JP2021168008A - Program and information processing apparatus - Google Patents

Program and information processing apparatus Download PDF

Info

Publication number
JP2021168008A
JP2021168008A JP2020070352A JP2020070352A JP2021168008A JP 2021168008 A JP2021168008 A JP 2021168008A JP 2020070352 A JP2020070352 A JP 2020070352A JP 2020070352 A JP2020070352 A JP 2020070352A JP 2021168008 A JP2021168008 A JP 2021168008A
Authority
JP
Japan
Prior art keywords
user
payment amount
operation schedule
amount
users
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020070352A
Other languages
Japanese (ja)
Other versions
JP7131840B2 (en
Inventor
洋祐 日高
Yosuke Hidaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maas Tech Japan
Original Assignee
Maas Tech Japan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maas Tech Japan filed Critical Maas Tech Japan
Priority to JP2020070352A priority Critical patent/JP7131840B2/en
Publication of JP2021168008A publication Critical patent/JP2021168008A/en
Priority to JP2022099453A priority patent/JP7483272B2/en
Application granted granted Critical
Publication of JP7131840B2 publication Critical patent/JP7131840B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To determine a profitable operation schedule according to mobile demand of users.SOLUTION: A program is a program for determining an operation schedule of transportation in a predetermined region, and causes a computer to function as reception means 52 that receives transmission of mobile demand including at least a desired loading/unloading places, use date and hour, and an amount of payment from a plurality of users, determination means 54 that determines operation schedule including at least loading/unloading places and operation date and hour according to the amount of payment, and notification means 58 that notifies each of users who transmit the mobile demand of the determined operation schedule.SELECTED DRAWING: Figure 3

Description

本発明は、プログラム及び情報処理装置に関する。 The present invention relates to a program and an information processing device.

従来から、目的地が同じ方向である複数のユーザが同乗する相乗りタクシーが知られている。 Conventionally, a shared taxi in which a plurality of users whose destinations are in the same direction ride together has been known.

これに関し、非特許文献1には、ユーザが乗車地や目的地等を入力することにより、同乗予定者を検索して、各ユーザが相乗りに同意すると、タクシーが順番に迎車する技術が開示されている。 In this regard, Non-Patent Document 1 discloses a technique in which a user searches for a passenger who is scheduled to ride by inputting a boarding place, a destination, etc., and when each user agrees to ride in a carpool, the taxi picks up the taxi in order. ing.

JapanTaxi株式会社、“空間も、お金も、相乗り。相乗りタクシー”、[online]、平成30年3月11日、[令和2年2月2日検索]、インターネット<URL:https://ainori.japantaxi.jp/>JapanTaxi Co., Ltd., "Carpooling space and money. Carpooling taxi", [online], March 11, 2018, [Search on February 2, 2018], Internet <URL: https: // ainori .japantaxi.jp/>

しかしながら、非特許文献1に記載の技術では、ユーザは定期的に相乗りタクシーを利用したい場合でも、その都度、乗車地や目的地等を入力して、同乗予定者を検索しなければならない。このため、例えば山間部で高齢化率の高い地域(過疎地域)において、定期的に病院等へ通院しているユーザには、乗車地や目的地等を毎回入力する負担がかかるだけでなく、同乗予定者を容易に検索することができず、金銭的な負担もかかるという問題がある。 However, in the technique described in Non-Patent Document 1, even if the user wants to use a shared taxi on a regular basis, he / she must enter a boarding place, a destination, and the like each time to search for a passenger who is scheduled to ride. For this reason, for example, in a mountainous area where the aging rate is high (depopulated area), a user who regularly visits a hospital or the like is not only burdened with inputting a boarding place and a destination each time. There is a problem that it is not possible to easily search for passengers who will be traveling, and it will be a financial burden.

また、交通機関(例えば、鉄道やバス等)を運行する事業者は、各ユーザによる支払金額(収入金額)を正確に予測することが難しいため、このような地域において新たな運行ダイヤを決定することに消極的であった。 In addition, since it is difficult for a business operator operating a transportation system (for example, a railroad or a bus) to accurately predict the payment amount (income amount) by each user, a new operation schedule is determined in such an area. I was particularly reluctant.

本発明はこのような課題に鑑みてなされたものであり、その目的は、ユーザの移動需要に応じた採算性のある運行ダイヤを決定することができるプログラム及び情報処理装置を提供することにある。 The present invention has been made in view of such a problem, and an object of the present invention is to provide a program and an information processing device capable of determining a profitable operation schedule according to a user's mobile demand. ..

上記課題を解決するために、本発明の第一態様に係るプログラムは、所定地域において交通機関の運行ダイヤを決定するためのプログラムであって、コンピュータを、複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段、前記支払金額に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段、前記決定された運行ダイヤを、前記移動需要を送信した各ユーザに通知する通知手段、として機能させる。 In order to solve the above problems, the program according to the first aspect of the present invention is a program for determining an operation schedule of transportation in a predetermined area, and a computer can be used by a plurality of users at least at a desired boarding / alighting place. The reception means for receiving the transmission of the travel demand including the usage date and time, the determination means for determining the operation schedule including at least the boarding / alighting place and the operation date and time according to the payment amount, and the determined operation schedule for the travel demand. It functions as a notification means for notifying each user who sent the message.

また、本発明の第二態様では、前記決定手段は、前記移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる希望乗降場所を優先して前記運行ダイヤを決定する。 Further, in the second aspect of the present invention, the determination means determines the operation schedule with priority given to the desired boarding / alighting place included in the travel demand as the payment amount included in the travel demand increases.

また、本発明の第三態様では、前記決定手段は、前記移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる利用日時を優先して前記運行ダイヤを決定する。 Further, in the third aspect of the present invention, the determination means determines the operation schedule by giving priority to the usage date and time included in the travel demand as the payment amount included in the travel demand increases.

また、本発明の第四態様では、前記決定手段は、前記移動需要それぞれに含まれる支払金額の合計である収入金額が、前記移動需要を送信したユーザ数に対応する運行コストに達している場合、前記運行ダイヤを決定する。 Further, in the fourth aspect of the present invention, in the determination means, when the income amount, which is the total of the payment amounts included in each of the mobile demands, reaches the operating cost corresponding to the number of users who have transmitted the mobile demands. , Determine the operation schedule.

また、本発明の第五態様では、前記通知手段は、前記収入金額が前記運行コストに達していない場合、前記移動需要を送信した各ユーザに、支払金額が不足していることを通知する。 Further, in the fifth aspect of the present invention, when the income amount does not reach the operating cost, the notification means notifies each user who has transmitted the mobile demand that the payment amount is insufficient.

また、本発明の第六態様では、前記受付手段は、前記移動需要を送信した各ユーザから、新たな支払金額の送信を受け付け、前記決定手段は、各ユーザから前記送信された新たな支払金額の合計である収入金額が前記運行コストに達している場合、前記運行ダイヤを決定する。 Further, in the sixth aspect of the present invention, the receiving means receives the transmission of a new payment amount from each user who has transmitted the moving demand, and the determining means receives the new payment amount transmitted from each user. When the amount of income, which is the total amount of the above, has reached the operation cost, the operation schedule is determined.

また、本発明の第七態様では、前記受付手段は、前記運行ダイヤで交通機関を利用している一のユーザから、利用を中止する要求を受け付け、前記通知手段は、前記一のユーザの支払金額を除いた前記収入金額が、前記一のユーザを除いた新たなユーザ数に対応する運行コストに達していない場合、前記運行ダイヤで交通機関を利用している他のユーザそれぞれに、支払金額が不足していることを通知する。 Further, in the seventh aspect of the present invention, the receiving means receives a request to stop the use from one user who is using the transportation system in the operation timetable, and the notifying means pays for the one user. If the income amount excluding the amount does not reach the operating cost corresponding to the number of new users excluding the one user, the payment amount is paid to each of the other users using the transportation system in the operation timetable. Notify that there is a shortage.

また、本発明の第八態様では、前記受付手段は、前記他のユーザそれぞれから、新たな支払金額の送信を受け付け、前記決定手段は、前記他のユーザそれぞれから前記送信された新たな支払金額の合計である収入金額が前記新たなユーザ数に対応する運行コストに達している場合、前記交通機関の運行を継続することを決定する。 Further, in the eighth aspect of the present invention, the receiving means receives the transmission of a new payment amount from each of the other users, and the determining means receives the new payment amount transmitted from each of the other users. When the amount of income, which is the total amount of income, has reached the operating cost corresponding to the new number of users, it is decided to continue the operation of the transportation system.

また、本発明の第九態様では、前記決定手段は、前記一のユーザによる利用の中止に応じて、前記運行ダイヤに含まれる乗降場所又は運行日時を変更する。 Further, in the ninth aspect of the present invention, the determination means changes the boarding / alighting place or the operation date and time included in the operation timetable according to the suspension of use by the one user.

また、本発明の第十態様に係る情報処理装置は、所定地域において交通機関の運行ダイヤを決定するための情報処理装置であって、複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段と、前記支払金額に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段と、前記決定された運行ダイヤを、前記移動需要を送信した各ユーザに通知する通知手段と、を備える。 Further, the information processing device according to the tenth aspect of the present invention is an information processing device for determining an operation schedule of transportation in a predetermined area, and is at least a desired boarding / alighting place, a date and time of use, and a payment amount from a plurality of users. The moving demand was transmitted to the receiving means for accepting the transmission of the moving demand including the above, the determining means for determining the operation timetable including at least the boarding / alighting place and the operation date and time according to the payment amount, and the determined operation timetable. A notification means for notifying each user is provided.

本発明によれば、ユーザの移動需要に応じた採算性のある運行ダイヤを決定することができる。 According to the present invention, it is possible to determine a profitable operation schedule according to the user's mobile demand.

