JP2021102873A - Roof repair method - Google Patents

Roof repair method Download PDF

Info

Publication number
JP2021102873A
JP2021102873A JP2019234358A JP2019234358A JP2021102873A JP 2021102873 A JP2021102873 A JP 2021102873A JP 2019234358 A JP2019234358 A JP 2019234358A JP 2019234358 A JP2019234358 A JP 2019234358A JP 2021102873 A JP2021102873 A JP 2021102873A
Authority
JP
Japan
Prior art keywords
roof
repair
sheet
damaged
repair method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019234358A
Other languages
Japanese (ja)
Inventor
忠藏 熊谷
Chuzo Kumagai
忠藏 熊谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Chuzo
Original Assignee
Kumagai Chuzo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Chuzo filed Critical Kumagai Chuzo
Priority to JP2019234358A priority Critical patent/JP2021102873A/en
Publication of JP2021102873A publication Critical patent/JP2021102873A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

To provide a roof repair method capable of easily and appropriately repairing a damaged roof of a building, and being excellent in durability.SOLUTION: A roof repair method comprises a measurement step (S1) for measuring a repair range including a damage portion of a roof with the use of an unmanned aircraft, a repair sheet preparation step (S2) for preparing a repair sheet which is cut into a size according to the repair range, and a repair sheet attachment step (S3) for attaching the repair sheet to the damage portion of the roof.SELECTED DRAWING: Figure 1

Description

本発明は、建築物の破損した屋根を補修シートで覆って屋根の補修を行う屋根の補修工法に関する。 The present invention relates to a roof repair method in which a damaged roof of a building is covered with a repair sheet to repair the roof.

近年、台風や豪雨などの自然災害により、建築物の被害が相次いでいる。とりわけ、台風は、その発生頻度の多さから、直近台風の被害による建築物の補修が完了しないまま、連続して次の台風による被害を受けることがある。 In recent years, buildings have been damaged one after another due to natural disasters such as typhoons and heavy rains. In particular, due to the high frequency of typhoons, typhoons may be continuously damaged by the next typhoon without completing the repair of buildings due to the damage of the latest typhoon.

一方、我が国における一般住宅には古くから瓦屋根が使用されているが、台風災害により特定の地域に被害が集中した場合には、被災後から瓦屋根の葺き替えまでに、半年から数年要することもある。すなわち、瓦は受注生産であることから予備の瓦がなく、また、瓦職人も不足している事情から、葺き替え作業に取り掛かるまでに長期間を要する。 On the other hand, tiled roofs have been used for ordinary houses in Japan for a long time, but if damage is concentrated in a specific area due to a typhoon disaster, it will take half a year to several years from the time of the disaster to the replacement of the tiled roof. There is also. That is, since the tiles are made to order, there are no spare roof tiles, and there is a shortage of roof tile craftsmen, so it takes a long time to start the re-roofing work.

こうした状況下、被災後から瓦屋根の葺き替えまでに、屋根をブルーシートなどで覆い、その上に土嚢袋を載せて、それらを組紐で引くなどすることにより、応急処置的に瓦屋根の補修を行っている実情がある。 Under these circumstances, from the time of the disaster to the replacement of the tiled roof, the roof is covered with a blue sheet, sandbags are placed on it, and they are pulled with braids to repair the tiled roof as a first aid measure. There is a fact that we are doing.

このような瓦屋根の補修に関する技術としては、例えば、不織布と補強ネットとが多孔フィルムを挟むように積層された基材と基材の一方の面に形成された撥水性樹脂からなる滑り止め層と、基材の他方の面に形成された粘着層とを有し、滑り止め層の基材に対する面積が60〜90%であり、引張強度が、縦方向で200N/5cm以上、横方向で150N/5cm以上であり、透湿性が100〜5000g/m2・24hの範囲であり、耐水圧が10kPa以上であり、波長領域400〜700nmの透過率が40%以上である野地養生シート(特許文献1参照)や、ハトメを備える帯状接合部を介して相対向する、土嚢を収納可能な水平断面が略四角形の同寸法の二つの袋を有し、前記袋の前記接合部側端部は開口し、他端部は閉口していることを特徴とする土嚢保護袋(特許文献2参照)が提案されている。 As a technique for repairing such a tiled roof, for example, a non-slip layer made of a base material in which a non-woven fabric and a reinforcing net are laminated so as to sandwich a porous film and a water-repellent resin formed on one surface of the base material. And an adhesive layer formed on the other surface of the base material, the area of the non-slip layer with respect to the base material is 60 to 90%, and the tensile strength is 200 N / 5 cm or more in the vertical direction and in the horizontal direction. and at 150 N / 5 cm or higher, in the range of moisture permeability 100~5000g / m 2 · 24h, and the water pressure resistance 10kPa or more, sheathing curing sheet (Patent transmittance in the wavelength region 400~700nm not less than 40% (See Document 1) and two bags of the same size with substantially square horizontal cross sections capable of accommodating sandbags, which face each other via a band-shaped joint provided with a bag, and the end of the joint on the side of the bag. A sandbag protective bag (see Patent Document 2) has been proposed, which is characterized in that it is open and the other end is closed.

特開2018−168554号公報JP-A-2018-168554 実登3169178号公報Jitsuto 3169178 Gazette

従来のブルーシートを用いた補修工法では、通常用いられるブルーシートが雨風や直射日光に弱く、数か月で老朽化してしまうため、ブルーシートが破けるという問題があった。また、組紐が切れてブルーシートが吹き飛ばされ架線に引っ掛かったり、土嚢袋が落下したりするなどの二次災害の問題があった。さらに、重量のある土嚢袋を屋根で扱うことから熟練した技術が必要であり、専門としない業者が作業を行うには長時間を要すると共に、作業時の安全性にも問題があった。 In the conventional repair method using a blue sheet, the normally used blue sheet is vulnerable to rain, wind and direct sunlight, and deteriorates in a few months, so that there is a problem that the blue sheet is torn. In addition, there were problems of secondary disasters such as the braid being cut and the blue sheet being blown off and being caught on the overhead wire, and the sandbags falling. Furthermore, since the heavy sandbags are handled on the roof, skillful skills are required, and it takes a long time for a non-specialized contractor to perform the work, and there is also a problem in safety during work.

本発明の課題は、建築物の破損した屋根の補修を容易かつ適切に行うことができると共に、耐久性に優れる屋根補修工法を提供することにある。 An object of the present invention is to provide a roof repair method which can easily and appropriately repair a damaged roof of a building and has excellent durability.

本発明者は、建築物の破損した屋根の補修工法、特に瓦屋根の葺き替え作業に取り掛かるまでの瓦屋根の補修工法について鋭意検討した結果、屋根の破損部分を含む補修範囲を、無人航空機を用いて測定し、補修範囲に応じた大きさに切断した補修シートを作製し、屋根の破損部分に補修シートを取り付けることによって、屋根の補修を容易かつ適切に行うことができると共に、耐久性に優れる屋根に補修することができることを見いだし、本発明を完成するに至った。 As a result of diligent studies on a method for repairing a damaged roof of a building, particularly a method for repairing a tiled roof until the tiled roof is re-roofed, the present inventor uses an unmanned aircraft to cover the repair range including the damaged part of the roof. By making a repair sheet cut to a size according to the repair range and attaching the repair sheet to the damaged part of the roof, the roof can be repaired easily and appropriately, and the roof is excellent in durability. We found that the roof could be repaired, and completed the present invention.

また、屋根基材が破損した穴あき破損部分を有する屋根を補修する際には、さらに、屋根の穴あき破損部分を含む穴あき補修範囲を測定し、穴あき補修範囲に応じた大きさに切断した下地シートを作製し、屋根の穴あき破損部分に下地シートの取り付け、その上に発泡体の設置し、さらに、その上に補修シートを取り付けることによって、ひどく破損した屋根であっても、屋根の補修を容易かつ適切に行うことができると共に、耐久性に優れる屋根に補修することができることを見いだした。 Further, when repairing a roof having a perforated damaged part in which the roof base material is damaged, the perforated repair range including the perforated damaged part of the roof is further measured, and the size is adjusted according to the perforated repair range. By making a cut base sheet, attaching the base sheet to the perforated damaged part of the roof, installing the foam on it, and then attaching the repair sheet on it, even if the roof is severely damaged, It was found that the roof can be repaired easily and appropriately, and that the roof can be repaired with excellent durability.

