term plan creation unit 100B, part or all of the work plan adjustment unit 100I, and part or all of the work record input unit 100F, the CPU 310 of the terminal 300 executes the program of the memory 320. May be realized by. In this case, the terminal 300 may be able to download a program for executing a part or all of the processes in the medium-term plan creation unit 100B, the work plan adjustment unit 100I, and the work record input unit 100F via the Internet or the like. preferable.

(K)
先の実施形態に係る農作物生産管理システム1やプログラムなどは、農作業に関する作業計画の調整を行うためのものであったが、上記の技術は、他の作業計画の調整に適用することができる。例えば、工場における作業計画や、建築現場における作業計画など、あらゆる作業計画の調整に適用することができる。
(K)
The crop production control system 1 and the program according to the previous embodiment were for adjusting the work plan related to the agricultural work, but the above technique can be applied to the adjustment of other work plans. For example, it can be applied to the adjustment of any work plan such as a work plan at a factory or a work plan at a construction site.

なお、上記変形例(A)~(K)は各例単独で適用されてもよいし、複数の例が組み合わされて適用されてもよい。 The modified examples (A) to (K) may be applied individually to each example, or may be applied in combination of a plurality of examples.

今回開示された実施形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した説明ではなく、特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 The embodiments disclosed this time should be considered to be exemplary and not restrictive in all respects. The scope of the present invention is shown by the scope of claims, not the above description, and is intended to include all modifications within the meaning and scope equivalent to the scope of claims.

1 :農作物生産管理システム
100 :サーバ
110 :CPU
100P :作業予定量分配部
100Q :作業量不足単位期間特定部
100R :作業不足量追加分配部
100S :作業実績量入力部
1: Agricultural product production management system 100: Server 110: CPU
100P: Scheduled work amount distribution unit 100Q: Work amount shortage unit period specification unit 100R: Work shortage amount additional distribution unit 100S: Work record amount input unit

Claims (5)

複数の単位期間から成る特定期間の作業予定量を前記単位期間に分配する作業予定量分配部と、
前記単位期間における作業実績量を、対応する前記単位期間に関連付けて入力する作業実績量入力部と、
前記作業実績量が前記作業予定量を下回る単位期間を特定する作業量不足単位期間特定部と、
前記作業量不足単位期間特定部により特定された前記単位期間において前記作業予定量から前記作業実績量を差し引いて求められる作業不足量を、前記作業実績量入力部により前記作業実績量が入力されていない前記単位期間に追加分配する作業不足量追加分配部と
を備える、農作物生産管理システム。
A work schedule amount distribution unit that distributes a work schedule amount for a specific period consisting of a plurality of unit periods to the unit period, and a work schedule amount distribution unit.
A work record amount input unit that inputs the work record amount in the unit period in association with the corresponding unit period,
Insufficient work amount to specify the unit period in which the actual work amount is less than the planned work amount.
The work shortage amount obtained by subtracting the work actual amount from the work scheduled amount in the unit period specified by the work amount shortage unit period specific unit is input by the work actual amount input unit. A crop production management system including a work shortage additional distribution unit for additional distribution during the unit period.
前記作業不足量追加分配部は、(a)前記単位期間における作業候補者の人数および(b)前記単位期間における作業候補者の作業遂行能力の少なくとも一方に基づいて、前記作業不足量を前記単位期間に追加分配する
請求項1に記載の農作物生産管理システム。
The work shortage additional distribution unit determines the work shortage amount as the unit based on at least one of (a) the number of work candidates in the unit period and (b) the work execution ability of the work candidate in the unit period. The crop production management system according to claim 1, which is additionally distributed over a period.
前記作業実績量が前記作業予定量を上回る単位期間を特定する作業量超過単位期間特定部と、
前記作業量超過単位期間特定部により特定された前記単位期間において前記作業実績量から前記作業予定量を差し引いて求められる作業超過量を、前記作業実績量が未入力である少なくとも一つの前記単位期間に対応する前記作業予定量から差し引く作業超過量減算部と
をさらに備える、請求項1または2に記載の農作物生産管理システム。
A work amount excess unit period specifying unit that specifies a unit period in which the actual work amount exceeds the planned work amount,
Work amount excess unit period At least one said unit period in which the work actual amount is not input, the work excess amount obtained by subtracting the work scheduled amount from the work actual amount in the unit period specified by the specific unit. The crop production management system according to claim 1 or 2, further comprising a work excess amount subtraction unit to be subtracted from the work scheduled amount corresponding to the above.
コンピュータに対して
複数の単位期間から成る特定期間の作業予定量を前記単位期間に分配させる作業予定量分配ステップと、
前記単位期間における作業実績量を、対応する前記単位期間に関連付けて入力させる作業実績量入力受付ステップと、
前記作業実績量が前記作業予定量を下回る単位期間を特定させる作業量不足単位期間特定ステップと、
前記作業量不足単位期間特定ステップにおいて特定された前記単位期間において前記作業予定量から前記作業実績量を差し引いて求められる作業不足量を、前記作業実績量入力受付ステップにおいて前記作業実績量が入力されていない前記単位期間に追加分配させる作業不足量追加分配ステップと
を備える、農作物生産管理プログラム。
A work schedule distribution step that causes a computer to distribute a work schedule amount of a specific period consisting of a plurality of unit periods to the unit period.
A work record amount input reception step for inputting the work record amount in the unit period in association with the corresponding unit period, and
Insufficient work amount to specify a unit period in which the actual work amount is less than the planned work amount.
The work shortage amount obtained by subtracting the work actual amount from the work scheduled amount in the unit period specified in the work amount shortage unit period specific step is input, and the work actual amount is input in the work actual amount input reception step. A crop production management program comprising an additional distribution step for work shortages to be additionally distributed during the above unit period.
コンピュータに対して
複数の単位期間から成る特定期間の作業予定量を前記単位期間に分配させる作業予定量分配ステップと、
前記単位期間における作業実績量を、対応する前記単位期間に関連付けて入力させる作業実績量入力受付ステップと、
前記作業実績量が前記作業予定量を下回る単位期間を特定させる作業量不足単位期間特定ステップと、
前記作業量不足単位期間特定ステップにおいて特定された前記単位期間において前記作業予定量から前記作業実績量を差し引いて求められる作業不足量を、前記作業実績量入力受付ステップにおいて前記作業実績量が入力されていない前記単位期間に追加分配させる作業不足量追加分配ステップと
を備える、農作物生産管理方法。