本発明の実施形態に係る運行ダイヤ決定システムの全体構成の一例を示すブロック図である。It is a block diagram which shows an example of the whole structure of the operation schedule determination system which concerns on embodiment of this invention. 図1に示すサーバ装置のハードウェア構成の一例を示すブロック図である。It is a block diagram which shows an example of the hardware composition of the server apparatus shown in FIG. 図1に示すサーバ装置の機能的構成の一例を示すブロック図である。It is a block diagram which shows an example of the functional configuration of the server apparatus shown in FIG. 本実施形態に係る運行ダイヤ決定システムにおいて、交通機関の運行を決定する処理の流れの一例を示すフローチャートである。It is a flowchart which shows an example of the flow of the process which determines the operation of a transportation system in the operation timetable determination system which concerns on this embodiment. 本実施形態に係る入力画面の一例を示す図である。It is a figure which shows an example of the input screen which concerns on this embodiment. 本実施形態に係る運行決定通知画面の一例を示す図である。It is a figure which shows an example of the operation decision notification screen which concerns on this embodiment. 本実施形態に係る決定不可通知画面の一例を示す図である。It is a figure which shows an example of the undecidable notification screen which concerns on this embodiment. 本実施形態に係る運行ダイヤ決定システムにおいて、交通機関の運行を継続するための処理の流れの一例を示すフローチャートである。It is a flowchart which shows an example of the process flow for continuing the operation of the transportation system in the operation schedule determination system which concerns on this embodiment. 本実施形態に係る運行継続通知画面の一例を示す図である。It is a figure which shows an example of the operation continuation notification screen which concerns on this embodiment. 本実施形態に係る金額不足通知画面の一例を示す図である。It is a figure which shows an example of the amount shortage notification screen which concerns on this embodiment.

以下、添付図面を参照しながら本発明の実施形態(以下、「本実施形態」という。)について説明する。説明の理解を容易にするため、各図面において同一の構成要素及びステップに対しては可能な限り同一の符号を付して、重複する説明は省略する。 Hereinafter, embodiments of the present invention (hereinafter, referred to as “the present embodiment”) will be described with reference to the accompanying drawings. In order to facilitate understanding of the description, the same components and steps are designated by the same reference numerals as much as possible in each drawing, and duplicate description is omitted.

<全体構成>
図1は、本発明の実施形態に係る運行ダイヤ決定システム1の全体構成の一例を示すブロック図である。
<Overall configuration>
FIG. 1 is a block diagram showing an example of the overall configuration of the operation schedule determination system 1 according to the embodiment of the present invention.

図1に示すように、運行ダイヤ決定システム1は、サーバ装置10と、複数の端末装置12と、を備える。これらの装置は、インターネットや電話回線網等の通信ネットワークNTを介して互いに通信可能に構成されている。 As shown in FIG. 1, the operation schedule determination system 1 includes a server device 10 and a plurality of terminal devices 12. These devices are configured to be able to communicate with each other via a communication network NT such as the Internet or a telephone line network.

サーバ装置10は、運行ダイヤの決定に関する各種制御を行う装置(コンピュータ)である。このサーバ装置10は、端末装置12を介したユーザからの移動需要の送信に基づき、運行ダイヤを決定する。 The server device 10 is a device (computer) that performs various controls related to determination of an operation schedule. The server device 10 determines the operation schedule based on the transmission of the movement demand from the user via the terminal device 12.

端末装置12は、ユーザが操作する装置である。これら端末装置12は、例えば、第一端末装置12Aと、第二端末装置12Bと、を含む。端末装置12としては、携帯電話やスマートフォン、タブレット、パーソナルコンピュータ等が挙げられる。 The terminal device 12 is a device operated by the user. These terminal devices 12 include, for example, a first terminal device 12A and a second terminal device 12B. Examples of the terminal device 12 include mobile phones, smartphones, tablets, personal computers, and the like.

第一端末装置12Aは、第一のユーザが操作する装置である。 The first terminal device 12A is a device operated by the first user.

第二端末装置12Bは、第二のユーザが操作する装置である。 The second terminal device 12B is a device operated by a second user.

<ハードウェア構成>
図2は、図1に示すサーバ装置10のハードウェア構成の一例を示すブロック図である。
<Hardware configuration>
FIG. 2 is a block diagram showing an example of the hardware configuration of the server device 10 shown in FIG.

図2に示すように、サーバ装置10は、制御装置20と、通信装置26と、記憶装置28と、を備える。制御装置20は、CPU(Central Processing Unit)22及びメモリ24を主に備えて構成される。 As shown in FIG. 2, the server device 10 includes a control device 20, a communication device 26, and a storage device 28. The control device 20 mainly includes a CPU (Central Processing Unit) 22 and a memory 24.

制御装置20では、CPU22がメモリ24或いは記憶装置28等に格納された所定のプログラムを実行することにより、各種の機能手段として機能する。この機能手段の詳細については後述する。 In the control device 20, the CPU 22 functions as various functional means by executing a predetermined program stored in the memory 24, the storage device 28, or the like. Details of this functional means will be described later.

通信装置26は、外部の装置と通信するための通信インターフェース等で構成される。通信装置26は、例えば、端末装置12との間で各種の情報を送受信する。 The communication device 26 is composed of a communication interface or the like for communicating with an external device. The communication device 26 transmits and receives various types of information to and from the terminal device 12, for example.

記憶装置28は、ハードディスク等で構成される。記憶装置28は、制御装置20における処理の実行に必要な各種プログラムや各種の情報、及び処理結果の情報を記憶する。 The storage device 28 is composed of a hard disk or the like. The storage device 28 stores various programs and various information necessary for executing the process in the control device 20, and information on the processing result.

なお、サーバ装置10は、専用又は汎用のサーバ・コンピュータなどの情報処理装置を用いて実現することができる。また、サーバ装置10は、単一の情報処理装置より構成されるものであっても、通信ネットワークNT上に分散した複数の情報処理装置より構成されるものであってもよい。また、図2は、サーバ装置10が有する主要なハードウェア構成の一部を示しているに過ぎず、サーバ装置10は、サーバが一般的に備える他の構成を備えることができる。また、複数の端末装置12のハードウェア構成も、例えば操作手段や表示装置等を備える他は、サーバ装置10と同様の構成を備えることができる。 The server device 10 can be realized by using an information processing device such as a dedicated or general-purpose server computer. Further, the server device 10 may be composed of a single information processing device or may be composed of a plurality of information processing devices distributed on the communication network NT. Further, FIG. 2 shows only a part of the main hardware configurations of the server device 10, and the server device 10 can include other configurations generally provided by the server. Further, the hardware configuration of the plurality of terminal devices 12 can be provided with the same configuration as that of the server device 10 except that, for example, an operating means, a display device, and the like are provided.

<機能的構成>
図3は、図1に示すサーバ装置10の機能的構成の一例を示すブロック図である。
<Functional configuration>
FIG. 3 is a block diagram showing an example of the functional configuration of the server device 10 shown in FIG.

図3に示すように、サーバ装置10は、機能的構成として、記憶手段50と、受付手段52と、決定手段54と、判定手段56と、通知手段58と、を備える。 As shown in FIG. 3, the server device 10 includes a storage unit 50, a reception unit 52, a determination unit 54, a determination unit 56, and a notification unit 58 as functional configurations.

記憶手段50は、ユーザ情報50Aや、運行ダイヤ情報50B等を記憶する機能手段である。 The storage means 50 is a functional means for storing user information 50A, operation timetable information 50B, and the like.

ユーザ情報50Aは、各ユーザの識別情報(ユーザID)に対応付けて、ユーザそれぞれのログインIDや、パスワード、ユーザ名、生年月日、性別、年齢、自宅住所、連絡先、移動需要等を含む。連絡先としては、電話番号や、メールアドレス、メッセージアプリケーションのユーザID等が挙げられる。移動需要は、少なくとも希望乗降場所、利用日時、支払金額を含む。この移動需要は、受付手段52が各ユーザの端末装置12から受け付けた情報である。希望乗降場所は、ユーザが希望する出発地と到着地を含む。この出発地は、例えばユーザの自宅に最も近い道路に面した地点である。この到着地は、例えばユーザの行き先(例えば病院、学校、スーパーマーケット等)である。利用日時は、ユーザが交通機関を利用する日時であって、利用日や、往路の到着時間、復路の出発時間を含む。例えば、利用日時には、利用日である曜日と、出発地である自宅から到着地である病院Aへの到着時間と、到着地である病院Aから出発地である自宅への出発時間とを含む。この到着時間と出発時間は、例えば15分単位の時間帯で設定される。支払金額は、ユーザが交通機関の利用で支払うことが可能な(支払ってもよい)金額であって、例えば1ヶ月間における利用額(月額料金)である。 The user information 50A includes each user's login ID, password, user name, date of birth, gender, age, home address, contact information, travel demand, etc. in association with the identification information (user ID) of each user. .. Examples of the contact information include a telephone number, an e-mail address, a user ID of a message application, and the like. Travel demand includes at least the desired boarding / alighting location, date and time of use, and payment amount. This mobile demand is information received by the receiving means 52 from the terminal device 12 of each user. The desired boarding / alighting place includes the departure place and the arrival place desired by the user. This starting point is, for example, the point facing the road closest to the user's home. This destination is, for example, the destination of the user (eg, hospital, school, supermarket, etc.). The usage date and time is the date and time when the user uses the transportation system, and includes the usage date, the arrival time on the outbound route, and the departure time on the return route. For example, the date and time of use includes the day of the week that is the date of use, the arrival time from the home that is the departure point to the hospital A that is the arrival point, and the departure time from the hospital A that is the arrival point to the home that is the departure point. .. The arrival time and departure time are set, for example, in a time zone of 15 minutes. The payment amount is an amount that the user can (or may pay) to pay by using transportation, for example, a usage amount (monthly charge) for one month.