すなわち、本発明は、以下の通りである。
[1]
建築物の破損した屋根を補修シートで覆って屋根の補修を行う屋根補修工法であって、
前記屋根の破損部分を含む補修範囲を、無人航空機を用いて測定する測定工程と、
前記補修範囲に応じた大きさに切断した補修シートを作製する補修シート作製工程と、
前記屋根の破損部分に前記補修シートを取り付ける補修シート取付工程と、
を有することを特徴とする屋根補修工法。
[2]
屋根基材が破損した穴あき破損部分を有する屋根を補修する方法であって、
前記測定工程が、さらに、屋根の穴あき破損部分を含む穴あき補修範囲を測定する工程であり、
前記補修シート取付工程の前に、
前記穴あき補修範囲に応じた大きさに切断した下地シートを作製する下地シート作製工程と、
前記屋根の穴あき破損部分に前記下地シートを取り付ける下地シート取付工程と、
前記下地シートの上に発泡材料を吹き付けて、該下地シート上に発泡体を設置する発泡体設置工程と、
を有することを特徴とする上記[1]記載の屋根補修工法。
[3]
前記補修シート作製工程において、屋根の破損部分に近い屋根の下端部及び/又は側端部に巻き付け可能な大きさの補修シートを作製すると共に、前記補修シート取付工程において、屋根の破損部分に近い屋根の下端部及び/又は側端部に補修シートを巻き付けて固定することを特徴とする上記[1]又は[2]記載の屋根補修方法。
[4]
前記補修シート作製工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に取り付け可能な大きさの補修シートを作製すると共に、前記補修シート取付工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に補修シートを取り付けることを特徴とする上記[1]〜[3]のいずれか記載の屋根補修工法。
[5]
前記補修シート作製工程において、補修シートの屋根の頂部に相当する位置に、目印を付すことを特徴とする上記[4]記載の屋根補修工法。
[6]
前記補修シート取付工程において、固定金具を用いて補修シートを屋根に固定することを特徴とする上記[1]〜[5]のいずれか記載の屋根補修工法。
[7]
前記補修シート取付工程において、防水テープ及び/又はコーキング剤を用いて補修シートを屋根に固定することを特徴とする上記[1]〜[6]のいずれか記載の屋根補修工法。
[8]
前記下地シートが、網目を有する下地シート本体を備えていることを特徴とする上記[2]〜[7]のいずれか記載の屋根補修工法。
[9]
前記下地シートが、さらに、補強シートを備えていることを特徴とする上記[8]記載の屋根補修工法。
[10]
前記補強シートが、網目を有する補強シートであることを特徴とする上記[9]記載の屋根補修工法。
[11]
前記下地シート取付工程において、屋根の穴あき破損部分に下地シート本体を取り付けた後、該下地シート本体の上に補強シートを取り付けることを特徴とする上記[9]又は[10]記載の屋根補修工法。
[12]
前記発泡体が、発泡硬質ウレタンであることを特徴とする上記[2]〜[11]のいずれか記載の屋根補修工法。
[13]
前記補修シートが、エステル帆布シート又はターポリン帆布シートであることを特徴とする上記[1]〜[12]のいずれか記載の屋根補修工法。
[14]
前記破損した屋根が瓦構造の屋根であって、
前記測定工程において、無人航空機を用いて屋根の破損部分の葺き替えが必要な瓦の数を計測することを特徴とする上記[1]〜[13]のいずれか記載の屋根補修工法。
[15]
上記[14]記載の屋根補修工法と、瓦屋根葺替工法とを備えた瓦屋根改修方法であって、
前記瓦屋根葺替工法が、
前記屋根補修工法において計測した葺き替えが必要な数の瓦を作製する瓦作製工程と、
前記屋根補修工法において取り付けられた補修シートを取り外す取外工程と、
前記取外工程において補修シートが取り外された屋根に、前記瓦作製工程において作製された瓦を取り付ける瓦取付工程と、
を有することを特徴とする瓦屋根改修方法。
That is, the present invention is as follows.
[1]
It is a roof repair method that repairs the roof by covering the damaged roof of the building with a repair sheet.
A measurement process for measuring the repair range including the damaged part of the roof using an unmanned aerial vehicle, and
A repair sheet manufacturing process for producing a repair sheet cut to a size corresponding to the repair range, and a repair sheet manufacturing process.
The repair sheet attaching process of attaching the repair sheet to the damaged part of the roof, and
A roof repair method characterized by having.
[2]
It is a method of repairing a roof that has a perforated damaged part where the roof base material is damaged.
The measurement step is a step of further measuring the perforated repair range including the perforated damaged portion of the roof.
Before the repair sheet mounting process,
A base sheet manufacturing process for manufacturing a base sheet cut to a size corresponding to the perforated repair range, and
The base sheet mounting process for mounting the base sheet on the perforated damaged portion of the roof, and
A foam installation step of spraying a foam material on the base sheet and installing the foam on the base sheet,
The roof repair method according to the above [1].
[3]
In the repair sheet manufacturing step, a repair sheet having a size that can be wound around the lower end portion and / or the side end portion of the roof near the damaged portion of the roof is manufactured, and in the repair sheet attaching step, the repair sheet is close to the damaged portion of the roof. The roof repair method according to the above [1] or [2], wherein the repair sheet is wound around the lower end portion and / or the side end portion of the roof and fixed.
[4]
In the repair sheet manufacturing process, a repair sheet having a size that can be attached to the roof on the opposite slope beyond the top of the roof from the damaged part of the roof is produced, and in the repair sheet attaching process, from the damaged part of the roof. The roof repair method according to any one of [1] to [3] above, wherein the repair sheet is attached to the roof on the opposite slope beyond the top of the roof.
[5]
The roof repair method according to the above [4], wherein in the repair sheet manufacturing step, a mark is attached to a position corresponding to the top of the roof of the repair sheet.
[6]
The roof repair method according to any one of [1] to [5] above, wherein the repair sheet is fixed to the roof by using a fixing bracket in the repair sheet attaching step.
[7]
The roof repair method according to any one of the above [1] to [6], wherein the repair sheet is fixed to the roof by using a waterproof tape and / or a caulking agent in the repair sheet attaching step.
[8]
The roof repair method according to any one of [2] to [7] above, wherein the base sheet includes a base sheet main body having a mesh.
[9]
The roof repair method according to the above [8], wherein the base sheet further includes a reinforcing sheet.
[10]
The roof repair method according to the above [9], wherein the reinforcing sheet is a reinforcing sheet having a mesh.
[11]
The roof repair according to the above [9] or [10], which comprises attaching the base sheet main body to the perforated damaged portion of the roof in the base sheet attaching step, and then attaching the reinforcing sheet on the base sheet main body. Construction method.
[12]
The roof repair method according to any one of the above [2] to [11], wherein the foam is foamed hard urethane.
[13]
The roof repair method according to any one of the above [1] to [12], wherein the repair sheet is an ester canvas sheet or a tarpaulin canvas sheet.
[14]
The damaged roof is a tiled roof,
The roof repair method according to any one of [1] to [13] above, wherein in the measurement step, the number of roof tiles that need to be re-roofed at a damaged portion of the roof is measured by using an unmanned aerial vehicle.
[15]
It is a tile roof repair method including the roof repair method described in [14] above and the tile roof replacement method.
The tiled roof replacement method
The roof tile manufacturing process for producing the number of roof tiles that need to be re-roofed as measured in the roof repair method, and
The removal process for removing the repair sheet attached in the roof repair method, and
A roof tile mounting step of attaching the roof tile produced in the roof tile manufacturing process to the roof from which the repair sheet was removed in the roof tile manufacturing process,
A tiled roof repair method characterized by having.

本発明の屋根補修工法によれば、建築物の破損した屋根の補修を容易かつ適切に行うことができる。また、補修箇所は、耐久性に優れる。 According to the roof repair method of the present invention, it is possible to easily and appropriately repair a damaged roof of a building. In addition, the repaired part has excellent durability.

本発明の一実施形態に係る屋根補修工法の工程図である。It is a process drawing of the roof repair method which concerns on one Embodiment of this invention. 本発明の一実施形態に係る屋根基材が破損した穴あき破損部分を有する屋根を補修する場合の屋根補修工法の工程図である。It is a process drawing of the roof repair method in the case of repairing the roof which has the perforated damaged part which damaged the roof base material which concerns on one Embodiment of this invention. 本発明の一実施形態に係る穴あき破損部分を有する屋根の屋根補修工法における測定工程の説明図である。It is explanatory drawing of the measurement process in the roof repair method of the roof which has a perforated damaged part which concerns on one Embodiment of this invention. 本発明の測定工程におけるドローンを用いてマーキングされた屋根の概略平面図である。It is a schematic plan view of the roof marked by using the drone in the measurement process of this invention. 本発明の一実施形態に係る屋根補修工法における(A)補修シート作製工程、及び(B)下地シート作製工程の説明図である。It is explanatory drawing of (A) repair sheet manufacturing process and (B) base sheet manufacturing process in the roof repair method which concerns on one Embodiment of this invention. 本発明の一実施形態に係る屋根補修工法における下地シート取付工程の説明図であり、下地シート本体を屋根に取り付けた状態を示す概略平面図である。It is explanatory drawing of the base sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which the base sheet main body is attached to the roof. 本発明の一実施形態に係る屋根補修工法における下地シート取付工程の説明図であり、補強シートを屋根に取り付けた状態を示す概略平面図である。It is explanatory drawing of the base sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which attached the reinforcing sheet to a roof. 本発明の一実施形態に係る屋根補修工法における発泡体設置工程の説明図であり、発泡硬質ウレタンを設置した状態を示す概略平面図である。It is explanatory drawing of the foam installation process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which foamed rigid urethane is installed. 本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に巻き付けて固定した状態を示す概略平面図である。It is explanatory drawing of the repair sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which the repair sheet was wound around the roof and fixed. 本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、(A)は図9におけるA−A線中央拡大断面図、(B)は図9におけるB−B線中央拡大断面図を示す。It is explanatory drawing of the repair sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, (A) is the central enlarged sectional view of line AA in FIG. 9, (B) is the center of line BB in FIG. An enlarged cross-sectional view is shown. 本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に固定金具を用いて固定した状態を示す概略平面図である。It is explanatory drawing of the repair sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which fixed the repair sheet to the roof by using the fixing metal fittings. 本発明の補修シート取付工程における固定金具を示す説明図である。It is explanatory drawing which shows the fixing metal fitting in the repair sheet attachment process of this invention. 本発明の補修シート取付工程における固定金具の装着前の状態を示す概略図である。It is the schematic which shows the state before mounting of the fixing metal fitting in the repair sheet mounting process of this invention. 本発明の補修シート取付工程における固定金具の装着後の状態を示す概略図である。It is the schematic which shows the state after mounting of the fixing metal fitting in the repair sheet mounting process of this invention. 本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に防水テープを用いて固定した状態を示す概略平面図である。It is explanatory drawing of the repair sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which fixed the repair sheet to the roof by using the waterproof tape. 本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根にコーキング剤を用いて固定した状態を示す概略平面図である。It is explanatory drawing of the repair sheet attachment process in the roof repair method which concerns on one Embodiment of this invention, and is the schematic plan view which shows the state which fixed the repair sheet to the roof by using the caulking agent. 本発明の補修シート取付工程における防水テープ及びコーキング剤による固定を示す概略図である。It is the schematic which shows the fixing by the waterproof tape and the caulking agent in the repair sheet attachment process of this invention.

本発明の屋根補修工法は、建築物の破損した屋根を補修シートで覆って屋根の補修を行う屋根補修工法であって、屋根の破損部分を含む補修範囲を、無人航空機を用いて測定する測定工程と、補修範囲に応じた大きさに切断した補修シートを作製する補修シート作製工程と、屋根の破損部分に補修シートを取り付ける補修シート取付工程と、を有することを特徴とする。 The roof repair method of the present invention is a roof repair method in which a damaged roof of a building is covered with a repair sheet to repair the roof, and the repair range including the damaged part of the roof is measured by using an unmanned aircraft. It is characterized by having a step, a repair sheet manufacturing step of manufacturing a repair sheet cut into a size according to the repair range, and a repair sheet mounting step of mounting the repair sheet on a damaged portion of the roof.

また、本発明の屋根補修工法は、屋根基材が破損した穴あき破損部分を有する屋根を補修する場合には、測定工程が、さらに、屋根の穴あき破損部分を含む穴あき補修範囲を測定する工程であり、補修シート取付工程の前に、穴あき補修範囲に応じた大きさに切断した下地シートを作製する下地シート作製工程と、屋根の穴あき破損部分に下地シートを取り付ける下地シート取付工程と、下地シートの上に発泡材料を吹き付けて、下地シート上に発泡体を設置する発泡体設置工程と、を有することが好ましい。 Further, in the roof repair method of the present invention, when repairing a roof having a perforated damaged portion in which the roof base material is damaged, the measurement step further measures the perforated repair range including the perforated damaged portion of the roof. Before the repair sheet mounting process, there is a base sheet manufacturing process that prepares a base sheet cut to a size according to the perforated repair range, and a base sheet mounting that attaches the base sheet to the perforated damaged part of the roof. It is preferable to have a step and a foam installation step of spraying a foam material on the base sheet and installing the foam on the base sheet.

本発明の屋根補修工法においては、建築物の破損した屋根の補修を容易かつ適切に行うことができる。特に、無人航空機を用いて測定を行うことから、従来の屋根の上での作業が少なく、安全に作業を行うことができる。また、少人数で作業を行うことができる。さらに、補修シートの取り付けには、熟練した技術を必要としないことから、被災地域等の建設業者など屋根工事を専門としない施工業者であっても容易に作業することができる。
また、本発明の屋根補修工法は、被災地などの屋根の葺き替え作業までの屋根の補修に用いることができる。
In the roof repair method of the present invention, it is possible to easily and appropriately repair a damaged roof of a building. In particular, since the measurement is performed using an unmanned aerial vehicle, there is less work on the conventional roof, and the work can be performed safely. Also, the work can be done by a small number of people. Furthermore, since the installation of the repair sheet does not require skilled skills, even a contractor who does not specialize in roof construction, such as a contractor in a disaster area, can easily perform the work.
Further, the roof repair method of the present invention can be used for roof repair up to the roof re-roofing work in a disaster area or the like.