A work schedule distribution step that causes a computer to distribute a work schedule amount of a specific period consisting of a plurality of unit periods to the unit period.
A work record amount input reception step for inputting the work record amount in the unit period in association with the corresponding unit period, and
Insufficient work amount to specify a unit period in which the actual work amount is less than the planned work amount.
The work shortage amount obtained by subtracting the work actual amount from the work scheduled amount in the unit period specified in the work amount shortage unit period specific step is input, and the work actual amount is input in the work actual amount input reception step. A crop production management method comprising a work shortage additional distribution step for additional distribution during the unit period.

JP2020187921A 2020-11-11 2020-11-11 Crop production control systems, information processing methods, and programs Active JP6892085B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020187921A JP6892085B1 (en) 2020-11-11 2020-11-11 Crop production control systems, information processing methods, and programs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020187921A JP6892085B1 (en) 2020-11-11 2020-11-11 Crop production control systems, information processing methods, and programs

Publications (2)

Publication Number Publication Date
JP6892085B1 JP6892085B1 (en) 2021-06-18
JP2022077187A true JP2022077187A (en) 2022-05-23

Family

ID=76432634

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020187921A Active JP6892085B1 (en) 2020-11-11 2020-11-11 Crop production control systems, information processing methods, and programs

Country Status (1)

Country Link
JP (1) JP6892085B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004258808A (en) * 2003-02-24 2004-09-16 Fujitsu Ltd Apparatus and program for preparing work plan
JP2006076768A (en) * 2004-09-13 2006-03-23 Toyota Industries Corp Work management system and work management method
JP2009064231A (en) * 2007-09-06 2009-03-26 Agri Support Network Kk Management program for production history
JP2016071499A (en) * 2014-09-29 2016-05-09 株式会社富士通エフサス Work process supervising device, work process supervising method, and work process supervising program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004258808A (en) * 2003-02-24 2004-09-16 Fujitsu Ltd Apparatus and program for preparing work plan
JP2006076768A (en) * 2004-09-13 2006-03-23 Toyota Industries Corp Work management system and work management method
JP2009064231A (en) * 2007-09-06 2009-03-26 Agri Support Network Kk Management program for production history
JP2016071499A (en) * 2014-09-29 2016-05-09 株式会社富士通エフサス Work process supervising device, work process supervising method, and work process supervising program

Also Published As

Publication number Publication date
JP6892085B1 (en) 2021-06-18

Similar Documents

Publication Publication Date Title
US6192346B1 (en) Vacations and holiday scheduling method and system having a bidding object which enables employees to bid and prevent from bidding if higher priority employees have not bid
US5911134A (en) Method for planning, scheduling and managing personnel
US5185780A (en) Method for predicting agent requirements in a force management system
US7987105B2 (en) Traffic based labor allocation method and system
US7487106B2 (en) System and method for managing mobile workers
US5325292A (en) Tour/schedule generation for a force management system
US5289368A (en) Force management system user interface
US7069229B1 (en) Method and apparatus for planning and monitoring multiple tasks and employee work performance based on user defined criteria and predictive ability
WO1996042062A9 (en) Vacation and holiday scheduling system
US20150242782A1 (en) Interactive Planning Method And Tool
US10037500B2 (en) System and method for automatic shrinkage forecasting
KR20030068661A (en) Integrated construction management system and method using portable terminal
Pergher et al. A multi-attribute decision model for setting production planning parameters
US8688596B2 (en) Project activity reporting
Rahmat et al. The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects
WO1992007318A1 (en) Method and system for planning, scheduling and managing personnel
US20130138471A1 (en) Planning and scheduling tool assistant
JPH03268098A (en) Building maintenance control system
JP6892085B1 (en) Crop production control systems, information processing methods, and programs
JP2021144756A (en) Project plan formulation system
KR20230012229A (en) Collaborative project management platform and method of the same
JP6632104B1 (en) Crop production management system, server, information processing method, terminal, and program
Noor Measuring construction labor productivity by daily visits
Dzhusoev et al. Selection of Software Products for the Development of a Calendar Plan for High-Rise Construction
JP6611025B1 (en) Crop production management system, server, information processing method, terminal, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201125

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20201125

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20210210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210216

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210326

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210427

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210518

R150 Certificate of patent or registration of utility model

Ref document number: 6892085

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150