運行ダイヤ情報50Bは、各運行ダイヤの識別情報(運行ダイヤID)に対応付けて、運行ダイヤそれぞれの地域、利用ユーザ、収入金額、乗降場所、運行日時、運行車両、運行コスト、決定フラグ等を含む。地域は、運行ダイヤが決定している地域又は未決定の地域を特定する情報(例えば町名や村名)を含む。利用ユーザは、運行ダイヤを利用する又は利用を希望する各ユーザの識別情報を含む。収入金額は、各利用ユーザの移動需要に含まれる支払金額の合計である。この収入金額は、利用ユーザが増減することや、支払金額が増減することに伴って変化する。乗降場所は、運行ダイヤにおける停留所の名称と位置情報(例えば緯度及び経度、住所)を含む。運行日時は、運行ダイヤにおける運行日と運行時間を含む。この運行日時は、各停留所の時刻表として記憶されていてもよい。運行車両は、運行ダイヤにおいて利用される一又は複数の車両の識別情報(車両ID)に対応付けて、車両価格、車両燃費、乗車定員、必要免許等を含む。乗車定員は、乗車するユーザの最大人数に応じて定まる。運行コストは、所定期間(例えば1ヶ月)における運行にかかる費用である。この費用は、決定手段54によって、利用ユーザ数や移動距離、車両価格、車両燃費、車両維持費(例えば駐車場費や税金、メンテナンス費、保険料)、人件費(例えば運転手の給与)等に基づいて算出される。決定フラグは、運行ダイヤが決定しているか否かを示すフラグである。決定フラグには、「決定」と「未決定」の何れかが含まれ、初期値は「未定」である。 The operation timetable information 50B associates with the identification information (operation timetable ID) of each operation timetable, and sets the area, user, income amount, boarding / alighting place, operation date and time, operation vehicle, operation cost, decision flag, etc. of each operation timetable. include. The area includes information (for example, a town name or a village name) that identifies an area for which the operation schedule has been determined or an undetermined area. The user uses the identification information of each user who uses or wishes to use the operation schedule. The income amount is the sum of the payment amounts included in the mobile demand of each user. This income amount changes as the number of users increases or decreases and the payment amount increases or decreases. The boarding / alighting place includes the name and location information (for example, latitude and longitude, address) of the stop in the operation schedule. The operation date and time includes the operation date and the operation time in the operation schedule. This operation date and time may be stored as a timetable of each stop. The operating vehicle includes vehicle price, vehicle fuel consumption, passenger capacity, required license, etc. in association with the identification information (vehicle ID) of one or more vehicles used in the operation schedule. The boarding capacity is determined according to the maximum number of passengers. The operating cost is the cost of operating in a predetermined period (for example, one month). This cost depends on the determination means 54, such as the number of users, the distance traveled, the vehicle price, the vehicle fuel consumption, the vehicle maintenance cost (for example, parking lot cost, tax, maintenance cost, insurance premium), labor cost (for example, driver's salary), etc. It is calculated based on. The determination flag is a flag indicating whether or not the operation schedule has been determined. The decision flag includes either "decided" or "undecided", and the initial value is "undecided".

受付手段52は、ユーザの端末装置12から各種情報を受け付ける機能手段である。本実施形態では、受付手段52は、複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける。 The receiving means 52 is a functional means for receiving various information from the user's terminal device 12. In the present embodiment, the receiving means 52 receives from a plurality of users the transmission of the moving demand including at least the desired boarding / alighting place, the date and time of use, and the payment amount.

また、受付手段52は、移動需要を送信した各ユーザから、新たな支払金額の送信を受け付ける。例えば、受付手段52は、通知手段58によって支払金額が不足していることが通知された各ユーザから、以前の支払金額から増額された新たな支払金額の送信を受け付ける。 In addition, the receiving means 52 accepts the transmission of a new payment amount from each user who has transmitted the mobile demand. For example, the receiving means 52 accepts the transmission of a new payment amount increased from the previous payment amount from each user notified by the notification means 58 that the payment amount is insufficient.

また、受付手段52は、決定手段54によって決定された運行ダイヤで交通機関を利用している一のユーザから、利用を中止する要求を受け付ける。また、受付手段52は、当該一のユーザを除いた当該交通機関を利用している他のユーザそれぞれから、新たな支払金額の送信を受け付ける。例えば、受付手段52は、通知手段58によって支払金額が不足していることが通知された当該他のユーザから、以前の支払金額から増額された新たな支払金額の送信を受け付ける。 Further, the reception means 52 receives a request to stop the use from one user who is using the transportation system in the operation schedule determined by the determination means 54. In addition, the reception means 52 accepts transmission of a new payment amount from each of the other users using the transportation system other than the one user. For example, the receiving means 52 accepts the transmission of a new payment amount increased from the previous payment amount from the other user who has been notified by the notification means 58 that the payment amount is insufficient.

決定手段54は、所定地域において交通機関の(定期的な)運行ダイヤを決定する機能手段である。この所定地域としては、例えば過疎地域における町や村、集落が挙げられる。本実施形態では、決定手段54は、受付手段52が受け付けた各ユーザの移動需要に含まれる希望乗降場所や利用日時、支払金額に応じて、運行ダイヤを決定する。この運行ダイヤは、例えば利用ユーザ、収入金額、乗降場所、運行日時、運行車両、運行コスト等を含む。そして、決定手段54は、決定した運行ダイヤを運行ダイヤ情報50Bに記憶する。また、決定手段54は、運行ダイヤを決定したことに応じて、運行ダイヤ情報50Bの決定フラグを「決定」に更新する。 The determination means 54 is a functional means for determining a (regular) operation schedule of transportation in a predetermined area. Examples of this predetermined area include towns, villages, and villages in depopulated areas. In the present embodiment, the determination means 54 determines the operation schedule according to the desired boarding / alighting place, the date and time of use, and the payment amount included in the movement demand of each user received by the reception means 52. This operation schedule includes, for example, the user, the amount of income, the boarding / alighting place, the operation date and time, the operation vehicle, the operation cost, and the like. Then, the determination means 54 stores the determined operation schedule in the operation schedule information 50B. Further, the determination means 54 updates the determination flag of the operation schedule information 50B to "determine" in response to the determination of the operation schedule.

例えば、決定手段54は、所定地域内の一又は複数の道路に面している地点を中心として500m四方に区画し、各ユーザの移動需要に含まれる2以上の希望乗降場所が、1つの区画に含まれる場合、各希望乗降場所からの距離が最も短い地点であって道路に面している地点を乗降場所(停留所)として運行ダイヤを決定する。また、例えば、決定手段54は、受付手段52が受け付けた移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる希望乗降場所を優先して運行ダイヤを決定する。具体的には、決定手段54は、同じ区画内に希望乗降場所を設定(希望)した各ユーザの支払金額の平均値を算出する。続いて、決定手段54は、或るユーザの支払金額が当該平均値を第一所定額(例えば2500円)上回っている場合、当該或るユーザの移動需要に含まれる希望乗降場所の第一所定範囲内(例えば200m以内)に乗降場所を決定する。また、決定手段54は、或るユーザの移動需要に含まれる支払金額が当該平均値を第二所定額(例えば5000円)上回っている場合、当該或るユーザの移動需要に含まれる希望乗降場所の第二所定範囲内(例えば150m以内)に乗降場所を決定する。 For example, the determination means 54 divides a point facing one or a plurality of roads in a predetermined area into 500 m squares, and two or more desired boarding / alighting places included in the movement demand of each user are one section. If it is included in, the operation schedule is determined by setting the point facing the road as the point where the distance from each desired boarding / alighting place is the shortest as the boarding / alighting place (stop). Further, for example, the determining means 54 determines the operation schedule with priority given to the desired boarding / alighting place included in the moving demand as the payment amount included in the moving demand received by the receiving means 52 increases. Specifically, the determination means 54 calculates the average value of the payment amounts of each user who has set (desired) the desired boarding / alighting place in the same section. Subsequently, when the payment amount of a certain user exceeds the average value by the first predetermined amount (for example, 2500 yen), the determination means 54 first determines the desired boarding / alighting place included in the movement demand of the certain user. Determine the boarding / alighting place within the range (for example, within 200 m). Further, when the payment amount included in the mobile demand of a certain user exceeds the average value by a second predetermined amount (for example, 5000 yen), the determination means 54 is a desired boarding / alighting place included in the mobile demand of the certain user. The boarding / alighting place is determined within the second predetermined range (for example, within 150 m).

例えば、決定手段54は、移動需要それぞれに同一の希望乗降場所が含まれる場合であって、当該移動需要それぞれに含まれる利用日時が、所定時間(1時間)以内であるとき、当該利用日時の平均値を運行日時として運行ダイヤを決定する。具体的には、決定手段54は、2以上の移動需要それぞれに同一の希望降車場所(例えば病院A)が含まれる場合であって、当該移動需要それぞれに含まれる利用日が同日であって、往路の到着時間が9時〜10時までの間であるとき、当該到着時間の平均値を運行日時(到着時間)として運行ダイヤを決定する。また、例えば、決定手段54は、移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる利用日時を優先して運行ダイヤを決定する。具体的には、決定手段54は、移動需要それぞれに同一の希望降車場所(例えば病院A)が含まれる場合であって、当該移動需要それぞれに含まれる利用日が同日(同じ曜日)であり、到着時間が9時〜10時までの間であるとき、当該到着時間を設定した各ユーザの支払金額の平均値を算出する。続いて、決定手段54は、或るユーザの移動需要に含まれる支払金額が当該平均値を第一所定額(例えば2500円)上回っている場合、当該或るユーザの移動需要に含まれる到着時間の第一所定時間内(例えば30分以内)に運行日時(病院Aへの到着時間)を決定する。また、決定手段54は、或るユーザの移動需要に含まれる支払金額が当該平均値を第二所定額(例えば5000円)上回っている場合、当該或るユーザの移動需要に含まれる到着時間の第二所定時間内(例えば15分以内)に運行日時(病院Aへの到着日時)を決定する。 For example, the determination means 54 determines the date and time of use when the same desired boarding / alighting place is included in each of the travel demands and the date and time of use included in each of the travel demands is within a predetermined time (1 hour). The operation schedule is determined using the average value as the operation date and time. Specifically, the determination means 54 is a case where the same desired drop-off place (for example, hospital A) is included in each of the two or more mobile demands, and the usage date included in each of the mobile demands is the same day. When the arrival time on the outbound route is between 9:00 and 10:00, the operation schedule is determined by using the average value of the arrival times as the operation date and time (arrival time). Further, for example, the determination means 54 determines the operation schedule by giving priority to the usage date and time included in the movement demand as the payment amount included in the movement demand increases. Specifically, the determination means 54 is a case where the same desired drop-off place (for example, hospital A) is included in each of the moving demands, and the usage date included in each of the moving demands is the same day (same day of the week). When the arrival time is between 9:00 and 10:00, the average value of the payment amount of each user who set the arrival time is calculated. Subsequently, the determining means 54 determines the arrival time included in the moving demand of the certain user when the payment amount included in the moving demand of the certain user exceeds the average value by the first predetermined amount (for example, 2500 yen). The operation date and time (arrival time at hospital A) is determined within the first predetermined time (for example, within 30 minutes). Further, when the payment amount included in the moving demand of a certain user exceeds the average value by a second predetermined amount (for example, 5000 yen), the determining means 54 determines the arrival time included in the moving demand of the certain user. The operation date and time (arrival date and time at hospital A) is determined within the second predetermined time (for example, within 15 minutes).