本発明の屋根補修工法は、例えば、洋瓦、和瓦、スレート、セメント瓦等の屋根材を用いた建築物に用いることができる。 The roof repair method of the present invention can be used for buildings using roofing materials such as Western roof tiles, Japanese roof tiles, slate, and cement roof tiles.

以下、本発明の屋根補修工法について詳しく説明する。
図1に示すように、本発明の一実施形態に係る屋根補修工法は、測定工程(S1)、補修シート作製工程(S2)、補修シート取付工程(S3)を順次有している。
Hereinafter, the roof repair method of the present invention will be described in detail.
As shown in FIG. 1, the roof repair method according to the embodiment of the present invention sequentially includes a measurement step (S1), a repair sheet manufacturing step (S2), and a repair sheet mounting step (S3).

まず、本発明の測定工程(S1)について説明する。
測定工程は、屋根の破損部分を含む補修範囲を、無人航空機を用いて測定する工程である。これにより、正確に屋根の破損部分を把握することができる。また、屋根の上に登って行う測定ではなく、地上からの無人航空機の操作により行う測定であるため安全である。さらに、1人でも作業を行うことができる。
First, the measurement step (S1) of the present invention will be described.
The measuring step is a step of measuring the repair range including the damaged part of the roof using an unmanned aerial vehicle. This makes it possible to accurately grasp the damaged part of the roof. In addition, it is safe because it is not a measurement performed by climbing on the roof, but a measurement performed by operating an unmanned aerial vehicle from the ground. Furthermore, even one person can perform the work.

本発明の屋根の破損とは、瓦やスレート等の屋根材が、無くなっている状態又は破壊されている状態をいう。また、本発明の屋根の破損部分とは、屋根材が無くなったか破壊され、屋根材の下に敷かれた防水シート(ルーフィング)や野地板等の屋根基材が露出した部分や、屋根材と共に屋根基材が無くなったか破壊され、屋根基材に穴(間隙を含む)が形成された穴あき破損部分や、その両方を含むものである。 Damage to the roof of the present invention means a state in which roofing materials such as roof tiles and slate are lost or destroyed. Further, the damaged portion of the roof of the present invention is a portion where the roofing material is lost or destroyed and the roof base material such as a waterproof sheet (roofing) or a field board laid under the roofing material is exposed, together with the roofing material. It includes perforated damaged parts where holes (including gaps) are formed in the roof base material due to loss or destruction of the roof base material, or both.

無人航空機(UAVともいう)は、人が乗ることができない飛行機、回転翼航空機、滑空機、飛行船であって、遠隔操作又は自動操縦により飛行させることができるものであり、例えば、ドローン(マルチコプター)、ラジコン飛行機、ラジコンヘリコプター等を挙げることができる。なお、本発明における無人航空機には、重量200g以下のいわゆる模型航空機や小型無人機も含まれる。 Unmanned aerial vehicles (also referred to as UAVs) are aircraft, rotary-wing aircraft, gliders, and airships that cannot be boarded by humans, and can be flown by remote control or automatic control. For example, drones (multicopters). ), Radio-controlled aircraft, radio-controlled helicopters, etc. The unmanned aerial vehicle in the present invention also includes a so-called model aircraft and a small unmanned aerial vehicle having a weight of 200 g or less.

本発明の無人航空機としては、屋根の破損部分を含む補修範囲を測定することができる測定装置を備えるものであれば特に制限されるものではないが、測定装置としては、例えば、屋根を上空から撮影するカメラ、レーザー測量装置等を挙げることができ、屋根を上空から撮影するカメラが好ましい。また、本発明の無人航空機は、屋根の補修範囲及び頂部(棟)をマーキングするマーキング装置を備えているものが好ましい。本発明のマーキング装置がマーキングする屋根の部位としては、例えば、屋根の補修範囲、屋根の穴あき補修範囲、屋根の頂部(棟)、屋根の下端部(軒先)、屋根の側端部(破風)等を挙げることができる。 The unmanned aerial vehicle of the present invention is not particularly limited as long as it is provided with a measuring device capable of measuring the repair range including the damaged part of the roof, but the measuring device includes, for example, the roof from the sky. Examples include a camera for taking a picture, a laser measuring device, and the like, and a camera for taking a picture of the roof from the sky is preferable. Further, the unmanned aerial vehicle of the present invention preferably includes a marking device for marking the repair range of the roof and the top (building). Examples of the roof portion marked by the marking device of the present invention include a roof repair range, a roof perforated repair range, a roof top (ridge), a roof lower end (eaves), and a roof side edge (gable). ) Etc. can be mentioned.

補修範囲は、少なくとも屋根の破損部分を含み、屋根の破損部分以外に、補修シートを屋根に取り付ける部分を含む。 The repair range includes at least the damaged part of the roof, and includes the part where the repair sheet is attached to the roof in addition to the damaged part of the roof.

次に、本発明の補修シート作製工程(S2)について説明する。
補修シート作製工程は、補修範囲に応じた大きさに切断した補修シートを作製する工程である。すなわち、測定工程において測定した屋根の破損部分を含む補修範囲に応じて、補修シートを切断して作製する。補修シートは、屋根における破損部分の位置や大きさにより適宜設定して切断されるものであるが、少なくとも屋根の破損部分を含む大きさに切断されるものであり、通常、屋根の破損部分以外に、補修シートを屋根に取り付ける部分を含めて切断される。
Next, the repair sheet manufacturing step (S2) of the present invention will be described.
The repair sheet manufacturing step is a step of manufacturing a repair sheet cut into a size corresponding to the repair range. That is, the repair sheet is cut and manufactured according to the repair range including the damaged portion of the roof measured in the measurement step. The repair sheet is cut by appropriately setting it according to the position and size of the damaged part on the roof, but it is cut to a size including at least the damaged part of the roof, and is usually other than the damaged part of the roof. In addition, the part including the part where the repair sheet is attached to the roof is cut.

補修シート作製工程においては、屋根の破損部分に近い屋根の下端部及び/又は側端部に巻き付け可能な大きさの補修シートを作製することが好ましい。これにより、補修シート取付工程において、屋根の破損部分に近い屋根の下端部及び/又は側端部に補修シートを巻き付けて固定することができ、容易かつ強固に補修シートを取り付けることができる。 In the repair sheet manufacturing step, it is preferable to prepare a repair sheet having a size that can be wrapped around the lower end portion and / or the side end portion of the roof near the damaged portion of the roof. Thereby, in the repair sheet attaching step, the repair sheet can be wound and fixed around the lower end portion and / or the side end portion of the roof near the damaged portion of the roof, and the repair sheet can be easily and firmly attached.

また、補修シート作製工程においては、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に取り付け可能な大きさの補修シートを作製することが好ましい。これにより、補修シート取付工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に補修シートを取り付けることができ、屋根に吹き付ける強風、特に屋根の下側からの風により、補修シートが吹き飛ばされることを防止することができる。 Further, in the repair sheet manufacturing process, it is preferable to manufacture a repair sheet having a size that can be attached to the roof on the opposite slope beyond the top of the roof from the damaged portion of the roof. As a result, in the repair sheet mounting process, the repair sheet can be mounted on the roof on the opposite slope beyond the top of the roof from the damaged part of the roof, and the strong wind blowing on the roof, especially the wind from the underside of the roof, causes the repair sheet to be mounted. It is possible to prevent the repair sheet from being blown off.

また、補修シート作製工程において、補修シートに、屋根に取り付けるための目印を付すことが好ましい。目印を付す箇所としては、特に制限されるものではないが、例えば、屋根の補修範囲、屋根の頂部(棟)、屋根の下端部(軒先)、屋根の側端部(破風)等を挙げることができる。複数箇所に目印を設ける場合は、少なくも1つ以上異なる目印を付すことが好ましい。これにより、補修シートの位置合わせがより容易となる。 Further, in the repair sheet manufacturing process, it is preferable to attach a mark to the repair sheet for attaching to the roof. The place to be marked is not particularly limited, but includes, for example, the repair range of the roof, the top of the roof (ridge), the lower end of the roof (eaves), the side edge of the roof (gable), and the like. Can be done. When markings are provided at a plurality of locations, it is preferable to mark at least one different mark. This makes it easier to align the repair sheet.

上記のように、補修シート作製工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に補修シートを取り付ける場合には、補修シートの屋根の頂部に相当する位置に、目印を付すことが好ましい。これにより、補修シートを屋根に取り付ける際に、上記目印を基準に、屋根の補修範囲及び補修シートの位置を合わせができることから、補修シートを正確かつ容易に取り付けることができる。目印としては、例えば、1つの点であってもよいが、頂部に沿った線や頂部に沿った2つの点など、取付方向が把握しやすいものが好ましい。また、補修シートの屋根の頂部に相当する位置の両端付近にそれぞれ異なる目印を付すことが好ましい。これにより、補修シートを取り付ける際に、より容易に取付方向が把握することができる。 As described above, in the repair sheet manufacturing process, when the repair sheet is attached to the roof on the opposite slope beyond the top of the roof from the damaged part of the roof, a mark is placed at a position corresponding to the top of the roof of the repair sheet. It is preferable to add. As a result, when the repair sheet is attached to the roof, the repair range of the roof and the position of the repair sheet can be aligned with reference to the above mark, so that the repair sheet can be attached accurately and easily. The mark may be, for example, one point, but it is preferable that the mark is one in which the mounting direction can be easily grasped, such as a line along the top or two points along the top. Further, it is preferable to put different marks near both ends of the position corresponding to the top of the roof of the repair sheet. As a result, when the repair sheet is attached, the attachment direction can be more easily grasped.

また、上記測定工程において、無人航空機により、屋根にマーキングを施した場合には、補修シートに、マーキングと同一の目印を付すことが好ましく、具体的に例えば、マーキング装置により屋根の補修範囲の一方側に2つの丸印を付すと共に、他方側に1つの丸印を付した場合、補修シートにおいて屋根の補修範囲の一方側に2つの丸印を付すと共に、他方側に1つの丸印を付せば、同じ目印を合わせるだけで位置合わせができることから、補修シートの取付方向を把握することができ、確実かつ容易に取り付けることができる。 Further, in the above measurement step, when the roof is marked by an unmanned aerial vehicle, it is preferable to mark the repair sheet with the same mark as the marking. Specifically, for example, one of the roof repair ranges is provided by the marking device. If two circles are attached to the side and one circle is attached to the other side, two circles are attached to one side of the roof repair range and one circle is attached to the other side of the repair sheet. By doing so, the alignment can be performed simply by aligning the same marks, so that the mounting direction of the repair sheet can be grasped, and the repair sheet can be mounted reliably and easily.

次に、本発明の補修シート取付工程(S3)について説明する。
補修シート取付工程は、屋根の破損部分に補修シートを取り付ける工程である。これにより、屋根の防水性、断熱性、遮音性、及び気密性を高くすることができる。また、屋根材が吹き飛ばされることを防ぐことができる。
なお、補修シートは、屋根の破損部分に屋根基材が残っている場合には、その上に直接取り付けてもよいし、屋根基材の上に保護シートを設け、その上に取り付けてもよい。また、屋根基材に穴が形成されている場合(穴あき破損部分)には、後述するように、下地シートや発泡体を設け、その上に取り付けることが好ましい。
Next, the repair sheet attaching step (S3) of the present invention will be described.
The repair sheet attaching process is a step of attaching the repair sheet to the damaged part of the roof. As a result, the waterproofness, heat insulation, sound insulation, and airtightness of the roof can be improved. In addition, it is possible to prevent the roofing material from being blown off.
If the roof base material remains on the damaged part of the roof, the repair sheet may be directly attached on the roof base material, or a protective sheet may be provided on the roof base material and attached on the protective sheet. .. Further, when holes are formed in the roof base material (perforated damaged portion), it is preferable to provide a base sheet or foam and mount the base sheet or foam on the base sheet or foam as described later.

