JP2021076565A5 - - Google Patents

Download PDF

Info

Publication number
JP2021076565A5
JP2021076565A5 JP2019217474A JP2019217474A JP2021076565A5 JP 2021076565 A5 JP2021076565 A5 JP 2021076565A5 JP 2019217474 A JP2019217474 A JP 2019217474A JP 2019217474 A JP2019217474 A JP 2019217474A JP 2021076565 A5 JP2021076565 A5 JP 2021076565A5
Authority
JP
Japan
Prior art keywords
rainfall
dam
prediction
resolution
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019217474A
Other languages
English (en)
Other versions
JP2021076565A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2019217474A priority Critical patent/JP2021076565A/ja
Priority claimed from JP2019217474A external-priority patent/JP2021076565A/ja
Publication of JP2021076565A publication Critical patent/JP2021076565A/ja
Publication of JP2021076565A5 publication Critical patent/JP2021076565A5/ja
Pending legal-status Critical Current

Links

Images

Description

高解像度モデルが数時間先の小規模な豪雨を鋭敏に捉えるが位置ずれや時間ずれが発生する事例の図である。(局地モデル(LFM)の特性と利用上の留意点について気象庁 平成25年11月)を引用し一部改変 低(中)解像度モデルによる降雨予測値から内挿によって細密化された降雨予測の格子間隔と高解像度モデルによる予測値の格子間隔6の説明図及び内挿方法の概念図である。 内挿方法の概念図である。 低(中)解像度モデルによる降雨予測値から内挿によって細密化された降雨予測の格子間隔と高解像度モデルによる予測値(その内挿値を含む)の格子間隔6の説明図及び内挿方法の概念図である。 内挿格子間隔の細密度によるダム流域範囲の表現誤差により降雨予測波形にずれが生じる。 高解像度予測値(その内挿値を含む)の波形5と内挿で得られた低(中)解像度予測値の波形5との位相、周期等1、2、3、4の相関有無を判定する照合メソッドの説明図である。波形5は予測初期時刻から数時間先迄の各1時間降雨量を表す折れ線グラフを近似して得られる曲線の波形をいう。 上記[図7]の実施例(2018年7月愛媛県肱川流域の野村ダム及び鹿野川ダムの事例)である。流域降雨量の高低解像度の予測波形の相関係数を推定する。(国交省四国地方整備局作成資料(より効果的なダム操作について国交省四国地方整備局平成30年9月14日8〜9頁)を引用し一部改変 高解像度(格子間隔1〜5km)と低解像度(格子間隔20km)降雨予測モデルによる降雨予測を比較した事例である。小規模な雨域の表現に差がある。(近年の降雨予測技術を活用したダム操作について 松ケ平ほか:平成28年度水源地環境技術研究所所報2頁図4を引用し一部改変 低解像度モデルによるダム流域の降雨予測精度の推定に使用した事例[図12]北上川ダム洪水予測システム改良について図2「国交省北上川ダム統合管理事務所平成30年6月 重茂ほかを引用し一部改変[図13]平成30年7月豪雨:ダム洪水調節効果と異常洪水時防災操作の課題「京都大学防災研究所角哲也」消防防災の科学2019春21頁図3を引用し一部改変 低解像度モデル(GSM)による降雨予測値の実測値との相関係数をリードタイム(予測時間)で表す事例である。(土木学会論文集B1(水工学)Vol.69,No.4,I_367−I_372,2013.松原ほか図7を引用し一部改変 GSMを初期値・境界値とするダム流域雨量のアンサンブル予測事例(アンサンブル予測雨量を活用したダム洪水調節手法「国交省国土技術政策総合研究所猪股ほか土木技術資料28頁」56−2(2014)図2を引用し一部改変 豪雨数時間前におけるピーク予測時間帯の高・低解像度波形の相関度評価(例示) 時系列データX.Yの相関係数(r)の事例 予測降雨波形相関係数(正の相関)の読み方 n次の内挿により高・低(中)解像度降雨予測波形の相関係数が累次増加するメカニズム(ダム流域イメージ) ダム事務所のGSMは過小予測ではあるが豪雨の生起から終息迄の時間帯を捉えている。(GSMは概ね実雨量と相関がある。)国交省四国地方整備局作成資料(より効果的なダム操作について国交省四国地方整備局平成30年9月14日8〜9頁)を引用し一部改変 2018.7野村・鹿野川ダム実降雨量〜GSM相関図及び相関係数 国交省四国地方整備局作成資料(より効果的なダム操作について国交省四国地方整備局平成30年9月14日8〜9頁)を引用し一部改変 実績雨量とRSM(GSM20km格子間隔の前モデル)の降雨波形の相関事例(早明浦ダム流域2004.8.30)(降雨予測技術を活用したダム洪水調節操作の高度化 国土技術政策総合研究所気候変動対応本部河川研究部水資源研究室 平成21年7月13頁)を引用し一部改変
JP2019217474A 2019-11-13 2019-11-13 低(中)解像度モデルによる降雨予測値の内挿(補間)値及び高解像度モデルの降雨予測値(内挿値含む)波形の相関に基づくダム流域に於ける数時間先の高精度な降雨予測値を得る方法(メソッド) Pending JP2021076565A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019217474A JP2021076565A (ja) 2019-11-13 2019-11-13 低(中)解像度モデルによる降雨予測値の内挿(補間)値及び高解像度モデルの降雨予測値(内挿値含む)波形の相関に基づくダム流域に於ける数時間先の高精度な降雨予測値を得る方法(メソッド)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019217474A JP2021076565A (ja) 2019-11-13 2019-11-13 低(中)解像度モデルによる降雨予測値の内挿(補間)値及び高解像度モデルの降雨予測値(内挿値含む)波形の相関に基づくダム流域に於ける数時間先の高精度な降雨予測値を得る方法(メソッド)