また、決定手段54は、判定手段56によって、移動需要それぞれに含まれる支払金額の合計である収入金額が、移動需要を送信したユーザ数に対応する運行コストに達していると判定された場合、運行ダイヤを決定する。一方、決定手段54は、判定手段56によって、移動需要それぞれに含まれる支払金額の合計である収入金額が、移動需要を送信したユーザ数に対応する運行コストに達していないと判定された場合、運行ダイヤを決定しない。 Further, when the determination means 54 determines by the determination means 56 that the income amount, which is the total of the payment amounts included in each of the mobile demands, has reached the operating cost corresponding to the number of users who have transmitted the mobile demands. Determine the operation schedule. On the other hand, when the determination means 54 determines by the determination means 56 that the income amount, which is the total of the payment amounts included in each of the mobile demands, does not reach the operating cost corresponding to the number of users who have transmitted the mobile demands. Do not decide the operation schedule.

また、決定手段54は、判定手段56によって、各ユーザから送信された新たな支払金額の合計である収入金額が運行コストに達していると判定された場合、運行ダイヤを決定する。一方、決定手段54は、判定手段56によって、当該収入金額が運行コストに達していないと判定された場合、運行ダイヤを決定しない。 Further, the determination means 54 determines the operation schedule when the determination means 56 determines that the income amount, which is the total of the new payment amounts transmitted from each user, has reached the operation cost. On the other hand, the determination means 54 does not determine the operation schedule when the determination means 56 determines that the income amount has not reached the operation cost.

また、決定手段54は、決定した運行ダイヤで交通機関を利用している一のユーザから、利用を中止する要求があった後、判定手段56によって、当該交通機関を利用している他のユーザそれぞれから送信された新たな支払金額の合計である収入金額が新たなユーザ数(他のユーザの数)に対応する運行コストに達していると判定された場合、運行ダイヤ(運行)を継続することを決定する。一方、決定手段54は、当該一のユーザから、利用を中止する要求があった後、判定手段56によって、当該収入金額が新たなユーザ数に対応する運行コストに達していないと判定された場合、運行ダイヤ(運行)を継続しないことを決定する。 In addition, the determination means 54 uses the determination means 56 to determine another user who is using the transportation means after a request from one user who is using the transportation means in the determined operation timetable to stop the use. If it is determined that the income amount, which is the total of the new payment amounts sent from each, has reached the operating cost corresponding to the new number of users (number of other users), the operation schedule (operation) is continued. Decide that. On the other hand, when the determination means 54 determines that the income amount has not reached the operating cost corresponding to the new number of users after the request from the one user to stop the use is made by the determination means 56. , Decide not to continue the operation schedule (operation).

また、決定手段54は、決定した運行ダイヤで交通機関を利用している一のユーザによる利用の中止に応じて、当該運行ダイヤに含まれる乗降場所又は運行日時を変更する。例えば、決定手段54は、当該一のユーザによる移動需要を除外して、他のユーザによる移動需要に基づいて、乗降場所や運行日時を再度決定する。 Further, the determination means 54 changes the boarding / alighting place or the operation date and time included in the operation schedule according to the suspension of use by one user who is using the transportation system in the determined operation schedule. For example, the determination means 54 excludes the movement demand by the one user, and determines the boarding / alighting place and the operation date and time again based on the movement demand by the other user.

判定手段56は、各種判定を行う機能手段である。本実施形態では、判定手段56は、移動需要それぞれに含まれる支払金額の合計である収入金額が、移動需要を送信したユーザ数に対応する運行コストに達しているか否かを判定する。また、判定手段56は、各ユーザから送信された新たな支払金額の合計である収入金額が運行コストに達しているか否かを判定する。また、判定手段56は、交通機関の利用を中止する要求を行った一のユーザを除く他のユーザそれぞれから送信された新たな支払金額の合計である収入金額が新たなユーザ数(他のユーザの数)に対応する運行コストに達しているか否かを判定する。 The determination means 56 is a functional means for performing various determinations. In the present embodiment, the determination means 56 determines whether or not the income amount, which is the total of the payment amounts included in each of the mobile demands, reaches the operating cost corresponding to the number of users who have transmitted the mobile demands. Further, the determination means 56 determines whether or not the income amount, which is the total of the new payment amounts transmitted from each user, has reached the operating cost. Further, in the determination means 56, the number of new users (other users) is the total amount of new payments sent from each of the other users except the one user who requested to stop using the transportation system. Whether or not the operating cost corresponding to (number of) has been reached is determined.

通知手段58は、各ユーザの端末装置12に通知を行う機能手段である。本実施形態では、通知手段58は、決定手段54によって決定された運行ダイヤを、移動需要を送信した各ユーザの端末装置12に通知する。また、通知手段58は、移動需要それぞれに含まれる支払金額の合計である収入金額が運行コストに達していない場合、移動需要を送信した各ユーザの端末装置12に、支払金額が不足していることを通知する。 The notification means 58 is a functional means for notifying the terminal device 12 of each user. In the present embodiment, the notification means 58 notifies the terminal device 12 of each user who has transmitted the movement demand of the operation timetable determined by the determination means 54. Further, in the notification means 58, when the income amount, which is the total of the payment amounts included in each of the mobile demands, does not reach the operating cost, the payment amount is insufficient for the terminal device 12 of each user who transmitted the mobile demand. Notify that.

また、通知手段58は、交通機関の利用を中止する要求を行った一のユーザの支払金額を除いた収入金額が、当該一のユーザを除いた新たなユーザ数に対応する運行コストに達していない場合、運行ダイヤで交通機関を利用している他のユーザそれぞれに、支払金額が不足していることを通知する。 Further, in the notification means 58, the amount of income excluding the payment amount of one user who requested to stop using the transportation has reached the operating cost corresponding to the number of new users excluding the one user. If not, notify each other user who is using the transportation system on the operation schedule that the payment amount is insufficient.

<運行決定に係る処理の流れ>
図4は、本実施形態に係る運行ダイヤ決定システム1において、交通機関の運行を決定する処理の流れの一例を示すフローチャートである。また、以下のステップの処理は、例えば、ユーザが端末装置12において移動需要を入力するための指示を行ったタイミングで開始される。なお、以下のステップの順番及び内容は、適宜、変更することができる。
<Flow of processing related to operation decision>
FIG. 4 is a flowchart showing an example of a flow of processing for determining the operation of transportation in the operation schedule determination system 1 according to the present embodiment. Further, the processing of the following steps is started, for example, at the timing when the user gives an instruction to input the moving demand in the terminal device 12. The order and contents of the following steps can be changed as appropriate.

(ステップSP10)
受付手段52は、ユーザの端末装置12に、移動需要を入力するための入力画面を送信する。
(Step SP10)
The reception means 52 transmits an input screen for inputting the movement demand to the user's terminal device 12.

図5は、本実施形態に係る入力画面60の一例を示す図である。 FIG. 5 is a diagram showing an example of the input screen 60 according to the present embodiment.

図5に示すように、入力画面60は、希望乗降場所入力領域62と、利用日時入力領域64と、支払金額入力領域66と、送信ボタン68と、が設けられている。希望乗降場所入力領域62には、希望する乗車場所である出発地と、希望する降車場所である到着地とを入力する入力欄が表されている。希望乗降場所入力領域62では、ユーザによって出発地又は到着地の入力欄に郵便番号や住所、電話番号、マップコード等の情報が入力されることにより、当該情報に関する周辺地図を表示する画面に遷移し、ユーザは詳細な地点(位置)を設定することができる。利用日時入力領域64には、ユーザが交通機関を利用する曜日である利用日と、往路の到着時間である希望到着時間と、復路の車場所である到着地を入力する入力欄が表されている。支払金額入力領域66には、支払金額である月額料金を入力する入力欄が評されている。支払金額入力領域66では、ユーザが希望乗降場所入力領域62の出発地や到着地、利用日時入力領域64に含まれる利用日が入力済である場合、移動距離や利用頻度に応じた参考金額を表してもよい。送信ボタン68は、ユーザにより各入力欄に入力された移動需要(希望条件)をサーバ装置10に送信するためのボタンである。 As shown in FIG. 5, the input screen 60 is provided with a desired boarding / alighting place input area 62, a usage date / time input area 64, a payment amount input area 66, and a transmission button 68. In the desired boarding / alighting place input area 62, an input field for inputting a desired boarding place, a departure place, and a desired boarding place, an arrival place, is displayed. In the desired boarding / alighting place input area 62, when the user inputs information such as a zip code, an address, a telephone number, and a map code in the input field of the departure place or the arrival place, the screen transitions to a screen for displaying a surrounding map related to the information. However, the user can set a detailed point (position). In the usage date / time input area 64, an input field for inputting the usage date, which is the day of the week on which the user uses transportation, the desired arrival time, which is the arrival time on the outbound route, and the arrival place, which is the vehicle location on the return route, is displayed. There is. In the payment amount input area 66, an input field for inputting a monthly fee, which is a payment amount, is evaluated. In the payment amount input area 66, when the user has already entered the departure place and arrival place of the desired boarding / alighting place input area 62 and the use date included in the use date / time input area 64, a reference amount according to the travel distance and the frequency of use is input. It may be represented. The transmission button 68 is a button for transmitting the movement demand (desired condition) input in each input field by the user to the server device 10.