補修シートは、破損した屋根に覆うことができるものであれば特に制限されるものではなく、例えば、ポリエチレンクロスシート、エステル帆布シート、ターポリン帆布シート等の合成樹脂製の補修シートを挙げることができる。本発明の補修シートは、引張性、耐候性に優れる点で、エステル帆布シート又はターポリン帆布シートが好ましい。これにより、少なくとも2〜3年の耐久性を維持することができ、瓦屋根の葺き替え作業に取り掛かるまでの期間が長期化した場合にも問題ない。 The repair sheet is not particularly limited as long as it can cover a damaged roof, and examples thereof include a repair sheet made of synthetic resin such as a polyethylene cloth sheet, an ester canvas sheet, and a tarpaulin canvas sheet. .. The repair sheet of the present invention is preferably an ester canvas sheet or a tarpaulin canvas sheet in terms of excellent tensile strength and weather resistance. As a result, the durability can be maintained for at least 2 to 3 years, and there is no problem even if the period until the tile roof re-roofing work is started is prolonged.

補修シートは、建築物又は屋根材の色に合わせて着色してもよい。補修シートを建築物又は屋根材の色に合わせて着色すれば、補修シートを取り付けた際に、建築物の外観を良くすることができる。 The repair sheet may be colored to match the color of the building or roofing material. If the repair sheet is colored according to the color of the building or the roofing material, the appearance of the building can be improved when the repair sheet is attached.

補修シートの屋根への取付方法としては、固定金具を用いて補修シートを屋根に固定する方法や、防水テープ及び/又はコーキング剤を用いて補修シートを屋根に固定する方法を挙げることができる。 Examples of the method of attaching the repair sheet to the roof include a method of fixing the repair sheet to the roof using a fixing bracket and a method of fixing the repair sheet to the roof using a waterproof tape and / or a caulking agent.

また、上述したように、特定の部位については、屋根の破損部分に近い屋根の下端部及び/又は側端部に補修シートを巻き付けて固定する方法や、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に補修シートを取り付ける方法を採用することができる。 Further, as described above, for a specific part, a method of wrapping a repair sheet around the lower end and / or the side end of the roof near the damaged part of the roof, or a method of fixing the damaged part of the roof beyond the top of the roof. A method of attaching a repair sheet to the roof on the opposite slope can be adopted.

なお、屋根の下端部及び/又は側端部に巻き付けた補修シートの固定方法としては、例えば、タッカー(建築用ホッチキス、ステープラーともいう)を用いて、屋根の下端部及び/又は側端部の下側(裏側)に針を打ち付けてることにより、固定することができる。また、防水テープ及び/又はコーキング剤を用いて固定してもよい。 As a method of fixing the repair sheet wrapped around the lower end and / or the side end of the roof, for example, a tacker (also referred to as a building stapler or a stapler) is used to fix the lower end and / or the side end of the roof. It can be fixed by striking the needle on the lower side (back side). Alternatively, it may be fixed with a waterproof tape and / or a caulking agent.

固定金具を用いて補修シートを屋根に固定する方法の場合、固定金具は、補修シートを屋根に固定できるものであれば特に制限されるものではない。例えば、瓦構造の屋根に補修シートを取り付ける固定金具としては、上瓦及び下瓦が重なり合う間隙に補修シートを貫通して挿入される瓦間挿入部と、瓦間挿入部の上方に位置し、上瓦の上の補修シートを押さえる上瓦押さえ部とを有し、該瓦間挿入部及び上瓦押さえ部が連結部を介して連結された、横向きU字状又はコ字状に形成された上瓦固定部と、該上瓦固定部の瓦間挿入部の反対側に設けられた、下瓦の上の補修シートを押さえる下瓦押さえ部と、を備えるものを用いることができる(図12参照)。これにより、補修シートを屋根に確実に固定することができる。また、瓦同士が重なり合って生じる間隙に差し込むという簡単な作業で補修シートを屋根に取り付けることができる。 In the case of the method of fixing the repair sheet to the roof using the fixing metal fitting, the fixing metal fitting is not particularly limited as long as the repair sheet can be fixed to the roof. For example, as a fixing bracket for attaching a repair sheet to a roof of a roof tile structure, there are an inter-tile insertion part that is inserted through the repair sheet in the gap where the upper and lower tiles overlap, and an inter-tile insertion part that is located above the inter-tile insertion part. It has an upper tile holding portion that holds the repair sheet on the upper tile, and the inter-tile insertion portion and the upper tile holding portion are connected via a connecting portion, and is formed in a horizontal U-shape or a U-shape. An upper tile fixing portion and a lower tile holding portion for holding a repair sheet on the lower tile, which is provided on the opposite side of the inter-tile insertion portion of the upper tile fixing portion, can be used (FIG. 12). reference). As a result, the repair sheet can be securely fixed to the roof. In addition, the repair sheet can be attached to the roof by a simple operation of inserting the tiles into the gap created by overlapping the tiles.

瓦間挿入部は、先端が鋭角に形成された棒状部材であることが好ましい。これにより、補修シートを容易に貫通させることができ、取付が容易となる。なお、瓦間挿入部が貫通して補修シートに形成された孔や間隙は、防水テープ又はコーキング剤でシールしてもよい。 The inter-tile insertion portion is preferably a rod-shaped member having an acute-angled tip. As a result, the repair sheet can be easily penetrated, and the installation becomes easy. The holes and gaps formed in the repair sheet through which the inter-tile insertion portion penetrates may be sealed with a waterproof tape or a caulking agent.

防水テープとしては、防水性を有し、屋根及び補修シートの境界部分に形成される孔や間隙をシールできるものであれば特に制限されるものではなく、ゴム系材料又は合成樹脂系材料のシート状基材に粘着剤が塗布されたものを挙げることができる。ゴム系材料としては、例えば、ブチルゴム、シリコンゴム等を挙げることできる。また、合成樹脂系材料としては、例えば、ポリエチレン、EVA(エチレン・酢酸ビニル共重合樹脂)を挙げることできる。 The waterproof tape is not particularly limited as long as it is waterproof and can seal holes and gaps formed at the boundary between the roof and the repair sheet, and is a sheet made of a rubber-based material or a synthetic resin-based material. Examples thereof include those in which a pressure-sensitive adhesive is applied to a similar base material. Examples of the rubber-based material include butyl rubber and silicon rubber. Further, examples of the synthetic resin-based material include polyethylene and EVA (ethylene-vinyl acetate copolymer resin).

コーキング剤としては、屋根及び補修シートの境界部分に形成される孔や間隙をシールできるものであれば特に制限されるものではなく、例えば、ウレタンコーキング剤、変性シリコンコーキング剤、アクリルコーキング剤、シリコンコーキング剤、油性コーキング剤等を挙げることができる。コーキング剤は、防水テープと共に用いてもよく、例えば、防水テープを用いて屋根及び補修シートの境界部分に形成される孔や間隙をシールした後に、上からコーキング剤を用いてもよい。 The caulking agent is not particularly limited as long as it can seal the holes and gaps formed at the boundary between the roof and the repair sheet. For example, a urethane caulking agent, a modified silicon caulking agent, an acrylic caulking agent, and silicon. Examples thereof include caulking agents and oil-based caulking agents. The caulking agent may be used together with the waterproof tape. For example, the caulking agent may be used from above after sealing the holes and gaps formed at the boundary portion between the roof and the repair sheet with the waterproof tape.

続いて、屋根基材が破損した穴あき破損部分を有する屋根を補修する方法について説明する。 Subsequently, a method of repairing a roof having a perforated damaged portion in which the roof base material is damaged will be described.

図2に示すように、本発明の屋根補修工法は、無人航空機を用いて測定する測定工程(S1’)と、補修シート作製工程(S2)と、下地シート作製工程(S4)と、下地シート取付工程(S5)と、発泡体設置工程(S6)と、補修シート取付工程(S3)とを有する。 As shown in FIG. 2, the roof repair method of the present invention includes a measurement step (S1') for measuring using an unmanned aerial vehicle, a repair sheet manufacturing step (S2), a base sheet manufacturing step (S4), and a base sheet. It has an attachment step (S5), a foam installation step (S6), and a repair sheet attachment step (S3).

この工法では、下地シート取付工程(S5)及び発泡体設置工程(S6)において、屋根の穴あき破損部分に下地シート及び発泡体を取り付けられ、これにより、屋根の耐久性を優れたものにすることができる。また、下地シート及び発泡体の取り付けには、熟練した技術を必要としないことから、被災地域等の建設業者など屋根工事を専門としない施工業者であっても作業することができる。 In this construction method, in the base sheet mounting step (S5) and the foam installation step (S6), the base sheet and the foam are attached to the perforated damaged portion of the roof, thereby improving the durability of the roof. be able to. In addition, since the installation of the base sheet and the foam does not require skillful techniques, even a contractor who does not specialize in roof construction, such as a contractor in a disaster area, can work.

まず、測定工程(S1’)について説明する。
測定工程(S1’)は、屋根の破損部分を含む補修範囲、及び屋根の穴あき破損部分を含む穴あき補修範囲を、無人航空機を用いて測定する工程である。すなわち、破損範囲において、穴あき破損部分がある場合には、破損部分全体のみならず、穴あき破損部分の範囲も測定する。
First, the measurement step (S1') will be described.
The measurement step (S1') is a step of measuring the repair range including the damaged portion of the roof and the perforated repair range including the damaged portion of the roof using an unmanned aerial vehicle. That is, if there is a perforated damaged portion in the damaged range, not only the entire damaged portion but also the range of the perforated damaged portion is measured.

次に、補修シート作製工程(S2)及び補修シート取付工程(S3)は、上記説明したのと同様の工程であるので、下地シート作製工程(S4)について説明する。
下地シート作製工程は、穴あき補修範囲に応じた大きさに切断した下地シートを作製する工程である。すなわち、測定工程において測定した、屋根の穴あき破損部分を含む穴あき補修範囲に応じて、下地シートを切断して作製する。下地シートは、屋根における穴あき破損部分の位置や大きさにより適宜設定して切断されるものであるが、少なくとも屋根の穴あき破損部分を含む大きさに切断されるものであり、屋根の破損部分以外に、下地シートを屋根に取り付ける部分を含めて切断される。
Next, since the repair sheet manufacturing step (S2) and the repair sheet attaching step (S3) are the same steps as described above, the base sheet manufacturing step (S4) will be described.
The base sheet manufacturing step is a step of manufacturing a base sheet cut to a size corresponding to the perforated repair range. That is, it is produced by cutting the base sheet according to the perforated repair range including the perforated damaged portion of the roof measured in the measuring step. The base sheet is appropriately set and cut according to the position and size of the perforated damaged portion on the roof, but is cut to a size including at least the perforated damaged portion of the roof, and the roof is damaged. In addition to the part, the part including the part where the base sheet is attached to the roof is cut.