Publications (2)

Publication Number Publication Date
JP2021076565A JP2021076565A (ja) 2021-05-20
JP2021076565A5 true JP2021076565A5 (ja) 2021-09-09

Family

ID=75898628

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019217474A Pending JP2021076565A (ja) 2019-11-13 2019-11-13 低(中)解像度モデルによる降雨予測値の内挿(補間)値及び高解像度モデルの降雨予測値(内挿値含む)波形の相関に基づくダム流域に於ける数時間先の高精度な降雨予測値を得る方法(メソッド)

Country Status (1)

Country Link
JP (1) JP2021076565A (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114580275B (zh) * 2022-02-23 2024-04-12 中国人民解放军63796部队 一种基于卫星遥感和探空廓线的积雨云监测方法
CN114997534B (zh) * 2022-07-29 2022-10-21 长江水利委员会水文局 基于视觉特征的相似降雨预报方法和设备

Similar Documents

Publication Publication Date Title
Lu et al. Water discharge and sediment flux changes over the past decades in the Lower Mekong River: possible impacts of the Chinese dams
Carniello et al. Modeling sand-mud transport induced by tidal currents and wind waves in shallow microtidal basins: Application to the Venice Lagoon (Italy)
Hitz et al. Application of ash (Fraxinus excelsior L.) roots to determine erosion rates in mountain torrents
JP2021076565A5 (ja)
Tajima et al. Study on locally varying inundation characteristics induced by super Typhoon Haiyan. Part 1: Dynamic behavior of storm surge and waves around San Pedro Bay
Winterwerp et al. SPM response to tide and river flow in the hyper-turbid Ems River
Jothiprakash et al. Re-look to conventional techniques for trapping efficiency estimation of a reservoir
Morin et al. Storm surge hazard in Manila Bay: Typhoon Nesat (Pedring) and the SW monsoon
Adegbola et al. Historical rainfall-runoff modeling of river Ogunpa, Ibadan, Nigeria
Lucas-Borja et al. The use of check dams for soil restoration at watershed level: A century of history and perspectives
Chadwick et al. A new analysis of the Slapton barrier beach system, UK
Zhang et al. Modelling of medium-term (decadal) coastal foredune morphodynamics-historical hindcast and future scenarios of the świna gate barrier coast (southern Baltic Sea)
Sarker Impact of upstream human interventions on the morphology of the Ganges-Gorai system
JP2021076565A (ja) 低(中)解像度モデルによる降雨予測値の内挿(補間)値及び高解像度モデルの降雨予測値(内挿値含む)波形の相関に基づくダム流域に於ける数時間先の高精度な降雨予測値を得る方法(メソッド)
Zhang et al. An examination of estuary stability in response to human interventions in the South Branch of the Yangtze (Changjiang) estuary, China
Sarker et al. Formation and dynamics of coastal chars in Bangladesh
Steijn et al. Extreme coastal dynamics of Sittaung estuary (Myanmar)
VAN HETEREN et al. Evidence and implications of middle-to late-Holocene shoreface steepening offshore the western Netherlands
Foyle et al. Reduced sediment export to the Pennsylvania Lake Erie littoral zone during an era of average lake levels
Ikeda et al. Study of prediction methods of debris-flow peak discharge
Brennan et al. Continuous prediction of clay‐bed stream erosion in response to climate model output for a small urban watershed
Drake et al. Cliff recession and behaviour studies, Hunstanton, UK
Kirkpatrick et al. Interactions, mechanisms and impact of future coastal urban flooding. A case study of Cork city
Benson et al. Erosion-deposition prone assessment along the Kelantan and Terengganu coasts due to sea level rise
Brocchini et al. Wave-Forced Dynamics at Microtidal River Mouths