図4に戻って、処理は、ステップSP12の処理に移行する。 Returning to FIG. 4, the process shifts to the process of step SP12.

(ステップSP12)
入力画面60において送信ボタン68が押下されたことに応じて、受付手段52は、ユーザの端末装置12から移動需要の送信を受け付ける。そして、処理は、ステップSP14の処理に移行する。
(Step SP12)
In response to the fact that the transmission button 68 is pressed on the input screen 60, the reception means 52 receives the transmission of the movement demand from the user's terminal device 12. Then, the process shifts to the process of step SP14.

(ステップSP14)
決定手段54は、ユーザ情報50Aの移動需要において、ユーザの識別情報(ユーザID)に対応付けて、ステップSP12で受け付けた移動需要を追加する。また、決定手段54は、運行ダイヤ情報50Bの地域を参照して、当該移動需要に含まれる希望乗降場所を含む地域を検索する。続いて、決定手段54は、検索した運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザに、ステップSP12で移動需要を送信したユーザの識別情報(ユーザID)を追加する。続いて、決定手段54は、検索した運行ダイヤの識別情報(運行ダイヤID)に対応する収入金額に、当該移動需要に含まれる支払金額を加算する。そして、処理は、ステップSP16の処理に移行する。
(Step SP14)
The determination means 54 adds the movement demand received in step SP12 in association with the user identification information (user ID) in the movement demand of the user information 50A. Further, the determination means 54 refers to the area of the operation schedule information 50B and searches for an area including a desired boarding / alighting place included in the travel demand. Subsequently, the determination means 54 adds the identification information (user ID) of the user who transmitted the movement demand in step SP12 to the user user corresponding to the searched operation timetable identification information (operation timetable ID). Subsequently, the determination means 54 adds the payment amount included in the moving demand to the income amount corresponding to the searched operation timetable identification information (operation timetable ID). Then, the process shifts to the process of step SP16.

(ステップSP16)
決定手段54は、ユーザ情報50Aと運行ダイヤ情報50Bを参照して、ステップSP14において検索した運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザそれぞれの移動需要を取得する。続いて、決定手段54は、運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザの数(ユーザ数)と利用ユーザそれぞれの利用日時に基づいて車両と車両数を特定し、乗降場所や運行日時を含む運行ダイヤを仮決定する。続いて、決定手段54は、仮決定した運行ダイヤに応じて、所定地域において交通機関を定期的に運行するための運行コスト(例えば1ヶ月のコスト)を計算する。続いて、決定手段54は、計算した運行コストを運行ダイヤ情報50Bの運行コストに記憶する。そして、処理は、ステップSP18の処理に移行する。
(Step SP16)
The determination means 54 refers to the user information 50A and the operation timetable information 50B, and acquires the movement demand of each user corresponding to the operation timetable identification information (operation timetable ID) searched in step SP14. Subsequently, the determination means 54 identifies the vehicle and the number of vehicles based on the number of users (number of users) corresponding to the identification information (operation timetable ID) of the operation timetable and the date and time of use of each user, and determines the boarding / alighting place and the number of vehicles. Temporarily determine the operation schedule including the operation date and time. Subsequently, the determination means 54 calculates an operation cost (for example, a one-month cost) for periodically operating the transportation system in the predetermined area according to the tentatively determined operation schedule. Subsequently, the determination means 54 stores the calculated operating cost in the operating cost of the operating timetable information 50B. Then, the process shifts to the process of step SP18.

(ステップSP18)
判定手段56は、ステップSP14において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する収入金額が、ステップSP16において計算された運行コストに達しているか否かを判定する。例えば、判定手段56は、当該収入金額が当該運行コストを超えている場合、判定を肯定する。そして、当該判定が肯定判定された場合には、処理は、ステップSP20の処理に移行する。一方、当該判定が否定判定された場合には、処理は、ステップSP22の処理に移行する。
(Step SP18)
The determination means 56 determines whether or not the amount of income corresponding to the identification information (operation timetable ID) of the operation timetable searched in step SP14 has reached the operation cost calculated in step SP16. For example, the determination means 56 affirms the determination when the income amount exceeds the operating cost. Then, when the determination is affirmative, the process shifts to the process of step SP20. On the other hand, if the determination is negative, the process proceeds to the process of step SP22.

(ステップSP20)
決定手段54は、ステップSP16において仮決定した運行ダイヤを本決定する。すなわち、決定手段54は、運行ダイヤ情報50Bにおいて、ステップSP14において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する決定フラグを「決定」に更新する。続いて、通知手段58は、決定手段54によって決定された運行ダイヤを、移動需要を送信した各ユーザの端末装置12に通知する。具体的には、通知手段58は、ステップSP14において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザそれぞれの端末装置12に対して、運行決定通知画面を送信する。
(Step SP20)
The determination means 54 finally determines the operation schedule tentatively determined in step SP16. That is, the determination means 54 updates the determination flag corresponding to the identification information (operation timetable ID) of the operation timetable searched in step SP14 to "determine" in the operation timetable information 50B. Subsequently, the notification means 58 notifies the terminal device 12 of each user who has transmitted the movement demand of the operation schedule determined by the determination means 54. Specifically, the notification means 58 transmits an operation decision notification screen to the terminal device 12 of each user corresponding to the operation timetable identification information (operation timetable ID) searched in step SP14.

図6は、本実施形態に係る運行決定通知画面70の一例を示す図である。 FIG. 6 is a diagram showing an example of the operation decision notification screen 70 according to the present embodiment.

図6に示すように、運行決定通知画面70は、運行通知領域72が設けられている。運行通知領域72には、運行ダイヤが決定したことや、運行日時、乗降場所(停留所)等が表されている。 As shown in FIG. 6, the operation decision notification screen 70 is provided with an operation notification area 72. The operation notification area 72 indicates that the operation schedule has been determined, the operation date and time, the boarding / alighting place (stop), and the like.

そして、処理は、図4に示す一連の処理を終了する。 Then, the process ends a series of processes shown in FIG.

(ステップSP22)
通知手段58は、収入金額が不足していることを、移動需要を送信した各ユーザの端末装置12に通知する。具体的には、通知手段58は、ステップSP14において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザそれぞれの端末装置12に対して、決定不可通知画面を送信する。
(Step SP22)
The notification means 58 notifies the terminal device 12 of each user who has transmitted the mobile demand that the income amount is insufficient. Specifically, the notification means 58 transmits a non-determinable notification screen to the terminal device 12 of each user user corresponding to the identification information (operation timetable ID) of the operation timetable searched in step SP14.

図7は、本実施形態に係る決定不可通知画面80の一例を示す図である。 FIG. 7 is a diagram showing an example of the undecidable notification screen 80 according to the present embodiment.

図7に示すように、決定不可通知画面80は、金額不足通知領域82と、再入力ボタン84と、が設けられている。金額不足通知領域82には、収入金額が不足していることにより、運行ダイヤが決定できないこと等が表されている。再入力ボタン84は、ユーザが新たに月額料金(支払金額)を再入力するためのボタンである。 As shown in FIG. 7, the undecidable notification screen 80 is provided with an amount shortage notification area 82 and a re-entry button 84. In the amount shortage notification area 82, it is indicated that the operation schedule cannot be determined due to the lack of income amount. The re-entry button 84 is a button for the user to newly re-enter the monthly fee (payment amount).

そして、処理は、図4に示す一連の処理を終了する。 Then, the process ends a series of processes shown in FIG.

<運行継続に係る処理の流れ>
図8は、本実施形態に係る運行ダイヤ決定システム1において、交通機関の運行を継続するための処理の流れの一例を示すフローチャートである。また、以下のステップの処理は、例えば、一のユーザが端末装置12において交通機関の利用を中止する要求を行ったタイミングで開始される。なお、以下のステップの順番及び内容は、適宜、変更することができる。
<Flow of processing related to continuation of operation>
FIG. 8 is a flowchart showing an example of a processing flow for continuing the operation of the transportation system in the operation schedule determination system 1 according to the present embodiment. Further, the processing of the following steps is started, for example, at the timing when one user makes a request to stop using the transportation system in the terminal device 12. The order and contents of the following steps can be changed as appropriate.

(ステップSP30)
受付手段52は、一のユーザの端末装置12から中止要求を受け付ける。そして、処理は、ステップSP32の処理に移行する。
(Step SP30)
The receiving means 52 receives a cancellation request from the terminal device 12 of one user. Then, the process shifts to the process of step SP32.

(ステップSP32)
決定手段54は、ユーザ情報50Aにおいて、一のユーザの識別情報(ユーザID)に対応付けられている支払金額を取得する。続いて、決定手段54は、運行ダイヤ情報50Bにおいて、当該一のユーザが利用ユーザとして記憶されている運行ダイヤを検索し、当該検索した運行ダイヤの識別情報(運行ダイヤID)に対応する収入金額から当該取得した支払金額を減算する。続いて、決定手段54は、検索した運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザから、当該一のユーザの識別情報(ユーザID)を削除する。そして、処理は、ステップSP34の処理に移行する。
(Step SP32)
The determination means 54 acquires the payment amount associated with the identification information (user ID) of one user in the user information 50A. Subsequently, the determination means 54 searches for the operation timetable stored as the user in the operation timetable information 50B, and the income amount corresponding to the identification information (operation timetable ID) of the searched operation timetable. Subtract the acquired payment amount from. Subsequently, the determination means 54 deletes the identification information (user ID) of the one user from the user users corresponding to the searched identification information (operation timetable ID) of the operation timetable. Then, the process shifts to the process of step SP34.