続いて、下地シート取付工程(S5)について説明する。
下地シート取付工程は、屋根の穴あき破損部分に下地シートを取り付ける工程である。下地シートは、後述する発泡材料を吹き付けるための基材となり、また、発泡材料の屋根への付着を防止すると共に、発泡体の取り外しを容易とする。
Subsequently, the base sheet attaching step (S5) will be described.
The base sheet attaching step is a step of attaching the base sheet to the perforated damaged portion of the roof. The base sheet serves as a base material for spraying the foam material described later, prevents the foam material from adhering to the roof, and facilitates the removal of the foam.

下地シートは、下地シート本体のみからなるものであってもよいが、補強シートを備えていることが好ましい。
下地シート本体の材質としては、屋根の穴あき破損部分に形成された穴を塞ぐことができ、後述する発泡材の屋根への付着を防止することができる材料からなるものであれば特に制限されるものではなく、例えば、合成樹脂、ゴム、金属等の材料を挙げることができ、耐水性、軽量性、及び加工容易性に優れる点から、合成樹脂が好ましい。
The base sheet may be composed of only the base sheet main body, but it is preferable that the base sheet is provided with a reinforcing sheet.
The material of the base sheet body is particularly limited as long as it is made of a material that can close the holes formed in the perforated damaged portion of the roof and prevent the foaming material described later from adhering to the roof. However, for example, materials such as synthetic resin, rubber, and metal can be mentioned, and synthetic resin is preferable from the viewpoint of excellent water resistance, light weight, and ease of processing.

下地シート本体は、薄く広い形状のものであり、網目を有することが好ましい。これにより、折り畳んで持ち運んだり、丸めて持ち運ぶなど運搬が容易となり、また、軽量であるため、屋根の上でも容易かつ安全に作業ができる。 The base sheet body has a thin and wide shape, and preferably has a mesh. This makes it easy to carry by folding or rolling, and because it is lightweight, it is possible to work easily and safely even on the roof.

下地シート本体の厚さとしては、0.05〜3.0mmであることが好ましく、0.1〜1.5mmであることがより好ましい。網目サイズとしては、1辺が、0.1mm〜5mmであることが好ましく、0.5mm〜2.5mmであることがより好ましい。これにより、軽量であり、運搬や作業が容易になると共に、発泡材料の屋根への付着を防止することができる。 The thickness of the base sheet body is preferably 0.05 to 3.0 mm, more preferably 0.1 to 1.5 mm. The mesh size is preferably 0.1 mm to 5 mm on one side, and more preferably 0.5 mm to 2.5 mm. As a result, it is lightweight, easy to carry and work, and can prevent the foam material from adhering to the roof.

補強シートの材質としては、下地シート本体の強度を補強する材料からなるものであれば特に制限されるものではなく、好ましくは、下地シート本体よりも強固な材料からなる。例えば、合成樹脂、ゴム、金属の材料を挙げることができ、耐水性、軽量性、及び加工容易性に優れる点から、合成樹脂が好ましい。 The material of the reinforcing sheet is not particularly limited as long as it is made of a material that reinforces the strength of the base sheet main body, and is preferably made of a material that is stronger than the base sheet main body. For example, synthetic resin, rubber, and metal materials can be mentioned, and synthetic resin is preferable from the viewpoint of excellent water resistance, light weight, and ease of processing.

補強シートは、薄く広い形状のものであり、網目を有することが好ましい。これにより、折り畳んで持ち運んだり、丸めて持ち運ぶなど運搬が容易となり、また、軽量であるため、屋根の上でも容易かつ安全に作業ができる。 The reinforcing sheet has a thin and wide shape, and preferably has a mesh. This makes it easy to carry by folding or rolling, and because it is lightweight, it is possible to work easily and safely even on the roof.

補強シートの厚さとしては、1.0〜10.0mmであることが好ましく、2.0〜5.0mmであることがより好ましい。網目サイズとしては、1辺が、1.0mm〜50mmであることが好ましく、5.0mm〜30mmであることがより好ましい。これにより、軽量であると共に、下地シート本体を補強することができ、例えば、屋根の穴あき破損部分に、作業者が誤って手をつくなど、作業員が体重をかけた場合にも支えることができ、より高い安全性を担保することができる。 The thickness of the reinforcing sheet is preferably 1.0 to 10.0 mm, more preferably 2.0 to 5.0 mm. The mesh size is preferably 1.0 mm to 50 mm on one side, and more preferably 5.0 mm to 30 mm. As a result, it is lightweight and can reinforce the base sheet body. For example, it can be supported even when the worker puts his / her weight on the damaged part of the roof, such as when the worker accidentally touches the hole. And higher safety can be guaranteed.

下地シートが補強シートを備える場合、屋根の穴あき破損部分に補強シートを取り付けた後、その上に下地シート本体を取り付けてもよいし、屋根の穴あき破損部分に下地シート本体を取り付けた後、その上に補強シートを取り付けてもよいが、本発明の下地シート取付工程においては、屋根の穴あき破損部分に下地シート本体を取り付けた後、その上に補強シートを取り付けることが好ましい。これにより、下地シートの上に取り付けた発泡体の破断を防止することができる。 When the base sheet is provided with a reinforcing sheet, the base sheet body may be mounted on the perforated damaged part of the roof after the reinforcing sheet is attached, or after the base sheet body is attached to the perforated damaged part of the roof. Although a reinforcing sheet may be attached on the base sheet, in the base sheet attaching step of the present invention, it is preferable to attach the base sheet main body to the perforated damaged portion of the roof and then attach the reinforcing sheet on the base sheet main body. This makes it possible to prevent the foam mounted on the base sheet from breaking.

下地シートの屋根の穴あき破損部分への取付方法としては、下地シートを取り付けることができる方法であれば特に制限されるものではなく、例えば、接着剤、針等の固定具を用いた取付方法を挙げることができ、針を用いた取付方法が好ましい。具体的には、屋根の穴あき破損部分を覆った下地シートを、屋根材が無く屋根の屋根基材が露出した箇所に、タッカーを用いて針を打ち付けて取り付ける方法を用いることができる。 The method of attaching the base sheet to the perforated and damaged portion of the roof is not particularly limited as long as the base sheet can be attached. For example, an attachment method using a fixture such as an adhesive or a needle. The mounting method using a needle is preferable. Specifically, a method can be used in which a base sheet covering a perforated and damaged portion of the roof is attached by hitting a needle with a tacker at a portion where there is no roofing material and the roof base material of the roof is exposed.

また、下地シート作製工程において、下地シートに、屋根に取り付けるための目印を付すことが好ましい。目印を付す箇所としては、通常、屋根の穴あき補修範囲の周囲のいずれかの位置である。例えば、下地シートの上下、左右等の対向する2つの端部の少なくとも一方に目印を付すことが好ましい。複数箇所に目印を設ける場合は、少なくも1つ以上異なる目印を付すことが好ましい。目印としては、例えば、1つの点であってもよいが、線や2つの点など、取付方向が把握しやすいものが好ましい。 Further, in the process of producing the base sheet, it is preferable to add a mark for attaching to the roof to the base sheet. The place to be marked is usually any position around the perforated repair area of the roof. For example, it is preferable to mark at least one of two opposing ends of the base sheet, such as top and bottom, left and right. When markings are provided at a plurality of locations, it is preferable to mark at least one different mark. The mark may be, for example, one point, but a line, two points, or the like, which makes it easy to grasp the mounting direction, is preferable.

また、上記測定工程において、無人航空機により、屋根にマーキングを施した場合には、下地シートに、マーキングと同一の目印を付すことが好ましく、具体的に例えば、マーキング装置により屋根の穴あき補修範囲の一方側に2つの丸印を付すと共に、他方側に1つの丸印を付した場合、下地シートにおいて屋根の穴あき補修範囲の一方側に2つの丸印を付すと共に、他方側に1つの丸印を付せば、同じ目印を合わせるだけで位置合わせができることから、下地シートの取付方向を把握することができ、確実かつ容易に取り付けることができる。 Further, in the above measurement step, when the roof is marked by an unmanned aerial vehicle, it is preferable to give the same mark as the marking on the base sheet. Specifically, for example, the range of repairing holes in the roof by a marking device. When two circles are attached to one side and one circle is attached to the other side, two circles are attached to one side of the perforated repair range of the roof on the base sheet and one is attached to the other side. If a circle is attached, the alignment can be performed simply by aligning the same marks, so that the mounting direction of the base sheet can be grasped, and the base sheet can be mounted reliably and easily.

次に、発泡体設置工程(S6)について説明する。
発泡体設置工程は、屋根の穴あき破損部分に取り付けられた下地シートの上に発泡材料を吹き付けて、下地シート上に発泡体を設置する工程である。これにより、補修シートを取り付けた際に、屋根の防水性、断熱性、遮音性、及び気密性を高くすることができる。また、あらかじめ成形した発泡体を屋根に設置するのではなく、屋根の上で吹き付けて発泡体を成形して設置するため、事前のサイズ調整が不要で作業が煩雑にならず、正確なサイズ調整が可能である。さらに、1人でも作業を行うことができる。
Next, the foam installation step (S6) will be described.
The foam installation step is a step of spraying a foam material on a base sheet attached to a perforated damaged portion of the roof to install the foam on the base sheet. As a result, when the repair sheet is attached, the waterproofness, heat insulation, sound insulation, and airtightness of the roof can be improved. In addition, instead of installing the pre-molded foam on the roof, the foam is molded and installed by spraying it on the roof, so there is no need to adjust the size in advance and the work is not complicated, and accurate size adjustment. Is possible. Furthermore, even one person can perform the work.

発泡材料は、屋根の穴あき破損部分に取り付けられた下地シートの上に、発泡体を形成できる材料であれば特に制限されるものではなく、合成樹脂発泡材料やゴム発泡材料を挙げることができる。合成樹脂材料としては、例えば、アクリル系樹脂発泡材料、ポリウレタン系樹脂発泡材料、ポリスチレン系樹脂発泡材料、フェノール系樹脂発泡材料、ポリ塩化ビニル系樹脂発泡材料、ポリオレフィン系樹脂発泡材料等を挙げることができる。また、ゴム発泡材料としては、例えば、ウレタンゴム系発泡材料、エチレンプロピレンゴム系発泡材料、アクリルゴム系発泡材料、シリコンゴム系発泡材料、フッ素ゴム系発泡材料等を挙げることができる。 The foam material is not particularly limited as long as it can form a foam on the base sheet attached to the perforated damaged portion of the roof, and examples thereof include synthetic resin foam materials and rubber foam materials. .. Examples of the synthetic resin material include an acrylic resin foam material, a polyurethane resin foam material, a polystyrene resin foam material, a phenol resin foam material, a polyvinyl chloride resin foam material, a polyolefin resin foam material, and the like. it can. Examples of the rubber foam material include urethane rubber-based foam material, ethylene propylene rubber-based foam material, acrylic rubber-based foam material, silicon rubber-based foam material, fluororubber-based foam material, and the like.

発泡材料の吹き付け方法としては、特に制限されるものではなく、発泡材料の吹き付けに通常用いられる方法を採用することができ、例えば、吹付ガン、スプレーガン、エアブラシ等の吹き付け装置を用いた吹き付け方法を採用することができる。 The method of spraying the foamed material is not particularly limited, and a method usually used for spraying the foamed material can be adopted. For example, a spraying method using a spraying device such as a spraying gun, a spray gun, or an airbrush. Can be adopted.