(ステップSP34)
決定手段54は、ユーザ情報50Aと運行ダイヤ情報50Bを参照して、ステップSP32において検索した運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザ(他のユーザ)それぞれの移動需要を取得する。続いて、決定手段54は、運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザの数(他のユーザの数)と利用ユーザ(他のユーザ)それぞれの利用日時に基づいて車両と車両数を再度特定し、乗降場所や運行日時を含む運行ダイヤを仮決定する。続いて、決定手段54は、特定した車両や車両数、仮決定した運行ダイヤに応じて、所定地域において交通機関を定期的に運行するための運行コスト(例えば1ヶ月のコスト)を再計算する。続いて、決定手段54は、再計算した運行コストを運行ダイヤ情報50Bの運行コストに記憶する。そして、処理は、ステップSP36の処理に移行する。
(Step SP34)
The determination means 54 refers to the user information 50A and the operation timetable information 50B, and acquires the movement demand of each user (other user) corresponding to the operation timetable identification information (operation timetable ID) searched in step SP32. .. Subsequently, the determination means 54 determines the vehicle and the vehicle based on the number of users (number of other users) corresponding to the identification information (operation timetable ID) of the operation schedule and the usage date and time of each user (other user). The number will be specified again, and the operation schedule including the boarding / alighting place and the operation date and time will be tentatively determined. Subsequently, the determination means 54 recalculates the operation cost (for example, the cost for one month) for periodically operating the transportation system in the predetermined area according to the specified vehicle, the number of vehicles, and the tentatively determined operation schedule. .. Subsequently, the determination means 54 stores the recalculated operating cost in the operating cost of the operating timetable information 50B. Then, the process shifts to the process of step SP36.

(ステップSP36)
判定手段56は、ステップSP32において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する収入金額が、ステップSP34において計算された運行コストに達しているか否かを判定する。例えば、判定手段56は、当該収入金額が当該運行コストを超えている場合、判定を肯定する。そして、当該判定が肯定判定された場合には、処理は、ステップSP38の処理に移行する。一方、当該判定が否定判定された場合には、処理は、ステップSP40の処理に移行する。
(Step SP36)
The determination means 56 determines whether or not the amount of income corresponding to the identification information (operation timetable ID) of the operation timetable searched in step SP32 reaches the operation cost calculated in step SP34. For example, the determination means 56 affirms the determination when the income amount exceeds the operating cost. Then, when the determination is affirmative, the process shifts to the process of step SP38. On the other hand, if the determination is negative, the process proceeds to the process of step SP40.

(ステップSP38)
決定手段54は、ステップSP34において仮決定した運行ダイヤを本決定する。続いて、通知手段58は、決定手段54によって決定された運行ダイヤを、利用ユーザ(他のユーザ)の端末装置12に通知する。具体的には、通知手段58は、ステップSP32において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザ(他のユーザ)それぞれの端末装置12に対して、運行継続通知画面を送信する。
(Step SP38)
The determination means 54 finally determines the operation schedule tentatively determined in step SP34. Subsequently, the notification means 58 notifies the terminal device 12 of the user (other user) of the operation schedule determined by the determination means 54. Specifically, the notification means 58 displays an operation continuation notification screen for each terminal device 12 of the user (other user) corresponding to the operation timetable identification information (operation timetable ID) searched in step SP32. Send.

図9は、本実施形態に係る運行継続通知画面90の一例を示す図である。 FIG. 9 is a diagram showing an example of the operation continuation notification screen 90 according to the present embodiment.

図9に示すように、運行継続通知画面90は、運行継続通知領域92が設けられている。運行継続通知領域92には、交通機関の運行継続が決定したことや、変更された運行日時、乗降場所が表されている。 As shown in FIG. 9, the operation continuation notification screen 90 is provided with an operation continuation notification area 92. The operation continuation notification area 92 indicates that the operation continuation of the transportation system has been decided, the changed operation date and time, and the boarding / alighting place.

そして、処理は、図8に示す一連の処理を終了する。 Then, the process ends a series of processes shown in FIG.

(ステップSP40)
決定手段54は、運行ダイヤ情報50Bにおいて、ステップSP32において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する決定フラグを「未決定」に更新する。続いて、通知手段58は、収入金額が不足していることを、利用ユーザ(他のユーザ)の端末装置12に通知する。具体的には、通知手段58は、ステップSP32において検索された運行ダイヤの識別情報(運行ダイヤID)に対応する利用ユーザ(他のユーザ)それぞれの端末装置12に対して、金額不足通知画面を送信する。
(Step SP40)
In the operation timetable information 50B, the determination means 54 updates the determination flag corresponding to the operation timetable identification information (operation timetable ID) searched in step SP32 to "undecided". Subsequently, the notification means 58 notifies the terminal device 12 of the user (other user) that the income amount is insufficient. Specifically, the notification means 58 displays an amount shortage notification screen for each terminal device 12 of the user (other user) corresponding to the operation schedule identification information (operation schedule ID) searched in step SP32. Send.

図10は、本実施形態に係る金額不足通知画面100の一例を示す図である。 FIG. 10 is a diagram showing an example of the amount shortage notification screen 100 according to the present embodiment.

図10に示すように、金額不足通知画面100は、金額不足通知領域102と、再入力ボタン104と、が設けられている。金額不足通知領域102には、収入金額が不足していることにより、交通機関の運行が継続できないこと等が表されている。再入力ボタン104は、ユーザが月額料金(支払金額)を再入力するためのボタンである。 As shown in FIG. 10, the amount shortage notification screen 100 is provided with an amount shortage notification area 102 and a re-entry button 104. In the amount shortage notification area 102, it is indicated that the operation of the transportation system cannot be continued due to the shortage of the income amount. The re-entry button 104 is a button for the user to re-enter the monthly fee (payment amount).

そして、処理は、図8に示す一連の処理を終了する。 Then, the process ends a series of processes shown in FIG.

<効果>
以上、本実施形態では、所定地域において交通機関の定期的な運行ダイヤを決定するためのプログラムであって、コンピュータを、複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段52、支払金額に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段54、決定された運行ダイヤを、移動需要を送信した各ユーザに通知する通知手段58、として機能させる。
<Effect>
As described above, in the present embodiment, it is a program for determining a regular operation schedule of transportation in a predetermined area, and a moving demand including at least a desired boarding / alighting place, a date and time of use, and a payment amount from a plurality of users. Reception means 52 for accepting transmission of 58, to function as.

この構成によれば、複数のユーザから支払金額を含む移動需要を受け付け、当該支払金額に応じて運行ダイヤを決定するため、ユーザの移動需要に応じた採算性のある運行ダイヤを決定することができる。また、ユーザに対しては、同乗予定者の検索や金銭的な負荷を軽減することができる。 According to this configuration, since mobile demand including the payment amount is received from a plurality of users and the operation schedule is determined according to the payment amount, it is possible to determine a profitable operation schedule according to the user's travel demand. can. In addition, for the user, it is possible to reduce the search for the prospective passenger and the financial burden.

また、本実施形態では、決定手段54は、移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる希望乗降場所を優先して運行ダイヤを決定する。 Further, in the present embodiment, the determination means 54 determines the operation schedule by giving priority to the desired boarding / alighting place included in the travel demand as the payment amount included in the travel demand increases.

この構成によれば、支払金額が多いほど希望乗降場所が優先された運行ダイヤが決定されるため、ユーザによる支払金額を高めることができ、もって採算性のある運行ダイヤを決定することができる。 According to this configuration, the operation schedule in which the desired boarding / alighting place is prioritized is determined as the payment amount is larger, so that the payment amount by the user can be increased and the operation schedule that is profitable can be determined.

また、本実施形態では、決定手段54は、移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる利用日時を優先して運行ダイヤを決定する。 Further, in the present embodiment, the determination means 54 determines the operation schedule by giving priority to the usage date and time included in the movement demand as the payment amount included in the movement demand increases.

この構成によれば、支払金額が多いほど利用日時が優先された運行ダイヤが決定されるため、ユーザによる支払金額を高めることができ、もって採算性のある運行ダイヤを決定することができる。 According to this configuration, the operation schedule in which the usage date and time is prioritized is determined as the payment amount is larger, so that the payment amount by the user can be increased, and the operation schedule that is profitable can be determined.

また、本実施形態では、決定手段54は、移動需要それぞれに含まれる支払金額の合計である収入金額が、移動需要を送信したユーザ数に対応する運行コストに達している場合、運行ダイヤを決定する。 Further, in the present embodiment, the determination means 54 determines the operation schedule when the income amount, which is the total of the payment amounts included in each of the movement demands, reaches the operation cost corresponding to the number of users who have transmitted the movement demands. do.

この構成によれば、収入金額が運行コストに達している場合に運行ダイヤを決定するため、採算性のある運行ダイヤを決定することができる。 According to this configuration, since the operation schedule is determined when the amount of income reaches the operation cost, it is possible to determine a profitable operation schedule.

また、本実施形態では、通知手段58は、収入金額が運行コストに達していない場合、移動需要を送信した各ユーザに、支払金額が不足していることを通知する。 Further, in the present embodiment, when the income amount does not reach the operating cost, the notification means 58 notifies each user who has transmitted the movement demand that the payment amount is insufficient.

この構成によれば、収入金額が運行コストに達していない場合に支払金額が不足していることを通知するため、利用を希望するユーザに対して納得感を与えることができる。 According to this configuration, when the income amount does not reach the operating cost, it is notified that the payment amount is insufficient, so that it is possible to give a convincing feeling to the user who wants to use it.

また、本実施形態では、受付手段52は、移動需要を送信した各ユーザから、新たな支払金額の送信を受け付け、決定手段54は、各ユーザから送信された新たな支払金額の合計である収入金額が運行コストに達している場合、運行ダイヤを決定する。 Further, in the present embodiment, the receiving means 52 receives the transmission of a new payment amount from each user who has transmitted the mobile demand, and the determining means 54 is the income which is the total of the new payment amounts transmitted from each user. If the amount has reached the operating cost, determine the operating schedule.

この構成によれば、収入金額が運行コストに達していない場合に新たな支払金額の送信を受け付け、新たな収入金額が運行コストに達していることにより運行ダイヤを決定するため、採算性のある運行ダイヤを決定することができるとともに、運行ダイヤを決定しやすくすることができる。 According to this configuration, it is profitable because it accepts the transmission of a new payment amount when the income amount has not reached the operation cost and determines the operation schedule based on the new income amount reaching the operation cost. It is possible to determine the operation timetable and to make it easier to determine the operation timetable.

また、本実施形態では、受付手段52は、運行ダイヤで交通機関を利用している一のユーザから、利用を中止する要求を受け付け、通知手段58は、一のユーザの支払金額を除いた収入金額が、一のユーザを除いた新たなユーザ数に対応する運行コストに達していない場合、運行ダイヤで交通機関を利用している他のユーザそれぞれに、支払金額が不足していることを通知する。 Further, in the present embodiment, the reception means 52 receives a request to stop the use from one user who is using the transportation system in the operation schedule, and the notification means 58 is the income excluding the payment amount of the one user. If the amount does not reach the operating cost corresponding to the number of new users excluding one user, notify each of the other users using transportation on the operation schedule that the payment amount is insufficient. do.

この構成によれば、利用を中止する一のユーザがいる場合に、他のユーザそれぞれに支払金額が不足していることを通知するため、利用をしているユーザに対して納得感を与えることができる。 According to this configuration, when there is one user who discontinues the use, the other users are notified that the payment amount is insufficient, so that the user who is using the user feels convinced. Can be done.

また、本実施形態では、受付手段52は、他のユーザそれぞれから、新たな支払金額の送信を受け付け、決定手段54は、他のユーザそれぞれから送信された新たな支払金額の合計である収入金額が新たなユーザ数に対応する運行コストに達している場合、交通機関の運行を継続することを決定する。 Further, in the present embodiment, the receiving means 52 accepts the transmission of a new payment amount from each of the other users, and the determining means 54 is the income amount which is the total of the new payment amounts transmitted from each of the other users. If the operating cost has reached the new number of users, it is decided to continue the operation of the transportation system.

この構成によれば、収入金額が運行コストに達していない場合に新たな支払金額の送信を受け付け、新たな収入金額が運行コストに達していることにより交通機関の運行を継続するため、採算性のある運行ダイヤを決定することができるとともに、交通機関の運行を継続しやすくすることができる。 According to this configuration, if the amount of income does not reach the operating cost, a new payment amount is accepted, and when the new amount of income reaches the operating cost, the operation of the transportation system is continued, so that it is profitable. It is possible to determine a certain operation schedule and to make it easier to continue the operation of transportation.

また、本実施形態では、決定手段54は、一のユーザによる利用の中止に応じて、運行ダイヤに含まれる乗降場所又は運行日時を変更する。 Further, in the present embodiment, the determination means 54 changes the boarding / alighting place or the operation date and time included in the operation schedule according to the suspension of use by one user.

この構成によれば、一のユーザによる交通機関の利用中止に伴い、乗降場所又は運行日時が変更されるため、継続して交通機関を利用する他のユーザの利便性を向上させることができる。 According to this configuration, when one user stops using the transportation system, the boarding / alighting place or the operation date and time is changed, so that the convenience of another user who continuously uses the transportation system can be improved.

<変形例>
なお、本発明は上記の実施形態に限定されるものではない。すなわち、上記の実施形態に、当業者が適宜設計変更を加えたものも、本発明の特徴を備えている限り、本発明の範囲に包含される。また、上記実施形態及び後述する変形例が備える各要素は、技術的に可能な限りにおいて組み合わせることができ、これらを組み合わせたものも本発明の特徴を含む限り本発明の範囲に包含される。
<Modification example>
The present invention is not limited to the above embodiment. That is, the above-described embodiment with appropriate design changes by those skilled in the art is also included in the scope of the present invention as long as it has the features of the present invention. Further, the elements included in the above-described embodiment and the modifications described later can be combined as much as technically possible, and the combination thereof is also included in the scope of the present invention as long as the features of the present invention are included.

例えば、上記実施形態では、ステップSP10で送信される入力画面において、ユーザが希望する降車場所を入力する領域が設けられる場合を説明したが、この降車場所は所定地域内の予め定められた地点(例えば病院や学校、役場、スーパーマーケット)のみを入力可能としてもよい。また、この入力画面では、支払金額である月額料金を入力する入力欄が表される場合を説明したが、この入力欄の近傍において、支払金額が多いほど希望乗車場所や利用日時を優先することを表示してもよい。また、この入力画面では、往路の到着時刻と、復路の出発時刻を入力する入力欄が表される場合を説明したが、往路の出発時刻と復路の到着時刻を入力する入力欄が表されてもよい。 For example, in the above embodiment, the case where the input screen transmitted in step SP10 is provided with an area for inputting the disembarkation place desired by the user, the disembarkation place is a predetermined point in a predetermined area ( For example, only hospitals, schools, government offices, supermarkets) may be input. In addition, this input screen explained the case where an input field for entering the monthly fare, which is the payment amount, is displayed. However, in the vicinity of this input field, the larger the payment amount, the priority is given to the desired boarding place and usage date and time. May be displayed. In addition, in this input screen, the case where the input field for inputting the arrival time of the outward route and the departure time of the return route is displayed has been explained, but the input field for inputting the departure time of the outward route and the arrival time of the return route is displayed. May be good.

また、判定手段56は、移動需要それぞれに含まれる支払金額の合計である収入金額が、移動需要を送信したユーザ数に対応する運行コストに達しているか否かを判定する場合を説明したが、この収入金額には、自治体からの助成金等を加算してもよい。 Further, the determination means 56 has described a case where it is determined whether or not the income amount, which is the total of the payment amounts included in each of the mobile demands, reaches the operating cost corresponding to the number of users who have transmitted the mobile demands. A subsidy from the local government may be added to this income amount.

また、通知手段58は、各ユーザに支払金額が不足していることを通知する場合を説明したが、支払金額が少ないユーザにのみ当該不足していることを通知してもよい。例えば、通知手段58は、各ユーザの支払金額の平均額よりも少ない支払金額を送信した一部のユーザにのみ、支払金額が不足していることを通知する。なお、例えば、通知手段58は、1人あたりの運行コストよりも少ない支払金額を送信した一部のユーザにのみ、支払金額が不足していることを通知してもよい。 Further, although the notification means 58 has described the case of notifying each user that the payment amount is insufficient, the notification means 58 may notify only the user having a small payment amount that the payment amount is insufficient. For example, the notification means 58 notifies only some users who have transmitted a payment amount less than the average payment amount of each user that the payment amount is insufficient. Note that, for example, the notification means 58 may notify only some users who have transmitted a payment amount less than the operating cost per person that the payment amount is insufficient.

また、上記実施形態では、通知手段58は、決定手段54によって決定された運行ダイヤを、移動需要を送信した各ユーザの端末装置12に通知する場合を説明したが、当該決定された運行ダイヤを交通機関の端末装置に通知してもよい。 Further, in the above embodiment, the notification means 58 has described the case where the operation timetable determined by the determination means 54 is notified to the terminal device 12 of each user who has transmitted the movement demand. You may notify the terminal device of the transportation system.

[付記]
本発明には、以下の付記が含まれる。
<付記1>
所定地域において交通機関の運行ダイヤを決定するためのプログラムであって、コンピュータを、
複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段、
前記支払金額及び2以上のユーザの支払金額の合計に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段、
前記決定された運行ダイヤを、前記移動需要を送信した各ユーザに通知する通知手段、
として機能させるプログラム。
[Additional Notes]
The present invention includes the following appendices.
<Appendix 1>
A program for determining transportation schedules in a given area, using a computer
A reception means that accepts transmission of travel demand including at least the desired boarding / alighting place, date and time of use, and payment amount from multiple users.
A determination means for determining an operation schedule including at least a boarding / alighting place and an operation date and time according to the total of the payment amount and the payment amounts of two or more users.
A notification means for notifying each user who has transmitted the movement demand of the determined operation schedule.
A program that functions as.

10…サーバ装置(コンピュータ)、50…記憶手段、52…受付手段、54…決定手段、58…通知手段

10 ... Server device (computer), 50 ... Storage means, 52 ... Reception means, 54 ... Decision means, 58 ... Notification means

Claims (10)