発泡体の硬さとしては、硬質、半硬質、軟質のいずれであってもよいが、耐久性を有する点で、硬質が好ましい。本発明の発泡体は、断熱性、遮音性及び耐久性に優れる点で、発泡硬質ウレタンが好ましい。 The hardness of the foam may be hard, semi-hard, or soft, but hard is preferable in terms of durability. The foam of the present invention is preferably foamed hard urethane because it is excellent in heat insulation, sound insulation and durability.

なお、本発明の屋根補修工法は、上記のように、屋根の穴あき破損部分に、下地シート、及び発泡材料吹き付けによる発泡体を取り付けることが好ましいが、屋根の穴あき破損部分に、屋根基材の代わりとなる下地材を設置してもよい。下地材としては、断熱効果及び/又は防音効果を有する板状のものが好ましい。 In the roof repair method of the present invention, as described above, it is preferable to attach the base sheet and the foam by spraying the foam material to the perforated damaged portion of the roof, but the roof base is attached to the perforated damaged portion of the roof. A base material may be installed instead of the material. As the base material, a plate-like material having a heat insulating effect and / or a soundproofing effect is preferable.

本発明の屋根補修工法においては、破損した屋根が瓦構造の屋根である場合、測定工程において、無人航空機を用いて屋根の破損部分の葺き替えが必要な瓦の数を計測することが好ましい。これにより、瓦屋根の葺き替えの際に必要な瓦の数を把握でき、瓦屋根の葺き替え前に予め葺き替え用の瓦を準備することができる。 In the roof repair method of the present invention, when the damaged roof is a roof with a roof tile structure, it is preferable to measure the number of roof tiles that need to be re-roofed at the damaged part of the roof by using an unmanned aerial vehicle in the measurement process. As a result, the number of tiles required for re-roofing the tiled roof can be grasped, and tiles for re-roofing can be prepared in advance before re-roofing the tiled roof.

本発明の屋根補修工法の測定工程において、瓦の数を測定する場合、屋根補修工法に続いて、瓦屋根の葺き替えを行い、瓦屋根の改修を行うことができる。 When measuring the number of roof tiles in the measuring step of the roof repair method of the present invention, the tiled roof can be re-roofed and the tiled roof can be repaired following the roof repair method.

すなわち、本発明の瓦屋根改修方法は、上記屋根補修工法と、瓦屋根葺替工法とを備えた瓦屋根改修方法であって、瓦屋根葺替工法が、屋根補修工法において計測した葺き替えが必要な数の瓦を作製する瓦作製工程と、屋根補修工法において取り付けられた補修シートを取り外す取外工程と、取外工程において補修シートが取り外された屋根に、瓦作製工程において作製された瓦を取り付ける瓦取付工程と、を有する。
これにより、屋根の葺き替え作業において、あらかじめ測定工程に計測した瓦の数に基づいて作製した瓦を用いることができ、必要な瓦を計測する手間が省けて作業時間の短縮化を図ることができる。
That is, the tile roof repair method of the present invention is a tile roof repair method including the above roof repair method and the tile roof re-roofing method, and the number of tile roof re-roofing methods that require re-roofing measured in the roof repair method. A roof tile manufacturing process for manufacturing roof tiles, a removal process for removing the repair sheet attached in the roof repair method, and a roof tile for which the roof tile produced in the roof tile manufacturing process is attached to the roof from which the repair sheet was removed in the removal process. It has a mounting process.
As a result, in the roof re-roofing work, it is possible to use roof tiles manufactured based on the number of roof tiles measured in advance in the measurement process, and it is possible to save the trouble of measuring the required roof tiles and shorten the work time. ..

なお、屋根の補修において、下地シートや発泡材料(発泡体)を用いた場合は、取外工程において、下地シート及び発泡体を取り外す。 When a base sheet or foam material (foam) is used for roof repair, the base sheet and foam are removed in the removal process.

本発明の瓦屋根葺替工法及び屋根補修工法においては、測定工程において、無人航空機を用いて測定した、補修範囲や葺き替えが必要な瓦の数などの測定データを、一軒ごとにナンバリングすると共に、クラウド、データサーバ、USBフラッシュメモリ等の記憶媒体に保存することができる。また、補修シート作製工程及び下地シート作製工程において作製された補修シート等のサイズや色等の作製データを、上記測定データに紐づけして記憶媒体に保存し管理することができる。また、各取付工程において、必要に応じて撮影及び記録される作業の進捗を示した画像や映像の画像データを、上記測定データ及びシート作製データに紐づけして記憶媒体に保存し管理することができる。 In the roof tile replacement method and roof repair method of the present invention, measurement data such as the repair range and the number of roof tiles that need to be re-roofed, which are measured by using an unmanned aerial vehicle, are numbered for each house in the measurement process. It can be saved in a storage medium such as a cloud, a data server, or a USB flash memory. Further, the production data such as the size and color of the repair sheet produced in the repair sheet production step and the base sheet production step can be stored and managed in the storage medium in association with the measurement data. In addition, in each mounting process, image data of images and videos showing the progress of the work to be photographed and recorded as necessary shall be stored and managed in a storage medium in association with the above measurement data and sheet preparation data. Can be done.

上記のように各工程におけるデータを記録媒体に保存し管理する場合、各データは、保存した記憶媒体を通じて、補修シート等の作製を行うシート業者、屋根の補修を行う施工業者、運送業者、瓦製造業者、葺き替え業者等の各関係各社に共有される。これにより、補修及び葺き替えにおけるすべてのデータを一元管理でき、測定工程から作製工程、作製工程から取付工程など、工程間の移行をスムーズに行うことができる。また、作製された補修シート等の材料を補修現場に同じタイミングで搬入することや、管理業者などの各関係者が進捗状況を共有することができるなど、効率よく作業を進めることができる。 When the data in each process is stored and managed in a recording medium as described above, each data is stored in a sheet supplier who manufactures repair sheets, etc., a contractor who repairs the roof, a carrier, and a roof tile through the stored storage medium. It is shared by related companies such as manufacturers and re-roofing companies. As a result, all the data in repair and re-roofing can be centrally managed, and the transition between processes such as the measurement process to the manufacturing process and the manufacturing process to the mounting process can be smoothly performed. In addition, the produced materials such as repair sheets can be delivered to the repair site at the same timing, and the progress can be shared by each related party such as a management company, so that the work can be carried out efficiently.

以下、本発明を実施例により具体的に説明するが、本発明の範囲はこれに限定されるものではない。 Hereinafter, the present invention will be specifically described with reference to Examples, but the scope of the present invention is not limited thereto.

ここで、図3は、本発明の一実施形態に係る穴あき破損部分を有する屋根の屋根補修工法における測定工程の説明図である。図4は、本発明の測定工程におけるドローンを用いてマーキングされた屋根の概略平面図である。図5は、本発明の一実施形態に係る屋根補修工法における(A)補修シート作製工程、及び(B)下地シート作製工程の説明図である。図6は、本発明の一実施形態に係る屋根補修工法における下地シート取付工程の説明図であり、下地シート本体を屋根に取り付けた状態を示す概略平面図である。図7は、本発明の一実施形態に係る屋根補修工法における下地シート取付工程の説明図であり、補強シートを屋根に取り付けた状態を示す概略平面図である。図8は、本発明の一実施形態に係る屋根補修工法における発泡体設置工程の説明図であり、発泡硬質ウレタンを設置した状態を示す概略平面図である。 Here, FIG. 3 is an explanatory diagram of a measurement process in a roof repair method for a roof having a perforated damaged portion according to an embodiment of the present invention. FIG. 4 is a schematic plan view of a roof marked with a drone in the measurement process of the present invention. FIG. 5 is an explanatory view of (A) a repair sheet manufacturing process and (B) a base sheet manufacturing process in the roof repair method according to the embodiment of the present invention. FIG. 6 is an explanatory view of a base sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the base sheet main body is attached to the roof. FIG. 7 is an explanatory view of a base sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the reinforcing sheet is attached to the roof. FIG. 8 is an explanatory view of a foam installation process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which foamed rigid urethane is installed.

図9は、本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に巻き付けて固定した状態を示す概略平面図である。図10は、本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、(A)は図9におけるA−A線中央拡大断面図、(B)は図9におけるB−B線中央拡大断面図を示す。図11は、本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に固定金具を用いて固定した状態を示す概略平面図である。図12は、本発明の補修シート取付工程における固定金具を示す説明図である。図13は、本発明の補修シート取付工程における固定金具の装着前の状態を示す概略図である。図14は、本発明の補修シート取付工程における固定金具の装着後の状態を示す概略図である。図15は、本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根に防水テープを用いて固定した状態を示す概略平面図である。図16は、本発明の一実施形態に係る屋根補修工法における補修シート取付工程の説明図であり、補修シートを屋根にコーキング剤を用いて固定した状態を示す概略平面図である。図17は、本発明の補修シート取付工程における防水テープ及びコーキング剤による固定を示す概略図である。 FIG. 9 is an explanatory view of a repair sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the repair sheet is wound around the roof and fixed. 10A and 10B are explanatory views of a repair sheet attaching process in the roof repair method according to the embodiment of the present invention, FIG. 10A is an enlarged cross-sectional view taken along the line AA in FIG. 9, and FIG. 10B is B in FIG. -B line central enlarged cross-sectional view is shown. FIG. 11 is an explanatory view of a repair sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the repair sheet is fixed to the roof by using a fixing bracket. FIG. 12 is an explanatory view showing a fixing bracket in the repair sheet mounting process of the present invention. FIG. 13 is a schematic view showing a state before mounting the fixing bracket in the repair sheet mounting process of the present invention. FIG. 14 is a schematic view showing a state after mounting the fixing bracket in the repair sheet mounting process of the present invention. FIG. 15 is an explanatory view of a repair sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the repair sheet is fixed to the roof with a waterproof tape. FIG. 16 is an explanatory view of a repair sheet attaching process in the roof repair method according to the embodiment of the present invention, and is a schematic plan view showing a state in which the repair sheet is fixed to the roof with a caulking agent. FIG. 17 is a schematic view showing fixing with a waterproof tape and a caulking agent in the repair sheet attaching process of the present invention.

図3に示すように、まず、建築物10の破損した瓦構造の屋根の破損部分12を含む補修範囲を、無人航空機としてのドローン14を用いて測定する(測定工程)。屋根の破損部分12は、屋根材としての瓦16が無く、瓦16の下に敷かれた、防水シート18や野地板20等の屋根基材22が露出している下地材露出破損部分24と、瓦16と共に屋根基材22が無く、屋根基材22に穴が形成され、垂木26が露出している穴あき破損部分28である。また、ドローン14は、マーキング装置30及びカメラ32を備えている。 As shown in FIG. 3, first, the repair range including the damaged portion 12 of the roof of the damaged tile structure of the building 10 is measured using the drone 14 as an unmanned aerial vehicle (measurement step). The damaged portion 12 of the roof has no tile 16 as a roofing material, and is a base material exposed damaged portion 24 laid under the roof tile 16 on which the roof base material 22 such as the waterproof sheet 18 and the field board 20 is exposed. , There is no roof base material 22 together with the roof tile 16, and a hole is formed in the roof base material 22, and the rafter 26 is exposed. Further, the drone 14 includes a marking device 30 and a camera 32.

図4に示すように、ドローン14は、マーキング装置30を用いて、屋根の補修範囲(補修範囲全体)、屋根の穴あき補修範囲、屋根の頂部(棟)、屋根の下端部(軒先)、屋根の側端部(破風)に、塗料でマーキング34a〜34iを付ける。なお、マーキングの形状は、特に制限されない。続けて、ドローン14は、カメラ32を用いて、マーキングされた屋根の撮影を行い、屋根の破損部分12を含む補修範囲及び屋根の穴あき補修範囲を測定する。 As shown in FIG. 4, the drone 14 uses the marking device 30 to repair the roof (the entire repair range), the perforated repair range of the roof, the top of the roof (building), the lower end of the roof (the eaves), and the like. Marking 34a to 34i with paint is attached to the side edge (gable) of the roof. The shape of the marking is not particularly limited. Subsequently, the drone 14 uses the camera 32 to take a picture of the marked roof, and measures the repair range including the damaged portion 12 of the roof and the perforated repair range of the roof.

次に、図5(A)に示すように、測定工程において測定した補修範囲に応じた大きさに切断した補修シート36を作製する(補修シート作製工程)。また、図5(B)に示すように、測定工程において測定した穴あき補修範囲に応じた大きさに切断した下地シート38(下地シート本体40、補強シート42)を作製する。なお、図5中、2点鎖線は、屋根の平面図を表す想像線である。 Next, as shown in FIG. 5A, a repair sheet 36 cut into a size corresponding to the repair range measured in the measurement step is produced (repair sheet production step). Further, as shown in FIG. 5B, a base sheet 38 (base sheet main body 40, reinforcing sheet 42) cut to a size corresponding to the perforated repair range measured in the measurement step is produced. In FIG. 5, the two-dot chain line is an imaginary line representing a plan view of the roof.

図5(A)に示すように、補修シート36を、屋根の破損部分12に近い屋根の下端部44及び側端部46に巻き付け可能な大きさに切断すると共に、屋根の破損部分12から屋根の頂部(棟)48を越えた反対側の斜面の屋根に取り付け可能な大きさに切断する。補修シート36は、建築物10又は瓦16の色に合わせて着色したものを採用することができる。 As shown in FIG. 5A, the repair sheet 36 is cut into a size that can be wrapped around the lower end portion 44 and the side end portion 46 of the roof close to the damaged portion 12 of the roof, and the roof is cut from the damaged portion 12 of the roof to the roof. Cut to a size that can be attached to the roof on the opposite slope beyond the top (ridge) 48 of the building. As the repair sheet 36, one colored according to the color of the building 10 or the roof tile 16 can be adopted.

図5(B)に示すように、下地シート38(下地シート本体40、補強シート42)を、測定工程において測定した、屋根の穴あき破損部分28を含む穴あき補修範囲に応じて、下地シートを切断する。 As shown in FIG. 5B, the base sheet 38 (base sheet main body 40, reinforcing sheet 42) is measured according to the perforated repair range including the perforated damaged portion 28 of the roof measured in the measurement process. To disconnect.

補修シート36には、屋根の補修範囲の角(34a,34b,34g,34i)、頂部48の両端(34c,34d)に相当する位置に、目印50a〜50fを付す。各目印50は、対応するマーキング34と同一の目印を付す。 Marks 50a to 50f are attached to the repair sheet 36 at positions corresponding to the corners (34a, 34b, 34g, 34i) of the roof repair range and both ends (34c, 34d) of the top 48. Each mark 50 has the same mark as the corresponding marking 34.

下地シート38には、穴開き補修範囲の角(34e,34f,34h,34i)に相当する位置に、目印52a〜52dを付す。各目印52は、対応するマーキング34と同一の目印を付す。 Marks 52a to 52d are attached to the base sheet 38 at positions corresponding to the corners (34e, 34f, 34h, 34i) of the perforated repair range. Each mark 52 has the same mark as the corresponding marking 34.

続いて、図6及び7に示すように、屋根の穴あき破損部分28に下地シート38(下地シート本体40、補強シート42)を取り付ける(下地シート取付工程)。 Subsequently, as shown in FIGS. 6 and 7, the base sheet 38 (base sheet main body 40, reinforcing sheet 42) is attached to the perforated damaged portion 28 of the roof (base sheet attaching step).

図6に示すように、下地シート本体40を、屋根の穴あき破損部分28に取り付けると共に、破損部分12の野地板18及び垂木26に、タッカーを用いて複数の針を打ち付けて取り付ける。 As shown in FIG. 6, the base sheet main body 40 is attached to the perforated damaged portion 28 of the roof, and is attached to the field board 18 and the rafters 26 of the damaged portion 12 by striking a plurality of needles using a tacker.

図7に示すように、屋根の穴あき破損部分28に下地シート本体40を取り付けた後、下地シート本体40の上に補強シート42を取り付けると共に、破損部分12の野地板18及び垂木26、並びに屋根の下端部及び側端部の下側(裏側)に、タッカーを用いて複数の針を打ち付けて取り付ける。 As shown in FIG. 7, after the base sheet main body 40 is attached to the perforated damaged portion 28 of the roof, the reinforcing sheet 42 is attached on the base sheet main body 40, and the field plate 18 and the rafters 26 of the damaged portion 12 and the rafters 26 are attached. A plurality of needles are struck and attached to the lower end and the lower side (back side) of the side edge of the roof using a tacker.

続いて、図8に示すように、下地シート本体40の上に補強シート42を取り付けた後、補強シート42の上に発泡材料としての発泡硬質ウレタンの原液を、吹付ガンを用いて吹き付けて、発泡体としての発泡硬質ウレタン54を設置する(発泡体設置工程)。 Subsequently, as shown in FIG. 8, after mounting the reinforcing sheet 42 on the base sheet main body 40, a stock solution of foamed hard urethane as a foaming material is sprayed onto the reinforcing sheet 42 using a spray gun. The foamed rigid urethane 54 as a foam is installed (foam installation step).

続いて、図9に示すように、発泡硬質ウレタン54の上に補修シート36を取り付ける(補修シート取付工程)。補修シート36を、屋根の破損部分12に近い屋根の下端部44及び側端部46に補修シート36を巻き付けて固定する。この際、補修シート36に付された目印50c,50dを目安とし、屋根の頂部34c,34dに位置を合わせて取り付ける。 Subsequently, as shown in FIG. 9, the repair sheet 36 is mounted on the foamed rigid urethane 54 (repair sheet mounting step). The repair sheet 36 is fixed by winding the repair sheet 36 around the lower end portion 44 and the side end portion 46 of the roof near the damaged portion 12 of the roof. At this time, using the marks 50c and 50d attached to the repair sheet 36 as a guide, the roof tops 34c and 34d are aligned and attached.

図10(A)に示すように、瓦16や、防水シート18及び野地板20等の屋根基材22が無い穴あき破損部分28においては、垂木26の上に、下地シート本体40、補強シート42、発泡硬質ウレタン54、補修シート36を順に積み重ねて取り付ける。また、補修シート36を、屋根の破損部分12から屋根の頂部48を越え、反対側の斜面の頂部48から2枚目の瓦16aの下端を越える範囲に取り付ける。 As shown in FIG. 10A, in the perforated damaged portion 28 without the roof tile 16, the waterproof sheet 18, the field board 20, and the like, the base sheet main body 40 and the reinforcing sheet are placed on the rafters 26. 42, foamed rigid urethane 54, and repair sheet 36 are stacked and attached in this order. Further, the repair sheet 36 is attached in a range from the damaged portion 12 of the roof beyond the top 48 of the roof and from the top 48 of the opposite slope beyond the lower end of the second roof tile 16a.

図10(B)に示すように、補修シート36を取り付けた屋根の瓦16がある部分においては、瓦16や頂部48に沿って補修シート36を取り付ける。 As shown in FIG. 10B, the repair sheet 36 is attached along the roof tile 16 and the top 48 in the portion where the roof tile 16 to which the repair sheet 36 is attached is located.

図11に示すように、補修シート36は、固定金具56を用いて屋根に固定される。 As shown in FIG. 11, the repair sheet 36 is fixed to the roof using the fixing bracket 56.

図12〜14に示すように、固定金具56は、上瓦16A及び下瓦16Bが重なり合う間隙に補修シート36を貫通して挿入される瓦間挿入部58と、瓦間挿入部58の上方に位置し、上瓦16Aの上の補修シート36を押さえる上瓦押さえ部60とを有し、瓦間挿入部58及び上瓦押さえ部60が連結部を介して連結された、横向きU字状又はコ字状に形成された上瓦固定部62と、上瓦固定部62の瓦間挿入部58の反対側に設けられた、下瓦16Bの上の補修シート36を押さえる下瓦押さえ部64とを備えている。瓦間挿入部58は、先端が鋭角に形成された棒状部材である。 As shown in FIGS. 12 to 14, the fixing bracket 56 is inserted above the inter-tile insertion portion 58 and the inter-tile insertion portion 58, which are inserted through the repair sheet 36 into the gap where the upper tile 16A and the lower tile 16B overlap. A sideways U-shape or having an upper tile holding portion 60 that is located and holds the repair sheet 36 on the upper tile 16A, and the inter-tile insertion portion 58 and the upper tile holding portion 60 are connected via a connecting portion. The upper tile fixing portion 62 formed in a U shape and the lower tile holding portion 64 for holding the repair sheet 36 on the lower tile 16B provided on the opposite side of the tile-to-tile insertion portion 58 of the upper tile fixing portion 62. It has. The inter-tile insertion portion 58 is a rod-shaped member having an acute-angled tip.

図13及び14に示すように、屋根の瓦16に沿って配置された補修シート36の上から、固定金具56の瓦間挿入部58を上瓦16A及び下瓦16Bが重なり合う間隙に補修シート36を介して(貫通して)挿入することで、補修シート36を屋根に固定する。 As shown in FIGS. 13 and 14, from above the repair sheet 36 arranged along the roof tile 16, the inter-tile insertion portion 58 of the fixing bracket 56 is inserted into the gap where the upper tile 16A and the lower tile 16B overlap. The repair sheet 36 is fixed to the roof by inserting (penetrating) through.

続いて、図15に示すように、屋根及び補修シート36の境界部分に形成される孔や間隙を、防水テープ66を用いてシールし、補修シート36を屋根に固定する。 Subsequently, as shown in FIG. 15, the holes and gaps formed at the boundary between the roof and the repair sheet 36 are sealed with the waterproof tape 66, and the repair sheet 36 is fixed to the roof.

さらに、図16に示すように、コーキングガンを用いてコーキング剤68を塗布してシールする。 Further, as shown in FIG. 16, a caulking agent 68 is applied and sealed using a caulking gun.

図17に示すように、さらに、コーキング剤68を、瓦16が重なり合い生じる段差70や、固定金具56を装着のために形成された孔72などの補修シート36の防水テープ66を貼りづらい箇所に塗布し、シールする。 As shown in FIG. 17, the caulking agent 68 is further applied to places where it is difficult to attach the waterproof tape 66 of the repair sheet 36 such as the step 70 formed by overlapping the roof tiles 16 and the hole 72 formed for mounting the fixing bracket 56. Apply and seal.