所定地域において交通機関の運行ダイヤを決定するためのプログラムであって、
コンピュータを、
複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段、
前記支払金額に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段、
前記決定された運行ダイヤを、前記移動需要を送信した各ユーザに通知する通知手段、
として機能させるプログラム。
It is a program for determining the operation schedule of transportation in a predetermined area.
Computer,
A reception means that accepts transmission of travel demand including at least the desired boarding / alighting place, date and time of use, and payment amount from multiple users.
Determining means for determining the operation schedule including at least the boarding / alighting place and the operation date and time according to the payment amount.
A notification means for notifying each user who has transmitted the movement demand of the determined operation schedule.
A program that functions as.
前記決定手段は、前記移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる希望乗降場所を優先して前記運行ダイヤを決定する、
請求項1に記載のプログラム。
The determination means determines the operation schedule by giving priority to the desired boarding / alighting place included in the travel demand as the payment amount included in the travel demand increases.
The program according to claim 1.
前記決定手段は、前記移動需要に含まれる支払金額が多いほど、当該移動需要に含まれる利用日時を優先して前記運行ダイヤを決定する、
請求項1に記載のプログラム。
The determination means determines the operation schedule by giving priority to the usage date and time included in the travel demand as the payment amount included in the travel demand increases.
The program according to claim 1.
前記決定手段は、前記移動需要それぞれに含まれる支払金額の合計である収入金額が、前記移動需要を送信したユーザ数に対応する運行コストに達している場合、前記運行ダイヤを決定する、
請求項1乃至3の何れか1項に記載のプログラム。
The determination means determines the operation schedule when the income amount, which is the total of the payment amounts included in each of the movement demands, reaches the operation cost corresponding to the number of users who have transmitted the movement demands.
The program according to any one of claims 1 to 3.
前記通知手段は、前記収入金額が前記運行コストに達していない場合、前記移動需要を送信した各ユーザに、支払金額が不足していることを通知する、
請求項4に記載のプログラム。
When the income amount does not reach the operating cost, the notification means notifies each user who has transmitted the movement demand that the payment amount is insufficient.
The program according to claim 4.
前記受付手段は、前記移動需要を送信した各ユーザから、新たな支払金額の送信を受け付け、
前記決定手段は、各ユーザから前記送信された新たな支払金額の合計である収入金額が前記運行コストに達している場合、前記運行ダイヤを決定する、
請求項5に記載のプログラム。
The receiving means receives the transmission of a new payment amount from each user who has transmitted the moving demand, and receives the transmission.
The determination means determines the operation schedule when the income amount, which is the total of the new payment amounts transmitted from each user, reaches the operation cost.
The program according to claim 5.
前記受付手段は、前記運行ダイヤで交通機関を利用している一のユーザから、利用を中止する要求を受け付け、
前記通知手段は、前記一のユーザの支払金額を除いた前記収入金額が、前記一のユーザを除いた新たなユーザ数に対応する運行コストに達していない場合、前記運行ダイヤで交通機関を利用している他のユーザそれぞれに、支払金額が不足していることを通知する、
請求項4乃至6の何れか1項に記載のプログラム。
The reception means receives a request to stop the use from one user who is using the transportation system in the operation schedule, and receives the request.
The notification means uses transportation in the operation timetable when the income amount excluding the payment amount of the one user does not reach the operation cost corresponding to the number of new users excluding the one user. Notify each of the other users that the payment amount is insufficient,
The program according to any one of claims 4 to 6.
前記受付手段は、前記他のユーザそれぞれから、新たな支払金額の送信を受け付け、
前記決定手段は、前記他のユーザそれぞれから前記送信された新たな支払金額の合計である収入金額が前記新たなユーザ数に対応する運行コストに達している場合、前記交通機関の運行を継続することを決定する、
請求項7に記載のプログラム。
The reception means receives transmission of a new payment amount from each of the other users,
The determination means continues the operation of the transportation system when the income amount, which is the total of the new payment amounts transmitted from each of the other users, reaches the operating cost corresponding to the new number of users. Decide that,
The program according to claim 7.
前記決定手段は、前記一のユーザによる利用の中止に応じて、前記運行ダイヤに含まれる乗降場所又は運行日時を変更する、
請求項8に記載のプログラム。
The determination means changes the boarding / alighting place or the operation date and time included in the operation timetable according to the suspension of use by the one user.
The program according to claim 8.
所定地域において交通機関の運行ダイヤを決定するための情報処理装置であって、
複数のユーザから、少なくとも希望乗降場所、利用日時、支払金額を含む移動需要の送信を受け付ける受付手段と、
前記支払金額に応じて、少なくとも乗降場所、運行日時を含む運行ダイヤを決定する決定手段と、
前記決定された運行ダイヤを、前記移動需要を送信した各ユーザに通知する通知手段と、
を備える情報処理装置。

It is an information processing device for determining the operation schedule of transportation in a predetermined area.
A reception means that accepts transmission of travel demand including at least the desired boarding / alighting place, date and time of use, and payment amount from multiple users.
A means of determining an operation schedule including at least the boarding / alighting place and the operation date and time according to the payment amount, and
A notification means for notifying each user who has transmitted the movement demand of the determined operation schedule, and
Information processing device equipped with.

JP2020070352A 2020-04-09 2020-04-09 Program and information processing device Active JP7131840B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2020070352A JP7131840B2 (en) 2020-04-09 2020-04-09 Program and information processing device
JP2022099453A JP7483272B2 (en) 2020-04-09 2022-06-21 PROGRAM AND INFORMATION PROCESSING APPARATUS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020070352A JP7131840B2 (en) 2020-04-09 2020-04-09 Program and information processing device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2022099453A Division JP7483272B2 (en) 2020-04-09 2022-06-21 PROGRAM AND INFORMATION PROCESSING APPARATUS

Publications (2)

Publication Number Publication Date
JP2021168008A true JP2021168008A (en) 2021-10-21
JP7131840B2 JP7131840B2 (en) 2022-09-06

Family

ID=78079766

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2020070352A Active JP7131840B2 (en) 2020-04-09 2020-04-09 Program and information processing device
JP2022099453A Active JP7483272B2 (en) 2020-04-09 2022-06-21 PROGRAM AND INFORMATION PROCESSING APPARATUS

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2022099453A Active JP7483272B2 (en) 2020-04-09 2022-06-21 PROGRAM AND INFORMATION PROCESSING APPARATUS

Country Status (1)

Country Link
JP (2) JP7131840B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002236997A (en) * 2001-02-07 2002-08-23 Casio Comput Co Ltd Passenger terminal equipment, vehicle operation management device, boarding data processing system, and program
JP2003067459A (en) * 2001-08-30 2003-03-07 Hitachi Information Systems Ltd Operation schedule organizing system for public transportation, it's method, and it's processing program
JP2004199179A (en) * 2002-12-16 2004-07-15 Toshihiro Hosokawa Demand bus train operation management system and method
JP2010165342A (en) * 2009-10-27 2010-07-29 Shinobu Hidaka Vehicle reservation server device, temporary reservation proxy server device, vehicle reservation system and computer program
JP2014191725A (en) * 2013-03-28 2014-10-06 Fujitsu Ltd Demand responsive transit connection support method, program and system
WO2018230676A1 (en) * 2017-06-15 2018-12-20 本田技研工業株式会社 Ride-sharing management device, ride-sharing management method, and program
US20190205813A1 (en) * 2017-12-29 2019-07-04 ANI Technologies Private Limited Method and system for transportation service routing
JP2019175392A (en) * 2018-03-29 2019-10-10 パナソニックIpマネジメント株式会社 Carpool support system, carpool support method, program and movable body

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6726605B2 (en) 2016-11-21 2020-07-22 株式会社日立製作所 Transportation supply and demand matching system and transportation supply and demand matching method
JP7025302B2 (en) 2018-08-07 2022-02-24 株式会社日立製作所 Information processing system and information processing method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002236997A (en) * 2001-02-07 2002-08-23 Casio Comput Co Ltd Passenger terminal equipment, vehicle operation management device, boarding data processing system, and program
JP2003067459A (en) * 2001-08-30 2003-03-07 Hitachi Information Systems Ltd Operation schedule organizing system for public transportation, it's method, and it's processing program
JP2004199179A (en) * 2002-12-16 2004-07-15 Toshihiro Hosokawa Demand bus train operation management system and method
JP2010165342A (en) * 2009-10-27 2010-07-29 Shinobu Hidaka Vehicle reservation server device, temporary reservation proxy server device, vehicle reservation system and computer program
JP2014191725A (en) * 2013-03-28 2014-10-06 Fujitsu Ltd Demand responsive transit connection support method, program and system
WO2018230676A1 (en) * 2017-06-15 2018-12-20 本田技研工業株式会社 Ride-sharing management device, ride-sharing management method, and program
US20190205813A1 (en) * 2017-12-29 2019-07-04 ANI Technologies Private Limited Method and system for transportation service routing
JP2019175392A (en) * 2018-03-29 2019-10-10 パナソニックIpマネジメント株式会社 Carpool support system, carpool support method, program and movable body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
READYFOR: ""「鉄道」に関するプロジェクト"", [ONLINE], JPN6022000546, 5 July 2019 (2019-07-05), JP, ISSN: 0004679987 *

Also Published As

Publication number Publication date
JP2022118141A (en) 2022-08-12
JP7131840B2 (en) 2022-09-06
JP7483272B2 (en) 2024-05-15

Similar Documents

Publication Publication Date Title
JP6655939B2 (en) Transport service reservation method, transport service reservation device, and transport service reservation program
US20130024249A1 (en) Public transport optimization
Agatz et al. Optimization for dynamic ride-sharing: A review
US20150095198A1 (en) Systems and methods for altering travel routes with a transaction location
US20150095122A1 (en) Systems and methods for determining pro rata shares of a monetary cost during a ride sharing situation
US20150095197A1 (en) Systems and methods for minimizing travel costs for use of transportation providers by a user
WO2015077634A1 (en) Methods and systems for scheduling a shared ride among commuters
JP5928588B2 (en) On-demand vehicle operation management device, on-demand vehicle operation management method, and on-demand vehicle operation management system
US20140074757A1 (en) Estimating taxi fare
US20100088026A1 (en) Location-aware selection of public transportation
US20190019146A1 (en) System and method for arranging deliveries and ride sharings
US20150032485A1 (en) Digital method For Providing Transportation Services
CN109118752A (en) Information processing method, information processing system and program
US20180150772A1 (en) Systems and Methods for Vehicle Resource Management
US20200132499A1 (en) Information providing apparatus, information providing system, information providing method, and non-transitory recording medium
US20200132494A1 (en) Data generating apparatus, data generating system, data generation method, and non-transitory recording medium
JP5986300B1 (en) Route information providing system, route information providing method, and route information providing program
Mulley et al. Recent developments in community transport provision: Comparative experience from Britain and Australia
JP7131840B2 (en) Program and information processing device
JP2007207077A (en) Vehicle allocation information provision system and vehicle allocation reservation server
JP2002140402A (en) Method for providing vehicle pool service and system for the same and device for the same
JP6810483B1 (en) Programs and information processing equipment
JP2024000642A (en) Program and information processing apparatus
JP7295720B2 (en) Vehicle allocation management device and vehicle allocation management method
JP7348591B2 (en) Monitoring support method, monitoring management device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220111

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220202

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20220517

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220621

C60 Trial request (containing other claim documents, opposition documents)

Free format text: JAPANESE INTERMEDIATE CODE: C60

Effective date: 20220621

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20220628

C21 Notice of transfer of a case for reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C21

Effective date: 20220705

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220818

R150 Certificate of patent or registration of utility model

Ref document number: 7131840

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150