以上のように、本発明の工法によれば、建築物の破損した屋根の補修を容易かつ適切に行うことができる。また、補修箇所は、耐久性に優れる。 As described above, according to the construction method of the present invention, it is possible to easily and appropriately repair a damaged roof of a building. In addition, the repaired part has excellent durability.

本発明の屋根補修工法は、建築物の破損した屋根を耐久性に優れる屋根に補修することができ、例えば、台風被災地における建築物の補修に用いることできることから、産業上有用である。 The roof repair method of the present invention is industrially useful because it can repair a damaged roof of a building to a roof having excellent durability, and can be used, for example, for repairing a building in a typhoon-stricken area.

10 建築物
12 破損部分
14 ドローン
16 瓦
18 防水シート
20 野地板
22 屋根基材
24 下地材露出部分
26 垂木
28 穴あき破損部分
30 マーキング装置
32 カメラ
34 マーキング
36 補修シート
38 下地シート
40 下地シート本体
42 補強シート
44 下端部
46 側端部
48 頂部
50 目印
52 目印
54 発泡硬質ウレタン
56 固定金具
58 瓦間挿入部
60 上瓦押さえ部
62 上瓦固定部
64 下瓦押さえ部
66 防水テープ
68 コーキング剤
70 段差
72 孔

10 Building 12 Damaged part 14 Drone 16 Roof tile 18 Waterproof sheet 20 Field board 22 Roof base material 24 Base material exposed part 26 Rafters 28 Perforated damaged part 30 Marking device 32 Camera 34 Marking 36 Repair sheet 38 Base sheet 40 Base sheet body 42 Reinforcing sheet 44 Lower end 46 Side end 48 Top 50 Mark 52 Mark 54 Foamed hard urethane 56 Fixing bracket 58 Inter-tile insertion part 60 Upper tile holding part 62 Upper tile fixing part 64 Lower tile holding part 66 Waterproof tape 68 Caulking agent 70 Step 72 holes

Claims (15)

建築物の破損した屋根を補修シートで覆って屋根の補修を行う屋根補修工法であって、
前記屋根の破損部分を含む補修範囲を、無人航空機を用いて測定する測定工程と、
前記補修範囲に応じた大きさに切断した補修シートを作製する補修シート作製工程と、
前記屋根の破損部分に前記補修シートを取り付ける補修シート取付工程と、
を有することを特徴とする屋根補修工法。
It is a roof repair method that repairs the roof by covering the damaged roof of the building with a repair sheet.
A measurement process for measuring the repair range including the damaged part of the roof using an unmanned aerial vehicle, and
A repair sheet manufacturing process for producing a repair sheet cut to a size corresponding to the repair range, and a repair sheet manufacturing process.
The repair sheet attaching process of attaching the repair sheet to the damaged part of the roof, and
A roof repair method characterized by having.
屋根基材が破損した穴あき破損部分を有する屋根を補修する方法であって、
前記測定工程が、さらに、屋根の穴あき破損部分を含む穴あき補修範囲を測定する工程であり、
前記補修シート取付工程の前に、
前記穴あき補修範囲に応じた大きさに切断した下地シートを作製する下地シート作製工程と、
前記屋根の穴あき破損部分に前記下地シートを取り付ける下地シート取付工程と、
前記下地シートの上に発泡材料を吹き付けて、該下地シート上に発泡体を設置する発泡体設置工程と、
を有することを特徴とする請求項1記載の屋根補修工法。
It is a method of repairing a roof that has a perforated damaged part where the roof base material is damaged.
The measurement step is a step of further measuring the perforated repair range including the perforated damaged portion of the roof.
Before the repair sheet mounting process,
A base sheet manufacturing process for manufacturing a base sheet cut to a size corresponding to the perforated repair range, and
The base sheet mounting process for mounting the base sheet on the perforated damaged portion of the roof, and
A foam installation step of spraying a foam material on the base sheet and installing the foam on the base sheet,
The roof repair method according to claim 1, wherein the roof repair method is characterized by having.
前記補修シート作製工程において、屋根の破損部分に近い屋根の下端部及び/又は側端部に巻き付け可能な大きさの補修シートを作製すると共に、前記補修シート取付工程において、屋根の破損部分に近い屋根の下端部及び/又は側端部に補修シートを巻き付けて固定することを特徴とする請求項1又は2記載の屋根補修方法。 In the repair sheet manufacturing step, a repair sheet having a size that can be wound around the lower end portion and / or the side end portion of the roof near the damaged portion of the roof is manufactured, and in the repair sheet attaching step, the repair sheet is close to the damaged portion of the roof. The roof repair method according to claim 1 or 2, wherein the repair sheet is wound around the lower end portion and / or the side end portion of the roof and fixed. 前記補修シート作製工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に取り付け可能な大きさの補修シートを作製すると共に、前記補修シート取付工程において、屋根の破損部分から屋根の頂部を越えた反対側の斜面の屋根に補修シートを取り付けることを特徴とする請求項1〜3のいずれか記載の屋根補修工法。 In the repair sheet manufacturing process, a repair sheet having a size that can be attached to the roof on the opposite slope beyond the top of the roof from the damaged part of the roof is produced, and in the repair sheet attaching process, from the damaged part of the roof. The roof repair method according to any one of claims 1 to 3, wherein the repair sheet is attached to the roof on the opposite slope beyond the top of the roof. 前記補修シート作製工程において、補修シートの屋根の頂部に相当する位置に、目印を付すことを特徴とする請求項4記載の屋根補修工法。 The roof repair method according to claim 4, wherein in the repair sheet manufacturing step, a mark is attached to a position corresponding to the top of the roof of the repair sheet. 前記補修シート取付工程において、固定金具を用いて補修シートを屋根に固定することを特徴とする請求項1〜5のいずれか記載の屋根補修工法。 The roof repair method according to any one of claims 1 to 5, wherein the repair sheet is fixed to the roof by using a fixing bracket in the repair sheet attaching step. 前記補修シート取付工程において、防水テープ及び/又はコーキング剤を用いて補修シートを屋根に固定することを特徴とする請求項1〜6のいずれか記載の屋根補修工法。 The roof repair method according to any one of claims 1 to 6, wherein the repair sheet is fixed to the roof by using a waterproof tape and / or a caulking agent in the repair sheet attaching step. 前記下地シートが、網目を有する下地シート本体を備えていることを特徴とする請求項2〜7のいずれか記載の屋根補修工法。 The roof repair method according to any one of claims 2 to 7, wherein the base sheet includes a base sheet main body having a mesh. 前記下地シートが、さらに、補強シートを備えていることを特徴とする請求項8記載の屋根補修工法。 The roof repair method according to claim 8, wherein the base sheet further includes a reinforcing sheet. 前記補強シートが、網目を有する補強シートであることを特徴とする請求項9記載の屋根補修工法。 The roof repair method according to claim 9, wherein the reinforcing sheet is a reinforcing sheet having a mesh. 前記下地シート取付工程において、屋根の穴あき破損部分に下地シート本体を取り付けた後、該下地シート本体の上に補強シートを取り付けることを特徴とする請求項9又は10記載の屋根補修工法。 The roof repair method according to claim 9 or 10, wherein in the base sheet attaching step, a base sheet main body is attached to a perforated damaged portion of the roof, and then a reinforcing sheet is attached onto the base sheet main body. 前記発泡体が、発泡硬質ウレタンであることを特徴とする請求項2〜11のいずれか記載の屋根補修工法。 The roof repair method according to any one of claims 2 to 11, wherein the foam is foamed hard urethane. 前記補修シートが、エステル帆布シート又はターポリン帆布シートであることを特徴とする請求項1〜12のいずれか記載の屋根補修工法。 The roof repair method according to any one of claims 1 to 12, wherein the repair sheet is an ester canvas sheet or a tarpaulin canvas sheet. 前記破損した屋根が瓦構造の屋根であって、
前記測定工程において、無人航空機を用いて屋根の破損部分の葺き替えが必要な瓦の数を計測することを特徴とする請求項1〜13のいずれか記載の屋根補修工法。
The damaged roof is a tiled roof,
The roof repair method according to any one of claims 1 to 13, wherein in the measuring step, an unmanned aerial vehicle is used to measure the number of roof tiles that need to be re-roofed at a damaged portion of the roof.
請求項14記載の屋根補修工法と、瓦屋根葺替工法とを備えた瓦屋根改修方法であって、
前記瓦屋根葺替工法が、
前記屋根補修工法において計測した葺き替えが必要な数の瓦を作製する瓦作製工程と、
前記屋根補修工法において取り付けられた補修シートを取り外す取外工程と、
前記取外工程において補修シートが取り外された屋根に、前記瓦作製工程において作製された瓦を取り付ける瓦取付工程と、
を有することを特徴とする瓦屋根改修方法。

A tile roof repair method including the roof repair method according to claim 14 and the tile roof replacement method.
The tiled roof replacement method
The roof tile manufacturing process for producing the number of roof tiles that need to be re-roofed as measured in the roof repair method, and
The removal process for removing the repair sheet attached in the roof repair method, and
A roof tile mounting step of attaching the roof tile produced in the roof tile manufacturing step to the roof from which the repair sheet was removed in the roofing step, and a roof tile mounting step.
A tiled roof repair method characterized by having.

JP2019234358A 2019-12-25 2019-12-25 Roof repair method Pending JP2021102873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019234358A JP2021102873A (en) 2019-12-25 2019-12-25 Roof repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019234358A JP2021102873A (en) 2019-12-25 2019-12-25 Roof repair method

Publications (1)

Publication Number Publication Date
JP2021102873A true JP2021102873A (en) 2021-07-15

Family

ID=76755615

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019234358A Pending JP2021102873A (en) 2019-12-25 2019-12-25 Roof repair method

Country Status (1)

Country Link
JP (1) JP2021102873A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024034599A1 (en) * 2022-08-10 2024-02-15 恵和株式会社 Roof repair method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024034599A1 (en) * 2022-08-10 2024-02-15 恵和株式会社 Roof repair method

Similar Documents

Publication Publication Date Title
AU2021104661A4 (en) Heat Shrink Covering of Built Structures and Method
CA2530558C (en) Fastener-free composite roofing product
US11168484B2 (en) Roof and wall cover system
US20070199276A1 (en) Self-seal ring for roofing nail
US20180347195A1 (en) Roofing system and method
JP2021102873A (en) Roof repair method
US11927017B2 (en) Roofing system and method
US20230358062A1 (en) Roof and wall cover system
AU2009200232A1 (en) Vented Roof Cover System
JP5981061B1 (en) Wing support material having an opening and method of using the same
MX2008003674A (en) Roofing system and method.
JP2007070877A (en) Construction method of waterproofing sheet in corner section of building
US4397129A (en) Resurfacing construction
CN104264911A (en) Laying method of asphalt tile
JP2000129867A (en) Waterproof sheet with projection and its waterproof method
US11555318B2 (en) Roof cover system improvement
JP3059155U (en) Waterproof sheet with protrusion
JP2002339524A (en) Roof board with lap margin
JP5395339B2 (en) Surface material and surface finishing method
JP2017115351A (en) Lower roof sheet
JPH10196067A (en) Waterproofing construction method
JP2019190255A (en) Flat plate slate roof material
JP2000336861A (en) Waterproof construction method
JPH1193341A (en) Incombustible holed waterproof sheet and waterproofing
GB2416367A (en) Roof Sunshade